SU1253736A1 - Installation for pressure sintering - Google Patents
Installation for pressure sintering Download PDFInfo
- Publication number
- SU1253736A1 SU1253736A1 SU853839498A SU3839498A SU1253736A1 SU 1253736 A1 SU1253736 A1 SU 1253736A1 SU 853839498 A SU853839498 A SU 853839498A SU 3839498 A SU3839498 A SU 3839498A SU 1253736 A1 SU1253736 A1 SU 1253736A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- loading
- muffle
- trolleys
- installation
- rollers
- Prior art date
Links
- 238000009434 installation Methods 0.000 title description 11
- 238000005245 sintering Methods 0.000 title description 4
- 239000007789 gas Substances 0.000 description 5
- 230000001681 protective effect Effects 0.000 description 3
- 239000011261 inert gas Substances 0.000 description 2
- 239000002783 friction material Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000004663 powder metallurgy Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Tunnel Furnaces (AREA)
Description
Изобретение относитс к порошковой металлургии, в частности к установкам дл спекани заготовок, например фрикционнь х материалов, под давлением в защитной атмосфере.The invention relates to powder metallurgy, in particular, installations for sintering blanks, for example friction materials, under pressure in a protective atmosphere.
Целью изобретени вл етс сокращение количества операций при загрузке и выгрузке заготовок, повышение надежности работы и снижение тепловых потерь.The aim of the invention is to reduce the number of operations when loading and unloading blanks, improving reliability and reducing heat losses.
На фиг. 1 изображена установка в рабочем положении,продольный разрез;на фиг 2 -разрез А-А на фиг. (перехватывающее устройство) ;на фиг.З - разрез Б-Б на фи 1(шлюзовый отсек,поперечный разрез) ;на фиг.4 -разрез В-Вна фиг. 1 (узел фиксации пакетов заготовок) .FIG. 1 shows the installation in the working position, a longitudinal section; FIG. 2 is a section A-A in FIG. (interceptor device); FIG. 3 is a section B-B on phi 1 (airlock compartment, cross section); FIG. 4 is a section of B-B of FIG. 1 (block fixation package blanks).
Установка дл спекани под давлением содержит камеру загрузки, включающую шлюзовой отсек с тележкой 1, котора выполнена заодно с крышкой 2, соединенный со штоком гидроцилиндра толкатель 3, шибер 4 и рабочую камеру 5, в нижней части которой установлен гидроцилиндр давлени 6, Над рабочей камерой 5 расположена печь с муфелем 7, в нижней части Которого смонтирован узел фиксации пакетов, состо щий из двух пар раздвижных поворотных ползунов 8, кажда из которых соединена с приводом . За муфелем 7 соосно ему установлен теплообменник 9, представл ющий собой металлический стакан с футерованной газовой рубашкой, образующей кольцевую полость. В верхней части теплообменник снабжен входным патрубком , а в нижней части внутренней стенки предусмотрены направленные отверсти дл выхода нагретого защитного газа во внутреннюю полость м уфел печи, Вьше теплообменника расположен вод ной холодильник 10, над которым установлен механизм захвата пакетов, выполненный в виде двух групп выдвижных валков 11, расположенных друг против друга во втулках с возможностью вращени и соединенных с гидроцилиндром. Над холодильником смонтирована камера выгрузки включающа шлюзовой отсек, аналогичный пшюзовому отсеку камеры загрузки с тележкой 12 и крышкой 13, шибер 14 и рабочую камеру 15, в верхней части которой расположен упор 16, который крепитс к силовой раме установки. Камера снабжена толкателем 17. В установку загружают пакеты 18.A pressure sintering unit contains a loading chamber comprising an airlock compartment with a carriage 1, which is integral with a lid 2, connected to a hydraulic cylinder rod, a pusher 3, a gate valve 4 and a working chamber 5, at the bottom of which a pressure cylinder 6 is installed. a furnace with a muffle 7 is located, in the lower part of which a package fixing unit is assembled, consisting of two pairs of sliding swivel sliders 8, each of which is connected to a drive. A heat exchanger 9 is mounted coaxially behind the muffle 7, which is a metal cup with a lined gas jacket forming an annular cavity. In the upper part, the heat exchanger is provided with an inlet nozzle, and in the lower part of the inner wall, there are directional openings for the heated protective gas to enter the internal cavity of the furnace tube. Above the heat exchanger is a water cooler 10, over which the bag trapping mechanism is installed. rolls 11 arranged against each other in sleeves rotatably and connected to the hydraulic cylinder. Above the refrigerator, an unloading chamber is mounted including an airlock compartment, similar to a pseudo compartment of a loading chamber with a carriage 12 and a lid 13, a gate 14 and a working chamber 15, in the upper part of which there is a stop 16 which is attached to the power frame of the installation. The camera is equipped with a pusher 17. Packs 18 are loaded into the installation.
