| A TLBO and a Jaya heuristics for permutation flow shop scheduling to minimize the sum of inventory holding and batch delay costs A Mishra, D Shrivastava Computers & Industrial Engineering 124, 509-522, 2018 | 56 | 2018 |
| Joint optimization of production scheduling and group preventive maintenance planning in multi-machine systems AK Mishra, D Shrivastava, D Tarasia, A Rahim Annals of Operations Research 316 (1), 401-444, 2022 | 33 | 2022 |
| A discrete Jaya algorithm for permutation flow-shop scheduling problem A Mishra, D Shrivastava Int. J. Ind. Eng. Comput 11 (3), 415-428, 2020 | 21 | 2020 |
| An efficient Jaya algorithm for multi-objective permutation flow shop scheduling problem AK Mishra, D Shrivastava, B Bundela, S Sircar Advanced engineering optimization through intelligent techniques: select …, 2019 | 21 | 2019 |
| An opportunistic group maintenance model for the multi-unit series system employing Jaya algorithm AK Mishra, D Shrivastava, P Vrat Opsearch 57 (2), 603-628, 2020 | 17 | 2020 |
| Integration of production scheduling and group maintenance planning in multi-unit system employing TLBO algorithm AK Mishra, D Shrivastava Procedia CIRP 93, 949-954, 2020 | 8 | 2020 |
| Study of erosion wear of pump material for handling water ash slurry A Mishra, SG Kumar | 2 | 2011 |
| An Efficient Jaya Algorithm for Joint Optimization of Preventive Maintenance and Quality Policy in Production Systems AK Mishra, D Shrivastava, R Rastogi Procedia CIRP 107, 1299-1304, 2022 | 1 | 2022 |
| Group preventive maintenance model for multi-unit series system: a tlbo algorithm-based approach AK Mishra, D Shrivastava, H Gupta Recent Advances in Mechanical Engineering: Select Proceedings of ITME 2019 …, 2020 | 1 | 2020 |
| Parameter less hybrid IG-Jaya approach for permutation flow shop scheduling problem A Mishra, D Shrivastava Journal of Industrial and Management Optimization 20 (2), 606-629, 2024 | | 2024 |