[go: up one dir, main page]

EP1346106B1 - Road construction and method for realizing such a road construction - Google Patents

Road construction and method for realizing such a road construction Download PDF

Info

Publication number
EP1346106B1
EP1346106B1 EP01271475A EP01271475A EP1346106B1 EP 1346106 B1 EP1346106 B1 EP 1346106B1 EP 01271475 A EP01271475 A EP 01271475A EP 01271475 A EP01271475 A EP 01271475A EP 1346106 B1 EP1346106 B1 EP 1346106B1
Authority
EP
European Patent Office
Prior art keywords
binder course
road surface
layer
foundation layer
road construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP01271475A
Other languages
German (de)
French (fr)
Other versions
EP1346106A1 (en
Inventor
Robertus Wilhelmus Marinus Naus
Joannes Louis Marie Van Monfort
Pieter Jozef Luypaert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vermeer Infrastructuur BV
Intron BV
Original Assignee
Vermeer Infrastructuur BV
Intron BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vermeer Infrastructuur BV, Intron BV filed Critical Vermeer Infrastructuur BV
Publication of EP1346106A1 publication Critical patent/EP1346106A1/en
Application granted granted Critical
Publication of EP1346106B1 publication Critical patent/EP1346106B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/16Reinforcements
    • E01C11/165Reinforcements particularly for bituminous or rubber- or plastic-bound pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/12Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/14Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces for heating or drying foundation, paving, or materials thereon, e.g. paint
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/12Pavings made of prefabricated single units made of units with bituminous binders or from bituminous material, e.g. asphalt mats
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/18Pavings made of prefabricated single units made of rubber units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/185Isolating, separating or connecting intermediate layers, e.g. adhesive layers; Transmission of shearing force in horizontal intermediate planes, e.g. by protrusions