5five
00
5five
Установка работает след тощим образом .The installation works in a skinny manner.
Пакет 18 устанавливают на ролики 19 тележки 1. Тележку с пакетомPackage 18 set on rollers 19 trolleys 1. Cart with package
ввод т в шлюзовой отсек, при этом уплотнение обеспечиваетс гтрижатием крышки 2 к корпусу отсека штоком 20 гидроцилиндра привода тележки. Затем пшюзовой отсек продувают инертным газом, открывают заслонку шибера 4, и толкатель 3 перемещает пакет по рольгангу камеры загрузки и устанавливает его над штоком гидроцилиндра давлени 6, после чего возвращаетс в исходное положение. Закрываетс заслонка шибера 4, Затем шток гид- роцклиндра 6 перемещаетс вверх, прижима столб пакетов к упору 16; осуществл етс цикл спекани под давлением , В установке посто нно поддерживаетс избыточное давление защитного газа, который подаетс через входной патрубок теплообменника 9 в газовую рубашку последнего, проход через которую, газ нагреваетс и через направленные отверсти во внутренней стенке теплообменника поступает во внутреннюю полость установки. После окончани цикла работы установки срабатывают механизм захвата пакетов и узел фиксации пакетов. При этом выдвигаютс валки 11 (фиг.З) и сдвигаютс ползуны 8, занима рабочее Положение. После этого шток гидроцилиндра 6 перемещаетс вниз, опуска столб пакетов; при этом верхний пакет подхватываетс под основание валками 11 механизма захвата и отдел етс от столба пакетов, которьй далее перемещаетс вниз и устанавливаетс на ползуны В узла фиксации пакетов . Затем открываетс заслонка шибера 14, и толкатель 17 перемещает пакет с валков t1 механизма захватаis inserted into the airlock compartment, while the seal is ensured by pressing the cover 2 to the compartment case by the rod 20 of the trolley drive hydraulic cylinder. Then the bore compartment is flushed with an inert gas, the flap of the gate 4 is opened, and the pusher 3 moves the bag along the loading chamber bedside table and sets it over the pressure cylinder 6, then returns to its original position. The damper of the gate 4 is closed. Then the rod of the hydraulic cylinder 6 moves upward, pressing the stack of packages against the stop 16; A pressure sintering cycle is carried out. The installation continuously maintains an overpressure of protective gas which is supplied through the inlet of the heat exchanger 9 to the gas jacket of the latter, the passage through which the gas heats up and enters the internal cavity of the installation through directional holes in the internal wall of the heat exchanger. After the installation cycle ends, the packet capture mechanism and the packet fixing node are activated. In this case, the rollers 11 (fig. 3) are advanced and the sliders 8 are shifted to occupy the working position. After that, the rod of the hydraulic cylinder 6 is moved down, lowering the column of packages; in this case, the upper bag is picked up under the base by the rollers 11 of the locking mechanism and is separated from the bag column, which then moves down and is placed on the slides B of the bag fixing unit. Then the flap of the gate 14 opens, and the pusher 17 moves the bag from the rolls t1 of the locking mechanism
5 на ролики 21 тележки 12, образующие с валками 11 общий рольганг, и возвращаетс в исходное положение. Валки 1 1 и ползуны 8 также возвращаютс в исходное положение, и закрьгеа0 етс заслонка шибера 14. Производитс продувка шлюзового отсека камеры выгрузки инертным газом, после чего открываетс крышка 13, вывод тележку 12с выгружаемым пакетом из шлю55 зового отсека камеры выгрузки.5 to the rollers 21 of the carriage 12, which form with the rollers 11 a common roller conveyor, and returns to its original position. The rollers 1 1 and the slide blocks 8 also return to their original position, and the gate of the gate 14 is closed. The airlock chamber of the discharge chamber is purged with an inert gas, after which the cover 13 opens and the trolley 12c is discharged from the discharge chamber of the discharge chamber.
Цикл повтор етс загрузкой очередного пакета.The cycle is repeated by loading the next packet.
