RU2039274C1 - Method for recultivation of open pits - Google Patents
Method for recultivation of open pits Download PDFInfo
- Publication number
- RU2039274C1 RU2039274C1 SU5056424A RU2039274C1 RU 2039274 C1 RU2039274 C1 RU 2039274C1 SU 5056424 A SU5056424 A SU 5056424A RU 2039274 C1 RU2039274 C1 RU 2039274C1
- Authority
- RU
- Russia
- Prior art keywords
- walls
- quarry
- longitudinal
- filled
- construction
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 14
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 239000002699 waste material Substances 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 claims description 8
- 230000002085 persistent effect Effects 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000004078 waterproofing Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 2
- 238000009423 ventilation Methods 0.000 claims description 2
- 238000004064 recycling Methods 0.000 claims 1
- 238000005065 mining Methods 0.000 abstract description 7
- 239000002689 soil Substances 0.000 abstract description 4
- 238000005192 partition Methods 0.000 abstract 2
- 239000000126 substance Substances 0.000 abstract 1
- 239000002440 industrial waste Substances 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009439 industrial construction Methods 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 241000566515 Nedra Species 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 235000013311 vegetables Nutrition 0.000 description 1
- 239000010878 waste rock Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 230000003245 working effect Effects 0.000 description 1
Images
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
Description
Изобретение относится к горному делу, преимущественно к открытым горным работам, и может быть использовано для технической рекультивации карьерных выемок или мертвых участков, остающихся после добычи строительного камня и других приповерхностных полезных ископаемых. The invention relates to mining, mainly to open cast mining, and can be used for technical reclamation of quarry excavations or dead sites remaining after the extraction of building stone and other surface minerals.
В современных условиях способ технической рекультивации карьера во многом зависит от направления дальнейшего использования восстанавливаемых земель (лесное, земледельческое, водное или специальное). При лесном и земледельческом направлениях наиболее простым способом рекультивации является заполнение чаш карьеров отходами производства, пустой породой с последующим нанесением на них и планировкой потенциально плодородного грунта и чернозема. Недостатками известных способов рекультивации в этом случае являются: значительные затраты времени и техники на восстановление земель; отходов производства, во многих случаях, недостаточно для заполнения чаши и их приходится доставлять к карьеру; закладываемые в выработанное пространство отходы производства содержат полезные компоненты, которые при соответствующем развитии техники и технологии их переработки, могли бы быть использованы в народном хозяйстве; ликвидируется возможность использования карьерной выемки для промышленного строительства и других целей. In modern conditions, the method of technical reclamation of a quarry largely depends on the direction of further use of the restored lands (forestry, agricultural, water or special). In the forestry and agricultural areas, the easiest way to reclaim is to fill the cups of quarries with industrial waste, waste rock, followed by drawing on them and planning potentially fertile soil and black soil. The disadvantages of the known methods of restoration in this case are: significant time and equipment costs for land restoration; production waste, in many cases, is not enough to fill the bowl and they have to be delivered to the quarry; industrial wastes laid in the developed space contain useful components that, with the appropriate development of technology and technology for their processing, could be used in the national economy; the possibility of using quarry excavation for industrial construction and other purposes is being eliminated.
Известен способ рекультивации карьеров, заключающийся в формировании путем отсыпки упорных стенок поперек карьера и продольных перемычек с заполнением пространства между ними отходами производства [1] Однако такой способ рекультивации лишь частично ликвидирует недостатки, присущие традиционным способам восстановления земель, нарушенных открытыми горными работами. Основной недостаток его ликвидация возможности использования карьерной выемки для промышленного строительства, сооружения объектов различного назначения в уже имеющейся подземной чаше. There is a method of reclamation of quarries, which consists in the formation by filling up the persistent walls across the quarry and longitudinal bridges with filling the space between them with industrial waste [1] However, this method of reclamation only partially eliminates the inherent disadvantages of traditional methods of restoration of land disturbed by open cast mining. The main drawback is its elimination of the possibility of using quarry excavation for industrial construction, the construction of facilities for various purposes in an existing underground bowl.
Целью изобретения является эффективное использование образованных в результате эксплуатации месторождений полезных ископаемых карьерных выемок. The aim of the invention is the effective use of mineral deposits formed as a result of exploitation of quarries.
Достигается это тем, что в известном способе рекультивации карьеров, включающем формирование упорных стенок поперек карьера и сооружение продольных перемычек, упорные стенки и продольные перемычки возводят парными из искусственных или природных материалов, причем пространство между стенами, образующими парные упорные стенки и продольные перемычки заполняют отходами производства, оставляя на всю высоту их дренажные или вентиляционные каналы. This is achieved by the fact that in the known method of reclamation of quarries, including the formation of thrust walls across the quarry and the construction of longitudinal bridges, thrust walls and longitudinal bridges are erected in pairs from artificial or natural materials, and the space between the walls forming the paired persistent walls and longitudinal bridges is filled with production waste leaving their drainage or ventilation ducts to their full height.
Другое отличие состоит в том, что перед началом работ по возведению парных упорных стенок и продольных перемычек на дне карьера сооружается дренажная система. Another difference is that before starting work on the construction of paired thrust walls and longitudinal lintels, a drainage system is constructed at the bottom of the quarry.
Кроме того, после возведения парных упорных стенок и продольных перемычек на них укладывают верхнее перекрытие, слой гидроизоляции, слой потенциально-плодородной земли, слой чернозема, а в верхних перекрытиях сооружают люки, ляды или другие устройства в соответствии с дальнейшим использованием образованного подземного сооружения. In addition, after the construction of paired thrust walls and longitudinal lintels, an upper ceiling, a layer of waterproofing, a layer of potentially fertile earth, a layer of chernozem are laid on them, and hatches, lyady or other devices are constructed in the upper ceilings in accordance with the further use of the formed underground structure.
На фиг.1 изображено подземное сооружение-нефтехранилище; на фиг.2 схема карьера в плане в период выполнения работ по горнотехнической рекультивации в средней части отвала. Figure 1 shows an underground oil storage facility; figure 2 diagram of the quarry in the plan during the implementation of mining restoration in the middle part of the dump.
Способ рекультивации карьера заключается в следующем: после окончания горных работ в карьерной чаще (на ее дне) сооружают дренажную систему 1 (например, из асбестоцементных перфорированных труб, размещаемых в подушке из щебня фракции 15-35 мм) и возводят ленточные фундаменты 2 под парные упорные стенки 3 и продольные перемычки 4. В фундаментах 2 оставляют каналы 5, соединяющие дренажную систему 1 с дренажными каналами 6 в упорных стенках 3. The method of reclamation of the quarry is as follows: after the completion of mining in the quarry more often (at its bottom),
Фундаменты 2 по всей площади дна карьера перекрываются водонепроницаемыми с определенной несущей способностью плитами 7. Одновременно из нескольких точек с фундаментов 2 ведут работы по возведению стен, формирующих парные упорные стенки 3 и продольные перемычки 4. По мере возведения стен пространство между ними (в пределах упорной стенки и продольной перемычки) заполняют отходами производства 8. (Технически это можно выполнить, используя, например, различного рода перегружатели, точки, эстакады для автосамосвалов и т.п.). После того как парные упорные стенки 3 и поперечные перемычки 4 будут возведены до необходимой высотной отметки, они перекрываются верхними перекрытиями 9, в которых имеются люки 10, и гидроизоляцией 11. Затем оставшийся до поверхностной отметки свободный объем заполняется потенциально плодородным слоем грунта 12 и черноземом 13. The
Использование предлагаемого способа рекультивации карьеров обеспечивает по сравнению с существующими способами следующие преимущества:
возможность получения подземных сооружений, в том числе: емкостей для хранения нефти, нефтепродуктов, газов; складов для хранения овощей, зерна; объектов гражданской обороны и т.п.Using the proposed method of reclamation of quarries provides, in comparison with existing methods, the following advantages:
the possibility of obtaining underground structures, including: tanks for storing oil, oil products, gases; warehouses for storing vegetables, grain; civil defense facilities, etc.
сокращение (в определенных условиях) сроков рекультивации подработанных территорий и капиталовложений на рекультивацию. reduction (in certain conditions) of the terms of reclamation of the earned territories and investments in reclamation.
Известно, например, что строительство подземных сооружений для хранения нефти и нефтепродуктов объемом более 100 тыс.м3 в скандинавских странах, даже с проведением комплекса подземных выработок (в заявляемом изобретении выработанное пространство уже создано эксплуатационными работами), обходится дешевле, чем наземных (см. Петренко Е.В. Освоение подземного пространства. М. Недра, 1988, с. 98). Если к тому же учесть, что восстановленная поверхность над подземным сооружением может быть использована как пашня или пастбище, то становится очевидным эффективность предлагаемого способа рекультивации карьеров.It is known, for example, that the construction of underground facilities for storing oil and oil products with a volume of more than 100 thousand m 3 in the Scandinavian countries, even with a complex of underground workings (in the claimed invention, the developed space has already been created by operational works), is cheaper than ground-based (see Petrenko E.V. Development of the underground space.M. Nedra, 1988, p. 98). If you also take into account that the restored surface above the underground structure can be used as arable land or pasture, then the effectiveness of the proposed method for the rehabilitation of quarries becomes obvious.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU5056424 RU2039274C1 (en) | 1992-02-25 | 1992-02-25 | Method for recultivation of open pits |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU5056424 RU2039274C1 (en) | 1992-02-25 | 1992-02-25 | Method for recultivation of open pits |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2039274C1 true RU2039274C1 (en) | 1995-07-09 |
Family
ID=21610440
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU5056424 RU2039274C1 (en) | 1992-02-25 | 1992-02-25 | Method for recultivation of open pits |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2039274C1 (en) |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2199665C1 (en) * | 2001-07-05 | 2003-02-27 | Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) | Process of development of tailing dump |
| RU2274749C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
| RU2274750C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
| RU2289694C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of limestone quarries during construction of industrial structures |
| RU2289695C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclaiming territories damaged by open extraction of deposits |
| RU2301893C1 (en) * | 2006-08-14 | 2007-06-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for lime pit reclamation |
| RU2310755C1 (en) * | 2006-11-21 | 2007-11-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for worked-out pit reclamation |
| RU2310756C1 (en) * | 2006-12-19 | 2007-11-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for exhausted pit reclamation |
| RU2325534C1 (en) * | 2007-06-06 | 2008-05-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for mined land reclamation |
| RU2374447C1 (en) * | 2008-06-10 | 2009-11-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of disturbed lands |
| RU2433268C1 (en) * | 2010-04-12 | 2011-11-10 | Государственное образовательное учреждение высшего профессионального образования "Иркутский государственный технический университет" (ГОУ ИрГТУ) | Method of quarries reclamation (versions) |
| RU2443865C1 (en) * | 2010-08-31 | 2012-02-27 | Общество с ограниченной ответственностью "Экостройресурс" ООО "Экостройресурс" | Method to recover abandoned pits |
| RU2444628C1 (en) * | 2010-08-09 | 2012-03-10 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Restoration method of disturbed lands at open development of deposits of mineral resources |
| RU2448252C1 (en) * | 2010-11-15 | 2012-04-20 | Общество с ограниченной ответственностью "Экостройресурс" (ООО "Экостройресурс") | Recovery method of mined-out pits for construction of cemetery-museum |
| RU2448251C1 (en) * | 2010-08-31 | 2012-04-20 | Общество с ограниченной ответственностью "Экостройресурс" (ООО "Экостройресурс") | Recovery method of mined-out pits for construction of cemetery-museum |
| RU2457331C1 (en) * | 2011-02-15 | 2012-07-27 | Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) | Method to reclaim water-logged open pits |
| RU2491423C2 (en) * | 2011-10-27 | 2013-08-27 | Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс" | Method to restore mined-out quarries for construction of cemetery-museum |
-
1992
- 1992-02-25 RU SU5056424 patent/RU2039274C1/en active
Non-Patent Citations (1)
| Title |
|---|
| Авторское свидетельство СССР N 1330313, кл. E 21C 41/32, 1990. * |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2199665C1 (en) * | 2001-07-05 | 2003-02-27 | Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) | Process of development of tailing dump |