Definitions

  • the invention relates to a road construction and to a method for realizing such a road construction comprising a foundation layer, a road surface provided on top of the foundation layer, and a binder course provided between the foundation layer and the road surface for bonding the road surface to the foundation layer. It is observed, that in addition to the binder course just mentioned, further layers may be present on the foundation layer and under the road surface.
  • the binder course comprises bitumen, but other materials may also be used in the binder course. For the sake of clarity, reference will always be made to bitumen as the applicable binder course, while the invention must not be considered to be limited thereto.
  • the prior art road construction as realized for many years now has a foundation layer, of which a top layer of asphalt is a component. On this top layer a finishing layer of asphalt has to be applied which will serve as road surface.
  • a bitumen emulsion which is applied as a thin layer to the surface of the foundation layer to be asphalted.
  • the water in the emulsion will evaporate under the influence of the heat of the asphalt applied as road surface. This softens the bitumen layer, creating a physical bond between the asphalt layers of the foundation layer and the road surface.
  • the known road construction is realized on site.
  • the invention aims to make a road construction possible of the so-called modular type, consisting of prefabricated elements.
  • One problem that needs to be solved is that the bitumen binder course cannot be realized in the usual manner because the asphalt to be applied on the bitumen layer no longer holds the heat necessary for allowing the bitumen to bond.
  • the object of the invention is therefore to provide a road construction that allows the road to be finished with prefabricated elements, while nevertheless allowing bonding of the road surface on the foundation layer to be realized.
  • US-A-4,849,020 teaches a method for the realization of a road construction according to which citation, on a foundation layer a binder course is applied, in which particles are incorporated that are sensitive to excitation by electromagnetic waves, and wherein on the binder course a road surface is applied, and wherein the bonding of the road surface on the foundation layer is realized by electromagnetically heating the binder course.
  • Electromagnetic heating may be effected by microwaves or by induction, without being limited thereto.
  • An electrically conductive structure may be, for example, metal wire netting or carbon fibre.
  • the principle, heating by means of induction coils, is based on the indirect and contactless heating of the binder course by means of inducing eddy currents in the electrically conductive structure provided.
  • the eddy currents induce heat that is subsequently given off to the binder course, which as a result softens and thereby effectuates binding or detachment (see below, in connection with the removal of the road surface).
  • the invention proposes a method for realizing a road construction as in claim 1 and a road construction as in claim 4.
  • the road construction of the invention can be realized quickly and effectively because the binder course with the incorporated particles is applied on the foundation layer by unwinding it from a roll of a prefabricated bituminized fleece.
  • the invention also proposes a separate bituminized fleece, as is known per se from FR-A-2693490.
  • the fleece of the invention as in claim 2 is characterized in that it incorporates particles that are sensitive to excitation by electromagnetic waves. Such a fleece is preferably wound onto a roll and can be unrolled.
  • the same is preferably characterized in that the road surface comprises a sound-absorbing asphalt mattress or rubber mat.
  • the asphalt mattress or rubber mat may be covered with a perforated top layer.
  • the top layer is selected from a layer of bioresin comprising carborundum and a bituminized fleece enriched with chippings.
  • the components of the road surface are fabricated under controlled conditions, rolled up, and subsequently transported to the site and unrolled.
  • the road surface is constructed in layers and consists of two or possibly three layers on the foundation layer, to wit
  • the particles comprised in the binder course may be selected from the following group:
  • the rolled up road surface is transported to the desired site. Transportation may be carried out by means of lorries.
  • the size of the rolls will have to be adapted, among other things, to the statutory dimensions of a lorry and the allowable curvature in the respective material. As indication one might consider rolls having a width of approximately 4 m and a length of, for example, 20 m but preferably of approximately 50 m.
  • the binder course is then rolled out first on the existing paving. Subsequently the sound-absorbing layer is rolled out on the binder course. Bonding is realized by heating the binder course by means of low-frequency or high-frequency electromagnetic waves resulting in adhesion.
  • the road surface may optionally be heated by means of pre-heaters and subsequently pressed on by means of a road roller. If the likelihood exists that the sound-absorbing layer is unable to realize the desirable skid-resistance, an additional top layer may be applied.
  • the road surface After about one hour, when the bonding is completed, the road surface is ready for use. If the road surface is damaged, it can be removed in a quick and efficient manner. This may be realized, for example, by vibrating the binder course by means of high-frequency electromagnetic waves. This causes the binder course to become rigid, such that the bonding between foundation layer and road surface can be cancelled simply by shear. The road surface may then be removed without 'brute force' by a lorry provided with special grippers. While the binder course is being vibrated, the coherence of the remaining layers remains intact. This aspect is realized due to the fact that only the particles in the binder course are sensitive to the electromagnetic waves. It is also possible to use low-frequency electromagnetic waves; the heat thus induced causes the binder course to be softened, after which the road surface to be replaced can simply be rolled up.
  • the road surface is comprised of two or optionally three layers, to wit a binder course, a sound-absorbing layer and optionally a surface layer.
  • the binder course has been described in the foregoing.
  • the asphalt mattress is a product wherein the asphalt is applied on a carrier.
  • the carrier is comprised of, for example, three-dimensionally structured polyamide fibres, which are fused together where they cross each other.
  • the thickness of the mattress is approximately 30 mm.
  • the rubber mat is preferably made from used car tires that have been ground to a granulate of 0-6 mm grading.
  • the granulate is mixed with a binder, for example, polyurethane and subsequently placed in a mould and heated.
  • the thickness of the mat may vary between 20-100 mm, preferably 30 mm.
  • the cavity percentage is approximately 25%. Due to the properties of rubber and the amount of cavity, the product has good sound absorbing characteristics.
  • the absorption coefficient may vary between 0.11 at a frequency of 110 Hz and 0.85 at a frequency of 1600 Hz.
  • the sound-absorbing layer does not comply with the civil engineering requirements for use as road surface, it is possible to apply a top layer to the sound-absorbing layer.
  • the desired properties such as, for example, skid-resistance may be realized.
  • the top layer is comprised of a perforated layer of bioresin wherein the surface is provided with a layer of carborundum chippings graded from 0-2 mm.
  • the bioresin is an epoxy resin, which is applied in an environmentally friendly manner.
  • Carborundum is a mineral of a considerable hardness. The mineral is, moreover, wear-resistant.
  • the carborundum provides the desired skid-resistance of the road surface.
  • the bioresin will be provided with perforations of a diameter of approximately 4 mm.
  • the percentage of open surface may be approximately 25%, rendering the top layer water-permeable. This improves safety in wet conditions.
  • the so-called air-pumping sound is reduced due to the fact that the expanding air in the mating surface between tire and road surface is led away to the sound-absorbing asphalt layer.
  • bituminized fleece of a thickness of 2 to 3 mm.
  • the surface is provided with carborundum chippings or an equivalent product, and perforations will be provided.
  • Said apparatus comprises a frame 2 and wheels 3 that are coupled with the frame, making the apparatus 1 mobile. Between the wheels 3 and suspended from the frame 2, heating means are provided in casings 4, for example, in the form of a microwave generator with an accompanying high-voltage unit. Where electromagnetic heating by means of microwaves is concerned, a so-called microwave launcher 5 as shown in Figure 2 is useful. The figure shows clearly that in this way the microwaves are emitted very closely to the road surface.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention relates to a road construction and to a method for realizing such a road construction comprising a foundation layer, a road surface provided on top of the foundation layer, and a binder course provided between the foundation layer and the road surface for bonding the road surface to the foundation layer. In the binder course metal particles are incorporated. The metal particles form threads and are iron particles. The binder course comprises bitumen that is incorporated in a fleece.