00
5five
00
312537364312537364
Предлагаема установка обеспечива-дво|Чном ходе штока основного гидроет сокращение количества операций прицилиндра давлени . Надежность работыThe proposed installation provides a double stroke of the main hydraulic rod reducing the number of operations of the pressure cylinder. Reliability
загрузке и выгрузке заготовок с 30устанобки повышаетс в результате сни (в известной установке) до 24 . Прижени в 1 ,5 раза перепада тe mepaтyp поloading and unloading the workpieces from a 30-piece boom increases as a result of lowering (in the known installation) to 24. Prizhi in 1, 5 times the drop of the terapatip
этом исключаетс необходимость в до- 5сечению пакета при его охлаждении,аthis eliminates the need to further cut the package when it is cooled, and
прлнительном гидроцилиндре давлени итепловые потери снижаютс в 2раза.The pressure hydraulic cylinder and the heat loss is reduced by a factor of 2.
тt
Фи.1Phi.1
Фиг.ЗFig.Z
Рабочее nojro- тение ползунобWorking slide
Редактор Т.ПарфеноваEditor T. Parfenova
Составитель А.Туманов Техред Л.СердюковаCompiled by A.Tumanov Tehred L. Serdyukova
Заказ 4665/15Тираж 757ПодписноеOrder 4665/15 Circulation 757 Subscription
ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee
по делам изобретений и открытий 113035, Москва, Ж-35, Раушска наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5
Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4
UZ.lfUz.lf
Корректор С,ЧерниCorrector C, Cherni
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU853839498A SU1253736A1 (en) | 1985-01-08 | 1985-01-08 | Installation for pressure sintering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU853839498A SU1253736A1 (en) | 1985-01-08 | 1985-01-08 | Installation for pressure sintering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1253736A1 true SU1253736A1 (en) | 1986-08-30 |
Family
ID=21156981
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU853839498A SU1253736A1 (en) | 1985-01-08 | 1985-01-08 | Installation for pressure sintering |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1253736A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2168130C2 (en) * | 1999-07-08 | 2001-05-27 | Тамов Мухадин Чашифович | Plant for manufacturing building parts |
-
1985
- 1985-01-08 SU SU853839498A patent/SU1253736A1/en active
Non-Patent Citations (1)
| Title |
|---|
| Авторское свидетельство СССР № 429248, кл. F 27 В 1/00, 1971. Авторское свидетельство СССР № 759234, кл. В 23 F 3/14, 1978. * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2168130C2 (en) * | 1999-07-08 | 2001-05-27 | Тамов Мухадин Чашифович | Plant for manufacturing building parts |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4518353A (en) | Vacuum sintering furnace | |
| US4741695A (en) | Walking beam type reheating furnace | |
| US4118016A (en) | Continuous heat treating vacuum furnace | |
| US20070212657A1 (en) | Change-over apparatus for cooling gas passages in vacuum heat treating furnace | |
| CN109579515A (en) | A kind of external-heat vacuum continuous fritting furnace | |
| SU1253736A1 (en) | Installation for pressure sintering | |
| JP2005016861A (en) | Cooling gas air path switching device for vacuum heat treatment furnace | |
| US4205935A (en) | Continuous heating furnace for the heat treatment of small parts | |
| US3782705A (en) | Continuously operated vacuum furnace having work part transfer conveyor and load and unload mechanism | |
| US3716222A (en) | Heating furnace | |
| JP2009132980A (en) | Continuous vacuum carburizing furnace | |
| SU759234A1 (en) | Plant for pressure sintering of powdered material workpiecies | |
| CA1125010A (en) | Continuous heat treating vacuum furnace | |
| US6113670A (en) | Twin chamber combustion furnace | |
| US4669939A (en) | Workpiece charger for heating furnace | |
| JP2009221552A (en) | Continuous vacuum heat treating furnace | |
| SU1038370A1 (en) | Universal electric furnace | |
| SU555147A1 (en) | Pass furnace for metal heating | |
| GB2026663A (en) | Continuous Heat Treating Vacuum Furnace | |
| CN116558285A (en) | Full-automatic vacuum hydrogen reduction device | |
| SU553046A1 (en) | Induction Furnace for Sintering Powder Products | |
| SU992977A1 (en) | Unit for vacuum heat treatment of elongated articles | |
| SU587307A1 (en) | Pusher-type electric furnace | |
| SU374378A1 (en) | FURNACE FOR HEAT TREATMENT OF PRODUCTS | |
| US4014443A (en) | Delivery device for heating furnaces |