[go: up one dir, main page]

SU1234613A2 - Hydraulic work-performing member - Google Patents

Hydraulic work-performing member Download PDF

Info

Publication number
SU1234613A2
SU1234613A2 SU843790595A SU3790595A SU1234613A2 SU 1234613 A2 SU1234613 A2 SU 1234613A2 SU 843790595 A SU843790595 A SU 843790595A SU 3790595 A SU3790595 A SU 3790595A SU 1234613 A2 SU1234613 A2 SU 1234613A2
Authority
SU
USSR - Soviet Union
Prior art keywords
support
windows
water
barrel
chamber
Prior art date
Application number
SU843790595A
Other languages
Russian (ru)
Inventor
Аркадий Кононович Либерман
Ольга Антоновна Бойко
Original Assignee
Liberman Arkadij K
Bojko Olga A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liberman Arkadij K, Bojko Olga A filed Critical Liberman Arkadij K
Priority to SU843790595A priority Critical patent/SU1234613A2/en
Application granted granted Critical
Publication of SU1234613A2 publication Critical patent/SU1234613A2/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

Изобретение о гиоснтс  к орион iipoMiiiiii- ленности, прелназначено д;1н безлюдной выемки угл  и  вл етс  дополни гельным к основному по авт. св. .NO 1153055.The invention of geosnts to Orion iipoMiiiiii-, is designed for a d; 1n deserted coal excavation and is complementary to the main one by aut. St. .No 1153055.

Целью изобретени   в.т етс  iioiibiHiCHiie эффективности pa6oTi)i за счет обеснемени  автоматизации распора.The aim of the invention is to iioiibiHiCHiie efficiency pa6oTi) i due to the depreciation of the automation of the thrust.

На фиг. 1 схематически изображен 1 ид- равлический исполнительный орган; на фиг. 2 - вид А на фи|-. 1; на фиг. 3 разрез Б-Б на фиг. 2; на фиг. 4 гидравлический исполнительный орган, продо;п ный разрез с опущенными стволами; на . 5 то же, с 11ОД)1 тыми стволами; на фи1 . 6 - разрез В В на фиг. 4.FIG. 1 schematically depicts 1 identical executive body; in fig. 2 - view A on fi | -. one; in fig. 3 section bb in fig. 2; in fig. 4 hydraulic actuator, prod; ny cut with lowered trunks; on . 5 the same, with 11DO) 1 of these trunks; on fi1. 6 shows a section B according to FIG. four.

Гидравлический исполииге.чьный орган содержит станок 1 подачи с врапхателем 2 бурового става 3, соссо щег о из трубчатых игганг на про.межуточных поддерживаюнхих опорах 4, етруеформирующую головку 5 с опорой 6 и переходной нггангой 7. Опора может перемещатьс  вдоль 1ереходной 1птанги. Исполнительный орган имеет корпус 8 с буровыми етруеформируюп|,ими ство;1ами 9. В корпусе 8 выполнена подвод п1,а  10 и отво- д пда  11 камеры. В сквозном окне 12 корпуса на полых ВОДОПОДВОДЯП1ИХ ос х 13 и 14 установлены струеформирующие очистной ствол 15 и пазообразую ций ствол 16. Оси располагаютс  во вту,тках 17, которые образу ют капалы 18, во втулках имеютс  окна 19. Оеи креп те  нружинн1 1ми кольнами 20 и фиксируютс  от нроворота П1понка.ми 21. На ос х выполнены под1К)д ни1е окна 22. Отво- д п1.ие окна 23 и 24 соответстве1П1о на оси очистиого ствола и на оси назообразуклпего CTBO. ia c.vKMnetU) один относительно дру| ого на двойной угол.The hydraulic organ contains a machine of 1 feed with an overdrive 2 drilling rig 3, made from tubular iggang on intermediate support pillars 4, an emulsifying head 5 with support 6 and a transition ngganga 7. The support can move along 1 transitional plate. The executive body has a housing 8 with drilling emulsion forming them; 1; 9. In the housing 8, an inlet is made, and 10 and a chamber outlet 11. Through the window 12 of the housing on the hollow WATER 2 axes 13 and 14 are installed stream-forming cleaning shaft 15 and grooves forming the shaft 16. The axes are located in the hubs 17, which form the canals 18, there are windows in the bushes. 20 and are fixed from the right-handedness of P1-punkas 21. 21. The axes are made under the window. 22. The windows of the window 23 and 24 correspond to the axis of the cleaned trunk and on the axis of the vertical CTBO. ia c.vKMnetU) one is relatively different | wow at a double angle.