Description

  • The invention relates to a road construction and to a method for realizing such a road construction comprising a foundation layer, a road surface provided on top of the foundation layer, and a binder course provided between the foundation layer and the road surface for bonding the road surface to the foundation layer. It is observed, that in addition to the binder course just mentioned, further layers may be present on the foundation layer and under the road surface. In general the binder course comprises bitumen, but other materials may also be used in the binder course. For the sake of clarity, reference will always be made to bitumen as the applicable binder course, while the invention must not be considered to be limited thereto.
  • The prior art road construction as realized for many years now has a foundation layer, of which a top layer of asphalt is a component. On this top layer a finishing layer of asphalt has to be applied which will serve as road surface. In the prior art the bonding between the road surface and the foundation layer is realized with a bitumen emulsion, which is applied as a thin layer to the surface of the foundation layer to be asphalted. The water in the emulsion will evaporate under the influence of the heat of the asphalt applied as road surface. This softens the bitumen layer, creating a physical bond between the asphalt layers of the foundation layer and the road surface.
  • The known road construction is realized on site. However, the invention aims to make a road construction possible of the so-called modular type, consisting of prefabricated elements. One problem that needs to be solved is that the bitumen binder course cannot be realized in the usual manner because the asphalt to be applied on the bitumen layer no longer holds the heat necessary for allowing the bitumen to bond. The object of the invention is therefore to provide a road construction that allows the road to be finished with prefabricated elements, while nevertheless allowing bonding of the road surface on the foundation layer to be realized.
  • US-A-4,849,020 teaches a method for the realization of a road construction according to which citation, on a foundation layer a binder course is applied, in which particles are incorporated that are sensitive to excitation by electromagnetic waves, and wherein on the binder course a road surface is applied, and wherein the bonding of the road surface on the foundation layer is realized by electromagnetically heating the binder course. Electromagnetic heating may be effected by microwaves or by induction, without being limited thereto.
  • Specifically when using microwave energy, compounds are incorporated in the binder course that are based on one of the following types of additives or combinations thereof:
    • metal salts such as, for example, NaCl or KBr;
    • organic salts trimethyl ammonium methosulphate;
    • mineral and synthetic oil or fatty compounds (for example, in the form of emulsions or encapsulated);
    • carbon (C) components (in the form of filaments, particles and tissues);
    • metallic components such as Fe, Al (in the form of filaments, particles and tissues).
  • The addition of said substances to the binder course changes some of the material-specific properties of this layer, such as melting and boiling point, thermal capacity and dielectric constant. In this manner said substances ensure that the material of the binder course is still serviceable as binding agent, while at the same time being factors more sensitive to microwave energy than the surrounding material. This makes it possible for the microwave energy to, as it were, completely pass through the asphalt layer, inducing heat only in the binder course. Energy losses to the underground are thus limited to a minimum. In the bottom of the binder course an optional layer may be incorporated preventing losses to the underground.
  • When using induction heating with induction coils, it is possible to only induce heat in the binder course, if the binder course is provided with an electrically conductive structure. An electrically conductive structure may be, for example, metal wire netting or carbon fibre.
  • The principle, heating by means of induction coils, is based on the indirect and contactless heating of the binder course by means of inducing eddy currents in the electrically conductive structure provided. The eddy currents induce heat that is subsequently given off to the binder course, which as a result softens and thereby effectuates binding or detachment (see below, in connection with the removal of the road surface).
  • An important advantage of these forms of heating is that they are contactless. This is especially advantageous where existing roads are concerned that are not completely level.
  • The invention proposes a method for realizing a road construction as in claim 1 and a road construction as in claim 4.
  • The road construction of the invention can be realized quickly and effectively because the binder course with the incorporated particles is applied on the foundation layer by unwinding it from a roll of a prefabricated bituminized fleece. Correspondingly, the invention also proposes a separate bituminized fleece, as is known per se from FR-A-2693490. The fleece of the invention as in claim 2 is characterized in that it incorporates particles that are sensitive to excitation by electromagnetic waves. Such a fleece is preferably wound onto a roll and can be unrolled.
  • To finish the road construction, the same is preferably characterized in that the road surface comprises a sound-absorbing asphalt mattress or rubber mat.
  • To improve the properties of the road and to reduce the rolling resistance it may be preferred for the asphalt mattress or rubber mat to be covered with a perforated top layer. Conveniently and to render it wear-resistant, this may be realized such that the top layer is selected from a layer of bioresin comprising carborundum and a bituminized fleece enriched with chippings.
  • The invention will now be further elucidated with reference to the following non-limiting exemplary embodiment of the road construction according to the invention and the method for realising the same.
  • The components of the road surface are fabricated under controlled conditions, rolled up, and subsequently transported to the site and unrolled. The road surface is constructed in layers and consists of two or possibly three layers on the foundation layer, to wit
    1. 1) a binder course comprising bitumen incorporated in a fleece with particles that are sensitive to excitation by electromagnetic waves;
    2. 2) a sound absorbing layer;
    3. 3) optionally a top layer.
  • The particles comprised in the binder course may be selected from the following group:
    • metal salts such as, for example, NaCl or KBr;
    • organic salts trimethyl ammonium methosulfate;
    • mineral and synthetic oil or fatty compounds (for example, in the form of emulsions or encapsulated);
    • carbon (C) components (in the form of filaments, particles and tissues);
    • metallic components such as Fe, Al (in the form of filaments, particles and tissues).
    Of course, combinations from this group are also possible.
  • After the layers have been fabricated in the factory, the rolled up road surface is transported to the desired site. Transportation may be carried out by means of lorries. The size of the rolls will have to be adapted, among other things, to the statutory dimensions of a lorry and the allowable curvature in the respective material. As indication one might consider rolls having a width of approximately 4 m and a length of, for example, 20 m but preferably of approximately 50 m.
  • The binder course is then rolled out first on the existing paving. Subsequently the sound-absorbing layer is rolled out on the binder course. Bonding is realized by heating the binder course by means of low-frequency or high-frequency electromagnetic waves resulting in adhesion. In order to improve the cohesion and flatness of the sound-absorbing layer, the road surface may optionally be heated by means of pre-heaters and subsequently pressed on by means of a road roller. If the likelihood exists that the sound-absorbing layer is unable to realize the desirable skid-resistance, an additional top layer may be applied.
  • After about one hour, when the bonding is completed, the road surface is ready for use. If the road surface is damaged, it can be removed in a quick and efficient manner. This may be realized, for example, by vibrating the binder course by means of high-frequency electromagnetic waves. This causes the binder course to become rigid, such that the bonding between foundation layer and road surface can be cancelled simply by shear. The road surface may then be removed without 'brute force' by a lorry provided with special grippers. While the binder course is being vibrated, the coherence of the remaining layers remains intact. This aspect is realized due to the fact that only the particles in the binder course are sensitive to the electromagnetic waves. It is also possible to use low-frequency electromagnetic waves; the heat thus induced causes the binder course to be softened, after which the road surface to be replaced can simply be rolled up.
  • As already mentioned, the road surface is comprised of two or optionally three layers, to wit a binder course, a sound-absorbing layer and optionally a surface layer. The binder course has been described in the foregoing.
  • For the sound-absorbing layer there are, among others, the following two possibilities:
    1. 1) an asphalt mattress;
    2. 2) a rubber mat.
    Asphalt mattress
  • The asphalt mattress is a product wherein the asphalt is applied on a carrier. The carrier is comprised of, for example, three-dimensionally structured polyamide fibres, which are fused together where they cross each other. The thickness of the mattress is approximately 30 mm. Minerals having a grading from 4-6 mm, for example, a stone fracture of 75-90% with a cavity from 15-30%, may also be used in the asphalt.
  • Rubber mat
  • The rubber mat is preferably made from used car tires that have been ground to a granulate of 0-6 mm grading. The granulate is mixed with a binder, for example, polyurethane and subsequently placed in a mould and heated. Depending on the application, the thickness of the mat may vary between 20-100 mm, preferably 30 mm. The cavity percentage is approximately 25%. Due to the properties of rubber and the amount of cavity, the product has good sound absorbing characteristics. The absorption coefficient may vary between 0.11 at a frequency of 110 Hz and 0.85 at a frequency of 1600 Hz.
  • If the sound-absorbing layer does not comply with the civil engineering requirements for use as road surface, it is possible to apply a top layer to the sound-absorbing layer. By means of this layer the desired properties such as, for example, skid-resistance may be realized.
  • For the self-adhesive top layer there are at least two possibilities:
    1. 1) a perforated layer of bioresin;
    2. 2) a perforated layer of a bituminous fabric.
    Top layer of perforated bioresin
  • The top layer is comprised of a perforated layer of bioresin wherein the surface is provided with a layer of carborundum chippings graded from 0-2 mm. The bioresin is an epoxy resin, which is applied in an environmentally friendly manner. Carborundum is a mineral of a considerable hardness. The mineral is, moreover, wear-resistant. The carborundum provides the desired skid-resistance of the road surface. The bioresin will be provided with perforations of a diameter of approximately 4 mm. The percentage of open surface may be approximately 25%, rendering the top layer water-permeable. This improves safety in wet conditions. By means of the perforations the so-called air-pumping sound is reduced due to the fact that the expanding air in the mating surface between tire and road surface is led away to the sound-absorbing asphalt layer.
  • Top layer of bituminous fabric
  • It is also possible to use a perforated bituminized fleece of a thickness of 2 to 3 mm. As in the top layer of bioresin, the surface is provided with carborundum chippings or an equivalent product, and perforations will be provided.
  • In the following, finally, the apparatus will be elucidated, which apparatus is proposed for use in a method for realizing a road construction as explained in the foregoing.
  • The apparatus will be explained below with reference to the drawing, which
    • in Fig. 1 shows a side-view of the apparatus; and
    • in Fig. 2 shows a rear-view of the apparatus.
  • Identical reference numbers in the figures refer to similar elements.
  • Generally speaking, the apparatus is indicated in the figures by reference number 1. Said apparatus 1 comprises a frame 2 and wheels 3 that are coupled with the frame, making the apparatus 1 mobile. Between the wheels 3 and suspended from the frame 2, heating means are provided in casings 4, for example, in the form of a microwave generator with an accompanying high-voltage unit. Where electromagnetic heating by means of microwaves is concerned, a so-called microwave launcher 5 as shown in Figure 2 is useful. The figure shows clearly that in this way the microwaves are emitted very closely to the road surface.
  • To the person skilled in the art it is very obvious how such an apparatus has to be further embodied in order to be useful for the above-defined objective of realizing and optionally partly dismantling a road construction.

Claims (7)

  1. A method for realizing a road construction, wherein on a foundation layer a binder course is applied, in which particles are incorporated that are sensitive to excitation by electromagnetic waves, and wherein on the binder course a road surface is applied, and wherein the bonding of the road surface on the foundation layer is realized by electromagnetically heating the binder course, characterized in that the binder course with the incorporated particles is applied on the foundation layer by unwinding it from a roll of a prefabricated bituminized fleece.
  2. A bituminized fleece, characterized in that it incorporates particles that are sensitive to excitation by electromagnetic waves.
  3. A fleece according to claim 2, characterized in that the same is wound onto a roll and can be unrolled.
  4. A road construction comprising a foundation layer, a road surface provided on top of the foundation layer, and a binder course provided between the foundation layer and the road surface for bonding the road surface to the foundation layer, which binder course incorporates particles that are sensitive to excitation by electromagnetic waves, characterized in that the binder course comprises bitumen that is incorporated in a fleece, and that said fleece incorporates said particles that are sensitive to excitation by electromagnetic waves.
  5. A road construction according to claim 4, characterized in that the road surface comprises a sound-absorbing asphalt mattress or rubber mat.
  6. A road construction according to claim 5, characterized in that the asphalt mattress or rubber mat is covered with a perforated top layer.
  7. A road construction according to claim 5, characterized in that the top layer is selected from a layer of bioresin comprising carborundum and a bituminized fleece enriched with chippings.
EP01271475A 2000-12-18 2001-11-12 Road construction and method for realizing such a road construction Expired - Lifetime EP1346106B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NL1016907 2000-12-18
NL1016907A NL1016907C2 (en) 2000-12-18 2000-12-18 Road construction and method for realizing such a road construction.
PCT/NL2001/000817 WO2002050375A1 (en) 2000-12-18 2001-11-12 Road construction, apparatus and method for realising it

Publications (2)

Publication Number Publication Date
EP1346106A1 EP1346106A1 (en) 2003-09-24
EP1346106B1 true EP1346106B1 (en) 2006-03-22

Family

ID=19772599

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01271475A Expired - Lifetime EP1346106B1 (en) 2000-12-18 2001-11-12 Road construction and method for realizing such a road construction

Country Status (8)

Country Link
US (1) US20040037643A1 (en)
EP (1) EP1346106B1 (en)
AT (1) ATE321170T1 (en)
AU (1) AU2002224215A1 (en)
DE (1) DE60118099T2 (en)
ES (1) ES2261335T3 (en)
NL (1) NL1016907C2 (en)
WO (1) WO2002050375A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7160049B2 (en) * 2001-09-28 2007-01-09 Takenaka Corporation Paving material for absorbing electromagnetic wave and pavement structure using it
PL2118372T3 (en) 2007-03-06 2013-03-29 Matthaei Bauunternehmen Gmbh & Co Kg Road surface material, road surface made thereof, vehicle with tires, method for avoiding the icing or for the deicing of a road surface, and system for carrying out the same
DE102008004645A1 (en) * 2007-10-05 2009-04-23 Matthäi Bauunternehmen GmbH & Co. KG Mineral for the production of a roadway layer, method for the production thereof, roadway layer thereof and method for the production of the roadway layer
EP3490008A1 (en) 2017-11-27 2019-05-29 Nederlandse Organisatie voor toegepast- natuurwetenschappelijk onderzoek TNO Photovoltaic multilayer laminate
US10161087B1 (en) 2017-12-06 2018-12-25 Caterpillar Paving Products Inc. System and method for asphalt heating
NL2023452B1 (en) 2019-07-08 2021-02-02 Univ Delft Tech Inductive Bituminous Waterproofing Membrane
JP7596143B2 (en) * 2020-12-28 2024-12-09 大林道路株式会社 Precast asphalt pavement
CN113278383A (en) * 2021-07-02 2021-08-20 河南公路卫士交通科技有限公司 Sand-covered seam-sticking belt and preparation method thereof

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4319856A (en) * 1977-01-03 1982-03-16 Microdry Corportion Microwave method and apparatus for reprocessing pavements
DE2854263A1 (en) * 1977-12-14 1979-06-28 Morris Richard Jeppson PROCEDURE AND EQUIPMENT FOR THE PROCESSING OF ROAD COVERINGS
US4362780A (en) * 1978-05-08 1982-12-07 Owens-Corning Fiberglas Corporation Fiber reinforced membrane paving construction
US4594022A (en) * 1984-05-23 1986-06-10 Mp Materials Corporation Paving method and pavement construction for concentrating microwave heating within pavement material
DE8616634U1 (en) * 1986-06-21 1986-08-07 Deutag-Mischwerke GmbH, 5000 Köln Flexible plastic mat filled with asphalt compound
US4849020A (en) * 1987-04-20 1989-07-18 The Titan Corporation Asphalt compounds and method for asphalt reconditioning using microwave radiation
US5246306A (en) * 1987-11-04 1993-09-21 Bay Mills Limited Reinforcements for asphaltic paving, processes for making such reinforcements, and reinforced pavings
DE68901166D1 (en) * 1988-08-26 1992-05-14 Fibrescreed Ltd MATERIALS FOR BRIDGE JOINTS AND FOR USE IN REPAIRING OR COVERING ROADS AND THE LIKE AND METHOD.
FR2693490B1 (en) * 1992-07-07 1994-09-02 Elf Antar France Improved system for preventing cracks from rising between the structural layer and the wearing course of a roadway and method for producing such a system.
CA2102090C (en) * 1993-10-29 2000-02-15 Patrick C. Wiley Process for heating an asphalt surface
US5681128A (en) * 1995-02-21 1997-10-28 Illinois Tool Works Inc. Surface marking systems
US5707171A (en) * 1995-09-26 1998-01-13 Zaleski; Peter L. Electrically conductive paving mixture and pavement system
DE19827577C1 (en) * 1998-06-20 1999-10-28 Abg Allg Baumaschinen Gmbh Surface leveler for road surfacing machine
DE19855555C2 (en) * 1998-12-02 2001-03-15 Linn High Therm Gmbh Heating device

Also Published As

Publication number Publication date
WO2002050375A1 (en) 2002-06-27
DE60118099D1 (en) 2006-05-11
AU2002224215A1 (en) 2002-07-01
NL1016907C2 (en) 2002-06-19
DE60118099T2 (en) 2007-03-01
EP1346106A1 (en) 2003-09-24
US20040037643A1 (en) 2004-02-26
ES2261335T3 (en) 2006-11-16
ATE321170T1 (en) 2006-04-15

Similar Documents

Publication Publication Date Title
KR100476132B1 (en) Road reinforcing sheet, structure of asphalt reinforced pavement and method for paving road
US4699542A (en) Composition for reinforcing asphaltic roads and reinforced roads using the same
RU2306380C2 (en) Method for cracked paved surface repair
CA1225857A (en) Paving method and pavement construction for concentrating microwave heating within pavement material
EP1346106B1 (en) Road construction and method for realizing such a road construction
US4849020A (en) Asphalt compounds and method for asphalt reconditioning using microwave radiation
CN100366822C (en) Methods of strengthening and waterproofing paved surfaces
WO2000055427A1 (en) Method of resurfacing roads and bridge decks
KR102060861B1 (en) Stiffener for asphalt construction
Sandberg et al. Texturing of cement concrete pavements to reduce traffic noise
SU1098982A1 (en) Road coating
JPH11247113A (en) Partially draining road pavement structure and construction thereof
JPH0463927B2 (en)
US20250239887A1 (en) Wireless power transfer transmitter system in asphalt pavement and construction/rehabilitation method thereof
KR102607194B1 (en) Temporary road pavement mat combining woven and non-woven fabrics
EP2118372B1 (en) Road surface material, road surface made thereof, vehicle with tires, method for avoiding the icing or for the deicing of a road surface, and system for carrying out the same
JPS60208502A (en) Construction of bitumen pavement
Zarrin et al. Design of Roller compacting concrete pavement
SU852995A1 (en) Method of preventing slippery state of road paving
KR20000058226A (en) Method of paving sidewalk
KR20010003347A (en) Construction method on Hi-porous concrete pavement functioning snow melting and thawing by using Electro Conduction Concrete
Gilchrist et al. Asphalt reinforcement: 10 years of experience and development
JPH06341107A (en) Execution method of asphalt road in which pipe for heating is buried
JPH07300812A (en) Non-slip plate and layout method of the non-slip plate
JP2004183268A (en) Method for constructing porous elastic pavement

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20030718

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

17Q First examination report despatched

Effective date: 20050214

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: ROAD CONSTRUCTION AND METHOD FOR REALIZING SUCH A ROAD CONSTRUCTION

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20060322

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 60118099

Country of ref document: DE

Date of ref document: 20060511

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060622

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060822

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061113

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2261335

Country of ref document: ES

Kind code of ref document: T3

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061130

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20061227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060623

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20091123

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20091130

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20091123

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20091126

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20100506

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20100423

Year of fee payment: 9

Ref country code: IT

Payment date: 20100429

Year of fee payment: 9

BERE Be: lapsed

Owner name: *INTRON B.V.

Effective date: 20101130

Owner name: *VERMEER INFRASTRUCTUUR B.V.

Effective date: 20101130

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20110601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20101112

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20110801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110601

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101130

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60118099

Country of ref document: DE

Effective date: 20110601

Ref country code: DE

Ref legal event code: R119

Ref document number: 60118099

Country of ref document: DE

Effective date: 20110531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101112

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20120411

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20101113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES