[go: up one dir, main page]

WO2000043145A1 - Method for manufacturing dehydration adjustment holder of washing machine - Google Patents

Method for manufacturing dehydration adjustment holder of washing machine Download PDF

Info

Publication number
WO2000043145A1
WO2000043145A1 PCT/KR2000/000037 KR0000037W WO0043145A1 WO 2000043145 A1 WO2000043145 A1 WO 2000043145A1 KR 0000037 W KR0000037 W KR 0000037W WO 0043145 A1 WO0043145 A1 WO 0043145A1
Authority
WO
WIPO (PCT)
Prior art keywords
wing
protrusion
working
molding
making
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2000/000037
Other languages
French (fr)
Inventor
Sangrak Son
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to AU23282/00A priority Critical patent/AU2328200A/en
Publication of WO2000043145A1 publication Critical patent/WO2000043145A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F37/00Details specific to washing machines covered by groups D06F21/00 - D06F25/00
    • D06F37/02Rotary receptacles, e.g. drums
    • D06F37/12Rotary receptacles, e.g. drums adapted for rotation or oscillation about a vertical axis

Definitions

  • the present invention relates to a washing machine, and more particularly, to a method for manufacturing dehydration adjustment holder of the washing machine.
  • a dehydration holder of a washing machine is coupled to a dehydration body as a shaft in the bottom of the dehydration body to thus be driven, as shown in FIG. 2 showing a method a holder according to the prior art, with hot forging working.
  • the prior art forging working is sequentially executed with material cutting working 10, heating working 20, first forging working 30, t- ⁇ riming and edge cutting working 40, reheating working 50, and second forging working 60, and machinelikely executed with shorting -blasting 70 for stripping oxidation skin surface generated due to the forging workings, plating working 80, shaft hole cutting process working 90 for coupling the shaft of the dehydration body. Also, it is finally executed with edge cutting working 100 by the molding.
  • the edge cutting working 50 performed prior to the second forging working 60 is necessarily required because the edge of the product made from the first forging working 40 is irregular and has problems such as environment pollution and the urgency in the health of workers, as the working for stripping oxidation skin surface of the material generated after forging working in the shorting-blasting 70 following the second forging working. Because the shaft hole process working 90 as machinelikely performed is divided into first and second forging workings, the prior art has problem in that the shaft hole process working 90 takes much time to be performed and the precision of the size is varied depending on the worker's skill.
  • FIG. 1 is a view showing a method for manufactuiing a holder according to the present invention.
  • FIG. 2 is a view showing a method for manufacturing a holder according to the prior art.
  • the above object can be achieved according to the present invention with a method for manufacturing a dehydration adjustment holder of a washing machine, including: a trimming and first molding working A for simultaneously shaping a center protrusion, a wing connected to the center protrusion, and a depression in the interior of the wing; a correction process B for making an upper surface of the wing to be flat while repeating diameter diminishment working and depth hardening working of the protrusion; a process C for making a penetrating space at the center of the protrusion while cutting and removing unnecessary edge of the diameter of the wing according to selected size; a wing correction process D for molding and constructing a hole a and a cutting unit-groove of the conventional wing; a recorrection process E for vertically making a protrusion portion at an end of the penetrating space, to be flated; and, a final cleaning and painting process E.
  • a trimming and first molding working A for simultaneously shaping a center protrusion, a wing connected
  • a wing correction process D for forming a hole a and cutting unit-groove b as necessary construction elements of the wing 2 of the above molded product is performed with the molding, a recorrection process E for vertically making a protrusion portion la remained in cut state, in the end of the protrusion 1 generated upon molding the penetrating space 2' in the process C, to be flated, and a conventional cleaning and painting process F are performed sequentially, thereby producing perfected products.
  • All processes of the present invention are performed with press molding working. Namely, the prior art forging working is selected for preventing the dirninishment of the pressure force at the shaft because the penetrating space 2', or, the end of the shaft tube is increased to be thin with the molding process and accordingly, terminals are open upon assembling the shaft.
  • the process according to the present invention is executed as an up setting process of hardening the diameter of the upper surface 1' of the protrusion 1 as a measure including a hardening process.
  • the tii-T-ming and first molding process A applies the pressure to the metal plate (material) supplied therein with the molding and molds a fundamental structure having the protrusion 1 and the wing 2.
  • the correction process B is performed as a previous process for molding the fundamental structure, with repeating diameter diminishment working and depth hardening working of the protrusion 1 depending on the selected requirements.
  • the above repeating workings are performed by considering the phenomenon of rapidly making the thickneee of the protrusion to be thin to thus be cracked in the case of suddenly climi-nishing the diameter of the protrusion 1.
  • the up setting process is performed with trimming the upper surface 1' of the protrusion 1, the upper surface 1' is finally molded to be flat. This is shown in the correction process of the diagrams of the present invention.
  • the process C is executed with making the penetrating space 2' at the center of the protrusion 1 with the molding and forming the shaft tube for coupling the rotation shaft of the dehydration body, while cutting and removing unnecessary edge of the diameter of the wing 2 according to the selected size.
  • the molding having the diameter less than that of the penetrating space 2' is used in the process C, so that the protrusion portion la can be remained to be coupled and cut to the end of the interior of the penetrating space 2'.
  • the protrusion portion la is corrected with recorrection process E as will be described hereinafter.
  • the above state become the fundamental structure having the fundamental configuration and the construction elements of the present invention.
  • the wing correction process D molds and constructs the hole a and a cutting unit-groove b as necessary elements of the conventional wing 2 in the above fundamental structure.
  • the recorrection process E according to the present invention vertically can finally obtain the perfected products through the conventional cleaning and painting process while making a protrusion portion la generated upon molding the penetrating space 2' in the process C, to be flated and makes the coupling of the shaft to be intimate with each other.
  • the present invention has advantages in that the price of the product can be remarkably lowered as production in large quantities and the generation of inferior goods can be decreased with molding at the exact size because the repeating workings can be performed with adapting not the conventional forging working but the press molding working. As well, the size of the penetrating space 2' is exactly made with precision process, thereby maintaining good reliability of the product. Likewise, the present invention is for applying the pressure with using the metal plate, thereby contributing the production in large quantities and price cutting.

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

A method for manufacturing a dehydration adjustment holder of a washing machine, comprising: a trimming and first molding working (A) for simultaneously shaping a center protrusion, a wing connected to the center protrusion, and a depression in the interior of the wing; a correction process (B) for making an upper surface of the wing to be flat while repeating diameter diminishment working and depth hardening working of the protrusion; a process (C) for making a penetrating space at the center of the protrusion while cutting and removing unnecessary edge of the diameter of the wing according to selected size; a wing correction process (D) for molding and constructing a hole (a) and a cutting unit-groove of the conventional wing; a recorrection process (E) for vertically making a protrusion portion at an end of the penetrating space, to be flattened; and, a final cleaning and painting process (E).

Description

METHOD FOR MANUFACTURING DEHYDRATION ADJUSTMENT HOLDER OF WASHING MACHINE
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a washing machine, and more particularly, to a method for manufacturing dehydration adjustment holder of the washing machine.
2. Description of the Related Art
The prevent invention is made so as to cheaply produce products having good quality in large quantities with press working which breaks from a prior art forging working.
A dehydration holder of a washing machine is coupled to a dehydration body as a shaft in the bottom of the dehydration body to thus be driven, as shown in FIG. 2 showing a method a holder according to the prior art, with hot forging working.
Namely, the prior art forging working is sequentially executed with material cutting working 10, heating working 20, first forging working 30, t-±riming and edge cutting working 40, reheating working 50, and second forging working 60, and machinelikely executed with shorting -blasting 70 for stripping oxidation skin surface generated due to the forging workings, plating working 80, shaft hole cutting process working 90 for coupling the shaft of the dehydration body. Also, it is finally executed with edge cutting working 100 by the molding.
That is, it takes much time and much electrical power to molding with heating the material as stated above. Further, because the molding working has the problem in that an end (edge) of protrusions become thin in case of changing the quality of the material, however the forging working has now been unavoidably performed as measure for easily changing the quality of the material.
Especially, now that the forging working is not performed in a first time, it is repeated in two times. At this point, operation efficiency is deteriorated due to ihanu workings of inserting heated material into the molding frame with tweezers by ones and stripping perfected products from the molding frame, thereby generating urgency of fire generation.
The edge cutting working 50 performed prior to the second forging working 60 is necessarily required because the edge of the product made from the first forging working 40 is irregular and has problems such as environment pollution and the urgency in the health of workers, as the working for stripping oxidation skin surface of the material generated after forging working in the shorting-blasting 70 following the second forging working. Because the shaft hole process working 90 as machinelikely performed is divided into first and second forging workings, the prior art has problem in that the shaft hole process working 90 takes much time to be performed and the precision of the size is varied depending on the worker's skill.
BRIEF DESCRIPTION OF THE DRAWINGS
A more complete appreciation of this invention, many of the attendant advantages thereof, will be readily apparent as the same becomes better understood by reference to the following detailed description when considered in conjunction with the accompanying drawings, in which like reference symbols indicate the same or similar elements components, wherein,
FIG. 1 is a view showing a method for manufactuiing a holder according to the present invention; and,
FIG. 2 is a view showing a method for manufacturing a holder according to the prior art.
SUMMARY OF THE INVENTION
It is therefore an object of the present invention for solving the above problem to provide a method for manufacturing a dehydration holder of a washing machine with press molding working stripped from the forging working of the prior art, thereby generating good operation efficiency, price cutting of the product due to production in large quantities, and excellent precision.
The above object can be achieved according to the present invention with a method for manufacturing a dehydration adjustment holder of a washing machine, including: a trimming and first molding working A for simultaneously shaping a center protrusion, a wing connected to the center protrusion, and a depression in the interior of the wing; a correction process B for making an upper surface of the wing to be flat while repeating diameter diminishment working and depth hardening working of the protrusion; a process C for making a penetrating space at the center of the protrusion while cutting and removing unnecessary edge of the diameter of the wing according to selected size; a wing correction process D for molding and constructing a hole a and a cutting unit-groove of the conventional wing; a recorrection process E for vertically making a protrusion portion at an end of the penetrating space, to be flated; and, a final cleaning and painting process E.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
Hereinafter, a preferred embodiment of the present invention will be in detail explained with reference to the accompanying drawings.
A center protrusion 1, a wing 2 connected to the above center protrusion 1, a depression 2a in the interior of the wing 2 are simultaneously shaped through trimming working of the cut material in the molding and a first molding process A. The molding state is similar to that of a hat.
While reducing the diameter of the protrusion 1 with the molding, the depth of the protrusion 1 becomes deep and the molding process of the wing 2 is performed to horizontally and precisely rotate the dehydration body. Next, the above workings are again repeated in two times and a correcting process B to flatly cast an upper surface 1' of the protrusion 1 and to edgily cast the edge in selected sizes, and a process C to shape a shaft tube by making the penetrating space 2' at the center of the protrusion 1 are performed.
Following that, a wing correction process D for forming a hole a and cutting unit-groove b as necessary construction elements of the wing 2 of the above molded product is performed with the molding, a recorrection process E for vertically making a protrusion portion la remained in cut state, in the end of the protrusion 1 generated upon molding the penetrating space 2' in the process C, to be flated, and a conventional cleaning and painting process F are performed sequentially, thereby producing perfected products.
All processes of the present invention are performed with press molding working. Namely, the prior art forging working is selected for preventing the dirninishment of the pressure force at the shaft because the penetrating space 2', or, the end of the shaft tube is increased to be thin with the molding process and accordingly, terminals are open upon assembling the shaft. However, the process according to the present invention is executed as an up setting process of hardening the diameter of the upper surface 1' of the protrusion 1 as a measure including a hardening process.
The tii-T-ming and first molding process A applies the pressure to the metal plate (material) supplied therein with the molding and molds a fundamental structure having the protrusion 1 and the wing 2. Also, the correction process B is performed as a previous process for molding the fundamental structure, with repeating diameter diminishment working and depth hardening working of the protrusion 1 depending on the selected requirements. The above repeating workings are performed by considering the phenomenon of rapidly making the thickneee of the protrusion to be thin to thus be cracked in the case of suddenly climi-nishing the diameter of the protrusion 1. Further, since the up setting process is performed with trimming the upper surface 1' of the protrusion 1, the upper surface 1' is finally molded to be flat. This is shown in the correction process of the diagrams of the present invention.
The process C is executed with making the penetrating space 2' at the center of the protrusion 1 with the molding and forming the shaft tube for coupling the rotation shaft of the dehydration body, while cutting and removing unnecessary edge of the diameter of the wing 2 according to the selected size. In this case, since it is not easy to perform the process C in the event that the diameter of the molding is equal to that of the penetrating space 2' upon molding the penetrating space 2', the molding having the diameter less than that of the penetrating space 2' is used in the process C, so that the protrusion portion la can be remained to be coupled and cut to the end of the interior of the penetrating space 2'. However, the protrusion portion la is corrected with recorrection process E as will be described hereinafter. The above state become the fundamental structure having the fundamental configuration and the construction elements of the present invention.
Therefore, the wing correction process D molds and constructs the hole a and a cutting unit-groove b as necessary elements of the conventional wing 2 in the above fundamental structure. Also, the recorrection process E according to the present invention vertically can finally obtain the perfected products through the conventional cleaning and painting process while making a protrusion portion la generated upon molding the penetrating space 2' in the process C, to be flated and makes the coupling of the shaft to be intimate with each other.
As may be apparent from the foregoing, the present invention has advantages in that the price of the product can be remarkably lowered as production in large quantities and the generation of inferior goods can be decreased with molding at the exact size because the repeating workings can be performed with adapting not the conventional forging working but the press molding working. As well, the size of the penetrating space 2' is exactly made with precision process, thereby maintaining good reliability of the product. Likewise, the present invention is for applying the pressure with using the metal plate, thereby contributing the production in large quantities and price cutting.
While there have been illustrated and described what are considered to be preferred embodiments of the present invention, it will be understood by those skilled in the art that various changes and modifications may be made, and equivalents may be substituted for elements thereof without departing from the true scope of the present invention. In" addition, many modifications may be made to adapt a particular situation to the teaching of the present invention without departing from the central scope thereof. Therefore, it is intended that the present invention not be limited to the particular embodiments disclosed as the best mode contemplated for carrying out the present invention, but that the present invention includes all embodiments falling within the scope of the appended claims.

Claims

WHAT IS CLAIMED IS:
1. A method for manufacturing a dehydration adjustment holder of a washing machine, comprising: a trimming and first molding working A for simultaneously shaping a center protrusion, a wing connected to said center protrusion, and a depression in the interior of the wing; a coπrection process B for making an upper surface of said wing to be flat while repeating diameter diminishment working and depth hardening working of said protrusion; a process C for making a penetrating space at the center of said protrusion while cutting and removing unnecessary edge of the diameter of said wing according to selected size; a wing correction process D for molding and constructing a hole a and a cutting unit-groove of said conventional wing; a recorrection process E for vertically making a protrusion portion at an end of said penetrating space, to be flated; and, a final cleaning and painting process E.
PCT/KR2000/000037 1999-01-23 2000-01-20 Method for manufacturing dehydration adjustment holder of washing machine Ceased WO2000043145A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU23282/00A AU2328200A (en) 1999-01-23 2000-01-20 Method for manufacturing dehydration adjustment holder of washing machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1019990002074A KR100296674B1 (en) 1999-01-23 1999-01-23 Method of Making Holder of Dehydration Tank for Washing Machine
KR1999/2074 1999-01-23

Publications (1)

Publication Number Publication Date
WO2000043145A1 true WO2000043145A1 (en) 2000-07-27

Family

ID=19572149

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2000/000037 Ceased WO2000043145A1 (en) 1999-01-23 2000-01-20 Method for manufacturing dehydration adjustment holder of washing machine

Country Status (3)

Country Link
KR (1) KR100296674B1 (en)
AU (1) AU2328200A (en)
WO (1) WO2000043145A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005056231A3 (en) * 2003-12-11 2005-09-09 Feintool Int Holding Method and device for the production of a thin-walled part
US8092613B2 (en) 2002-05-31 2012-01-10 Ecolab Usa Inc. Methods and compositions for the removal of starch
US8758520B2 (en) 2011-05-20 2014-06-24 Ecolab Usa Inc. Acid formulations for use in a system for warewashing
US9139800B2 (en) 2011-12-13 2015-09-22 Ecolab Usa Inc. Concentrated warewashing compositions and methods

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102202387B1 (en) * 2019-12-26 2021-01-13 손상락 Manufacturing method for holder of dehydrator of washing machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3001227A1 (en) * 1979-04-10 1980-10-23 Schwarzenberg Waschgeraete Shearing and drawing tool set for shaping of metal sheet - esp. stainless steel sheet, which is blanked and drawn, to make drum for domestic washing machines
CH636542A5 (en) * 1979-04-11 1983-06-15 Statnik Max Et Co Sa Method for the production of flanged bushes and a flanged bush produced by this method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55147421A (en) * 1979-05-02 1980-11-17 Mazda Motor Corp Production of branched joint pipe

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3001227A1 (en) * 1979-04-10 1980-10-23 Schwarzenberg Waschgeraete Shearing and drawing tool set for shaping of metal sheet - esp. stainless steel sheet, which is blanked and drawn, to make drum for domestic washing machines
CH636542A5 (en) * 1979-04-11 1983-06-15 Statnik Max Et Co Sa Method for the production of flanged bushes and a flanged bush produced by this method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8092613B2 (en) 2002-05-31 2012-01-10 Ecolab Usa Inc. Methods and compositions for the removal of starch
US8709167B2 (en) 2002-05-31 2014-04-29 Ecolab Usa Inc. Methods and compositions for the removal of starch
US8882932B2 (en) 2002-05-31 2014-11-11 Ecolab Usa Inc. Methods and compositions for the removal of starch
WO2005056231A3 (en) * 2003-12-11 2005-09-09 Feintool Int Holding Method and device for the production of a thin-walled part
US7536894B2 (en) 2003-12-11 2009-05-26 Feintool International Holding Ag Method and device for the production of the thin-walled part
US8758520B2 (en) 2011-05-20 2014-06-24 Ecolab Usa Inc. Acid formulations for use in a system for warewashing
US9481857B2 (en) 2011-05-20 2016-11-01 Ecolab Usa Inc. Acid formulations for use in a system for warewashing
US9139800B2 (en) 2011-12-13 2015-09-22 Ecolab Usa Inc. Concentrated warewashing compositions and methods

Also Published As

Publication number Publication date
AU2328200A (en) 2000-08-07
KR100296674B1 (en) 2001-07-12
KR19990068273A (en) 1999-09-06

Similar Documents

Publication Publication Date Title
CA2199608A1 (en) Method for continuous gum base manufacturing
WO2000043145A1 (en) Method for manufacturing dehydration adjustment holder of washing machine
KR101279784B1 (en) Forging flange being formed on the outer circumference of the metal case and forging device
CN108262397A (en) A kind of refrigerator back board forming die and moulding process
JP3129009B2 (en) Molding method of vertically long seamless steel mold
CN212442827U (en) Boneless wiper spring plate forming machine
CN217141989U (en) Novel panel beating Z type is bent and is pressed muscle integration mould
CN209206240U (en) Deepen sheet metal component Bending Mould
CN208776573U (en) A kind of shaping jig and its mould group of edged lens
CN107030204B (en) A kind of rocker piece of hub trimming die tool
CN107433811B (en) Stamping head, numerical control equipment and method for processing plastic material
CN106655650A (en) Production technology for rapid molding of voice coil motor
CN218965938U (en) Silica gel umbrella-shaped earmuff does not have burr production mould structure
KR100754032B1 (en) Commutator piece for starting motor, its manufacturing method and manufacturing apparatus
KR100486947B1 (en) Method of molding recess punch for screw manufacturing
CN112958736A (en) Forming method of die forging and die tool
CN223518461U (en) Precision guide stamping die frame
CN222729661U (en) Glass cup mold
CN217343313U (en) Metal casing spin forming die
CN214977174U (en) Stamping die of automobile seat back beam support frame
WO2003062709A8 (en) Method for producing a holding element
CN202943150U (en) Novel bending tool
JPH0825362A (en) Tire vulcanizing mold and production of metal blade used therein
CN109433902A (en) A kind of thin type complex parts processing method
KR200409789Y1 (en) Commutator piece for starting motor and its manufacturing apparatus

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AL AU BA BB BG BR CA CN CU CZ EE GE HR HU ID IL IN IS JP KP LC LK LR LT LV MG MK MN MX NO NZ PL RO SG SI SK SL TR TT UA US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase