[go: up one dir, main page]

SU1560686A1 - Method of pipe laying in ground - Google Patents

Method of pipe laying in ground Download PDF

Info

Publication number
SU1560686A1
SU1560686A1 SU874318694A SU4318694A SU1560686A1 SU 1560686 A1 SU1560686 A1 SU 1560686A1 SU 874318694 A SU874318694 A SU 874318694A SU 4318694 A SU4318694 A SU 4318694A SU 1560686 A1 SU1560686 A1 SU 1560686A1
Authority
SU
USSR - Soviet Union
Prior art keywords
channel
pipelines
length
trench
walls
Prior art date
Application number
SU874318694A
Other languages
Russian (ru)
Inventor
Владимир Кузьмич Чернов
Original Assignee
Предприятие П/Я А-7080
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-7080 filed Critical Предприятие П/Я А-7080
Priority to SU874318694A priority Critical patent/SU1560686A1/en
Application granted granted Critical
Publication of SU1560686A1 publication Critical patent/SU1560686A1/en

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Изобретение относитс  к строительству и может быть использовано при сооружении подземных коммуникаций с целью уменьшени  ширины земл ной полосы, отводимой дл  производства работ в стесненых услови х улиц и уменьшени  повреждаемости их благоустройства. Способ осуществл ют следующим образом. Разрабатывают траншею 1 и возвод т лоток 2 канала и стены 3 до верха траншеи. После возведени  стен 3 их раскрепл ют внутренними распорными элементами 4, посел чего до монтажа трубопроводов осуществл ют обратную засыпку 6 с образованием по крайней мере, с одной стороны канала проезда и сборочных площадок. В случае укладки трубопроводов секци ми, длина которых превышает рассто ние между внутренними распорными элементами 4, их удал ют на участке длиной, равной длине секции, стены 3 на этом участке заанкеривают к грунту засыпки дополнительными распорками, а после окончани  монтажа дополнительные распорки удал ют и устанавливают внутреннее распорные элементы 4, перекрытие канала и восстанавливают дорожное покрытие. 2 з.п.ф-лы, 3 ил.The invention relates to the construction and can be used in the construction of underground utilities in order to reduce the width of the land strip allocated for work in the constrained conditions of streets and reduce the damage to their improvement. The method is carried out as follows. Trench 1 is developed and tray 2 of the channel and wall 3 is raised to the top of the trench. After the walls 3 are erected, they are fastened with internal spacer elements 4, and then before the pipelines are installed, backfilling 6 is carried out with the formation of at least one side of the passage channel and assembly sites. In the case of laying pipelines with sections that are longer than the distance between the inner spacer elements 4, they are removed in a section of length equal to the section length, walls 3 in this area are anchored to the soil by backfilling with additional spacers, and after the installation is completed, additional spacers are removed and establish the internal spacers 4, the overlap of the channel and restore the road surface. 2 hp ff, 3 ill.

Description

Изобретение относитс  к строительству и может быть использовано при сооружении подземных коммуникаций.The invention relates to the construction and can be used in the construction of underground utilities.

Целью изобретени   вл етс  уменьшение ширины земл ной полосы, отводимой дл  производства работ в стесненных услови х улиц, и уменьшение повреждаемости их благоустройства.The aim of the invention is to reduce the width of the land strip allocated for work in the cramped conditions of the streets, and to reduce the damage to their improvement.

На фиг.1 показан момент прокладки трубопровода после монтажа лотка и стен канала и засыпки пазух; на фиг.2- момент укладки трубопроводов длинными секци ми; на фиг.З - момент окончани  всех работ.Figure 1 shows the moment of laying the pipeline after installation of the tray and the walls of the channel and backfilling of the sinuses; Fig. 2 illustrates the moment of laying the pipelines in long sections; in FIG. 3, the moment of completion of all works.

Способ осуществл ют следующим образом.The method is carried out as follows.

Разрабатывают траншею 1 и возвод т лоток 2 канала и стены 3 до верха траншеи. После возведени  стен 3 их раскрепл ют внутренними дискретно расположенными распорными элементами 4, после чего до монтажа трубопроводов 5 осуществл ют обратную засыпку 6 с образованием по крайней мере с одной стороны канала проезда и сборочных площадок.Trench 1 is developed and tray 2 of the channel and wall 3 is raised to the top of the trench. After the walls 3 are erected, they are loosened by internal discrete spaced elements 4, after which prior to the installation of the pipelines 5, backfilling 6 is carried out with formation of at least one side of the passage channel and assembly sites.

Б случае укладки трубопроводов 5 секци ми длиной, превышающей рассто In the case of laying pipelines in 5 sections, longer than

ние между внутренними распорными элементами 4, часть внутренних распор- рных элементов- 4 на участке длиной, равной длине секции, удал ют, верхние части стен 3 канала на этом участке заанкеривают к грунту засыпки 6 дополнительными распорками 7, а после окончани  монтажа секции дополнительные распорки 7 удал ют и устанавливают внутренние распорные элементы 4 на этом участке.The connection between the internal spacer elements 4, part of the internal spacer elements 4 in a length equal to the length of the section is removed, the upper parts of the walls 3 of the channel in this area anchors the additional spacers 7 to the soil of the backfill 6, and 7, internal spacer elements 4 are removed and installed in this area.

По окончании монтажа трубопроводов и прочего оборудовани  канала, проведение проверок и испытаний их, устанавливают перекрытие канала 8 и восстанавливают дорожное покрытие 9 непосредственно по перекрытию канала или по балластной подушке 10.Upon completion of the installation of pipelines and other equipment of the channel, conducting inspections and testing them, install the overlap of the channel 8 and restore the pavement 9 directly on the channel overlap or on the ballast cushion 10.

Если по проекту требуетс  выполн ть и другие работы, например, гидроизол ционные , то они выполн ютс  в соответствующий период возведени  канала параллельно описанным работам.If the project requires other works, for example, waterproofing, they are carried out in the appropriate period of the construction of the canal in parallel with the works described.

Монтаж днища стен и распорных элементов может быть выполнен с помощью специального навесного над тран шеей оборудовани , которое передвигают вперед по трассе канала по мере сборки его секций в траншее и обратной засыпки.The installation of the bottom of the walls and spacers can be performed using special equipment mounted above the trench, which is moved forward along the channel along the channel as the sections are assembled into a trench and backfilled.

Способ позвол ет улучшить организацию работ и услови  производства за счет создани  сборочных площадок и проездов дл  автотранспорта с механизмами непосредственно р дом с каналом , а также сократить количество повреждений и разрушений элементов благоустройства улицы за счет прекращени  езды магаин и механизмов по тротуарам и газонам. Кроме того, при ремонтах и заменах трубопроводов зна- чительно уменьшаютс  объемы работ и повреждени  дорожного покрыти  улицы, что дает возможность выполн ть ремонтные работы путем вскрыти  канала со съемом перекрыти  и применени  всего комплекса механизации т желых работ вместо практикуемых способов проведеThe method allows to improve the organization of work and production conditions by creating assembly platforms and passages for motor vehicles with mechanisms directly adjacent to the canal, as well as reducing the amount of damage and destruction of street improvement elements due to the cessation of riding shops and mechanisms on sidewalks and lawns. In addition, repair and replacement of pipelines significantly reduce the amount of work and damage to the street pavement, which makes it possible to carry out repair work by opening the canal with the removal of the overlap and use of the whole complex of mechanization of heavy work

5five

00

5five

00

5five

00

5five

ни  ремонта с подачей материалов через люки и монтажные окна и выполнени  ремонтных работ в замкнутом, тесном пространстве канала с преобладанием ручного т желого физического труда.repair with the supply of materials through hatches and installation windows and the implementation of repair work in a closed, tight channel space with a predominance of manual heavy physical labor.

Claims (3)

1.Способ прокладки трубопроводов в грунте, включающий разработку траншеи , возведение лотка канала и стен до верха траншеи, монтаж трубопроводов с последующим возведением перекрыти  канала в уровне поверхности грунта и обратную засыпку траншеи, отличающийс тем, что, с целью уменьшени  ширины земл ной полосы, отводимой дл  производства работ в стесненных услови х улиц,1. A method of laying pipelines in the ground, including developing a trench, erecting a channel tray and walls to the top of the trench, installing pipelines with the subsequent erection of the channel in the ground surface and backfilling the trench, in order to reduce the width of the land strip, allocated for the production of works in the constrained conditions of the streets, и уменьшени  повреждаемости их благоустройства , после возведени  стен раскрепл ют их внутренними дискретно расположенными распорными элементами, а обратную засыпку осуществл ют до монтажа трубопроводов с образованием по крайней мере с одной стороны канала проезда и сборочных площадок.and reducing the damage to their improvement, after the walls are erected, they are fixed with internal discrete spaced elements, and backfilling is carried out before the installation of the pipelines with the formation of at least one side of the passage channel and assembly sites. 2.Способ поп.1, о тлич а ю - щ и и с   тем, что трубопроводы укладывают секци ми длиной, не превышающей рассто ние между внутренними распорными элементами по длине канала.2. Method pop.1, which is different from the fact that the pipelines are laid in sections of length not exceeding the distance between the internal spacer elements along the length of the channel. 3.Способ по п.1, отличающийс  тем, что трубопроводы укладывают секци ми длиной, превышающей рассто ние между внутренними распорными элементами по длине канала, причем до укладки каждой секции часть внутренних распорных элементов на участке длиной, равной длине секции, удал ют, верхние части стен канала3. A method according to claim 1, characterized in that the pipelines are laid in sections of a length exceeding the distance between the inner spacer elements along the channel length, and prior to the placement of each section, part of the internal spacer elements in the section equal to the length of the section are removed, the upper parts of the canal walls на этом участке заанкеривают к грунту засыпки дополнительными распорками, а после окончани  монтажа секции дополнительные распорки удал ют и устанавливают внутренние распорные элементы на этом участке.in this area, anchor to the soil backfill with additional spacers, and after the section is installed, the additional spacers are removed and internal spacers are installed in this area. юYu -ГЧ /-HF / / Ч 3 Ю / / г/ W 3 Yu / / g Фм.1Fm.1 Фм.2Fm.2 Фм.ЗFm.z
SU874318694A 1987-10-21 1987-10-21 Method of pipe laying in ground SU1560686A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874318694A SU1560686A1 (en) 1987-10-21 1987-10-21 Method of pipe laying in ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874318694A SU1560686A1 (en) 1987-10-21 1987-10-21 Method of pipe laying in ground

Publications (1)

Publication Number Publication Date
SU1560686A1 true SU1560686A1 (en) 1990-04-30

Family

ID=21332605

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874318694A SU1560686A1 (en) 1987-10-21 1987-10-21 Method of pipe laying in ground

Country Status (1)

Country Link
SU (1) SU1560686A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2160340C2 (en) * 1998-09-21 2000-12-10 Открытое акционерное общество "Уралкалий" Method for laying underground service lines
RU2805711C1 (en) * 2023-03-23 2023-10-23 Анатолий Анатольевич Дубас Method for laying pipeline through passing tunnels

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Патент FR К 2234785, кл. Е 02 D 29/10, 1975. Авдолимов Е.М., Шальнов А.П. Вод ные тепловые сети. М.: Стройиз- дат, 1984, с.213-217. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2160340C2 (en) * 1998-09-21 2000-12-10 Открытое акционерное общество "Уралкалий" Method for laying underground service lines
RU2805711C1 (en) * 2023-03-23 2023-10-23 Анатолий Анатольевич Дубас Method for laying pipeline through passing tunnels

Similar Documents

Publication Publication Date Title
US3999394A (en) Precast ribbed arch subway structure and method
KR101206860B1 (en) Excavation tunnel constructing method using vertical side wall and arch ceiling
US6406220B1 (en) Arched support structure
SU738521A3 (en) Method of building band foundation
US7744307B2 (en) Method for renovating of a traffic-carrying structure
SU1560686A1 (en) Method of pipe laying in ground
CN112411623A (en) Excavation support system and construction method of urban open cut and underpass tunnel
CN109140046B (en) Method for plugging end of pipe jacking pipe curtain
US3914946A (en) Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance and method
JPS6062398A (en) Construction of underpass
JPS584094A (en) Method of constructing low road cross
JPH0313691A (en) How to build an underground tunnel
JP3120150B1 (en) Road lining method
JP2006112137A (en) Branch tunnel junction structure and its construction method
SU1413195A1 (en) Underground railway station and method of constructing same
JPS6117696A (en) Construction of underground head
SU1654418A1 (en) Culvert
CN222362520U (en) A partial cover and excavation structure for subway facilities under a busy urban highway
RU2805711C1 (en) Method for laying pipeline through passing tunnels
JPH07197772A (en) How to build an underpass
SU1569498A1 (en) Suspension unit for underground pipeline
KR20060110138A (en) Wall structure and construction method using H pile
SU947293A1 (en) Method of constructing a shallow-depth tunnel
KR101847356B1 (en) Half excavation cross roadway construction method
KR20240022081A (en) Construction Method of Drainage Channel in Soft Ground of Road with High Inflow of Groundwater