WO2013183795A1 - 건설기계용 주행 제어방법 - Google Patents
건설기계용 주행 제어방법 Download PDFInfo
- Publication number
- WO2013183795A1 WO2013183795A1 PCT/KR2012/004378 KR2012004378W WO2013183795A1 WO 2013183795 A1 WO2013183795 A1 WO 2013183795A1 KR 2012004378 W KR2012004378 W KR 2012004378W WO 2013183795 A1 WO2013183795 A1 WO 2013183795A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- driving
- work device
- joystick
- valve
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2221—Control of flow rate; Load sensing arrangements
- E02F9/2239—Control of flow rate; Load sensing arrangements using two or more pumps with cross-assistance
- E02F9/2242—Control of flow rate; Load sensing arrangements using two or more pumps with cross-assistance including an electronic controller
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2253—Controlling the travelling speed of vehicles, e.g. adjusting travelling speed according to implement loads, control of hydrostatic transmission
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2278—Hydraulic circuits
- E02F9/2292—Systems with two or more pumps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B11/00—Servomotor systems without provision for follow-up action; Circuits therefor
- F15B11/16—Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
- F15B11/17—Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors using two or more pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B21/00—Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
- F15B21/10—Delay devices or arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/63—Electronic controllers
- F15B2211/6303—Electronic controllers using input signals
- F15B2211/6346—Electronic controllers using input signals representing a state of input means, e.g. joystick position
Definitions
- the present invention relates to a traveling control method for a construction machine, and more particularly, a traveling control for a construction machine to improve the operability of the working device when performing a flattening operation by operating a work device such as an arm while driving an excavator at the same time. It is about a method.
- First and second hydraulic pumps P1 and P2 connected to the engine (not shown),
- a left travel control valve (2) installed in the discharge flow path (1) of the first hydraulic pump (P1) and controlling the driving of the left travel motor;
- a control valve 3 for the first working device which is installed in the parallel flow paths 1a of the first hydraulic pump P1 and consists of spools respectively controlling the first arm and the second boom drive;
- a right traveling control valve 5 installed in the discharge passage 4 of the second hydraulic pump P2 and controlling the driving of the right traveling motor
- a control valve 7 for a second working device which is installed in the parallel flow passage 4a of the second hydraulic pump P2, and is formed of spools respectively controlling the driving of the first boom, the bucket, and the second arm,
- the solenoid valve 9 which switches the traveling switching valve 8 to the traveling switching mode at the time of the compound operation which operates a traveling and a work device simultaneously is provided.
- the driver when performing an operation of leveling the ground evenly using an excavator or carrying a heavy article, the driver includes a work device 10 and a traveling device 6 formed of a boom, an arm, or the like; Drive tracks simultaneously).
- the travel switching valve 8 is driven by the solenoid valve 9 in the travel switching mode. (Spool is switched to the position of Fig. 1 (b)). Therefore, the hydraulic oil discharged from the first hydraulic pump P1 is supplied to the left traveling motor and the right traveling motor through the discharge flow paths 1 and 4, and the hydraulic oil discharged from the second hydraulic pump P2 is parallel to the flow path ( Through 1a, 4a, it is possible to distribute and supply the control valve 3 for the first work device and the control valve 7 for the second work device.
- the traveling switching mode function of the traveling switching valve 8 is released (the spool is switched to the position of FIG. 1 (a)) at the moment when the operation direction of the working device such as the arm is changed while driving the excavator, the working When the device 10 is operated, shock is generated to increase the driver's fatigue degree, and the operability of operating the work device 10 is inferior.
- the embodiment of the present invention improves the operability of operating the work device by delaying the driving switching mode release function for a certain time when the work device is not temporarily operated during a compound operation for simultaneously operating the work device while driving an excavator. It relates to a driving control method for a construction machine.
- the first and second hydraulic pumps, the left travel control valves provided in the discharge flow path of the first hydraulic pump, the right travel control valves installed in the discharge flow path of the second hydraulic pump, and the parallel flow paths of the first hydraulic pump The control valve for the first work device, the control valve for the second work device installed in the parallel flow path of the second hydraulic pump, and the operation oil and the work device are switched at the same time so that the hydraulic oil from the first hydraulic pump Distributing and supplying to the right traveling motor, and supplying and supplying the hydraulic oil from the second hydraulic pump to the control valve for the first work device and the control valve for the second work device to switch between the travel switching valve and the travel switching valve.
- the traveling control method for a construction machine having a solenoid valve and a controller for controlling the solenoid valve
- a fifth step of determining whether the driving pedal is operated and the joystick operation is temporarily stopped for a set time
- the solenoid valve is controlled to And a seventh step of releasing the driving switching mode and repeating the process of returning to the second step.
- the output voltage input to the controller according to the operation of the electric joystick can be used as the detection means for detecting the running and the operation of the work device.
- the secondary pressure input to the controller according to the operation of the hydraulic joystick can be used.
- a hydraulic switch provided in the hydraulic system can be used.
- a parameter stored in an internal memory included in the controller may be used.
- a switch that can be set by a user may be used.
- a monitor installed in the cab can be used.
- a cluster installed in the cab may be used.
- Running control method for a construction machine according to an embodiment of the present invention configured as described above has the following advantages.
- the travel switching mode function is controlled not to be released for a certain time, thereby reducing the occurrence of shock when the work device is operated, thereby improving operability.
- FIG. 1 (a, b) is a view for explaining a driving control apparatus according to the prior art
- FIG. 2 is a view for explaining a stop operation performed by driving a work device while driving
- FIG. 3 is a view for explaining a driving switching solenoid valve control according to the operation of the traveling and work apparatus in the traveling control method for a construction machine according to an embodiment of the present invention
- FIG. 4 is a flowchart illustrating a traveling control method for a construction machine according to an embodiment of the present invention.
- First and second hydraulic pumps P1 and P2 connected to the engine (not shown),
- a left travel control valve (2) installed in the discharge flow path (1) of the first hydraulic pump (P1) and controlling the driving of the left travel motor;
- a right traveling control valve 5 installed in the discharge passage 4 of the second hydraulic pump P2 and controlling the driving of the right traveling motor
- a control valve 3 for the first working device which is installed in the parallel flow paths 1a of the first hydraulic pump P1, and is formed of spools respectively controlling the drive for the first arm and the second boom,
- a control valve 7 for a second working device which is installed in the parallel flow path 4a of the second hydraulic pump P2, and which consists of spools that respectively control driving of the first boom, the bucket, and the second arm,
- the joystick By comparing the magnitude of the operation signal value according to the operation of the joystick 12 with the set value (referring to a preset threshold value to determine whether the joystick 12 is operated), the joystick (if the operation signal value is relatively large) 12) the fourth step (S400) is determined to operate the work device is operated,
- a seventh step S700 of determining whether the driving pedal 13 is operated and the joystick 12 operation is temporarily stopped for a set time (flag 1?);
- the initial set time required e.g., time required is set to 0
- the delay time set value of the driving switching function e.g., set to "1" second
- an output voltage input to the controller 11 according to the operation of the electric joystick may be used.
- a secondary pressure input to the controller 11 according to the operation of the hydraulic joystick may be used.
- a hydraulic switch provided in the hydraulic system may be used.
- a parameter stored in the internal memory included in the controller 11 may be used.
- a switch that can be set by a user may be used.
- a monitor installed in the cab may be used.
- a cluster 14 installed in the cab may be used.
- the above-described excavator is provided with a traveling device, an upper swinging body rotatably mounted to the traveling device, and a working device consisting of a boom, an arm, and a bucket rotatably mounted to the upper swinging body.
- the user when performing a stop operation for smoothly leveling the ground using an excavator, the user sets a delay time setting value of the travel switching function of the travel switching valve 8 by way of example.
- Set value 1 second
- the initial value is set to 0 for the required time and flag, respectively.
- the above-described set value is a set value for a time t for delaying the release of the run switching mode when the run switching mode of the run switching valve 8 is released.
- the operation signal values according to the operation of the joystick 12 and the driving pedal 13 are input to the controller 11 by the user in real time.
- the operation signal value according to the operation of the driving pedal 13 and the magnitude of the set value is compared, if the operation signal value is relatively large, it is determined that the driving is in progress and proceeds to "S400", the operation signal value is If it is relatively small, it is determined that the driving pedal 13 has not been operated, and the flow advances to "S1000".
- the controller 11 stores the required time as "0" and stores the flag as "1". .
- the driving switching valve 8 is switched to the driving switching mode by controlling the solenoid valve 9, and in the second step S200. Repeat the process of returning.
- the driving pedal 13 is recognized as operated, and it is determined whether the operation of the joystick 12 is temporarily stopped during the set time (i.e., when the work device operation is temporarily stopped while driving). do. That is, when it is determined that the driving pedal 13 is operated and the joystick 12 operation is stopped within the set time, the process proceeds to "S800", and the driving pedal 13 is operated and the joystick 12 operation is stopped for longer than the set time. If it is determined that the answer has been made, proceed to "S1000".
- the program runs one loop to measure the required time in increments.
- the driving switching valve 8 may be switched to the driving switching mode.
- the traveling switching valve 8 is switched to the traveling switching mode (that means the spool is switched to the position of Fig. 1 (b)), Even when the work device operation signal is not input within the set time, the drive change mode release is delayed during the set time (1 second).
- the travel switching function is maintained for the set time, thereby improving the operability of operating the work device.
- the operation of the work device is delayed by delaying the driving switching mode release function for a certain time when the work device is not temporarily operated. There is an effect that can improve the operability.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Operation Control Of Excavators (AREA)
Description
Claims (8)
- 제1,2유압펌프와, 제1유압펌프의 토출유로에 설치되는 좌측 주행제어밸브와, 제2유압펌프의 토출유로에 설치되는 우측 주행제어밸브와, 제1유압펌프의 병렬유로에 설치되는 제1작업장치용 제어밸브와, 제2유압펌프의 병렬유로에 설치되는 제2작업장치용 제어밸브와, 주행과 작업장치를 동시에 조작시 절환되어 제1유압펌프로부터의 작동유를 좌측 주행모터와 우측 주행모터에 분배 공급하고, 제2유압펌프로부터의 작동유를 제1작업장치용 제어밸브와 제2작업장치용 제어밸브에 분배 공급하여 편 주행을 방지하는 주행 절환밸브와, 주행 절환밸브를 절환시키는 전자밸브와, 전자밸브를 제어하는 제어기를 구비하는 건설기계용 주행 제어방법에 있어서:상기 주행 절환밸브의 주행 절환기능의 지연시간 설정값을 입력하는 제1단계와,사용자에 의해 조이스틱 및 주행페달 조작에 따른 조작신호값을 실시간으로 입력하는 제2단계와,상기 주행페달 및 조이스틱의 조작에 따른 주행 및 작업장치 작동 여부를 판단하는 제3단계와,상기 주행페달과 조이스틱을 동시에 조작한 경우, 상기 전자밸브를 제어하여 상기 주행 절환밸브를 주행 절환모드로 절환시키고, 제2단계로 복귀하는 과정을 반복하는 제4단계와,상기 주행페달이 조작되고, 상기 조이스틱 조작이 설정시간동안 일시적으로 정지된 경우인지를 판단하는 제5단계와,초기 설정된 소요시간과, 주행 절환기능의 지연시간 설정값의 대소 여부를 판단하되, 설정값이 상대적으로 큰 경우에 주행 절환밸브를 주행 절환모드로 절환시키는 제6단계와,상기 주행페달이 초기부터 조작되지않는 경우, 주행페달이 조작되고 조이스틱 조작이 설정시간 이상으로 정지된 경우, 또는 초기 설정된 소요시간이 지연시간 설정값보다 큰 경우에, 상기 전자밸브를 제어하여 주행 절환밸브의 주행 절환모드를 해제시키고, 제2단계로 복귀하는 과정을 반복하는 제7단계를 구비하는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 주행과 작업장치의 작동 유무를 검출하는 검출수단으로, 전기식 조이스틱의 조작에 따라 제어기에 입력되는 출력전압이 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 주행과 작업장치의 작동 유무를 검출하는 검출수단으로, 유압식 조이스틱의 조작에 따라 제어기에 입력되는 2차압력이 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 주행과 작업장치의 작동 유무를 검출하는 검출수단으로, 유압시스템에 구비되는 유압 스위치가 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 제어기에 설정값을 입력하는 수단으로, 상기 제어기에 구비되는 내부 메모리에 저장되는 파라미터가 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 제어기에 설정값을 입력하는 수단으로, 사용자에 의해 설정이 가능한 스위치가 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 제어기에 설정값을 입력하는 수단으로, 운전실캡 내에 설치되는 모니터가 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
- 제1항에 있어서, 상기 제어기에 설정값을 입력하는 수단으로, 운전실캡 내에 설치되는 클러스터가 사용되는 것을 특징으로 하는 건설기계용 주행 제어방법.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/KR2012/004378 WO2013183795A1 (ko) | 2012-06-04 | 2012-06-04 | 건설기계용 주행 제어방법 |
| KR1020147033010A KR101770732B1 (ko) | 2012-06-04 | 2012-06-04 | 건설기계의 주행 제어방법 |
| US14/403,945 US9562345B2 (en) | 2012-06-04 | 2012-06-04 | Driving control method for construction machine |
| DE112012006316.3T DE112012006316B4 (de) | 2012-06-04 | 2012-06-04 | Antriebssteuerverfahren für eine Baumaschine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/KR2012/004378 WO2013183795A1 (ko) | 2012-06-04 | 2012-06-04 | 건설기계용 주행 제어방법 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013183795A1 true WO2013183795A1 (ko) | 2013-12-12 |
Family
ID=49712174
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2012/004378 Ceased WO2013183795A1 (ko) | 2012-06-04 | 2012-06-04 | 건설기계용 주행 제어방법 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US9562345B2 (ko) |
| KR (1) | KR101770732B1 (ko) |
| DE (1) | DE112012006316B4 (ko) |
| WO (1) | WO2013183795A1 (ko) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014115907A1 (ko) | 2013-01-24 | 2014-07-31 | 볼보 컨스트럭션 이큅먼트 에이비 | 건설기계의 유량 제어장치 및 제어방법 |
| KR101822931B1 (ko) * | 2013-02-06 | 2018-01-29 | 볼보 컨스트럭션 이큅먼트 에이비 | 건설기계용 선회 제어 시스템 |
| JP6575916B2 (ja) * | 2016-08-17 | 2019-09-18 | 日立建機株式会社 | 作業車両 |
| US12435490B2 (en) * | 2022-06-30 | 2025-10-07 | Caterpillar Sarl | Electro-hydraulic controlled excavator travel to tool control priority function |
| JP2025080831A (ja) * | 2023-11-15 | 2025-05-27 | キャタピラー エス エー アール エル | 建設機械の油圧回路 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0726592A (ja) * | 1993-07-07 | 1995-01-27 | Kubota Corp | バックホウの油圧回路構造 |
| JPH07207697A (ja) * | 1994-01-13 | 1995-08-08 | Yutani Heavy Ind Ltd | 建設機械の油圧回路 |
| KR100734442B1 (ko) * | 2006-04-18 | 2007-07-03 | 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 | 주행직진용 유압회로 |
| KR20100071501A (ko) * | 2008-12-19 | 2010-06-29 | 두산인프라코어 주식회사 | 건설기계의 동력제어장치 |
| JP2010216208A (ja) * | 2009-03-19 | 2010-09-30 | Caterpillar Sarl | 旋回制御装置 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3225532B2 (ja) | 1991-03-29 | 2001-11-05 | ソニー株式会社 | ドライエッチング方法 |
| JP2007120004A (ja) | 2005-10-24 | 2007-05-17 | Kobelco Contstruction Machinery Ltd | 作業機械の油圧制御装置 |
| US7614225B2 (en) | 2006-04-18 | 2009-11-10 | Volvo Construction Equipment Holding Sweden Ab | Straight traveling hydraulic circuit |
| KR100753986B1 (ko) | 2006-04-18 | 2007-08-31 | 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 | 주행직진용 유압회로 |
| BRPI0920016A2 (pt) * | 2008-12-17 | 2015-12-15 | Komatsu Mfg Co Ltd | dispositivo de controle para um veículo de transmissão hidrostática |
| WO2012002585A1 (ko) | 2010-06-28 | 2012-01-05 | 볼보 컨스트럭션 이큅먼트 에이비 | 하이브리드식 굴삭기의 제어시스템 |
| WO2012008627A1 (ko) | 2010-07-13 | 2012-01-19 | 볼보 컨스트럭션 이큅먼트 에이비 | 건설기계의 선회 제어 장치 및 그 방법 |
| KR20140010368A (ko) | 2010-12-27 | 2014-01-24 | 볼보 컨스트럭션 이큅먼트 에이비 | 건설기계의 에너지 재생 시스템 |
| CN103649556B (zh) | 2011-07-12 | 2016-10-26 | 沃尔沃建造设备有限公司 | 用于施工机械的液压致动器阻尼控制系统 |
| KR20140050030A (ko) | 2011-08-09 | 2014-04-28 | 볼보 컨스트럭션 이큅먼트 에이비 | 건설기계의 유압 제어시스템 |
| CN103717913B (zh) | 2011-08-09 | 2016-06-29 | 沃尔沃建造设备有限公司 | 用于施工机械的液压控制系统及方法 |
| EP2765240A4 (en) | 2011-10-05 | 2015-10-28 | Volvo Constr Equip Ab | SYSTEM FOR CONTROLLING LEVELING WORK WITH A BAGGER |
-
2012
- 2012-06-04 KR KR1020147033010A patent/KR101770732B1/ko not_active Expired - Fee Related
- 2012-06-04 DE DE112012006316.3T patent/DE112012006316B4/de not_active Expired - Fee Related
- 2012-06-04 US US14/403,945 patent/US9562345B2/en not_active Expired - Fee Related
- 2012-06-04 WO PCT/KR2012/004378 patent/WO2013183795A1/ko not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0726592A (ja) * | 1993-07-07 | 1995-01-27 | Kubota Corp | バックホウの油圧回路構造 |
| JPH07207697A (ja) * | 1994-01-13 | 1995-08-08 | Yutani Heavy Ind Ltd | 建設機械の油圧回路 |
| KR100734442B1 (ko) * | 2006-04-18 | 2007-07-03 | 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 | 주행직진용 유압회로 |
| KR20100071501A (ko) * | 2008-12-19 | 2010-06-29 | 두산인프라코어 주식회사 | 건설기계의 동력제어장치 |
| JP2010216208A (ja) * | 2009-03-19 | 2010-09-30 | Caterpillar Sarl | 旋回制御装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| DE112012006316T5 (de) | 2015-01-22 |
| KR101770732B1 (ko) | 2017-08-23 |
| DE112012006316B4 (de) | 2023-07-06 |
| KR20150022780A (ko) | 2015-03-04 |
| US9562345B2 (en) | 2017-02-07 |
| US20150176251A1 (en) | 2015-06-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2013022131A1 (ko) | 건설기계의 유압 제어시스템 | |
| WO2013015467A1 (ko) | 건설기계용 유압시스템 | |
| WO2011162429A1 (ko) | 건설기계의 유압펌프 제어시스템 | |
| WO2012091182A1 (ko) | 건설기계의 유압시스템 | |
| WO2014208795A1 (ko) | 플로팅기능을 갖는 건설기계용 유압회로 및 플로팅기능 제어방법 | |
| WO2013183795A1 (ko) | 건설기계용 주행 제어방법 | |
| WO2012091184A1 (ko) | 건설기계의 에너지 재생 시스템 | |
| WO2013008964A1 (ko) | 건설기계용 유압 액츄에이터 댐핑 제어시스템 | |
| WO2015111775A1 (ko) | 건설기계용 재생유량 제어장치 및 그 제어방법 | |
| WO2013103157A2 (ko) | 건설기계용 덤프 구동 제어방법 | |
| WO2012121427A1 (ko) | 파이프 레이어용 유압회로 | |
| WO2014112668A1 (ko) | 건설기계의 유량 제어장치 및 제어방법 | |
| WO2013051737A1 (ko) | 굴삭기를 이용한 평탄화 작업 제어시스템 | |
| WO2014092355A1 (ko) | 조이스틱 컨트롤 기반의 건설장비 자동 제어 시스템 및 방법 | |
| WO2013022132A1 (ko) | 건설기계의 압력 제어시스템 | |
| WO2017094986A1 (ko) | 건설기계의 유압 시스템 및 유압 제어 방법 | |
| WO2012087012A2 (ko) | 전자유압펌프용 비상 제어부를 포함하는 건설기계의 유압 시스템 | |
| WO2015099353A1 (ko) | 붐 에너지 회생 제어 회로 및 제어 방법 | |
| WO2016072535A1 (ko) | 건설기계용 주행직진장치 및 그 제어방법 | |
| WO2014115907A1 (ko) | 건설기계의 유량 제어장치 및 제어방법 | |
| WO2013176298A1 (ko) | 건설기계용 유압시스템 | |
| WO2012091186A1 (ko) | 건설기계용 주행 제어시스템 | |
| WO2012074145A1 (ko) | 건설기계의 유압펌프 제어시스템 | |
| WO2013157672A1 (ko) | 건설기계용 유압시스템 | |
| WO2012053672A1 (ko) | 건설장비용 유압시스템 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12878276 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 20147033010 Country of ref document: KR Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14403945 Country of ref document: US Ref document number: 1120120063163 Country of ref document: DE Ref document number: 112012006316 Country of ref document: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12878276 Country of ref document: EP Kind code of ref document: A1 |