SU1546541A1 - Method of closure of river beg - Google Patents

Method of closure of river beg Download PDF

Info

Publication number
SU1546541A1
SU1546541A1 SU884395959A SU4395959A SU1546541A1 SU 1546541 A1 SU1546541 A1 SU 1546541A1 SU 884395959 A SU884395959 A SU 884395959A SU 4395959 A SU4395959 A SU 4395959A SU 1546541 A1 SU1546541 A1 SU 1546541A1
Authority
SU
USSR - Soviet Union
Prior art keywords
banquet
channel
banquets
closure
dam
Prior art date
Application number
SU884395959A
Other languages
Russian (ru)
Inventor
Тимур Халимович Ахмедов
Евгения Семеновна Маркус
Альбина Аркадьевна Пичугина
Иван Петрович Шаг
Original Assignee
Казахский научно-исследовательский институт энергетики
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Казахский научно-исследовательский институт энергетики filed Critical Казахский научно-исследовательский институт энергетики
Priority to SU884395959A priority Critical patent/SU1546541A1/en
Application granted granted Critical
Publication of SU1546541A1 publication Critical patent/SU1546541A1/en

Links

Landscapes

  • Revetment (AREA)

Abstract

Изобретение относитс  к гидротехническому строительству. Цель изобретени  - снижение трудозатрат за счет сокращени  предпускового периода при строительстве гидростанции. На первом этапе производ т предварительное стеснение русла частью земл ной плотины 1, начина  от первоначального берега 5. Затем производ т отсыпку низового банкета 3 из горной массы и с отставанием от него на 30-50 м верхового банкета 2. Одновременно провод т отсыпку тела земл ной плотины 1 между банкетами 2 и 3. Конечный этап перекрыти  - замыкание - провод т низовым банкетом 3. 1 з.п. ф-лы, 2 ил.FIELD OF THE INVENTION The invention relates to hydraulic engineering. The purpose of the invention is to reduce labor costs by reducing the pre-launch period during the construction of a hydropower station. At the first stage, the channel is preliminarily constrained by a part of the earth dam 1, starting from the original shore 5. Then the bottom banquet 3 is dumped from the rock mass and 30-50 m of the top banquet 2 are behind it. At the same time, the ground body is dumped Noah dam 1 between the feasts 2 and 3. The final stage of the overlap - closure - is carried out by the downstairs banquet 3. 1 Cp f-ly, 2 ill.

Description

Q,3/c,Q, 3 / c,

ОABOUT

200 400200 400

ffffO 800 Фиг. 2ffffO 800 FIG. 2

WOO 1200WOO 1200

Claims (2)

Формула изобретенияClaim 1. Способ перекрытия русла реки преимущественно при строительстве гидростанции, включающий стеснение русла с одного из берегов путем выдвижения двух банкетов — верхового и низового, отличающийся1. The method of blocking the river bed mainly during the construction of the hydroelectric station, including the restriction of the channel from one of the banks by putting forward two banquets - the top and bottom, characterized 30 тем, что, с целью снижения трудозатрат за счет сокращения предпускового периода при строительстве гидростанции, в процессе перекрытия перед выдвижением верхового и низового банкетов осуществляют возведение цокольной части земляной русловой плоти35 ны, размещаемой между банкетами, при помощи которой вначале производят предварительное стеснение русла, затем выдвигают два банкета, причем верховой банкет отсыпают с оставанием, а в пространстве 4Q между банкетами продолжают возводить русловую плотину, отсыпку которой прекращают вместе с отсыпкой верхового банкета на заключительном этапе перекрытия, а замыкание прорана осуществляют низовым банкетом, при этом гребень всего насыпного 45 сооружения размещают на отметке, необходимой для пуска первого гидроагрегата.30 in that, in order to reduce labor costs by reducing the pre-launch period during the construction of the hydroelectric station, in the process of overlapping before extending the upper and lower banquets, the basement part of the earthen channel dam 35, placed between the banquets, is first constructed, with the help of which the channel is first constrained, then put forward two banquets, and the horse banquet is sprinkled with leaving, and in the 4Q space between the banquets they continue to erect a channel dam, the filling of which is stopped together with tsypkoy rideable banquet overlap at the final stage, and the closure of the closure channel is performed grassroots banquet, the total bulk comb structures 45 are placed at the level required to start the first hydraulic unit. 2. Способ по π. 1, отличающийся тем, что, с целью повышения экономичности, верховой банкет отсыпают из материала насыпной русловой плотины.2. The method according to π. 1, characterized in that, in order to increase efficiency, the horse banquet is sprinkled from the material of the bulk channel dam. Фиг. 2FIG. 2
SU884395959A 1988-02-10 1988-02-10 Method of closure of river beg SU1546541A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884395959A SU1546541A1 (en) 1988-02-10 1988-02-10 Method of closure of river beg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884395959A SU1546541A1 (en) 1988-02-10 1988-02-10 Method of closure of river beg

Publications (1)

Publication Number Publication Date
SU1546541A1 true SU1546541A1 (en) 1990-02-28

Family

ID=21362764

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884395959A SU1546541A1 (en) 1988-02-10 1988-02-10 Method of closure of river beg

Country Status (1)

Country Link
SU (1) SU1546541A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Меламут Д. Л Гидромеханизаци в промышленном и сельском хоз йственном строительстве. М.: Литература по строительству, 1967, с. 319-325. Васильев А. Ф. и др. Перекрытие русла р. Туломы в створе земл ной плотины Верхне- туломской ГЭС.-Гидротехническое строительство, 1963, № 7. *

Similar Documents

Publication Publication Date Title
RU96111630A (en) METHOD FOR FIXING SOIL
SU1546541A1 (en) Method of closure of river beg
ATE39374T1 (en) ARRANGEMENT OF MODULAR ELEMENTS TO PROTECT BANKS OF CANALS, DATs AND WATERWAYS IN GENERAL.
SU1687705A1 (en) Method for burial of solid materials
RU2004674C1 (en) Loose-fill dam
SU866031A1 (en) Method of damming a river bed
SU1486549A1 (en) Method of damming a river bed
RU2004675C1 (en) Method for erection of earth structure
JPS554487A (en) Foundation pile
SU1583522A1 (en) Method of constructing a hydraulically deposited earth dam
SU1116113A1 (en) Method of erecting profile earth-fill structures
SU1573080A1 (en) Method of erecting ground dam on soft slit foundation
SU1393867A1 (en) Method of hydraulic deposition of artificial sand beach of cohesive materials
RU1778215C (en) Method for consolidation of riverbank
SU1446225A1 (en) Method of damming river flow
SU773204A1 (en) Method of consolidating the slopes of earth-fill structure
SU825955A1 (en) Method of dumping on watered loose soil base
RU2019623C1 (en) Method for erection of hydraulically filled structure on slumping grounds
SU503981A1 (en) The method of deep compaction of the array of water-saturated sandy soil
SU1758153A1 (en) Method of erecting river head in hydraulic tunnel
SU1393872A1 (en) Method of constructing water spillway in the body of earth dam
SU523973A1 (en) The method of construction of dams
SU874874A1 (en) Method of damming river beds
SU1710652A1 (en) Method of damming a river bed
SU1291653A1 (en) Method of passing construction flaws under a dam