[go: up one dir, main page]

US20110250977A1 - Method for producing a screw foundation - Google Patents

Method for producing a screw foundation Download PDF

Info

Publication number
US20110250977A1
US20110250977A1 US13/129,381 US200913129381A US2011250977A1 US 20110250977 A1 US20110250977 A1 US 20110250977A1 US 200913129381 A US200913129381 A US 200913129381A US 2011250977 A1 US2011250977 A1 US 2011250977A1
Authority
US
United States
Prior art keywords
starting material
tubular starting
free end
shaped elements
tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/129,381
Inventor
Stephan Reisch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TERRAFIX GmbH
Original Assignee
TERRAFIX GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TERRAFIX GmbH filed Critical TERRAFIX GmbH
Assigned to TERRAFIX GMBH reassignment TERRAFIX GMBH ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: Reisch, Stephan
Publication of US20110250977A1 publication Critical patent/US20110250977A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D41/00Application of procedures in order to alter the diameter of tube ends
    • B21D41/04Reducing; Closing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/801Ground anchors driven by screwing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • E04H12/2223Sockets or holders for poles or posts not used driven into the ground by screwing

Definitions

  • the invention relates to a method for producing a screw foundation for anchoring building parts or structures in the ground.
  • Screw foundations are widely used in structural engineering for directly anchoring signposts, masts, canopies and the like in the ground.
  • screw foundations which are also called ground anchors, have a coil-like coarse thread that can be screwed directly into the ground.
  • the idea forming the basis of the invention is, with a method for producing a screw foundation, to reduce the number of procedural steps directly affecting the later screw foundation such that not only is a simplified procedural sequence produced, but at the same time also a reduced number of interfaces and so of weak points.
  • the method according to the invention comprises the following steps:
  • the method according to the invention makes it possible to use a comparably small amount of material and for the screw foundation to have an even wall thickness. Starting materials with different diameters can thus also be processed without changing the shaped elements (this then only requires a longer path of movement for the shaped elements).
  • the number of shaped elements used for compressing is not particularly restricted within the framework of the invention. According to one further development of the invention provision is made, however, such that at least three, preferably at least four shaped elements are used to compress the free end of the tubular starting material. This in turn produces even deformation with low internal stresses.
  • the shaped elements are configured and moved together such that the free end of the tubular starting material is moulded to form a blunt end.
  • material accumulations and concentrations of stress in the region of the free end can be avoided.
  • the inventors have established that a blunt end can also be screwed into most grounds without any problem.
  • the free end of the tubular starting material is moulded by the shaped elements such that it has an axial through hole.
  • the through hole also enables (rain) water, which could otherwise lead to corrosion or frost damage, to flow away.
  • At least one shaped element has at least one projection on its surface facing towards the tubular starting material.
  • the tubular starting material can be secured easily and securely in its longitudinal direction during the pressing process. This applies independently of the length of the tubular starting material, whereas changes to the length with other securing means respectively necessitate alterations. Any indentations in the tubular starting material produced by the at least one projection are of no significance to the present application.
  • connection section is additionally formed which is provided on the side of the tubular starting material lying opposite the at least partially tapering region.
  • the tubular starting material can have different geometries, such as for example a rectangular or round cross-section, and can be produced from different materials. It is particularly advantageous to use stainless steel which combines good deformability with high resistance to corrosion.
  • a further method according to the invention for producing a screw foundation is the subject matter of independent claim 9 .
  • This method ties in with the same inventive idea as the method described above in which the proportion of the procedural steps directly affecting the later screw foundation is to be reduced.
  • the method defined in claim 9 comprises the following steps:
  • the method can be implemented with simple means, and only a very small quantity of starting material is required. Furthermore, the later screwing foundation obtains a very even wall thickness, and the screw foundation can be produced without welding on additional pieces of tube, even in large quantities. This applies in particular if according to a further development of the invention the at least one welded seam is provided in a tapering section.
  • FIG. 1 shows diagrammatically a side view of a screw foundation produced by means of a method according to the invention
  • FIG. 2 shows diagrammatically a side view of a screw foundation produced by means of a method according to the invention
  • FIG. 3 shows diagrammatically a side sectional view of a screw foundation in the course of the method according to the invention
  • FIG. 4 shows diagrammatically shaped elements used in the course of the method according to the invention
  • FIG. 5 shows diagrammatically an alternative embodiment of the method according to the invention and of a screw foundation produced by the latter.
  • the method according to the invention serves to produce screw foundations 1 , as illustrated respectively in a side view, for example in FIG. 1 and FIG. 2 .
  • the screw foundations 1 serve to anchor building parts or structures in the ground, and for this purpose can be screwed into the ground by means of a screw-like or helical thread 16 .
  • the thread 16 is provided at least on a tapering region 14 of a starting material or base element 10 .
  • the screw foundation 1 has on the end lying opposite the tapering region 14 a connection section 30 which in the present embodiment is formed by a circumferential flange which can include, for example, through holes (not shown) or welded on threaded nuts (not shown).
  • a tubular starting material 10 which can be made for example of stainless steel, is provided with a required length, the tubular starting material 10 possibly having, for example, a rectangular or a round cross-section (hollow cross-section). Then the free end 12 of the tubular starting material 10 is inserted between a number of shaped elements 20 , the arrangement of the shaped elements in the present embodiment being shown diagrammatically in FIG. 4 .
  • the shaped elements 20 can be moved radially between an open position ( FIG. 4 a )) and a closed position ( FIG. 4 b )). Correspondingly, the shaped elements are moved into the position shown in FIG. 4 a ) before inserting the free end 12 of the tubular starting material 10 . As soon as the free end 12 is inserted, and for example is positioned by means of a stop, the shaped elements 20 are moved together radially. They are thus acted upon evenly by a press 22 shown diagrammatically in FIG. 3 so that the free end 12 of the tubular starting material 10 is compressed evenly.
  • projections 24 which are respectively formed on a surface of the shaped elements 20 facing towards the tubular starting material engage in the surface of the tubular starting material 10 so that the tubular staring material 10 is secured in its longitudinal direction.
  • This compressing of the free end 12 of the tubular starting material 10 is continued until the free end 12 has obtained the desired tapering form, as shown diagrammatically in a sectional view, for example in FIG. 3 .
  • the free end 12 shown in FIG. 3 thus has a blunt end 18 which defines an axial through hole 12 a.
  • the screw-like or helical thread 16 is formed on the tapering region 14 , for example by welding on corresponding thread coils. Furthermore, the connection section 30 already described above is formed on the tubular starting material 10 , for example also by welding on. The production process is thus concluded.
  • FIG. 5 An alternative method according to the present invention for producing a screw foundation 1 will be described in the following with reference to FIG. 5 .
  • a tubular, one-piece starting material 10 as already described above is also provided.
  • this starting material 10 is divided into two base elements along a spiked line 42 , by means of which base elements 40 each having two toothed sections 44 are formed.
  • toothed sections 44 are now deformed such that the latter form a tapering section 14 of the base element (see FIG. 5 b )). Now the toothed sections 44 are connected to one another along a welded seam 46 which is provided in the tapering section 14 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

A method for producing a screw foundation (1) for anchoring building parts or structures in the ground, comprising the following steps: providing a tubular starting material (10) with a required length, laying a free end (12) of the tubular starting material (10) between at least two shaped elements (20), securing the tubular starting material (10) in its longitudinal direction, compressing the free end (12) of the tubular starting material (10) by moving together the at least two shaped elements (20), with the result that an at least partially tapering region (14) is formed on the free end (12) of the tubular starting material (10), and forming a screw-like or helical thread (16) on the at least partially tapering region (14).

Description

    TECHNICAL FIELD
  • The invention relates to a method for producing a screw foundation for anchoring building parts or structures in the ground.
  • PRIOR ART
  • Screw foundations are widely used in structural engineering for directly anchoring signposts, masts, canopies and the like in the ground. For this purpose screw foundations, which are also called ground anchors, have a coil-like coarse thread that can be screwed directly into the ground.
  • In order to produce the screw foundations it is known, for example from DE 198 36 370 A1, to hammer a cylindrical tube into the desired shape. This is generally achieved by using a conical mould into which the cylindrical tube is hammered in the longitudinal direction of the tube. A spike is then welded onto the tapered end of the tube produced in this way. Furthermore, a further tube section is welded onto the opposite end of the tube in order to achieve the desired length of the screw foundation.
  • Although such screw foundations have proved to be of value in practice, it has been shown that they are associated with a comparably high degree of complexity in production and have weaknesses as regards durability and strength.
  • DESCRIPTION OF THE INVENTION
  • It is therefore the object of the present invention to provide a method for producing a screw foundation which enables a simple production process while minimising weaknesses.
  • This object is achieved according to the invention by a method for producing a screw foundation according to claim 1. Particularly advantageous further developments of the invention are specified in the dependent claims.
  • The idea forming the basis of the invention is, with a method for producing a screw foundation, to reduce the number of procedural steps directly affecting the later screw foundation such that not only is a simplified procedural sequence produced, but at the same time also a reduced number of interfaces and so of weak points. Against this background the method according to the invention comprises the following steps:
      • providing a tubular starting material with a required length,
      • laying a free end of the tubular starting material between at least two shaped elements,
      • securing the tubular starting material in its longitudinal direction,
      • compressing the free end of the tubular starting material by moving together the at least two shaped elements, with the result that an at least partially tapering region is formed on the free end of the tubular starting material, and
      • forming a screw-like or helical thread on the at least partially tapering region.
  • By means of the use according to the invention of a plurality of moveable shaped elements which compress the free end of the tubular starting material, one can dispense with a number of procedural steps and interfaces which exist in the prior art. Therefore, with the method according to the invention long screw foundations made from a single tubular starting material can also be produced without additional tube sections having to be welded on. In this way a substantial, static and corrosion-related weakness is eliminated.
  • Moreover, the method according to the invention makes it possible to use a comparably small amount of material and for the screw foundation to have an even wall thickness. Starting materials with different diameters can thus also be processed without changing the shaped elements (this then only requires a longer path of movement for the shaped elements).
  • Furthermore, it is possible with the method according to the invention to produce a spike required for penetrating and driving into the ground in one piece from the tubular starting material so that corresponding complexity and weaknesses are also avoided here.
  • According to a further development of the method according to the invention provision is made such that when moved together the shaped elements are acted upon evenly by a hydraulic press. The use of a hydraulic press makes possible an efficient and precise procedural sequence, the even distribution of the pressing force contributing to low internal stresses and so to a high loading capacity of the screw foundation produced.
  • The number of shaped elements used for compressing is not particularly restricted within the framework of the invention. According to one further development of the invention provision is made, however, such that at least three, preferably at least four shaped elements are used to compress the free end of the tubular starting material. This in turn produces even deformation with low internal stresses.
  • According to a further development of the method according to the invention provision is further made such that the shaped elements are configured and moved together such that the free end of the tubular starting material is moulded to form a blunt end. In this way material accumulations and concentrations of stress in the region of the free end can be avoided. The inventors have established that a blunt end can also be screwed into most grounds without any problem.
  • With this concept it is particularly preferred if the free end of the tubular starting material is moulded by the shaped elements such that it has an axial through hole. In this way not only is the screwing in made easier, but the through hole also enables (rain) water, which could otherwise lead to corrosion or frost damage, to flow away.
  • According to a further development of the invention provision is made, moreover, such that at least one shaped element has at least one projection on its surface facing towards the tubular starting material. In this way the tubular starting material can be secured easily and securely in its longitudinal direction during the pressing process. This applies independently of the length of the tubular starting material, whereas changes to the length with other securing means respectively necessitate alterations. Any indentations in the tubular starting material produced by the at least one projection are of no significance to the present application.
  • According to a further development of the invention provision is further made such that on the tubular starting material a connection section is additionally formed which is provided on the side of the tubular starting material lying opposite the at least partially tapering region. In this way objects to be anchored can be connected easily and securely to the screw foundation, where it is advantageously also possible to form the connection section using shaped elements that can be moved together.
  • Within the framework of the present invention the tubular starting material can have different geometries, such as for example a rectangular or round cross-section, and can be produced from different materials. It is particularly advantageous to use stainless steel which combines good deformability with high resistance to corrosion.
  • A further method according to the invention for producing a screw foundation is the subject matter of independent claim 9. This method ties in with the same inventive idea as the method described above in which the proportion of the procedural steps directly affecting the later screw foundation is to be reduced. For this purpose the method defined in claim 9 comprises the following steps:
      • providing a tubular starting material in one piece;
      • dividing the starting material into at least two base elements respectively along a spiked line, by means of which base elements respectively having at least two toothed sections are formed;
      • deforming the toothed sections such that the latter form a tapering section of the base element;
      • connecting the toothed sections to one another along at least one welded seam.
  • With this method one can dispense with strong deformations or compression of the starting material. Therefore the method can be implemented with simple means, and only a very small quantity of starting material is required. Furthermore, the later screwing foundation obtains a very even wall thickness, and the screw foundation can be produced without welding on additional pieces of tube, even in large quantities. This applies in particular if according to a further development of the invention the at least one welded seam is provided in a tapering section.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 shows diagrammatically a side view of a screw foundation produced by means of a method according to the invention;
  • FIG. 2 shows diagrammatically a side view of a screw foundation produced by means of a method according to the invention;
  • FIG. 3 shows diagrammatically a side sectional view of a screw foundation in the course of the method according to the invention;
  • FIG. 4 shows diagrammatically shaped elements used in the course of the method according to the invention;
  • FIG. 5 shows diagrammatically an alternative embodiment of the method according to the invention and of a screw foundation produced by the latter.
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
  • In the following preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
  • The method according to the invention serves to produce screw foundations 1, as illustrated respectively in a side view, for example in FIG. 1 and FIG. 2.
  • The screw foundations 1 serve to anchor building parts or structures in the ground, and for this purpose can be screwed into the ground by means of a screw-like or helical thread 16. The thread 16 is provided at least on a tapering region 14 of a starting material or base element 10. Furthermore, the screw foundation 1 has on the end lying opposite the tapering region 14 a connection section 30 which in the present embodiment is formed by a circumferential flange which can include, for example, through holes (not shown) or welded on threaded nuts (not shown).
  • In the following the method according to the invention for producing the screw foundation 1 will be described with reference to FIGS. 3 and 4. First of all a tubular starting material 10, which can be made for example of stainless steel, is provided with a required length, the tubular starting material 10 possibly having, for example, a rectangular or a round cross-section (hollow cross-section). Then the free end 12 of the tubular starting material 10 is inserted between a number of shaped elements 20, the arrangement of the shaped elements in the present embodiment being shown diagrammatically in FIG. 4.
  • As can be seen in FIG. 4, the shaped elements 20 can be moved radially between an open position (FIG. 4 a)) and a closed position (FIG. 4 b)). Correspondingly, the shaped elements are moved into the position shown in FIG. 4 a) before inserting the free end 12 of the tubular starting material 10. As soon as the free end 12 is inserted, and for example is positioned by means of a stop, the shaped elements 20 are moved together radially. They are thus acted upon evenly by a press 22 shown diagrammatically in FIG. 3 so that the free end 12 of the tubular starting material 10 is compressed evenly.
  • Here the projections 24 which are respectively formed on a surface of the shaped elements 20 facing towards the tubular starting material engage in the surface of the tubular starting material 10 so that the tubular staring material 10 is secured in its longitudinal direction.
  • This compressing of the free end 12 of the tubular starting material 10 is continued until the free end 12 has obtained the desired tapering form, as shown diagrammatically in a sectional view, for example in FIG. 3. The free end 12 shown in FIG. 3 thus has a blunt end 18 which defines an axial through hole 12 a.
  • Then the pressing force of the hydraulic press 22 is released, and the shaped elements 20 are moved back somewhat so that the starting material 10 can be removed.
  • Now the screw-like or helical thread 16 is formed on the tapering region 14, for example by welding on corresponding thread coils. Furthermore, the connection section 30 already described above is formed on the tubular starting material 10, for example also by welding on. The production process is thus concluded.
  • An alternative method according to the present invention for producing a screw foundation 1 will be described in the following with reference to FIG. 5. With this method a tubular, one-piece starting material 10 as already described above is also provided. As shown in FIG. 5 a), this starting material 10 is divided into two base elements along a spiked line 42, by means of which base elements 40 each having two toothed sections 44 are formed.
  • These toothed sections 44 are now deformed such that the latter form a tapering section 14 of the base element (see FIG. 5 b)). Now the toothed sections 44 are connected to one another along a welded seam 46 which is provided in the tapering section 14.
  • Finally, although not shown in FIG. 5, a thread in the region of the tapering section 14 and a flange section or the like are provided so that the production of the screw foundation 1 is concluded.

Claims (12)

1. A method for producing a screw foundation (1) for anchoring building parts or structures in the ground, comprising the following steps:
providing a tubular starting material (10) with a required length,
laying a free end (12) of the tubular starting material (10) between at least two shaped elements (20),
securing the tubular starting material (10) in its longitudinal direction,
compressing the free end (12) of the tubular starting material (10) by moving together at least two shaped elements (20), with the result that an at least partially tapering region (14) is formed on the free end (12) of the tubular starting material (10), and
forming a screw-like or helical thread (16) on the at least partially tapering region (14).
2. The method according to claim 1, characterised in that when moved together the shaped elements (20) are acted upon evenly by a hydraulic press (22).
3. The method according to claim 1 or 2, characterised in that at least three, preferably at least four shaped elements (20) are used to compress the free end (12) of the tubular starting material (10).
4. The method according to any of the preceding claims, characterised in that the shaped elements (20) are configured and moved together such that the free end (12) of the tubular starting material (10) is moulded to form a blunt end (18).
5. The method according to claim 4, characterised in that the free end (12) of the tubular starting material is moulded by the shaped elements (20) such that it has an axial through hole (12 a).
6. The method according to any of the preceding claims, characterised in that at least one shaped element (20) has at least one projection (24) on its surface facing towards the tubular starting material.
7. The method according to any of the preceding claims, characterised in that the tubular starting material (10) has a rectangular or round cross-section.
8. The method according to any of the preceding claims, characterised in that there is additionally formed on the tubular starting material (10) a connection section (30) which is provided on the side of the tubular starting material (10) lying opposite the at least partially tapering region (14).
9. The method according to claim 8, characterised in that the connection section (30) is formed with a flange (30) extending around the tubular starting material and which has through holes and/or welded on threaded nuts.
10. The method according to any of the preceding claims, characterised in that the tubular starting material (10) is made at least partially of stainless steel.
11. The method for producing a screw foundation (10) for anchoring building parts or structures in the ground, comprising the steps:
providing a tubular starting material (10) in one piece;
dividing the starting material (10) into at least two base elements (40) respectively along a spiked line (42), by means of which base elements (40) respectively having at least two toothed sections (44) are formed;
deforming the toothed sections (44) such that the latter form a tapering section (14) of the base element (40);
connecting the toothed sections (44) to one another along at least one welded seam (46).
12. The method according to claim 10, characterised in that at least one welded seam (46) is provided in the tapering section (14).
US13/129,381 2008-11-13 2009-10-09 Method for producing a screw foundation Abandoned US20110250977A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102008043709A DE102008043709A1 (en) 2008-11-13 2008-11-13 Method for producing a rotary foundation
DE102008043709.3 2008-11-13
PCT/EP2009/063184 WO2010054902A1 (en) 2008-11-13 2009-10-09 Method for producing a screw foundation

Publications (1)

Publication Number Publication Date
US20110250977A1 true US20110250977A1 (en) 2011-10-13

Family

ID=41426208

Family Applications (1)

Application Number Title Priority Date Filing Date
US13/129,381 Abandoned US20110250977A1 (en) 2008-11-13 2009-10-09 Method for producing a screw foundation

Country Status (7)

Country Link
US (1) US20110250977A1 (en)
EP (1) EP2350409A1 (en)
AU (1) AU2009315881A1 (en)
CA (1) CA2743919A1 (en)
DE (1) DE102008043709A1 (en)
MX (1) MX2011005065A (en)
WO (1) WO2010054902A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10794035B2 (en) 2014-06-26 2020-10-06 Rbs Sprl Fastener for construction element

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010043785B3 (en) * 2010-11-11 2012-03-22 Krinner Innovation Gmbh Screw foundation for e.g. post, has helical screw with tapered intermediate portion that includes convex cladding region whose convexity radius is equal to diameter of upper cylindrical portion of screw
DE102021133240A1 (en) 2021-12-15 2023-06-15 Winkelmann Powertrain Components GmbH & Co. KG. Ground screw for fixing elements in a substructure with a tubular body

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2129290A (en) * 1936-09-19 1938-09-06 Firm Friedr Method and apparatus for producing screw threads
US6779375B1 (en) * 2003-03-26 2004-08-24 Randall L. Alexoff Method and apparatus for producing tubes and hollow shafts

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3362212A (en) * 1965-04-13 1968-01-09 Walker Mfg Co Tube machine
IT1261103B (en) * 1993-10-29 1996-05-09 Borletti Climatizzazione PROCEDURE FOR CONFORMING ACCORDING TO A CIRCULAR CROSS SECTION THE END OF AN OBLONG CROSS SECTION TUBE.
GB2305948A (en) * 1995-10-04 1997-04-23 Rumney Barbara Anne Ground bolts
DE19814474C1 (en) * 1998-04-01 1999-07-08 Peter Dipl Ing Schroeck Radial press tool for rotationally symmetrical workpieces
DE19836370C2 (en) 1998-08-11 2002-07-18 Klaus Krinner Process for the production of fastening devices for rods, posts, masts or the like in the ground and fastening devices produced according to this process
US6523302B2 (en) * 2000-12-04 2003-02-25 Esmail Zayeratabat One piece garden stake
DE10250257B4 (en) * 2001-12-12 2010-05-12 Erich Haimerl Straßenleitpfostenfuß
DE102005034260B3 (en) * 2005-07-22 2006-07-27 Schröck-Horn, Ursula Radial press for pressing of rotationally symmetrical hollow bodies with parallel posts and two part press tool useful in production of flexible hose fittings has provision for swinging tool parts around axis
DE102005045574A1 (en) * 2005-09-23 2007-04-12 "DOMA"-Autozubehör und Industriebedarf GmbH Screw foundation for a ground anchor, to be screwed into the ground, has a spiral at a conical section between two cylindrical sections
US7494160B2 (en) * 2006-06-15 2009-02-24 Fu Zhun Precision Industry (Shen Zhen) Co., Ltd. Sealing structure of heat pipe and method for manufacturing the same
DE202008004967U1 (en) * 2008-04-09 2008-07-17 Cortec Gmbh ground anchor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2129290A (en) * 1936-09-19 1938-09-06 Firm Friedr Method and apparatus for producing screw threads
US6779375B1 (en) * 2003-03-26 2004-08-24 Randall L. Alexoff Method and apparatus for producing tubes and hollow shafts

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10794035B2 (en) 2014-06-26 2020-10-06 Rbs Sprl Fastener for construction element

Also Published As

Publication number Publication date
WO2010054902A1 (en) 2010-05-20
MX2011005065A (en) 2011-09-01
CA2743919A1 (en) 2010-05-20
AU2009315881A1 (en) 2011-06-30
EP2350409A1 (en) 2011-08-03
DE102008043709A1 (en) 2010-05-20

Similar Documents

Publication Publication Date Title
EP2239376B1 (en) Anchoring component for a wind farm tower
US8302276B2 (en) Anchor bolt and annularly grooved expansion sleeve assembly exhibiting high pull-out resistance, particularly under cracked concrete test conditions
US8353655B2 (en) Floor anchor
CN216238501U (en) Mechanical connecting structure for precast pile
CN108532591A (en) Connector and the prefabricated components connected with the connector
US8484909B2 (en) Foundation screw with portions of variable diameter
CN101413397A (en) Self drilling rock bolt
CN104762954A (en) Steel pipe concrete pile
US20110250977A1 (en) Method for producing a screw foundation
CN105735134B (en) Temporary tensioning method for stub matching prefabricated box girders
US7175368B2 (en) Method and test setup for determining the bearing behaviour of displacement piles
CN107489144B (en) Reinforcing tubular pile
CN102587582B (en) Pre-stress tensioning clamp of hollow self-balance pre-stress steel bar
CN217758723U (en) Steel structure spiral body and spiral ground pile
EP2893139B1 (en) Arrangement for the high-strength anchorage of a tendon having a tie rod in a structural element and method for producing an anchorage of this type
KR20080025902A (en) Rockbolt and its construction method
US20230066468A1 (en) Flared reinforced pier and pier bracket assembly and methods of manufacturing and use
CN111455996A (en) Prefabricated prestressed anchor rod with guide device and construction method
CN217150188U (en) Precast pile connecting structure and whole pile structure
CN1382891A (en) Method for mounting anchor tendon penetrated mechanically
RU2646282C1 (en) Concrete screw pile and method of its mounting
JP2015113563A (en) Screw pile and burying method thereof
CN204626380U (en) A kind of steel pipe concrete pipe pile and prepare the particular manufacturing craft of this pile tube
CN212561508U (en) Take guider's prefabricated prestressed anchorage pole
KR200313707Y1 (en) Permanent Ground Anchor

Legal Events

Date Code Title Description
AS Assignment

Owner name: TERRAFIX GMBH, GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:REISCH, STEPHAN;REEL/FRAME:026359/0373

Effective date: 20110530

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION