[go: up one dir, main page]

WO2009092896A2 - Railway track renewal train element comprising a ballast clearing system - Google Patents

Railway track renewal train element comprising a ballast clearing system Download PDF

Info

Publication number
WO2009092896A2
WO2009092896A2 PCT/FR2008/001534 FR2008001534W WO2009092896A2 WO 2009092896 A2 WO2009092896 A2 WO 2009092896A2 FR 2008001534 W FR2008001534 W FR 2008001534W WO 2009092896 A2 WO2009092896 A2 WO 2009092896A2
Authority
WO
WIPO (PCT)
Prior art keywords
ballast
train
railway
station
stripping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/FR2008/001534
Other languages
French (fr)
Other versions
WO2009092896A3 (en
Inventor
Guillaume Chaine
Thierry Torti
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Europeenne de Travaux Ferroviaires ETF SA
Original Assignee
Europeenne de Travaux Ferroviaires ETF SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Europeenne de Travaux Ferroviaires ETF SA filed Critical Europeenne de Travaux Ferroviaires ETF SA
Publication of WO2009092896A2 publication Critical patent/WO2009092896A2/en
Publication of WO2009092896A3 publication Critical patent/WO2009092896A3/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers

Definitions

  • the present invention relates to a railway track renewal train element comprising a ballast stripping facility combined with a system for replacing sleepers and rails.
  • the railway rails are supported on wooden or concrete sleepers of standard lengths 2 200 mm and 2 600 mm for level crossings.
  • Mechanized tools have been developed to replace the sleepers at very high yields, that is to say by automating and linking together all the operations to be carried out: disconnecting the "old" rail from the sleepers, separating the old rail on the sides, removal of old sleepers, extraction of troublesome ballast towards the sides of the track, tamping and leveling of the ballast layer, laying of new sleepers, installation of the new rail previously arranged on both sides of the track, fastening of the new rail to new sleepers, re-ballastage by a special ballast train, mechanical tamping of the ballast by specialized gear called tampers.
  • These operations require mechanized tools, relatively bulky, which are mounted on trains of railway works which must also to be able to circulate safely on the railway network when they are not in the works phase.
  • Ballast stripping can be accomplished using a tool called a dynamic plow, consisting of a relatively high bow with horizontal spades that dive into the ballast and push it out of the tracks.
  • This method has limitations in terms of the volume of excavated ballast, especially in station platform areas. It often happens that this device is saturated, especially when the type of armament changes, ie when it is necessary to dig more to replace wooden sleepers by concrete sleepers, which generates an excess of ballast .
  • the stripping of the ballast can also be carried out using a device called equalizer and having a carterized horizontal structure and closed on itself, inside which circulates a vane chain.
  • a front opening in a portion of said structure allows, when it is immersed in the ballast, that the pallets cause ballast on the side of the track without being loaded. Nevertheless, such a device has a limited flow of excavated ballast. It allows more surface leveling and leveling of the ballast surface than deep stripping and moving large volumes of ballast.
  • the invention proposes a railway train renewal train element comprising a ballast stripping installation and a tie replacement system, said tie replacement system comprising an extraction station of the used sleepers and a substation station. laying of new sleepers respectively arranged on both sides of the stripping station of said stripping facility.
  • the stripping installation comprises:
  • a tabular structure closed on itself and delimiting, in a plane inclined with respect to the vertical, a closed loop internal passage having in its lower part, a horizontal section provided with a longitudinal front opening which extends over the the width of the ballast to be cleared, two lateral corridors joining at the upper part of the structure and, in said upper part, an opening leading to ballast evacuation means, the two lateral passages being shaped so as to delimit between their regions; central areas an area of greater width,
  • the railway train renewal train element thus defined comprises a stripping installation which is in the form of a tabular structure closed on itself, the tube of which delimits a corridor which has any section, ideally rectangular in order to be able to guide a chain that circulates in a closed loop in said corridor.
  • the chain called stripping chain
  • the chain is provided with fingers orthogonal to its direction of movement so as to cause the ballast in the structure through said front opening to said evacuation orifice.
  • this structure In the operating position, this structure is inclined relative to the vertical, the lower part facing the direction of travel of the train and diving into the ballast just behind the drop zone of the old sleepers.
  • This lower part is open frontally so that the chain which circulates inside said structure, provided with shovels and links equipped with peaks called fingers and moved by a pinion, causes ballast inside a lateral lane. called lift corridor.
  • the minimum form of such a structure should be generally triangular, the base of the triangle being constituted by the horizontal section which collects the ballast, and the sides of the triangle by the lateral sections which converge towards the discharge orifice. ballast.
  • the lateral sections have a curved shape towards the outside of the structure, for example curve or "in the form of circumflex accent", so that their spacing in the middle part said structure is greater than the length of a cross.
  • the structure may have different geometries, for example ovoid or polygonal, ideally octagonal, provided that the spacing of the lateral sections in its middle part is sufficient for it to be traversed by a specific conveyor carrying new sleepers oriented perpendicular to the tracks .
  • the form of the stripping facility is such that on the one hand the conveyor new sleepers can cross the structure and secondly it can convey the new sleepers oriented perpendicular to the track.
  • the gain is double:
  • ballast stripping installation combined with the system for substituting sleepers according to the invention thus makes it possible to obtain a set mechanized very compact which channels the surplus ballast inherent to the quay zones and cross-type changes, leaving an area without excess ballast, thus ensuring the rear of the train a quantity of ballast sufficient to stall the way to the using mechanized machines such as tampers.
  • the space between the stripping area and the laying area of the new sleepers can be used to insert additional facilities such as unbalanced bow or plow, dynamic, or vibrating blade tamping facility.
  • the ballast entrained in the corridor of said structure is discharged through an opening at its upper part and is recovered, for example on a first belt conveyor, so as to transport it to a storage location and to redeposit it on the replacement sleepers thanks for example to a grazing chute.
  • This first conveyor can retract, for example by translation or by rotation about a vertical axis, so let the flow of baled ballast directly on the track after the installation of new sleepers, which allows to fill immediately the way in the case of show jumping of type crossings and during production cycle ends.
  • Ballast dewatering is an operation that, depending on weather conditions, can raise a lot of dust and thus make working conditions difficult. It is therefore advantageous to provide a water spray ramp above the stripping facility to stabilize the dust.
  • the stripping facility shall allow normal and safe movement of the work train when not in operation.
  • the front part must be able to be placed in a high position, by translation or rotation of the installation around a horizontal axis, and maintained in this position so as to respect the UIC template of the track.
  • the tie replacement device, the dynamic plow, the snow groomer must be able to be placed in a high position to comply with the UIC template of the track, all folded once inside the UIC railroad jig says circulation.
  • the invention also relates to a railway train renewal train comprising, in particular:
  • ballast conveyors consisting for example of rubber mats for transporting the ballast from the substitution zone of the crosspieces towards the rear of the train,
  • a so-called grazing chute for making buffer storage and filling the newly laid track with ballast; this chute can be equipped upstream of at least one conveyor receiving ballast and pivoted about a substantially vertical axis relative to said chute to project any excess ballast on either side of the track or on a dock,
  • a system for replacing old rails with new rails and further comprising a ballast removal facility combined with a tie replacement system.
  • FIG. 1 is a plan view of the ballast removal facility
  • FIG. 2 is a side view of the ballast stripping facility combined with a tie replacement system, mounted on a work train.
  • FIG. 1 there is a tabular structure 1 of octagonal shape in which a chain (not visible) is driven by a pinion integral with the axis 2.
  • the chain is provided with fingers 3 which are visible at the opening frontal 4 of the structure.
  • this opening is immersed in the ballast, which is driven inside the structure 1 by the fingers 3.
  • This opening is preferably rectilinear and has a length sufficient to have a leading edge much greater than the length of a cross.
  • the spacing between the lateral sections 1a and 1b in the middle part of the structure 1 is sufficient for the new crosspieces 6, transported and deposited on the ballast by the conveyor 7, to pass through the structure 1 in their greatest length; the longest cross-section length to be taken into account is that of railway crossings, ie 2,600 mm.
  • This conveyor 5 can retract so that the ballast falls directly on the track downstream of the station of installation of the new sleepers.
  • a dynamic plow 10 can be interposed between the ballast stripping station and the cross-laying station 12.
  • a snow groomer 11 comprising a vibrating pad can be inserted between the dynamic plow 10 and the station for installing the new sleepers.
  • the structure 1 is fixed to the structure of the train 13 in a mobile manner, for example around an axis 14 so that it can be raised, for example by means of the jack 15, to respect the gauge of the track during the running of the train .
  • the dynamic plow 10, the snow groomer 11 and the cross-laying tool 12 can also be raised so as to respect the gauge of the track.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Railway Tracks (AREA)

