SU1060761A1 - Method of erecting an embankement - Google Patents
Method of erecting an embankement Download PDFInfo
- Publication number
- SU1060761A1 SU1060761A1 SU823426945A SU3426945A SU1060761A1 SU 1060761 A1 SU1060761 A1 SU 1060761A1 SU 823426945 A SU823426945 A SU 823426945A SU 3426945 A SU3426945 A SU 3426945A SU 1060761 A1 SU1060761 A1 SU 1060761A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- layer
- soil
- filling
- stone
- ungraded
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 239000004575 stone Substances 0.000 claims abstract description 22
- 239000002689 soil Substances 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000005056 compaction Methods 0.000 claims abstract description 4
- 206010063409 Acarodermatitis Diseases 0.000 abstract 6
- 241000447727 Scabies Species 0.000 abstract 6
- 208000005687 scabies Diseases 0.000 abstract 6
- 238000010276 construction Methods 0.000 description 7
- 235000017060 Arachis glabrata Nutrition 0.000 description 1
- 241001553178 Arachis glabrata Species 0.000 description 1
- 235000010777 Arachis hypogaea Nutrition 0.000 description 1
- 235000018262 Arachis monticola Nutrition 0.000 description 1
- 241000231739 Rutilus rutilus Species 0.000 description 1
- 238000010410 dusting Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 235000020232 peanut Nutrition 0.000 description 1
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
СПОСОБ ВОЗВЕДЕНИЯ НАСЫПИ , включающий послойную отсыпку грунта с планировкой и уплотнением каждого сло и обсыпку откосов каменным материалом , отличающийс тем, что, с целью снижени трудозатрат, насыпь .возвод т из несортировайного скальйого грунта, причем после отсыпки каждого сло из него извлекают крупные камни, а обсыпку откосов осуществл ют после отсыпки каждого сло путем перемещени извлеченных из этого сло крупных камней на его откосные части. О A METHOD OF BREAKING A BULK, including layered soil dumping with the layout and compaction of each layer and the filling of slopes with stone material, characterized in that, in order to reduce labor costs, embankment is removed from the non-graded skal soil, and after the filling of each layer, the stone is removed from ungraded skimy soil, and after the filling of each layer, the stone is removed from ungraded scaby soil, and after the filling of each layer, the stone is removed from ungraded scaby soil, and after the filling of each layer, the stone is removed from ungraded scaby soil, and after the filling of each layer, the stone is removed from ungraded scaby soil, and after the filling of each layer, the stone is removed from ungraded scaby soil, and after the filling of each layer, the stone is removed from ungraded scaby soil; and sprinkling of slopes is carried out after each layer is filled by transferring the large stones extracted from this layer to its slopes. ABOUT
Description
Изобретение относитс к строительству и может быть использовано преимущественно при возведении насыпных земл ных сооружений. Известны способы возведени дорожных насыпей с противодеформационными бермами ,- включающие возведение насыпи с последующей отсыпкой берм из каменного материала 1. Недостаки известных способов - мала устойчивость берм и больщие трудозатраты, Наиболее близким к предлагаемому по технической сущности и достигаемому результату вл етс .способ возведени насыпи , включающий послойную отсыпку грунта с планировкой и уплотнением каждого сло и обсыпку откосов каменным материалом 2. Недостаток известного способа возведени насыпей - большие трудозатраты. Цель изобретени - снижение трудозатрат . Указанна цель достигаетс тем, что согласно способу возведени насыпи, включающему послойную отсыпку грунта с планировкой и уплотнением каждого сло и обсыпку откосов каменным материалом, насыпь возвод т из несортированного скального грунта, причем после отсыпки каждого сло из него извлекают крупные камни, а обсыпку откосов осуществл ют после отсыпки каждого сло путем перемещени извлеченных из этого сло крупных камней на его откосные части. На фиг. 1 схематично показано размещение машин и механизмов в пределах насыпи при ее возведении согласно предлагаемому способу; на фиг. 2 - поперечный разрез А-А на фиг. 1. Предлагаемый способ заключаетс в следующем . Несортированный скальный грунт, из которого возвод т насыпь 1 с обсыпкой 2 из крупного камн , транспортируют к месту укладки автосамосвалами 3 из карьера или разрабатываемой дорожной выемки, разравнивают слоем требуемой толщины бульдозером 4, посредством землеройно-транспортной мащины 5 с вилообразным рабочим органом, например корчевателем пней, Затем выгребают из полученного сло несортированного скального грунта камни заданного размера, перемещают их в сторону откосов и сдвигают на откосы в виде обсыпки 2 проектной щириной I. Землеройно-транспортна мащина 5 выполн ет челночнообразное чередование рабочих 6 и холостых 7 ходов поперек земл ного полотна или под некоторым углом к его оси. После выгребани крупных камней заданного размера и укладки их на откос оставщийс в слое грунт планируют и уплотн ют катком 8 до требуемой нормы плотности. На уплотненный слой грунта . отсыпают следующий слой несортированного скального грунта и описанные выше операции повтор ют, Предлагаемый способ возведени насыпи позвол ет-совмещать земл ные работы по возведению насыпи с работами по камней требуемого размера и обсыпке ими откосов возводимой насыпи. В результате применени предлагаемого способа достигаетс сокращение трудозатрат за счет операций по отсыпке насыпи и обсыпно ее откосов каменным материалом.The invention relates to construction and can be used primarily in the construction of bulk earth structures. There are known methods for erecting road embankments with antideformation berms, including the construction of an embankment with subsequent dumping of stone material berms 1. The disadvantages of the known methods are low berm resistance and high labor costs. The closest to the proposed technical essence and the achieved result is an embankment construction method including layer-by-layer dumping of soil with the layout and compaction of each layer and the sprinkling of slopes with stone material 2. The disadvantage of the known method of construction of embankments is large ie labor. The purpose of the invention is to reduce labor costs. This goal is achieved by the fact that, according to the method of erecting an embankment, which includes layering of soil with the layout and compaction of each layer and the filling of slopes with stone material, the embankment is erected from unsorted rocky soil, and after filling of each layer, large stones are removed from it, and the slopes are excavated after dumping each layer by moving the large stones extracted from this layer to its slopes. FIG. 1 schematically shows the placement of machines and mechanisms within the embankment during its construction in accordance with the proposed method; in fig. 2 is a cross section A-A in FIG. 1. The proposed method is as follows. Ungraded rocky soil, from which the embankment 1 with the sprinkling 2 of large stone is erected, is transported to the place of laying by dump trucks 3 from the quarry or the excavated roadway, is leveled with the required thickness using a bulldozer 4, using a earthmoving transport unit 5 with a fork-like working body, for example a roach stubs. Then, stones of a given size are removed from the resulting layer of unsorted rocky soil, move them to the side of the slopes and shift to the slopes in the form of dusting 2 project width I. Earth oyno-transport maschina 5 performs the job alternation chelnochnoobraznoe 6 and 7 moves across idle peanut web or at an angle to its axis. After digging up large stones of a given size and laying them on the slope, the soil remaining in the layer is planned and compacted by roller 8 to the required density standard. On compacted soil layer. the next layer of unsorted rocky soil is poured and the operations described above are repeated. The proposed embankment method makes it possible to combine earthworks for embankment construction with works on stones of the required size and sprinkling them with slopes of the embankment being built. As a result of the application of the proposed method, labor costs are reduced due to the operations of filling the embankment and sprinkling its slopes with stone material.
Х X
/ Щ / U
у/ /A )/j(, У Срие,2y / / A) / j (, Y Sree, 2
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU823426945A SU1060761A1 (en) | 1982-04-19 | 1982-04-19 | Method of erecting an embankement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU823426945A SU1060761A1 (en) | 1982-04-19 | 1982-04-19 | Method of erecting an embankement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU1060761A1 true SU1060761A1 (en) | 1983-12-15 |
Family
ID=21007915
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU823426945A SU1060761A1 (en) | 1982-04-19 | 1982-04-19 | Method of erecting an embankement |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU1060761A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2469147C1 (en) * | 2011-07-20 | 2012-12-10 | Василий Петрович Ягин | Dam of soil materials |
-
1982
- 1982-04-19 SU SU823426945A patent/SU1060761A1/en active
Non-Patent Citations (1)
| Title |
|---|
| 1. Справочник по земл ному полотну эксплуатируемых железных дорог. М., «Транспорт, 1978, с. 287. 2. Техйические указани по техйологии сооружейи железйодорожного земл ного полотна, вен 186-75, М., «Оргтрайсстрой, 1975, с. 278-279 (прототип). * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2469147C1 (en) * | 2011-07-20 | 2012-12-10 | Василий Петрович Ягин | Dam of soil materials |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103806432B (en) | Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region | |
| CN109594442A (en) | Garden path construction technology | |
| SU1060761A1 (en) | Method of erecting an embankement | |
| US5788422A (en) | Underground barrier construction apparatus with soil-retaining shield | |
| RU2325534C1 (en) | Method for mined land reclamation | |
| Breitenbach | Rockfill placement and compaction guidelines | |
| US3182460A (en) | Apparatus for making permeable conduits in subterranean lines of drainage | |
| RU2273687C1 (en) | Roadbed and roadbed forming method | |
| SU1724814A1 (en) | Embankment filling method | |
| US4072016A (en) | Method of reconstructing and reclamation of river channels | |
| CN113882353A (en) | Multi-pile type conversion disposal structure under complex geology of extreme racetrack and construction method thereof | |
| US3191387A (en) | Method for making permeable conduits in subterranean lines of drainage | |
| RU2426832C1 (en) | Method to build earth water-retaining construction in warm season (versions) | |
| RU2145372C1 (en) | Method of earth dam construction | |
| CN115573354A (en) | A high-fill construction method | |
| RU2791061C1 (en) | Method for waterproofing a man-made container using loose overburden rocks in development of mineral deposits | |
| O'Flaherty | Earthworks and unbound bases for pavements | |
| SU1615285A1 (en) | Method of erecting embankment | |
| SU1025898A1 (en) | Method of burying waste in natural cavities | |
| CN117926653A (en) | Method for half-filling and half-digging roadbed at poor geological interface of soft rock | |
| Henry et al. | THE CONSTRUCTION OF THE NEW HONG KONG AIRPORT. | |
| NL8403796A (en) | Method of producing sub-soil water barrier - involves digging up to 15 m deep slot using tractor to move shuttering through slot whilst feeding screen material into it | |
| SU1622517A1 (en) | Embankment foundation | |
| Malhotra et al. | Salient Construction Features of Beas Dam Embankment | |
| CN114086538A (en) | Method for replacing open pit bottom sludge by utilizing waste rock partition alternate extrusion |