RU2654906C2 - Method of reconstruction of barrow pits for building of cemetery - Google Patents

Method of reconstruction of barrow pits for building of cemetery Download PDF

Info

Publication number
RU2654906C2
RU2654906C2 RU2016144492A RU2016144492A RU2654906C2 RU 2654906 C2 RU2654906 C2 RU 2654906C2 RU 2016144492 A RU2016144492 A RU 2016144492A RU 2016144492 A RU2016144492 A RU 2016144492A RU 2654906 C2 RU2654906 C2 RU 2654906C2
Authority
RU
Russia
Prior art keywords
layer
mined
mixture consisting
thickness
quarry
Prior art date
Application number
RU2016144492A
Other languages
Russian (ru)
Other versions
RU2016144492A (en
RU2016144492A3 (en
Inventor
Олег Валентинович Болдырев
Василий Васильевич Мухортов
Валентина Витальевна Морозова
Татьяна Леонидовна Мухортова
Original Assignee
Общество с ограниченной ответственностью "Экологические Инновационные Технологии"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Экологические Инновационные Технологии" filed Critical Общество с ограниченной ответственностью "Экологические Инновационные Технологии"
Priority to RU2016144492A priority Critical patent/RU2654906C2/en
Publication of RU2016144492A publication Critical patent/RU2016144492A/en
Publication of RU2016144492A3 publication Critical patent/RU2016144492A3/ru
Application granted granted Critical
Publication of RU2654906C2 publication Critical patent/RU2654906C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Processing Of Solid Wastes (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

FIELD: mining.
SUBSTANCE: invention relates to technical reclamation of borrow cut remaining after mining of ragstone and other near-surface mineral deposits. Method includes resue stopping, transfer and storage in separate banded ettles of the soil layer and stripping soils, course of open-pit field, stowing mined-out space up to the boundary of the upper level of groundwater with building refuse that is close in composition to natural minerals with different thickness of fractions, lit-by-lit with the subsequent consolidation of each layer, laying drainage layer with building refuse, with the thickness of fractions of 150–200 mm. On top of the drainage layer, the intermediate layer is poured with building refuse with the thickness of fractions not more than 120 mm, until its upper limit reaches 1/2 the height of mined-out space of open-cast. Over the intermediate layer, the primary backfill of mined-out space of open-cast is made with a mixture consisting of mixed in equal proportions stripping solid, clay and crushed building refuse with thickness of fractions not more than 100 mm, and the backfill is made lit-by-lit with the thickness of each subsequent layer not more than 1 meter and the compaction of each layer. Backfill is carried out until the moment until the full filling of the mined-out space of open-cast remains at least 1.5 meters of its height, then the final backfill is produced in series in parallel rows, with the first row and all odd rows poured with a mixture consisting of mixed in equal proportions stripping solid and crushed building refuse with thickness of fractions not more than 80 mm, and the second row and all subsequent even rows are sprinkled with a mixture consisting of mixed in equal proportions of the soil layer and sandy loam, while the width of the even and odd rows should be not less than 4 meters, in addition, after the mined-out space of open-cast is fully filled, the entire area of the filled mined-out space is compacted and the layout is made with a bulldozer, after which they are sprinkled with a layer of a mixture consisting of sandy loam, soil mix and seeds of perennial herbs of meadow-weedy grass.
EFFECT: technical result is a reduction in the labor efforts of restoration work.
1 cl

Description

Изобретение относится к технической рекультивации карьерных выемок, остающихся после добычи строительного камня и других приповерхностных полезных ископаемых.The invention relates to the technical reclamation of quarries remaining after the extraction of building stone and other surface minerals.

Известен способ восстановления нарушенных земель при открытой разработке месторождений (1), выбранный в качестве прототипа, включает раздельную выемку, перемещение и складирование в отдельные ленточные отвалы почвенного слоя и вскрышных пород, выработку карьерного поля, закладку выработанного пространства до границы верхнего уровня грунтовых вод строительными отходами, близкими по своему составу к природным минералам, с различной крупностью фракций, послойно с последующим уплотнением каждого слоя, укладку дренирующего слоя строительными отходами с крупностью фракции 150-200 мм и отсыпку слоя плодородного грунта.A known method of restoring disturbed lands during open-pit mining of deposits (1), selected as a prototype, includes separate excavation, transfer and storage of soil layer and overburden into separate tape dumps, development of a quarry field, laying of worked out space to the boundary of the upper groundwater level with construction waste , similar in composition to natural minerals, with different particle sizes, layer by layer, followed by compaction of each layer, laying a drainage layer of a builder GOVERNMENTAL waste fractions with a particle size of 150-200 mm and dumping of fertile soil layers.

