SU1393872A1 - Method of constructing water spillway in the body of earth dam - Google Patents

Method of constructing water spillway in the body of earth dam Download PDF

Info

Publication number
SU1393872A1
SU1393872A1 SU864152658A SU4152658A SU1393872A1 SU 1393872 A1 SU1393872 A1 SU 1393872A1 SU 864152658 A SU864152658 A SU 864152658A SU 4152658 A SU4152658 A SU 4152658A SU 1393872 A1 SU1393872 A1 SU 1393872A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dam
base
supporting structure
spillway
expansion joints
Prior art date
Application number
SU864152658A
Other languages
Russian (ru)
Inventor
Виктор Фролович Илюшин
Original Assignee
В.Ф. Илюшин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.Ф. Илюшин filed Critical В.Ф. Илюшин
Priority to SU864152658A priority Critical patent/SU1393872A1/en
Application granted granted Critical
Publication of SU1393872A1 publication Critical patent/SU1393872A1/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

Изобретение относитс  к гидротехнике . Целью изобретени   вл етс  сокращение затрат на подготовку основани  под водосбросом. Способ включает подготовку основани , возведение несущей конструкции, состо щей из отделенных друг от друга деформационными швами трубнатых звеньев,- отсыпку плотины. Перед отсьшкой грунтовой плотины поверхность основани  планируют в направлении вдоль сооружени  по вьтуклой кривой с максимальным подъемом над местом наибольшей глубины сло  аллюви  в русле реки. Поперечные деформационные швы в несущей конструкции выполн ют сход щимис  к ее подошве. После отсьтки плотины до проектной отметки и завершени  осадок поверхность основани  и подошва несущей конструкции получают горизонтальное , а поперечные деформационные швы - вертикальное положени . 3 ил. с SS елThe invention relates to hydraulic engineering. The aim of the invention is to reduce the cost of preparing the base under the spillway. The method includes the preparation of the base, the erection of a supporting structure consisting of separated from each other by expansion joints of tubular links, dumping of a dam. Before starting the earth dam, the bottom surface is planned in the direction along the structure along a tight curve with a maximum rise above the place of the greatest depth of the alluvium layer in the river bed. The lateral expansion joints in the supporting structure are made converging to its sole. After the dam has been erected to the design mark and the sediment has been completed, the surface of the base and the bottom of the supporting structure are horizontal and the transverse expansion joints are in a vertical position. 3 il. with SS ate

Description

со со соwith so with so

0000

| to| to

: Изобретение относитс  к гидротех- н же, в частности к строительству тоубчатых водосбросов в теле грунтовых плотин, возводимых на русловом а 1лювии. : The invention relates to hydraulic engineering, in particular, to the construction of tubular spillways in a body of earth dams erected on a channel bed of a luvia.

Цель изобретени  - сокращение затрат на подготовку основани  под вод сбросом.The purpose of the invention is to reduce the cost of preparing the foundation for water discharge.

На фиг. 1 показано положение несущей конструкции после.возведени ; на фиг. 2 - то же, после отсыпки плоти- Hibi и завершени  осадок в основании; на фиг« 3 - узел I на фиг.1,FIG. 1 shows the position of the supporting structure after the introduction; in fig. 2 - the same, after Hibi dough is poured and the sediment in the base is completed; in Fig "3 - node I in Fig.1,

Водоброс, возводимый предлагаемым способом, включает, например, подводщий и отвод щий туннельные участки, yjqacTOK 3 перехода через русло 4 ре- к, придонна  часть которого запол- н|ена русловым аллювием 5. Дно и бере гЦ реки сложены скальным грунтом 6. ПЬдвод щий 1 и отвод ш,ий 2 туннельны участки водосброса закреплены желе- зЬбетонной обделкой 7. Конструкци  врдосброса на участке перехода через Р|усло реки выполнена из трубчатых же л|езобетонных звеньев 8, отделенных рруг от друга деформационными швамиThe water discharge erected by the proposed method includes, for example, inlet and outlet tunnel sections, yjqacTOK 3 crossings through the river 4 rivers, the bottom part of which is filled with channel alluvium 5. The bottom and bank of the river are composed of rocky soil 6. Pdvod The first 1 and the diversion points, the second tunnel areas of the spillway are fixed with an iron lining 7. The construction of the solid dump at the crossing point through the river is made of the same tubular links 8, separated from each other by expansion joints

9,заполненными м гкими прокладками9, filled with soft pads

10,н апример битумат ами.10, for example, bitumen.

Через швы 9 могут быть пропущены стержни 11 из прочного материала, например из стали, размещенные в ко- 5в:згхах 12, например,, из резиновых В1лангов. Сверху конструкци  пригру- Жена весом плотины 13,.Through the seams 9, rods 11 of durable material, for example steel, placed in cocks 5, 12, eg rubber rubber, can be passed. Top construction prigru- Wife weighing dam 13 ,.

Сооружают водосброс следующим с бразом. Construct spillway next brazom.

I Прокод т подземный подвод щий II подземный отвод щий 2 туннельные З частки, параллельно с этим на участие 3 перехода водосброса через русло 4 реки планируют сложенное русловым |шлювием 5 основание. При этом основание планируют в направлении вдол Сооружени  по выпуклой кривой так, что максимальньй подъем поверхности основани  расположен над местом наибольшей глубины сло  аллюви  5 в русле 4 реки, дно и берега которого «гложены скальным грунтом 6, Закон кривизны поверхности основани  определ ют на основании расчетов или исследований на модели с абсо- .Пютных размеров толщи аллюви  5, топографии русла 4 реки, нагрузки йа конструкцию водосброса от плотины 13, геомеханических характеристик руслового аллюви  5 и др.I Prokhodt underground supply. II underground diverting 2 tunnel Z chastki, in parallel with the participation of 3 transitions of the spillway through the river 4 rivers plan folded channel channel 5 basis. In this case, the base is planned in the direction along the Structure along a convex curve so that the maximum rise of the base surface is located above the place of the greatest depth of the alluvial layer 5 in the channel 4 of the river, the bottom and banks of which are enclosed with rocky soil 6, based on calculations or studies on a model with an absolute. Comfortable dimensions of the alluvial stratum 5, the topography of the riverbed 4, the load of the spillway structure from the dam 13, the geomechanical characteristics of the channel alluvium 5, etc.

00

5five

00

5five

00

5five

00

5five

00

5five

Возвод т обделку 7 подземных участков 1 и 2 водосброса.Erection of 7 underground sections 1 and 2 of the spillway is built.

На спланированном основании из аллюви  5 возвод т открытым способом несущую конструкцию водосброса из монолитного или сборного железобетона . При этом поперечные деформационные швы 9, отдел ющие друг от друга трубчатые звень  8, выполн ют сход щимис  к подошве конструкции. При возведении звеньев 8 несущей конструкции в швах 9 нанос т м гкие прокладки 10, и зготовленные, например, из битуматов, шлаковатных тюф ков и др., через швы 9 пропускают стальные стержни 11, снабженные кожухами 12.On a planned base of alluvium 5, the supporting structure of a spillway of monolithic or precast concrete was erected in an open way. Here, the transverse expansion joints 9, which separate the tubular links 8 from each other, are made converging to the base of the structure. During the construction of links 8 of the supporting structure in the seams 9, soft gaskets 10 are applied, and made, for example, from bitumen, slag bales, etc., steel rods 11 equipped with shells 12 are passed through the seams 9.

После окончани  строительства несущей конструкции возвод т плотину 13. По мере возведени  плотины нагрузки на основание из аллюви  5 увеличиваютс , аллювий уплотн етс  и в нем происход т осадки, при зтом больша  осадка соответствует максимальной толщине сло  аллюви  5.After the construction of the supporting structure is completed, the dam 13 is erected. As the dam is erected, the load on the base of the alluvium 5 increases, the alluvium condenses and precipitates in it, and the large sediment corresponds to the maximum thickness of the alluvium layer 5.

После возведени  плотины до проектной отметки и завершени  осадок поверхность основани  из аллюви  5 и подошва несущей кострукции получают горизонтальное, а поперечные деформационные швы 9 - вертикальное положени , т.е. конструкци  приобретает нормальное эксплуатационное состо ние .After the dam is erected to the design mark and the sediment is completed, the surface of the base of the alluvium 5 and the sole of the bearing structure are horizontal, and the transverse expansion joints 9 are in vertical position, i.e. the structure is in normal operating condition.

Claims (1)

Формула изобретени Invention Formula Способ сооружени  водосброса в теле грунтовой плотины, размещенной на русловом аллювии, включающий подготовку основани , возведение несущей конструкции , состо щей из отделенных друг от друга деформационными швами трубчатьпс звеньев, отсьтку грунтовой плотины, отличающийс  тем, что, с целью сокращени  затрат на подготовку основани  под водосбросом , перед отсьткой плотины поверхность основани  планируют в направлении вдоль сооружени  по выпуклой кривой с максимальным подъемом над местом наибольшей глубины сло  аллюви  в русле реки, поперечные деформационные швы в несущей конструкции вьшолн ют сход щимис  к ее подошве .A method for constructing a spillway in the body of an earth dam located on a riverbed alluvium, including preparing the base, erecting a supporting structure consisting of tubing links separated from each other, and dredging, characterized in that, in order to reduce the cost of preparing the base for spillway, in front of the dam, the bottom surface is planned in the direction along the structure along a convex curve with a maximum rise above the place of the greatest depth of the alluvium layer in the riverbed The transverse expansion joints in the supporting structure are converging to its sole. .«ж (Ул , . Г -А-К; ,-гл- - A-KS гхги. “OK (Ul,. G –A – K;, –gl– - A-KS ghgi УHave (риг.г(rig.g.
SU864152658A 1986-11-26 1986-11-26 Method of constructing water spillway in the body of earth dam SU1393872A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864152658A SU1393872A1 (en) 1986-11-26 1986-11-26 Method of constructing water spillway in the body of earth dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864152658A SU1393872A1 (en) 1986-11-26 1986-11-26 Method of constructing water spillway in the body of earth dam

Publications (1)

Publication Number Publication Date
SU1393872A1 true SU1393872A1 (en) 1988-05-07

Family

ID=21269567

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864152658A SU1393872A1 (en) 1986-11-26 1986-11-26 Method of constructing water spillway in the body of earth dam

Country Status (1)

Country Link
SU (1) SU1393872A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Гидротехнические сооружени . /Под ред. В.П. Недриги. - М.: Стройиздат, 1983, с. 363, рис. 13.2. Там же, с. 362. *

Similar Documents

Publication Publication Date Title
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
Etcheverry Irrigation Practice and Engineering...
US3465530A (en) Dam construction
SU1393872A1 (en) Method of constructing water spillway in the body of earth dam
CN113373865B (en) Frame type embankment structure
CN113047215A (en) Middle plate pile high pile wharf structure
SU1555418A1 (en) Method of constructing spillway in the body of earth dam
SU1514860A1 (en) Method of erecting earth dam on alluvia-covered rock bed
SU1700138A1 (en) Design and erection of artificial deep-water island
RU61303U1 (en) RESISTANT FOR PAIRING THE SOIL DAM WITH CONCRETE STRUCTURES
Ridehalgh SHOREHAM HARBOUR DEVELOPMENT.
CN101029470A (en) Hydraulic spile bridge and dyke construction
SU1758153A1 (en) Method of erecting river head in hydraulic tunnel
SU1124084A1 (en) Dam and method of erecting same
SU1142580A1 (en) Method of constructing a cellular dam
FOX et al. DISCUSSION. THE KIDDERPUR DOCKS.
Rao ENGINEERING PROBLEMS IN RECENT RIVER VALLEY PROJECTS IN INDIA.
CN115897629A (en) Longitudinal cofferdam structure
Robb et al. Discussion of “Robb on Foundation Treatment at Rodriguez Dam”
SU1052609A1 (en) Made-up boom
NAYLOR THE SECOND-STAGE DEVELOPMENT OF THE LOCHABER WATER-POWER SCHEME.(INCLUDES PHOTOGRAPHS AND APPENDICES).
SU1629375A1 (en) Method for hydraulic filling of structures
SU1573080A1 (en) Method of erecting ground dam on soft slit foundation
JP2519299B2 (en) Underwater civil engineering structure and its construction method
MACKENZIE THE AVONMOUTH DOCK (INCLUDING PLATES AT BACK OF VOLUME).