[go: up one dir, main page]

WO2012005675A1 - Aiguillage ferroviaire antiblocage et procédé de réalisation d'aiguillages ferroviaires antiblocage - Google Patents

Aiguillage ferroviaire antiblocage et procédé de réalisation d'aiguillages ferroviaires antiblocage Download PDF

Info

Publication number
WO2012005675A1
WO2012005675A1 PCT/SE2011/050917 SE2011050917W WO2012005675A1 WO 2012005675 A1 WO2012005675 A1 WO 2012005675A1 SE 2011050917 W SE2011050917 W SE 2011050917W WO 2012005675 A1 WO2012005675 A1 WO 2012005675A1
Authority
WO
WIPO (PCT)
Prior art keywords
sleepers
debris
chamber
railway
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/SE2011/050917
Other languages
English (en)
Inventor
Joakim Flygare
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to SE1200778A priority Critical patent/SE1200778A1/sv
Priority to FI20120413A priority patent/FI20120413A7/fi
Priority to CA2819577A priority patent/CA2819577A1/fr
Publication of WO2012005675A1 publication Critical patent/WO2012005675A1/fr
Priority to NO20121502A priority patent/NO20121502A1/no
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/04Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B19/00Protection of permanent way against development of dust or against the effect of wind, sun, frost, or corrosion; Means to reduce development of noise
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/16Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from steel
    • E01B3/20Sleeper construction for special purposes, e.g. with openings for ballast working
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B7/00Switches; Crossings
    • E01B7/20Safety means for switches, e.g. switch point protectors, auxiliary or guiding rail members
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B7/00Switches; Crossings
    • E01B7/22Special sleepers for switches or crossings; Fastening means therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H8/00Removing undesirable matter from the permanent way of railways; Removing undesirable matter from tramway rails
    • E01H8/10Removing undesirable matter from rails, flange grooves, or the like railway parts, e.g. removing ice from contact rails, removing mud from flange grooves

Definitions

  • a railroad switch or turnout or (set of) points is a mechanical installation enabling railway trains to be guided from one track (for example the mainline track) to another diverging track (for example to a siding) at a railway junction.
  • the switch consists of the pair of linked tapering rails, known as “points” or (“switch rails” or “point blades”), lying between the diverging outer rails (called the “stock rails”). These points can be moved laterally into one of two positions to direct a train coming from the narrow end of the points toward the straight-ahead through path or the diverging path (in which case the points are in contact with the stock rails).
  • compacted debris can cause the train wheels to jump over the compacted debris, and the subsequent impact caused by the wheel landing on the track can severely damage or even break the rail.
  • snow and ice packed between the moving blade and the fixed rail and/or in the operating linkage can prevent the moving blade moving to its desired position and thereby prevent the correct operation of switches.
  • people were employed by railway companies to keep the switches clear by sweeping the snow away, and this is still used in some countries, especially on minor lines.
  • Some were provided with gas torches for melting ice.
  • switches have had heaters installed in the vicinity of the points so that the temperature of the rails in these areas can be kept above freezing. The heaters may be powered by gas or electricity.
  • anti-icing chemicals can be applied to create a barrier between the metal surfaces of the switch and ice.
  • Such heating methods are expensive to install and operate. While these methods can be effective against snow and ice, they are less successful when the snow or ice is contaminated with solid debris such as leaves, sand or gravel and are often unable to cope with the large quantities of ice and snow which fall from a train due to the vibrations caused by riding over the points and which fall directly on the points.
  • Heater also have a poor or even negative function when very low temperatures are encountered as inadequate drainage of the melt water can lead to it refreezing and the build-up of ice. Such built-up ice can be very difficult to remove.
  • the term “longitudinal” is a direction parallel to the longitudinal axis of a pair of rails
  • the term “transverse” is perpendicular to the longitudinal axis of a pair of rails
  • the expression “nominal” when related to the level of ballast or a railway bed is intended to mean the level which the ballast or railway bed is specified to have in the region of the railway junction outside the area when the present invention is provided.
  • the ballast or railway bed is specified to have a level which is, for example 5 cm below the bottom of the rails then the "nominal level" of the ballast or railway bed is 5 cm below the bottom of the rails.
  • An object of the invention is to provide a railway junction which comprises a set of points, which railway junction is more resistant to jam than previous railway junctions.
  • Figure 1 shows schematically a lateral view of a portion of a railway junction including a set of points in accordance with a first embodiment of the present invention.
  • Figure 2 shows a plan view of the railway junction of figure 1.
  • Figure 3 shows schematically a perspective view of a jam-reducing sleeper in accordance with the present invention.
  • Figures 4a) and 4b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figures 5 a) and 5b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with another further embodiment of the present invention.
  • Figures 6a) and 6b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with yet another further embodiment of the present invention.
  • Figures 7a) and 7b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figures 8a) and 8b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figure 8c) shows schematically in perspective an embodiment of a debris-receiving cassette and removable liners in accordance with the present invention.
  • Figures 9a) and 9b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figures 10a) and 10b) show respectively plan and sectional schematic views of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figure 10c) shows schematically in perspective a further embodiment of a debris-receiving cassette in accordance with the present invention.
  • Figures 1 la) to l id) show schematically examples of profiles of longitudinal beams in accordance with the present invention.
  • Figure 12a) and 12b) show schematically in cross-section examples of devices for emptying chambers in accordance with the present invention.
  • Figure 1 shows a lateral cross-sectional view of a portion of a railway junction 1 provided with rails and sleepers according to a first embodiment of the present invention.
  • the rails extend over a row of conventional sleepers 3 which surround two jam-reducing sleepers 4a-4b in accordance with the present invention.
  • Both types of sleepers rest on a bed of railway ballast 2.
  • the distance between the upper surface of the ballast and the undersides of the rails is nominally x cm in the region of the conventional sleepers, for example x may be 5 or 7.5 or even 10 cm, the height being specified according to circumstances and taking into account the terrain, .
  • the jam-reducing sleepers are taller than the conventional sleepers which have a height of Z at the contact surface for the rails.
  • the height Z of a conventional sleeper is 125 mm or 150 mm.
  • the jam-reducing sleepers are Y cm taller than the conventional sleepers, where Y preferably is greater than 10 cm and less than 60 cm. More preferably Y is greater than 20 cm and less than 40 cm as this range allows a good compromise between allowing a deep debris-receiving chamber as described below while maintaining a stable support for the rails.
  • ballast can be excavated from region between the two jam-reducing sleepers forming a chamber 6 of depth X below the points.
  • the ballast can be excavated down to the bottom of the jam-reducing sleepers - a total depth of (Y + Z) cm from the bottom of the rails. This means that the distance (X + x) between the undersides of the rails and the upper surface of the ballast in the chamber 6 between the jam-reducing sleepers is greater than that the distance x between the upper surface of the ballast in the vicinity of the conventional sleepers.
  • This chamber 6 which lies below the nominal level of the ballast arranged by the neighbouring conventional sleepers is able to receive a proportionally larger volume of snow or other debris than before it fills up and hence delays the moment when the build up of debris risks blocking or jam the points. Theoretically it will take (X+x)/x times longer to fill up than the
  • the chamber may be formed without the use of jam-reducing sleepers.
  • the conventional sleepers are retained and level of the ballast between the sleepers is at least partly lowered to a level which is lower than the nominal level.
  • the level could be as low as the base of the sleeper, i.e. 125 mm below its upper surface or as high as (x + 1) cm below it.
  • the jam-reducing sleepers can be held together by longitudinal beams 5 which provide the pair of jam-reducing sleepers with a greater resistance to the forces exerted on them by the rails that otherwise would be possible.
  • the jam-reducing sleepers are higher than the corresponding conventional sleepers they can more easily tip over when forces are applied to them in the longitudinal direction of the rails which occur, for example, when a train applies its brakes.
  • the chamber may be excavated only partially instead of to the full depth of the jam-reducing sleepers thereby leaving a stabilizing layer of ballast at the bottom of the chamber between the jam-reducing sleepers.
  • Prior art literature describes various arrangements for melting or blowing snow away from the rails and these can be used with the jam-reducing sleepers and chambers according to the invention and are suitable for fitting in the chamber which is formed under the rails by the jam-reducing sleepers, but possibly the most important feature of the jam-reducing sleepers is that, compared to conventional prior art railway junctions, by permitting the formation of a stable chamber under the rails, they passively allow an increased volume of snow and other debris to fall below the rails, thereby prevent them from becoming jammed or contaminated as quickly as conventional railway junctions do, without requiring any other accessories or consuming power.
  • Figure 2 shows a plan view of a set of points in a portion of a railway junction comprising four rails 1 with sleepers 4a-4b in accordance with the present invention.
  • a set of points there is a stationary set of rails and a set of merging rails which comprises a movable portion which can be moved to be in contact with the stationary rails or to lie a distance away from them.
  • Snow and other debris which accumulates in the space which can be formed between the movable portions of the merging rails and stationary rails can be packed together and prevent the movable rails from coming into contact with the stationary rails.
  • This type of set of points failure occurs regularly in the winter and the most common way of correcting the problem is to manually remove snow or debris from the points. Snow and ice can sometimes be removed by manual heating but this method does not work for all types of debris and temperature conditions.
  • the jam-reducing sleepers 4a-b and longitudinal beams 5a-b enclose a debris-receiving chamber under the rails which extends laterally at least to one side and preferably to both sides of the rails so that a space is provided which allows debris to fall down from the rails.
  • the chamber is preferably dimensioned so that it extend under the fixed rails and the movable portion of the movable rails independently of whether the set of points is in the open or closed state.
  • the surfaces of the stationary rails and the movable portions of the merging rails are immediately above the chamber so that the risk that they should jam is reduced.
  • the upper surfaces of the jam-reducing sleepers which are exposed between, and outside of, the rails are convex with peaks parallel with the longitudinal axis of the sleepers.
  • the convex profile means that snow and other debris which falls onto the upper surface of the sleepers slides off the sleepers and into the chamber below.
  • the figures also show fastening means such as bolts 8 which fasten the longitudinal beams to the jam-reducing sleepers.
  • FIG. 3 shows a separate jam-reducing sleeper 4 in accordance with the present invention in which portions of two rails la, lb are shown by dotted lines.
  • the jam-reducing sleepers have an elongated lower part with a quadratic cross-section on the upper surface of which three prisms with substantially triangular cross-sections 11.
  • the triangular cross-sections Preferably have rounded peaks which are arranged with their longitudinal axes substantially parallel with the longitudinal axis of the sleeper.
  • the triangular portions are intended to let debris slide off them and can be complemented with appropriate surface treatment, e.g. polishing or low friction coatings, to facilitate that debris slides off them.
  • a resilient mat 7, 7a, 7b is provided on the underside of the jam-reducing sleepers in order to compensate for the thinner layer of ballast under the sleeper. Compensation for the thinner lay of ballast here can also be obtained by using stabilizing material in the ballast.
  • a stabilizing material could be an adhesive material, for example mortar, cement, epoxy resin, adhesive polymers, or the like.
  • Figures 4a) and 4b) show schematically respectively a plan view and a sectional view along line IV-IV of a portion of a railway junction 41 in accordance with a further embodiment of the present invention.
  • the railway junction includes a set of points comprising a pair of movable rails 43 and a pair of stationary rails 45. These are supported by six sleepers A-F which lie on a railway bed 47.
  • Railway bed 47 is made, for example, of ballast.
  • Sleepers A and B are conventional sleepers of height Z which are extra long in order to be able to provide support for the movable rails as well as the stationary rails.
  • Sleepers C, D and E are arranged below the region of the railway junction where the movable rails can come into contact with the stationary rails.
  • Sleepers C, D and E are jam-reducing sleepers of height X in accordance with the present invention, sleeper C being extra long in order to be able to provide support for the movable rails as well as the stationary rails.
  • Sleepers D and E are of normal length, as is conventional sleeper F.
  • the three jam-reducing sleepers C, D, E are arranged in a row and are joined to each other by longitudinal beams 53, 55 attached to their end faces.
  • Longitudinal beam 53 arranged on the side of the junction away from the movable rails is substantially straight.
  • Longitudinal beam 55 arranged on the side of the junction away under the movable rails is bent in order to take into account the greater length of sleeper C.
  • An open-topped debris-receiving chamber 57 is formed in the space between jam-reducing sleepers C and D and longitudinal beams 53, 55.
  • the bottom of a debris-receiving chamber can be left uncovered to expose the lowered railway bed surface, or, as shown here, provided with a solid floor 59.
  • a further open-topped debris-receiving chamber 61 is formed is formed in the space between jam-reducing sleepers D and E and longitudinal beams 53, 55.
  • This chamber 61 has a perforated floor 63 which allows liquids to drain from the chamber. Chambers 57 and 61 can be made in an existing railway junction resting on ballast by:
  • the two longitudinal walls of the chamber are formed of the longitudinal beams 53, 55 made of solid or perforated material which extends between the outer two sleepers, and the bottom of the chamber is provided with a solid or perforated floor.
  • the floor 59, 63 may be horizontal or it may be sloping as shown by the dashed lines.
  • FIGS 5a) and 5b) show schematically respectively a plan and a sectional view along line V- V of a portion of a railway junction in accordance with another further embodiment of the present invention.
  • conventional sleepers are supported on two underlying walls 71, 71 ' which extend in the longitudinal direction of the stationary rails.
  • Ballast or other rail bed material if present, is excavated from between walls 71, 71 ' to form a debris- receiving chamber 73.
  • Each wall can be made of ballast that has stabilized with an adhesive material, such as mortar, cement, epoxy resin, adhesive polymers, or the like, or the wall can be made of concrete, metal, composite material, wood or the like.
  • the walls may be attached to the sleepers and/or provided with braces which extend across the width of the chambers.
  • Each wall extends under at least the sleepers C, D, E which are under the region of the railway junction where the movable rails can come into contact with the stationary rails.
  • the walls extend further than this in order to provide an debris-receiving enlarged chamber under the rails.
  • lids 75 shown by dotted lines
  • the sleepers are positioned on top of the walls they do not form complete transverse bulkheads in the chamber which means that debris that falls into the chamber between sleepers C and E can move under the sleepers B, C and E into the spaces formed between sleepers A to C and E to F.
  • Chamber 73 can be made in an existing railway junction resting on ballast by:
  • FIGS 6a) and 6b) show schematically respectively a plan and a sectional view along line VI -VI of a portion of a railway junction in accordance with yet another further embodiment of the present invention.
  • at least one sleeper (the sleeper between sleepers C and E) 9 is absent.
  • the rails are supported on rail supporting beams 81 positioned on top of conventional and/or jam- reducing sleepers.
  • FIGS 7a) and 7b) show schematically respectively a plan view and a sectional view along line VII-VII of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • the ballast surrounding the debris-receiving chambers 171 and 173 is stabilized with an adhesive material, such as mortar, cement, epoxy resin, adhesive polymers, or the like, in a region between the chain lines where chain line K shows the outer boundary of the stabilized ballast and line L' and L" show the inner boundaries of the stabilized ballast.
  • the portion of the outer boundary K of the stabilized region which is parallel to the stationary rails is at least half a sleeper width from the centreline of the stationary rails, more preferably at least 10 cm outside of the end of the sleeper resting on the stabilized region and even more preferably at least 20 cm outside of the end of the sleeper resting in it.
  • the longitudinal extent of outer boundary of the stabilized region is sufficient to stabilize the sleepers and the chamber walls and preferably extend more than half the distance from the sleeper it is supporting to the next sleeper.
  • the depth M of stabilized ballast is at least to the same level as the nominal depth N of the bottom of the excavated chamber(s) (the bottom does not have to be stabilized but can be formed of packed or loose ballast or of a plate or net) and preferably is deeper.
  • All the sleepers may be conventional sleepers or, as shown by dotted lines) one or more of sleepers C, D and F may be jam-reducing sleepers of greater depth than conventional sleepers A, B and F.
  • Figures 8a) and 8b) show schematically respectively a plan view and a sectional view along line VIII-VIII of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figure 8c) shows schematically in perspective an embodiment of a cassette and removable liners in accordance with the present invention.
  • two debris-receiving chambers 181 ' and 181 " are arranged between jam- reducing sleepers C and D
  • two debris-receiving chambers 183' and 183" are arranged between jam-reducing sleepers D and E. It is conceivable that jam-reducing sleepers are replaced by conventional sleepers in a variation on this embodiment of the invention if the cassettes are made sufficiently strong and rigid enough to maintain their shape themselves during use.
  • Each chamber is positioned under a stationary rail and a movable rail and extends from the region near, at, or beyond, the outer end of sleeper D to a position near, or at, the centreline of the railway track. If the pair of chambers between each pair of sleepers do not meet (for example they do not extend all the way to the region at, or near, the centreline of the railway track) then a separating wall 185 made of stabilised, ballast, rigid beams, concrete or any other suitable material can be placed between them.
  • Chambers 181 ' and 183' are formed in accordance with any of the embodiments described above or can be made in the same way as chambers 181 " and 183" described in the following.
  • chambers 181 " and 183" have walls and floors formed by means of open rigid debris-receiving cassettes 187' and 187" placed in excavations in the railway bed.
  • the length 1 of a cassette is the same as or less than the distance d between sleepers
  • the breadth b of a cassette is greater than the maximum distance r between the inner surface of the stationary rail and the outer surface of the moving rail which it is positioned under, and its depth d is greater than 125 mm, preferably greater than 250 mm and more preferably greater than 500 mm.
  • the floors of a cassette can be solid or perforated.
  • a debris-receiving cassette can used as an empty vessel or can be provided with one or more liners 191.
  • each cassette is provided with at least two narrow liners in the form of open-topped boxes which each have a breadth which is the same as, or less than, half the interior breadth of the cassette.
  • each cassette contains three liners 191 each of which have a breadth which is one third of the interior breadth of cassette 181 " and 183".
  • One reason for using a plurality of liners is to facilitate removal of the liners from the cassette when the liners need emptying. Another reason is that, in order to prevent blocking of the points it is necessary only to prevent the accumulation of debris underneath the contact area of the movable and stationary rails.
  • One of more of the liners which are not directly under the contact area can be provided with a lid 193 which prevents debris falling vertically into it.
  • the adjacent sides of liners should have an upper edge which is lower than the lid, thereby leaving a gap between the lid and upper edge which debris can flow over.
  • Lids can be made removable to allow emptying and cleaning.
  • the rails lying over the cassettes would prevent a liner having the same dimensions as the interior of the cassette from being lifted out of the cassette.
  • the chamber it is possible to arrange the chamber so that at least one liner can be removed with being obstructed by a rail. Once this liner has been removed it is possible to slide the second liner into the position previously occupied by the removed liner and then remove the second liner. This can be repeated until all the liners have been removed. Replacement of the liners is the reverse of removal of liners.
  • Liners preferably have substantially the same height and length as the interior of the cassettes as shown in chamber 181 " in figure 8b). However it is also conceivable that they are tapered (as shown in chamber 183" in figure 8b), in order to reduce the risk of them becoming jammed in the cassette.
  • Figures 9a) and 9b) show schematically respectively a plan view and a sectional view along line IX-IX of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • This embodiment is similar to the previous embodiment shown in figures 8a) - 8c) and illustrates different possible debris-receiving cassette cross-section shapes.
  • Cassette 187a has an elliptical cross-section
  • cassette 187b has a cylindrical cross-section
  • cassette 187c has an octagonal cross-section
  • cassette 187d has a hexagonal cross- section.
  • Other cross-sectional shapes are also possible.
  • All cassettes may have substantially vertical sides, or one or more sides may slope in order to provide a cassette with a downward tapering or upward tapering cross section.
  • longitudinal beams 53, 55 may be provided to stabilise the cassettes.
  • cassettes are used in conjunction with jam-reducing sleepers or longitudinal beams or the like it may be possible to dispense with the wall(s) of the cassette which would otherwise be adjacent a sleeper or beam or the like, thus resulting in a cassette with one or more open vertical face(s).
  • Figures 10a) and 10b) show schematically respectively a plan view and a sectional view along line X-X of a portion of a railway junction in accordance with a further embodiment of the present invention.
  • Figure 10c) shows schematically in perspective a further embodiment of a debris-receiving cassette and removable liners in accordance with the present invention.
  • two debris-receiving chambers 201 ' and 201 " are arranged between jam-reducing sleepers C and D
  • two debris-receiving chambers 203' and 203" are arranged between jam-reducing sleepers D and E.
  • each chamber is positioned under a stationary rail and a movable rail and extends from the region near, at, or beyond, the outer end of sleeper D to a position near, or at, the centreline of the railway track. If the pair of chambers between each pair of sleepers do not meet (for example they do not extend all the way to the region at, or near, the centreline of the railway track) then a separating wall 205 made of stabilised, ballast, rigid beams, concrete or any other suitable material can be placed between them.
  • chambers are similar to the chamber shown in figures 8a)-8b) except that they have walls formed by means of open rigid debris-receiving cassettes 207', 207", 209', 209" with downwardly tapered walls placed in excavations in the railway bed.
  • the cassettes may have open bases or solid bottoms.
  • a debris-receiving cassette can used as an empty vessel or can be provided with one or more liners 191.
  • each cassette is provided with at least two narrow liners in the form of open-topped boxes which each have a breadth which is the same as, or less than, half the interior breadth of the cassette. Liners are also tapered to make it easier to break them loose if they should become frozen or jammed into place.
  • the cassettes are preferably provided with an opening 210 in the upper face which during use is positioned under the region where the moving rail comes into contact with the stationary rail.
  • the remainder of the upper face is preferably covered with one or more removable lids 213. Each lid can be provided with a lifting handle 215.
  • the lids 213 are provided with at least one opening 217 into which the tip of a spike or crowbar can be inserted into in order to lever off the lid if it becomes stuck or frozen into place.
  • a sleeper, or example sleeper D as shown in figures 10a) and 10b) which is adjacent a debris-receiving chamber can be provided with a convex cover 219 which allows debris which falls on it to slide off.
  • the cover 219 is made of metal and preferably is provided with heating means which can provide heat to the region which is critical for correct functioning of the points. Cover 219 can be attached to the adjacent chamber(s) to guide debris into the chamber(s).
  • Longitudinal beams which connect sleepers to each other have the tasks of maintaining the distance between the sleepers, resisting tipping forces on the sleepers, preventing ballast from filing the chamber and in some case supporting the undersides of the railway tracks.
  • the longitudinal beams are made of suitably dimensioned plates or beams with upper and/or lower flanges where appropriate.
  • beams may have I, C, U (regular or inverted as shown by dotted lines), Z , or any other suitable cross-sectional profiles.
  • the sleepers may be supported by ballast stabilized using a ballast adhesive.
  • All the debris-receiving chambers are preferably provided with means for assisting remove of debris from the chamber.
  • a heating system can be provided to melt the snow and ice and a drain provided to lead the melt water away.
  • a chamber may be provided with an inlet for compressed air which can be injected into the lower part of the chamber in order to blow accumulated debris out of the open face of the chamber - this is particularly appropriate when the expected debris is snow, leaves, sand or other particulate material which does not form a single solid mass. While the invention has been illustrated with examples in which a chamber or chambers is/are formed in a railway bed using ballast, it is of course conceivable that the chamber can be formed in any other type of railway bed.
  • the chamber or chambers can be formed directly in the concrete bed. They can be produced either during construction of the concrete bed (for example by using shuttering to form a void around which concrete is applied) or following construction of the concrete bed (for example by removing concrete in the regions where a chamber is desired).
  • the frequency of the points in the junction becoming jammed is reduced.
  • All methods in accordance with the present invention for constructing railway junctions in accordance with the present invention comprise the step of providing a debris-receiving chamber under the region of a railway junction where a movable rail can come into contact with a stationary rail, the chamber having a floor which is arranged a level which is below the nominal level of the ballast or railway bed outside of the region of a railway junction where a movable rail can come into contact with a stationary rail.
  • the chamber has a floor which is at least 1 cm lower than said nominal level, more preferably more than 10 cm lower than said nominal level, even more preferably more than 20 cm below said nominal level.
  • the chamber has substantially rigid walls under the region of a railway junction where a movable rail can come into contact with a stationary rail.
  • at least one wall is formed by a jam-reducing sleeper.
  • at least one wall is formed by a box or cassette.
  • any chamber in accordance with the present invention can be solid, or perforated to allow water to drain out of it.
  • Thermal means for melting ice and snow in the form of electrical heaters or radiators may also be provided.
  • Chambers may be provided with pneumatic, hydraulic, mechanical, electrical and/or chemical (e.g. salt or antifreeze) means for removing debris from the chamber.
  • a chamber 121 may by provided with an inflatable bladder 123 (shown deflated in dashed lines) which is connected to the exterior of the rail-bed 125 by an air hose 127 with a compressed air connector 129. Applying compressed air to the bladder via the air hose will cause it to expand and thereby eject from the chamber debris that has collected over it.
  • a chamber 131 may be provided with a feed-screw drive 133 (driven for example by an electric, pneumatic or hydraulic motor) which can be actuated to remove debris from the chamber via a disposal duct 135 which leads out of the rail bed 137.
  • a feed-screw drive 133 driven for example by an electric, pneumatic or hydraulic motor
  • a disposal duct 135 which leads out of the rail bed 137.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Braking Arrangements (AREA)
  • Slide Switches (AREA)

Abstract

L'invention porte sur des agencements d'aiguillages ferroviaires, et sur des procédés et des composants en permettant la réalisation. Lesdits aiguillages ferroviaires comprennent un ensemble de rails fixes et un ensemble de rails mobiles (1) et une zone où lesdits rails mobiles peuvent être déplacés pour venir au contact desdits rails fixes, ladite zone comportant une chambre (6) destinée à recevoir des débris.
PCT/SE2011/050917 2010-07-06 2011-07-06 Aiguillage ferroviaire antiblocage et procédé de réalisation d'aiguillages ferroviaires antiblocage Ceased WO2012005675A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
SE1200778A SE1200778A1 (sv) 2010-07-06 2011-07-06 Blockeringsresistent järnvägsväxel och metod för att åstadkomma blockeringsresistent järnvägsväxel.
FI20120413A FI20120413A7 (fi) 2010-07-06 2011-07-06 Järjestely rautatieristeyksen yhteydessä ja menetelmä järjestelyn aikaansaamiseksi
CA2819577A CA2819577A1 (fr) 2010-07-06 2011-07-06 Aiguillage ferroviaire antiblocage et procede de realisation d'aiguillages ferroviaires antiblocage
NO20121502A NO20121502A1 (no) 2010-07-06 2012-12-12 Blokkeringsmotstandsdyktig jernbanebryter og metode for a gi blokkeringsmotstandsdyktig jernbanebryter

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE1000732A SE535633C2 (sv) 2010-07-06 2010-07-06 Blockeringsresistenta slipers för tågväxlar, anordning vid växel samt metod för att åstadkomma en anordning vid växel
SE1000732-6 2010-07-06

Publications (1)

Publication Number Publication Date
WO2012005675A1 true WO2012005675A1 (fr) 2012-01-12

Family

ID=45441435

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2011/050917 Ceased WO2012005675A1 (fr) 2010-07-06 2011-07-06 Aiguillage ferroviaire antiblocage et procédé de réalisation d'aiguillages ferroviaires antiblocage

Country Status (5)

Country Link
CA (1) CA2819577A1 (fr)
FI (1) FI20120413A7 (fr)
NO (1) NO20121502A1 (fr)
SE (2) SE535633C2 (fr)
WO (1) WO2012005675A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012130425A3 (fr) * 2011-03-25 2012-12-06 Strabag Rail Gmbh Trajectoire de voie de circulation pour véhicules sur rails et support de voie de circulation pour une telle trajectoire de voie de circulation
WO2015067977A1 (fr) * 2013-11-08 2015-05-14 Szabó József Agencement structural et procédé de stabilisation de travaux de terrassement linéaires

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4010896A (en) * 1976-03-25 1977-03-08 Stockton William N Modular liquid collection system for railroad roadbeds
RU1799940C (ru) * 1990-10-18 1993-03-07 С.А.Макидонский Устройство дл защиты стрелочного перевода от снега и воды
EP0539349A1 (fr) * 1991-10-21 1993-04-28 Klaus Johann Lindinger Dispositif pour protéger le ballast de voies ferrées contre des produits nocifs à l'environnement, en particulier de l'huile répandue
US5782405A (en) * 1993-12-27 1998-07-21 Vincent; Jon R. Railroad track collector pan system
US6290143B1 (en) * 1996-05-02 2001-09-18 Century Group, L.L.C. Apparatus and method for collecting liquid spillage at rail facilities

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4010896A (en) * 1976-03-25 1977-03-08 Stockton William N Modular liquid collection system for railroad roadbeds
RU1799940C (ru) * 1990-10-18 1993-03-07 С.А.Макидонский Устройство дл защиты стрелочного перевода от снега и воды
EP0539349A1 (fr) * 1991-10-21 1993-04-28 Klaus Johann Lindinger Dispositif pour protéger le ballast de voies ferrées contre des produits nocifs à l'environnement, en particulier de l'huile répandue
US5782405A (en) * 1993-12-27 1998-07-21 Vincent; Jon R. Railroad track collector pan system
US6290143B1 (en) * 1996-05-02 2001-09-18 Century Group, L.L.C. Apparatus and method for collecting liquid spillage at rail facilities

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012130425A3 (fr) * 2011-03-25 2012-12-06 Strabag Rail Gmbh Trajectoire de voie de circulation pour véhicules sur rails et support de voie de circulation pour une telle trajectoire de voie de circulation
WO2015067977A1 (fr) * 2013-11-08 2015-05-14 Szabó József Agencement structural et procédé de stabilisation de travaux de terrassement linéaires

Also Published As

Publication number Publication date
FI20120413L (fr) 2013-01-30
FI20120413A7 (fi) 2013-01-30
CA2819577A1 (fr) 2012-01-12
SE1200778A1 (sv) 2013-01-28
NO20121502A1 (no) 2013-01-28
SE535633C2 (sv) 2012-10-23
SE1000732A1 (sv) 2012-01-07

Similar Documents

Publication Publication Date Title
CN103518019B (zh) 路轨轨道轨枕支承体
AU2011351482B2 (en) Method for producing a slab trackway
KR102164162B1 (ko) 자갈이 깔린 궤도를 슬래브 궤도로 변환하는 방법
US4905896A (en) Railroad roadway for high speed rail-mounted vehicles
CN112411293A (zh) 一种市政公路路面结构及路面基层的抗压方法
DE4100881A1 (de) Oberbau fuer eisenbahn-gleisanlagen
DE19503220A1 (de) System für den schotterlosen Oberbau von Gleisanlagen
KR101076029B1 (ko) 교량상 기설 자갈도상궤도의 궤도구조 개량방법
KR100556219B1 (ko) 철도교량의 상부구조물 교체 및 이를 이용한 유도상화방법.
KR101260947B1 (ko) 궤도지지 장치
WO2012005675A1 (fr) Aiguillage ferroviaire antiblocage et procédé de réalisation d'aiguillages ferroviaires antiblocage
EA004007B1 (ru) Способ и устройство для корректировки положения сборной панельной конструкции из железобетонных плит
RU2314382C2 (ru) Способ производства конструкции рельсового пути
CN115075066B (zh) 无砟轨道纠偏方法
CN105247138B (zh) 具有作为防止沙粒覆盖的升高的钢轨紧固件的轨枕
EP1995380A2 (fr) Appareil pour recueillir des liquides le long des chemins de fer
SI9200382A (en) Railway track structure
RU2127786C1 (ru) Верхнее строение пути и способ его сооружения
DE19959236C1 (de) Bahnsteig
JP4020918B2 (ja) 桁橋の架橋構造
RU2297488C1 (ru) Железнодорожный переезд и способ изготовления резиножелезобетонных плит для него
KR200388019Y1 (ko) 철도교량에 설치되는 조립식 교량신축이음장치
KR20120111056A (ko) 철도 유도상 교량용 배수판 및 이를 이용한 배수 개선 공법
CZ21758U1 (cs) Přechod pro uložení neoprenové ochranné hadice v kolejišti
KR20190090988A (ko) 궤도의 일탈을 방지하기 위한 앵커 시공방법 및 이를 위한 강관 앵커장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11803904

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 20120413

Country of ref document: FI

ENP Entry into the national phase

Ref document number: 2819577

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11803904

Country of ref document: EP

Kind code of ref document: A1