Недостатком известного способа является извлечение больших объемов почвы для создания плодородного слоя, что в свою очередь ведет к образованию больших площадей нарушенных земель, росту трудозатрат и значительному увеличению стоимости восстановительных работ.The disadvantage of this method is to extract large volumes of soil to create a fertile layer, which in turn leads to the formation of large areas of disturbed land, an increase in labor costs and a significant increase in the cost of restoration work.

Предлагаемое изобретение обеспечивает снижение трудозатрат и стоимости восстановительных работ, а также защищает почву от ветровой и водной эрозии. Для этого в способе восстановления выработанных карьеров для строительства кладбища, включающем раздельную выемку, перемещение и складирование почвенного слоя и вскрышных пород, выработку карьерного поля, закладку выработанного пространства до границы верхнего уровня грунтовых вод строительными отходами, близкими по своему составу к природным минералам, с различной крупностью фракций, послойно с последующим уплотнением каждого слоя, укладку дренирующего слоя строительными отходами с крупностью фракций 150-200 мм, согласно изобретению поверх дренирующего слоя отсыпают промежуточный слой строительными отходами с крупностью фракций не более 120 мм до того момента, пока его верхняя граница не достигнет 1/2 высоты выработанного пространства карьера, затем поверх промежуточного слоя производят засыпку выработанного пространства карьера смесью, состоящей из смешанных в равных пропорциях вскрышных пород, глины и измельченных строительных отходов с крупностью фракций не более 100 мм, причем засыпку производят послойно с толщиной каждого последующего слоя не менее 1 метра и уплотнением каждого слоя, при этом засыпку производят вплоть до того момента, пока до полного заполнения выработанного пространства карьера останется не менее 1,5 метров его высоты, затем окончательную засыпку производят последовательно параллельными рядами, причем первый ряд и все нечетные ряды отсыпают смесью, состоящей из смешанных в равных пропорциях вскрышных пород и измельченных строительных отходов крупностью не более 80 мм, а второй ряд и все последующие четные ряды отсыпают смесью, состоящей из смешанных в равных пропорциях почвенного слоя и супеси, при этом ширина четных и нечетных рядом должна быть не менее 4 метров, кроме того после полного заполнения выработанного пространства карьера всю площадь заполненного выработанного пространства карьера уплотняют и производят планировку бульдозером, после чего отсыпают слой толщиной 50-80 мм из смеси, состоящей из супеси, грунтосмеси и семян многолетних трав лугово-сорной травы.The present invention reduces labor costs and the cost of restoration work, and also protects the soil from wind and water erosion. To do this, in the method of restoring mined quarries for the construction of a cemetery, including separate excavation, moving and storing the soil layer and overburden, mining a quarry field, laying the mined space to the boundary of the upper groundwater level with construction waste that is similar in composition to natural minerals with different particle size, layer by layer, followed by compaction of each layer, laying the drainage layer with construction waste with a grain size of 150-200 mm, according to the invention the intermediate layer is poured over the drainage layer with construction waste with a grain size of not more than 120 mm until its upper boundary reaches 1/2 the height of the quarry mined space, then the quarry mined out is filled with a mixture of equal proportions over the intermediate layer overburden, clay and crushed construction waste with a grain size of not more than 100 mm, and backfill is done in layers with a thickness of each subsequent layer of at least 1 meter and each layer is taken away, in this case filling is carried out up to the moment when at least 1.5 meters of its height remains until the quarry mined-out is completely filled, then the final filling is carried out sequentially in parallel rows, and the first row and all odd rows are covered with a mixture consisting of mixed in equal proportions overburden and crushed building waste with a particle size of not more than 80 mm, and the second row and all subsequent even rows are sprinkled with a mixture consisting of soil mixed in equal proportions layer and sandy loam, while the width of the even and odd nearby should be at least 4 meters, in addition, after the quarry has been completely filled, the entire area of the quarry worked out is compacted and laid out with a bulldozer, after which a layer 50-80 mm thick is poured from the mixture consisting of sandy loam, soil mixture and seeds of perennial grasses of meadow-weed grass.

