WO2018133711A1 PCT/CN2018/071980 CN2018071980W WO2018133711A1 WO 2018133711 A1 WO2018133711 A1 WO 2018133711A1 CN 2018071980 W CN2018071980 W CN 2018071980W WO 2018133711 A1 WO2018133711 A1 WO 2018133711A1
Authority
WO
WIPO (PCT)
Prior art keywords
chain
pier
pier foundation
foundation
cutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2018/071980
Other languages
English (en)
Chinese (zh)
Inventor
王燏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2018133711A1 publication Critical patent/WO2018133711A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes

Definitions

  • the invention relates to a bridge pier foundation and a construction method thereof, and belongs to the technical field of bridge engineering foundation construction.
  • the existing pier foundation technology generally adopts the construction method of first cofferdam and then excavation, with long construction period, high labor intensity and poor working environment safety.
  • the existing foundation technology of the sinking well is based on excavation in the well and relies on its own gravity to overcome the frictional resistance of the well wall and sink to the design elevation to seal the bottom.
  • the main defects are: long construction period, high cost, difficult to correct, and encountered well When an obstacle such as a bottom stone is used, the blade foot is difficult to overcome and is prone to suddenness and is prone to accidents.
  • the present invention proposes a pier foundation and a construction method thereof, the purpose of which is to overcome the drawbacks of the prior art.
  • the main advantages are as follows: 1) The pier foundation 1 can be manufactured in whole or in sections in the prefabrication field, or it can be lowered while pouring in the fixed formwork on site, and the construction is convenient; 2) the structure is simple; 3) the whole sinks on the site, The construction period is short and the cost is low.
  • the sinking foundation is manufactured in the prefabricated section, and it can also be lowered in the fixed formwork on the site, the construction is simple and good quality; 2) the whole sinking at the site, The construction period is short and the cost is low; 3) It is especially suitable for the construction of obstacles such as boulder in the bottom of the well.
  • the technical solution of the invention is that the bottom of the foundation of the pier is provided with a chain knife running track, and a chain cutter for excavating rock and earth is installed on the track during construction, the chain knife is composed of a chain and a cutter fixed on the chain; the chain excavating device is mainly It consists of a chain cutter and a transmission device.
  • the transmission device is mainly composed of a sprocket and a driving device.
  • the driving device drives the chain cutter.
  • the chain cutter runs along the track.
  • the cutter at the bottom of the pier foundation excavates the rock and soil, and the chain cutter running vertically upwards will The excavated rock and soil is sent to the top, and the chain cutter and the pier foundation at the bottom of the pier foundation are lowered together.
  • the prefabrication method is divided into the following steps:
  • the cast-in method is divided into the following steps:
  • the invention has the advantages that the defects of the prior art are overcome, and since the pier foundation itself has a chain excavating device, the overall excavation of the site can be used to prefabricate the pier foundation in the workshop, or the side can be poured in the fixed template on the site.
  • the construction is simple, especially the overall waterproofing is particularly good, the construction period is short, and the cost is low.
  • FIG. 1 is a schematic structural view of a pier foundation 1 and a structural schematic view of the chain excavation device 2 when excavating the rock at the bottom of the pier foundation, and also the bottom track of the pier foundation 1 has a height difference, which facilitates the operation of the chain cutter 3 at the intersection.
  • Figure 2 is a view in the direction of arrow A of Figure 1, and is also a schematic structural view of the driving device 4, the tensioning device 5 and the sprocket 6 constituting the chain excavating device 2;
  • Figure 3 is a cross-sectional view taken along line B-B of Figure 1, and is a schematic view showing the structure of the chain cutter 3 excavating the rock and soil horizontal conveyor 7-1 at the bottom of the pier foundation;
  • Figure 4 is a cross-sectional view taken along line C-C of Figure 1, and is also a schematic structural view of a vertical geotechnical conveyor 7-2 composed of a chain cutter 3 and a side cover 1-3;
  • FIG. 5 is a schematic structural view of the chain cutter 3, and (a) is a schematic structural view of the chain 3-1 and the cutter 3-2, and is also composed of A ten-byte 3-1-1 and B ten-byte 3-1-2. Schematic diagram of the ten-byte structure of the chain 3-1; also a schematic diagram of the structure in which the chain 3-1 realizes space bending. (b) is a schematic structural view of the chain cutter composed of the rope 3-1B and the cutter 3-2B; also a schematic structural view of the rope 3-1B and the cutter 3-2B;