Abstract

A railway track renewal train element comprising a ballast clearing installation and a sleeper (cross-tie) replacement system. The sleeper replacement system comprises a worn sleeper extraction station and a new sleeper laying station (12) these being positioned respectively on either side of the ballast clearing station of the said ballast clearing installation. The ballast clearing installation comprises a tubular structure (1) closed on itself and delimiting, in a plane that is inclined with respect to the vertical, a closed-loop internal passage through which there circulates a chain that has fingers (3) orthogonal to its direction of travel and shaped in such a way as to carry the ballast into the structure (1) through a frontal opening as far as a discharge orifice (8). The sleeper laying installation comprises conveying means (7) capable of conveying the sleepers with their axes perpendicular to the track, these conveying means (7) passing through a wider region of the tubular structure (1).

Description

ELEMENT DE TRAIN DE RENOUVELLEMENT DE VOIES FERROVIAIRES COMPORTANT UN SYSTEME DE DEGARNISSAGE DU BALLAST. RAILWAY RENEWAL TRAIN ELEMENT COMPRISING A BALLAST REMOVAL SYSTEM.

La présente invention concerne un élément de train de renouvellement de voies ferroviaires comportant une installation de dégarnissage de ballast combinée à un système de remplacement de traverses et de rails.The present invention relates to a railway track renewal train element comprising a ballast stripping facility combined with a system for replacing sleepers and rails.

Elle s'applique notamment, mais non exclusivement, aux opérations de remplacement de traverses de chemin de fer et/ou de rails, qui nécessitent de dégarnir au moins partiellement les voies du ballast existant.It applies in particular, but not exclusively, to the replacement operations of railway sleepers and / or rails, which require at least partially stripping the existing ballast tracks.

Les rails de chemin de fer reposent sur des traverses, en bois ou en béton, de longueurs standard 2 200 mm et 2 600 mm pour les passages à niveau. Des outils mécanisés ont été développés pour remplacer les traverses à des rendements très importants, c'est-à-dire en automatisant et en enchaînant l'ensemble des opérations à réaliser : désolidarisation du rail dit « ancien » aux traverses, écartement du rail ancien sur les côtés, dépose des traverses anciennes, extraction du ballast gênant vers les cotés de la voie, damage et nivellement de la couche de ballast, pose des traverses neuves, mise en place du rail neuf préalablement disposé de part et d'autre de la voie, solidarisation du rail neuf aux traverses neuves, re-ballastage par un train spécial de ballast, bourrage mécanique du ballast par engins spécialisés appelés bourreuses. Ces opérations nécessitent des outils mécanisés, relativement encombrants, qui sont montés sur des trains de travaux ferroviaires qui doivent également pouvoir circuler sans encombre sur le réseau ferré lorsqu'ils ne sont pas en phase de travaux.The railway rails are supported on wooden or concrete sleepers of standard lengths 2 200 mm and 2 600 mm for level crossings. Mechanized tools have been developed to replace the sleepers at very high yields, that is to say by automating and linking together all the operations to be carried out: disconnecting the "old" rail from the sleepers, separating the old rail on the sides, removal of old sleepers, extraction of troublesome ballast towards the sides of the track, tamping and leveling of the ballast layer, laying of new sleepers, installation of the new rail previously arranged on both sides of the track, fastening of the new rail to new sleepers, re-ballastage by a special ballast train, mechanical tamping of the ballast by specialized gear called tampers. These operations require mechanized tools, relatively bulky, which are mounted on trains of railway works which must also to be able to circulate safely on the railway network when they are not in the works phase.

Le dégarnissage du ballast peut s'effectuer à l'aide d'un outil appelé charrue dynamique, constituée d'une étrave relativement haute comportant des bêches horizontales qui plongent dans le ballast et le repoussent vers l'extérieur des voies. Cette méthode connaît des limites en terme de volume de ballast excavé, notamment dans les zones de quais de gare. Il arrive fréquemment que ce dispositif soit saturé, surtout lorsque le type d'armement change, c'est à dire lorsqu'il faut creuser d'avantage pour remplacer des traverses en bois par des traverses en béton, ce qui génère un excès de ballast.Ballast stripping can be accomplished using a tool called a dynamic plow, consisting of a relatively high bow with horizontal spades that dive into the ballast and push it out of the tracks. This method has limitations in terms of the volume of excavated ballast, especially in station platform areas. It often happens that this device is saturated, especially when the type of armament changes, ie when it is necessary to dig more to replace wooden sleepers by concrete sleepers, which generates an excess of ballast .

Le dégarnissage du ballast peut également s'effectuer à l'aide d'un dispositif appelé régaleur et comportant une structure horizontale cartérisée et fermée sur elle-même, à l'intérieur de laquelle circule une chaîne à palettes. Une ouverture frontale dans une portion de ladite structure permet, quand elle est plongée dans le ballast, que les palettes entraînent du ballast sur le coté de la voie sans être chargé. Néanmoins un tel dispositif dispose d'un débit limité de ballast excavé. Il permet d'avantage de surfacer et de niveler la surface du ballast que de dégarnir en profondeur et déplacer des volumes de ballast importants.The stripping of the ballast can also be carried out using a device called equalizer and having a carterized horizontal structure and closed on itself, inside which circulates a vane chain. A front opening in a portion of said structure allows, when it is immersed in the ballast, that the pallets cause ballast on the side of the track without being loaded. Nevertheless, such a device has a limited flow of excavated ballast. It allows more surface leveling and leveling of the ballast surface than deep stripping and moving large volumes of ballast.

C'est l'objet de l'invention que de proposer une installation de dégarnissage de voies ferrées compacte et permettant d'excaver une quantité de ballast importante au niveau de la zone de substitution des traverses, combinée à un système de remplacement de traverses.It is the object of the invention to provide a compact railway stripping facility and to excavate a large amount of ballast in the substation area of the sleepers, combined with a system of replacement sleepers.

A cet effet l'invention propose un élément de train de renouvellement de voies ferroviaires comportant une installation de dégarnissage de ballast et un système de remplacement de traverses, ledit système de remplacement de traverses comprenant un poste d'extraction des traverses usagées et un poste de pose de traverses neuves respectivement disposés de part et d'autre du poste de dégarnissage de ladite installation de dégarnissage. Selon l'invention, l'installation de dégarnissage comporte :To this end, the invention proposes a railway train renewal train element comprising a ballast stripping installation and a tie replacement system, said tie replacement system comprising an extraction station of the used sleepers and a substation station. laying of new sleepers respectively arranged on both sides of the stripping station of said stripping facility. According to the invention, the stripping installation comprises:

• une structure tabulaire fermée sur elle-même et délimitant, dans un plan incliné par rapport à la verticale, un passage interne en boucle fermée comportant dans sa partie inférieure, un tronçon horizontal muni d'une ouverture frontale longitudinale qui s'étend sur la largeur du ballast à dégarnir, deux couloirs latéraux se rejoignant à la partie supérieure de la structure et, dans ladite partie supérieure, un orifice débouchant sur des moyens d'évacuation du ballast, les deux couloirs latéraux étant conformés de manière à délimiter entre leurs régions centrales une zone de plus grande largeur,A tabular structure closed on itself and delimiting, in a plane inclined with respect to the vertical, a closed loop internal passage having in its lower part, a horizontal section provided with a longitudinal front opening which extends over the the width of the ballast to be cleared, two lateral corridors joining at the upper part of the structure and, in said upper part, an opening leading to ballast evacuation means, the two lateral passages being shaped so as to delimit between their regions; central areas an area of greater width,

• une chaîne en boucle fermée circulant dans ledit passage sous l'effet d'un moyen d'entraînement solidaire de la structure, ladite chaîne étant munie de doigts orthogonaux à son sens de déplacement et conformés de manière à entraîner le ballast dans la structure par ladite ouverture frontale jusqu' audit orifice d'évacuation, l'installation de pose des traverses comprenant des moyens de transport aptes à transporter les traverses axées perpendiculairement à la voie, ces moyens de transport passant dans ladite zone de plus grande largeur de ladite structure tabulaire.A closed-loop chain circulating in said passage under the effect of a driving means integral with the structure, said chain being provided with fingers orthogonal to its direction of movement and shaped so as to drive the ballast into the structure by said front opening to said discharge orifice, the cross-laying installation comprising transport means capable of transporting the crosspieces oriented perpendicular to the track, these transport means passing through said zone of greater width of said tabular structure .

L'élément de train de renouvellement de voies ferroviaires ainsi défini comporte une installation de dégarnissage qui se présente sous la forme d'une structure tabulaire fermée sur elle-même, dont le tube délimite un couloir qui présente une section quelconque, idéalement rectangulaire pour pouvoir guider une chaîne qui circule en boucle fermée dans ledit couloir. La chaîne, appelée chaîne de dégarnissage, est munie de doigts orthogonaux à son sens de déplacement de manière à entraîner le ballast dans la structure par ladite ouverture frontale jusqu'audit orifice d'évacuation. En position de fonctionnement, cette structure est inclinée par rapport à la verticale, la partie inférieure faisant face au sens de la marche du train et plongeant dans le ballast juste derrière la zone de dépose des traverses anciennes. Cette partie inférieure est ouverte frontalement de sorte que la chaîne qui circule à l'intérieur de ladite structure, munie de pelles et de maillons équipés de pics appelés doigts et mue par un pignon, entraîne du ballast à l'intérieur d'un couloir latéral appelé couloir de remontée.The railway train renewal train element thus defined comprises a stripping installation which is in the form of a tabular structure closed on itself, the tube of which delimits a corridor which has any section, ideally rectangular in order to be able to guide a chain that circulates in a closed loop in said corridor. The chain, called stripping chain, is provided with fingers orthogonal to its direction of movement so as to cause the ballast in the structure through said front opening to said evacuation orifice. In the operating position, this structure is inclined relative to the vertical, the lower part facing the direction of travel of the train and diving into the ballast just behind the drop zone of the old sleepers. This lower part is open frontally so that the chain which circulates inside said structure, provided with shovels and links equipped with peaks called fingers and moved by a pinion, causes ballast inside a lateral lane. called lift corridor.

En toute logique, la forme minimale d'une telle structure devrait être globalement triangulaire, la base du triangle étant constituée par le tronçon horizontal qui collecte le ballast, et les côtés du triangle par les tronçons latéraux qui convergent vers l'orifice d'évacuation du ballast. Néanmoins, dans l'installation selon l'invention, les tronçons latéraux présentent une forme bombée vers l'extérieur de la structure, par exemple courbe ou « en forme d'accent circonflexe », de façon à ce que leur écartement dans la partie médiane de ladite structure soit supérieur à la longueur d'une traverse. La structure peut présenter différentes géométries, par exemple ovoïdes ou polygonales, idéalement octogonale, pour autant que l' écartement des tronçons latéraux dans sa partie médiane soit suffisant pour qu'elle puisse être traversée par un convoyeur spécifique portant des traverses neuves orientées perpendiculairement aux voies.Logically, the minimum form of such a structure should be generally triangular, the base of the triangle being constituted by the horizontal section which collects the ballast, and the sides of the triangle by the lateral sections which converge towards the discharge orifice. ballast. Nevertheless, in the installation according to the invention, the lateral sections have a curved shape towards the outside of the structure, for example curve or "in the form of circumflex accent", so that their spacing in the middle part said structure is greater than the length of a cross. The structure may have different geometries, for example ovoid or polygonal, ideally octagonal, provided that the spacing of the lateral sections in its middle part is sufficient for it to be traversed by a specific conveyor carrying new sleepers oriented perpendicular to the tracks .

La forme de l'installation de dégarnissage est donc telle que d'une part le convoyeur de traverses neuves peut traverser la structure et d'autre part il peut convoyer les traverses neuves axées perpendiculairement à la voie. Le gain est double :The form of the stripping facility is such that on the one hand the conveyor new sleepers can cross the structure and secondly it can convey the new sleepers oriented perpendicular to the track. The gain is double:

• Gain de place, car les traverses neuves peuvent être posées au plus près du poste de dégarnissage de ballast ;• Space-saving, as new sleepers can be placed closer to the ballast clearing station;

• Simplification de l'installation, car les traverses neuves peuvent être convoyées dans le même sens que celui qu'elles auront une fois posées sur le ballast, ce qui évite d'avoir à leur faire exécuter une rotation autour d'un axe vertical au dernier moment• Simplification of the installation, because the new sleepers can be conveyed in the same direction as that they will have once put on the ballast, which avoids having to make them execute a rotation about a vertical axis with last moment

L'installation de dégarnissage de ballast combinée au système de substitution de traverses selon l'invention permet donc d'obtenir un ensemble mécanisé très compact qui canalise les surplus de ballast inhérents aux zones de quais et aux changements de type de traverse, en laissant une zone sans excédent de ballast, garantissant ainsi à l'arrière du train une quantité de ballast suffisante pour caler la voie à l'aide d'engins mécanisés tels que des bourreuses. De plus, l'espace entre la zone de dégarnissage et la zone de pose des traverses neuves peut être exploité pour insérer des installations complémentaires tels qu'une étrave à balourd ou charrue, dynamique, ou une installation de damage à lame vibrante.The ballast stripping installation combined with the system for substituting sleepers according to the invention thus makes it possible to obtain a set mechanized very compact which channels the surplus ballast inherent to the quay zones and cross-type changes, leaving an area without excess ballast, thus ensuring the rear of the train a quantity of ballast sufficient to stall the way to the using mechanized machines such as tampers. In addition, the space between the stripping area and the laying area of the new sleepers can be used to insert additional facilities such as unbalanced bow or plow, dynamic, or vibrating blade tamping facility.

Le ballast entraîné dans le couloir de ladite structure est évacué par une ouverture à sa partie supérieure et est récupéré, par exemple sur un premier convoyeur à bande, de façon à le transporter vers un lieu de stockage et à le redéposer sur les traverses de remplacement grâce par exemple à une goulotte rasante.The ballast entrained in the corridor of said structure is discharged through an opening at its upper part and is recovered, for example on a first belt conveyor, so as to transport it to a storage location and to redeposit it on the replacement sleepers thanks for example to a grazing chute.

Ce premier convoyeur peut s'escamoter, par exemple par translation ou par rotation autour d'un axe vertical, de façon laisser passer le flux de ballast dégarni directement sur la voie après la pose des traverses neuves, ce qui permet de remplir immédiatement la voie en cas de saut d'obstacles de type passages à niveau et lors des fins de cycle de production.This first conveyor can retract, for example by translation or by rotation about a vertical axis, so let the flow of baled ballast directly on the track after the installation of new sleepers, which allows to fill immediately the way in the case of show jumping of type crossings and during production cycle ends.

Le dégamissage de ballast est une opération qui en fonction des conditions climatiques peut soulever beaucoup de poussières et rendre ainsi les conditions de travail difficiles. Il est donc avantageux de prévoir une rampe d'arrosage d'eau au-dessus de l'installation de dégarnissage pour stabiliser les poussières.Ballast dewatering is an operation that, depending on weather conditions, can raise a lot of dust and thus make working conditions difficult. It is therefore advantageous to provide a water spray ramp above the stripping facility to stabilize the dust.

L'installation de dégarnissage doit permettre la circulation normale et en sécurité du train de travaux lorsqu'il n'est pas en opération. A cet effet, la partie frontale doit pouvoir être mise en position haute, par translation ou par rotation de l'installation autour d'un axe horizontal, et maintenue dans cette position de manière à respecter le gabarit UIC de la voie. De la même façon, le dispositif de remplacement de traverses, la charrue dynamique, la dameuse doivent pouvoir être mis en position haute pour respecter le gabarit UIC de la voie, le tout une fois replié s'inscrivant à l'intérieur du gabarit ferroviaire UIC dit de circulation.The stripping facility shall allow normal and safe movement of the work train when not in operation. For this purpose, the front part must be able to be placed in a high position, by translation or rotation of the installation around a horizontal axis, and maintained in this position so as to respect the UIC template of the track. In the same way, the tie replacement device, the dynamic plow, the snow groomer must be able to be placed in a high position to comply with the UIC template of the track, all folded once inside the UIC railroad jig says circulation.

L'invention porte également sur un train de train de renouvellement de voies ferroviaires comportant notamment :The invention also relates to a railway train renewal train comprising, in particular:

• un ensemble de convoyeurs à ballast constitués par exemple de tapis en caoutchouc permettant de transporter le ballast de la zone de substitution des traverses vers l'arrière du train,A set of ballast conveyors consisting for example of rubber mats for transporting the ballast from the substitution zone of the crosspieces towards the rear of the train,

• une goulotte dite rasante permettant de réaliser stockage tampon et de remplir de ballast la voie nouvellement posée ; cette goulotte peut être équipée en amont d'au moins un convoyeur recevant du ballast et monté pivotant autour d'un axe sensiblement vertical par rapport à ladite goulotte afin de projeter un éventuel excédent de ballast de part et d'autre de la voie ou sur un quai,• a so-called grazing chute for making buffer storage and filling the newly laid track with ballast; this chute can be equipped upstream of at least one conveyor receiving ballast and pivoted about a substantially vertical axis relative to said chute to project any excess ballast on either side of the track or on a dock,

• un système de remplacement des rails anciens par des rails neufs, et comprenant en outre une installation de dégarnissage de ballast combinée à un système de remplacement de traverses.A system for replacing old rails with new rails, and further comprising a ballast removal facility combined with a tie replacement system.

L'invention sera mieux comprise au vu des dessins annexés, donnés à titre d'exemples non limitatifs, dans lesquels :The invention will be better understood from the accompanying drawings, given by way of non-limiting examples, in which:

La figure 1 est une vue en plan de l'installation de dégarnissage de ballast ;Figure 1 is a plan view of the ballast removal facility;

La figure 2 est une vue latérale de l'installation de dégarnissage de ballast combinée à un système de remplacement de traverses, montés sur un train de travaux.Figure 2 is a side view of the ballast stripping facility combined with a tie replacement system, mounted on a work train.

Sur la figure 1 on distingue la structure tabulaire 1 de forme octogonale dans laquelle circule une chaîne (non visible) entraînée par un pignon solidaire de l'axe 2. La chaîne est munie de doigts 3 qui sont visibles au niveau de la l'ouverture frontale 4 de la structure. Comme il est visible sur la figure 2, cette ouverture est plongée dans le ballast, qui est entraîné à l'intérieur de la structure 1 par les doigts 3. Cette ouverture est de préférence rectiligne et a une longueur suffisante pour présenter un front d'attaque largement supérieur à la longueur d'une traverse.In FIG. 1, there is a tabular structure 1 of octagonal shape in which a chain (not visible) is driven by a pinion integral with the axis 2. The chain is provided with fingers 3 which are visible at the opening frontal 4 of the structure. As can be seen in FIG. 2, this opening is immersed in the ballast, which is driven inside the structure 1 by the fingers 3. This opening is preferably rectilinear and has a length sufficient to have a leading edge much greater than the length of a cross.

Comme représenté en figures 1 et 2, l'écartement entre les tronçons latéraux la et Ib dans la partie médiane de la structure 1 est suffisant pour que les traverses neuves 6, transportées et déposées sur le ballast par le convoyeur 7, traversent la structure 1 dans leur plus grande longueur ; la plus grande longueur de traverse à prendre en compte est celle des traverses de passages à niveaux, soit 2 600 mm.As shown in FIGS. 1 and 2, the spacing between the lateral sections 1a and 1b in the middle part of the structure 1 is sufficient for the new crosspieces 6, transported and deposited on the ballast by the conveyor 7, to pass through the structure 1 in their greatest length; the longest cross-section length to be taken into account is that of railway crossings, ie 2,600 mm.

Le ballast s'échappe de la structure 1 par un orifice d'évacuation situé au voisinage de l'axe 2, est canalisé par une structure en forme d'entonnoir 8 et est récupéré par le convoyeur 5. Ce convoyeur 5 peut s'escamoter de façon que le ballast tombe directement sur la voie en aval du poste de pose des traverses neuves.The ballast escapes from the structure 1 through an evacuation orifice located in the vicinity of the axis 2, is channeled by a funnel-shaped structure 8 and is recovered by the conveyor 5. This conveyor 5 can retract so that the ballast falls directly on the track downstream of the station of installation of the new sleepers.

Une charrue dynamique 10 peut être intercalée entre le poste de dégarnissage de ballast et le poste de pose de traverses 12.A dynamic plow 10 can be interposed between the ballast stripping station and the cross-laying station 12.

Une dameuse 11 comportant un patin vibrant peut être intercalée entre la charrue dynamique 10 et le poste de pose des traverses neuves.A snow groomer 11 comprising a vibrating pad can be inserted between the dynamic plow 10 and the station for installing the new sleepers.

La structure 1 est fixée à la structure du train 13 de façon mobile, par exemple autour d'un axe 14 de façon à pouvoir être relevée, par exemple grâce au vérin 15, pour respecter le gabarit de la voie lors de la circulation du train. La charrue dynamique 10, la dameuse 11 et l'outil de pose de traverses 12 peuvent également être relevés de façon à respecter le gabarit de la voie. The structure 1 is fixed to the structure of the train 13 in a mobile manner, for example around an axis 14 so that it can be raised, for example by means of the jack 15, to respect the gauge of the track during the running of the train . The dynamic plow 10, the snow groomer 11 and the cross-laying tool 12 can also be raised so as to respect the gauge of the track.

Claims

Revendications claims 1. Elément de train de renouvellement de voies ferroviaires comportant une installation de dégarnissage de ballast et un système de remplacement de traverses, ledit système de remplacement de traverses comprenant un poste d'extraction des traverses usagées et un poste de pose de traverses neuves (12) respectivement disposés de part et d'autre du poste de dégarnissage de ladite installation de dégarnissage, caractérisé en ce que l'installation de dégarnissage comporte :1. Railway track renewal train element comprising a ballast removal facility and a tie replacement system, said tie replacement system including a used tie-out station and a new railway tie-off station (12). ) respectively disposed on either side of the stripping station of said stripping facility, characterized in that the stripping facility comprises: • une structure tabulaire (1) fermée sur elle-même et délimitant, dans un plan incliné par rapport à la verticale, un passage interne en boucle fermée comportant dans sa partie inférieure, un tronçon horizontal muni d'une ouverture frontale longitudinale qui s'étend sur la largeur du ballast à dégarnir, deux couloirs latéraux se rejoignant à la partie supérieure de la structure et, dans ladite partie supérieure, un orifice (8) débouchant sur des moyens d'évacuation du ballast (5), les deux couloirs latéraux étant conformés de manière à délimiter entre leurs régions centrales une zone de plus grande largeur,A tabular structure (1) closed on itself and delimiting, in a plane inclined with respect to the vertical, a closed loop internal passage comprising in its lower part, a horizontal section provided with a longitudinal front opening which extends over the width of the ballast to empty, two lateral corridors joining at the upper part of the structure and, in said upper part, an orifice (8) opening on ballast evacuation means (5), the two lateral corridors being shaped so as to delimit between their central regions an area of greater width, • une chaîne en boucle fermée circulant dans ledit passage sous l'effet d'un moyen d'entraînement solidaire de la structure, ladite chaîne étant munie de doigts (3) orthogonaux à son sens de déplacement et conformés de manière à entraîner le ballast dans la structure (1) par ladite ouverture frontale jusqu' audit orifice d'évacuation (8), et en ce que l'installation de pose des traverses comprend des moyens de transport (7) aptes à transporter les traverses axées perpendiculairement à la voie, ces moyens de transport (7) passant dans ladite zone de plus grande largeur de ladite structure tubulaire (1).A closed-loop chain circulating in said passage under the effect of a driving means integral with the structure, said chain being provided with fingers (3) orthogonal to its direction of movement and shaped so as to drive the ballast in the structure (1) through said front opening to said discharge port (8), and in that the cross-laying installation comprises transport means (7) capable of transporting the crosspieces oriented perpendicular to the track, these transport means (7) passing through said zone of greater width of said tubular structure (1). 2. Elément de train de renouvellement de voies ferroviaires selon la revendication 1, caractérisé en ce que ledit orifice d'évacuation du ballast (8) est situé au- dessus d'un premier convoyeur (5) de façon à convoyer le ballast vers un lieu de stockage.2. Railway train renewal train element according to claim 1, characterized in that said ballast discharge port (8) is located above a first conveyor (5) so as to convey the ballast to a storage location. 3. Elément de train de renouvellement de voies ferroviaires selon la revendication 2, caractérisé en ce que ledit premier convoyeur (5) peut s'écarter de sa position au dessous dudit orifice d'évacuation (8), de façon à ce que le flux de ballast dégarni issu dudit orifice se dépose directement sur la voie en aval du poste de pose des traverses neuves (12).3. train renewal train element according to claim 2, characterized in that said first conveyor (5) can deviate from its position below said discharge orifice (8), so that the flow recessed ballast from said orifice is deposited directly on the track downstream of the station of installation of the new sleepers (12). 4. Elément de train de renouvellement de voies ferroviaires selon l'une quelconque des revendications précédentes, caractérisé en ce que ladite installation de dégarnissage est équipé d'une rampe d'arrosage d'eau afin de stabiliser les poussières émises par la manipulation du ballast.4. Railroad train renewal train element according to any one of the preceding claims, characterized in that said stripping installation is equipped with a water spray ramp in order to stabilize the dust emitted by the handling of the ballast. . 5. Elément de train de renouvellement de voies ferroviaires selon l'une quelconque des revendications précédentes, caractérisé en ce qu'il comporte en outre, situées entre le poste de dégarnissage de ballast et le poste de pose de traverses neuves (12) :Railway track renewal train element according to any one of the preceding claims, characterized in that it furthermore comprises, located between the ballast stripping station and the new stringer station (12): • une charrue dynamique (10), et/ou• a dynamic plow (10), and / or • une installation de damage (11).• a grooming facility (11). 6. Elément de train de renouvellement de voies ferroviaires selon l'une quelconque des revendications précédentes, caractérisé en ce qu'il est mobile par rapport à la structure (13) dudit train de travaux ferroviaires, en translation verticale ou en rotation par rapport à un axe horizontal (14), de façon à pouvoir prendre une position haute de circulation dans laquelle elle respecte le gabarit ferroviaire UIC dit de circulation de la voie. 6. Railway train renewal train element according to any one of the preceding claims, characterized in that it is movable relative to the structure (13) of said railway train train, in vertical translation or in rotation with respect to a horizontal axis (14), so as to be able to take a high traffic position in which it complies with the UIC railway gauge said track traffic. 7. Elément de train de renouvellement de voies ferroviaires selon l'une quelconque des revendications précédentes, caractérisé en ce qu'il comporte en outre :7. Railway train renewal train element according to any one of the preceding claims, characterized in that it further comprises: • au moins un second convoyeur à ballast permettant de transporter le ballast de la zone de substitution des traverses vers l'arrière du train, et/ouAt least one second ballast conveyor for transporting the ballast from the substitution zone of the sleepers towards the rear of the train, and / or • une goulotte dite rasante située en aval de la zone de substitution de traverses, cette goulotte pouvant être équipée en amont d'au moins un convoyeur monté pivotant autour d'un axe sensiblement vertical par rapport à ladite goulotte, et/ouA so-called grazing chute located downstream of the cross-substitution zone, this chute being able to be equipped upstream with at least one conveyor pivoted about a substantially vertical axis with respect to said chute, and / or • un système de remplacement des rails anciens par des rails neufs,• a system for replacing old rails with new rails, 8. Train utilisant un élément de train de renouvellement de voies ferroviaires selon l'une quelconque des revendications précédentes. 8. Train using a railway train renewal element according to any one of the preceding claims.
PCT/FR2008/001534 2008-01-08 2008-10-30 Railway track renewal train element comprising a ballast clearing system Ceased WO2009092896A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0800095A FR2926094B1 (en) 2008-01-08 2008-01-08 RAILWAY RENEWAL TRAIN ELEMENT COMPRISING A BALLAST REMOVAL SYSTEM.
FR0800095 2008-01-08

Publications (2)

Publication Number Publication Date
WO2009092896A2 true WO2009092896A2 (en) 2009-07-30
WO2009092896A3 WO2009092896A3 (en) 2009-09-17

Family

ID=39650678

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FR2008/001534 Ceased WO2009092896A2 (en) 2008-01-08 2008-10-30 Railway track renewal train element comprising a ballast clearing system

Country Status (2)

Country Link
FR (1) FR2926094B1 (en)
WO (1) WO2009092896A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010072346A1 (en) * 2008-12-16 2010-07-01 Matisa Material Industriel Sa Machine and method for renovating a track

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT373316B (en) * 1982-03-10 1984-01-10 Plasser Bahnbaumasch Franz MOBILE SYSTEM FOR RECORDING AND CLEANING THE GRAVITY OF RAILWAYS
EP0538760B1 (en) * 1991-10-24 1994-07-27 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Conveyor and endless chain assembly for railway track working machines
RU2059743C1 (en) * 1993-11-09 1996-05-10 Акционерное общество "Тулажелдормаш" Machine for renewal of railway ballast prism
FR2741640B1 (en) * 1995-11-27 1997-12-26 Sud Ouest Travaux RAILWAY RENEWAL PROCESS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010072346A1 (en) * 2008-12-16 2010-07-01 Matisa Material Industriel Sa Machine and method for renovating a track
US8555786B2 (en) 2008-12-16 2013-10-15 Matisa Materiel Industriel Sa Machine and method for renovating a track

Also Published As

Publication number Publication date
FR2926094B1 (en) 2009-12-11
FR2926094A1 (en) 2009-07-10
WO2009092896A3 (en) 2009-09-17

Similar Documents

Publication Publication Date Title
US8182190B2 (en) Unloading system and method for continuously moving rapid discharge railcars
CH620005A5 (en)
FR2518602A1 (en) ROLLING PLANT AND PROCESS FOR THE PROGRESSIVE CONTINUOUS CLEAN-UP OF THE INFRASTRUCTURE OF A RAILWAY
FR2473575A1 (en) MOBILE INSTALLATION FOR SANITATION OF INFRASTRUCTURE OF RAILWAYS AND METHOD FOR PERFORMING SANITATION USING SUCH FACILITY
US8555786B2 (en) Machine and method for renovating a track
FR2968017A1 (en) PROCESS FOR CONSTRUCTING RAILWAY.
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
FR3109129A1 (en) mechanism for reciprocating stacks of sleepers and railway vehicle comprising such a mechanism
FR2511077A1 (en) ARTICULATED CHAIN CONVEYOR, MOUNTED ON A MINE OR TUNNEL GALLERY SERVING ROW
EP1956144A1 (en) Wagon for unloading ballast on a railway
WO2009092896A2 (en) Railway track renewal train element comprising a ballast clearing system
KR20100134555A (en) How to repair the ballast of the track
CH686144A5 (en) Renewal train a railway line.
US20180010303A1 (en) Method for track renewal
EP2067898A2 (en) Method and equipment for track renewal
WO2013144489A1 (en) Dual-flow aggregate-transporting car
US20050281643A1 (en) Conveyor system for loading hopper cars of dump train and associated methods
FR2736367A1 (en) Installation for continuous repair of rail track - comprises several pivoted machine chassis, supported on wheels, having systems for placing new sleepers, lifting old sleepers from track and ballast cleaning and ejection
EP0775780B1 (en) Method for renewing railway tracks
EP3892775B1 (en) Carriage for transferring sleepers and associated railway vehicle
BE536101A (en)
FR2759101A1 (en) System for replacing worn=out railway sleepers e.g. beside platforms
FR3021674A1 (en) RAILWAY RENOVATION KIT
CH329659A (en) Method of repairing railway tracks and installation for its implementation
WO2024246326A1 (en) Work train for renewing the ballast and sleepers of a track portion

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08871598

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08871598

Country of ref document: EP

Kind code of ref document: A2