Внедрение данного технического решения снижает стоимость восстановительных работ за счет использования строительных отходов, образующихся в результате реконструкции, сломе и ремонте зданий и сооружений, а также отпадает необходимость извлечения больших объемов почвы для создания плодородного слоя. Учитывая то, что образующиеся строительные отходы вывозятся на полигоны захоронения бытовых и промышленных отходов, то внедрение данного изобретения позволит улучшить экологическую ситуацию и сократить существующий в Московском регионе дефицит земли. Использование смеси, состоящей из смешанных в равных пропорциях вскрышных пород глины и измельченных строительных отходов, для засыпки выработанного пространства карьера позволило получить в сочетании со слоем песка более легкий состав грунта, который способствует ускорению минерализации останков. Добавление супеси к смесям сводит к минимуму процесс усадки и образование неровностей. Данное техническое решение применимо для устройства мусульманских кладбищ.The implementation of this technical solution reduces the cost of restoration work through the use of construction waste resulting from the reconstruction, demolition and repair of buildings and structures, and there is no need to extract large volumes of soil to create a fertile layer. Considering that the generated construction waste is taken to landfills for household and industrial waste, the introduction of this invention will improve the environmental situation and reduce the existing land deficit in the Moscow region. The use of a mixture consisting of overburdened clay mixed in equal proportions and crushed building waste to fill the mined quarry space made it possible to obtain a lighter soil composition in combination with a layer of sand, which helps to accelerate the mineralization of the remains. Adding sandy loam to the mixes minimizes the shrinkage process and the formation of bumps. This technical solution is applicable for the construction of Muslim cemeteries.

Способ осуществляют следующим образом.The method is as follows.

Вначале производят раздельную выемку карьера, перемещение и складирование в отдельные ленточные отвалы почвенного слоя и вскрышных пород на свободных бортах карьера. Вначале на площади нарушенного участка выполняют планировочные работы. Планировку территории выполняют с приданием планируемой поверхности незначительного уклона в сторону общего понижения земной поверхности. Затем производят закладку выработанного пространства до границы верхнего уровня грунтовых вод строительными отходами, близкими по своему составу к природным минералам, с различной крупностью фракций, послойно с последующим уплотнением каждого слоя. При этом каждый уложенный слой уплотняют методом укатки уплотняющими машинами и механизмами. После чего производят укладку дренирующего слоя строительными отходами с крупностью фракций 150-200 мм. Дренирующий слой отсыпают послойно, каждый слой уплотняют. Поверх дренирующего слоя отсыпают промежуточный слой строительными отходами с крупностью фракции не более 100 мм. Отсыпку производят до того момента пока верхняя граница промежуточного слоя не достигнет 1/2 высоты выработанного пространства карьера. А поверх промежуточного слоя производят первичную засыпку выработанного пространства карьера смесью, состоящей из смешанных в равных пропорциях вскрышных пород, глины и измельченных строительных отходов, при этом крупность измельченных фракций строительных отходов не должна превышать 100 мм. Засыпку производят послойно вплоть до того момента, пока до полного заполнения выработанного пространства карьера останется не менее 1,5 метров его высоты. Толщина каждого последующего слоя должна быть не более одного метра. Каждый слой уплотняют методом укатки уплотняющими машинами и механизмами. После этого производят окончательную засыпку выработанного пространства карьера последовательно параллельными рядами, начиная с любого свободного края карьера. Первый ряд и все последующие нечетные отсыпают смесью, состоящей из смешанных в равных пропорциях вскрышных пород и измельченных строительных отходов крупностью не более 80 мм, а второй ряд и все последующие четные ряды отсыпают смесью, состоящей из смешанных в равных пропорциях почвенного слоя и супеси. Почвенный слой берут из ранее складированного бурта после раздельной выемки. Ширина четных и нечетных рядов должна быть не менее 4 метров. Четные и нечетные ряды отсыпают таким образом, чтобы они были непрерывными по длине и своими концами перекрывали противоположные борта карьера. После того, как таким образом будет заполнен весь объем выработанного пространства карьера, производят очередное уплотнение, а затем производят планировку бульдозером всей поверхности заполненного пространства выработанного карьера. Всю поверхность заполненного карьера отсыпают слоем из смеси, состоящей из супеси, грунтосмеси и семян многолетних трав лугово-сорной группы.Initially, a separate quarry is made, moving and storing into separate tape dumps of the soil layer and overburden on the free sides of the quarry. Initially, planning works are performed on the area of the disturbed site. Territory planning is carried out with the planned surface giving a slight slope towards a general lowering of the earth's surface. Then, the mined-out space is laid to the boundary of the upper groundwater level with construction waste that is close in composition to natural minerals, with different sizes of fractions, layer by layer, followed by compaction of each layer. In this case, each laid layer is compacted by rolling using sealing machines and mechanisms. After that, the drainage layer is laid with construction waste with a grain size of 150-200 mm. The drainage layer is poured in layers, each layer is compacted. An intermediate layer is poured over the drainage layer with construction waste with a grain size of not more than 100 mm. Dumping is carried out until the upper boundary of the intermediate layer reaches 1/2 the height of the mined quarry space. And on top of the intermediate layer, primary filling of the quarry mined-out space is made with a mixture consisting of overburden, clay and crushed building waste mixed in equal proportions, while the size of the crushed building waste fractions should not exceed 100 mm. Backfill is carried out in layers until the moment when until the mine is completely filled up, the quarry will have at least 1.5 meters of its height. The thickness of each subsequent layer should be no more than one meter. Each layer is sealed by rolling using sealing machines and mechanisms. After that, the final filling of the mined-out quarry space is carried out in successive parallel rows, starting from any free edge of the quarry. The first row and all subsequent odd ones are sprinkled with a mixture consisting of overburden mixed in equal proportions and crushed building waste with a particle size of not more than 80 mm, and the second row and all subsequent even rows are sprinkled with a mixture consisting of soil layer and sandy loam mixed in equal proportions. The soil layer is taken from a previously stored pile after separate excavation. The width of the even and odd rows should be at least 4 meters. Odd and even rows are filled in such a way that they are continuous in length and overlap opposite sides of the quarry with their ends. After the entire volume of the mined-out space of the quarry is thus filled, another compaction is made, and then the bulldozer plans the entire surface of the filled space of the mined-out quarry. The entire surface of the filled quarry is sprinkled with a layer of a mixture consisting of sandy loam, soil mixture and seeds of perennial grasses of the meadow-weed group.