| RU2274749C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
| RU2274750C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
| RU2289694C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of limestone quarries during construction of industrial structures |
| RU2289695C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclaiming territories damaged by open extraction of deposits |
| RU2301893C1 (en) * | 2006-08-14 | 2007-06-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for lime pit reclamation |
| RU2310755C1 (en) * | 2006-11-21 | 2007-11-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for worked-out pit reclamation |
| RU2310756C1 (en) * | 2006-12-19 | 2007-11-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for exhausted pit reclamation |
| RU2325534C1 (en) * | 2007-06-06 | 2008-05-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for mined land reclamation |
| RU2374447C1 (en) * | 2008-06-10 | 2009-11-27 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of disturbed lands |
| RU2433268C1 (en) * | 2010-04-12 | 2011-11-10 | Государственное образовательное учреждение высшего профессионального образования "Иркутский государственный технический университет" (ГОУ ИрГТУ) | Method of quarries reclamation (versions) |
| RU2444628C1 (en) * | 2010-08-09 | 2012-03-10 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Restoration method of disturbed lands at open development of deposits of mineral resources |
| RU2443865C1 (en) * | 2010-08-31 | 2012-02-27 | Общество с ограниченной ответственностью "Экостройресурс" ООО "Экостройресурс" | Method to recover abandoned pits |
| RU2448251C1 (en) * | 2010-08-31 | 2012-04-20 | Общество с ограниченной ответственностью "Экостройресурс" (ООО "Экостройресурс") | Recovery method of mined-out pits for construction of cemetery-museum |
| RU2448252C1 (en) * | 2010-11-15 | 2012-04-20 | Общество с ограниченной ответственностью "Экостройресурс" (ООО "Экостройресурс") | Recovery method of mined-out pits for construction of cemetery-museum |
| RU2457331C1 (en) * | 2011-02-15 | 2012-07-27 | Государственное образовательное учреждение высшего профессионального образования Читинский государственный университет (ЧитГУ) | Method to reclaim water-logged open pits |
| RU2491423C2 (en) * | 2011-10-27 | 2013-08-27 | Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс" | Method to restore mined-out quarries for construction of cemetery-museum |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2039274C1 (en) | Method for recultivation of open pits | |
| Bell et al. | Mining subsidence and its effect on the environment: some differing examples | |
| Mitchell et al. | Performance of improved ground during the Loma Prieta earthquake | |
| RU2439098C2 (en) | Method of drilling mud utilisation | |
| RU2289694C1 (en) | Method for reclamation of limestone quarries during construction of industrial structures | |
| Grigor'ev et al. | Reasons for Deformation and Failure of the Structural Units of an Apartment Building on a Slopeside Site. | |
| RU2654906C2 (en) | Method of reconstruction of barrow pits for building of cemetery | |
| JP2814898B2 (en) | Underground storage facility | |
| RU2340729C1 (en) | Slump slope reinforcement method | |
| Straskraba et al. | The differences in underground mines dewatering with the application of caving or backfilling mining methods | |
| Chmielewski | Analysis of retaining wall stability in areas specified in register of objects of cultural heritage | |
| Olyansky et al. | Features of construction of buildings and constructions on loessial the bases in Moldova | |
| RU2088760C1 (en) | Method for recultivation of slopes in opencast mining of mineral deposits | |
| RU2791061C1 (en) | Method for waterproofing a man-made container using loose overburden rocks in development of mineral deposits | |
| De Bruyn et al. | The problem of sinkhole formation in two dolomite areas of South Africa | |
| RU2396430C1 (en) | Method for reclamation of sludge pond compartment filled with grainy wastes of industrial enterprises | |
| Sadovenko et al. | Geodynamics of formation of emergency situation of a building resulting from a subway construction | |
| Brook | Reclamation of abandoned underground mines in the United Kingdom | |
| Kozliakova et al. | Providing stability of engineering structures in cities within covered karst areas | |
| Salvatore | 8. SOUTH-WESTERN COUNTIES | |
| Smith | Damage Between Westport and Greymouth | |
| Cullhed et al. | Trench B | |
| RU2354830C1 (en) | Method of recovering barrow pits for costructing various structures | |
| Bakalov et al. | Carbonaceous breeds as the material of engineering protection of Imeretinskaya valley (Sochi) | |
| RU2491423C2 (en) | Method to restore mined-out quarries for construction of cemetery-museum |