[go: up one dir, main page]

WO2013035183A1 - 電池システム監視装置 - Google Patents

電池システム監視装置 Download PDF

Info

Publication number
WO2013035183A1
WO2013035183A1 PCT/JP2011/070498 JP2011070498W WO2013035183A1 WO 2013035183 A1 WO2013035183 A1 WO 2013035183A1 JP 2011070498 W JP2011070498 W JP 2011070498W WO 2013035183 A1 WO2013035183 A1 WO 2013035183A1
Authority
WO
WIPO (PCT)
Prior art keywords
cell
balancing
voltage
soc
battery system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2011/070498
Other languages
English (en)
French (fr)
Inventor
彰彦 工藤
睦 菊地
金井 友範
山内 辰美
明広 町田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vehicle Energy Japan Inc
Original Assignee
Hitachi Vehicle Energy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Vehicle Energy Ltd filed Critical Hitachi Vehicle Energy Ltd
Priority to JP2013532368A priority Critical patent/JP5683710B2/ja
Priority to CN201180072976.4A priority patent/CN103765721B/zh
Priority to PCT/JP2011/070498 priority patent/WO2013035183A1/ja
Priority to US14/241,009 priority patent/US9746525B2/en
Publication of WO2013035183A1 publication Critical patent/WO2013035183A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/0023Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
    • B60L3/0046Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to electric energy storage systems, e.g. batteries or capacitors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/0023Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
    • B60L3/0069Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to the isolation, e.g. ground fault or leak current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/04Cutting off the power supply under fault conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L50/00Electric propulsion with power supplied within the vehicle
    • B60L50/10Electric propulsion with power supplied within the vehicle using propulsion power supplied by engine-driven generators, e.g. generators driven by combustion engines
    • B60L50/16Electric propulsion with power supplied within the vehicle using propulsion power supplied by engine-driven generators, e.g. generators driven by combustion engines with provision for separate direct mechanical propulsion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L50/00Electric propulsion with power supplied within the vehicle
    • B60L50/50Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells
    • B60L50/60Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells using power supplied by batteries
    • B60L50/66Arrangements of batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/15Preventing overcharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/20Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules having different nominal voltages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/22Balancing the charge of battery modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/24Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries for controlling the temperature of batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L7/00Electrodynamic brake systems for vehicles in general
    • B60L7/10Dynamic electric regenerative braking
    • B60L7/14Dynamic electric regenerative braking for vehicles propelled by AC motors
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/486Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for measuring temperature
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0014Circuits for equalisation of charge between batteries
    • H02J7/0016Circuits for equalisation of charge between batteries using shunting, discharge or bypass circuits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2210/00Converter types
    • B60L2210/40DC to AC converters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/10Vehicle control parameters
    • B60L2240/36Temperature of vehicle components or parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/545Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/547Voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/549Current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/60Navigation input
    • B60L2240/66Ambient conditions
    • B60L2240/662Temperature
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/396Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M2220/00Batteries for particular applications
    • H01M2220/20Batteries in motive systems, e.g. vehicle, ship, plane
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Definitions

  • the present invention relates to a battery system monitoring device.
  • an assembled battery configured by connecting a large number of single battery cells of a secondary battery in series is used to secure a desired high voltage.
  • an integrated circuit that measures cell voltage (voltage between terminals of a single battery cell) and equalizes (balances) the remaining state of charge for calculating the capacity of each single battery cell and managing protection. Is used in an assembled battery monitoring device to manage single battery cells. In order to increase the reliability of this integrated circuit, not only measurement and equalization of the cell voltage but also various diagnoses including disconnection detection of the cell voltage detection line are performed to increase the reliability. (For example, refer to Patent Document 1).
  • an assembled battery composed of a secondary battery such as a lithium battery has greatly increased its use in an electric vehicle (EV) or a plug-in hybrid vehicle (PHV).
  • EV electric vehicle
  • PSV plug-in hybrid vehicle
  • the range of use of the SOC of these secondary batteries is wider than that used in a hybrid vehicle (HEV). Therefore, it is required to perform voltage monitoring and diagnosis of all cells at high speed. Further, in order to improve the accuracy of voltage monitoring and diagnosis, it is required to improve the voltage measurement accuracy of all cells over a wide range of use of the secondary battery.
  • the circuit for measuring the voltage between the terminals of the unit cell has temperature characteristics, it is necessary to keep the temperature of the voltage measuring circuit within a predetermined range in order to improve the measurement accuracy of the voltage between the terminals.
  • Patent Document 2 describes an assembled battery capacity adjustment device that changes the magnitude of a bypass current for adjusting the capacity of a large number of single battery cells based on the temperature around the bypass resistance.
  • capacity adjustment is performed by dividing a plurality of single battery cells into a plurality of groups, selecting a timing for adjusting the capacity of each single battery cell for each group, and adjusting the capacity of each single battery cell.
  • a capacitance adjustment circuit that suppresses temperature rise is described.
  • Balancing discharge for equalizing the state of charge of each unit cell generates heat due to the on-resistance of the balancing switch in the integrated circuit, which affects the voltage measurement accuracy of the unit cell in this integrated circuit.
  • the polarization in the single battery cell also affects the accuracy of the SOC estimated from the voltage between the terminals.
  • balancing discharge corresponding to the calculation method of the SOC in consideration of the voltage measurement accuracy in the integrated circuit has not been performed.
  • a battery system monitoring device for monitoring a battery system including a cell group in which a plurality of single battery cells are connected in series, and the states of the plurality of single battery cells in the cell group
  • a first control device that monitors and controls the first control device, a second control device that controls the first control device, a temperature detection unit that measures the temperature in the vicinity of the first control device, and between the terminals of the unit cell
  • a plurality of voltage detection lines for connecting each of the positive and negative electrodes of the single battery cell and the first control device for measuring the voltage are provided, and the first control device is connected to the positive electrode of the single battery cell.
  • Each battery cell has a balancing switch connected between the voltage detection line connected to the negative electrode and the voltage detection line connected to the negative electrode, and performs balancing discharge of the battery cell.
  • the voltage detection line has a first resistor.
  • Balancing in series A balancing discharge circuit comprising a switch and a second resistor connected in series to the balancing switch is connected between a voltage detection line connected to the positive electrode of the battery cell and a voltage detection line connected to the negative electrode.
  • the connection point between the balancing discharge circuit and the voltage detection line connected to the positive electrode of the single battery cell and the connection point between the balancing discharge circuit and the voltage detection line connected to the negative electrode of the single battery cell are respectively from the first resistor. Provided on the cell group side.
  • the first control device includes a voltage detection line connected to each of the positive electrode and the negative electrode of one unit cell or A selection unit that selects a temperature detection line connected to the temperature detection unit and outputs a positive potential and a negative potential of one single battery cell or an output voltage of the temperature detection unit, and one single cell output from the selection unit
  • a voltage measuring unit that measures a voltage between terminals of one unit cell or an output voltage of the temperature detection unit from a positive electrode potential and a negative electrode potential of the cell or an output voltage of the temperature detection unit; It is preferable to include a storage unit that stores data for converting the output voltage of the detection unit into temperature.
  • the second control device performs the first control when starting the vehicle equipped with the battery system monitoring device.
  • the first control device performs balancing discharge for the single battery cell that is subject to balancing discharge when the vehicle is stopped last time. It is preferable to control this.
  • the second control device performs the first control when starting the vehicle equipped with the battery system monitoring device.
  • each of the plurality of single battery cells of the cell group is not connected to a load that drives the vehicle in the battery system. It is preferable to measure the voltage between the terminals, calculate the remaining capacity (SOC) of each of the plurality of single battery cells, and perform balancing discharge based on this SOC.
  • the second control device is configured such that the measured inter-terminal voltages of the plurality of single battery cells are all predetermined voltages.
  • the SOC of each of the plurality of unit cells and the deviation thereof are calculated, and the first controller controls the balancing discharge of the unit cell having the deviation of the SOC more than a predetermined threshold. It is preferable to carry out.
  • the sixth aspect of the present invention in the battery system monitoring apparatus according to the fourth aspect, even one of the measured inter-terminal voltages of the plurality of unit cells is not within the predetermined voltage range.
  • the second control device calculates each SOC of the plurality of unit cells and its deviation, It is preferable that the balancing discharge of the single battery cell having the SOC with the deviation equal to or greater than the threshold value is performed by controlling the first control device.
  • the fourth to sixth aspects In the battery system monitoring device according to any one of the aspects, the second control device is configured such that when at least one of the measured inter-terminal voltages of the plurality of single battery cells is not within a predetermined voltage range, Pairing of balancing discharge at the previous stop The balancing discharge of single cells became, it is preferably performed by controlling the first control device.
  • the battery system monitoring device further includes a current detection unit that detects a charge / discharge current of the battery system, and the second control device is measured If even one of the voltages between the terminals of each of the plurality of unit cells is not within the predetermined voltage range, the balancing discharge of the unit cell that is the target of the balancing discharge at the previous stop of the vehicle is first controlled.
  • the SOC of each of the plurality of unit cells is integrated with the charge / discharge current of the battery system detected by the current detector and the current of balancing discharge of the unit cells in the SOC at the time of the previous stop of the vehicle.
  • the second control device prioritizes the unit cell having a large SOC deviation and performs balancing discharge. It is preferable to perform balancing discharge of the target single battery cell.
  • the second control device is subject to balancing discharge in preference to the single battery cell having a large SOC deviation. It is preferable to perform balancing discharge of the single battery cell.
  • the second control device is a single unit that is a target of balancing discharge. Balancing discharge of the battery cell may be performed by duty-controlling a balancing switch corresponding to the single battery cell targeted for balancing discharge so that the temperature in the vicinity of the first control device is less than a predetermined upper limit value. preferable.
  • the first control device at the highest level among the one control devices and the second control device are connected via a communication line via an insulating element, and the first lowest control value among the M first control devices.
  • the control device and the second control device are connected via a communication line via an insulating element, the M first control devices are connected to each other via a communication line, and the M first control devices are connected to the second control device.
  • a battery system monitoring apparatus for monitoring a battery system including a cell group in which a plurality of single battery cells are connected in series, wherein the plurality of single batteries have OCV-SOC characteristics.
  • the charge / discharge current of the battery system is A current detection unit for detecting; a first control device for monitoring and controlling a state of a plurality of single battery cells of the cell group; a second control device for controlling the first control device; and a voltage of the single battery cell.
  • each unit cell is based on the OCV of the plurality of single battery cells detected by the voltage detection circuit.
  • the SOC of each single battery cell is calculated by the first SOC calculation method for calculating the SOC of the battery cell, and the temperature of the voltage detection circuit detected by the temperature detection unit is outside the predetermined temperature range, the current detection unit
  • Each single battery cell by the second SOC calculation method for calculating the SOC of each single battery cell by integrating the charge / discharge current of the battery system detected by the above and the balancing discharge current of each of the plurality of single battery cells by the balancing discharge circuit The SOC is calculated.
  • the battery system monitoring apparatus By using the battery system monitoring apparatus according to the present invention, it is possible to perform balancing discharge without impairing the measurement accuracy of the voltage measuring circuit between the terminals of the single battery cell provided in the battery system monitoring apparatus. Further, since the balancing discharge is performed in accordance with the measurement accuracy of the voltage measuring circuit, the efficient balancing discharge can be performed.
  • FIG. 2 is a configuration example of an electric drive device of a hybrid vehicle including a power storage device in which a total voltage detection circuit is incorporated in the battery controller of the power storage device illustrated in FIG. 1.
  • FIG. 3 is a diagram showing a connection example of communication lines between a cell controller IC 300 and a microcomputer 504 in a battery controller 500 in the cell controller 200 shown in FIG. 1 or FIG.
  • FIG. 3 is a diagram showing another example of connection of communication lines between the cell controller IC 300 and the microcomputer 504 in the battery controller 500 in the cell controller 200 shown in FIG. 1 or FIG.
  • FIG. 1 It is a figure which shows the internal structural example of cell controller IC300. It is a figure which shows the structural example of the logic part of cell controller IC300. It is a figure which shows the connection with the external circuit of a starting detection part, a communication receiving part, and FF input part in case cell controller IC300 is the highest setting. It is explanatory drawing which shows the detail of the connection to the microcomputer 504 in case cell controller IC3 is the lowest setting. It is explanatory drawing which shows the internal structure of the communication receiver of cell controller IC300. It is explanatory drawing which shows the example of a communication waveform of a FSK system. FIG.
  • FIG. 3 is a schematic diagram of a circuit that inputs a block voltage to a multiplexer in order to perform a block voltage measurement.
  • 12 is a schematic diagram of a circuit when an RC filter and a voltage dividing resistor of the block voltage input unit 225 shown in FIG. 11 are installed outside the cell controller IC 300.
  • FIG. (A) is an example when only the filter capacitor is installed outside, and (b) is an example when both the voltage dividing resistor and the filter capacitor are installed outside. It is a figure which shows the example of the OCV-SOC conversion curve of two secondary batteries which have a different characteristic. It is a figure explaining the SOC calculation error in the type B secondary battery shown in FIG.
  • Embodiment described below is an example at the time of applying the electrical storage apparatus provided with the battery system monitoring apparatus by this invention with respect to the electrical storage apparatus provided with the battery system used for a hybrid vehicle (HEV) etc.
  • HEV hybrid vehicle
  • the present invention is not limited to HEVs and can be widely applied to various power storage devices mounted on plug-in hybrid vehicles (PHEV), electric vehicles (EV), railway vehicles, and the like.
  • a lithium-ion battery having a voltage in the range of 3.0 to 4.2 V (average output voltage: 3.6 V) is assumed as a storage / discharge device that is the minimum unit of control. Any device that can store and discharge electricity that restricts its use when the SOC (State of Charge) is too high (overcharge) or too low (overdischarge) can be used. Collectively, it is called a single battery or single battery cell.
  • a plurality of (approximately several to a dozen) single battery cells connected in series are called cell groups, and a plurality of cell groups connected in series are called battery modules. .
  • a plurality of cell groups or battery modules connected in series or in series and parallel are referred to as a battery system.
  • a cell group, a battery module, and a battery system are collectively referred to as an assembled battery.
  • a cell controller IC that detects the cell voltage of each single battery cell and monitors the battery state while performing a balancing operation or the like is provided for each cell group.
  • the power storage device 100 is connected to an inverter 700 via relays 600 and 610, and the inverter 700 is connected to a motor 800.
  • the inverter 700 includes an inverter circuit including a plurality of semiconductor switching elements, a gate driving circuit for the semiconductor switching elements, and a motor controller that generates a pulse signal for PWM control of the gate driving circuit. 1 is omitted.
  • the power storage device 100 mainly detects a cell group 102 composed of a plurality of lithium ion single battery cells 101, a battery system 104 in which the plurality of cell groups 102 are connected in series, and the voltage of each single battery cell 101.
  • the cell controller 200 includes a plurality of cell controller ICs 300 that perform a balancing discharge operation, and the battery controller 500 that controls the operation of the cell controller 200 and determines the state of each unit cell.
  • 96 lithium ion cells having a rated capacity of 5.5 Ah are connected in series.
  • the battery controller 500 communicates with a plurality of cell controller ICs 300 via the insulating element group 400 to control these cell controller ICs.
  • the cell controller IC 300 is provided for each cell group 102.
  • a voltage detection line between the battery system 104 and the cell controller 200 is connected to the cell controller 200 by a connector (not shown).
  • the battery controller 500 includes a current detection circuit 502 connected to a current sensor 503 that detects a charge / discharge current flowing in the battery system 104, and communication between the cell controller 200, the inverter 700, and a host vehicle controller (not shown).
  • a microcomputer 504 that controls the entire 500 and a storage unit 505 are provided.
  • the storage unit 505 stores various data related to the operation of the power storage device 100, such as the voltage of each battery cell, the current measurement value using the current sensor 503, and the results of various disconnection diagnosis described below. Yes. This data stores data related to the calculation of the ambient temperature of the cell controller IC 300 and the calculation of the temperature when balancing discharge is performed, which will be described later.
  • a total voltage measurement circuit 701 that measures the total voltage of the battery system 104 is provided inside the inverter 700.
  • the battery controller 500 performs temperature correction of the battery state parameter based on the temperature of the unit cell 101 measured by the temperature detection circuit connected to the cell controller IC 300. Yes.
  • the storage unit that stores the data for calculating the ambient temperature of the cell controller IC 300 may be provided in the cell controller IC 300 instead of the battery controller 500. In this case, data obtained by converting the output voltage of the temperature detection unit into a temperature by the logic unit of the cell controller IC 300 is transmitted to the battery controller. For example, when the temperature of the resistance of the balancing switch 222 is corrected, it is easier to manage the correction data held for each cell controller IC.
  • FIG. 2 shows an example in which the total voltage detection circuit 501 is also installed in the battery controller 500.
  • the total voltage detection circuit 501 may not be provided in the battery controller 500 as shown in FIG.
  • the cell controller 200 and the battery controller 500 are provided on one substrate, and these are housed in a metal case.
  • the battery system 104 is also housed in a metal case.
  • the cell controller 200 and the battery system 104 are connected by a harness in which a plurality of voltage detection lines, connection lines for temperature sensors (not shown) of single battery cells, and the like are bundled.
  • the battery controller 500 transmits a command for the cell controller 200 to perform OCV (open circuit voltage) measurement of all the single battery cells via the insulating element group 400.
  • OCV open circuit voltage
  • the measured OCV data of each single battery cell is transmitted from the cell controller 200 to the battery controller 500 via the insulating element group 400 in units of cell groups.
  • the battery controller 500 converts the received OCV of each single battery cell into SOC, and calculates the SOC deviation of all single battery cells.
  • a single battery cell having a SOC deviation larger than a predetermined value is subject to balancing discharge.
  • the time until the SOC deviation of the unit cell subject to balancing discharge becomes zero is calculated, and a command for performing a control operation to turn on the balancing switch in the cell controller IC 300 is issued from the battery controller 500 for this time. It is sent to the cell controller 200, and balancing discharge of the single cell to be balanced is performed.
  • the inverter 700 or a vehicle controller (not shown) as a host controller turns on the relay 600 and the relay 610, and the power storage device 100 is connected to the inverter 700 and the motor 800, and the inverter 700 receives a charge / discharge command from the vehicle controller.
  • the inverter 700 operates to drive the motor 800, and the charge / discharge operation of the power storage device 100 is performed.
  • the battery controller 500 From the time when the power storage device 100 starts charging / discharging with the relay 600 and the relay 610 turned on, the battery controller 500 measures the charging / discharging current and the total voltage at regular intervals. From the obtained total voltage and charge / discharge current values, the battery controller 500 calculates the state of charge (SOC) of the assembled battery and the internal resistance (DCR) of the battery in real time (the calculation method is omitted). Furthermore, the current or power that can be charged / discharged by the battery system 104 is calculated in real time from these values and transmitted to the inverter 700, and the inverter 700 controls the charge / discharge current or power within the range. In FIG. 1, the battery controller 500 does not measure the total voltage, but the total voltage value is obtained from the cell controller 200 by a method described later.
  • FIG. 3 is a diagram showing a communication connection example between the cell controller ICs 300 a to 300 d in the cell controller 200 and the microcomputer 504 in the battery controller 500.
  • the microcomputer 504 includes an activation signal output port for activating cell controller ICs 300a to 300d in the cell controller 200, a transmission port TXD for transmitting commands and data, and a data packet (FF) for detecting an overcharge state.
  • FF signal output port for outputting a signal.
  • a battery module 103 in which two cell groups 102 in which a plurality of single battery cells are connected in series is connected in series is arranged above and below a service disconnect switch (SD-SW) 105.
  • the number of cell groups constituting the battery module 103 is not limited to two and may be three or more.
  • cell controller ICs 300a to 300d are provided, respectively.
  • the lowermost cell controller IC 300a in FIG. 3 is the highest cell controller that first receives a signal from the microcomputer 504.
  • the configuration may be such that the uppermost cell controller IC 300d in FIG. 3 is the highest cell controller.
  • the cell controller ICs 300a to 300d are not particularly limited.
  • the cell groups 102a to 102d are called cell groups or cell groups 102 unless they are particularly limited.
  • a service disconnect switch (hereinafter referred to as SD-SW) 105 is a switch often used in a high-voltage assembled battery. By opening this SD-SW 105 during maintenance and inspection, the current path of the assembled battery is interrupted. The purpose is to prevent the electric shock of the operator. If this SD-SW 105 is opened, the series connection of the batteries will be cut off, so even if a human touches the uppermost terminal and the lowermost terminal of the assembled battery, a high voltage will not be applied to the human body. Can be prevented.
  • the command and data signal are transmitted from the transmission port TXD of the microcomputer 504 to the communication reception terminal RXD of the uppermost cell controller IC 300a through the high-speed insulating element 401 and the capacitor 403.
  • the activation signal output port is connected to the activation signal input terminal WU_Rx of the cell controller IC 300a through the low speed insulating element 402.
  • the FF signal is transmitted from the FF signal output port to the FF input terminal FFIN of the cell controller IC 300a through the low speed insulating element 402 and the capacitor 403.
  • the communication output terminal TXD is connected to the communication receiving terminal RXD of the cell controller IC 300b one lower level by capacitor coupling, and the FF output terminal FFOUT is capacitor coupled to the FF input terminal FFIN of the cell controller IC 300b.
  • the activation output terminal WU_Tx of the cell controller IC 300a is connected to the activation signal input terminal WU_Rx of the cell controller IC 300b which is one lower level.
  • the high-speed insulating element 401, the low-speed insulating element 402, and the capacitor 403 collectively combine the insulating elements used in the communication path path between the microcomputer 504 and the uppermost cell controller IC 300a. Fig. 1).
  • the assembled battery is connected in series through the connection, and even if the SD-SW 105 is disconnected, the assembled battery is connected in series, so that the energization of the assembled battery cannot be cut off. Therefore, there is a possibility that an operator may receive an electric shock.
  • the activation signal is also output from the activation signal output port of the microcomputer 504 to the cell controller IC 300c on the upper side (lower side) of the SD-SW 105 in FIG.
  • the communication output terminal TXD is connected to the communication reception port RXD of the microcomputer 504 via the high-speed insulating element 401.
  • the FF output terminal FFOUT of the cell controller IC 300 d is connected to the FF signal input port of the microcomputer 504 via the low-speed insulating element 402.
  • the microcomputer 504 When the cell controller 200 is activated, the microcomputer 504 outputs an activation signal, and the cell controller IC 300a and the cell controller IC 300c are activated by receiving the activation signal through the low-speed insulating element 402. The activated cell controller IC outputs an activation signal to the next cell controller IC. In this way, all the cell controller ICs 300 are activated in order.
  • an insulating element that can also transmit a DC signal such as a photocoupler is used for the low-speed insulating element 402, and the activation signal from the microcomputer 504 to the cell controller IC 300a and the cell controller IC 300c is a DC signal or a relatively time width signal. This is done with a wide pulse signal. This is because noise and voltage fluctuations are likely to occur when the power storage device 100 is started, so that this influence is removed.
  • a signal for activating the next cell controller IC from the cell controller IC 300a or 300c activated first is performed by a short pulse or an AC pulse signal.
  • the microcomputer 504 transmits a command signal and data (data packet) to the reception terminal RXD of the cell controller IC 300a through the high-speed insulating element 401.
  • the cell controller IC 300a receives the command signal and the data packet, and further transmits them from the output terminal TXD to the next cell controller IC 300b.
  • all the cell controller ICs 300a to 300d receive the command signal and data, and operate according to the command signal and data.
  • the cell controller ICs 300a to 300d receive data packets.
  • the microcomputer 504 receives the data packet including the command signal transmitted by itself, and when the command signal is normally transferred and there is data added by the cell controller ICs 300a to 300d, the data is received.
  • the loop of the cell controller ICs 300a to 300d for the FF signal passing through the FF input terminal FFIN and the FF output terminal FFOUT is a loop for detecting the overcharge or overdischarge state of the single battery cell. This is for detecting the reliability of overcharge detection important for ensuring safety in a system different from the communication line passing through the TXD terminal and the RXD terminal.
  • the FF signal is assumed to be a rectangular wave signal with a constant period. For example, the normal state is a rectangular wave of 1 kHz, and the overcharged state is a rectangular wave of 2 KHz.
  • the cell controller IC 300 When a rectangular wave of 1 kHz is input to the FF input terminal FFIN input, the cell controller IC 300 recognizes that the host cell controller IC 300 is in a normal state (not overcharged), and the cell voltage detection value of the cell controller IC 300 is When an overcharge voltage is detected, a 2 kHz rectangular wave is output to the FF output terminal FFOUT output regardless of whether the frequency of the input signal at the FF input terminal FFIN is 1 kHz or 2 kHz, and the overcharge state is set to the lower cell. Output to the controller IC 300. In addition, when the frequency of the input signal at the FFIN terminal is a signal other than 1 kHz or 2 kHz, a rectangular wave is not output to the FF output terminal FFOUT.
  • the cell controller IC300 Even if a certain cell controller IC300 does not detect an overcharge voltage of a single battery cell of the cell group to be controlled, if a 2 kHz rectangular wave is input from another cell controller IC300 to the FF input terminal FFIN, the cell controller The IC outputs a 2 kHz rectangular wave to the FF output terminal FFOUT. In this way, the FF signal loop outputs that any cell controller IC 300 has detected overcharge, and the microcomputer 504 can detect overcharge through a different path from the high-speed communication signal loop.
  • the microcomputer 504 normally outputs a rectangular wave indicating a normal state of 1 kHz to the uppermost cell controller IC 300a. If the microcomputer 504 outputs a rectangular wave indicating an overcharge of 2 kHz, the microcomputer 504 generates a rectangular wave of the returned FF signal even if all the cell controller ICs 300a to 300d do not detect the overcharge voltage. If it is 2 kHz, it can be confirmed that the FF loop is operating normally. Further, when a failure occurs in the FF loop, for example, when the wire breaks, the state can be identified because the rectangular wave is not transmitted.
  • FIG. 4 is a diagram showing an example in which the cell controller ICs 300a to 300d in the cell controller 200 and the microcomputer 504 in the battery controller 500 are connected by another method.
  • the difference from FIG. 3 is that a capacitor 403 is used for the communication connection line between the switches 103 at the middle point of the assembled battery in connection of each line.
  • the command signal and the FF signal are short pulse rectangular wave signals, and data communication is possible even if capacitor coupling is used.
  • insulation that requires a power source such as a photocoupler is possible.
  • the number of elements can be reduced, and current consumption due to such an insulating element can be reduced.
  • FIG. 5 is an explanatory diagram showing the internal configuration of one cell controller IC 300.
  • the cell group 102 includes 12 single battery cells 101 (referred to as cells 1 to 12).
  • the cell group 102 and the cell controller IC 300 that controls the cell group 102 are connected to the respective voltage detection CV terminals (CV1 to 13 terminals) via the voltage detection lines SL1 to SL13 for detecting the voltage of each single battery cell. It is connected to BS terminals (BS01H to BS12H terminals and BS01L to BS12L terminals) that perform a balancing operation.
  • Both ends of each unit cell, that is, the positive terminal and the negative terminal are connected to the CV terminal via the cell input resistor Rcv 202, and the cell input capacitor Cin 203 is connected between each CV terminal and the lowest GND terminal.
  • Rcv 202 cell input resistor
  • the cell input resistor Rcv 202 and the cell input capacitor Cin 203 constitute an RC filter to suppress noise mainly including a ripple voltage superimposed on the cell voltage due to the operation of the inverter 700.
  • the voltage terminals at both ends of the unit cell are connected to the balancing switch terminal (BS terminal) through the balancing resistor (Rb) 201.
  • a balancing switch (BS) 222 that supplies a balancing current is connected inside the IC. When the BS 222 is turned on, the balancing current of the cell flows through the balancing resistor 201.
  • a balancing terminal capacitor (Cb) 204 is connected between the BS terminals.
  • the BS terminal for balancing discharge of each battery cell and the CV terminal for measuring the voltage between terminals are provided as dedicated terminals, respectively.
  • a balancing discharge circuit composed of the balancing resistor Rb201 and the balancing switch BS222 is connected to the voltage detection line on the unit cell side with respect to the cell input resistor Rcv202.
  • the balancing current does not flow through the cell input resistance Rcv 202, accurate voltage measurement between terminals is possible.
  • ON / OFF of the balancing resistor Rb201, the balancing terminal capacitor Cb204, and the balancing switch 222 of the balancing discharge circuit does not affect the voltage measurement between the terminals.
  • the circuit for balancing discharge is shared with the circuit for measuring the voltage between terminals (voltage detection line and cell input resistance) In many cases, the voltage between the terminals decreases when balancing discharge is performed. Accordingly, accurate voltage measurement between terminals has been performed with the balancing discharge stopped.
  • the cell input capacitor Cin203 is conventionally connected between the voltage detection lines connected to the positive and negative electrodes of each single battery cell. However, in the configuration according to the present invention, the negative electrode side of the cell input capacitor Cin203 is connected to the GND. It is connected.
  • the capacitor Cin 203 is not discharged by turning on / off the balancing switch, and accordingly, the voltage between the terminals of each unit cell during the balancing discharge. Measurement can be performed accurately.
  • the CV terminal is connected to the input terminal (Min terminal, Min1 to Min13) of the multiplexer 210 inside the cell controller IC300.
  • the multiplexer 210 selects each cell and outputs the positive potential and the negative potential, and is controlled by the output from the multiplexer input selection register 245 of the logic unit 213.
  • the output of the multiplexer 210 is converted into a voltage between terminals of each single battery cell through the differential amplifier 211, and the voltage is converted into a digital value by the AD converter 212.
  • the operation of the AD converter 212 is controlled by the logic unit 213, and the output of the AD converter 212 is processed by the logic unit 213. That is, voltage measurement is performed by the differential amplifier 211 and the AD converter 212.
  • the AD converter 212 is a high-speed AD converter such as a successive approximation type. By using such a high-speed AD converter, multiplexer diagnosis (details are omitted) can be performed at high speed. If a high-speed AD converter has a noise component in the signal, it will be detected and AD converted. For this reason, a cell input resistor Rcv202 and a cell input capacitor Cin203 are provided on each of the voltage detection lines connected to the CV terminal for measuring the voltage between the terminals to form an RC filter, and after removing noise, the multiplexer 210, the difference The signal is input to the AD converter 212 via the dynamic amplifier 211.
  • the cutoff frequency of the RC filter at the CV terminal is set to about 50 Hz.
  • the noise about 20% in pp, about 20 kHz
  • a capacitor Cb204 connected to the balancing terminal (BS terminal) is a bypass capacitor provided as a noise countermeasure for the balancing switch. Since the time constant of the balancing discharge circuit of the RC filter composed of the balancing resistor Rb201 and the balancing terminal capacitor Cb204 is small, disconnection determination (details omitted) in balancing current detection can be performed at high speed.
  • sampling is performed a plurality of times by the AD converter, and the sampling results are averaged. It is also possible to remove noise components.
  • the voltage detection line extends from the positive or negative electrode of the single battery cell (cell 1 to cell 12) to the input terminals Min1 to Min13 of the multiplexer 210.
  • a voltage input line (that is, a voltage detection line) connected to the input terminals Min1 to Min13 of the multiplexer 210 is connected to two adjacent voltage input lines, that is, a voltage detection line connected to the positive electrode of each unit cell and a negative electrode.
  • a multiplexer input short-circuit switch 224 is provided between the voltage detection lines.
  • the multiplexer input short-circuit switches 224 corresponding to the single battery cells are referred to as SWX1 to SWX12, respectively.
  • Each voltage input line is provided with a resistor Rmpx for protecting the multiplexer input.
  • the input terminals Min14 to Min17 of the multiplexer 210 are provided for inputting the output voltage from the block voltage input unit 225, and multiplexer input short-circuit switches SWX14 to SWX16 are provided between these input lines. Yes.
  • the cell controller IC 300 is provided with auxiliary input terminals AUXIN and AGND to which a temperature detection circuit 250 including a thermistor 251, a thermistor dividing resistor 252, a thermistor input resistor 253, and a thermistor input capacitor 254 is connected.
  • FIG. 5 shows only one pair of the temperature detection circuit 250 and the auxiliary input terminals AUXIN and AGND, but actually a plurality of sets of auxiliary input terminals are provided.
  • a voltage generating circuit such as a temperature detection circuit is connected to the auxiliary input terminal, and the voltage from this circuit is selected by the multiplexer 210 and digitized via the differential amplifier 211 and the AD converter 212. Is input to the logic unit 213.
  • a plurality of temperature detection circuits 250 are also provided, and these output voltages are input to a plurality of auxiliary input terminals. These output voltages are connected to the input terminals Min16 and Min17 of the multiplexer 210 through wiring (referred to as temperature voltage detection lines) in the cell controller IC 300, similarly to the voltage detection lines described above.
  • the resistance value of the thermistor 251 varies greatly depending on the temperature of the place where it is installed.
  • the thermistor dividing resistor 252 connected in series with the thermistor 251 divides the VDD voltage, and the voltage across the thermistor 251 is input to the cell controller IC 300 from the auxiliary input terminals AUXMIN and AGND.
  • the thermistor input resistor 253 and the thermistor input capacitor act as an RC filter that removes noise from the signal input to the auxiliary input terminal. That is, the voltage generated by the thermistor 251 in response to the temperature change is noise-removed by the RC filter and input to the cell controller IC 300.
  • the digitized terminal voltage of the thermistor 251 is transmitted to the host controller (battery controller 500) via the command signal output unit 220, and the battery controller 500 determines the voltage between the terminals of the thermistor 251.
  • the temperature of the place where the thermistor 251 is installed is calculated. The calculation of the temperature can be performed using a relational expression between the voltage between the terminals of the thermistor 251 and the temperature depending on the resistance temperature characteristic of the thermistor 251, or data tabulating the voltage between the terminals of the thermistor 251 and the temperature. .
  • the thermistor 251 is installed in the vicinity of the cell controller IC 300, the temperature of the cell controller IC 300 is accurately measured, and the differential amplifier 211, the AD converter 212, and the like are configured.
  • the temperature of the inter-terminal voltage measurement circuit is controlled to be within a predetermined range. Thereby, the accuracy of the measured voltage value depending on the temperature characteristics of the junction of the semiconductor element included in the voltage measuring circuit is maintained.
  • the plurality of temperature detection circuits 250 measure the temperature in the power storage device with the battery system or the battery monitoring device, and if an abnormal temperature is detected, this information is further transmitted to the host control device. It is also used for notifying the operator of the electric vehicle by generating an alarm or the like while performing operations such as stopping the use of the system or changing the control of the vehicle.
  • FIG. 6 shows an outline of the configuration of the logic unit 213.
  • a detection voltage signal from the AD converter 212 is input to the logic unit 213, and this is compared with a predetermined threshold by the voltage comparison unit 240. For example, if the detected voltage signal is larger than a predetermined threshold value, the detection result “1” is stored in the detection result register 241 in the order of measurement of the input selected by the multiplexer 210, assuming that a normal voltage is detected.
  • the balancing switch state detection circuit 223 When the balancing switch state detection circuit 223 is operated to detect the presence or absence of balancing current or to diagnose the balancing switch 222, these results are directly stored in the detection result storage register 241 (FIG. 5). 2). Note that the diagnosis result data of the balancing switch 222 is actually stored in the detection result storage register 241 via a potential conversion circuit (not shown), but this description is omitted.
  • the disconnection determination unit 242 Based on the detection result stored in the detection result register 241, the disconnection determination unit 242 performs disconnection determination of the voltage detection line.
  • the result of the disconnection determination of the voltage detection line is stored in the diagnosis result register 243. It should be noted that these measurement results are also stored in the detection result register 243 when measurements for diagnosis of circuits and logic involved in disconnection detection are performed. In the diagnosis of the circuit and logic involved in the disconnection detection based on the measurement results in these diagnoses, the diagnosis corresponding to this measurement is performed by the disconnection determination unit 242 in one continuous measurement, and the diagnosis result register is similarly used. Stored in
  • the output of the AD converter 212 is the voltage between the terminals of the single battery cell selected by the multiplexer 210 or the voltage between the two voltage detection lines connected to the input terminals Min1 to Min13.
  • the voltage between terminals of each single battery cell is stored in the voltage measurement result register 244. Even when the disconnection detection is performed using the measured value of the voltage between the terminals of the single battery cell, the voltage between the terminals of each single battery cell is stored in the voltage measurement result register 244.
  • the disconnection detection result or diagnosis result stored in the diagnosis result register 243 and the voltage between the terminals of each unit cell stored in the voltage measurement result register 244 are transmitted from the cell controller IC 300 via the communication line. It is transmitted to the controller (battery controller 500). Details of the content and operation of the disconnection determination are omitted.
  • the logic unit 213 includes a register that controls various switches provided in the cell controller IC 300.
  • the multiplexer input selection register 245 stores data for switching the multiplexer 245 to select an input.
  • the multiplexer diagnosis register 246 stores data for controlling the multiplexer input short-circuit switch 224 for diagnosing the multiplexer.
  • the balancing switch control register 247 stores data for controlling on / off of the balancing switch 222 provided for each cell.
  • the balancing switch state diagnosis register 248 stores data for controlling the switch circuit of the balancing switch state detection circuit 223 for diagnosing the balancing switch 222 (details are omitted).
  • the S / H control register 249 stores data for controlling a switch (not shown) in the sample hold circuit (S / H) of the block voltage input unit 225 shown in FIG.
  • the output of the multiplexer input selection register 245 is actually input to the multiplexer drive circuit, and the multiplexer 210 is driven by the output of this multiplexer drive circuit (not shown).
  • the outputs of the multiplexer diagnosis register 246, the balancing switch control register 247, and the balancing switch diagnosis register 248 are respectively connected to a drive circuit (not shown), and the multiplexer input short-circuit switch 224,
  • the switching circuits (not shown) of the balancing switch 222 and the balancing switch state detection circuit 223 are driven.
  • these drive circuits are omitted.
  • the operating power of the cell controller IC 300 is supplied from the Vcc terminal (see FIGS. 5, 7, and 8).
  • a Vcc capacitor (Cvcc) 206 connected to the Vcc terminal is a capacitor for suppressing noise.
  • the inter-terminal voltage Vcc of the cell group 102 is input to the Vcc terminal via the power supply line VL1.
  • the power supply line VL ⁇ b> 1 is connected to the cell group side from the resistor Rcv ⁇ b> 202 in the highest voltage detection line SL ⁇ b> 1 or is the cell 1 that is the highest cell in the cell group 102. Is connected to the positive electrode side.
  • the Vcc terminal is further connected to the power supply unit 226 in the cell controller IC 300, and an internal regulator supplies the 3.3V operation power supply VDD to a circuit operating with the VDD power supply including the logic unit.
  • the power supply VDD is also connected to the VDD terminal of the cell controller IC300.
  • a VDD capacitor (Cvdd) 206 for operation stabilization is connected, and power is supplied to a circuit operating with an external Vdd.
  • the power supply unit 226 has a start signal detection circuit that is started by the output of the start signal detection unit 215.
  • start signal is received from the host cell controller IC or the microcomputer 504 via the insulating element 402
  • power is supplied to the regulator.
  • start-up and POR (power-on reset) operations are performed.
  • the activation signal output unit 216 is operated by the output from the logic unit 213, and outputs the activation signal to the lower cell controller IC 300.
  • the activation signal output unit 216 is connected to a capacitor outside the cell controller IC 300. This capacitor performs a charge pump operation, and is for generating a voltage higher than the power supply Vcc of the cell controller IC 300 by a set voltage.
  • the Vcc terminal is always connected to the activation signal detection unit 215, and power is supplied only to the activation signal detection unit 215 even when the entire operation of the cell controller IC 300 is stopped.
  • the activation signal detection unit 215 since the power is supplied from the battery (cell group 102) when the cell controller IC is in an operation stop state, the activation signal detection unit 215 has a circuit configuration that reduces the current consumption as much as possible.
  • FIG. 7 is a diagram illustrating a connection example of the activation signal detection unit 215, the command signal reception unit 217, and the FF signal input unit 218 with respect to the uppermost cell controller IC 300a of FIG.
  • the WU_RX terminal is used as the activation signal input terminal.
  • This terminal is connected to a start-up low-speed isolation element 402 which is a photocoupler.
  • the microcomputer 504 supplies a current to the diode of the start-up low-speed isolation element 402 through the drive transistor 404, the insulated transistor side is turned on. It becomes.
  • the transistor side of the low-speed insulating element 402 is connected to the Vcc of the cell controller IC 300 via a resistor, and when the transistor side is turned on, Vcc is applied to the WU_RX terminal of the cell controller IC 300.
  • the activation signal detection unit 215 is a comparator having a set threshold value, and outputs an activation detection signal to the power supply unit 226 when detecting the ON state of the transistor of the insulating element 402. In this way, as described above, it is possible to reduce the current consumption in the operation stop state.
  • the command signal receiving unit 217 uses a terminal RXD.
  • a small communication high-speed insulating element 401 using a transformer is connected to this terminal via a capacitor 403, and a communication signal is transmitted from the microcomputer 504.
  • a digital isolator is used as the high-speed communication insulating element.
  • an operating power supply is also required on the transmission side.
  • the operating power the operating power VDD of the cell controller IC 300 is supplied using the VDD terminal. Since this VDD is not output when the operation is stopped, no dark current flows during the operation stop.
  • the command signal receiving unit 217 detects a pulse signal, and the detected pulse signal is used by the logic unit 213 as a digital communication signal.
  • the terminal FFIN is used for the FF signal input unit 218, and the microcomputer 504 drives the driving transistor 405 through the low-speed insulating element 402 and the capacitor 403, which are photocouplers, as in the case of the command signal receiving unit 217.
  • the FF signal is transmitted.
  • the FF signal input unit 218 detects a pulse signal, and the detected pulse signal is detected by the logic unit 213 as an overcharge or overdischarge signal.
  • FIG. 8 is a diagram showing a connection example of the command signal output unit 220, the FF signal output unit 221 and an external circuit for the lowest cell controller IC 300d of FIG.
  • the command output signal of the command signal output unit 220 is output from the output terminal TXD, and is received by the data reception port RXD of the microcomputer 504 via the high-speed insulating element 401 for command signal communication.
  • the high-speed insulating element 401 for communication using a transformer uses the VDD of the cell controller IC 300 as a power supply on the transmission side.
  • the output signal terminal FFO of the FF signal output unit 221 drives the starting low-speed insulating element 402 that is a photocoupler through the driving transistor 410, and the output signal from the photocoupler is input to the FF signal input port of the microcomputer 504.
  • the Since transmission / reception of signals through the low-speed and high-speed insulating elements 401 and 402 is the same as that described with reference to FIG. 7, the description thereof is omitted.
  • FIGS. 3, 4, and 7, communication between the cell controller ICs 300 and transmission of the FF signal are performed using a capacitor 403.
  • a specific circuit configuration of the receiving unit is shown in FIG.
  • a load resistor to which a voltage of Vdd / 2 is applied is connected to the capacitor-coupled input terminal RX, and a positive terminal thereof is connected to a comparator having a hysteresis characteristic with Vdd / 2 as a threshold, and the input terminal RX
  • the pulse signal applied to is reproduced as a command signal.
  • the DUTY ratio is preferably 50% from the viewpoint of noise resistance. Therefore, although the FF signal is a rectangular wave having a DUTY ratio of 50%, the high-speed communication signal is also preferably a signal having a DUTY ratio of 50%.
  • a communication signal system an FSK system (Frequency Shift Keying) that changes the frequency of a square wave between logic “0” and “1”, or a PWM system that changes the pulse width of a rectangular wave between logic “0” and “1” ( Pulse Width Modulation), and using this method makes it possible to increase noise resistance and ensure reliability.
  • FIG. 10 shows an example of the communication waveform of the FSK method.
  • the cell controller IC 300 shown on the upper side in the figure is a lower controller IC 300
  • the cell controller IC 300 shown on the lower side is an upper cell controller IC 300.
  • the command from the microcomputer 504 is first transmitted to the cell controller IC shown on the lower side in the figure, This is because the cell controller is placed at the upper and lower levels on the basis of the order.
  • a circuit configuration in which the cell controller IC shown in the upper side in the drawing first receives a command from the microcomputer 504 may be adopted, so that the upper and lower levels of the cell controller IC are not limited to the illustrated state.
  • the upper single battery cell in the figure is the upper single battery cell because the upper single battery cell in the figure has a high potential.
  • FIG. 11 is an explanatory diagram of a circuit for measuring the block voltage.
  • the battery controller 500 does not have a total voltage measurement circuit. Instead, when the battery controller 500 receives a command for measuring the total voltage of the battery system 104 from the host controller (inverter or vehicle controller) through CAN (Controller Area Network) communication, each of the plurality of cell groups of the battery system 104. A command for measuring the voltage of the entire cell group (referred to as a block voltage) almost simultaneously is transmitted to the plurality of cell controller ICs 300 as described with reference to FIGS. Each of the cell controller ICs 300 measures the voltage (block voltage) of the entire cell group composed of 12 unit cells to be controlled, and the battery controller 500 receives the data by communication and integrates each block voltage. The total voltage of the battery system 104.
  • the battery controller 500 issues a command for measuring the block voltage of the cell group controlled by each cell controller IC 300 with a single command.
  • This command does not specify the cell controller IC 300 at a specific address, but is sent to all the cell controller ICs 300 once.
  • the timing at which each cell controller IC 300 receives this block voltage measurement command has a difference in the order of ⁇ sec due to a delay due to the signal transmission path length. Therefore, the timing at which each cell controller IC performs the block voltage measurement is also in the order of ⁇ sec. Will shift.
  • the block voltage input unit 225 includes a filter with a low cut-off frequency as will be described below, and the block voltage measurement value hardly varies with timing differences of the order of ⁇ sec. It can be assumed that the voltage measurements are made at approximately the same time and does not affect the measurement of the total voltage of the battery system 104.
  • the host controller (battery controller 500) can read the inter-terminal voltage of each cell group via the communication line and take the sum of them to obtain the total voltage of the assembled battery.
  • the power supply unit 226 includes a block voltage energizing switch 230, which is turned on when the cell controller IC 300 is activated.
  • the output voltage of the block voltage energizing switch 230 is divided by voltage dividing resistors 231 and 232 using high-precision high resistances, and is supplied to the sample hold circuit 236 via a filter resistor 233 and a filter capacitor 234 that are RC filters for noise removal. Entered.
  • the cut-off frequency of the RC filter is set to be approximately the same as the cut-off frequency of the RC filter of the CV terminal described above.
  • the sample hold circuit 236 is controlled by the logic unit 213 and holds the divided block voltage in the sample hold capacitor 236.
  • the output of the sample hold circuit 236 is input to the multiplexer 210 via a multiplexer input short-circuit switch 224 described later.
  • the input switching of the multiplexer 210 is designated from the logic unit 213, and the divided block voltage is input to the input 15 and the input 17.
  • the divided block voltage input to the multiplexer is further converted into a digital value by the AD converter 212 via the differential amplifier 211 (see FIG. 5).
  • a switch (not shown) in the sample hold circuit 236 is controlled to be turned on when sample hold is performed by the output of the S / H control register 249 of the logic unit 213.
  • the measurement of the voltage between terminals of each cell group by the block voltage measurement is performed simultaneously by the broadcast command as described above, separately from the measurement of the voltage between terminals of each single battery cell of the cell group. Further, since the total voltage of the battery system 104 needs to be constantly monitored, this block voltage measurement is frequently performed at a substantially constant interval (for example, every 100 ms).
  • the sample hold circuit 236 performs the voltage measurement between terminals of each single battery cell in the disconnection diagnosis described later, the voltage between the terminals of the cell group and each single battery cell of this cell group after the measurement is completed.
  • the inter-terminal voltage is transmitted to the host controller (battery controller 500) together, it is necessary to hold the measurement result of the block voltage until the measurement of the inter-terminal voltage of the unit cell in the disconnection diagnosis is completed. It is. Therefore, it is not necessary to provide the sample hold circuit 236 when disconnection diagnosis is not performed.
  • the resistance value of the voltage dividing resistors 231 and 232 is used by the host controller (battery controller 500). A voltage value is calculated. The sum of the voltages across the terminals of all the cell groups is obtained as the total voltage of the assembled battery.
  • the reason why the block voltage energizing switch 230 is provided is to cut off the current flowing through the voltage dividing resistors 231 and 232 when the operation of the cell controller IC 300 is stopped, thereby reducing the dark current.
  • the filter resistor 233 constituting the RC filter can be omitted by substituting its function with the voltage dividing resistor 231. Furthermore, the RC capacitor can be made to have a desired frequency characteristic by installing the filter capacitor 234 outside the cell controller IC 300 and selecting the capacitance of the filter capacitor 234 as appropriate.
  • FIG. 12A shows an example of a circuit in this case, and particularly shows a part of the block voltage input unit 225 in FIG.
  • an external connection terminal VblkF is provided in order to install the filter capacitor 234 outside the cell controller IC 300.
  • an external connection terminal Vvd is further provided, and the voltage dividing resistor is provided outside the cell controller IC 300.
  • 231 and 232 may be installed.
  • an external connection terminal Vvd is further provided.
  • the SOC of each single battery cell is calculated by measuring the OCV when the vehicle is started. Based on this SOC, balancing discharge is performed so as to equalize the SOC of each single battery cell. By controlling the effective discharge current of this balancing discharge, heat generation due to the balancing discharge current is suppressed, and the terminals of the single battery cell are controlled.
  • the temperature of the voltage measuring circuit for measuring the voltage between the terminals is set within a predetermined range so that the voltage between the terminals is measured with the required accuracy.
  • OCV-SOC characteristics of secondary battery For example, even if the secondary battery is a secondary battery belonging to a lithium ion battery, an OCV-SOC conversion curve, which is a characteristic curve representing the relationship between OCV and SOC, varies depending on the internal electrode material.
  • FIG. 13 shows an example of two secondary batteries having different characteristics. These OCV-SOC conversion curves are in a stable state without polarization of the single battery cell. When a load such as an inverter is connected to the battery system and charging / discharging is performed, the central portion of the conversion curve particularly moves up and down depending on the state of polarization inside the battery.
  • OCV and SOC have a substantially linear relationship in the entire range of SOC from 100% to 0%. That is, in the type A secondary battery, if the influence of polarization can be ignored, the SOC can be accurately obtained from the measured OCV (open circuit voltage) in the entire region of FIG.
  • the SOC V-SOC conversion curve is used in the region B in order to calculate the SOC with good accuracy for the secondary battery such as type B. Preferably it is not.
  • a battery system composed of a secondary battery having characteristics such as type B is used, and the SOC calculated from the OCV at the start of the electric vehicle is in region B, for example, a host controller (battery controller 500)
  • the charge / discharge control of the battery system is performed using the previous SOC value stored in (). That is, the SOC in this case uses the previous SOC value, the integrated value of the charge / discharge current and the balancing discharge current (described later).
  • a secondary battery may be used in the region B.
  • This has the advantage that the OCV variation is small relative to the SOC variation, that is, the terminal voltage is stable.
  • the detected current value generated by the relationship between the fluctuation of the charge / discharge current and the current detection timing using the current sensor 503 and the accuracy of the current detection itself. Errors accumulate and the SOC calculated using the integrated current value deviates from the actual SOC. In such a case, even if it is the region B, it is possible to obtain an accurate value by calculating the SOC using this OCV-SOC conversion curve.
  • the SOC can be calculated more accurately by reducing the OCV measurement error.
  • voltage measurement is performed a plurality of times, it takes time, so that the most accurate SOC is calculated according to the situation by appropriately using the SOC calculation means of the various methods described above. For example, if a predetermined time has elapsed since the last time OCV was measured, the SOC is calculated by measuring OCV even if the state of the secondary battery is region B when the vehicle is started.
  • the most accurate SOC calculation method according to the characteristics of the secondary battery and its use state that is, the most accurate characteristic of the secondary battery and its use state is obtained. It is possible to use a method for calculating the SOC. As a result, the battery system can be operated efficiently, overdischarge and overcharge can be avoided, and the vehicle can be driven stably.
  • the predetermined time varies depending on the specifications of the secondary battery, but is approximately several hours for a lithium ion battery, for example. Moreover, in a lead storage battery, the polarization elimination time is longer than that of a lithium ion battery.
  • FIG. 15 shows an example of the relationship between the junction temperature of the semiconductor included in the voltage measurement circuit (the differential amplifier 211 and the AD converter 212 in FIG. 5) and the voltage measurement accuracy measured by this voltage measurement circuit.
  • the junction temperature is between 0 ° C. and 40 ° C.
  • various semiconductor characteristics of the inter-terminal voltage measurement circuit are aligned, and the voltage detection accuracy is ⁇ 5 mV.
  • the voltage detection accuracy is ⁇ 10 mV. This indicates that the junction temperature must be between 0 ° C. and 40 ° C. when measuring the voltage between the terminals of the single battery cell with high accuracy.
  • junction temperature T j (Effect of heat generated by balancing switch 222 on junction temperature)
  • junction temperature T j was measured using the above-described temperature detection circuit 250 (see FIG. 5), the temperature T a around the cell controller IC 300, is calculated using the following equation (1).
  • T j T a + ⁇ ja ⁇ (P 0 + P BS ). . .
  • T j junction temperature
  • T a Ambient temperature of the cell controller IC 300 (temperature of the installation place of the thermistor 251)
  • ⁇ ja including cell controller IC300 package
  • P 0 power consumption of cell controller IC 300 when no balancing discharge occurs
  • P BS Power consumption due to on-resistance of balancing switch in balancing discharge
  • the temperature resistance ⁇ ja between the junction and the thermistor 251 may be calculated from the thermal resistance of a known IC package, the thermal resistance of the substrate between the cell controller IC 300 and the thermistor 251 and the like. Or you may produce
  • the power consumption P BS during balancing discharge in one balancing switch 222 is the voltage V CCV between terminals of one single battery cell, the resistance value R b of the balancing resistor 201, and the ON resistance of the balancing switch 222 as R BS .
  • P BS V CCV 2 ⁇ R BS / (2 ⁇ R b + R BS ) 2 . . . (2) (See FIG. 5).
  • the balancing resistor 201 is an external resistor attached to the cell controller IC 300, and a highly accurate resistor is used.
  • the on-resistance value R BS of the balancing switch 222 varies to some extent in the manufacturing process of the semiconductor chip of the cell controller IC 300.
  • the resistance value Rb of the balancing resistor 201 is solved by balancing discharge of the capacity of the single battery cells, the remaining capacity of the plurality of single battery cells constituting the cell group or the assembled battery, and how much time it takes. Detailed description will be omitted here.
  • the capacity of the single battery cells tends to increase year by year, and accordingly, it is required to increase the balancing current and quickly equalize the remaining capacity of the single battery cells. Therefore, although the resistance value of the balancing resistor 201 tends to be small, at present, R BS ⁇ R b . Since the balancing switch 222 is composed of a MOSFET, it is desirable to set Rb larger than the resistance value of the average balancing switch in consideration of its temperature characteristics.
  • the on-resistance value R BS of each balancing switch 222 of the cell controller IC 300 may be measured, and the power consumption by the on-resistance R BS of the balancing switch 222 may be obtained using the above equation (2). Furthermore, was calculated from the balancing discharge current amount (i.e. correction amount SOC) and balancing resistance R b and the balancing switches of the on-resistance R BS as described below, actually incurred and balancing discharge time of each cell cells Since the accurate on-resistance R BS of the balancing switch 222 is obtained by calculation from the balancing discharge time, this may be used.
  • F BS V CCV 2 ⁇ F BS . . . (3)
  • F BS is a coefficient that depends on the on-resistance value of the balancing switch 222.
  • the coefficient F BS is the balancing switch 222 in this temperature range on so that the temperature variation of the resistance R BS is negligible, for example, such as by adding a temperature compensation circuit, it is also possible to design the balancing switch 222.
  • the resistance value R of the balancing switch 222 is calculated from the equations (8) and (9) by measuring the OCV in a state where the polarization is eliminated. BS and balancing discharge current Ib1 are obtained. In addition, if the time between the respective OCV measurements for calculating SOC0 and SOC1 is long, there is an influence of the self-discharge of the single battery cell. Therefore, in consideration of these influences or under the condition that there is no influence, R The BS needs to be calculated.
  • the resistance value R BS of the balancing switch 222 is obtained by a desired method, the coefficient F BS is calculated by Expression (4), and the power consumption P BS at the balancing switch 222 is calculated by Expression (3). Can be calculated.
  • the initial SOC is obtained based on the OCV-SOC conversion curve of FIG. 13 using the OCV measured when the electric vehicle such as HEV, PHEV, EV is started.
  • the initial value of the SOC of the single battery cell is assumed to be SOC0.
  • ⁇ I indicates an integrated value of the charging / discharging current I (t)
  • ⁇ Ib indicates an integrated value of the balancing discharge current Ib (t).
  • T shows that it fluctuates with time. Since I (t) is a charge / discharge current, when the battery system is charged, I (t) is a negative value and the SOC increases. As described above, the balancing discharge current slightly varies in accordance with the change in the voltage between the terminals of each unit cell. The balancing discharge is performed on the single battery cells in which the SOCs of all the single battery cells are obtained and the SOC variation ⁇ SOC (> 0) is larger than the predetermined threshold value ⁇ SOCth (> 0). The SOC of each single battery cell is managed by the battery controller 500 and the cell controller 200.
  • the balancing discharge current Ib for correcting the variation in the SOC of each single battery cell is accurately obtained as described above, Variations can be eliminated in a short time.
  • the balance switch 222 is turned on.
  • ⁇ SOC ⁇ Ib (t) dt ⁇ ⁇ SOCth. . . (12)
  • the balancing discharge is stopped immediately.
  • Ib (t) is a constant current value Ib calculated using the on-resistance of the balancing switch 222 calculated by the above-described desired method
  • Ib (t) is a constant current value Ib calculated using the on-resistance of the balancing switch 222 calculated by the above-described desired method
  • various methods including setting of ⁇ SOCth can be considered. Therefore, the method described below is an example, and only an outline is shown.
  • the expression (1) is an expression including only the power consumption of one single battery cell for the sake of explanation, but the actual cell controller IC 300 is provided with a plurality of balancing switches 222.
  • one cell group is composed of 12 unit cells, and the cell controller IC 300 that controls one cell group is provided with 12 balancing switches 222 correspondingly. It has been.
  • the battery system is composed of a plurality of cell groups, and a cell controller IC 300 that controls these cell groups is also operating simultaneously.
  • the cell controller 200 and the battery controller 500 are provided on one substrate, and these are housed in a metal case.
  • a balancing resistor 201 is also provided on this substrate.
  • Balancing switches 222 and balancing resistors 201 corresponding to the number of unit cells are housed in one metal case, and these generate heat when the balancing switch 222 is turned on by balancing discharge. As described below, a plurality of balancing switches 222 may operate simultaneously.
  • the ambient temperature of the cell controller IC 300 is measured in the vicinity of each cell controller IC 300. In the following description, control of the balancing switch 222 with one cell controller IC will be described for simplicity.
  • n balancing switches are provided in one cell controller.
  • the terminal Measuring the voltage makes it possible to measure the voltage with high accuracy.
  • the cell controller IC can be warmed by a heater (not shown) provided separately.
  • the balancing discharge current must be zero. That is, when the ambient temperature of the cell controller IC 300 is T a ⁇ T amax , all the balancing switches 222 must be turned off, which means that high-accuracy voltage measurement between terminals cannot be performed as described above. It does not mean that no balancing discharge is performed.
  • the ambient temperature of the cell controller IC 300 is lower than the temperature set by the equation (17), that is, if T a ⁇ T amax , the plurality of balancing switches 222 are appropriately turned on and off, and the junction temperature is 40 ° C. or lower. Can be controlled.
  • the ambient temperature T a of the cell controller IC300 is increased by the power consumption due to this balancing discharge (balancing resistor and the on-resistance of the balancing switch). This temperature rise depends on the temperature at the place where the ambient temperature is being measured and also on the outside, for example the temperature outside the battery monitoring device, and the thermal resistance between them.
  • a temperature change in the battery monitoring device, outside of such a battery monitoring device if the temperature is the location does not change or large duty post around in the heat capacity of the measuring location of the ambient temperature T a of the cell controller IC 300, , based on the temperature of such a location, corresponding to the power consumption of the balancing discharge, that is, to calculate the increase in the ambient temperature T a which corresponds to the power consumption that corresponds to the number that are turned on balancing switches 222 Is possible.
  • the ambient temperature T a of the cell controller IC300 is substantially same as the outside temperature or ambient temperature of the battery monitoring device It is thought that it has become.
  • the ambient temperature Ta of the cell controller IC 300 at the time of starting the vehicle is used as a reference, for example, when one balancing switch 222 is turned on, the influence of power consumption by balancing discharge by this one balancing switch 222 whether the ambient temperature T a of the cell controller IC300 reaches T amax, it is possible to advance to the determination.
  • Depends on the power consumption when performing the balancing discharge stores the increase of the ambient temperature T a of the cell controller IC300 in advance, and a table with experimental measurements, the table example in the storage unit 505 of the battery controller 500 Just keep it.
  • the data of the rise of the ambient temperature T a of the cell controller IC300 may be those calculated in the computer simulations.
  • Control of power consumption by controlling the balancing switch 222 There are basically two methods for controlling power consumption in balancing discharge by turning on / off the balancing switch.
  • One is to control the on / off duty ratio of the balancing switch 222. That is, the time during which the balancing switch is on is controlled between 0% and 100%, and the average balancing current is changed between 0% and 100%.
  • a MOSFET switch is used as the balancing switch 222, and the gate of the MOSFET switch may be PWM-controlled. This method can also be applied to a case where T a ⁇ T amax only by turning on one balancing switch 222 at all times.
  • Another method is when a plurality of unit cells are subject to balancing discharge, that is, when the SOC deviation ⁇ SOC of the plurality of unit cells is greater than a predetermined threshold ⁇ SOCth that requires balancing discharge.
  • all the balancing switches that are the targets of balancing discharge are not turned on at the same time. For example, by changing the balancing switch that is turned on at regular intervals, the power consumption by balancing discharge can be controlled to satisfy the condition of T a ⁇ T amax .
  • a method of performing balancing discharge by appropriately selecting a balancing switch to be turned on as described above is also a category of duty control in a broad sense.
  • the average duty ratio of all the balancing switches is It can be seen that the chip temperature becomes 40 ° C. at about 40%. That is, in this case, the average duty ratio of all the balancing switches needs to be about 40% or less. This is an average duty ratio corresponding to short-time power consumption when the ambient temperature Ta is 25 ° C. When sustain this state, since the ambient temperature T a is increased, the average duty ratio in response to this it is necessary to lower.
  • FIG. 17 shows an outline of a flow when the balancing discharge operation using the battery system monitoring apparatus according to the present invention is performed on the type B secondary battery described in FIGS. 13 and 14.
  • FIG. 17 mainly describes the processing in the microcomputer 504, and only the portions related to the present invention are extracted and collectively shown.
  • each cell controller IC is first activated, but this activation sequence is omitted.
  • the diagnosis of the internal circuit operation of each single battery cell and the cell controller IC itself or the disconnection diagnosis of the voltage detection line is not included in this flow.
  • Inverter 700 is not connected to power storage device 100 when the vehicle is started, and relays 600 and 610 are open.
  • the connection between the inverter 700 and the power storage device 100 is performed in the middle of the flow of FIG. 17, the illustration is omitted.
  • the measurement of the voltage between terminals of each single battery cell is used for, for example, real-time calculation (explanation is omitted) of the internal resistance (DCR) of each single battery cell. Therefore, the measurement of the voltage between the terminals of each single battery cell is appropriately performed in a predetermined cycle, and the measurement of the ambient temperature Ta is also performed as part of the measurement of the voltage between the terminals of each single battery cell. .
  • the voltage between the terminals of each single battery cell and the output voltage of the temperature detection circuit are selected by switching the multiplexer 210. These voltages are collectively transmitted as data packets to each cell controller IC 300 via the communication path described with reference to FIGS.
  • the microcomputer 504 After the electric vehicle is started in step S1, the microcomputer 504 generates a command for measuring the ambient temperature of each cell controller IC in step S2, and this command is sent to each cell via the communication path described in FIGS. It is transmitted to the controller IC 300.
  • the cell controller IC 300 selects the output of the temperature detection circuit by the multiplexer 210 and inputs this voltage to the differential amplifier 211 while the balancing switch 222 is OFF.
  • the output voltage from the temperature detection circuit is digitized by the AD converter 212 and input to the logic unit 213.
  • the logic unit 213 further transmits the digitized output voltage of the temperature detection circuit to the microcomputer 504 via a communication path.
  • the microcomputer 504 calculates the ambient temperature Ta of the cell controller IC 300 using the data stored in the storage unit 505 for converting the output voltage of the temperature detection circuit into a temperature (step S3).
  • step S4 if the ambient temperature Ta of the cell controller IC300 is not within the range between a predetermined lower limit temperature T amin and the upper limit temperature T amax, since not performed OCV measurement, step S13 is skipped and-S12 step S5 The processing operation is performed.
  • the balancing discharge is performed on the single battery cell in which the previous balancing discharge has not been completed. That is, the list of single battery cells to be balanced discharge described below and the balancing discharge schedule of these single battery cells are used by taking over the previous one.
  • step S5C1 the cell controller IC 300 measures the voltage between the terminals of each single battery cell, and transmits the measurement result to the microcomputer 504.
  • OCV open circuit voltage
  • step S6 if even one OCV of the measured single battery cell is in the region B described with reference to FIG. 14, the process proceeds to step S7.
  • step S7 as described above with reference to FIG. 14, it is determined whether or not a predetermined time has elapsed since the last time OCV was measured and SOC was calculated. If it is determined that the predetermined time has elapsed since the SOC was calculated by measuring the OCV last time, even if the measured OCV of the single battery cell is in the region B in FIG. 14, steps S8 to S13 are performed. The processing operation is performed. At this time, the previous OCV measurement data stored in the storage unit 505 of the battery controller 500 is used. The predetermined time is determined by the specifications of the secondary battery and the usage state, but the details are omitted.
  • step S7 If it is determined in step S7 that the predetermined time has not elapsed since the last OCV measurement and the SOC was calculated, the SOC calculation is not performed and the following steps S8 to S13 are skipped and the processing operation of step S14 is performed. I do. In this case as well, balancing discharge is performed based on the balancing discharge data last time. With such an operation, it is possible to perform balancing discharge of the secondary battery based on the most accurate SOC according to the state of the secondary battery.
  • step S6 If it is determined in step S6 that the OCV of each battery cell is in the region A of FIG. 14 or if it is determined in step S7 that a predetermined time has elapsed since the previous OCV measurement, In S8, the SOC of each single battery cell is calculated. As described above, the SOC is calculated using the OCV-SOC conversion curve described with reference to FIGS.
  • step S9 the SOC deviation ⁇ SOC is calculated for each unit cell from the SOC of each unit cell calculated in step S8. At this time, the order of the SOC size is also calculated.
  • step S10 it is determined whether there is a single battery cell to be balanced discharge target.
  • the balancing discharge is performed on the SOC having a deviation ⁇ SOC larger than a predetermined threshold value ⁇ SOCth. If there is no single battery cell having a SOC with a deviation larger than ⁇ SOCth, the process ends in step S19.
  • each target total balancing discharge current amount ( ⁇ Ib (t) dt in the equations (10) to (12) or Ib ⁇ t in the equation (13)) is obtained in the unit cell to be balanced discharge.
  • the SOC deviation ⁇ SOC becomes the target total balancing discharge current amount.
  • ⁇ SOC ⁇ SOCth may be set as the target total balancing discharge current amount.
  • the ⁇ SOCth and the target total balancing discharge current amount can be set in various ways, and this description is omitted here.
  • step S13 the balancing discharge schedule of the balancing discharge target single battery cell is set.
  • This balancing discharge scheduling is performed in accordance with the rules for balancing discharge described above.
  • FIG. 18 (a) is an example showing the initial state of SOC (SOC value at the start of the vehicle) of a cell group consisting of 12 single battery cells (cell 1 to cell 12). The SOC is usually expressed as a percentage. If the values of the SOC levels L0 to L4 in FIG. 18A are within the region A in FIG. 14, the SOC is calculated in step S8 when the electric vehicle is started. In the case of region B in FIG.
  • steps S8 to S13 are skipped as described above, and balancing discharge after step S14 is performed using the SOC value and balancing discharge schedule at the previous vehicle stop.
  • the SOC level L0 fluctuates depending on the charge / discharge current of the battery system 104.
  • the ⁇ SOC is focused in FIG. Ignore changes.
  • the scheduling of balancing discharge is to determine in what order the balancing discharge is performed on the single cells selected in step S11. This scheduling will be described below together with the overall flow of balancing discharge.
  • the deviation of the measured value having the normal variation is defined as a difference from the average value of these measured values.
  • the SOC deviation ⁇ SOC is set based on the lowest SOC value. This is because the balancing discharge is performed from a single battery cell having a large SOC. That is, here, the SOC deviation ⁇ SOC of each single battery cell is defined by the difference from the level L0 which is the smallest value of these single battery cells. Balancing discharge is performed for the SOC deviation of each single battery cell that is equal to or greater than a predetermined threshold value ⁇ SOCth.
  • each single battery cell is discharged such that the SOC deviation ⁇ SOC of each single battery cell is equal to or less than ⁇ SOCth.
  • FIG. 18A cells 2, 6, 6, and 11 having a deviation equal to or greater than ⁇ SOCth are subjected to balancing discharge, for example, as shown in FIG.
  • balancing discharge may be performed in the order from the largest ⁇ SOC of each single battery cell as in the prior art.
  • the cell 2 is first subjected to balancing discharge by turning on the balancing switch 222 until the SOC is changed from the level L4 to L3.
  • the balancing switch 222 of the cell 2 is turned on. Change the duty ratio. If this duty ratio is D, P BS (2) ⁇ D ⁇ (40 ° C. ⁇ T a ) / ⁇ ja ⁇ P 0 . . . (18)
  • the duty ratio of the balancing switch 222 of each unit cell is set as D (2), D (6), D (11) as follows: Can also be controlled. P BS (2) ⁇ D (2) + P BS (6) ⁇ D (6) + P BS (11) ⁇ D (11) ⁇ (40 ° C. ⁇ T a ) / ⁇ ja ⁇ P. . . (20) However, D (2), D (6), and D (11) are defined so that the three balancing switches are not turned on simultaneously.
  • the decrease in SOC due to balancing discharge of each battery cell when duty control is performed corresponds to the amount of current ((Ib (t) dt in equations (10) to (12) or Ib ⁇ t in equation (13)).
  • t is the time during which balancing discharge is performed including duty control.
  • D ⁇ t corresponds to the time when the balancing switch is actually on.
  • the balancing discharge schedule is determined by the method described above, and the balancing discharge is executed in step S14 and subsequent steps.
  • a balancing discharge command for a single battery cell that is a balancing target (in consideration of duty control) is generated.
  • the balancing switch 222 for the balancing single battery cell is turned on by the cell controller IC 300.
  • balancing discharge is performed (step S14C1). This control is performed every predetermined cycle. When there is no designation of ON in each cycle, the balancing switch is turned off and duty control is performed.
  • the voltage between the terminals of the unit cell is measured as appropriate (substantially in real time) according to a command from the battery controller 500.
  • the balancing current of each single battery cell is calculated, the integrated value of the balancing discharge current is calculated, and the SOC of the single battery cell is calculated (step S15).
  • the battery controller 500 transfers the single battery cell to the cell controller IC 300.
  • a command to stop the balancing discharge is transmitted, and the balancing switch corresponding to this single battery cell is turned off (step S15C1).
  • step S16 it is determined from the calculated SOC of each single battery cell whether there is a single battery cell in which balancing discharge has not been completed, for example, using the above threshold value ⁇ SOCth and Expression (12). If all the unit cells satisfy the formula (12), the balancing discharge ends (step S19).
  • step S17 If there are remaining battery cells subject to balancing discharge, this list is adjusted so that they remain in the list of balancing target battery cells (step S17). Subsequently, in step S18, rescheduling of the balancing discharge is performed. The process returns to step S14 to continue the balancing discharge.
  • the ambient temperature Ta of the cell controller IC 300 is not within the predetermined range (0 ° C. to 40 ° C.) and the OCV of the single battery cell is not the region A in FIG.
  • the SOC calculated in this way can be used as the SOC used in the balancing discharge in steps S14 to S18 in FIG.
  • CCV OCV + I ⁇ DCR + Vp. . . (21)
  • I 0, no polarization occurs
  • the CCV Since the balancing discharge current is determined by the CCV, the balancing resistance, and the ON resistance of the balancing switch as described above, the CCV is appropriately measured while the vehicle is operating. Moreover, although description is abbreviate
  • the SOC is calculated.
  • the voltage measurement between the terminals of the unit cell for other purposes is appropriately performed.
  • the voltage measuring terminal (CV terminal) and the balancing discharge terminal (BS terminal) of the single battery cell are provided separately. Therefore, the voltage measurement between the terminals of the single battery cell and the balancing discharge do not interfere with each other. Further, the output voltage from the temperature measuring circuit can be measured simultaneously with the voltage measurement between the terminals of the single battery cell and in parallel with the balancing discharge. Further, the voltage measurement between the terminals of the single cell and the measurement of the output voltage from the temperature measurement circuit are performed while switching the multiplexer 210 in one control cycle of the cell controller IC300. Therefore, these voltage measurements and balancing discharges are performed almost simultaneously. By these, balancing discharge corresponding to the time change of the ambient temperature of the cell controller in real time can be performed.
  • the battery system 104 has been described as being configured by connecting the cell groups 102 in series.
  • the battery system 104 may be configured by connecting a plurality of cell groups in series or parallel.
  • the cell controller IC 300 is described as being provided in a one-to-one relationship with the cell group 102.
  • a single cell controller can control a plurality of cell groups, and a single cell group can be controlled by a plurality of cell groups. It is also possible to control with a cell controller.
  • the number of single battery cells constituting the cell group can be variously modified depending on the specifications of the battery module or battery system including a plurality of cell groups. Therefore, for example, n cell groups can be controlled by m cell controllers.
  • the specifications of such various battery systems are set in accordance with the power specifications required for electric vehicles such as HEVs and EVs on which the battery systems are mounted.
  • the voltage across the terminals of the plurality of cell groups is supplied to the block voltage input unit 225.
  • the output of the voltage input unit 225 is selected by the multiplexer 210 and input to the differential amplifier 211, and voltage measurement is performed.
  • the voltage between terminals of the cell group controlled by each cell controller IC 300 is input to the block voltage input unit 225 of each cell controller IC 300. Voltage measurement.
  • the configuration and functions of the cell controller described above can be applied to battery systems having such various configurations.
  • the battery system monitoring apparatus according to the present invention can be applied to battery systems having various configurations and to electric vehicles having various specifications.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Electrochemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

複数の単電池セルを直列接続したセルグループを備えた電池システムを監視する電池システム監視装置であって、第1の制御装置は、単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続された、当該単電池セルのバランシング放電を行うバランシングスイッチを単電池セル毎に備え、電圧検出線には、第1の抵抗が直列に設けられ、バランシングスイッチと当該バランシングスイッチに直列に接続された第2の抵抗とで構成されるバランシング放電回路が単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続され、バランシング放電回路と単電池セルの正極に接続された電圧検出線との接続点およびバランシング放電回路と単電池セルの負極に接続された電圧検出線との接続点は、それぞれ第1の抵抗よりセルグループ側に設けられる。

Description

電池システム監視装置
 本発明は電池システム監視装置に関する。
 ハイブリッド自動車(HEV)や電気自動車(EV)などでは、所望の高電圧を確保するため、二次電池の単電池セルを多数直列接続して構成される組電池(電池システム)が用いられている。このような組電池においては、各単電池セルの容量計算や保護管理のため、セル電圧(単電池セルの端子間電圧)の計測と充電状態すなわち残存容量の均等化(バランシング)を行う集積回路を組電池の監視装置内に用いて単電池セルの管理を行っている。この集積回路は信頼性を上げるためにセル電圧測定と均等化だけでなく、セル電圧検出線の断線検出を含む各種診断を行って信頼性を上げている。(例えば特許文献1参照)。
 近年、リチウム電池等の二次電池からなる組電池は、電気自動車(EV)あるいはプラグインハイブリッド自動車(PHV)での用途が大幅に増加している。二次電池がEVあるいはPHVで使用される場合は、ハイブリッド自動車(HEV)で使用される場合と比較して、これら二次電池のSOCの使用範囲が更に広いため、また、大電流出力によるSOCの変動が早いために、全セルの電圧監視と診断を高速に行うことが要求されている。また、電圧監視と診断の精度の向上のために、二次電池の広い使用範囲に渡って、全セルの電圧測定精度を向上することが要求されている。
 単電池セルの端子間電圧を測定する回路は温度特性を持つので、端子間電圧の測定精度を向上するためには、この電圧測定回路の温度を所定の範囲内とする必要がある。
 特許文献2では、多数の単電池セルの容量を調整するためのバイパス電流の大きさを、バイパス抵抗周辺の温度に基づいて変更する組電池の容量調整装置が記載されている。
 特許文献3では、複数の単電池セルを複数のグループに分け、各々のグループ毎に各単電池セルの容量を調整するタイミングを選択して各単電池セルの容量を調整することによって、容量調整中の温度上昇を抑える容量調整回路が記載されている。
特開2009-89488号公報 特開2006-115640号公報 特開2008-67460号公報
 各単電池セルの充電状態の均等化を行うためのバランシング放電は、集積回路内のバランシングスイッチのオン抵抗で発熱を生じさせ、この集積回路での単電池セルの端子間電圧測定精度に影響を与える。また、単電池セル内の分極も端子間電圧から推定するSOCの精度に影響を与える。従来は集積回路での電圧測定精度を考慮したSOCの算出方法に対応したバランシング放電が行われていなかった。
(1)本発明の第1の態様によると、複数の単電池セルを直列接続したセルグループを備えた電池システムを監視する電池システム監視装置であって、セルグループの複数の単電池セルの状態を監視し制御する第1の制御装置と、第1の制御装置を制御する第2の制御装置と、第1の制御装置の近傍の温度を測定する温度検出部と、単電池セルの端子間電圧を測定するための、単電池セルの正極および負極のそれぞれと第1の制御装置とを接続する複数の電圧検出線とを備え、第1の制御装置は、単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続された、当該単電池セルのバランシング放電を行うバランシングスイッチを単電池セル毎に備え、電圧検出線には、第1の抵抗が直列に設けられ、バランシングスイッチと当該バランシングスイッチに直列に接続された第2の抵抗とで構成されるバランシング放電回路が単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続され、バランシング放電回路と単電池セルの正極に接続された電圧検出線との接続点およびバランシング放電回路と単電池セルの負極に接続された電圧検出線との接続点は、それぞれ第1の抵抗よりセルグループ側に設けられる。
(2)本発明の第2の態様によると、第1の態様の電池システム監視装置において、第1の制御装置は、一の単電池セルの正極および負極のそれぞれに接続された電圧検出線あるいは、温度検出部に接続された温度検出線を選択し、一の単電池セルの正極電位および負極電位または温度検出部の出力電圧を出力する選択部と、選択部から出力された一の単電池セルの正極電位および負極電位または温度検出部の出力電圧から、一の単電池セルの端子間電圧または温度検出部の出力電圧を測定する電圧測定部とを備え、第2の制御装置は、温度検出部の出力電圧を温度に変換するデータを格納する記憶部を備えることが好ましい。
(3)本発明の第3の態様によると、第1または第2の態様の電池システム監視装置において、第2の制御装置は、電池システム監視装置を搭載した車両の始動時に、第1の制御装置の近傍の温度が所定の下限値以下であるかまたは所定の上限値以上である場合は、車両の前回停止時にバランシング放電の対象となった単電池セルに対するバランシング放電を、第1の制御装置を制御して行うことが好ましい。
(4)本発明の第4の態様によると、第1または第2の態様の電池システム監視装置において、第2の制御装置は、電池システム監視装置を搭載した車両の始動時に、第1の制御装置の近傍の温度が所定の下限値より大きく、かつ所定の上限値より小さい場合に、電池システムに車両を駆動する負荷が接続されていない状態で、セルグループの複数の単電池セルの各々の端子間電圧を測定して、複数の単電池セルの各々の残存容量(SOC)を算出するとともに、このSOCに基づいてバランシング放電を行うことが好ましい。
(5)本発明の第5の態様によると、第4の態様の電池システム監視装置において、第2の制御装置は、測定された複数の単電池セルの各々の端子間電圧が全て所定の電圧範囲に入っている場合に、複数の単電池セルの各々のSOCとその偏差を算出し、所定の閾値以上の偏差のSOCを持つ単電池セルのバランシング放電を、第1の制御装置を制御して行うことが好ましい。
(6)本発明の第6の態様によると、第4の態様の電池システム監視装置において、測定された複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合で、OCVを用いて前回SOCを算出したときから所定の時間が経過している場合は、第2の制御装置は、複数の単電池セルの各々のSOCとその偏差を算出し、所定の閾値以上の偏差のSOCを持つ単電池セルのバランシング放電を、第1の制御装置を制御して行うことが好ましい
(7)本発明の第7の態様によると、第4乃至第6の態様のいずれか1つの態様の電池システム監視装置において、第2の制御装置は、測定された複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合は、車両の前回停止時にバランシング放電の対象となった単電池セルのバランシング放電を、第1の制御装置を制御して行うことが好ましい。
(8)本発明の第8の態様によると、第4の態様の電池システム監視装置において、電池システムの充放電電流を検出する電流検出部をさらに備え、第2の制御装置は、測定された複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合は、車両の前回停止時にバランシング放電の対象となった単電池セルのバランシング放電を、第1の制御装置を制御して行い、複数の単電池セルの各々のSOCを、車両の前回停止時のSOCに電流検出部が検出した電池システムの充放電電流と単電池セルのバランシング放電の電流を積算して算出することが好ましい。
(9)本発明の第9の態様によると、第3または第7の態様の電池システム監視装置において、第2の制御装置は、SOCの偏差の大きい単電池セルを優先して、バランシング放電の対象となった単電池セルのバランシング放電を行うことが好ましい。
(10)本発明の第10の態様によると、第8の態様の電池システム監視装置において、第2の制御装置は、SOCの偏差の大きい単電池セルを優先して、バランシング放電の対象となった単電池セルのバランシング放電を行うことが好ましい。
(11)本発明の第11の態様によると、第3または第7または第9の態様のいずれか1つの態様の電池システム監視装置において、第2の制御装置は、バランシング放電の対象である単電池セルのバランシング放電を、第1の制御装置の近傍の温度が所定の上限値未満となるように、バランシング放電の対象となった単電池セルに対応したバランシングスイッチをデューティー制御して行うことが好ましい。
(12)本発明の第12の態様によると、第1乃至第11の態様のいずれか1つの態様の電池システム監視装置において、直列に接続されたN個(N≧1)のセルグループと、N個のセルグループを制御するM個(M≧1)の第1の制御装置と、M個の第1の制御装置の上位制御装置である第2の制御装置とを備え、M個の第1の制御装置のうち最上位の第1の制御装置と、第2の制御装置とは絶縁素子を介した通信ラインで接続され、M個の第1の制御装置のうち最下位の第1の制御装置と、第2の制御装置とは絶縁素子を介した通信ラインで接続され、M個の第1の制御装置は互いに通信ラインで接続され、M個の第1の制御装置は、第2の制御装置からの制御信号および制御データによって制御されることが好ましい。
(13)本発明の第13の態様によると、複数の単電池セルを直列接続したセルグループを備えた電池システムを監視する電池システム監視装置であって、複数の単電池は、OCV-SOC特性に関して、所定のOCVの範囲ではSOCの変化によるOCVの変化が少なく、所定のOCVの範囲外ではSOCの変化によるOCVの変化が大きい特性を有する電池システム監視装置において、電池システムの充放電電流を検出する電流検出部と、セルグループの複数の単電池セルの状態を監視し制御する第1の制御装置と、第1の制御装置を制御する第2の制御装置と、単電池セルの電圧を検出する電圧検出回路と、電圧検出回路の近傍の温度を測定する温度検出部と、複数の単電池セルのSOCのばらつきを低減するバランシング放電制御を行うバランシング放電回路とを備え、温度検出部によって検出された電圧検出回路の温度が所定の温度範囲である場合は、電圧検出回路によって検出された複数の単電池セルのOCVに基づいて、各単電池セルのSOCを算出する第1のSOC算出方法で各単電池セルのSOCを算出し、温度検出部によって検出された電圧検出回路の温度が所定の温度範囲外である場合は、電流検出部によって検出された電池システムの充放電電流とバランシング放電回路による複数の単電池セルの各々のバランシング放電電流を積算して各単電池セルのSOCを算出する第2のSOC算出方法で各単電池セルのSOCを算出する。
(14)本発明の第14の態様によると、第13の態様の電池システム監視装置において、温度検出部によって検出された電圧検出回路の温度が所定の温度範囲である場合は、各単電池セルのSOCを第1のSOC算出方法で算出するとともに、バランシング放電回路の発熱量を抑制した第1バランシング放電制御を行い、温度検出部によって検出された電圧検出回路の温度が所定の温度範囲外である場合は、各単電池セルのSOCを第2のSOC算出方法で算出するとともに、バランシング放電回路の発熱量を抑制しない第2バランシング放電制御を行うことが好ましい。
 本発明による電池システム監視装置を用いることにより、この電池システム監視装置に備えられた、単電池セルの端子間電圧測定回路の測定精度を損なうことなく、バランシング放電を行うことができる。またこの電圧測定回路の測定精度に対応してバランシング放電を行うので、効率の良いバランシング放電を行うことができる。
本発明による電池システム監視装置を組み込んだ蓄電装置を備えたハイブリッド自動車の電動駆動装置の構成例である。 図1に示す蓄電装置のバッテリーコントローラに総電圧検出回路を組み込んだ蓄電装置を備えたハイブリッド自動車の電動駆動装置の構成例である。 図1あるいは図2に示すセルコントローラ200内の、セルコントローラIC300とバッテリーコントローラ500内のマイクロコンピュータ504の間の通信線の接続例を示す図である。 図1あるいは図2に示すセルコントローラ200内の、セルコントローラIC300とバッテリーコントローラ500内のマイクロコンピュータ504の間の通信線のもう1つの接続例を示す図である。 セルコントローラIC300の内部構成例を示す図である。 セルコントローラIC300のロジック部の構成例を示す図である。 セルコントローラIC300が最上位設定の場合の、起動検出部、通信受信部、FF入力部の外部回路との接続を示す図である。 セルコントローラIC3が最下位設定の場合のマイクロコンピュータ504への接続の詳細を示す説明図である。 セルコントローラIC300の通信受信部の内部構成を示す説明図である。 FSK方式の通信波形例を示す説明図である。 ブロック電圧の測定を行うために、ブロック電圧をマルチプレクサに入力する回路の概略図である。 図11に示すブロック電圧入力部225のRCフィルターや分圧抵抗をセルコントローラIC300の外部に設置する場合の回路の概略図である。(a)はフィルターコンデンサのみを外部に設置する場合の例であり、(b)は分圧抵抗とフィルターコンデンサー共に外部に設置する場合の例である。 異なる特性をもつ2つの二次電池のOCV-SOC換算曲線の例を示す図である。 図13に示すタイプBの二次電池でのSOC算出誤差を説明する図である。 電圧測定回路の半導体のジャンクション温度と、電圧測定精度の関係の一例を示す図である。 バランシングスイッチのデューティ比(%)とセルコントローラICのチップの温度上昇の関係を模式的に示す図である。 本発明による電池システム監視装置を用いたバランシング放電動作を、図13および図14で説明したタイプBの二次電池に対し行う場合のフローの概略を示す図である。 12個の単電池セル(セル1~セル12)からなるセルグループのバランシング放電を説明するための図である。
 以下、図1~図18を参照して本発明を実施するための形態について説明する。以下に説明する実施形態は、本発明による電池システム監視装置を備えた蓄電装置を、ハイブリッド自動車(HEV)などに用いられる電池システムを備えた蓄電装置に対して適用した場合の例である。なお、本発明はHEVに限らず、プラグインハイブリッド自動車(PHEV)や電気自動車(EV)、鉄道車両などに搭載される各種蓄電装置に対して幅広く適用可能である。
 以下の実施例では、制御の最小単位となる蓄電・放電デバイスとして3.0~4.2V(平均出力電圧:3.6V)の範囲に電圧を持つリチウムイオン電池を想定しているが、それ以外でもSOC(State of Charge)の高すぎる場合(過充電)や低すぎる場合(過放電)に使用を制限するような、電気を蓄え放電可能なデバイスであれば何でもよく、ここでは、それらを総称して単電池あるいは単電池セルと呼ぶ。
 以下に説明する実施形態では、単電池セルを複数個(概ね数個から十数個)直列に接続したものをセルグループと呼び、このセルグループを複数個直列に接続したものを電池モジュールと呼ぶ。更にこのセルグループあるいは電池モジュールを複数個直列または直並列に接続したものを電池システムと呼称する。セルグループ、電池モジュールおよび電池システムを総称して組電池と呼んでいる。各単電池セルのセル電圧を検出し、バランシング動作等を行いながら電池状態を監視するセルコントローラICはセルグループ毎に設けられる。
 まず、図1を用いて、本発明による蓄電装置をハイブリッド自動車用駆動システムに適用した例について説明する。
 蓄電装置100は、リレー600、610を介してインバータ700に接続され、インバータ700はモータ800に接続されている。車両の発進・加速時には蓄電装置100から放電電力がインバータ700を通じてモータ800に供給されて図示されないエンジンをアシストする。車両停止・減速時には、モータ800からの回生電力がインバータ700を通じて蓄電装置100に充電される。なお、ここではインバータ700は複数の半導体スイッチング素子を備えたインバータ回路と、半導体スイッチング素子のゲート駆動回路と、ゲート駆動回路をPWM制御するパルス信号を発生するモーターコントローラとを備えているが、図1では省略されている。
 蓄電装置100は、主に、複数のリチウムイオン単電池セル101から構成されるセルグループ102と、複数のセルグループ102が直列接続された電池システム104と、各単電池セル101の電圧を検出し、バランシング放電動作を行うセルコントローラIC300を複数備えたセルコントローラ200と、セルコントローラ200の動作を制御し、各単電池セルの状態判定を行うバッテリーコントローラ500で構成される。本実施形態に示す蓄電装置の例では、定格容量5.5Ahのリチウムイオン単電池を96個直列に接続したものを使用している。バッテリーコントローラ500は絶縁素子群400を介して複数のセルコントローラIC300と通信を行って、これらのセルコンローラICの制御を行う。セルコントローラIC300は、前述のように、セルグループ102毎に設けられている。なお、電池システム104とセルコントローラ200の間の電圧検出線は、不図示のコネクタでセルコントローラ200に接続されている。
 バッテリーコントローラ500は、電池システム104に流れる充放電電流を検出する電流センサ503に接続される電流検出回路502と、セルコントローラ200とインバータ700及び図示されない上位の車両コントローラとの通信を含む、バッテリーコントローラ500の全体の制御を行うマイクロコンピュータ504と、記憶部505とを備えている。記憶部505は、各単電池セルの電圧や、上記の電流センサ503を用いた電流測定値、後述する各種の断線診断の結果等、蓄電装置100の動作に関連した種々のデータを格納している。このデータには、後述する、セルコントローラIC300の周囲温度の算出とバランシング放電を行った際の温度の算出に関するデータが格納されている。
 また、インバータ700の内部には電池システム104の総電圧を測定する総電圧測定回路701が設けられている。また、図1には示されていないがバッテリーコントローラ500は、セルコントローラIC300に接続された温度検出回路によって測定された単電池セル101の温度に基づいて、電池状態のパラメータの温度補正を行っている。
 なお、上記の、セルコントローラIC300の周囲温度を算出するためのデータを格納する記憶部は、バッテリーコントローラ500ではなく、セルコントローラIC300に設けてもよい。この場合は、温度検出部の出力電圧をセルコントローラIC300のロジック部で温度に換算されたデータがバッテリーコントローラに送信される。また、たとえばバランシングスイッチ222の抵抗の温度補正を行う場合は、この補正データをセルコントローラIC毎に保持する方が管理しやすい。
 図2は総電圧検出回路501がバッテリーコントローラ500にも設置された例である。後述するように、電池システム104の総電圧を測定できれば、総電圧検出回路501は、図1のようにバッテリーコントローラ500の内部に設けられていなくともよい。
 なお、図1、2では省略されているが、セルコントローラ200とバッテリーコントローラ500は、1つの基板の上に設けられており、これらは金属製のケースに収納されている。また、電池システム104も金属製のケースに収納されている。セルコントローラ200と電池システム104とは、複数の電圧検出線や単電池セルの温度センサ(不図示)の接続線等が束ねられたハーネスで接続されている。
 この蓄電装置100の起動後に以下の動作が行われる。バッテリーコントローラ500は、セルコントローラ200が全単電池セルのOCV(開路電圧)測定を行う指令を絶縁素子群400を介して送信する。測定された各単電池セルのOCVのデータは、セルコントローラ200からセルグループ単位で絶縁素子群400を介して、バッテリコントローラ500に送信される。バッテリーコントローラ500は受信した各単電池セルのOCVをSOCに変換し、全単電池セルのSOCの偏差を算出する。SOCの偏差が所定の値よりも大きい単電池セルがバランシング放電を行う対象となる。バランシング放電の対象となった単電池セルのSOCの偏差が0となるまでの時間が計算され、この時間だけセルコントローラIC300内のバランシングスイッチをオンとする制御動作を行う指令が、バッテリーコントローラ500からセルコントローラ200に送られ、バランシング対象の単電池セルのバランシング放電が行われる。
 上記で測定された各単電池セルのOCVから、電池システム104のSOCが算出された後、インバータ700あるいは上位コントローラである車両コントローラ(不図示)がリレー600とリレー610とをオンとして、蓄電装置100がインバータ700とモータ800に接続され、車両コントローラからの充放電指令をインバータ700が受けて、インバータ700が動作してモータ800を駆動するとともに、蓄電装置100の充放電動作が行われる。
 リレー600及びリレー610をオンとして蓄電装置100が充放電を開始する時から、バッテリーコントローラ500は、一定時間毎に充放電電流と総電圧を測定する。得られた総電圧と充放電電流の値から、バッテリーコントローラ500は組電池の充電状態(SOC)と電池の内部抵抗(DCR)をリアルタイムに算出(算出方法は省略)する。さらに、これらの値から電池システム104が充放電可能な電流あるいは電力をリアルタイムに算出して、インバータ700に送信し、インバータ700はその範囲内で充放電電流あるいは電力を制御する。尚、図1では総電圧をバッテリーコントローラ500が測定していないが、後述する方法でセルコントローラ200から総電圧値を得ている。
 図3は、セルコントローラ200内のセルコントローラIC300a~300dとバッテリーコントローラ500内のマイクロコンピュータ504の間の通信接続例を示す図である。マイクロコンピュータ504はセルコントローラ200内のセルコントローラIC300a~300dを起動させるための起動信号出力ポートと、コマンド及びデータを送信するための送信ポートTXDと、過充電状態を検出するためのデータパケット(FF信号)を出力するためのFF信号出力ポートを有している。
 図3の例では、複数の単電池セルを直列接続したセルグループ102を2個直列接続した電池モジュール103を、サービスディスコネクトスイッチ(SD-SW)105の上下に配した構成となっている。電池モジュール103を構成するセルグループの数は2個に限定されず、3個以上であってもよい。またこれらのセルグループ102a~102dに対応して、それぞれセルコントローラIC300a~300dが設けられている。
 なお、ここでは図3で一番下のセルコントローラIC300aを、マイクロコンピュータ504からの信号を最初に受信する最上位セルコントローラとしている。図3の一番上側のセルコントローラIC300dを最上位セルコントローラとする構成でもよい。
 以下単にセルコントローラICあるいはセルコントローラIC300と呼ぶ場合は、セルコントローラIC300a~300dを特に限定しない場合とする。また、同様にセルグループ102a~102dに対しても、これらを特に限定しない場合は、セルグループあるいはセルグループ102と呼ぶ。
 サービスディスコネクトスイッチ(以下SD-SWと呼ぶ)105は、高電圧の組電池でよく用いられるスイッチであり、保守点検時にこのSD-SW105を開放することによって、組電池の電流経路を遮断し、作業者の感電を防止することを目的としている。このSD-SW105を開放しておけば、電池の直列接続が絶たれるため組電池の最上位端子と最下位端子を人間が触っても高電圧が人体に印加されることはないので、感電が防止できる。
 コマンドおよびデータ信号の通信ラインでは、コマンドおよびデータ信号がマイクロコンピュータ504の送信ポートTXDから高速絶縁素子401とコンデンサ403を通じて最上位のセルコントローラIC300aの通信受信端子RXDに送信される。起動信号出力ポートは低速絶縁素子402を通じてセルコントローラIC300aの起動信号入力端子WU_Rxに接続される。また、FF信号の通信ラインでは、FF信号がFF信号出力ポートから低速絶縁素子402とコンデンサ403を通じてセルコントローラIC300aのFF入力端子FFINに送信される。最上位のセルコントローラIC300aは、その通信出力端子TXDが一つ下位のセルコントローラIC300bの通信受信端子RXDにコンデンサ結合で接続され、またFF出力端子FFOUTがセルコントローラIC300bのFF入力端子FFINにコンデンサ結合で接続される。また、セルコントローラIC300aの起動出力端子WU_Txは、この一つ下位のセルコントローラIC300bの起動信号入力端子WU_Rxに接続される。
 これらの高速絶縁素子401、低速絶縁素子402、および、コンデンサ403で、マイクロコンピュータ504と最上位のセルコントローラIC300aとの間の通信経路経路で用いられている絶縁素子をまとめて絶縁素子群400(図1)としている。
 サービスディスコネクトスイッチ(SD-SW)105の上側の電池モジュール103に接続されているセルコントローラICの最上位セルコントローラIC300cと、下側の電池モジュール103に接続されているセルコントローラICの最下位セルコントローラIC300bとの間の通信は、絶縁して行う必要がある。これは、上側および下側の電池モジュール103それぞれに直列接続されている単電池セルの数が多いために、電池モジュール103の端子間電圧が高くなるためである。このため、コマンドおよびデータ信号の通信ラインに高速の絶縁素子401が挿入され、FF信号の通信ラインに低速の絶縁素子402が挿入される。もしもこれらの通信ラインを直結するとその接続を通じて組電池が直列接続されることになり、SD-SW105の切り離しを行っても組電池の直列接続が維持されるため、組電池の通電を遮断できなくなり、作業者が感電する可能性を生じることになる。なお、図3のSD-SW105の上側(下位側)のセルコントローラIC300cにも、マイクロコンピュータ504の起動信号出力ポートから、低速絶縁素子402を通じて、起動信号が出力される。
 最下位のセルコントローラIC300dでは、通信出力端子TXDが高速絶縁素子401を介してマイクロコンピュータ504の通信受信ポートRXDに接続される。同様に、セルコントローラIC300dのFF出力端子FFOUTがマイクロコンピュータ504のFF信号入力ポートに低速の絶縁素子402を介して接続される。
 セルコントローラ200を起動する場合は、マイクロコンピュータ504は起動信号を出力し、セルコントローラIC300aとセルコントローラIC300cは低速絶縁素子402を通じて起動信号を受信して起動される。起動されたセルコントローラICは次のセルコントローラICに起動信号を出力する。このようにして全部のセルコントローラIC300は順番に起動される。
 なお、低速絶縁素子402にはフォトカプラのような直流信号も伝送できる絶縁素子を用いており、マイクロコンピュータ504からのセルコントローラIC300aとセルコントローラIC300cへの起動信号は直流信号または比較的時間幅の広いパルス信号で行われる。これは、蓄電装置100の起動時はノイズや電圧変動が発生し易いので、この影響を除去するためである。最初に起動されたセルコントローラIC300aまたは300cから次のセルコントローラICを起動するための信号は短パルスあるいは交流パルス信号により行われる。
 セルコントローラ200の起動後は、マイクロコンピュータ504は高速絶縁素子401を通じてセルコントローラIC300aの受信端子RXDにコマンド信号及びデータ(データパケット)を送信する。セルコントローラIC300aはコマンド信号とデータパケットを受信し、さらにこれらを出力端子TXDから次のセルコントローラIC300bに送信する。このようにして全部のセルコントローラIC300a~300dはコマンド信号とデータを受信し、このコマンド信号とデータに従って動作を行う。セルコントローラIC300a~300dがそれぞれ制御するセルグループ102a~102dの単電池セルの端子間電圧(セル電圧と呼ぶ)等のデータを得る場合には、ぞれぞれのセルコントローラIC300a~300dがデータパケットにデータを付加して、送信端子TXDから次のセルコントローラICのRXD端子に送信し、最終的にマイクロコンピュータ504のRXD端子で受信される。マイクロコンピュータ504は自分が送信したコマンド信号を含めたデータパケットを受信し、正常にコマンド信号転送が行われ、かつセルコントローラIC300a~300dが付加したデータがある場合にはそのデータが受信される。
 なお、FF信号のセルコントローラIC300a~300dのFF入力端子FFINおよびFF出力端子FFOUTを経由するループは、単電池セルの過充電あるいは過放電の状態を検出するループであり、リチウムイオン単電池セルの安全性確保のために重要な過充電の検出の信頼性を、TXD端子とRXD端子を経由する通信ラインとは別の系統で検出するためのものである。FF信号は一定周期の矩形波信号を想定しており、例えば、正常状態は1kHzの矩形波で、過充電状態は2KHzの矩形波とする。セルコントローラIC300はFF入力端子FFIN入力に1KHzの矩形波が入力された場合、上位のセルコントローラIC300は正常な状態である(過充電でない)と認識し、当該セルコントローラIC300のセル電圧検出値が過充電電圧を検出した場合には、FF入力端子FFINの入力信号の周波数が1kHzか2kHzのどちらの場合でも、FF出力端子FFOUT出力に2kHzの矩形波を出力し、過充電状態を下位のセルコントローラIC300に出力する。また、FFIN端子の入力信号の周波数が1kHzあるいは2kHz以外の信号の場合は、FF出力端子FFOUTに矩形波を出力しないものとする。
 あるセルコントローラIC300がその制御するセルグループの単電池セルの過充電電圧を検出していなくても、FF入力端子FFINに他のセルコントローラIC300から2kHzの矩形波が入力されると、当該セルコントローラICはFF出力端子FFOUTに2kHzの矩形波を出力する。このようにしてFF信号ループはいずれかのセルコントローラIC300が過充電を検出したことを出力し、マイクロコンピュータ504は高速の通信信号ループとは別の経路で過充電を検出できる。
 尚、マイクロコンピュータ504は、通常、最上位のセルコントローラIC300aに1kHzの正常状態を示す矩形波を出力するものとする。マイクロコンピュータ504が2kHzの過充電を示す矩形波を出力すれば、マイクロコンピュータ504は、全部のセルコントローラIC300a~300dが過充電電圧を検出していなくても、戻ってきたFF信号の矩形波が2kHzであれば、FFループが正常に動作していることを確認することができる。また、FFループに障害が発生した場合、例えば断線した場合は、矩形波が伝送されないのでその状態を識別できる。
 図4はセルコントローラ200内のセルコントローラIC300a~300dとバッテリーコントローラ500内のマイクロコンピュータ504の間を別の方法で接続する例を示す図である。図3との違いは、各ラインの接続で、組電池の中間点のスイッチ103の間の通信接続ラインにコンデンサ403を用いた点である。コマンド信号、FF信号は短パルスの矩形波信号であり、コンデンサ結合を用いてもデータ通信は可能であるので、このような回路を採用することで、フォトカプラのような電源を必要とする絶縁素子を削減することができ、このような絶縁素子による消費電流を削減することができる。
 図5は、1つのセルコントローラIC300の内部構成を示す説明図である。また、ロジック部213の構成概略を図6に示す。
 ここでは、セルグループ102は12個の単電池セル101(セル1~12とする)から構成されている。セルグループ102とこれを制御するセルコントローラIC300とは、各々の単電池セルの電圧検出を行う電圧検出線SL1~SL13とを介して、それぞれの電圧検出用のCV端子(CV1~13端子)とバランシング動作を行うBS端子(BS01H~BS12H端子およびBS01L~BS12L端子)とに接続されている。各単電池セルの両端すなわち正極端子と負極端子はそれぞれ、セル入力抵抗Rcv202を経由してCV端子に接続され、それぞれのCV端子には最下位のGND端子との間にセル入力コンデンサCin203が接続されている。
 このセル入力抵抗Rcv202とセル入力コンデンサCin203でRCフィルタを構成し、インバータ700の動作に起因してセル電圧に重畳するリップル電圧を主とするノイズを抑制する。単電池セルの両端の電圧端子はバランシング抵抗(Rb)201を通じてバランシングスイッチ端子(BS端子)に接続される。IC内部にはバランシング電流を通電するバランシングスイッチ(BS)222が接続されている。BS222をオンとするとバランシング抵抗201を通じて当該セルのバランシング電流が流れる。尚、BS端子間にはバランシング端子コンデンサ(Cb)204が接続されている。これは、バランシングスイッチ診断(詳細は省略)時の誤動作防止のためのもので、インバータ700の動作に起因するリップル電圧等のノイズで誤検出しないようにしている。なお、図5ではバランシング抵抗201、バランシングスイッチ毎にこのバランシングスイッチを挟むように2個設けられているが、1個だけ設けるようにしてもよい。
 なお、各単電池セルのバランシング放電用のBS端子と、端子間電圧測定用のCV端子とはそれぞれ専用の端子として設けられている。また、バランシング抵抗Rb201と、バランシングスイッチBS222とで構成されるバランシング放電回路は、セル入力抵抗Rcv202より単電池セル側で電圧検出線に接続されている。これによって、バランシング電流がセル入力抵抗Rcv202を流れないため、正確な端子間電圧測定が可能となっている。電圧検出線に断線の無い正常な状態では、バランシング放電回路のバランシング抵抗Rb201とバランシング端子コンデンサCb204、およびバランシングスイッチ222のオン・オフは、端子間電圧測定に影響を与えない。従来は、特開2010-249793号公報に記載されているように、バランシング放電用の回路の一部が端子間電圧測定用の回路(電圧検出線とセル入力抵抗)と共通となっている場合が多く、バランシング放電を行うと端子間電圧が低下するようになっていた。従って、正確な端子間電圧測定は、バランシング放電を停止して実施していた。
 また、セル入力コンデンサCin203は、従来は各単電池セルの正負極に接続された電圧検出線の間に接続されていたが、本発明による構成では、このセル入力コンデンサCin203の負極側が、GNDに接続されている。この回路構成を採用することにより、断線の無い正常な状態においては、バランシングスイッチのオン・オフによって、コンデンサCin203が放電されることがなく、従って、バランシング放電中に各単電池セルの端子間電圧測定を正確に行うことができる。
 CV端子はセルコントローラIC300の内部でマルチプレクサ210の入力端子(Min端子、Min1~Min13)に接続されている。マルチプレクサ210は各々のセルを選択して、その正極電位と負極電位を出力するもので、ロジック部213のマルチプレクサ入力選択レジスタ245からの出力で制御される。マルチプレクサ210の出力は差動増幅器211を通じて各単電池セルの端子間電圧に変換され、その電圧はADコンバータ212でデジタル値に変換される。ADコンバータ212の動作はロジック部213で制御され、ADコンバータ212の出力はロジック部213で処理される。すなわち、差動増幅器211とADコンバータ212とで電圧測定を行っている。
 このADコンバータ212には例えば逐次比較型等の高速なADコンバータを採用している。このような高速なADコンバータを用いることで、マルチプレクサの診断(詳細は省略)などを高速に行うことができるようになっている。
 高速なADコンバータは信号にノイズ成分があると、これをそのまま検出してAD変換してしまう。このため、端子間電圧測定用のCV端子に接続されている電圧検出線の各々にセル入力抵抗Rcv202とセル入力コンデンサCin203を設けてRCフィルタを構成し、ノイズを除去してからマルチプレクサ210、差動増幅器211を経由してADコンバータ212に入力されるようになっている。
 例えば、このCV端子のRCフィルタのカットオフ周波数は50Hz程度となるようにしている。これにより、インバータ700の半導体スイッチング素子のスイッチングによるノイズ(p-pで約20%、20kHz程度)は1/100以下にすることができる。
 なお、バランシング端子(BS端子)に接続されたコンデンサCb204はバランシングスイッチのノイズ対策用に設けられているバイパスコンデンサである。バランシング抵抗Rb201とバランシング端子コンデンサCb204で構成されるRCフィルタのバランシング放電回路の時定数は小さいので、バランシング電流検出での断線判定(詳細は省略)を高速に行うことができる。
 なお、CV端子のRCフィルタのカットオフ周波数を上記より高めに設定し、これにより取り切れないノイズ成分を除去するために、ADコンバータでサンプリングを複数回行い、この複数のサンプリング結果を平均化してノイズ成分を取り除くことも可能である。
 図5においては、単電池セル(セル1~セル12)の正極あるいは負極からマルチプレクサ210の入力端子Min1~Min13までの間を電圧検出線としている。
 マルチプレクサ210の入力端子Min1~Min13に接続される電圧入力ライン(すなわち電圧検出線)で、2つの隣り合う電圧入力ライン、すなわち各単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間にはマルチプレクサ入力短絡スイッチ224が設けられている。各単電池セルに対応したマルチプレクサ入力短絡スイッチ224をそれぞれSWX1~SWX12とする。また各電圧入力ラインにはマルチプレクサ入力保護用の抵抗Rmpxが設けられている。
 なお、マルチプレクサ210の入力端子Min14~Min17はるブロック電圧入力部225からの出力電圧の入力のために設けられており、これらの入力ラインの間にもマルチプレクサ入力短絡スイッチSWX14~SWX16が設けられている。
 セルコントローラIC300には、サーミスタ251、サーミスタ分割抵抗252、サーミスタ入力抵抗253、サーミスタ入力コンデンサ254から構成される温度検出回路250が接続される補助入力端子AUXINとAGNDが設けられている。図5には、1つの温度検出回路250と補助入力端子AUXINとAGNDが1対のみ示されているが、実際は補助入力端子は複数組設けられている。
 この補助入力端子には、温度検出回路等、電圧を発生する回路が接続され、この回路からの電圧をマルチプレクサ210で選択し、差動増幅器211およびADコンバータ212を介してデジタル化された電圧値がロジック部213に入力される。セルコントローラ200内の温度や単電池セルの温度を検出するため、温度検出回路250も複数設けられており、これらの出力電圧が複数の補助入力端子に入力されている。また、これらの出力電圧は上記の電圧検出線と同様に、セルコントローラIC300内の配線(温度電圧検出線と称する)を介してマルチプレクサ210の入力端子Min16とMin17に接続されている。
 サーミスタ251は、設置された場所の温度によりその抵抗値が大きく変化する。このサーミスタ251と直列に接続されたサーミスタ分割抵抗252とでVDD電圧を分割し、サーミスタ251の端子間電圧が補助入力端子AUXMINとAGNDからセルコントローラIC300に入力される。サーミスタ入力抵抗253とサーミスタ入力コンデンサは、この補助入力端子へ入力される信号のノイズを除去するRCフィルターとして作用する。すなわち、サーミスタ251が温度の変化に対応して発生する電圧は、このRCフィルターでノイズ除去されてセルコントローラIC300に入力される。
 ロジック部213から、コマンド信号出力部220を介して、上位制御装置(バッテリーコントローラ500)にデジタル化されたサーミスタ251の端子間電圧が送信され、バッテリーコントローラ500で、このサーミスタ251の端子間電圧から、サーミスタ251が設置された場所の温度が算出される。この温度の算出は、サーミスタ251の抵抗温度特性に依存するサーミスタ251の端子間電圧と温度との関係式、もしくはサーミスタ251の端子間電圧と温度関係をテーブル化したデータを用いて行うことができる。
 本発明による電池システム監視装置では、後述するように、サーミスタ251をセルコントローラIC300に近接して設置し、セルコントローラIC300の温度を正確に測定し、差動増幅器211およびADコンバータ212等から構成される端子間電圧の測定回路の温度を所定の範囲となるように制御している。これにより、この電圧測定回路に含まれている半導体素子のジャンクションの温度特性に依存する測定電圧値の精度を維持するようにしている。
 なお、複数の温度検出回路250は、電池システムあるいは電池監視装置を蓄電装置内の温度を測定し、もし異常な温度が検出された場合には、この情報をさらに上位制御装置に送信し、電池システムの使用を停止したり、車両の制御を変更する等の動作を行うとともに、アラーム等を発生して電動車両の操作者に知らせることにも用いられる。
 図6はロジック部213の構成の概略を示したものである。ロジック部213にはADコンバータ212からの検出電圧信号が入力され、これが電圧比較部240で所定の閾値と比較される。例えば、検出電圧信号が所定の閾値より大きければ、正常な電圧が検出されたとして検出結果「1」を検出結果レジスタ241に、マルチプレクサ210で選択された入力の測定順に格納する。
 なお、バランシングスイッチ状態検出回路223を動作させて、バランシング電流の有無の検出あるいは、バランシングスイッチ222の診断を行った場合は、これらの結果が検出結果格納レジスタ241に直接格納される(図5の2参照)。なお、バランシングスイッチ222の診断結果のデータは、実際は電位変換回路(不図示)を介して検出結果格納レジスタ241に格納されるがこの説明は省略する。
 検出結果レジスタ241に格納された検出結果に基づいて、断線判定部242は電圧検出線の断線判定を行う。電圧検出線の断線判定の結果は診断結果レジスタ243に格納される。
 なお、断線検出に関与する回路およびロジックの診断のための測定を行った場合にも、検出結果レジスタ243にこれらの測定結果が格納される。これらの診断における測定結果に基づく断線検出に関与する回路およびロジックの診断では、1回の連続した測定で、この測定に対応した部分の診断が断線判定部242で行われ、同様に診断結果レジスタに格納される。
 ADコンバータ212の出力は、上述のように、マルチプレクサ210で選択された単電池セルの端子間電圧、あるいは入力端子Min1~Min13に接続された2つの電圧検出線の間の電圧である。断線検出や診断以外の通常の蓄電装置100の動作では、各単電池セルの端子間電圧は電圧測定結果レジスタ244に格納される。断線検出を単電池セルの端子間電圧の測定値を用いて行う場合にも、各単電池セルの端子間電圧は電圧測定結果レジスタ244に格納される。
 診断結果レジスタ243に格納された断線検出結果または診断結果と、電圧測定結果レジスタ244に格納された各単電池セルの端子間電圧は、上述のように、セルコントローラIC300から通信ラインを介して上位コントローラ(バッテリコントローラ500)に送信される。
 なお、断線判定の内容および動作については、詳細を省略する。
 ロジック部213は、セルコントローラIC300に設けられた各種のスイッチを制御するレジスタを備えている。
 マルチプレクサ入力選択レジスタ245には、マルチプレクサ245を切り替えて入力を選択するためのデータが格納されている。マルチプレクサ診断レジスタ246には、マルチプレクサの診断を行うための、マルチプレクサ入力短絡スイッチ224を制御するデータが格納されている。バランシングスイッチ制御レジスタ247には、各セル毎に設けられたバランシングスイッチ222のオン・オフを制御するためのデータが格納されている。バランシングスイッチ状態診断レジスタ248には、バランシングスイッチ222の診断(詳細は省略)を行うための、バランシングスイッチ状態検出回路223のスイッチ回路を制御するデータが格納されている。S/H制御レジスタ249には図5に示すブロック電圧入力部225のサンプルホールド回路(S/H)内のスイッチ(不図示)を制御するためのデータが格納されている。
 なお、マルチプレクサ入力選択レジスタ245の出力は、実際はマルチプレクサ駆動回路に入力され、このマルチプレクサ駆動回路(不図示)の出力によってマルチプレクサ210が駆動されている。また、同様に、マルチプレクサ診断レジスタ246、バランシングスイッチ制御レジスタ247、バランシングスイッチ診断レジスタ248の出力は、それぞれ駆動回路(不図示)に接続され、これらの駆動回路を介して、マルチプレクサ入力短絡スイッチ224、バランシングスイッチ222、バランシングスイッチ状態検出回路223のスイッチ回路(不図示)が駆動されている。ここでは簡単のため、これらの駆動回路は省略されている。
 セルコントローラIC300の動作電源はVcc端子から供給される(図5、7、8参照)。Vcc端子に接続されたVccコンデンサ(Cvcc)206はノイズを抑えるコンデンサである。Vcc端子には、電源供給線VL1を介して、セルグループ102の端子間電圧Vccが入力される。この電源供給線VL1は、図5、7、8に示すように、最上位の電圧検出線SL1において抵抗Rcv202よりセルグループ側に接続されているか、あるいはセルグループ102の最上位セルであるセル1の正極側に接続されている。Vcc端子は更に、セルコントローラIC300内で電源部226に接続され、その内部のレギュレータはロジック部を含むVDD電源で動作する回路に3.3V動作電源VDDを供給する。電源VDDはまた、セルコントローラIC300のVDD端子に接続されている。動作安定用のVDDコンデンサ(Cvdd)206が接続され、外部のVddで動作する回路へも電源供給を行う。
 電源部226は起動信号検出部215の出力で起動する起動信号検出回路を有しており、上位セルコントローラICあるいはマイクロコンピュータ504から絶縁素子402を介して起動信号を受信すると、レギュレータへの電源供給が行われると共に、起動とPOR(パワーオンリセット)動作を行う。セルコントローラIC300が起動するとロジック部213からの出力で起動信号出力部216が動作し、下位のセルコントローラIC300に起動信号を出力する。尚、起動信号出力部216にはセルコントローラIC300の外側にコンデンサが接続されるようになっている。このコンデンサはチャージポンプ動作をおこなうもので、このセルコントローラIC300の電源Vccよりも設定電圧だけ高い電圧を発生させるためのものである。
 Vcc端子は起動信号検出部215へ常時接続され、セルコントローラIC300の全体の動作が停止している状態でも、起動信号検出部215にのみ電源が供給されている。ただし、セルコントローラICが動作停止状態では電源は電池(セルグループ102)から供給されるため、起動信号検出部215は、その消費電流をできるだけ少なくする回路構成となっている。
 図7は、図3の最上位セルコントローラIC300aについて、その起動信号検出部215、コマンド信号受信部217、およびFF信号入力部218と外部回路との接続例を示す図である。セルコントローラIC300が最上位設定の場合、起動信号入力端子はWU_RX端子が使用される。この端子にはフォトカプラである起動用低速絶縁素子402が接続され、マイクロコンピュータ504が駆動用トランジスタ404を通じて起動用の低速絶縁素子402のダイオードに電流を通電することで、絶縁されたトランジスタ側がオンとなる。低速絶縁素子402のトランジスタ側はコレクタ側がセルコントローラIC300のVccに抵抗を介して接続されており、トランジスタ側がオンとなると、セルコントローラIC300のWU_RX端子にはVccが印加される。起動信号検出部215は設定された閾値を有するコンパレータであり、絶縁素子402のトランジスタのオン状態を検出すると電源部226へ起動検出信号を出力する。このようにすれば、上述したように、動作停止状態の消費電流を下げることが可能となる。
 また、コマンド信号受信部217には端子RXDが使用される。この端子にはコンデンサ403を介してトランスを用いた小型の通信用の高速絶縁素子401が接続され、マイクロコンピュータ504から通信信号が送信される。この高速通信用絶縁素子には、例えばデジタルアイソレータを使用するが、これはフォトカプラと異なり、送信側にも動作電源が必要である。この動作電源はセルコントローラIC300の動作電源VDDがVDD端子を用いて供給される。このVDDは動作停止時に出力されないため、動作停止中に暗電流が流れることはない。尚、コマンド信号受信部217はパルス信号を検出するもので、検出されたパルス信号はデジタル通信信号としてロジック部213で利用される。
 また、FF信号入力部218には端子FFINが使用され、コマンド信号受信部217の場合と同様に、フォトカプラである低速絶縁素子402とコンデンサ403を通じて、マイクロコンピュータ504が駆動用トランジスタ405を駆動して、FF信号が伝達される。尚、FF信号入力部218はパルス信号を検出するもので、検出されたパルス信号はロジック部213で過充電あるいは過放電信号として検出される。
 図8は、図3の最下位セルコントローラIC300dについて、そのコマンド信号出力部220、FF信号出力部221と外部回路との接続例を示す図である。コマンド信号出力部220のコマンド出力信号は、出力端子TXDから出力され、コマンド信号通信用の高速絶縁素子401を経由してマイクロコンピュータ504のデータ受信ポートRXDで受信される。トランスを用いた通信用の高速絶縁素子401は送信側の供給電源としてセルコントローラIC300のVDDが使用される。FF信号出力部221の出力信号端子FFOは、駆動用トランジスタ410を通じてフォトカプラである起動用の低速絶縁素子402を駆動し、フォトカプラからの出力信号はマイクロコンピュータ504のFF信号入力ポートに入力される。なお、マイクロコンピュータ504から出力された起動信号がすべてのセルコントローラICで受信されたことは、最下位セルコントローラIC300dが起動された後のFF信号出力がマイクロコンピュータ504で受信されたことによって確認される。低速、高速絶縁素子401、402を介した信号の授受は図7で説明した場合と同様であるので、説明は省略する。
 図3、図4、図7に示したように、セルコントローラIC300間の通信およびFF信号の伝達はコンデンサ403を用いて行うようにしている。具体的な受信部の回路構成を図9に示す。コンデンサ結合された入力端子RXには、Vdd/2の電圧が印加された負荷抵抗が接続され、その正極側端子は、Vdd/2を閾値とするヒステリシス特性を有するコンパレータに接続され、入力端子RXに印加されたパルス信号がコマンド信号として再生される。
 なお、コンデンサ結合ではコマンド信号のDUTY比によって直流成分が変動するため、DUTY比が50%であることが、ノイズ耐性の点から好ましい。したがって、FF信号はDUTY比が50%の矩形波としているが、高速の通信信号もDUTY比が50%の信号であることが好ましい。その通信信号方式として、論理“0”と“1”で矩形波の周波数を変えるFSK方式(Frequency Shift Keying)、あるいは、論理“0”と“1”で矩形波のパルス幅を変えるPWM方式(Pulse Width Modulation)があり、この方式を使用することでノイズ耐性をあげて、信頼性を確保することが可能となる。図10にFSK方式の通信波形例を示す。図に示されるようにデータ“1”送信時のパルス信号周期がデータ“0”送信時のパルス信号周期の半分となっているので、データ送信時のデューティ比は50%であり、直流成分の変動はなく、図9のような回路構成で信頼性の高い通信が可能である。
 図5、図7、図8では、図で上側に示すセルコントローラIC300を下位コントローラIC300とし、下側に示すセルコントローラIC300を上位セルコントローラIC300としている。これは、図3、図4に示すように、本発明による蓄電装置の例では、マイクロコンピュータ504からの指令は、図で下側に示すセルコントローラICに最初に送信されており、通信経路での順番に基づいてセルコントローラの上位・下位としているためである。マイクロコンピュータ504からの指令を図で上側に示すセルコントローラICが最初に受信するような回路構成でもよいので、セルコントローラICの上位・下位については図示されている状態に限定されるものではない。
 また図3、図4の各セルグループの参照番号102a~102dも、ここで示すセルコントローラICの上位・下位の関係に合わせて設定しており、図で一番下側のセルグループが102aとなっている。
 ただし、各セルグループの中での単電池セルに関しては、図の上側の単電池セルの電位が高いので、図で上側に示す単電池セルを上位の単電池セルとしている。
(ブロック電圧測定)
 図11は、ブロック電圧の測定を行う回路の説明図である。図2で示されるように、バッテリーコントローラ500は総電圧測定回路を有していない。その代わりとして、バッテリーコントローラ500は、上位コントローラ(インバータまたは車両コントローラ)から電池システム104の総電圧を測定する指令をCAN(Controller Area Network)通信で受信すると、電池システム104の複数のセルグループのそれぞれのセルグループ全体の電圧(ブロック電圧と呼ぶ)をほぼ同時に測定する指令を、図3と図4で説明したように、複数のセルコントローラIC300に送信する。セルコントローラIC300の各々は、制御対象である12個の単電池セルからなるセルグループ全体の電圧(ブロック電圧)を測定し、バッテリーコントローラ500はそのデータを通信で受信して各ブロック電圧を積算し、電池システム104の総電圧とする。
(ブロードキャストコマンドによるブロック電圧測定)
 この際、バッテリーコントローラ500は一回のコマンドで全部のセルコントローラIC300に対してそれぞれが制御するセルグループのブロック電圧の測定を行う指令を出す。このコマンドは特定のアドレスのセルコントローラIC300を指定するものではなく、全部のセルコントローラIC300に対して一度のコマンド送信で行われる。各セルコントローラIC300がこのブロック電圧測定の指令を受信するタイミングは、信号の伝送経路長による遅延のため、μsecオーダーの差が生じ、従って、各セルコントローラICがブロック電圧測定を行うタイミングもμsecオーダーでずれることになる。しかしながら、ブロック電圧入力部225には、以下で説明するようにカットオフ周波数の低いフィルタが入っており、μsecオーダーのタイミング差では、ブロック電圧の測定値には殆ど差が生じないため、各ブロック電圧の測定はほぼ同時に行われると見なすことができ、電池システム104の総電圧の測定には影響しない。
 このように、ブロードキャストコマンドによるブロック電圧測定を行うことで、全セルコントローラICが、それらに対応する各セルグループの端子間電圧を、ほぼ同時に測定する。上位コントローラ(バッテリーコントローラ500)は、その各セルグループの端子間電圧を通信ラインを介して読み込み、それらの総和をとることにより組電池の総電圧とすることが可能となる。
 図11に示すように、1つのセルグループ全体の電圧、すなわち1つのセルグループの端子間電圧(=ブロック電圧)は、Vcc端子を通じて電源部226に印加される。電源部226にはブロック電圧通電スイッチ230が内蔵され、このスイッチはセルコントローラIC300が起動するとオンとなる。ブロック電圧通電スイッチ230の出力電圧は高精度の高抵抗を用いた分圧抵抗231と232で分圧され、ノイズ除去用RCフィルタであるフィルタ抵抗233とフィルタコンデンサ234を介してサンプルホールド回路236に入力される。このRCフィルタのカットオフ周波数は、前述のCV端子のRCフィルタのカットオフ周波数と同程度に設定されている。
 サンプルホールド回路236はロジック部213で制御され、サンプルホールドコンデンサ236に上記の分圧されたブロック電圧を保持する。サンプルホールド回路236の出力は、後述するマルチプレクサ入力短絡スイッチ224を経由してマルチプレクサ210に入力される。ブロック電圧測定時はマルチプレクサ210の入力切り替えがロジック部213から指定されて、入力15と入力17に分圧されたブロック電圧が入力される。マルチプレクサに入力された分圧されたブロック電圧は、さらに差動増幅器211を経由してADコンバータ212でデジタル値に変換される(図5参照)。なお、このサンプルホールド回路236内のスイッチ(不図示)は、ロジック部213のS/H制御レジスタ249の出力により、サンプルホールドを行う場合にオンとするように制御される。
 ブロック電圧測定による各セルグループの端子間電圧の測定は、セルグループの各単電池セルの端子間電圧の測定とは別に、上記のようにブロードキャストコマンドによって一斉に行われる。また、電池システム104の総電圧は、常時監視されている必要があるため、このブロック電圧測定は、ほぼ一定間隔(例えば100ms毎)で頻繁に行われる。
 サンプルホールド回路236は、後述する断線診断において各単電池セルの端子間電圧測定等を実施する場合は、その測定が終了してから、セルグループの端子間電圧とこのセルグループの各単電池セルの端子間電圧とを一緒に上位コントローラ(バッテリーコントローラ500)に送信するので、この断線診断での単電池セルの端子間電圧測定が終了するまで、ブロック電圧の測定結果を保持する必要があるためである。従って、断線診断を行わない場合にはサンプルホールド回路236を設ける必要はない。
 なお、上記の各セルグループの端子間電圧(ブロック電圧)を分圧した電圧から、上位コントローラ(バッテリーコントローラ500)で、分圧抵抗231と232の抵抗値を用いて、各セルグループの端子間電圧値が算出される。全てのセルグループの端子間電圧の総和が組電池の総電圧として求められる。
 (ブロック電圧入力部225の暗電流遮断)
 また、ブロック電圧通電スイッチ230を設けている理由は、セルコントローラIC300の動作停止時に分圧抵抗231と232に流れる電流を遮断して、暗電流を小さくするためである。
(フィルタコンデンサの外部接続によるRCフィルタの周波数特性設定)
 なお、上記のRCフィルタを構成するフィルタ抵抗233は、その機能を分圧抵抗231に代替させることにより省略することができる。更に、フィルタコンデンサ234をセルコントローラIC300の外部に設置し、このフィルタコンデンサ234の容量を適宜選択することにより、RCフィルタを所望の周波数特性を持つようにすることができる。
 図12(a)はこの場合の回路の例を示すものであり、特に図10のブロック電圧入力部225の部分を抜き出して示したものである。ここでは、フィルタコンデンサ234をセルコントローラIC300の外部に設置するため、外部接続端子VblkFが設けられている。
 また、セルコントローラIC300内に高精度の分圧抵抗を内蔵できない場合には、例えば、図12(b)に示すように、更に外部接続端子Vvdを設けて、セルコントローラIC300の外部に分圧抵抗231と232を設置しても良い。ここでは、分圧抵抗231と232をセルコントローラIC300の外部に設置するため、更に外部接続端子Vvdが設けられている。
(本発明による電池システム監視装置でのバランシング放電制御)
 本発明による電池システム監視装置でのバランシング放電制御では、車両始動時にOCVを測定して各単電池セルのSOCを算出する。このSOCに基づいて、各単電池セルのSOCを均等化するようにバランシング放電が行われるが、このバランシング放電の実効放電電流を制御して、バランシング放電電流による発熱を抑え、単電池セルの端子間電圧が必要とされる精度で測定されるように、この端子間電圧を測定する電圧測定回路の温度を所定の範囲となるようにしている。
 以下では、まずバランシング放電制御の基本的動作を説明し、さらに全体の動作フローについて説明する。
(二次電池のOCV-SOC特性)
 二次電池は、例えばリチウムイオン電池に属する二次電池であっても、内部の電極材料の違いによりOCVとSOCの関係を表わす特性曲線であるOCV-SOC換算曲線が異なるものがある。図13は、異なる特性をもつ2つの二次電池の例を示す。なお、これらのOCV-SOC換算曲線は、単電池セルの分極の無い安定した状態のものである。電池システムにインバータなどの負荷が接続されて充放電が行われると、電池内部の分極の状態により、特に換算曲線の中央部が上下に移動する。
 タイプAの二次電池では、SOCが100%から0%の全領域で、OCVとSOCがほぼ線形の関係を持っている。すなわち、タイプAの二次電池では、分極の影響を無視できる状態であれば、図13の全領域で、測定されたOCV(開路電圧)からSOCが精度よく求められる。
 これに対しタイプBの二次電池では、SOCが60%以上の領域(図13のAの部分)で、OCVとSOCはタイプAの二次電池と同様の線形関係となっているが、SOCが60%以下の部分で、OCVとSOCが線形の関係から大きくずれ、SOCの変化に対しOCVがあまり変化しない領域(図14のBの部分)となっている。
 図14のBの領域でOCVからSOCを算出すると、Aの領域で算出した場合より精度が低下する。図14の下に示す2つの曲線C、Dはそれぞれ、OCVの測定誤差が15mVと10mVの場合のSOCの算出誤差を示す。
 したがって、本発明による電池システム監視装置でのバランシング放電制御では、タイプBのような二次電池に対して、良好な精度でSOCを算出するため、領域Bでは、このOCV-SOC換算曲線を用いないことが好ましい。
 もし、タイプBのような特性の二次電池から構成される電池システムが用いられている場合、電動車両始動時にOCVから算出されるSOCが領域Bにある場合は、たとえば上位コントローラ(バッテリーコントローラ500)に保存されている、前回のSOC値を用いて電池システムの充放電制御が行われる。すなわち、この場合のSOCは前回のSOC値と充放電電流およびバランシング放電電流の積算値を用いる(後述)。
 ただし、場合によっては、領域Bで二次電池を使用することも考えられる。これはSOCの変動に対してOCVの変動が少ない、すなわち端子間電圧が安定しているという利点がある。また、長時間電流の積算値を用いてSOCを算出している場合は、充放電電流の変動と電流センサ503を用いた電流検出タイミングの関係および電流検出の精度そのものによって生じる、検出電流値の誤差が蓄積して、電流の積算値を用いて算出されたSOCが実際のSOCからずれてしまう。
 このような場合は、領域Bであったとしても、このOCV-SOC換算曲線を用いてSOCを算出する方が正確な値を得られる。また、たとえば複数回の電圧測定の平均によりノイズを抑制する等を行うことにより、OCVの測定誤差を小さくすれば、さらに正確なSOCが算出できる。
 複数回の電圧測定を行うとその分時間がかかるので、上記の種々な方法のSOC算出手段を適宜用いて状況に応じて最も正確なSOCを算出するようにする。たとえば、前回OCVを測定したときから所定の時間経過している場合は、車両始動時に二次電池の状態が領域Bであったとしても、OCVを測定してSOCを算出する。
 このように、2つのSOC算出方法を選択して用いることにより、二次電池の特性およびその使用状態に合わせて、最適なSOC算出方法、すなわち二次電池の特性およびその使用状態におけるもっとも正確なSOCを算出する方法を用いることが可能となる。これにより電池システムを効率よく稼働させるとともに、過放電や過充電を避けることができ、車両の安定した駆動が可能となる。
 なお、電動車両の始動時であっても、前回電動車両が停止した時から所定の時間が経過していない場合は、単電池セルの分極が解消されておらず、OCVが図13で表わされるような特性曲線上の値となっていない。したがって、OCVを測定して、これからSOCを算出する場合は、前回の車両の停止時から所定時間経過していなければならない。所定時間が経過していない場合は、さらにその前に算出されて保存されているSOC値を用いる。この所定時間は、二次電池の仕様により異なるが、例えばリチウムイオン電池では、概ね数時間程度である。また、鉛蓄電池では分極解消時間はリチウムイオン電池より長い。
(ジャンクション温度とバランシング放電制御)
 図15は、電圧測定回路(図5の差動増幅器211やADコンバータ212)に含まれる半導体のジャンクション温度と、この電圧測定回路により測定される電圧測定精度の関係の一例を示すものである。ジャンクション温度が0℃から40℃の間では、端子間電圧測定回路の種々の半導体の特性が揃えられて、電圧検出精度は±5mVとなっている。また、0℃から40℃以外の温度では、電圧検出精度は±10mVとなっている。
 これは、単電池セルの端子間電圧を精度よく測定する場合は、ジャンクション温度が0℃から40℃の間で行う必要があることを示している。
(ジャンクション温度へのバランシングスイッチ222の発熱の影響)
 ジャンクション温度Tは、上述の温度検出回路250(図5参照)を用いて測定された、セルコントローラIC300の付近の温度Tから、以下の式(1)を用いて算出される。
  T=T+Θja・(P+PBS)                      ...(1)
    T:ジャンクション温度、
    T:セルコントローラIC300の周辺温度(サーミスタ251の設置場所の温度)、
    Θja:セルコントローラIC300パッケージを含む、
        ジャンクション-サーミスタ251間の温度抵抗
    P:バランシング放電していない時のセルコントローラIC300の消費電力、
    PBS:バランシング放電でのバランシングスイッチのオン抵抗による消費電力
なお、電圧測定回路とバランシングスイッチ222は、セルコントローラIC300の1枚のチップ内にあり、それらのジャンクション温度はチップ内でほぼ同じとしている。また、バランシング放電時のバランシング抵抗201による発熱の影響は、セルコントローラIC300の周辺温度Tに繰り込まれているとしている。
 ジャンクション-サーミスタ251間の温度抵抗Θjaは、既知のICパッケージの熱抵抗と、セルコントローラIC300とサーミスタ251の間の基板の熱抵抗などから算出しておけばよい。あるいは実際の電池監視装置の構成と同様な構造を作製し、実験的に求めてもよい。
(バランシングスイッチのオン抵抗による消費電力)
 1つのバランシングスイッチ222でのバランシング放電時の消費電力PBSは、1つの単電池セルの端子間電圧VCCV、バランシング抵抗201の抵抗値R、バランシングスイッチ222のオン抵抗をRBSとして、
  PBS=VCCV ・RBS/(2・R+RBS                ...(2)
で求められる(図5参照)。
 バランシング抵抗201は、セルコントローラIC300の外付けの抵抗であり、精度のよい抵抗が用いられている。バランシングスイッチ222のオン抵抗値RBSは、セルコントローラIC300の半導体チップの製造工程上ある程度のばらつきがある。
 バランシング抵抗201の抵抗値Rbは、単電池セルの容量や、セルグループあるいは組電池を構成する複数の単電池セルの残存容量のばらつきや、このばらつきをどの程度の時間をかけてバランシング放電により解消するかによって決定されるが、ここでは詳細な説明を省略する。
 単電池セルの容量は年々増加する傾向にあり、これに伴いバランシング電流を大きくして、速やかに単電池セルの残存容量の均等化を行うことが要求されている。したがって、バランシング抵抗201の抵抗値は小さくなる傾向にあるが、現状ではRBS<Rとなっている。バランシングスイッチ222はMOSFETで構成されているので、その温度特性を考慮して、Rを平均的なバランシングスイッチの抵抗値より大きめに設定しておくことが望ましい。
 あるいは、セルコントローラIC300の各バランシングスイッチ222のオン抵抗値RBSを測定しておき、上記式(2)を用いてバランシングスイッチ222のオン抵抗RBSによる消費電力を求めてもよい。
 さらには、後述するようにバランシング放電電流量(すなわちSOCの補正量)とバランシング抵抗値Rおよびバランシングスイッチのオン抵抗値RBSから算出した、各単電池セルのバランシング放電時間と実際にかかったバランシング放電時間から正確なバランシングスイッチ222のオン抵抗RBSが計算で求められるので、これを用いてもよい。
 ここでは以下の説明を簡単にするため、上記の式(2)を以下のように表わす。
  PBS=VCCV ・FBS                          ...(3)
 FBSは、バランシングスイッチ222のオン抵抗値に依存する係数である。
 図15でジャンクション温度が0℃~40℃の範囲で電圧検出精度を良好に維持できるようにセルコントローラIC300が設計されていると同様に、この係数FBSは、この温度範囲でバランシングスイッチ222のオン抵抗RBSの温度変化が無視できるように、例えば温度補償回路を追加する等により、バランシングスイッチ222を設計することも可能である。
 式(1)と式(2)を比較すると、
  FBS=RBS/(2・R+RBS                    ...(4)
と表わされる。
 バランシングスイッチ222のオン抵抗を測定していない場合に、たとえば、0℃~40℃の範囲を維持しながら、バランシングスイッチ222のオン抵抗を無視して、FBS=1/(2・R)と仮定して、1つの単電池セルのバランシング放電を所定の時間t行い、この単電池セルのSOCがSOC0からSOC1に減少したとする。なおSOC0およびSOC1は、それぞれ単電池セルのOCV(開路電圧)を測定して、図13に示すようなOCV-SOC換算曲線から求めるものとする。
 バランシングスイッチ222のオン抵抗RBSを無視した場合のバランシング電流Ib0は、式(3)の端子間電圧VCCVを用いて(ここでは説明のため、分極などによる端子間電圧の変化は無視する。)、
  Ib0=VCCV/(2・R)                      ...(5)
と表わされるので、FBS=1/(2・R)が正しい係数であったとすれば、
  SOC0-SOC1=Ib0・t                    ...(6)
と表わされる。
 ところが、実際は、
  SOC0-SOC1=Ib1・t≠Ib0・t              ...(7)
でる。Ib1が正しいバランシング電流であるので、
  Ib1=VCCV/(2・R+RBS)                  ...(8)
となる。
 上記式(5)と(8)を比較することにより、
  RBS=2・R・(Ib0-Ib1)/Ib0              ...(9)
として、バランシングスイッチ222の抵抗値RBSを求めることができる。
 ただし、この方法では、バランシング電流による放電電流量が多い場合は分極の影響があるので、分極が解消した状態でOCVを測定して式(8)、(9)からバランシングスイッチ222の抵抗値RBSとバランシング放電電流Ib1をを求める。また、SOC0とSOC1の算出のためのそれぞれのOCV測定の間の時間が長いと単電池セルの自己放電の影響もあるので、これらの影響も考慮して、あるいは影響が無いような条件でRBSを算出する必要がある。
 以上のように、バランシングスイッチ222の抵抗値RBSを所望の方法で求めておき、式(4)で係数FBSを算出し、式(3)により、バランシングスイッチ222での消費電力PBSを算出することができる。
(各単電池セルのバランシング放電時間とバランシング放電制御)
 HEV、PHEV、EVなどの電動車両の起動時に測定されたOCVを用いて、図13のOCV-SOC換算曲線に基づいて、まず初期SOCを求める。例として1個の単電池セルの場合を説明する。
 単電池セルのSOCの初期値をSOC0とする。蓄電装置100とインバータ800が接続されたときの電池システム104とインバータ800間の充放電電流をI、またバランシング放電電流をIbとすると、この単電池セルのSOCは、以下のように表わされる。
  SOC=SOC0 - ∫I(t)dt - ∫Ib(t)dt      ...(10)
なお、∫Iは充放電電流I(t)の積算値を示し、∫Ibはバランシング放電電流Ib(t)の積算値を示す。(t)は時間により変動していることを示している。I(t)は充放電電流であるので、電池システムが充電されている場合は、I(t)は負の値であり、SOCは増加する。バランシング放電電流は、上記で説明したように、各単電池セルの端子間電圧の変化に対応して多少変動する。なお、バランシング放電は、全単電池セルのSOCを求め、SOCのばらつきΔSOC(>0)が所定の閾値ΔSOCth(>0)より大きい単電池セルに対して行われる。各単電池セルのSOCは、バッテリーコントローラ500とセルコントローラ200によって管理される。
 本発明による電池監視装置を含む電池制御装置を搭載した蓄電装置の一実施の形態によれば、各単電池セルのSOCのばらつきを補正するバランシング放電電流Ibを上述のように正確に求めて、短時間でばらつきを解消することができる。すなわち、バランシング放電とは、原理的には、
  ΔSOC - ∫Ib(t)dt =0                 ...(11) 
となるまでバランシングスイッチ222をオンとして放電を行うことである。
 実際は、たとえば、
  ΔSOC - ∫Ib(t)dt ≦ΔSOCth            ...(12) 
となった時点で速やかにバランシング放電を停止する。
 ここでは、上記で説明したように、Ib(t)が、前述の所望の方法で算出したバランシングスイッチ222のオン抵抗を用いて算出した、一定の電流値Ibであるとすると、概略のバランシング放電時間tは、たとえば以下の式で求めることができる。
  ΔSOC - Ib・t =0                     ...(13)
実際のバランシング放電では、ΔSOCthの設定を含め、色々な方法が考えられるので、以下で説明する方法は、1つの例であり、また概略のみを示している。
(バランシングスイッチの総消費電力の制限)
 式(1)は、説明のため、1つの単電池セルの消費電力のみ含んだ式であるが、実際のセルコントローラIC300には複数のバランシングスイッチ222が設けられている。上記で説明した実施形態では、1つのセルグループは12個の単電池セルで構成されており、これに対応して1つのセルグループを制御するセルコントローラIC300には12個のバランシングスイッチ222が設けられている。さらに電池システムは複数個のセルグループから構成されており、これらのセルグループを制御するセルコントローラIC300も同時に動作している。
 図1、2では省略されているが、セルコントローラ200とバッテリーコントローラ500は、1つの基板の上に設けられており、これらは金属製のケースに収納されている。また、バランシング抵抗201もこの基板上に設けられている。
 単電池セルの個数分のバランシングスイッチ222とバランシング抵抗201が1つの金属ケースの中に収納されていて、これらがバランシング放電でバランシングスイッチ222がオンとされた場合に発熱する。バランシングスイッチ222は、以下に説明するように複数個が同時に動作する場合がある。
 上記のセルコントローラIC300の周辺温度は、セルコントローラIC300毎にその付近で測定されている。以下の説明では簡単のため、1つのセルコントローラICでのバランシングスイッチ222の制御について説明する。
 1つのセルコントローラにn個のバランシングスイッチが備えられているとし、これに対応して、式(1)のPBSをΣi=1,nBS(i)に置き換えて、以下のように表わす。
  T=T+Θja・(P+Σi=1,nBS(i))            ...(14)
 ジャンクション温度を上記で説明したように、最低温度0℃から最高温度40℃の間にするように制御するということは、0℃≦T≦40℃であるから、
  0℃≦T+Θja・(P+Σi=1,nBS(i))≦40℃        ...(15)
となるようにΣi=1,nBS(i)を制御することになる。すなわち、i番目の単電池セルのバランシングスイッチ222をオフとすると、PBS(i)=0となるので、n個のバランシングスイッチ222のオン・オフを制御することになる。
 セルコントローラIC300を含む電池監視装置が、車両の始動時にT≦0℃のような場合、式(15)から、T+Θja・(P+Σi=1,nBS(i))<0であれば、いくらバランシング電流を流してもジャンクション温度は0℃以上にならない。しかしながら、実際はT<0℃の場合でも、ジャンクション温度はセルコントローラIC300の発熱だけで、すぐに上昇し、
=T+Θja・Pとなる。
 Tamin=-Θja・Pとすれば、Tamin≦Tの場合に単電池セルの端子間電圧を高精度に測定することができる。したがって、T<Taminの場合には、たとえばバランシング電流をある程度流して、Tが式(15)の左側の不等号の条件を満たすような状態になった場合に、単電池セルの端子間電圧を測定すれば、高精度な電圧測定が可能となる。あるいは、別に設けたヒータ(不図示)等で、セルコントローラICを暖めることも可能である。
 式(15)の右側の不等号の条件より、
  Σi=1,nBS(i)≦(40℃-T)/Θja-P            ...(16)
を満たすように、n個のバランシングスイッチのオン・オフを制御することが重要となる。なお、電動車両の始動時に既にT≧40℃であれば、ジャンクション温度を40℃以下とするためには、追加の冷却器が必要となる。
 ここでは、このような場合は、電池監視装置において単電池セルの高精度な電圧値が必要な制御あるいは動作のための単電池セルの端子間電圧測定は行わないとして説明する。
 周囲温度が高精度電圧測定に不適な高温あるいは低温であっても、たとえば断線診断では高精度な電圧測定が不要であるので、電圧測定回路での端子間電圧の測定は適宜行っている。また、バランシング放電において、バランシングスイッチ222が40℃以上となっても、MOSFETスイッチのオン抵抗の温度係数は正であるので、バランシング電流は減少する方向である。したがってバランシング放電により、予測された以上の放電は行われないので、これによって過放電となることはなく、バランシング放電も適宜行われる。
(バランシング放電での消費電力制御とセルコントローラIC300の周囲温度Tの制御)
 複数のバランシングスイッチ222のオン・オフを、式(16)の条件を満たすように制御して、バランシング放電を行う。
 P0は、バランシング放電に関係しないセルコントローラIC300の動作の消費電力であるので、ほぼ一定である。したがって、式(16)の右側が、(40℃-T)/Θja-P=0となる、セルコントローラIC300の周囲温度TをTamaxとすると、式(12)による制御を行う場合には、
  Tamax=40℃-P・Θja                      ...(17)
を満たす温度Tamaxでは、バランシング放電電流は0としなければならない。すなわち、セルコントローラIC300の周囲温度がT≧Tamaxの場合、バランシングスイッチ222を全てオフとしなければならないが、これは既に説明したように、高精度な端子間電圧測定ができないということを意味するものであり、バランシング放電をまったく行わないということを意味するものではない。
 セルコントローラIC300の周囲温度が式(17)で設定される温度未満であれば、すなわちT<Tamaxであれば、複数のバランシングスイッチ222を適宜オン・オフして、ジャンクション温度を40℃以下に制御することができる。
 バランシング放電が行われると、セルコントローラIC300の周囲温度Tは、このバランシング放電による消費電力(バランシング抵抗とバランシングスイッチのオン抵抗)により上昇する。この温度上昇は、周囲温度を測定している場所での温度と、さらにその外部、たとえば電池監視装置の外部の温度、およびこれらの間の熱抵抗に依存する。
 電池監視装置内部の温度変化に対して、このような電池監視装置の外部で、温度が変化しない場所、あるいはセルコントローラIC300の周囲温度Tの測定場所の近辺で熱容量の大きい部所があれば、このような場所の温度を基準として、バランシング放電の消費電力に対応した、すなわちバランシングスイッチ222のオンとなっている個数に対応した消費電力に対応した周囲温度Tの上昇を算出することが可能である。
 少なくとも、前回の電動車両の運転停止からある程度の時間経過した後での、電動車両の始動時では、セルコントローラIC300の周囲温度Tは、電池監視装置の外部の温度あるいは大気温度とほぼ同じになっていると考えられる。したがって、車両始動時のセルコントローラIC300の周囲温度Tを基準とすれば、たとえば1個のバランシングスイッチ222をオンとした時に、この1個のバランシングスイッチ222によるバランシング放電での消費電力の影響で、セルコントローラIC300の周囲温度TがTamaxに到達するかどうか、事前に判断が可能である。
 バランシング放電を行った時の消費電力に依存する、セルコントローラIC300の周囲温度Tの上昇を事前に実験測定してテーブル化しておき、このテーブルをたとえばバッテリーコントローラ500の記憶部505に格納しておけばよい。あるいは、セルコントローラIC300の周囲温度Tの上昇のデータはコンピュータシミュレーションで算出したものであってもよい。
(バランシングスイッチ222の制御による消費電力の制御)
 バランシングスイッチのオン・オフによる、バランシング放電での消費電力の制御方法には基本的に2つの方法がある。
 1つは、バランシングスイッチ222のオン・オフのデューティ比を制御することである。すなわち、バランシングスイッチのオンとなっている時間を0%から100%の間で制御して、平均的なバランシング電流を0%から100%の間で変化させることである。バランシングスイッチ222にはたとえばMOSFETスイッチが用いられており、このMOSFETスイッチのゲートをPWM制御すればよい。
 この方法は、1つのバランシングスイッチ222を常時オンとしただけで、T≧Tamaxとなるような場合にも適用できる。
 もう1つの方法は、複数の単電池セルがバランシング放電の対象となっている場合、すなわち、複数の単電池セルのSOCの偏差ΔSOCが、バランシング放電が必要とされる所定の閾値ΔSOCthより大きい場合、バランシング放電の対象となっているバランシングスイッチを全て同時にオンとしない方法である。たとえば、一定時間毎にオンとするバランシングスイッチを変更することにより、て、バランシング放電による消費電力をT<Tamaxの条件を満たすように制御することができる。
 なお、このようにオンとするバランシングスイッチを適宜選択してバランシング放電を行う方法も広い意味でのデューティ制御の範疇である。
 図16は、セルコントローラIC300内の全バランシングスイッチ(ここでは12個)を平均的にデューティ制御した場合のジャンクション温度、すなわちチップ温度の上昇を模式的に示したものである。バランシングスイッチのオン抵抗での発熱によるチップ温度の上昇であるので、上記式(14)のΣi=1,nBS(i)の消費電力のみによる温度上昇を示している。バランシングスイッチのオン抵抗や、チップの熱容量は、セルコントローラIC300の仕様により異なるので、図16は単にバランシングスイッチのオン・オフのデューティ比とチップ温度上昇の関係の例を示している。
 図16に示す例では、たとえば式(14)で、バランシング放電以外のセルコントローラIC300の消費電量Pを無視し、周囲温度Tが25℃であった場合、全バランシングスイッチの平均デューティ比が約40%でチップ温度が40℃となることが分かる。すなわち、この場合、全バランシングスイッチの平均デューティ比を約40%以下とする必要がある。
 なお、これは周囲温度Tが25℃であった時の、短時間の消費電力に対応する平均デューティ比である。この状態を持続すると、周囲温度Tが上昇するので、これに対応して平均デューティ比は下げる必要がある。
 上記で説明した、バランシング放電での種々の条件を考慮し、複数のバランシングスイッチを選択してオンとして、このバランシングスイッチに対応した単電池セルのバランシング放電を行う場合は、以下の規則に準じて行う。
 1)バランシング放電を行っていない状態でT≧Tamaxの場合は、単電池セルの高精度の電圧測定は行わない。
 2)バランシング放電を行っていない状態でT<Tamaxの場合は、単電池セルの高精度の電圧測定を行うことができ、またバランシング放電も以下の手順で同時に行うことができる。
 3)最もSOCの高い単電池セルを優先的にバランシング放電する。
 4)同じ程度のSOCの単電池セルが複数ある場合は、これらを同時にバランシング放電する。
 5)1個の単電池セルの場合も含め、単電池セルのバランシング放電による消費電力の和(=Σi=1,nBS(i))が、式(16)を満足するように、
  a)バランシング放電のデューティ比を変更する。
  b)バランシング放電を行う単電池セルを切り替える。
 バランシングスイッチのオン・オフは、セルコントローラIC300の所定の制御サイクル毎に、バランシングスイッチ制御レジスタ247の内容を変更することによって行われており、上記の3)、4)、5)の動作も全てバランシングスイッチ制御レジスタ247の内容によって制御されている。
 図17は、本発明による電池システム監視装置を用いたバランシング放電動作を、図13および図14で説明したタイプBの二次電池に対し行う場合のフローの概略を示すものである。なお、図17は、マイクロコンピュータ504での処理を中心に記載しており、また本発明に関する部分のみ抜き出して、まとめて示したものである。たとえば、電動車両始動時(ステップS1)には、まず各セルコントローラICが起動されるが、この起動シーケンスは省略されている。また、各単電池セルおよびセルコントローラIC自身の内部回路動作の診断、あるいは電圧検出線の断線診断などはこのフローには含まれていない。インバータ700は、車両の起動時には蓄電装置100と接続されておらず、リレー600、610はオープン状態である。インバータ700と蓄電装置100の接続は、図17のフローの途中で行われるが、図示は省略されている。
 各単電池セルの端子間電圧の測定はこれらの各種診断以外でも、たとえば各単電池セルの内部抵抗(DCR)のリアルタイム計算(説明は省略)などにも用いられる。したがって、各単電池セルの端子間電圧の測定は、適宜所定のサイクルで行われており、また周囲温度Tの測定も各単電池セルの端子間電圧の測定の一部として行われている。図5に示されているように、各単電池セルの端子間電圧と温度検出回路の出力電圧は、マルチプレクサ210の切り替えで選択される。これらの電圧はまとめてデータパケットとして、図3および4で説明した通信経路を介して、各セルコントローラIC300に送信される。
 ステップS1で電動車両が始動後、ステップS2で、マイクロコンピュータ504は各セルコントローラICの周囲温度を測定する指令を発生し、この指令は図3および4で説明した通信経路を介して、各セルコントローラIC300に送信される。
 セルコントローラIC300は、バランシングスイッチ222がオフの状態で、マルチプレクサ210で温度検出回路の出力を選択し、この電圧を差動増幅器211に入力する。温度検出回路からの出力電圧はADコンバータ212でデジタル化されロジック部213に入力される。ロジック部213は、このデジタル化された温度検出回路の出力電圧をさらに、通信経路を介してマイクロコンピュータ504に送信する。
 マイクロコンピュータ504は、記憶部505に格納された、温度検出回路の出力電圧を温度に換算するためのデータを用いて、セルコントローラIC300の周囲温度Taを算出する(ステップS3)。
 ステップS4で、セルコントローラIC300の周囲温度Taが所定の下限温度Taminと上限温度Tamaxの間の範囲に入っていなければ、OCV測定を行わないので、ステップS5からS12をスキップしてステップS13の処理動作を行う。この際、前回のバランシング放電を続いて行うので、前回バランシング放電が未完了であった単電池セルに対してバランシング放電が行われる。すなわち、以下で説明する、バランシング放電対象となる単電池セルのリストやこれらの単電池セルのバランシング放電スケジュールは前回のものを引き継いで使用する。
 Tamin<T<TamaxであればステップS5に進み、マイクロコンピュータ504は各単電池セルのOCV測定を行う指令を発生する。
 セルコントローラIC300は、ステップS5C1で各単電池セルの端子間電圧を測定し、測定結果をマイクロコンピュータ504に送信する。
 なお、この時の端子間電圧の測定は、電動車両の始動時に行われているので、蓄電装置100はインバータ700とまだ接続されておらず、したがって測定された端子間電圧は開路電圧(OCV)となる。
 ステップS6で、測定された単電池セルのOCVが1個でも、図14で説明した領域Bに入っている場合はステップS7に進む。
 ステップS7では、上記で図14を参照して説明したように、前回OCVを測定してSOCを算出した時から所定の時間が経過しているかどうか判定される。前回OCVを測定してSOCを算出した時から所定の時間が経過していると判定された場合は、測定された単電池セルのOCVが図14の領域Bにある場合でも、ステップS8~S13の処理動作を行う。この際、バッテリコントローラ500の記憶部505に保存されている前回のOCV測定のデータが用いられる。
 なお、この所定時間は二次電池の仕様や、使用状態により決定されるが詳細は省略する。
 ステップS7で、前回OCV測定してSOCを算出した時から所定の時間経過していないと判断された場合は、SOC算出を行わず、以下のステップS8~S13をスキップしてステップS14の処理動作を行う。この場合も同様に前回にバランシング放電のデータに基づいてバランシング放電を行う。
 このような動作により、二次電池の状態に応じた、最も正確なSOCに基づいて二次電池のバランシング放電を行うことができる。
 ステップS6で、各単電池セルのOCVが図14の領域Aに入っていると判断された場合、もしくはステップS7で前回のOCV測定から所定の時間経過していると判断された場合は、ステップS8で各単電池セルのSOCが算出される。このSOCの算出は前述のように、図13および図14で説明したOCV-SOC換算曲線を用いて行われる。 
 ステップS9では、ステップS8で算出された各単電池セルのSOCから、SOCの偏差ΔSOCがそれぞれの単電池セルに対して計算される。また、このときSOCの大きさの順も算出される。
 ステップS10ではバランシング放電対象となる単電池セルがあるかどうかが判断される。バランシング放電は、SOCの偏差ΔSOCが所定の閾値ΔSOCthより大きいものに対して行われる。ΔSOCthより大きい偏差のSOCを持つ単電池セルがない場合は、ステップS19で終了となる。
 バランシング放電対象となる単電池セルがある場合は、ステップS11でバランシング対象となる単電池セルのリストが作成される。さらにステップS12では、このバランシング放電対象の単電池セルで各々の目標総バランシング放電電流量(式(10)~(12)の∫Ib(t)dt、あるいは式(13)のIb・t)が算出される。例えば、式(10)を用いて目標総バランシング放電電流量とする場合は、SOCの偏差ΔSOCが目標総バランシング放電電流量となる。または、たとえば、ΔSOC-ΔSOCthを目標総バランシング放電電流量としてもよい。ΔSOCthならびに目標総バランシング放電電流量の設定は様々に行うことができ、この説明はここでは省略する。
 ステップS13では、バランシング放電対象単電池セルのバランシング放電スケジュールが設定される。このバランシング放電のスケジューリングは、上述のバランシング放電での規則に準じて行う。
 図18(a)は、12個の単電池セル(セル1~セル12)からなるセルグループのSOCの初期状態(車両の始動時でのSOC値)を示す例である。SOCは通常%で表わされる。図18(a)のSOCのレベルL0~L4の値が、図14の領域Aに入っていれば、電動車両の始動時に上記のステップS8でSOCが算出される。また図14の領域Bであれば、上記のようにステップS8~S13はスキップされ、ステップS14以降でのバランシング放電は、前回車両停止時のSOCの値とバランシング放電スケジュールを用いて行われる。
 なお、電池システム104がインバータ700と接続されている場合は、SOCのレベルL0は、電池システム104の充放電電流により変動しているが、ここでは図18でΔSOCのみに着目するので、L0の変化は無視している。
 バランシング放電のスケジューリングとは、ステップS11で選択された単電池セルを、どのような順序でバランシング放電を行うか決定することである。以下にこのスケジューリングについて、バランシング放電全体の流れとともに説明する。
 通常ばらつきのある測定値の偏差とは、これらの測定値の平均値からの差で定義されるが、バランシング放電の場合は、もっとも低いSOC値を基準にしてSOCの偏差ΔSOCとする。これはバランシング放電でSOCの大きな単電池セルからバランシング放電を行うためである。すなわちここでは、各単電池セルのSOCの偏差ΔSOCは、これらの単電池セルの最も小さな値であるレベルL0からの差で定義される。
 バランシング放電は、各単電池セルのSOCの偏差が所定の閾値ΔSOCth以上のものに対して行われる。ΔSOCthは、使用している二次電池の仕様や、バランシング抵抗、またどの程度のバランシング放電時間で各単電池セルのSOCの均等化を行うかによっても異なるが、たとえばΔSOCth=1%となるようにバランシング放電を行うとする。
 バランシング放電は、各単電池セルのSOCの偏差ΔSOCがΔSOCth以下となるように各単電池セルの放電を行う。図18(a)では、ΔSOCth以上の偏差を有するセル2、セル6、セル8、セル11がバランシング放電され、例えば図18(b)に示すような状態とされる。
 このようなバランシング放電は色々な方法が考えられ、たとえばΔSOCth以上のSOCの単電池セルをそのΔSOCが0となるまで行うような方法であってもよいし、またΔSOCがΔSOCth/2になるまで行うようにしてもよい。
 また、このバランシング放電は、従来のように、単に各単電池セルのΔSOCが大きいものから順にバランシング放電を行ってもよい。
 以下の説明ではセル1~セル12の各単電池セルのバランシングスイッチをオンとした時のバランシングスイッチでの消費電力をPBS(i);i=1~12とする。
 図18に示す例では、まずセル2が最初に、そのSOCがレベルL4からL3になるまで、バランシングスイッチ222をオンとしてバランシング放電される。この時、この1個の単電池セルのバランシング放電のみで、PBS(2)>(40℃-T)/Θja-Pとなる場合は、セル2のバランシングスイッチ222をオンとするデューティ比を変更する。このデューティ比をDとすると、
  PBS(2)・D≦(40℃-T)/Θja-P             ...(18)
となるようにバランシングスイッチ222を制御する。
 D=50%としなければならない場合は、所定のサイクル毎、たとえばセルコントローラIC300の制御サイクルで1サイクルおきにバランシングスイッチをオンとなるようにする。
 セル2がSOCのレベルDまでバランシング放電されると、セル2、セル6、セル11が同じSOCのレベルL3となるので、これらのセルのバランシング放電を行う。複数の単電池セルのバランシング放電を行う方法は、上述のとおり2通りある。すなわち、3個の単電池セル(セル2、セル6、セル11)を同時にオン・オフしてデューティ制御する方法と、3個の単電池セルのバランシングスイッチ222を切り替えながらオンとしてデューティ制御する方法がある。
 デューティ制御のサイクルが充分短ければ、3個のバランシングスイッチが同時にオンとなるときがあっても、以下の式(19)を満たすように制御することができる。
  (PBS(2)+PBS(6)+PBS(11))・D≦(40℃-T)/Θja-P
   ...(19)
 あるいは、3個のバランシングスイッチを切り替えながらデューティ制御する場合は、それぞれの単電池セルのバランシングスイッチ222のデューティ比を、D(2)、D(6)、D(11)として、以下のようにも制御することができる。
  PBS(2)・D(2)+PBS(6)・D(6)+PBS(11)・D(11)
    ≦(40℃-T)/Θja-P                   ...(20)
  ただし、D(2)、D(6)、D(11)は、3個のバランシングスイッチが同時にオンとならないように定義する。
 デューティ制御を行った場合の各単電池セルのバランシング放電によるSOCの減少は電流量(式(10)~(12)の∫Ib(t)dtあるいは式(13)のIb・t)に対応して、D*∫Ib(t)dtあるいはD・Ib・tと表わされる。ただし、tはデューティ制御を含めバランシング放電を行っている時間である。この場合、D・tがバランシングスイッチが実際にオンとなっている時間に対応する。
 3個の単電池セル(セル2、セル6、セル11)が、SOCのレベルL2までバランシング放電されると、4個の単電池セル(セル2、セル6、セル8、セル11)が同じレベルL2となるので、上記と同様にバランシング放電動作を行って、4個の単電池セルのSOCのレベルがL1となるようにする。
 以上の動作により、12個の単電池セルのSOCがすべてΔSOCthの範囲に入るので、バランシング放電動作は終了となる。 
 以上に説明したような方法で、バランシング放電スケジュールを決定し、ステップS14以下でバランシング放電を実行する。
 まずステップS14で、バランシング対象(デューティ制御を考慮)である単電池セルのバランシング放電指令が発生され、この指令に基づいてセルコントローラIC300で、バランシング対象の単電池セルのバランシングスイッチ222がオンとされてバランシング放電される(ステップS14C1)。この制御は所定のサイクル毎に行われる。それぞれのサイクルでオンの指定が無い場合はバランシングスイッチはオフとされデューティー制御が行われる。
 前述のように、セルコントローラ200あるいは各セルコントローラIC300が動作している間は、バッテリーコントローラ500からの指令により単電池セルの端子間電圧の測定が、適宜(ほぼリアルタイム)行われており、この測定された端子間電圧に基づいて、各単電池セルのバランシング電流が算出されるとともに、バランシング放電電流の積算値が算出され、単電池セルのSOCが算出される(ステップS15)。
 なお、この際、上記の式(12)で説明したように、算出された単電池セルのSOCがバランシング放電終了状態となっていれば、バッテリーコントローラ500からセルコントローラIC300に、この単電池セルのバランシング放電を停止する指令が送信され、この単電池セルに対応したバランシングスイッチがオフとされる(ステップS15C1)。
 ステップS16では、算出された各単電池セルのSOCから、バランシング放電未完了の単電池セルがあるかどうか、たとえば上記の閾値ΔSOCthと式(12)を用いて判断される。全ての単電池セルが式(12)を満たしていれば、バランシング放電終了となる(ステップS19)。
 バランシング放電対象の単電池セルが残っていれば、これらがバランシング対象単電池セルのリストに残るようにこのリストを調整する(ステップS17)。続いてステップS18で、バランシング放電の再スケジューリングを行う、ステップS14に戻ってバランシング放電を続行する。
 図18に示すような簡単な例では、最初に各単電池セル毎に、バランシング放電に必要な時間を算出すれば、ステップS15からS18の処理は不要に見える。しかしながら、実際は各単電池セルのSOCは図18に示すよりも細かくばらついている。また各単電池セルのバランシング放電電流も、バランシングスイッチのオン抵抗や各単電池セルの内部状態によってそれぞれ異なるので、適宜所定のサイクルで単電池セルの端子間電圧を測定し、これに基づいてバランシング放電電流さらにSOCを算出し、セルコントローラICの周囲温度を参考にしながら制御を行う必要がある。
 また、電池システムを効率よく稼働させるため、および車両の安全稼働のため、各単電池セルの過放電は確実に避けるようにするため、所定のサイクルでのSOCの算出ならびに制御が必要である。
 上記では説明を省略したが、セルコントローラIC300の周囲温度Taが所定の範囲(0℃~40℃)に入っておらず、また単電池セルのOCVが図14の領域Aでない場合であっても、場合によっては、このような状態で端子間電圧を測定してSOCを算出した方が、この状態では最も正確なSOCとなる場合も考えられる。このような場合はたとえ精度が良くなくとも、このように算出したSOCを用いて電池システムの制御ならびに車両の制御を行うことが車両の安全稼働のために必要である。
 たとえば、詳細な説明は省略するが、場合によっては、単電池セルのOCVでなく、CCVと内部抵抗を測定し、これから単電池セルの温度等の補正も行ってSOCを算出することも可能である。図17におけるステップS14からS18のバランシング放電で用いるSOCに、このように算出したSOCを使用することもできる。
(バランシング放電の変形実施例)
 図18の例で説明したバランシング放電で、たとえば、セル2、セル6、セル8、セル11のそれぞれに最初から異なるデューティ比を与えて、4つの単電池セルのバランシング放電を連続的に行うように制御することも可能である。
 図18に示す例では、L1-L2、L2-L3、L3-L4の差はそれぞれほぼ等しくなっている。このような場合、たとえば4つの単電池セルのバランシング放電電流がほぼ等しいときには、D(2):D(6)およびD(11):D(8)=3:2:1となるようにすれば、上記のようにステップ的にSOCのレベル毎に揃えながらバランシング放電を行うのでなく、4個の単電池セルのバランシング放電を、連続的にかつSOCの偏差の大きい単電池セルを優先して行うことができる。
 ここで簡単に、単電池セルの開路電圧(OCV)と閉路電圧(CCV)と分極電圧Vpおよび充放電電流Iと内部抵抗DCRの関係について説明する。これらは以下の式(21)で関係づけられている。
  CCV=OCV+I・DCR+Vp                   ...(21)
 単電池セル101あるいは電池システム104にインバータなどの負荷が接続されていない初期の状態では、I=0であり、分極も起きておらずVp=0であるので、CCV=OCVとなる。すなわち、電動車両が所定の時間停止したあとで、始動された場合に単電池セルの端子間電圧を測定するとこれがOCVとなる。
 インバータなどの負荷が接続され、充放電電流Iが流れる状態が続くと、単電池セルの内部に分極が生じる。この分極は解消するまで所定の時間単電池セルを放置する必要がある。したがって、一旦分極が生じると、充放電電流Iが0となっても、CCVとOCVは一致しない。このためOCVの測定は、車両始動時の分極が解消されている状態で行われている。
 バランシング放電電流は、上記で説明したようにCCVとバランシング抵抗およびバランシングスイッチのオン抵抗で定まるので、CCVは車両が稼働中は適宜測定される。またここでは説明を省略するが、インバータ負荷によるCCVの時間変化から、単電池セルの内部抵抗DCRを算出することができ、これから単電池セルの劣化状態の推定を行うことができる。さらに、CCVの測定により、電圧検出線などの断線検出や電池監視装置内の回路の各種の診断を行うことができる。
 したがって、上記で説明したように、図14のOCV-SOC換算曲線の領域Bの場合や、図15で示すようにジャンクション温度が0℃~40℃の範囲とならないような場合は、SOCを算出するための高精度な電圧測定は行わないが、それ以外の目的での単電池セルの端子間電圧測定は適宜行われている。
 本発明による電池監視装置で使用しているセルコントローラICでは、図5で説明したように単電池セルの端子間電圧測定用端子(CV端子)とバランシング放電用端子(BS端子)が別々に設けられており、単電池セルの端子間電圧測定とバランシング放電が互いに干渉しない。また、温度測定回路からの出力電圧も、単電池セルの端子間電圧測定と同時に、またバランシング放電と並行して測定できる。また、単電池セルの端子間電圧測定と温度測定回路からの出力電圧の測定とはセルコントローラIC300の1つの制御サイクルの中で、マルチプレクサ210を切り替えながら行われる。したがって、これらの電圧測定とバランシング放電とがほぼ同時に行われている。
 これらによって、セルコントローラの周囲温度の時間変化にリアルタイムに対応したバランシング放電を行うことができる。
 上記の実施形態の説明で示した例では、電池システム104はセルグループ102を直列接続して構成したものとして説明した。電池システム104は複数のセルグループを直並列または並列に接続して構成したものであってよい。
 また、上記では、セルコントローラIC300はセルグループ102と1対1で設けるように説明したが、1つのセルコントローラで複数のセルグループを制御することも可能であり、また1つのセルグループを複数のセルコントローラで制御することも可能である。セルグループを構成する単電池セルの数は、セルグループを複数含む電池モジュール、あるいは電池システムの仕様により様々に変形実施が可能である。したがって、たとえばm個のセルコントローラでn個のセルグループを制御することも可能である。またこのような様々の電池システムの仕様は、この電池システムを搭載するHEVやEVなどの電動車両に必要な電力仕様に合わせて設定される。
 従って、例えば、1つのセルコントローラIC300が、直列に接続された複数のセルグループ102を制御するように設けられている場合は、これら複数のセルグループ全体の端子間電圧がブロック電圧入力部225に入力され、この電圧入力部225の出力がマルチプレクサ210で選択されて差動増幅器211に入力されて、電圧測定が行われる。また、複数のセルコントローラIC300が1個のセルグループを制御する場合は、各々のセルコントローラIC300が制御するセルグループの部分の端子間電圧がそれぞれのセルコントローラIC300のブロック電圧入力部225に入力されて電圧測定が行われる。
 本発明による電池システム監視装置は、例えば上記で説明したセルコントローラの構成および機能は、このような様々の構成の電池システムにおいても適用可能である。このように、本発明による電池システム監視装置は様々な構成の電池システムに対して、また様々な仕様の電動車両に対して適用が可能である。
 以上の説明は本発明の実施形態の例であり、本発明はこれらの実施形態に限定されない。当業者であれば、本発明の特徴を損なわずに様々な変形実施が可能である。したがって、本発明の技術的思想の範囲内で考えられるその他の形態についても、本発明の範囲内に含まれる。

Claims (14)

  1.  複数の単電池セルを直列接続したセルグループを備えた電池システムを監視する電池システム監視装置であって、
     前記セルグループの複数の単電池セルの状態を監視し制御する第1の制御装置と、
     前記第1の制御装置を制御する第2の制御装置と、
     前記第1の制御装置の近傍の温度を測定する温度検出部と、
     前記単電池セルの端子間電圧を測定するための、前記単電池セルの正極および負極のそれぞれと前記第1の制御装置とを接続する複数の電圧検出線とを備え、
     前記第1の制御装置は、前記単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続された、当該単電池セルのバランシング放電を行うバランシングスイッチを前記単電池セル毎に備え、
     前記電圧検出線には、第1の抵抗が直列に設けられ、
     前記バランシングスイッチと当該バランシングスイッチに直列に接続された第2の抵抗とで構成されるバランシング放電回路が前記単電池セルの正極に接続された電圧検出線と負極に接続された電圧検出線の間に接続され、
     前記バランシング放電回路と前記単電池セルの正極に接続された電圧検出線との接続点および前記バランシング放電回路と前記単電池セルの負極に接続された電圧検出線との接続点は、それぞれ前記第1の抵抗より前記セルグループ側に設けられる電池システム監視装置。
  2.  請求項1に記載の電池システム監視装置において、
     前記第1の制御装置は、
     一の単電池セルの正極および負極のそれぞれに接続された電圧検出線あるいは、前記温度検出部に接続された温度検出線を選択し、前記一の単電池セルの正極電位および負極電位または前記温度検出部の出力電圧を出力する選択部と、
     前記選択部から出力された前記一の単電池セルの正極電位および負極電位または前記温度検出部の出力電圧から、前記一の単電池セルの端子間電圧または温度検出部の出力電圧を測定する電圧測定部とを備え、
     前記第2の制御装置は、
     前記温度検出部の出力電圧を温度に変換するデータを格納する記憶部を備える電池システム監視装置。
  3.  請求項1または2に記載の電池システム監視装置において、
     前記第2の制御装置は、
     前記電池システム監視装置を搭載した車両の始動時に、前記第1の制御装置の近傍の温度が所定の下限値以下であるかまたは所定の上限値以上である場合は、前記車両の前回停止時にバランシング放電の対象となった単電池セルに対するバランシング放電を、前記第1の制御装置を制御して行う電池システム監視装置。
  4.  請求項1または2に記載の電池システム監視装置において、
     前記第2の制御装置は、
     前記電池システム監視装置を搭載した車両の始動時に、前記第1の制御装置の近傍の温度が所定の下限値より大きく、かつ所定の上限値より小さい場合に、前記電池システムに前記車両を駆動する負荷が接続されていない状態で、前記セルグループの前記複数の単電池セルの各々の端子間電圧を測定して、前記複数の単電池セルの各々の残存容量(SOC)を算出するとともに、このSOCに基づいてバランシング放電を行う電池システム監視装置。
  5.  請求項4に記載の電池システム監視装置において、
     前記第2の制御装置は、
     測定された前記複数の単電池セルの各々の端子間電圧が全て所定の電圧範囲に入っている場合に、
     前記複数の単電池セルの各々のSOCとその偏差を算出し、所定の閾値以上の偏差のSOCを持つ単電池セルのバランシング放電を、前記第1の制御装置を制御して行う電池システム監視装置。
  6.  請求項4に記載の電池システム監視装置において、
     測定された前記複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合で、OCVを用いて前回SOCを算出したときから所定の時間が経過している場合は、
     前記第2の制御装置は、前記複数の単電池セルの各々のSOCとその偏差を算出し、所定の閾値以上の偏差のSOCを持つ単電池セルのバランシング放電を、前記第1の制御装置を制御して行う電池システム監視装置。
  7.  請求項4乃至6のいずれか1項に記載の電池システム監視装置において、
     前記第2の制御装置は、
     測定された前記複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合は、
     前記車両の前回停止時にバランシング放電の対象となった単電池セルのバランシング放電を、前記第1の制御装置を制御して行う電池システム監視装置。
  8.  請求項4に記載の電池システム監視装置において、
     前記電池システムの充放電電流を検出する電流検出部をさらに備え、
     前記第2の制御装置は、
     測定された前記複数の単電池セルの各々の端子間電圧が1つでも所定の電圧範囲に入っていない場合は、
     前記車両の前回停止時にバランシング放電の対象となった単電池セルのバランシング放電を、前記第1の制御装置を制御して行い、
     前記複数の単電池セルの各々のSOCを、前記車両の前回停止時のSOCに前記電流検出部が検出した前記電池システムの充放電電流と前記単電池セルのバランシング放電の電流を積算して算出する電池システム監視装置。
  9.  請求項3または7に記載の電池システム監視装置において、
     前記第2の制御装置は、SOCの偏差の大きい単電池セルを優先して、前記バランシング放電の対象となった単電池セルのバランシング放電を行う電池システム監視装置。
  10.  請求項8に記載の電池システム監視装置において、
     前記第2の制御装置は、SOCの偏差の大きい単電池セルを優先して、前記バランシング放電の対象となった単電池セルのバランシング放電を行う電池システム監視装置。
  11.  請求項3または7または9のいずれか1項に記載の電池システム監視装置において、
     前記第2の制御装置は、
     前記バランシング放電の対象である単電池セルのバランシング放電を、前記第1の制御装置の近傍の温度が前記所定の上限値未満となるように、前記バランシング放電の対象となった単電池セルに対応したバランシングスイッチをデューティー制御して行う電池システム監視装置。
  12.  請求項1乃至11に記載の電池システム監視装置において、
     直列に接続されたN個(N≧1)の前記セルグループと、
     前記N個のセルグループを制御するM個(M≧1)の前記第1の制御装置と、
     前記M個の前記第1の制御装置の上位制御装置である前記第2の制御装置とを備え、
     前記M個の前記第1の制御装置のうち最上位の第1の制御装置と、前記第2の制御装置とは絶縁素子を介した通信ラインで接続され、
     前記M個の前記第1の制御装置のうち最下位の第1の制御装置と、前記第2の制御装置とは絶縁素子を介した通信ラインで接続され、
     前記M個の前記第1の制御装置は互いに通信ラインで接続され、
     前記M個の前記第1の制御装置は、前記第2の制御装置からの制御信号および制御データによって制御される電池システム監視装置。
  13.  複数の単電池セルを直列接続したセルグループを備えた電池システムを監視する電池システム監視装置であって、前記複数の単電池は、OCV-SOC特性に関して、所定のOCVの範囲では前記SOCの変化によるOCVの変化が少なく、所定のOCVの範囲以外では前記SOCの変化によるOCVの変化が大きい特性を有する電池システム監視装置において、
     前記電池システムの充放電電流を検出する電流検出部と、
     前記セルグループの複数の単電池セルの状態を監視し制御する第1の制御装置と、
     前記第1の制御装置を制御する第2の制御装置と、
     前記単電池セルの電圧を検出する電圧検出回路と、
     前記電圧検出回路の近傍の温度を測定する温度検出部と、
     前記複数の単電池セルのSOCのばらつきを低減するバランシング放電制御を行うバランシング放電回路とを備え、
     前記温度検出部によって検出された前記電圧検出回路の温度が所定の温度範囲である場合は、
     前記電圧検出回路によって検出された前記複数の単電池セルのOCVに基づいて、各単電池セルのSOCを算出する第1のSOC算出方法で各単電池セルのSOCを算出し、
     前記温度検出部によって検出された前記電圧検出回路の温度が所定の温度範囲外である場合は、
     前記電流検出部によって検出された前記電池システムの充放電電流と前記バランシング放電回路による前記複数の単電池セルの各々のバランシング放電電流を積算して各単電池セルのSOCを算出する第2のSOC算出方法で各単電池セルのSOCを算出する電池システム監視装置。
  14.  請求項13に記載の電池システム監視装置において、
     前記温度検出部によって検出された前記電圧検出回路の温度が所定の温度範囲である場合は、
     各単電池セルのSOCを前記第1のSOC算出方法で算出するとともに、前記バランシング放電回路の発熱量を抑制した第1バランシング放電制御を行い、
     前記温度検出部によって検出された前記電圧検出回路の温度が所定の温度範囲外である場合は、
     各単電池セルのSOCを前記第2のSOC算出方法で算出するとともに、前記バランシング放電回路の発熱量を抑制しない第2バランシング放電制御を行う電池システム監視装置。
PCT/JP2011/070498 2011-09-08 2011-09-08 電池システム監視装置 Ceased WO2013035183A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2013532368A JP5683710B2 (ja) 2011-09-08 2011-09-08 電池システム監視装置
CN201180072976.4A CN103765721B (zh) 2011-09-08 2011-09-08 电池系统监视装置
PCT/JP2011/070498 WO2013035183A1 (ja) 2011-09-08 2011-09-08 電池システム監視装置
US14/241,009 US9746525B2 (en) 2011-09-08 2011-09-08 Battery system monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2011/070498 WO2013035183A1 (ja) 2011-09-08 2011-09-08 電池システム監視装置

Publications (1)

Publication Number Publication Date
WO2013035183A1 true WO2013035183A1 (ja) 2013-03-14

Family

ID=47831669

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/070498 Ceased WO2013035183A1 (ja) 2011-09-08 2011-09-08 電池システム監視装置

Country Status (4)

Country Link
US (1) US9746525B2 (ja)
JP (1) JP5683710B2 (ja)
CN (1) CN103765721B (ja)
WO (1) WO2013035183A1 (ja)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150039151A1 (en) * 2013-07-30 2015-02-05 Sumitomo Heavy Industries, Ltd. Working machine
JP2015136255A (ja) * 2014-01-17 2015-07-27 株式会社ケーヒン 電圧検出装置
CN105143899A (zh) * 2013-04-19 2015-12-09 日立汽车系统株式会社 电池系统监视装置
JP2016048469A (ja) * 2014-08-27 2016-04-07 ラピスセミコンダクタ株式会社 半導体装置、電池監視システム、及び半導体装置の起動方法
CN105637204A (zh) * 2013-10-18 2016-06-01 株式会社电装 控制装置及其温度推定方法
JP2016138868A (ja) * 2015-01-29 2016-08-04 ルネサスエレクトロニクス株式会社 バッテリセルの電圧補正方法、バッテリ監視装置、半導体チップ及び車両
JP2016158317A (ja) * 2015-02-23 2016-09-01 株式会社デンソー 蓄電装置
WO2017043237A1 (ja) * 2015-09-11 2017-03-16 日立オートモティブシステムズ株式会社 電池管理装置
EP3048697A4 (en) * 2013-09-17 2017-05-24 Sony Corporation Power storage device and method for controlling power storage device
JP2018125977A (ja) * 2017-02-01 2018-08-09 トヨタ自動車株式会社 電池モジュールの制御装置
WO2020021888A1 (ja) * 2018-07-25 2020-01-30 パナソニックIpマネジメント株式会社 管理装置、及び電源システム
US10752127B1 (en) 2019-03-29 2020-08-25 Denso Ten Limited Battery controller and method of battery control
WO2021186795A1 (ja) * 2020-03-18 2021-09-23 三洋電機株式会社 管理装置、及び電源システム
US11584233B2 (en) 2013-06-28 2023-02-21 Alelion Energy Systems Ab Battery arrangement for electrically powered industrial vehicle
EP4194251A1 (en) * 2013-08-15 2023-06-14 Volvo Truck Corporation Method and arrangement for balancing an energy storage system
CN117074437A (zh) * 2023-10-11 2023-11-17 青岛金诺德科技有限公司 无损检测方法及其在新能源汽车锂电池回收中的应用
US11946813B2 (en) 2019-02-13 2024-04-02 Lg Energy Solution, Ltd. Battery module detecting high temperature of battery cell and method for detecting high temperature of battery cell

Families Citing this family (122)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11740294B2 (en) 2010-06-03 2023-08-29 Midtronics, Inc. High use battery pack maintenance
US10046649B2 (en) 2012-06-28 2018-08-14 Midtronics, Inc. Hybrid and electric vehicle battery pack maintenance device
JP5829681B2 (ja) 2010-06-03 2015-12-09 ミッドトロニクス インコーポレイテッド 電気自動車用バッテリパックのメンテナンス
JP5796289B2 (ja) * 2010-11-26 2015-10-21 ソニー株式会社 二次電池セル、電池パック及び電力消費機器
US10536007B2 (en) 2011-03-05 2020-01-14 Powin Energy Corporation Battery energy storage system and control system and applications thereof
DE112012001144B4 (de) * 2011-03-07 2025-10-02 A123 Systems, LLC Verfahren zum opportunistischen Ausgleichen von Ladung zwischen Batteriezellen
US9293937B2 (en) * 2011-04-18 2016-03-22 Hitachi Automotive Systems, Ltd. Electric storage device
WO2012144674A1 (ko) * 2011-04-22 2012-10-26 Sk 이노베이션 주식회사 착탈 가능한 배터리 모듈, 이를 이용한 배터리 스트링을 위한 전하 균일 방법 및 장치
JP5787997B2 (ja) * 2011-05-31 2015-09-30 日立オートモティブシステムズ株式会社 電池システム監視装置
JP5775935B2 (ja) 2011-10-20 2015-09-09 日立オートモティブシステムズ株式会社 電池システムの監視装置およびこれを備えた蓄電装置
JP5866987B2 (ja) * 2011-11-10 2016-02-24 日産自動車株式会社 二次電池の制御装置およびsoc検出方法
WO2013070850A2 (en) 2011-11-10 2013-05-16 Midtronics, Inc. Battery pack tester
WO2013141100A1 (ja) * 2012-03-21 2013-09-26 三洋電機株式会社 電池状態推定装置
JP5866001B2 (ja) * 2012-04-27 2016-02-17 日立オートモティブシステムズ株式会社 電池監視装置および電池システム監視装置
JP6001334B2 (ja) * 2012-05-31 2016-10-05 ルネサスエレクトロニクス株式会社 半導体装置、バッテリ状態監視モジュール及び車輌システム
DE102012210603B4 (de) * 2012-06-22 2023-11-09 Robert Bosch Gmbh Sicherheitskonzept für Batterien
US11325479B2 (en) 2012-06-28 2022-05-10 Midtronics, Inc. Hybrid and electric vehicle battery maintenance device
CA2897054A1 (en) 2013-01-11 2014-07-17 Zpower, Llc Methods and systems for recharging a battery
JP6134520B2 (ja) * 2013-01-25 2017-05-24 Fdk株式会社 バランス補正装置及び蓄電装置
US20140244193A1 (en) * 2013-02-24 2014-08-28 Fairchild Semiconductor Corporation Battery state of charge tracking, equivalent circuit selection and benchmarking
US9268000B2 (en) * 2013-03-14 2016-02-23 Liebert Corporation System and method for improved accuracy in battery resistance measurement systems
US10240456B2 (en) * 2013-03-15 2019-03-26 Merlin Technology, Inc. Inground device with advanced transmit power control and associated methods
US9425619B2 (en) 2013-03-15 2016-08-23 Merlin Technology, Inc. Advanced inground device power control and associated methods
US10843574B2 (en) 2013-12-12 2020-11-24 Midtronics, Inc. Calibration and programming of in-vehicle battery sensors
JP6010014B2 (ja) * 2013-12-13 2016-10-19 株式会社東芝 通信制御装置
EP3078073B1 (en) * 2014-06-18 2017-10-04 Koninklijke Philips N.V. Device and method for controlling a plurality of cells of a battery
US9007015B1 (en) 2014-07-03 2015-04-14 The Noco Company Portable vehicle battery jump start apparatus with safety protection
US11458851B2 (en) 2014-07-03 2022-10-04 The Noco Company Jump starting apparatus
JP6384412B2 (ja) * 2014-07-10 2018-09-05 株式会社デンソー 電源装置
US10473555B2 (en) 2014-07-14 2019-11-12 Midtronics, Inc. Automotive maintenance system
US9751427B2 (en) * 2014-09-03 2017-09-05 Ford Global Technologies, Llc Vehicle traction battery thermal conditioning
US10222397B2 (en) 2014-09-26 2019-03-05 Midtronics, Inc. Cable connector for electronic battery tester
US10263436B2 (en) * 2014-10-20 2019-04-16 Powin Energy Corporation Electrical energy storage unit and control system and applications thereof
CN104505550B (zh) * 2014-12-25 2017-01-18 宁德时代新能源科技股份有限公司 磷酸铁锂电池组的被动均衡方法及系统
WO2016123075A1 (en) 2015-01-26 2016-08-04 Midtronics, Inc. Alternator tester
US10114060B2 (en) 2015-02-16 2018-10-30 Continental Automotive Systems, Inc. Negative battery main contactor status determination
US10449862B2 (en) * 2015-03-11 2019-10-22 Hitachi Automotive Systems, Ltd. Battery managing device, battery monitoring circuit, and control system
US20160285284A1 (en) * 2015-03-24 2016-09-29 Midtronics, Inc. Battery maintenance system
US10293693B2 (en) * 2015-04-21 2019-05-21 Samsung Electronics Co., Ltd. Battery control method and apparatus, battery module, and battery pack
AU2016255067A1 (en) * 2015-04-29 2017-11-02 Zpower, Llc Temperature dependent charge algorithm
JP2016220450A (ja) * 2015-05-22 2016-12-22 三菱重工業株式会社 電源制御装置、電源システム、電源制御方法およびプログラム
AU2016285501B2 (en) * 2015-06-30 2019-03-14 Murata Manufacturing Co., Ltd. Power storage system, controller, and storage battery charging and discharging method
JP6401122B2 (ja) * 2015-07-30 2018-10-03 矢崎総業株式会社 二次電池状態検出装置
US10254350B2 (en) 2015-08-06 2019-04-09 Powin Energy Corporation Warranty tracker for a battery pack
US10153521B2 (en) 2015-08-06 2018-12-11 Powin Energy Corporation Systems and methods for detecting a battery pack having an operating issue or defect
US10122186B2 (en) 2015-09-11 2018-11-06 Powin Energy Corporation Battery management systems (BMS) having isolated, distributed, daisy-chained battery module controllers
US9923247B2 (en) 2015-09-11 2018-03-20 Powin Energy Corporation Battery pack with integrated battery management system
CN107949793B (zh) * 2015-09-17 2022-06-28 新唐科技日本株式会社 电压检测电路、异常检测装置、以及电池系统
US9882401B2 (en) 2015-11-04 2018-01-30 Powin Energy Corporation Battery energy storage system
EP3282549B1 (en) * 2016-02-05 2020-02-26 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Adapter and charging control method
US9908370B2 (en) * 2016-03-21 2018-03-06 Faster Faster Inc. Dual motor feedback system for electric motorcycles
US10106049B2 (en) * 2016-05-18 2018-10-23 Nxp Usa, Inc. Battery monitoring device
JPWO2017208740A1 (ja) * 2016-05-31 2019-04-04 三洋電機株式会社 管理装置および電源システム
WO2017219136A1 (en) * 2016-06-21 2017-12-28 Corvus Energy Inc. Method of balancing a multi-cell battery
JP6539618B2 (ja) * 2016-07-21 2019-07-03 矢崎総業株式会社 電池監視システム
JP6691665B2 (ja) * 2016-08-05 2020-05-13 株式会社Gsユアサ 蓄電装置、蓄電装置の制御方法、車両
JP6883396B2 (ja) * 2016-08-25 2021-06-09 矢崎総業株式会社 急速充電装置
KR102167428B1 (ko) * 2016-10-21 2020-10-20 주식회사 엘지화학 듀티 제어를 통한 효과적인 배터리 셀 밸런싱 방법 및 시스템
US11054480B2 (en) 2016-10-25 2021-07-06 Midtronics, Inc. Electrical load for electronic battery tester and electronic battery tester including such electrical load
US12320857B2 (en) 2016-10-25 2025-06-03 Midtronics, Inc. Electrical load for electronic battery tester and electronic battery tester including such electrical load
CN106329669A (zh) * 2016-11-03 2017-01-11 湖北追日电气股份有限公司 一种分布式电池均衡模块
CN109964138B (zh) * 2016-11-25 2022-06-21 沃尔沃卡车集团 对电气存储系统中的电压故障状况进行分类的方法及装置
CN110024210A (zh) * 2016-11-30 2019-07-16 日立汽车系统株式会社 电池控制装置
US10699278B2 (en) 2016-12-22 2020-06-30 Powin Energy Corporation Battery pack monitoring and warranty tracking system
KR102319241B1 (ko) * 2017-01-03 2021-10-28 삼성에스디아이 주식회사 전압 검출 집적회로 및 이를 포함하는 배터리 관리 시스템
JP6776904B2 (ja) * 2017-01-13 2020-10-28 株式会社デンソー 電池パック及び電源システム
EP3571753B1 (en) * 2017-01-23 2024-04-24 Rafael Advanced Defense Systems Ltd. System for balancing a series of cells
JP6708148B2 (ja) * 2017-03-07 2020-06-10 株式会社オートネットワーク技術研究所 車載用電池の保護回路
EP3602731A4 (en) 2017-03-31 2023-06-07 The Noco Company PORTABLE OR HANDHELD STARTER FOR A VEHICLE BATTERY WITH BATTERY CELL EQUALIZATION CIRCUIT
WO2019190588A1 (en) * 2018-03-30 2019-10-03 The Noco Company Portable or hand held vehicle battery jump starting apparatus with battery cell equalization circuit
US10063068B1 (en) * 2017-04-11 2018-08-28 Lg Chem, Ltd. Battery system
CN108732448A (zh) 2017-04-24 2018-11-02 凹凸电子(武汉)有限公司 电池管理系统中的断线检测方法及断线解除检测方法
JP7006876B2 (ja) * 2017-05-01 2022-01-24 ラピスセミコンダクタ株式会社 半導体装置、電池監視システム、および半導体装置の起動方法
EP3398818B1 (en) * 2017-05-04 2022-07-06 Volvo Car Corporation Voltage supply unit, battery balancing method
CN107317059B (zh) * 2017-06-30 2019-12-20 西安华泰半导体科技有限公司 电池保护芯片级联的均衡控制电路
JP6866800B2 (ja) * 2017-08-04 2021-04-28 ブラザー工業株式会社 電圧異常検出装置
US10634725B2 (en) * 2017-08-18 2020-04-28 Nec Corporation System and method for model predictive energy storage system control
CN107611501B (zh) * 2017-08-21 2020-10-27 许继电源有限公司 蓄电池组监测系统、蓄电池组及其单体电池单元
CN109435778B (zh) * 2017-08-31 2022-03-18 比亚迪股份有限公司 电池均衡方法、系统、车辆、存储介质及电子设备
CN107379971B (zh) * 2017-09-11 2023-04-07 湖北师范大学 一种电机全电子再生制动能量回收系统
CN108183518B (zh) * 2017-11-30 2020-03-06 宁德时代新能源科技股份有限公司 电池组均衡控制方法和装置、以及均衡控制设备
CN108318820A (zh) * 2017-12-12 2018-07-24 合肥国轩高科动力能源有限公司 一种锂离子电池再现金属异物短路的方法
KR102446380B1 (ko) 2018-02-27 2022-09-21 삼성에스디아이 주식회사 배터리 관리 시스템
JP7112483B2 (ja) * 2018-03-08 2022-08-03 三洋電機株式会社 管理装置、蓄電システム
WO2019176395A1 (ja) * 2018-03-13 2019-09-19 パナソニックIpマネジメント株式会社 管理装置、蓄電システム
DE102018203980A1 (de) 2018-03-15 2019-09-19 Robert Bosch Gmbh Verfahren zum Betrieb eines Batteriesystems und Batteriesystem
CN108215929B (zh) * 2018-04-12 2019-10-11 福泰动力有限公司 电动汽车和充电控制方法
KR101944111B1 (ko) * 2018-04-24 2019-01-30 주식회사 경신 차량용 배터리 셀의 전압 측정장치
CN112136260B (zh) * 2018-05-14 2024-08-02 三洋电机株式会社 管理装置、蓄电系统
JP2020016582A (ja) * 2018-07-26 2020-01-30 ラピスセミコンダクタ株式会社 半導体装置、およびバッテリの残量の検出方法
EP3846278B1 (en) * 2018-08-29 2025-03-19 Nuvoton Technology Corporation Japan Cell monitoring circuit and management system
JP7018853B2 (ja) * 2018-09-05 2022-02-14 本田技研工業株式会社 情報提供装置、情報提供方法、及びプログラム
US11453309B2 (en) 2018-09-06 2022-09-27 Artisan Vehicle Systems, Inc. Electric power distribution system and method for electric mining machine
US11513160B2 (en) 2018-11-29 2022-11-29 Midtronics, Inc. Vehicle battery maintenance device
US11515585B2 (en) * 2019-02-21 2022-11-29 Datang Nxp Semiconductors Co., Ltd. Accurate battery temperature measurement by compensating self heating
IT201900009237A1 (it) 2019-06-17 2020-12-17 St Microelectronics Srl Procedimento di funzionamento di sistemi di gestione di batterie, dispositivo e veicolo corrispondenti
IT201900009234A1 (it) 2019-06-17 2020-12-17 St Microelectronics Srl Procedimento di funzionamento di sistemi di gestione di batterie, dispositivo e veicolo corrispondenti
US11566972B2 (en) 2019-07-31 2023-01-31 Midtronics, Inc. Tire tread gauge using visual indicator
KR102743393B1 (ko) * 2019-09-06 2024-12-16 주식회사 엘지에너지솔루션 배터리 관리 장치, 배터리 관리 방법, 배터리 팩 및 전기 차량
JP7323800B2 (ja) * 2019-10-18 2023-08-09 ミツミ電機株式会社 二次電池保護回路、二次電池保護装置、電池パック及び温度検出回路
EP3812784B1 (en) 2019-10-23 2025-01-29 NXP USA, Inc. Systems and methods involving measurement of battery cells
US11545839B2 (en) 2019-11-05 2023-01-03 Midtronics, Inc. System for charging a series of connected batteries
US11668779B2 (en) 2019-11-11 2023-06-06 Midtronics, Inc. Hybrid and electric vehicle battery pack maintenance device
US11474153B2 (en) 2019-11-12 2022-10-18 Midtronics, Inc. Battery pack maintenance system
US11271416B2 (en) * 2019-11-20 2022-03-08 Semiconductor Components Industries, Llc Methods and apparatus for a battery
DE102020216599A1 (de) 2019-12-31 2021-07-01 Midtronics, Inc. Intelligente Modulschnittstelle für eine Batteriewartungsvorrichtung
US11973202B2 (en) 2019-12-31 2024-04-30 Midtronics, Inc. Intelligent module interface for battery maintenance device
US11486930B2 (en) 2020-01-23 2022-11-01 Midtronics, Inc. Electronic battery tester with battery clamp storage holsters
CN114384437B (zh) * 2020-10-16 2025-07-18 凹凸电子(武汉)有限公司 控制器及电池电压检测方法
US12119683B2 (en) * 2020-10-23 2024-10-15 Denso Corporation Battery management device and battery device
CN114597981A (zh) * 2020-12-03 2022-06-07 昆山富士锦电子有限公司 电压平衡电路及其充电时平衡电池电压的方法
KR20220100332A (ko) * 2021-01-08 2022-07-15 주식회사 엘지에너지솔루션 배터리 장치 및 전압 공급 방법
US11715848B2 (en) 2021-05-27 2023-08-01 Ford Global Technologies, Llc Battery sensing module with temperature sensor selective disconnect
US11994023B2 (en) 2021-06-22 2024-05-28 Merlin Technology, Inc. Sonde with advanced battery power conservation and associated methods
JP7643253B2 (ja) * 2021-08-18 2025-03-11 トヨタ自動車株式会社 バッテリ管理装置
CN114274777B (zh) * 2021-12-15 2023-06-02 重庆长安新能源汽车科技有限公司 一种电池异常监控方法、系统及车辆
US12330513B2 (en) 2022-02-14 2025-06-17 Midtronics, Inc. Battery maintenance device with high voltage connector
US12392833B2 (en) 2022-05-09 2025-08-19 Midtronics, Inc. Electronic battery tester
JP2024090868A (ja) * 2022-12-23 2024-07-04 カワサキモータース株式会社 電動車両、及びその電動車両の制御方法
WO2024237911A1 (en) * 2023-05-16 2024-11-21 Coulomb Solutions, Inc. Centralized battery pack management
KR20250110601A (ko) * 2024-01-12 2025-07-21 주식회사 엘지에너지솔루션 셀 밸런싱 방법 및 이를 적용한 배터리 팩 관리 시스템
CN118833082B (zh) * 2024-07-23 2025-01-03 中国矿业大学 一种高能效锂电池单轨吊机车及其电池管理系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002374633A (ja) * 2001-06-14 2002-12-26 Osaka Gas Co Ltd 蓄電装置
JP2003149307A (ja) * 2001-11-16 2003-05-21 Toyota Motor Corp 電池残存容量算出方法
JP2005348457A (ja) * 2004-05-31 2005-12-15 Shin Kobe Electric Mach Co Ltd 組電池用制御回路
JP2010249793A (ja) * 2009-02-27 2010-11-04 Hitachi Ltd 電池監視装置および電池監視装置の診断方法
JP2011075504A (ja) * 2009-10-01 2011-04-14 Shindengen Electric Mfg Co Ltd 充電制御装置、および該充電制御装置における充電制御方法

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6587800B1 (en) * 2000-06-30 2003-07-01 Intel Corporation Reference timer for frequency measurement in a microprocessor
US6845332B2 (en) 2001-11-16 2005-01-18 Toyota Jidosha Kabushiki Kaisha State of charge calculation device and state of charge calculation method
JP3539424B2 (ja) * 2002-07-24 2004-07-07 日産自動車株式会社 電気自動車の制御装置
JP4035777B2 (ja) * 2003-02-10 2008-01-23 株式会社デンソー 組電池の放電装置
US7141953B2 (en) * 2003-09-04 2006-11-28 Intel Corporation Methods and apparatus for optimal voltage and frequency control of thermally limited systems
US6900650B1 (en) * 2004-03-01 2005-05-31 Transmeta Corporation System and method for controlling temperature during burn-in
JP4918714B2 (ja) * 2004-09-16 2012-04-18 セイコーインスツル株式会社 燃料電池システム
JP2006115640A (ja) 2004-10-15 2006-04-27 Nissan Motor Co Ltd 組電池の容量調整装置
JP4638251B2 (ja) * 2005-02-07 2011-02-23 富士重工業株式会社 バッテリの管理装置
JP4370297B2 (ja) * 2005-11-25 2009-11-25 矢崎総業株式会社 バッテリの管理装置
JP4503567B2 (ja) 2006-09-06 2010-07-14 日立ビークルエナジー株式会社 容量調整回路
KR100863956B1 (ko) * 2006-09-26 2008-10-16 삼성에스디아이 주식회사 배터리 관리 시스템 및 그 구동방법
KR100839382B1 (ko) * 2006-10-16 2008-06-20 삼성에스디아이 주식회사 배터리 관리 시스템 및 그의 구동 방법
JP4484858B2 (ja) * 2006-10-19 2010-06-16 日立ビークルエナジー株式会社 蓄電池管理装置およびそれを備える車両制御装置
WO2008055505A1 (en) * 2006-11-10 2008-05-15 Lithium Balance A/S A battery management system
JP5459946B2 (ja) 2007-09-28 2014-04-02 株式会社日立製作所 車両用直流電源装置
US8643376B2 (en) * 2009-03-04 2014-02-04 Yazaki Corporation Voltage measuring apparatus of assembled battery
JP5338701B2 (ja) * 2010-02-12 2013-11-13 株式会社デンソー 電池監視装置
WO2011153055A2 (en) * 2010-06-03 2011-12-08 A123 Systems, Inc. System and method for monitoring battery bus bars within a battery pack
US8587318B2 (en) * 2010-07-27 2013-11-19 GM Global Technology Operations LLC Sensor arrangement for an energy storage device and a method of using the same
KR101182429B1 (ko) * 2010-08-06 2012-09-12 삼성에스디아이 주식회사 배터리 팩 및 이의 제어 방법
US8531160B2 (en) * 2010-08-11 2013-09-10 A123 Systems, Inc. Rechargeable battery management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002374633A (ja) * 2001-06-14 2002-12-26 Osaka Gas Co Ltd 蓄電装置
JP2003149307A (ja) * 2001-11-16 2003-05-21 Toyota Motor Corp 電池残存容量算出方法
JP2005348457A (ja) * 2004-05-31 2005-12-15 Shin Kobe Electric Mach Co Ltd 組電池用制御回路
JP2010249793A (ja) * 2009-02-27 2010-11-04 Hitachi Ltd 電池監視装置および電池監視装置の診断方法
JP2011075504A (ja) * 2009-10-01 2011-04-14 Shindengen Electric Mfg Co Ltd 充電制御装置、および該充電制御装置における充電制御方法

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105143899B (zh) * 2013-04-19 2017-11-24 日立汽车系统株式会社 电池系统监视装置
CN105143899A (zh) * 2013-04-19 2015-12-09 日立汽车系统株式会社 电池系统监视装置
US11584233B2 (en) 2013-06-28 2023-02-21 Alelion Energy Systems Ab Battery arrangement for electrically powered industrial vehicle
US9550431B2 (en) * 2013-07-30 2017-01-24 Sumitomo Heavy Industries, Ltd. Working machine
US20150039151A1 (en) * 2013-07-30 2015-02-05 Sumitomo Heavy Industries, Ltd. Working machine
EP4194251A1 (en) * 2013-08-15 2023-06-14 Volvo Truck Corporation Method and arrangement for balancing an energy storage system
EP3048697A4 (en) * 2013-09-17 2017-05-24 Sony Corporation Power storage device and method for controlling power storage device
CN105637204A (zh) * 2013-10-18 2016-06-01 株式会社电装 控制装置及其温度推定方法
JP2015136255A (ja) * 2014-01-17 2015-07-27 株式会社ケーヒン 電圧検出装置
JP2016048469A (ja) * 2014-08-27 2016-04-07 ラピスセミコンダクタ株式会社 半導体装置、電池監視システム、及び半導体装置の起動方法
US10018680B2 (en) 2014-08-27 2018-07-10 Lapis Semiconductor Co., Ltd. Semiconductor device, battery monitoring system, and method for activating semiconductor device
JP2016138868A (ja) * 2015-01-29 2016-08-04 ルネサスエレクトロニクス株式会社 バッテリセルの電圧補正方法、バッテリ監視装置、半導体チップ及び車両
JP2016158317A (ja) * 2015-02-23 2016-09-01 株式会社デンソー 蓄電装置
WO2017043237A1 (ja) * 2015-09-11 2017-03-16 日立オートモティブシステムズ株式会社 電池管理装置
JPWO2017043237A1 (ja) * 2015-09-11 2018-03-01 日立オートモティブシステムズ株式会社 電池管理装置
CN108093662A (zh) * 2015-09-11 2018-05-29 日立汽车系统株式会社 电池管理装置
US10886578B2 (en) 2015-09-11 2021-01-05 Hitachi Automotive Systems, Ltd. Battery management device
JP2018125977A (ja) * 2017-02-01 2018-08-09 トヨタ自動車株式会社 電池モジュールの制御装置
JP7289113B2 (ja) 2018-07-25 2023-06-09 パナソニックIpマネジメント株式会社 管理装置、及び電源システム
JPWO2020021888A1 (ja) * 2018-07-25 2021-09-24 パナソニックIpマネジメント株式会社 管理装置、及び電源システム
WO2020021888A1 (ja) * 2018-07-25 2020-01-30 パナソニックIpマネジメント株式会社 管理装置、及び電源システム
US11946813B2 (en) 2019-02-13 2024-04-02 Lg Energy Solution, Ltd. Battery module detecting high temperature of battery cell and method for detecting high temperature of battery cell
US10752127B1 (en) 2019-03-29 2020-08-25 Denso Ten Limited Battery controller and method of battery control
JPWO2021186795A1 (ja) * 2020-03-18 2021-09-23
WO2021186795A1 (ja) * 2020-03-18 2021-09-23 三洋電機株式会社 管理装置、及び電源システム
JP7542606B2 (ja) 2020-03-18 2024-08-30 三洋電機株式会社 管理装置、及び電源システム
CN117074437A (zh) * 2023-10-11 2023-11-17 青岛金诺德科技有限公司 无损检测方法及其在新能源汽车锂电池回收中的应用
CN117074437B (zh) * 2023-10-11 2024-01-12 青岛金诺德科技有限公司 无损检测方法及其在新能源汽车锂电池回收中的应用

Also Published As

Publication number Publication date
US20140225622A1 (en) 2014-08-14
CN103765721B (zh) 2016-04-06
CN103765721A (zh) 2014-04-30
JP5683710B2 (ja) 2015-03-11
JPWO2013035183A1 (ja) 2015-03-23
US9746525B2 (en) 2017-08-29

Similar Documents

Publication Publication Date Title
JP5683710B2 (ja) 電池システム監視装置
EP3151360B1 (en) Battery system
US9673640B2 (en) Battery system monitoring apparatus and electric storage device including the same for balancing a plurality of battery cells by discharging them based on voltage dependent turn-on resistance adapting of the balancing switch
CN104917223B (zh) 电池监视装置
US9696380B2 (en) Relay control system and method for controlling same
US20110049977A1 (en) Safety and performance optimized controls for large scale electric vehicle battery systems
JP5727016B2 (ja) 電池制御装置
US9853463B2 (en) Battery monitoring and control integrated circuit and battery system
CN107889526B (zh) 电池系统监视装置
JPWO2012164761A1 (ja) 電池システム監視装置
JP6251136B2 (ja) 電池システム監視装置およびこれを備えた蓄電装置
CN112119564A (zh) 管理装置、蓄电系统
JP2014183671A (ja) 組電池の異常検出装置
EP3323665B1 (en) A battery pack balancing system and method
US10886578B2 (en) Battery management device
JP2018004406A (ja) 異常検出装置、および組電池システム
JP6026577B2 (ja) 電池監視・制御用集積回路および電池システム
JP7741300B2 (ja) 電池システム監視装置
JP2020193821A (ja) 電圧計測回路及び電池パック

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180072976.4

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11872133

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14241009

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2013532368

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11872133

Country of ref document: EP

Kind code of ref document: A1