В целях предотвращения деформации проведенных рекультивационных работ по закладке выработанного пространства карьера планировку поверхности проводят в два этапа. После нанесения последнего слоя дают временную выдержку не менее одного года. Временная выдержка может составлять и два года в зависимости от деформации поверхности выработанного пространства карьера. После окончания временной выдержки производят окончательную планировку и при необходимости дополнительную подсыпку. Затем ведут строительство дорог, ограждают всю площадь спланированной поверхности восстановленного карьера, предназначенного для устройства будущего кладбища. Возводят гидротехнические и мелиоративные сооружения. Все четные ряды спланированной поверхности будущего кладбища делят на участки для захоронения усопших, а нечетные ряды используют для устройства дорог и проходов между ними. Причем участки для захоронения усопших располагают таким образом, чтобы будущие могилы и надгробные памятники, расположенные на каждом из участков, были обращены в сторону Мекки. Данное техническое решение может быть применимо для устройства мусульманских кладбищ.In order to prevent deformation of the carried out remediation work on laying the mined-out quarry space, the surface layout is carried out in two stages. After applying the last layer give a temporary exposure of at least one year. Temporary exposure can be up to two years depending on the deformation of the surface of the mined quarry space. After the end of the temporary exposure, the final layout is made and, if necessary, additional backfill. Then they conduct road construction, enclose the entire area of the planned surface of the restored quarry, intended for the construction of a future cemetery. Hydraulic and land reclamation facilities are being erected. All the even rows of the planned surface of the future cemetery are divided into sections for the burial of the deceased, and the odd rows are used to arrange roads and passages between them. Moreover, the sites for the burial of the deceased are positioned so that future graves and tombstones located on each of the sites are facing Mecca. This technical solution may be applicable for the construction of Muslim cemeteries.

Источники информацииInformation sources

1. Патент России №2274749, кл. Е21С 41/32, 2006 г.1. Patent of Russia No. 2274749, cl. E21C 41/32, 2006

Claims (1)

Способ восстановления выработанных карьеров для строительства кладбища, включающий раздельную выемку, перемещение и складирование почвенного слоя и вскрышных пород, выработку карьерного поля, закладку выработанного пространства до границы верхнего уровня грунтовых вод строительными отходами, близкими по своему составу к природным минералам, с различной крупностью фракций, послойно с последующим уплотнением каждого слоя, укладку дренирующего слоя строительными отходами с крупностью фракций 150-200 мм, отличающийся тем, что поверх дренирующего слоя отсыпают промежуточный слой строительными отходами с крупностью фракций не более 120 мм до того момента, пока его верхняя граница не достигнет 1/2 высоты выработанного пространства карьера, затем поверх промежуточного слоя производят засыпку выработанного пространства карьера смесью, состоящей из смешанных в равных пропорциях вскрышных пород, глины и измельченных строительных отходов с крупностью фракций не более 100 мм, причем засыпку производят послойно с толщиной каждого последующего слоя не менее 1 метра и уплотнением каждого слоя, при этом засыпку производят вплоть до того момента, пока до полного заполнения выработанного пространства карьера останется не менее 1,5 метров его высоты, затем окончательную засыпку производят последовательно параллельными рядами, причем первый ряд и все нечетные ряды отсыпают смесью, состоящей из смешанных в равных пропорциях вскрышных пород и измельченных строительных отходов крупностью не более 80 мм, а второй ряд и все последующие четные ряды отсыпают смесью, состоящей из смешанных в равных пропорциях почвенного слоя и супеси, при этом ширина четных и нечетных рядом должна быть не менее 4 метров, кроме того после полного заполнения выработанного пространства карьера всю площадь заполненного выработанного пространства карьера уплотняют и производят планировку бульдозером, после чего отсыпают слоем из смеси, состоящей из супеси, грунтосмеси и семян многолетних трав лугово-сорной травы.A method for restoring mined quarries for the construction of a cemetery, including separate excavation, movement and storage of the soil layer and overburden, development of a quarry field, laying of the mined space to the boundary of the upper groundwater level with construction waste that is similar in composition to natural minerals, with different sizes of fractions, layer by layer, followed by compaction of each layer, laying of the drainage layer with construction waste with a grain size of 150-200 mm, characterized in that on top of the drain the intermediate layer is sprinkled with an intermediate layer with construction waste with a grain size of not more than 120 mm until its upper boundary reaches 1/2 of the height of the open pit space, then over the intermediate layer, the open pit space is filled with a mixture consisting of overburden mixed in equal proportions rocks, clay and crushed construction waste with a particle size of not more than 100 mm, and backfill is done in layers with a thickness of each subsequent layer of at least 1 meter and compaction of each of the layer, while filling is carried out up to the moment until at least 1.5 meters of its height remains until the quarry space is completely filled, then the final filling is carried out sequentially in parallel rows, and the first row and all odd rows are filled with a mixture consisting of mixed in equal proportions of overburden and crushed building waste with a particle size of not more than 80 mm, and the second row and all subsequent even rows are sprinkled with a mixture consisting of a mixed in equal proportions of the soil layer and su dogs, while the width of the even and odd nearby should be at least 4 meters, in addition, after the quarry has been completely filled, the entire area of the quarry worked out is compacted and laid out with a bulldozer, after which it is poured with a layer of a mixture consisting of sandy loam, soil mixture and seeds perennial grasses of meadow weed grass.
RU2016144492A 2016-11-14 2016-11-14 Method of reconstruction of barrow pits for building of cemetery RU2654906C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016144492A RU2654906C2 (en) 2016-11-14 2016-11-14 Method of reconstruction of barrow pits for building of cemetery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016144492A RU2654906C2 (en) 2016-11-14 2016-11-14 Method of reconstruction of barrow pits for building of cemetery

Publications (3)

Publication Number Publication Date
RU2016144492A RU2016144492A (en) 2018-05-14
RU2016144492A3 RU2016144492A3 (en) 2018-05-14
RU2654906C2 true RU2654906C2 (en) 2018-05-23

Family

ID=62151962

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016144492A RU2654906C2 (en) 2016-11-14 2016-11-14 Method of reconstruction of barrow pits for building of cemetery

Country Status (1)

Country Link
RU (1) RU2654906C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2719894C1 (en) * 2019-11-28 2020-04-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Башкирский государственный университет" Method of combining operations for extraction of minerals and restoration of lands during development of steep-dipping deposits
RU2846709C1 (en) * 2025-02-10 2025-09-12 Леонид Александрович Хилобок Method of recultivation of ash dump for construction of cemetery on it

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111788976A (en) * 2019-04-09 2020-10-20 沈阳中科生态环境研究院有限公司 Ecological restoration method for resource iron ore waste land

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2343617A1 (en) * 2001-04-10 2002-10-10 Gsi Environnement Inc. Recovery for the restoration of mining residue parks
RU2274749C1 (en) * 2005-04-15 2006-04-20 Общество с ограниченной ответственностью "Экостройресурс" Method for land reclamation in the case of land corruption by opened deposit development
RU96155U1 (en) * 2010-02-01 2010-07-20 Евгения Владимировна Селюнина DEVELOPMENT OF MULTI-LEVEL CEMETERY
RU2515012C1 (en) * 2013-03-28 2014-05-10 Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс" Method to restore barrow pits for construction of cemetery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2343617A1 (en) * 2001-04-10 2002-10-10 Gsi Environnement Inc. Recovery for the restoration of mining residue parks
RU2274749C1 (en) * 2005-04-15 2006-04-20 Общество с ограниченной ответственностью "Экостройресурс" Method for land reclamation in the case of land corruption by opened deposit development
RU96155U1 (en) * 2010-02-01 2010-07-20 Евгения Владимировна Селюнина DEVELOPMENT OF MULTI-LEVEL CEMETERY
RU2515012C1 (en) * 2013-03-28 2014-05-10 Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс" Method to restore barrow pits for construction of cemetery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2719894C1 (en) * 2019-11-28 2020-04-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Башкирский государственный университет" Method of combining operations for extraction of minerals and restoration of lands during development of steep-dipping deposits
RU2846709C1 (en) * 2025-02-10 2025-09-12 Леонид Александрович Хилобок Method of recultivation of ash dump for construction of cemetery on it

Also Published As

Publication number Publication date
RU2016144492A (en) 2018-05-14
RU2016144492A3 (en) 2018-05-14

Similar Documents

Publication Publication Date Title
RU2274749C1 (en) Method for land reclamation in the case of land corruption by opened deposit development
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN108222026B (en) Method for repairing small gangue dump of coal mine
CN108978385A (en) A kind of roadbed construction method on the road Tong Cun
Kleinhans et al. Guidelines for sinkhole and subsidence rehabilitation based on generic geological models of a dolomite environment on the East Rand, South Africa
RU2719894C1 (en) Method of combining operations for extraction of minerals and restoration of lands during development of steep-dipping deposits
CN108486976A (en) Mountain highway, which is filled out, digs intersection road structure and its construction method
SU1765400A1 (en) Method at sail mass reclamation during preparation of quarry sanitary-protection zone
RU2611749C1 (en) Recovery method of mined-out pits for construction of cemetery
RU2654906C2 (en) Method of reconstruction of barrow pits for building of cemetery
RU2529037C1 (en) Method to restore abandoned pits for construction of cemetery
RU2515012C1 (en) Method to restore barrow pits for construction of cemetery
RU2387837C1 (en) Method for recovery of exhausted open pits for construction of structures
RU2611750C1 (en) Method for recovery of exhausted open pits for construction of cemetry
RU2310755C1 (en) Method for worked-out pit reclamation
RU2274750C1 (en) Method for land reclamation in the case of land corruption by opened deposit development
Jiayin et al. Concept and Practice of Open-pit Mining Area Restoration and Reuse---Taking an Open-pit Coal Mining Area in Datong, Shanxi as an Example
RU2310756C1 (en) Method for exhausted pit reclamation
RU2448251C1 (en) Recovery method of mined-out pits for construction of cemetery-museum
RU2325534C1 (en) Method for mined land reclamation
RU2443865C1 (en) Method to recover abandoned pits
RU2448252C1 (en) Recovery method of mined-out pits for construction of cemetery-museum
RU2754753C1 (en) Method for reclamation of non-working sides of open pits
Munfakh Ground improvement in transportation projects: from old visions to innovative applications

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees