WO2011026940A1 - Recovery of energy from blast furnace gas in an expansion turbine - Google Patents

Recovery of energy from blast furnace gas in an expansion turbine Download PDF

Info

Publication number
WO2011026940A1
WO2011026940A1 PCT/EP2010/062960 EP2010062960W WO2011026940A1 WO 2011026940 A1 WO2011026940 A1 WO 2011026940A1 EP 2010062960 W EP2010062960 W EP 2010062960W WO 2011026940 A1 WO2011026940 A1 WO 2011026940A1
Authority
WO
WIPO (PCT)
Prior art keywords
top gas
heat
turbine
blast furnace
exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/EP2010/062960
Other languages
French (fr)
Inventor
Marc Solvi
Louis Schmit
Helmut Weissert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Paul Wurth SA
Original Assignee
Paul Wurth SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Paul Wurth SA filed Critical Paul Wurth SA
Priority to CN2010900011266U priority Critical patent/CN202595161U/en
Publication of WO2011026940A1 publication Critical patent/WO2011026940A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/10Arrangements for using waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/20Arrangements for treatment or cleaning of waste gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/40Gas purification of exhaust gases to be recirculated or used in other metallurgical processes
    • C21B2100/44Removing particles, e.g. by scrubbing, dedusting
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/62Energy conversion other than by heat exchange, e.g. by use of exhaust gas in energy production
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B2100/00Handling of exhaust gases produced during the manufacture of iron or steel
    • C21B2100/60Process control or energy utilisation in the manufacture of iron or steel
    • C21B2100/66Heat exchange
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Definitions

  • the present invention generally relates to the treatment of blast furnace gas and more specifically to the recovery of pneumatic energy from blast furnace top gas pressure in an expansion turbine.
  • blast furnace top gas is a by-product of blast furnaces that is generated when the iron ore is reduced with coke and / or other fuels to metallic iron.
  • Blast furnace top gas is commonly used as a fuel within the steel works, but it can be burnt in boilers and power plants as well. It may also be combined with natural gas or coke oven gas before combustion or a flame support with higher heating value gas or oil is provided to sustain combustion.
  • blast furnaces (BF) have been operated since decades with an internal overpressure, which— with a proper dimensioning of the furnace— permits a substantial increase in the conversion of materials and energy and thus in the output of pig iron.
  • Operation under internal overpressure also implies considerable additional costs related to equipment and operation. More particularly, it requires producing pressurized air with convenient supply pressure level in a cold blast compressor, to form the so-called cold blast, which is then heated up in the hot blast stoves (or Cowpers) to high temperature levels and the resulting hot blast is blown into the blast furnace.
  • the gas leaving the blast furnace at the top known as top gas or blast furnace gas
  • This top gas however still contains combustible components, primarily carbon monoxide, and to a lesser extent hydrogen, and can be used as low heating value combustion gas for producing heat or mechanical and electrical energy.
  • Top gas exiting the blast furnace carries along important amounts of solid matter, primarily in dust-like form. Before any subsequent use of the top gas, it is required to remove this solid material. This is conventionally achieved in a gas cleaning sub-plant of the blast furnace plant, which typically comprises first dry separation equipment— with a gravity-separator (dust catcher) and/or an axial cyclone— and a subsequent wet, fine cleaning device (wet separator). Due to the wet cleaning, the top gas temperature drops by about 100°C, is saturated with water vapor and includes additional liquid water droplets.
  • the top gas expands to close to atmospheric pressure while producing mechanical work.
  • the turbine rotor can be coupled e.g. to an electric generator, to the cold blast compressor, or to any other load.
  • the efficiency of such expansion turbine can be increased by heating-up the cleaned— and thus cooled— top gas just before it enters the turbine. This is e.g. described in JP 62074009. While heating-up of the cleaned top gas is desirable in respect to TRT efficiency, the expanded top gas however has a higher outlet temperature. This may be problematic for a user such as e.g. a thermal power station, where the top gas will arrive at a temperature higher than expected.
  • the object of the present invention is to provide an alternative method of recovering energy from blast furnace gas in a TRT plant as well as a corresponding system. This object is achieved by a method as claimed in claim 1 and a blast furnace top gas recovery system as claimed in claim 4.
  • expanded BF top gas leaving the expansion turbine in a TRT plant is used as a heat source in a heat-exchanger located inbetween the top gas cleaning unit/plant and the (conventional) preheating unit upstream of the expansion turbine.
  • the residual heat of the expanded top gas flow downstream of the expansion turbine is used to warm-up (preheat) the cleaned top gas flow upstream of the expansion turbine.
  • This circulation scheme of the BF top gas in a TRT plant proves significantly advantageous. First, it allows increasing the temperature of the cleaned BF top gas at the turbine inlet, since heat can be removed in the heat exchanger downstream of the turbine, so that the cleaned, expanded gas can be delivered to the clean gas network at a temperature convenient for downstream users. Secondly, since cleaned top gas is already partially warmed-up in the heat exchanger before the pre-heating unit, the amount of energy required in the pre-heating unit can be reduced.
  • heat exchanger herein encompasses any appropriate type of device where the flow of cleaned top gas upstream of the turbine can be brought into heat exchange relationship with the expanded top gas flow downstream of the turbine, however without mixing with one another. It is clear that in such heat exchanger the heat is transferred from the expanded cold gas to the top gas flow upstream of the turbine by conduction but there is no combustion of the expanded top gas stream in the heat exchanger itself.
  • a blast furnace top gas recovery system in accordance with one aspect of the present invention comprises: a top gas cleaning unit/plant conditioning top gas released by a blast furnace; a heat-exchanger comprising a heat-receiving side and a heat-giving side (each having an inlet and an outlet), wherein a first piping connects the outlet of said top gas cleaning plant with the inlet of the heat-receiving side of said heat exchanger; a pre-heating unit having an inlet connected to the outlet of said heat-giving side of said heat exchanger via a second piping; an expansion turbine having an inlet connected to the outlet of said pre-heating unit via a third piping and an outlet connected to the inlet of the heat-giving side of said heat exchanger via a fourth piping; a load coupled to the output shaft (rotor) of the expansion turbine.
  • FIG. 1 is a schematic diagram of a gas energy recovery system for perform- ing the present method.
  • thermodynamic processes under simplified and ideal conditions
  • [B] mainly depends on the pressure ratio before and after the turbine, i.e. on the top gas overpressure at the exit of the blast furnace and the pressure loss in the gas cleaning unit/plant on the one hand as well as on the clean gas network after the turbine, on the other hand.
  • a top gas overpressure at the BF top of about 2.5 bar g or 3.5 bar a
  • a value of 0.236 may e.g. be obtained for term [B]. It may be noted that [B] increases with p-i, and tends towards 1 when p 2 /pi drops towards 0.
  • Term [A] only sensibly varies with the turbine entry temperature. [A] in- creases proportionally to temperature T-i and thus also the specific output work a, the latter being however moderated by term [B]. It may be noted that term [A] represents the enthalpy of the top gas.
  • T 0 be the absolute temperature of the top gas at the outlet of the top gas cleaning unit
  • T-i > T 0 represents the case with pre-heating.
  • T 2 does not exceed T 0 , i.e. that the turbine outlet temperature does not exceed the temperature at the outlet of the top gas cleaning plant.
  • T-i may not exceed the value T 0 /[C].
  • the present invention proposes introducing a heat-exchanger inbetween the top gas cleaning plant and the (conventional) pre-heating unit to take advantage of the heat remaining in the expanded top gas and warm-up the cold, cleaned top gas. Accordingly, upon leaving the top gas cleaning plant the cold, cleaned top gas is fed into the heat-exchanger, on the cold side (heat- taking/receiving side) thereof, where its temperature increases from T 0 to T 0 i . In the heat-exchanger, heat is transferred to the cold cleaned gas from the expanded top gas that is fed into the hot side (heat-giving side) of the heat- exchanger.
  • the top gas is subsequently fed into in the conventional, pre-heating unit, where its temperature increases from T 0 i to T Downstream of the turbine, upon traversing the heat-exchanger, the temperature of top gas stream is decreased from T 2 to the desired temperature, i.e. again about T 0 , for entry into the clean gas network and use at a user facility.
  • Such operating process can be performed in a blast furnace plant as illustrated in Fig.1 and where the temperatures T 0 , ⁇ 0 ⁇ , ⁇ and T 2 are reported.
  • Reference sign 10 designates a blast furnace that is coupled to the top gas recovery system to recover the pneumatic energy from the top gas released by the furnace 10.
  • BF gas released from the BF 10 is fed into the top gas cleaning unit or plant generally indicated 12.
  • the top gas cleaning unit 12 preferably comprises a dry separator 16 serially connected with a wet separator 18. Any appropriate type of cleaning technology may be implemented in unit 12.
  • the cleaned top gas flow then enters into the heat exchanger 20 (where it is heated to T 0 i ) and subsequently into the pre-heating unit 22, from which it is released at T Subsequently, the pre-heated clean gas flow enters the expansion turbine 24 and exits therefrom at temperature T 2 .
  • This expanded gas stream flows through the heat-giving side of heat exchanger 20 and is delivered to the clean gas network at temperature T 0 .
  • the turbine 24 has a rotor with output shaft coupled to a load 30 such as for example an electric generator or an air compressor for the BF cold blast.
  • the heat-exchanger 20 is of the conventional type comprising: a plenum chamber on the cold (heat-taking) side that receives the cold top gas exiting from the cleaning plant 20; and a serpentine-like ducting traversing the plenum chamber and carrying the expanded top gas flow delivered by the turbine 24.
  • a plenum chamber on the cold (heat-taking) side that receives the cold top gas exiting from the cleaning plant 20
  • a serpentine-like ducting traversing the plenum chamber and carrying the expanded top gas flow delivered by the turbine 24.
  • any other type of heat-exchanger allowing bringing the upstream and downstream (relative to the turbine) BF gas flows into heat-exchange relationship, however without mixing, may be used. This heat exchange is preferably carried directly between the upstream and downstream BF gas without the use of an intermediate fluid loop.
  • the pre-heating unit 22 may of course also comprise a plenum/serpentine type heat exchanger, the heat-giving side of which may e.g. take its heat from a fluid heated via an external source, e.g. by combustion of BF gas or from the slag granulation installation, as e.g. described in JP 62074009 While in Fig.1 only the TRT system is represented and there is one piping system 14 interconnecting the various elements thereof, it is clear that not necessarily all but only a portion of top gas released by the BF 10 may be treated in the TRT, the remainder of top gas being used e.g. for heating (combustion) purposes in the pre-heating unit 22 or elsewhere, as it is clear to those skilled in the art. Let us now explain how the present process influences the operation of the recovery turbine.
  • a plenum/serpentine type heat exchanger the heat-giving side of which may e.g. take its heat from a fluid heated via an external source, e.g. by combustion
  • ⁇ - ⁇ has to be larger than T 0 * ⁇ 1/[C] - 1 ⁇ .
  • the limit value factor ⁇ 1/[C] - 1 ⁇ corresponds to the above-given limit for the pre-heating to avoid a temperature above T 0 at the turbine outlet, with a value of 0.31 in the exemplary calculation.
  • each augmentation of the temperature increase in the pre-heating unit 22 leads to an increase in the specific output work by a ratio of 1 :1 , or to the same extent as the change of enthalpy.
  • the preheating leads to an increase in the specific outlet work attenuated by factor [B], with a value of 0.236 in the example.
  • Table 1 summarized exemplary cases, under simplified conditions and neglecting the pressure losses in the heat exchanger 20 and pre-heating unit 22.
  • top gas is used for combustion in the pre-heating unit 22 for the temperature increase ⁇ - ⁇
  • the requirement for top gas is directly proportional to ⁇ -,.
  • the last column represents the effect of the introduced pre-heating energy.
  • the reference case is the heating-up to a temperature at which the expansion causes a lowering of the turbine outlet temperature to the turbine inlet temperature.
  • the influence of the increase in specific output work with respect to the "cold" turbine and the corresponding temperature increase (and thus heat) is formed in the pre-heating unit and this behavior is compared with the same in the reference case.
  • the increasing values show that increasing of the preheating (and thus the turbine inlet temperature), leads to an increase in efficiency.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A TRT process and system for recovering energy from blast furnace top gas in an expansion turbine are disclosed. The over-pressurized blast furnace top gas stream released by a blast furnace (10) is subsequently passed through a top gas cleaning plant (12), a preheating unit (22) and an expansion turbine (24) coupled to a load (30). The top gas stream is warmed-up in a heat-exchanger (20) located in-between the top gas cleaning plant (12) and the pre-heating unit (22). The top gas flow, after expansion in the turbine (24), is fed through the heat-giving side of the heat-exchanger (20).

Description

RECOVERY OF ENERGY FROM BLAST FURNACE GAS
IN AN EXPANSION TURBINE
FIELD OF THE INVENTION
The present invention generally relates to the treatment of blast furnace gas and more specifically to the recovery of pneumatic energy from blast furnace top gas pressure in an expansion turbine.
BACKGROUND OF THE INVENTION
As it is well known, blast furnace top gas is a by-product of blast furnaces that is generated when the iron ore is reduced with coke and / or other fuels to metallic iron. Blast furnace top gas is commonly used as a fuel within the steel works, but it can be burnt in boilers and power plants as well. It may also be combined with natural gas or coke oven gas before combustion or a flame support with higher heating value gas or oil is provided to sustain combustion. As it is also well known, blast furnaces (BF) have been operated since decades with an internal overpressure, which— with a proper dimensioning of the furnace— permits a substantial increase in the conversion of materials and energy and thus in the output of pig iron.
Operation under internal overpressure of course also implies considerable additional costs related to equipment and operation. More particularly, it requires producing pressurized air with convenient supply pressure level in a cold blast compressor, to form the so-called cold blast, which is then heated up in the hot blast stoves (or Cowpers) to high temperature levels and the resulting hot blast is blown into the blast furnace. Also typical for operation under overpressure is that the gas leaving the blast furnace at the top, known as top gas or blast furnace gas, is at a pressure substantially above atmospheric pressure. This top gas however still contains combustible components, primarily carbon monoxide, and to a lesser extent hydrogen, and can be used as low heating value combustion gas for producing heat or mechanical and electrical energy.
Top gas exiting the blast furnace carries along important amounts of solid matter, primarily in dust-like form. Before any subsequent use of the top gas, it is required to remove this solid material. This is conventionally achieved in a gas cleaning sub-plant of the blast furnace plant, which typically comprises first dry separation equipment— with a gravity-separator (dust catcher) and/or an axial cyclone— and a subsequent wet, fine cleaning device (wet separator). Due to the wet cleaning, the top gas temperature drops by about 100°C, is saturated with water vapor and includes additional liquid water droplets.
Upon cleaning, it has been known for long, in addition to the use of the thermal energy of the top gas, to recover the pneumatic energy of the pressurized BF top gas in an expansion turbine. In the turbine, the top gas expands to close to atmospheric pressure while producing mechanical work. The turbine rotor can be coupled e.g. to an electric generator, to the cold blast compressor, or to any other load.
As it is now also known, the efficiency of such expansion turbine (also referred to as Top pressure Recovery Turbine - TRT) can be increased by heating-up the cleaned— and thus cooled— top gas just before it enters the turbine. This is e.g. described in JP 62074009. While heating-up of the cleaned top gas is desirable in respect to TRT efficiency, the expanded top gas however has a higher outlet temperature. This may be problematic for a user such as e.g. a thermal power station, where the top gas will arrive at a temperature higher than expected.
OBJECT OF THE INVENTION
The object of the present invention is to provide an alternative method of recovering energy from blast furnace gas in a TRT plant as well as a corresponding system. This object is achieved by a method as claimed in claim 1 and a blast furnace top gas recovery system as claimed in claim 4.
SUMMARY OF THE INVENTION
According to the present invention, expanded BF top gas leaving the expansion turbine in a TRT plant is used as a heat source in a heat-exchanger located inbetween the top gas cleaning unit/plant and the (conventional) preheating unit upstream of the expansion turbine. In other words, the residual heat of the expanded top gas flow downstream of the expansion turbine is used to warm-up (preheat) the cleaned top gas flow upstream of the expansion turbine. This circulation scheme of the BF top gas in a TRT plant proves significantly advantageous. First, it allows increasing the temperature of the cleaned BF top gas at the turbine inlet, since heat can be removed in the heat exchanger downstream of the turbine, so that the cleaned, expanded gas can be delivered to the clean gas network at a temperature convenient for downstream users. Secondly, since cleaned top gas is already partially warmed-up in the heat exchanger before the pre-heating unit, the amount of energy required in the pre-heating unit can be reduced.
In practice, this mode of operation leads to an increase of energy output and efficiency of the whole BF top gas TRT process. The term heat exchanger herein encompasses any appropriate type of device where the flow of cleaned top gas upstream of the turbine can be brought into heat exchange relationship with the expanded top gas flow downstream of the turbine, however without mixing with one another. It is clear that in such heat exchanger the heat is transferred from the expanded cold gas to the top gas flow upstream of the turbine by conduction but there is no combustion of the expanded top gas stream in the heat exchanger itself.
Preferred embodiments are recited in the dependent claims. A blast furnace top gas recovery system in accordance with one aspect of the present invention comprises: a top gas cleaning unit/plant conditioning top gas released by a blast furnace; a heat-exchanger comprising a heat-receiving side and a heat-giving side (each having an inlet and an outlet), wherein a first piping connects the outlet of said top gas cleaning plant with the inlet of the heat-receiving side of said heat exchanger; a pre-heating unit having an inlet connected to the outlet of said heat-giving side of said heat exchanger via a second piping; an expansion turbine having an inlet connected to the outlet of said pre-heating unit via a third piping and an outlet connected to the inlet of the heat-giving side of said heat exchanger via a fourth piping; a load coupled to the output shaft (rotor) of the expansion turbine.
BRIEF DESCRIPTION OF THE DRAWING
The present invention will now be described, by way of example, with reference to the accompanying drawing, in which:
FIG. 1 : is a schematic diagram of a gas energy recovery system for perform- ing the present method.
DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
In order to further illustrate the present invention, an explanation of the involved thermodynamic processes, under simplified and ideal conditions, will now be given, in an exemplary manner.
Under the assumption of a perfect gas behaviour, regardless of the con- densing water vapor and neglecting the expansion losses, the specific output work from the expanding top gas in the turbine is expressed as: a = [K*R*T1/(K-1)]*[1 -1)/
-(p2/p1) ] = [A]*[B] (1)
where: a [J/kg] specific output work or specific output of mechanical energy, per kg of top gas κ [-] isentropic exponent, a value between 1 .3 and 1 .4 depending on the proportion of diatomic or tri-atomic gases in the top gas
R [J/(kg*K)] gas constant T-i [K] absolute temperature at turbine inlet
Pi [Pa a] absolute pressure at turbine inlet p2 [Pa a] absolute pressure at turbine outlet
Since pi and p2 appear as a ratio, they can also be more simply expressed in bars. The term [B] mainly depends on the pressure ratio before and after the turbine, i.e. on the top gas overpressure at the exit of the blast furnace and the pressure loss in the gas cleaning unit/plant on the one hand as well as on the clean gas network after the turbine, on the other hand. With a top gas overpressure at the BF top of about 2.5 bar g or 3.5 bar a, a overall pressure loss of 0.4 bar in the cleaning apparatus, a pressure of about 0.1 bar g or to 1 .1 bar a in the clean gas network and κ = 1 .35, a value of 0.236 may e.g. be obtained for term [B]. It may be noted that [B] increases with p-i, and tends towards 1 when p2/pi drops towards 0.
Term [A] only sensibly varies with the turbine entry temperature. [A] in- creases proportionally to temperature T-i and thus also the specific output work a, the latter being however moderated by term [B]. It may be noted that term [A] represents the enthalpy of the top gas.
As it clearly appears, a consequence of the influence of [A], i.e. the turbine entry temperature, onto the specific output work a is that a temperature drop of the top gas before entering into the turbine should be avoided as far as possible.
This can be achieved by replacing the wet, fine-cleaning by a dry fine- cleaning system, for example using an electro-filter or a bag filter - a solution which has rarely been implemented. The additional costs for such pressure- proof, wet fine-cleaning device are in fact substantial.
Although energetically less satisfactory, it is therefore predominant practice to install the turbine behind a wet fine-cleaning device, the turbine provid- ing for the expansion of cooled, steam saturated and water droplets containing blast furnace gas.
Based on this "cold" turbine configuration it has already been proposed to warm-up (preheat) the cooled blast furnace gas, downstream of the wet cleaning and upstream of the inlet of the turbine. This temperature increase of the previously "cold" and steam-saturated blast furnace gas at the turbine inlet has the advantage, in addition to the increase of the specific output work, of avoiding or reducing water vapor condensation and the formation of water droplets during the expansion. Indeed, water droplets can damage or cause the destruction of the turbine blades and the formation of droplets has therefore to be limited. The pre-heating of the "cold" blast furnace gas can e.g. be achieved in a pre-heating unit located upstream of the turbine inlet and exploiting the thermal energy gained from top gas combustion.
Let T0 be the absolute temperature of the top gas at the outlet of the top gas cleaning unit, then T-i = T0 represents the conventional practice of the "cold" expansion turbine, and T-i > T0 represents the case with pre-heating.
This implies that the turbine outlet temperature T2 is linked to the inlet temperature T-, through the pressure ratio p2/pi, which can be expressed:
T2 = TAf>2lfr) (K 1) K = T [C] (2)
With the exemplary values for the calculation of [B], a value of 0,764 is obtained for [C].
For existing installations and designs, it is important for subsequent top gas users that temperature T2 does not exceed T0, i.e. that the turbine outlet temperature does not exceed the temperature at the outlet of the top gas cleaning plant. Then T-i may not exceed the value T0/[C]. For example, in case T2 shall not exceed T0 = 50 °C « 323 K, then the preheating temperature T-i cannot exceed the value 323/0,764 = 423 K ~ 150 °C.
Accordingly, the increase in the specific output work due to pre-heating is limited to 1/[C] - 1 = 1/0,764 - 1 = 0,31 or 31 %, as compared to the "cold" turbine operation. (It may however be noted that the increase in total output work by heating of the water vapor and evaporation and overheating of the residual liquid cleaning water in the top gas as well as the expansion of the overheated steam at reduced or no condensation, are not taken into account for the sake of simplification). It shall be appreciated that, in order to further increase the specific output work, the present invention proposes introducing a heat-exchanger inbetween the top gas cleaning plant and the (conventional) pre-heating unit to take advantage of the heat remaining in the expanded top gas and warm-up the cold, cleaned top gas. Accordingly, upon leaving the top gas cleaning plant the cold, cleaned top gas is fed into the heat-exchanger, on the cold side (heat- taking/receiving side) thereof, where its temperature increases from T0 to T0i . In the heat-exchanger, heat is transferred to the cold cleaned gas from the expanded top gas that is fed into the hot side (heat-giving side) of the heat- exchanger. The top gas is subsequently fed into in the conventional, pre-heating unit, where its temperature increases from T0i to T Downstream of the turbine, upon traversing the heat-exchanger, the temperature of top gas stream is decreased from T2 to the desired temperature, i.e. again about T0, for entry into the clean gas network and use at a user facility. Such operating process can be performed in a blast furnace plant as illustrated in Fig.1 and where the temperatures T0, Τ0ι , ΤΊ and T2 are reported. Reference sign 10 designates a blast furnace that is coupled to the top gas recovery system to recover the pneumatic energy from the top gas released by the furnace 10. BF gas released from the BF 10 is fed into the top gas cleaning unit or plant generally indicated 12. The top gas cleaning unit 12 preferably comprises a dry separator 16 serially connected with a wet separator 18. Any appropriate type of cleaning technology may be implemented in unit 12.
The cleaned top gas flow then enters into the heat exchanger 20 (where it is heated to T0i ) and subsequently into the pre-heating unit 22, from which it is released at T Subsequently, the pre-heated clean gas flow enters the expansion turbine 24 and exits therefrom at temperature T2. This expanded gas stream flows through the heat-giving side of heat exchanger 20 and is delivered to the clean gas network at temperature T0. The turbine 24 has a rotor with output shaft coupled to a load 30 such as for example an electric generator or an air compressor for the BF cold blast.
In the present embodiment, the heat-exchanger 20 is of the conventional type comprising: a plenum chamber on the cold (heat-taking) side that receives the cold top gas exiting from the cleaning plant 20; and a serpentine-like ducting traversing the plenum chamber and carrying the expanded top gas flow delivered by the turbine 24. As is clear for the skilled person, any other type of heat-exchanger allowing bringing the upstream and downstream (relative to the turbine) BF gas flows into heat-exchange relationship, however without mixing, may be used. This heat exchange is preferably carried directly between the upstream and downstream BF gas without the use of an intermediate fluid loop. As for the pre-heating unit 22, it may of course also comprise a plenum/serpentine type heat exchanger, the heat-giving side of which may e.g. take its heat from a fluid heated via an external source, e.g. by combustion of BF gas or from the slag granulation installation, as e.g. described in JP 62074009 While in Fig.1 only the TRT system is represented and there is one piping system 14 interconnecting the various elements thereof, it is clear that not necessarily all but only a portion of top gas released by the BF 10 may be treated in the TRT, the remainder of top gas being used e.g. for heating (combustion) purposes in the pre-heating unit 22 or elsewhere, as it is clear to those skilled in the art. Let us now explain how the present process influences the operation of the recovery turbine.
If, under simplified assumptions, in particular neglecting the remaining temperature difference in the heat exchanger 20 between the heat-giving outlet and the heat-taking inlet, and again without consideration of water vapor and liquid water, the temperature increase on the heat-taking side and the temperature decrease on the heat-giving side in the heat-exchanger are equal and an outlet temperature on the heat-giving side of T0 is achieved, then ΔΤ0 = T0i-T0 = T2-T0, while the temperature increase in the pre-heating unit 22 corresponds to ΔΤ-ι = T-i-To-i , then there exists the following relationship between ΔΤ0 in the heat-exchanger 22 and ΔΤΊ the conventional pre-heating unit 22:
ΔΤο = {[0]/(1 -[0])}* ΔΤ1 - Τ0 (3)
In order for ΔΤ0 to be positive, i.e. to justify the use of the heat-exchanger 20, ΔΤ-ι has to be larger than T0 *{1/[C] - 1 }. The limit value factor {1/[C] - 1 } corresponds to the above-given limit for the pre-heating to avoid a temperature above T0 at the turbine outlet, with a value of 0.31 in the exemplary calculation.
In the range above this limit value, i.e. from the temperature at which the heat-exchanger 20 is useful, the following relationship between the temperature increase ΔΤΊ in the conventional pre-heating unit 22 and the turbine inlet temperature T-i exists:
^ = {1/(1 -10])}^^ (4)
Based on the above exemplary values, this leads to ΤΊ = 4,24 * ΔΤΊ. In other words, ΤΊ increases about a fourfold quicker than the temperature increase in the pre-heating unit 22. The consequence is made clear by using equation (4) in relationship (1 ), while using [C] as obtained from equation (2): a = [ ?R*l(K-1 )]*ATi (5)
Hence, each augmentation of the temperature increase in the pre-heating unit 22 leads to an increase in the specific output work by a ratio of 1 :1 , or to the same extent as the change of enthalpy. In the initially discussed case implementing pre-heating without the heat-exchanger 20 (e.g. up to 150°C), the preheating (and hence the increase in turbine inlet temperature) leads to an increase in the specific outlet work attenuated by factor [B], with a value of 0.236 in the example.
The 1 :1 conversion of the additional heat supplied (increase of ΔΤΊ) in extra output work (increase of a)— so to speak without Carnot efficiency— can be explained by the simultaneous displacement of the entire range of expansion temperatures to higher temperature levels, the ratio T2/T-i remaining constant due to the also constant p2/pi ratio.
To further illustrate the present process, Table 1 below summarized exemplary cases, under simplified conditions and neglecting the pressure losses in the heat exchanger 20 and pre-heating unit 22.
Figure imgf000011_0001
Table 1
In case top gas is used for combustion in the pre-heating unit 22 for the temperature increase ΔΤ-ι, the requirement for top gas is directly proportional to ΔΤ-,.
The significant increase in the specific output work, and hence the effi- ciency of the expansion of a predetermined flow mass of top gas, appears from the second to last column.
The last column represents the effect of the introduced pre-heating energy. The reference case is the heating-up to a temperature at which the expansion causes a lowering of the turbine outlet temperature to the turbine inlet temperature. For each case, the influence of the increase in specific output work with respect to the "cold" turbine and the corresponding temperature increase (and thus heat) is formed in the pre-heating unit and this behavior is compared with the same in the reference case. The increasing values show that increasing of the preheating (and thus the turbine inlet temperature), leads to an increase in efficiency.
As a further improvement of the performance may be obtained by injecting water into the heater. The water evaporates and overheats, of course, with a corresponding increase in the need for preheating energy, and increases the mass of the gas flow in the turbine that generates the output work.

Claims

Claims
1 . A process for recovering mechanical energy from blast furnace top gas in a top gas recovery turbine system, wherein a pressurized blast furnace top gas stream released by a blast furnace (10) is subsequently passed through a top gas cleaning unit (12), a preheating unit (22) and an expansion tur- bine (24) coupled to a load (30), characterised in that said top gas stream is warmed-up in a heat-exchanger (20) located in-between said top gas cleaning unit (12) and said pre-heating unit (22); and in that said top gas, after expansion in said turbine (24), is fed through the heat-giving side of said heat-exchanger (20).
2. The process according to claim 1 , wherein said blast furnace top gas stream is saturated with water vapor and/or contains water drops.
3. The process according to claim 1 , wherein water is introduced into said top gas stream in said pre-heating unit (22).
4. A blast furnace top gas recovery system comprising an expansion turbine (24) in which blast furnace gas expands and provides mechanical work to a load (30) coupled to the turbine output shaft, a top gas cleaning unit (12) and a pre-heating unit (22) being connected to said expansion turbine (24) and located upstream thereof, a piping system (14) connecting the top gas cleaning unit (12), pre-heating unit (22) and expansion turbine (24) in this order, characterized in that a heat-exchanger is located in the piping system in-between said top gas cleaning unit (12) and said pre-heating unit (22) for heating said top gas stream, wherein said heat-exchanger comprises a heat-giving side having its inlet in communication with the outlet of said expansion turbine (24).
5. The system according to claim 4, wherein said pre-heating unit (22) comprises at least one nozzle for injecting water in the clean top gas stream flowing therethrough.
PCT/EP2010/062960 2009-09-04 2010-09-03 Recovery of energy from blast furnace gas in an expansion turbine Ceased WO2011026940A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010900011266U CN202595161U (en) 2009-09-04 2010-09-03 Blast furnace top gas recovery system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
LU91604A LU91604B1 (en) 2009-09-04 2009-09-04 Recovery of energy from blast furnace gas in an expansion turbine.
LU91604 2009-09-04

Publications (1)

Publication Number Publication Date
WO2011026940A1 true WO2011026940A1 (en) 2011-03-10

Family

ID=41258878

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2010/062960 Ceased WO2011026940A1 (en) 2009-09-04 2010-09-03 Recovery of energy from blast furnace gas in an expansion turbine

Country Status (3)

Country Link
CN (1) CN202595161U (en)
LU (1) LU91604B1 (en)
WO (1) WO2011026940A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304595A (en) * 2011-09-23 2012-01-04 中冶南方工程技术有限公司 Top gas pressure recovery turbine generating system
CN102352784A (en) * 2011-10-28 2012-02-15 西安陕鼓动力股份有限公司 Power generating set combining iron-making blast furnace and sintered energy recycling
LU91917B1 (en) * 2011-12-16 2013-06-17 Wurth Paul Sa Cold wind generation from slag heat
CN103615322A (en) * 2013-11-20 2014-03-05 内蒙古包钢钢联股份有限公司 TRT (Top Gas Pressure Recovery Turbine) unit over-speed control system and TRT unit over-speed control method
CN103620168A (en) * 2011-06-03 2014-03-05 瓦锡兰芬兰有限公司 Exhaust system and method for reducing exhaust temperature
US20160319383A1 (en) * 2013-12-12 2016-11-03 Thyssenkrupp Ag Combined system for producing steel and method for operating the combined system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
LU92525B1 (en) * 2014-08-19 2016-02-22 Wurth Paul Sa Blast furnace plant
CN108590780A (en) * 2018-05-23 2018-09-28 湖北新冶钢特种钢管有限公司 A kind of TRT units Import Gas pre-heating system and its application method
CN117512251A (en) * 2022-07-29 2024-02-06 上海安可科技股份有限公司 High-order blanking system and blanking method of converter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54115605A (en) * 1978-02-28 1979-09-08 Mitsui Eng & Shipbuild Co Ltd Recovering method for energy of blast furnace top gas
JPS5514807A (en) * 1978-07-13 1980-02-01 Nippon Kokan Kk <Nkk> Recovering method for heat energy from top gas of blast furnace
SU1177351A2 (en) * 1982-12-24 1985-09-07 Запорожский индустриальный институт Blast furnace gas heating arrangement
JPS6274009A (en) 1985-09-27 1987-04-04 Sumitomo Metal Ind Ltd Blast furnace top pressure recovery power generation method
JPS62185810A (en) * 1986-02-12 1987-08-14 Sumitomo Metal Ind Ltd Device for recovering heat energy of blast furnace gas

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54115605A (en) * 1978-02-28 1979-09-08 Mitsui Eng & Shipbuild Co Ltd Recovering method for energy of blast furnace top gas
JPS5514807A (en) * 1978-07-13 1980-02-01 Nippon Kokan Kk <Nkk> Recovering method for heat energy from top gas of blast furnace
SU1177351A2 (en) * 1982-12-24 1985-09-07 Запорожский индустриальный институт Blast furnace gas heating arrangement
JPS6274009A (en) 1985-09-27 1987-04-04 Sumitomo Metal Ind Ltd Blast furnace top pressure recovery power generation method
JPS62185810A (en) * 1986-02-12 1987-08-14 Sumitomo Metal Ind Ltd Device for recovering heat energy of blast furnace gas

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103620168A (en) * 2011-06-03 2014-03-05 瓦锡兰芬兰有限公司 Exhaust system and method for reducing exhaust temperature
CN102304595A (en) * 2011-09-23 2012-01-04 中冶南方工程技术有限公司 Top gas pressure recovery turbine generating system
CN102352784A (en) * 2011-10-28 2012-02-15 西安陕鼓动力股份有限公司 Power generating set combining iron-making blast furnace and sintered energy recycling
LU91917B1 (en) * 2011-12-16 2013-06-17 Wurth Paul Sa Cold wind generation from slag heat
WO2013087838A1 (en) 2011-12-16 2013-06-20 Paul Wurth S.A. Cold wind generation from slag heat
CN103998626A (en) * 2011-12-16 2014-08-20 保尔伍斯股份有限公司 Cool air generation from slag heat
CN103615322A (en) * 2013-11-20 2014-03-05 内蒙古包钢钢联股份有限公司 TRT (Top Gas Pressure Recovery Turbine) unit over-speed control system and TRT unit over-speed control method
CN103615322B (en) * 2013-11-20 2016-01-20 内蒙古包钢钢联股份有限公司 TRT unit overspeed control system and hypervelocity controlling method thereof
US20160319383A1 (en) * 2013-12-12 2016-11-03 Thyssenkrupp Ag Combined system for producing steel and method for operating the combined system
US10781498B2 (en) 2013-12-12 2020-09-22 Thyssenkrupp Ag Combined system for producing steel and method for operating the combined system

Also Published As

Publication number Publication date
CN202595161U (en) 2012-12-12
LU91604B1 (en) 2011-03-07

Similar Documents

Publication Publication Date Title
WO2011026940A1 (en) Recovery of energy from blast furnace gas in an expansion turbine
RU2433339C2 (en) Method to generate power in power plant by burning carbon-containing fuel in substantially pure oxygen, power plant to generate power by burning carbon-containing fuel in substantially pure oxygen, method to modify process of power generation by burning carbon-containing fuel from fuel burning in air to fuel burning in substantially pure oxygen
JP5101642B2 (en) Optimization of low BTU fuel combustion combined cycle power plant by performance heating
KR100291967B1 (en) Disconnect assembly for coal pyrolysis gas and char combustion
JP5275296B2 (en) Integrated heat recovery system and method for increasing the efficiency of oxyfuel combustion furnaces
JP5568552B2 (en) Cement clinker manufacturing method and cement clinker manufacturing facility
EP2433050B1 (en) Heat recovery system and method
CN102016241A (en) Oxyfuel combusting boiler system and a method of generating power by using the boiler system
JP2013092146A (en) System and method for operating heat recovery steam generator
US20100242489A1 (en) Systems, Methods, and Apparatus for Modifying Power Output and Efficiency of a Combined Cycle Power Plant
RU2009139900A (en) METHOD FOR ENERGY PRODUCTION USING A GAS TURBINE OPERATING ON SOLID FUEL AND USING FUEL GAS HEAT, AND EQUIPMENT FOR IMPLEMENTING THIS METHOD
EP3844371B1 (en) System for generating energy in a working fluid from hydrogen and oxygen and method of operating this system
JP6272900B2 (en) Energy recovery from exhaust from melting furnace with gas turbine and heat exchanger
CN104870382B (en) Energy recovery from flue gases from melting furnaces using gas turbines and heat exchangers
US5435123A (en) Environmentally acceptable electric energy generation process and plant
JP2022543961A (en) Method for driving machine of ethylene plant steam generation circuit and integrated ethylene power plant system
KR20150135310A (en) Method for combustion of a low-grade fuel
JP2003518220A (en) Operation method of steam turbine equipment and steam turbine equipment operated by this method
US4545208A (en) Method of operating an industrial furnace
RU2553160C2 (en) Energy extraction from gases in blast-furnace unit
CN121002272A (en) Gas turbine plant with ammonia cracker and power plant with such plant and method of operating a gas turbine plant
JP2007503544A (en) Steam power station
CA2109963A1 (en) Environmentally acceptable energy generation process and plant in a combined gas/steam generating power station
JP3625301B2 (en) Waste heat recovery power generator
JP5790045B2 (en) Hot air generator

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201090001126.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10747890

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10747890

Country of ref document: EP

Kind code of ref document: A1