[go: up one dir, main page]

Follow
Divya Shrivastava (Pandey)
Divya Shrivastava (Pandey)
Associate Professor, Shiv Nadar Institution of Eminence
Verified email at snu.edu.in
Title
Cited by
Cited by
Year
A methodology for joint optimization for maintenance planning, process quality and production scheduling
D Pandey, MS Kulkarni, P Vrat
Computers & Industrial Engineering 61 (4), 1098-1106, 2011
1442011
Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework
D Pandey, MS Kulkarni, P Vrat
International Journal of Advanced Operations Management 2 (1-2), 1-24, 2010
932010
A TLBO and a Jaya heuristics for permutation flow shop scheduling to minimize the sum of inventory holding and batch delay costs
A Mishra, D Shrivastava
Computers & Industrial Engineering 124, 509-522, 2018
562018
Integrated design of preventive maintenance and quality control policy parameters with CUSUM chart
D Shrivastava, MS Kulkarni, P Vrat
The International Journal of Advanced Manufacturing Technology 82 (9), 2101-2112, 2016
432016
A methodology for simultaneous optimisation of design parameters for the preventive maintenance and quality policy incorporating Taguchi loss function
D Pandey, MS Kulkarni, P Vrat
International Journal of Production Research 50 (7), 2030-2045, 2012
422012
Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems
AK Mishra, D Shrivastava, D Tarasia, A Rahim
Annals of Operations Research 316 (1), 401-444, 2022
332022
A discrete Jaya algorithm for permutation flow-shop scheduling problem
A Mishra, D Shrivastava
Int. J. Ind. Eng. Comput 11 (3), 415-428, 2020
212020
An efficient Jaya algorithm for multi-objective permutation flow shop scheduling problem
AK Mishra, D Shrivastava, B Bundela, S Sircar
Advanced engineering optimization through intelligent techniques: select …, 2019
212019
A dynamic job rotation scheduling conceptual framework by a human representing digital twin
VKR Pabolu, D Shrivastava
Procedia CIRP 104, 1367-1372, 2021
172021
An opportunistic group maintenance model for the multi-unit series system employing Jaya algorithm
AK Mishra, D Shrivastava, P Vrat
Opsearch 57 (2), 603-628, 2020
172020
A model for optimal maintenance interval incorporating the cost of rejections in manufacturing
D Pandey, MS Kulkarni, P Vrat
Journal of Advances in Management Research 7 (2), 219-232, 2010
172010
A digital-twin based worker's work allocation framework for a collaborative assembly system
VKR Pabolu, D Shrivastava, MS Kulkarni
IFAC-PapersOnLine 55 (10), 1887-1892, 2022
152022
Metaheuristic optimization and computational investigation of resistance spot welding process parameter employing Jaya, TLBO and Rao-II algorithm
V Gurav, D Shrivastava
International Journal on Interactive Design and Manufacturing (IJIDeM) 19 (2 …, 2025
142025
Machine tool reliability
BK Lad, D Shrivastava, MS Kulkarni
John Wiley & Sons, 2016
132016
A dynamic system to predict an assembly line worker’s comfortable work-duration time by using the machine learning technique
VKR Pabolu, D Shrivastava, MS Kulkarni
Procedia CIRP 106, 270-275, 2022
122022
Modelling and prediction of worker task performance using a knowledge-based system application
VKR Pabolu, D Shrivastava, MS Kulkarni
International Journal of Production Economics 254, 108657, 2022
82022
Integration of production scheduling and group maintenance planning in multi-unit system employing TLBO algorithm
AK Mishra, D Shrivastava
Procedia CIRP 93, 949-954, 2020
82020
Development of intelligent system to consider worker's comfortable work duration in assembly line work scheduling
VKR Pabolu, D Shrivastava, MS Kulkarni
Journal of Manufacturing Systems 78, 226-243, 2025
72025
Intelligent Systems in Production Planning for an Assemble-to-Order Production System
VKR Pabolu, D Shrivastava, MS Kulkarni
Congress on Smart Computing Technologies, 177-190, 2022
22022
Intelligent system for assembly-line worker’s fatigue recognition and facilitation
VKR Pabolu, D Shrivastava, MS Kulkarni
Computers & Industrial Engineering 198, 110726, 2024
12024
The system can't perform the operation now. Try again later.
Articles 1–20