| Weibull accelerated failure time regression model for remaining useful life prediction of bearing working under multiple operating conditions P Kundu, AK Darpe, MS Kulkarni Mechanical Systems and Signal Processing 134, 106302, 2019 | 145 | 2019 |
| A methodology for joint optimization for maintenance planning, process quality and production scheduling D Pandey, MS Kulkarni, P Vrat Computers & Industrial Engineering 61 (4), 1098-1106, 2011 | 144 | 2011 |
| Combined Taguchi and dual response method for optimization of a centerless grinding operation MN Dhavlikar, MS Kulkarni, V Mariappan Journal of Materials Processing Technology 132 (1-3), 90-94, 2003 | 128 | 2003 |
| A review on diagnostic and prognostic approaches for gears P Kundu, AK Darpe, MS Kulkarni Structural Health Monitoring 20 (5), 2853-2893, 2021 | 116 | 2021 |
| Joint consideration of production scheduling, maintenance and quality policies: a review and conceptual framework D Pandey, MS Kulkarni, P Vrat International Journal of Advanced Operations Management 2 (1-2), 1-24, 2010 | 93 | 2010 |
| A correlation coefficient based vibration indicator for detecting natural pitting progression in spur gears P Kundu, AK Darpe, MS Kulkarni Mechanical Systems and Signal Processing 129, 741-763, 2019 | 86 | 2019 |
| A framework for value co-creation through customization and personalization in the context of machine tool PSS PU Zine, MS Kulkarni, R Chawla, AK Ray Procedia CIRP 16, 32-37, 2014 | 83 | 2014 |
| A novel methodology for online detection of bearing health status for naturally progressing defect P Shakya, MS Kulkarni, AK Darpe Journal of Sound and Vibration 333 (21), 5614-5629, 2014 | 82 | 2014 |
| An ensemble decision tree methodology for remaining useful life prediction of spur gears under natural pitting progression P Kundu, AK Darpe, MS Kulkarni Structural Health Monitoring 19 (3), 854-872, 2020 | 79 | 2020 |
| Bearing diagnosis based on Mahalanobis–Taguchi–Gram–Schmidt method P Shakya, MS Kulkarni, AK Darpe Journal of Sound and Vibration 337, 342-362, 2015 | 69 | 2015 |
| Optimisation of opportunistic maintenance of a multi-component system considering the effect of failures on quality and production schedule: A case study PP Tambe, S Mohite, MS Kulkarni The International Journal of Advanced Manufacturing Technology 69 (5), 1743-1756, 2013 | 69 | 2013 |
| Vibration-based fault diagnosis in rolling element bearings: Ranking of various time, frequency and time-frequency domain data-based damage identi cation parameters P Shakya, AK Darpe, MS Kulkarni International journal of condition monitoring 3 (2), 53-62, 2013 | 69 | 2013 |
| Managing quality in continuous casting process using product quality model and simulated annealing MS Kulkarni, AS Babu Journal of Materials Processing Technology 166 (2), 294-306, 2005 | 67 | 2005 |
| A simulation based optimization approach for spare parts forecasting and selective maintenance P Sharma, MS Kulkarni, V Yadav Reliability Engineering & System Safety 168, 274-289, 2017 | 64 | 2017 |
| Accelerated wear testing for evaluating the life characteristics of copper–graphite tribological composite K Rajkumar, K Kundu, S Aravindan, MS Kulkarni Materials & Design 32 (5), 3029-3035, 2011 | 61 | 2011 |
| Optimal maintenance schedule decisions for machine tools considering the user's cost structure BK Lad, MS Kulkarni International Journal of Production Research 50 (20), 5859-5871, 2012 | 58 | 2012 |
| A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance PP Tambe, MS Kulkarni Reliability engineering & system safety 226, 108681, 2022 | 55 | 2022 |
| A parameter estimation method for machine tool reliability analysis using expert judgement BK Lad, MS Kulkarni International journal of data analysis techniques and strategies 2 (2), 155-169, 2010 | 49 | 2010 |
| A superimposition based approach for maintenance and quality plan optimization with production schedule, availability, repair time and detection time constraints for a single … PP Tambe, MS Kulkarni Journal of Manufacturing Systems 37, 17-32, 2015 | 45 | 2015 |
| Integrated reliability and optimal maintenance schedule design: a life cycle cost based approach BK Lad, MS Kulkarni International Journal of Product Lifecycle Management 3 (1), 78-90, 2008 | 44 | 2008 |