(л вол1 1 имеют .муфты 25 с ко.льцевьгми каналами 26, в KOTOpi ie запрессованы втулки 27 с окнами 28 в очистном стволе и окна.ми 29 в иазообразующем стволе. Муфта очистного ствола имеет 30, котора  посредством т ги 31 с вилками соединена с про- уншной 32 назообразующего ствола. Эта нро- упшна с пазом посредством оси соединена со П1ТОКОМ 33. нроход ни1м через стенки подвод щей камеры. Шток имеет дифференциальную плон1адку 34. На одпом копце нггок имеет регулировочную вилку 35, на другом конце сферическую поверхность 36.(l vol1 1 have .couplings 25 with coil channels 26, in KOTOpi ie, the sleeves 27 are pressed with windows 28 in the cleaning barrel and the windows 29 and 29 in the formation of the barrel. The coupling of the cleaning barrel has 30 32 nasopathizing stem with a lead. This nozzle with a groove is connected via an axis with P1TOKOM 33. The flow passes through the walls of the feed chamber. The stem has a differential plane 34. At one end, the nggok has an adjusting fork 35, at the other end a spherical surface 36 .

На переходной 1птанге имеетс  упорный ф,. 37. На торне опоры крепитс  упор 38 со ско1ненпой пло1надкой. На опоре креп тс  распорные гидроцилипдры 39, соединенные своими пггоками 40 с лыжей 41. Гидроцилиндры имеют порн невые 42 и HJTOKO- вые 43 полоети, св занные с атмосферой. На переходной nrraiu e В1 н1олнепа камера 44 раснределительного мехапиз.ма. В камере имеетс  ко-льцева  полость 45, соединенна  посредством окон 46 в нгганге с подводом высоконанорной воды. В камере выполнены раснрсделительные полости 47, в кото There is a stop f on the transition pipe. 37. The support 38 is attached to the support turn with a screwdriver. On the pedestal, spacer hydrocipdles 39 are connected, connected with their ski projectile 40 with the ski 41. The hydraulic cylinders have porn nevye 42 and HJTOKO 43 semi-nets, associated with the atmosphere. On the transitional nrraiu e B1 nolopen camera 44 of the distributive mechapiz. The chamber has a cavity C 45, connected by windows 46 in the Nganga with a supply of high-banded water. The chamber is made of separation cavities 47 in which

00

5five

00

5five

00

5five

00

4545

5050

5555

рых наход тс  дифференпиа.льпые nopinnn 48 со пи оками 49, контактирующими с торцом опоры испо;1 1Ите;1Ы1О1Ч) органа. /1иф- фс)енциаЛ1 ные порпкчи имеют торцовую 50 и ко.льпсвую 51 площа.. В камере выполнены упо)ы 52, каиа, 53. 54 и 55, регу- ;1и(К)вочные дроссс,:1и 56. „Пини ми 57 и 58 )аснреде;1и гелып 1е полости камеры св заны с гидроцилиндрами распора. Капа.чы 55 св заны с атмосферой, , 1инии 58 св чаны между собой.There are differential nopinnn 48 with pic 49, which are in contact with the butt of the support; 1 1Тит; 1Ы1О1Ч) of the organ. / 1iffs) LIQUIP PORPCHES have a face 50 and a total of 51 squares. In the chamber, 52, kaia, 53. 54 and 55 regulative; 1i (K) jaws are made:, 1 and 56. „ Pin 57 and 58) arenred; 1 and gel 1e of the cavity of the chamber are connected to the hydraulic cylinders of the thrust. Capa 55 is connected to the atmosphere, the lines 58 are connected to each other.

Рабога исполнительного органа осущест- в.л етс  с,ледующим образом.The slave of the executive body is carried out in the following way.

Высоконанорна  вода по бч ровому сгаву 3, переходной нгганге 7 через окна 46 попадает в полость 45 камерь 44, затем в рас- пределительпые полости 47 под торцовые площадки 50 дифферепциа.льньгх порн1ней 48. Под .лейсл-вием давлени  ди(})фсре1П1иальные поршни, унира с1 своими 1нт()ками 49 в горец опоры 6 иснолнил сльного opi ana, ол о- д игают ее, пока площадки 51 норнщей не упрул с  в стенки расп)еде,лительнь х по,лос- тей 47. /1алее вода по каналу 53 и лини м 57, 58 поступает н но.лости 42 распорных гидропилипдров 39 и их П1ТОКИ 40 прижимают .лыжу 41 к кров.ле, чем обеспечивают iaciiop опоры. ОдноЕ ременмо вода через пе- )еходную щл ангу носл-упаел в каме)у И. ис- по,лиите,льног( opi ana, зал ем по кана.лам 18- i камеру I 1, а из пее к буровым сгво.лам 9.Highly nanorexed water along the ground 3, transitional nganga 7 through chamber 46 enters cavity 45 chamber 44, then into the distributor cavities 47 under the end platforms 50 diffractorial porn 48. Under pressure from di (11) fsr111 pistons , uni c1 with its own 1nt () 49 in the mountaineer of the support 6 and the slant opi ana, they all shook it until the grounds of the 51 Norna were pressed into the walls of the food, loungers, 47. / via channel 53 and lines 57, 58, the footnotes of 42 spacer hydro-lipids 39 and their P1TOKI 40 are pressed down onto the ski 41 to the roof, thus providing t iaciiop support. One mode of water through the port of the angu nos-upa in the kama) by I.ispo, litite, flax (opi ana, we walk along the canals of 18-i camera I 1, and from pee to the drilling site. Lam 9.

Вмесл с с ул им вода из Kaiia:ioB 18 через окна 19 вту,1ок 17. окна 22 посгх-цает во внул репние по.лосл и осей 13 и 14. Окна 28 очислл ого сллю.ла ( с окнами 23 па ос х 13 11 вода через них и ко.льнс- ioii капа,л 2t) .чосл уиаел к очис ллюму сгво, : 15, а гак как окна 29 на ос х 14 с К |Це П)| на .лвойпой у1Ч),л, лч) во.ла к пазообра.чую- |цсм ci iio/iy I(J ПС поступает. Лав, воды на ди(|)ференпиа, п.лошадку 34 щток 33, св занп1)1Й посредслл ом проупщпы 35 с очисл пь1м слл;о,лг)м и да,лее через т гу 31 -- с пазообразуюп1им слчю.лом, удерживает стволы в по;к)жении дл  очистной выемки. Исл екаюн1ие из буровых стволов BiiicoKona- порныс за счел покачивани  става вы- буриваюл опе)сжающую скважину. Раснер- л а  гидроци,лин,лрами в почву и кровлю опо- )а испо.лнил с.льного органа прен тсл вует ол-к;и)неник) сл ава от очистно- 14) сл-вола. Л.л  п|1оизводства очистной вые.м- ки производитс  продо.льпа  подача става, чтоб1 1 в об)азова 5Н1у1ос  ск1 ажин у воп1ел очисл пой сл во,л на ве.личипу спимае.мой стружкп. 1)и эл ом диффе 1енциальпые поршни , упира сь своими штоками 49 в торец распертой гидр()1илипдрами опоры исполните ,льного opi ana, зак)ывак)л- каналы 53 и от крьп)а1ол- каналы 54 и 55. Но, К)сти 42 гид- р()цили)1Д)ов )aciio|ia ч.ерез капа,лы 54 и 55 сообп1аюл с  с атмосферой. Как то,лько дав- ,лепие в полоет х 42 упадет и распор гидропилипдров ослабигс , дав,лением воды па торцовые п,ло1надки 50 дифференциальныеFrom Kaiia, the water from the street is ioB 18 through windows 19 in vtu, 1 in 17. windows 22 posg-za in the back of axle 13 and 14 windows. Windows 28 are shown (windows 23 pas x axis) 13 11 water through them and ko.lns- ioii kapa, l 2t). The driver went to clean it up: 15, and hook like windows 29 on axes 14 with K | Tse P) | on the left U1Ch), l, lh) of the vol to the tongue-and-groove cc iio / iy I (J CW enters. Love, water to the di (|) Ferenpia, p. 34 of shchtok 33, sv zanp1) The 1st Prospectus 35 S is cleared by the P1m Sl; o, lg) m and yes, after 31, with a Paz-forming slot, it keeps the trunks in place for the cleaning recess. An investigation of the BiiicoKona pits from the drill shafts found the drill hole to be drilled for swinging. Rasnerla hydrocyli, lin, Lrami to the soil and roof of the opo) and using the organ of the calf of the organ predstavlitsa ol; i) nenikik) ava from cleansing 14) castella. Ll p | 1 of the production of the sewage treatment plant is produced by supplying the supply, so that 1 1 in about) Azov 5N1u1os sk1 Azhin had a question to clean up the slit, l to the whole. 1) and electric differential pistons, resting their rods 49 on the butt of the disassembled hydra (), perform the support with the oleicles of the axle, Zak), channels 53 and 55). But, K ) 42 hydro-p () cili) 1D) s) aciio | ia through capa, ly 54 and 55 combined with the atmosphere. As it is, the pressure in scoop x 42 will fall and the thrust of the hydropilliprae weakens, giving, with water, to the end face, and 50 differential boxes

поршни перемещаютс  вниз и своими QITO- ками толкают опору, перемеща  ее по переходной штанге, при этом закрываютс  каналы 54 и 55 и открываютс  каналы 53, по которым вода поступает в полости 42 гидроцилиндров , и опора снова распираетс  между почвой и кровлей. Этот процесс происходит посто нно, пока производитс  подача става, т. е. происходит посто нное слежение опоры с распорными гидроцилиндрами за перемещением става.the pistons move downwards and with their QITOs push the support moving it along the transition rod, in doing so, the channels 54 and 55 are closed and the channels 53 are opened, through which water enters the hydraulic cylinder cavities 42, and the support again spreads between the soil and the roof. This process takes place continuously while the stav is being supplied, i.e., the support is continuously monitored with the expansion cylinders for the stavle movement.

При подаче става на величину снимаемой стружки опора, таким образом, автоматически распираетс  и при покачивании става снимаетс  стружка по всей мощности пласта, а буровые стволы при этом углубл ют опережающую скважину.When applying the stag to the amount of chips being removed, the support is thus automatically expanded and, when the stavion is rocked, the chips are removed over the entire formation thickness, while the drill shafts deepen the advance well.

После отмыва став снова подаетс  на забой на величину снимаемой стружки и производитс  очередной отмыв.After washing, it is again brought to the bottom by the amount of chips being removed and another wash is performed.

После отработки участка определенной поAfter working the site determined by

вой став 3 разворачивают на 180°. При щток 33 своей сферической поверхностью 36 находит на упор 38 опоры и переходит на его торцовую поверхность. Одновременно HITOK, преодолева  давление ЕЮДЫ на дифференциальную площадку 34, разворачивает стволы 15 и 16. При этом окна 28 во втулке очистного ствола 15 перекрываютс , доступ воды в ствол прекращаетс , а окна 29 во втулке пазообразуюн его ствола 16 сов10 мещаютс  с окнами 24 на его оси 14 и вода поступает к стволу 16. Давление воды на площадку 34 прижимает щток 33 к торцу упора 38 и удерживает стволы в положении дл  образовани  разгрузочного паза. За счет покачивани  става производитс  образованиеThe howling of the 3 is rotated by 180 °. With the spindle 33, with its spherical surface 36, it finds supports on the abutment 38 and moves to its face surface. At the same time, HITOK, overcoming the pressure of the FORCE on the differential pad 34, turns the trunks 15 and 16. At the same time, the windows 28 in the bushing of the cleaning shaft 15 are blocked, the water in the barrel is stopped, and the windows 29 in the sleeve of the shaft 16 coincide with the windows 24 on it the axis 14 and the water flows to the barrel 16. The water pressure on the pad 34 presses the brush 33 against the end of the stop 38 and holds the barrels in position to form a discharge groove. Due to the wiggle stav, education

5 разгрузочного паза стволом 16 по всей мощности пласта.5 unloading groove barrel 16 over the entire thickness of the reservoir.

После образовани  разгрузочного паза буровой став разворачиввают в обратную сторону, при этом щток 33 сходит с упора 38,After the unloading groove has been formed, the drill rod is turned in the opposite direction, with the swab 33 coming off the stop 38,

услови м безопасности длины производитс  Q а давлением воды на площадку 34 стволыthe safety conditions of length are Q and the pressure of water on the pad 34

образование дегазационного разгрузочного паза в боковом целике угл . Дл  гого буроЧthe formation of a degassing discharge groove in the side pillar angle. For the first time

возвращаютс  в исходное положение, после чего цикл работы повтор етс .return to the starting position, after which the cycle of operation is repeated.

Вид А повернутоView A turned

/////////////// ////// у /// / ///////////////////// //// // y /// // // //

вой став 3 разворачивают на 180°. При щток 33 своей сферической поверхностью 36 находит на упор 38 опоры и переходит на его торцовую поверхность. Одновременно HITOK, преодолева  давление ЕЮДЫ на дифференциальную площадку 34, разворачивает стволы 15 и 16. При этом окна 28 во втулке очистного ствола 15 перекрываютс , доступ воды в ствол прекращаетс , а окна 29 во втулке пазообразуюн его ствола 16 совмещаютс  с окнами 24 на его оси 14 и вода поступает к стволу 16. Давление воды на площадку 34 прижимает щток 33 к торцу упора 38 и удерживает стволы в положении дл  образовани  разгрузочного паза. За счет покачивани  става производитс  образованиеThe howling of the 3 is rotated by 180 °. With the spindle 33, with its spherical surface 36, it finds supports on the abutment 38 and moves to its face surface. At the same time, HITOK, overcoming the pressure of the FORUM on the differential pad 34, turns the trunks 15 and 16. At the same time, the windows 28 in the hub of the cleaning shaft 15 are blocked, water in the barrel is stopped, and the windows 29 in the hub of the shaft 16 of the barrel 16 are aligned with the windows 24 on its axis 14 and the water flows to the barrel 16. The water pressure on the pad 34 presses the brush 33 against the end of the stop 38 and holds the barrels in position to form a discharge groove. Due to the wiggle of the stav, education is produced

разгрузочного паза стволом 16 по всей мощности пласта.the discharge groove of the barrel 16 over the entire thickness of the reservoir.

После образовани  разгрузочного паза буровой став разворачиввают в обратную сторону, при этом щток 33 сходит с упора 38,After the unloading groove has been formed, the drill rod is turned in the opposite direction, with the swab 33 coming off the stop 38,

возвращаютс  в исходное положение, после чего цикл работы повтор етс .return to the starting position, after which the cycle of operation is repeated.

Вид А повернутоView A turned

4фиг . 2 Б-Б4fig. 2 bb

////////////////////////////////////////////////////////////

ТУTU

ТУTU

оabout

J5J5

. ///////////////// . /////////////////

фиг.Зfig.Z

6 52 h6 52 h

1 53ш1 53sh

5 505 50

5 5S5 5S

II

48 5148 51

5757

rr

hh

5555

flfl

VrVr

5858

++

VV

3535

3 3

- 49- 49

rr

т гt g

KK

2 J2 j

3535

//

ЮYU

фиг. iFIG. i

В- Впобер- озиг.5B-W-ozig.5

22 22

2121

1717

2020

фцг.бftsg.b

1e

(оставитель Н. Ястребинска  Те.ред И. ВересКорректор В. Бут га(left by N. Yastrebinsk Te.red I. VeresKorrektor V. But ha

Тираж 4 70ПодписноеCirculation 4 70Subscribe

ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee

по делам изобретений и открытийfor inventions and discoveries

113035, Москва, Ж-35, Раушска  наб., д. 4/5113035, Moscow, Zh-35, Raushsk nab. 4/5

Филиал ППП «Патент, г. Ужгород, ул. Проектна , 4Branch PPP "Patent, Uzhgorod, st. Project, 4

Claims (2)

1. ГИДРАВЛИЧЕСКИЙ ИСПОЛНИТЕЛЬНЫЙ ОРГАН по авт. св. № 1153055, отличающийся тем, что, с целью повышения эффективности работы за счет обеспечения автоматизации распора, он снабжен распределительным механизмом,выполненным в виде камеры, корпус которой закреплен на бу ровом ставе с возможностью взаимодействия с опорой посредством штоков с поршнями, расположенными в камере, при этом лыжи соединены с опорой посредством гидроцилиндров, а камера распределительного механизма сообщена с полостью бурового става и гидроцилиндрами.1. HYDRAULIC EXECUTIVE BODY for ed. St. No. 1153055, characterized in that, in order to increase work efficiency due to the automation of the spreader, it is equipped with a distribution mechanism made in the form of a camera, the housing of which is mounted on a drill stand with the possibility of interaction with the support through rods with pistons located in the chamber, in this case, the skis are connected to the support by means of hydraulic cylinders, and the cam of the distribution mechanism is in communication with the cavity of the drill stand and hydraulic cylinders. 2. Исполнительный орган по π. 1, отличающийся гем, что он снабжен дополнительным стволом с полой осью, в стенках которой выполнены отверстия, смещенные относительно отверстий основной оси на двойной угол, причем основной и дополнительный стволы соединены между собой посредством тяги.2. The executive body for π. 1, characterized in that it is provided with an additional barrel with a hollow axis, in the walls of which holes are made, offset from the holes of the main axis by a double angle, the main and additional trunks being interconnected by means of a rod. Фиг. 7 ю со со >FIG. 7 th from co>
SU843790595A 1984-09-13 1984-09-13 Hydraulic work-performing member SU1234613A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843790595A SU1234613A2 (en) 1984-09-13 1984-09-13 Hydraulic work-performing member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843790595A SU1234613A2 (en) 1984-09-13 1984-09-13 Hydraulic work-performing member

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU1153055A Addition SU257194A1 (en) ACTIVE WHEEL LIFT

Publications (1)

Publication Number Publication Date
SU1234613A2 true SU1234613A2 (en) 1986-05-30

Family

ID=21138489

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843790595A SU1234613A2 (en) 1984-09-13 1984-09-13 Hydraulic work-performing member

Country Status (1)

Country Link
SU (1) SU1234613A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167290C1 (en) * 2000-01-25 2001-05-20 Кариман Станислав Александрович Coal continuous miner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1153055, кл. Е 21 С 25/60, 1983. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167290C1 (en) * 2000-01-25 2001-05-20 Кариман Станислав Александрович Coal continuous miner

Similar Documents

Publication Publication Date Title
AU669885B2 (en) Deep excavator
JP7261354B2 (en) Hydro-mechanical drilling equipment, method of use and drilling process
CN208768404U (en) A kind of Garden Engineering planting machine with watering function
SU1234613A2 (en) Hydraulic work-performing member
CN108195611A (en) A kind of hydraulic engineering pipeline is laid with soil sample equipment
CN110725310B (en) Anchor drilling machine and anchor rod
CN115349324B (en) An integrated device for digging and filling holes for tree planting
CN108979572B (en) Combined anti-pollution sand washing device and method
CN107630657B (en) The mud kinetic energy reforming unit of construction is bored suitable for big drop massif interior orientation
CN103306622A (en) Hydraulically-pressurizing rope coring drill
CN105019448B (en) Double V termination stake making apparatus
CN211598525U (en) Wall-breaking and diameter-expanding combined drill bit
FR2382361A1 (en) Hydraulically assisted pilot valve - is used with double acting cylinder and controlled by rotary composite shaft
SU1640406A1 (en) Drilling and extracting rig
US1032049A (en) Method of boring tunnels.
CN106049440A (en) Implementation method of equal-thickness cement-soil wall making machine
SU1719634A1 (en) Arrangement for forming relief recesses in coal blocks
CN205445472U (en) A drill bit that is used for drilling variable aperture stake hole
SU1377367A1 (en) Hydraulic drilling system
JPH07279157A (en) Ground improving body forming device and construction method
SU889982A1 (en) Road roller hydraulic drive
CN213818888U (en) Orchard soil fertilization rifle
DE2505396C2 (en) Drilling rig with a pump for hydraulic support as a pressure generator and a hydrostatic rotary motor
DE2548284C3 (en) Hydraulic impact drill
CN2661900Y (en) Down-the-hole automatic drilling device