  • Figure 6 is a schematic view showing the construction of the foundation of the pier foundation 1;
  • FIG. 7 is a schematic view of the B-method construction of the pier foundation 1, and is also a schematic structural view of the bottom rail B-1 and the pouring formwork B-4, and is also a structural schematic view of the upper frame B-3 being fixed on the working platform without lifting;
  • Figure 8 is a plan view of the A1 type pier foundation 8-1, the lower part of the ground is indicated by a broken line, and the chain cutter 3 can replace the tool 3-2 on the chain on the working platform to adapt to different geological conditions of different depths;
  • Figure 9 is a view taken along the line A in Figure 8.
  • Figure 10 is a B-B view of Figure 9, and is also a schematic structural view of the above part of the A1 type pier foundation 8-1;
  • Figure 11 is a C-C view of Figure 9, and is also a schematic structural view of the underside of the A1 type pier foundation 8-1;
  • Figure 12 is a plan view of the A2 type pier foundation 8-2, the lower part of which is indicated by a broken line;
  • Figure 13 is a view taken along line A of Figure 12;
  • Figure 14 is a B-B view of Figure 13, and is also a schematic structural view of the A2 type pier foundation 8-2 above the ground;
  • Figure 15 is a C-C view of Figure 13, and is also a schematic structural view of the underside of the A2 type pier foundation 8-2;
  • Figure 16 is a plan view of the A3 type pier foundation 8-3, the lower part of the ground is indicated by a broken line;
  • Figure 17 is a view taken along the line A in Figure 16;
  • Figure 18 is a B-B view of Figure 17, and is also a schematic view of the A3 type pier foundation 8-3 above the ground;
  • Figure 19 is a C-C view of Figure 17, and is also a schematic structural view of the A3 type pier foundation 8-3 below the ground;
  • Figure 20 is a plan view of the A4 type pier foundation 8-4, the lower part of which is indicated by a broken line;
  • Figure 21 is a view taken along line A of Figure 20;
  • Figure 22 is a B-B view of Figure 21, and is also a schematic structural view of the A4 type pier foundation 8-4 above the ground;
  • Figure 23 is a plan view of the B1 type pier foundation 9-1, and is also a structural schematic view of the B1 type pier foundation 9-1 formed by embedding four plates;
  • Figure 24 is a view in the direction of arrow A of Figure 23, and is also a structural schematic view of each of the plates constituting the B1 type pier foundation 9-1 in the set order with the chain cutter 3 at the bottom thereof;
  • Figure 25 is a B-direction view of Figure 23, and is also a schematic structural view of a vertical geotechnical conveying device 7-2 composed of a chain cutter 3 and a side cover 1-3;
  • Figure 26 is a C-C view of Figure 23, which is also a structural schematic view of the bottom end opening of the B1 type pier foundation 9-1, and the concrete capping at the ground height position increases the carrying capacity;
  • FIG. 27 is a schematic view showing the structure of the B2 type pier foundation 9-2, which is a structural view of the sprocket 6 and the chain cutter 3 of the chain excavating device 2, and also the B2 type pier foundation 9-2 is completely sunk together with the chain cutter 3 at the bottom.
  • Schematic diagram of the time, the section below the ground of the B2 type pier foundation is consistent with the cross-sectional shape of the above ground part, that is, the pier section is the same as the foundation section;
  • Figure 28 is a view in the direction of arrow A of Figure 27, and is also a schematic view of the bridge on the top of the B2 type pier foundation 9-2.
  • the B2 type pier foundation 9-2 is internally welded and sealed at the ground height position to increase the axial load carrying capacity;
  • Figure 29 is a B-B view of Figure 28;
  • Figure 30 is a schematic view showing the structure of the B3 type pier foundation 9-3.
  • the structure below the ground of the B3 type pier foundation is different from the structure above the ground, that is, the pier section is different from the foundation section;
  • Figure 31 is a view taken along line A-A of Figure 30;
  • Figure 32 is a schematic structural view of a B4 type pier foundation 9-4;
  • Figure 33 is a view taken along line A in Figure 32;
  • Figure 34 is a B-B view of Figure 33;
  • FIG 35 is a schematic view of the structure of the B5 type pier foundation 9-5.
  • the B5 type pier foundation is mainly used for the higher main pier foundation.
  • the four pier foundations share one foundation, and each pier foundation has a construction channel reserved for the lower foundation.
  • the bottom cap is reinforced to increase the bearing capacity of the pier foundation;
  • Figure 36 is a view taken along the line A in Figure 35;
  • FIG. 37 is a B-B view of FIG. 35, and is a structural schematic view of the reserved construction channel inside the pier foundation entering the lower foundation for bottom capping reinforcement, and increasing the bearing capacity of the pier foundation;
  • the C-type pier foundation 10 mainly includes a bottom foundation 10-1, a immersed pipe 10-2, and a connecting beam 10-3, which is suitable for deep water;
  • Figure 39 is a view taken along line A-A of Figure 38;
  • Figure 40 is a B-B view of Figure 38
  • Figure 41 is a partial enlarged view of I of Figure 38;
  • Figure 42 is a plan view of the caisson foundation 11;
  • Figure 43 is a view taken along line A-A of Figure 42;
  • Figure 44 is a structural schematic view of the bottom rail and the side rail of the pier foundation 1, the type of the rail includes five kinds of a, b, c1, c2 and d, wherein a is a flat type, b is a convex type, and c is a concave type;
  • Figure 45 is a schematic view showing the structure of the d-shaped rail and the chain cutter of the pier foundation 1;
  • Fig. 46 is a structural schematic view showing that d is a longitudinally multi-row staggered tapered track.
  • 1 in the figure is the pier foundation with the excavating device at the bottom; 1-1 is the track running the chain cutter 3 at the bottom of the pier foundation 1; 1-2 is the track running the chain cutter 3 on the side of the pier foundation 1; 1-3 is the bottom belt a side cover of the edge of the pier foundation 1; 2 is a chain excavation device composed of a chain cutter 3, a driving device 4, a tensioning device 5, a sprocket 6, etc.; 3 is a chain cutter constituting the chain excavating device 2; -1 is the chain constituting the chain cutter 3, including the crawler, the rope and the flexible belt; 3-1-1 is the A ten-byte which constitutes the ten-byte of the chain; 3-1-2 is the B-cross which constitutes the ten-byte of the chain Section 3-1B is a steel cable constituting the chain cutter 3; 3-2 is a cutter for excavating the rock soil fixed on the chain 3-1; 3-2B is a cutter for excavating the rock soil fixed on the steel cable 3-1B 4 is
  • the bottom of the foundation of the pier is provided with a chain knife running track.
  • a chain cutter for excavating rock and earth is installed on the track
  • the chain knife is composed of a chain and a cutter fixed on the chain
  • the chain excavating device is mainly composed of a chain cutter and a transmission.
  • the device is composed of a device such as a sprocket and a driving device; the driving device drives the chain knife, the chain knife runs along the track, the cutter at the bottom of the pier foundation excavates the rock and soil, and the chain knife that runs vertically upwards will excavate the rock and soil Sent to the top, the chain knife at the bottom of the pier foundation and the foundation of the pier are lowered together.
  • the chain cutter replaces the cutter on the chain on the work platform or in the passage to adapt to different geological conditions at different depths.
  • the chain cutter is a multi-row chain cutter in the width direction, and the multi-row chain cutter performs simultaneous excavation or separate excavation as needed.
  • the construction method of the pier foundation is a prefabrication method, which is divided into the following steps:
  • the construction method of the pier foundation is the cast-in-place method, and the concrete except the bottom of the pier foundation is poured in the fixed formwork on the site, and the fixed formwork does not move during the construction, and the bottom of the pier foundation is poured with the bottom of the earth and earth.
  • the chain excavation device is installed on the frame, the frame is composed of the intermediate frame and the upper frame, the bottom of the intermediate frame is connected with the bottom of the pier foundation, the top of the intermediate frame is connected with the upper frame, and the middle frame is installed.
  • the track with the chain cutter running, the middle frame is the integral part of the foundation steel cage of the pier, and the chain cutter and the closed cavity of the intermediate frame from the bottom up constitute a chain-type vertical soil conveyor, with the bottom of the foundation of the pier foundation Sink, the intermediate device also sinks synchronously;
  • the upper frame is fixed on the work platform or fixed on the top of the intermediate frame, the upper frame is equipped with a chain drive device and a tensioning device, and the chain at the bottom of the pier foundation passes through the intermediate frame and the upper portion
  • the driving device of the frame and the tensioning device are connected; the cast-in method is divided into the following steps:
  • the pier foundation is the A-type pier foundation.
  • the pier foundation is a B-type pier foundation.
  • the bridge pier foundation C-type pier foundation The bridge pier foundation C-type pier foundation.
  • the pier foundation is the sinking foundation.
  • the chain constituting the chain cutter is a generalized chain including a crawler belt, a rope and a flexible belt.
  • the piers are provided with rails 1-1 and 1-2 in which the chain excavating device 2 is operated, and the chain excavating device 2 is composed of a chain cutter 3, a driving device 4, a tensioning device 5, and a sprocket. 6 composition, the chain knife 3 is composed of a chain 3-1 and a cutter 3-2 fixed on the chain; the driving device 4 drives the chain 3-1 during construction, and the chain 3-1 drives the cutter 3-2 to run along the track, the pier foundation
  • the bottom tool 3-2 excavates the rock and soil.
  • the horizontal chain cutter 3-2 at the bottom of the pier foundation is also a horizontal geotechnical conveyor 7-1.
  • the chain knife 3-2 and the side cover 1-3 moving upward from the bottom form a chain.
  • the pier foundation is divided into the following steps by the A method prefabrication method:
  • the prefabricated parts of the pier foundation 1 can be assembled on the ground, or they can be assembled while sinking, as shown in C in the figure;
  • the pier foundation is divided into the following steps by the B method:
  • the chain drive device 4, the tensioning device 5, the bottom rail B-1, the intermediate frame B-2, the upper frame B-3 chain 3-1 are connected to form a chain excavation device 2;
  • the pier foundation 1 is the A1 type pier foundation 8-1, the lower part of the ground is I-shaped, and the ground above is a figure.
  • the cross-sectional area of the pier below the ground is larger than the cross-section area of the pier above the ground. Strong ability, small footprint on the ground above the pier.
  • the pier foundation 1 is the A2 type pier foundation 8-2, the lower part of the ground is I-shaped, and the ground above is one-line on each side.
  • the cross-sectional area of the pier below the ground is larger than the cross-section area of the pier above the ground. Large, strong carrying capacity, the pier above the ground is in a shape on both sides.
  • the pier foundation 1 is the A3 type pier foundation 8-3, the lower part of the ground is I-shaped, and the ground above is a cross type on each side.
  • the cross-section of the pier above the ground is large and the rigidity is good.
  • the pier foundation 1 is the A4 type pier foundation 8-4, the lower part of the ground is I-shaped, and the ground above is a cylindrical type on both sides.
  • the cross-sectional area of the pier below the ground is larger than the cross-section area of the pier above the ground. , carrying capacity is strong.
  • the pier foundation 1 is a B1 type pier foundation 9-1, and the lower part of the ground is a well-shaped pier, and the lower end is open, and concrete capping is placed at the surface height to increase the bearing capacity.
  • the pier foundation 1 is a B2 type pier foundation 9-2, and the cross-sectional shape of the pier above the ground is the same as that of the pier below the ground, and both are well-shaped, and the lower end of the pier is open. Pouring concrete caps at height locations increases load carrying capacity.
  • the pier foundation 1 is the B3 type pier foundation 9-3.
  • the cross-sectional shape of the pier above the ground is different from the cross section of the pier below the ground.
  • the ground below is the well type, and the ground above is hollow. rectangle.
  • the pier foundation 1 is a B4 type pier foundation 9-4
  • the lower part of the ground is a well type
  • the above part of the ground has a cross shape at each of the four corners
  • the pier above the ground has good rigidity. Strong carrying capacity, suitable for the main pier.
  • the pier foundation 1 is the B5 type pier foundation 9-5
  • the lower part of the ground is the well-shaped pier foundation
  • the four piers share one foundation
  • each pier has a construction channel to enter the lower foundation.
  • the bottom capping reinforcement is carried out to increase the bearing capacity of the pier, which is suitable for the main pier of the cable bridge.
  • the pier foundation 1 is a C-type pier foundation 10, which is suitable for deep water area.
  • the immersed pipe 10-2 and the connecting beam 10-3 form a dry bottom construction environment, and the pier is constructed at the bottom of the immersed pipe.
  • Foundation 10-1, pier foundation 10-1 is a well-shaped pier, with a chain knife at the bottom, and the chain cutter excavates the rock-soil pier and the chain knife to descend. After reaching the set depth, the roof is reinforced, so that the pier foundation 10-1 and the immersed pipe
  • the 10-2 and the connecting beam 10-3 constitute a deep water C-type pier foundation 10.
  • the pier foundation 1 is a caisson foundation, which is suitable for deep water areas and large pier foundations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

La présente invention concerne une fondation de pilier. Le pied d'une fondation de pilier (1) est pourvu d'une chenille (1-1) pour permettre à un appareil d'excavation à chaîne (2) de fonctionner. L'appareil d'excavation à chaîne (2) est principalement composé d'un dispositif de coupe à chaîne (3) et d'un appareil de transmission, le dispositif de coupe à chaîne (3) étant composé d'une chaîne (3-1) et d'un dispositif de coupe (3-2) fixé sur la chaîne (3-1), et l'appareil de transmission étant principalement composé d'un pignon (6) et d'un appareil d'entraînement (4). L'appareil d'entraînement (4) entraîne le dispositif de coupe à chaîne (3), le dispositif de coupe à chaîne (3) s'étend le long de la chenille (1-1), l'appareil d'excavation à chaîne (2) au pied de la fondation de pilier (1) excave la roche et le sol, le dispositif de coupe à chaîne (3) fonctionnant perpendiculairement vers le haut délivre la roche et le sol excavés au-dessus, et le dispositif de coupe à chaîne (3) au pied de la fondation de pilier (1) et la fondation de pilier (1) descendent ensemble. L'invention concerne en outre un procédé de construction pour la fondation de pilier. La fondation de pilier (1) elle-même comporte l'appareil d'excavation à chaîne (2) de telle sorte que l'excavation sur place intégrale n'est pas nécessaire, la fondation de pilier peut être préformée au niveau du site de travail ou peut être construite par coulage tout en descendant dans un coffrage fixe sur place, la construction est simple, et les coûts sont faibles.
PCT/CN2018/071980 2017-01-18 2018-01-09 Fondation de pilier et procédé de construction associé Ceased WO2018133711A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710038059.3 2017-01-18
CN201710038059.3A CN106759418A (zh) 2017-01-18 2017-01-18 一种桥墩基础及其施工法

Publications (1)

Publication Number Publication Date
WO2018133711A1 true WO2018133711A1 (fr) 2018-07-26

Family

ID=58944082

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/071980 Ceased WO2018133711A1 (fr) 2017-01-18 2018-01-09 Fondation de pilier et procédé de construction associé

Country Status (2)

Country Link
CN (1) CN106759418A (fr)
WO (1) WO2018133711A1 (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759463A (zh) * 2017-01-18 2017-05-31 王燏斌 一种地下建筑及其施工法
CN106759418A (zh) * 2017-01-18 2017-05-31 王燏斌 一种桥墩基础及其施工法
CN107059877A (zh) * 2017-01-18 2017-08-18 王燏斌 一种施工时底部带有链刀的基础及其施工法
CN109778909A (zh) * 2019-03-06 2019-05-21 王燏斌 一种用于地下室的下沉施工法及其施工装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4120408A (en) * 1976-06-18 1978-10-17 Pohlig-Heckel-Bleichert Vereinigte Maschinen-Fabriken Bridge scraper
SU1308675A1 (ru) * 1985-11-13 1987-05-07 Специальное Конструкторское Бюро Главмостостроя Устройство дл надвижки пролетного строени моста
CN2079201U (zh) * 1990-11-28 1991-06-19 天津市自来水公司 链刀式挖沟机
CN100547178C (zh) * 2008-01-04 2009-10-07 贵州省桥梁工程总公司 水中桥梁基础施工方法
CN105133627A (zh) * 2015-07-28 2015-12-09 安徽省新路建设工程集团有限责任公司 单壁钢板桩围堰流水状态下施工工法
CN105569064A (zh) * 2015-12-10 2016-05-11 中铁大桥局集团有限公司 一种适用于深水裸岩的设置式沉井基础施工方法
CN106759418A (zh) * 2017-01-18 2017-05-31 王燏斌 一种桥墩基础及其施工法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5985021A (ja) * 1982-11-05 1984-05-16 Kajima Corp 地下連続壁工法及びその工法に使用する装置
JPS62233328A (ja) * 1986-04-01 1987-10-13 Fusao Sakano 爪付篦型バケットを備えた掘削装置本体を介して置き去り式に擁壁を設置する設置装置
JPH04179726A (ja) * 1990-11-13 1992-06-26 Kazutoshi Isachi 簡易地下連続壁工法における壁体用部材と該壁体用部材を使用した簡易地下連続壁工法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4120408A (en) * 1976-06-18 1978-10-17 Pohlig-Heckel-Bleichert Vereinigte Maschinen-Fabriken Bridge scraper
SU1308675A1 (ru) * 1985-11-13 1987-05-07 Специальное Конструкторское Бюро Главмостостроя Устройство дл надвижки пролетного строени моста
CN2079201U (zh) * 1990-11-28 1991-06-19 天津市自来水公司 链刀式挖沟机
CN100547178C (zh) * 2008-01-04 2009-10-07 贵州省桥梁工程总公司 水中桥梁基础施工方法
CN105133627A (zh) * 2015-07-28 2015-12-09 安徽省新路建设工程集团有限责任公司 单壁钢板桩围堰流水状态下施工工法
CN105569064A (zh) * 2015-12-10 2016-05-11 中铁大桥局集团有限公司 一种适用于深水裸岩的设置式沉井基础施工方法
CN106759418A (zh) * 2017-01-18 2017-05-31 王燏斌 一种桥墩基础及其施工法

Also Published As

Publication number Publication date
CN106759418A (zh) 2017-05-31

Similar Documents

Publication Publication Date Title
US20190376252A1 (en) Foundation With Chain Blades During Construction and Its Construction Method
CN109555540B (zh) 隧道形式预应力管幕结构及施工方法
CN101139839B (zh) 高承压水地区超深基坑的设置结构
CN107869144B (zh) 一种预掏槽环封双壁钢围堰深水基础综合施工方法
WO2018133740A1 (fr) Bâtiment souterrain et son procédé de construction
WO2018133711A1 (fr) Fondation de pilier et procédé de construction associé
CN107044129A (zh) 一种分块拼装式无底单壁钢套箱围堰及其施工方法
CN107489106B (zh) 一种岩石河床水中承台施工方法
WO2018133746A1 (fr) Bâtiment souterrain formé de pieux et de murs, et son procédé de construction
KR101256265B1 (ko) 임시 물막이공정이 생략된 교각의 수중설치공법.
WO2018177307A1 (fr) Bâtiment souterrain préfabriqué et son procédé de construction
CN110056003A (zh) 一种用于地下室的整体下沉施工法及其施工装置
CN111733827A (zh) 邻近高铁复杂环境淤泥地质下站场深基坑防护施工方法
CN106759464A (zh) 一种地下建筑及其施工法
CN115992483A (zh) 一种深水浅覆盖层斜岩栈桥施工方法
CN207228156U (zh) 一种由桩和墙组成的地下建筑物
CN210712922U (zh) 一种用于地下室的整体下沉施工装置
WO2018177304A1 (fr) Bâtiment souterrain préfabriqué et son procédé de construction
CN207228106U (zh) 一种基础挖掘灌注装置
WO2018177306A1 (fr) Paroi souterraine fabriquée et son procédé de construction
CN114922141B (zh) 一种钢构坝防渗帷幕结构体系
CN106400814A (zh) 一种基坑支护方法
CN106759287A (zh) 一种基础挖掘灌注装置及其逆作施工法
WO2018166523A1 (fr) Fondation en eau profonde, dispositif de construction, et procédé de construction associé
WO2018133748A1 (fr) Navire de construction pour tunnel sous-marin et procédé de construction associé

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18741741

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18741741

Country of ref document: EP

Kind code of ref document: A1