RU2419701C1 RU2009147181/11A RU2009147181A RU2419701C1 RU 2419701 C1 RU2419701 C1 RU 2419701C1 RU 2009147181/11 A RU2009147181/11 A RU 2009147181/11A RU 2009147181 A RU2009147181 A RU 2009147181A RU 2419701 C1 RU2419701 C1 RU 2419701C1
Authority
RU
Russia
Prior art keywords
reinforced concrete
sleepers
blocks
sleeper
railway
Prior art date
Application number
RU2009147181/11A
Other languages
Russian (ru)
Inventor
Иван Давыдович Востропятов (RU)
Иван Давыдович Востропятов
Original Assignee
Иван Давыдович Востропятов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Иван Давыдович Востропятов filed Critical Иван Давыдович Востропятов
Priority to RU2009147181/11A priority Critical patent/RU2419701C1/en
Application granted granted Critical
Publication of RU2419701C1 publication Critical patent/RU2419701C1/en

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

FIELD: construction. ^ SUBSTANCE: rail lengths are laid into longitudinal reinforced concrete blocks with the length of a single rail or onto reinforced concrete blocks of a single sleeper. Reinforced concrete blocks are attached to each other with transverse reinforced concrete sleepers. For reinforced concrete blocks of a single sleeper, a transverse sleeper is laid at the distance of the sleeper half. Finished blocks of reinforced concrete sleepers are connected to each other along the axis of the track with a separate "coupling" sleeper. The "coupling" sleeper is equipped with coupling units at both sides, made of a steel pipe or a steep rod. The coupling units are serially inserted into coupling seats in the ends of the reinforced concrete sleeper blocks as they are laid into a railroad bed. The coupling units are fixed with a rod or a pipe by steel bolts with a temperature gap and the possibility of rotation along the axis of the railroad bed. ^ EFFECT: increased efficiency of railway transport. ^ 3 dwg

Description

ОБЛАСТЬ ТЕХНИКИFIELD OF TECHNOLOGY

Изобретение относится к железнодорожному (ж/д) транспорту к изготовлению и укладке на ж/д полотно продольных блоков железобетонных (ж/б) шпал, соединенных поперечными ж/б шпалами, с уложенными на продольные блоки шпал рельсами. Стыковка блоков ж/б шпал производится посредством поперечной «стыковочной» шпалы, оборудованной стыковочными узлами. Технический результат - экономия расходных материалов, уменьшение шума, снижение затрат на эксплуатацию ж/д пути.The invention relates to railway (railway) transport for the manufacture and laying on a railway sheet of longitudinal blocks of reinforced concrete (reinforced concrete) sleepers connected by transverse reinforced concrete sleepers, with rails laid on the longitudinal blocks of sleepers. Joining of blocks of reinforced concrete sleepers is carried out by means of a transverse “docking” sleepers equipped with docking nodes. The technical result is the saving of consumables, reducing noise, reducing the cost of operating the railway track.

Известен «Способ укладки шпал на ж/д пути», патент №2262565 C1 от 20.10.2005 г. (1), где шпалы длиной 2,75 м укладываются нитью каждого рельса с зазором 0,5 м и соединяются в поперечном направлении круглыми деревянными стержнями диаметром 30 мм.The well-known "Method of laying sleepers on the railway track", patent No. 2262565 C1 of 10.20.2005, (1), where sleepers 2.75 m long are laid with the thread of each rail with a gap of 0.5 m and are connected in the transverse direction by round wooden rods with a diameter of 30 mm.

Недостатком является:The disadvantage is:

- продольные шпалы не взаимосвязаны между собой, что снижает безопасность пути;- longitudinal sleepers are not interconnected, which reduces the safety of the path;

- связка продольных шпал не имеет достаточной прочности.- a bunch of longitudinal sleepers does not have sufficient strength.

Известна ж/б шпала, патент №2155836 C1 от 10.09.2000 г. (2), включающая в себя арматуру, устройство для увеличения ее сопротивления переменной нагрузке и перемещениям поперек и вдоль пути. К недостатку можно отнести малую эффективность устройства к перемещениям.Known reinforced concrete sleepers патент C1 of September 10, 2000 (2), which includes reinforcement, a device to increase its resistance to variable load and displacements across and along the path. The disadvantage is the low efficiency of the device to movements.

РАСКРЫТИЕ ИЗОБРЕТЕНИЯSUMMARY OF THE INVENTION

Ж/Б блоки шпал изготавливаются длиной одного рельса /25 м/, ФИГ.2, либо длиной одной шпалы /2,75 м/, ФИГ.1, соединяемые ж/б поперечными шпалами 2, ФИГ.1, 2, отстоящими друг от друга на расстоянии 2,8 или 4 м в зависимости от сложности пути /подъем, спуск, повороты/ или соответственно посредине одной шпалы /1,35 м/, /крутые повороты, стрелки и др./ и служат для повышения надежности ж/д пути. Изготовление блоков шпал производится на ж/б заводе заливкой цемента подготовленной арматуры предварительно напряженной конструкции для повышения прочности к переменным нагрузкам (3).Reinforced concrete blocks of sleepers are made with the length of one rail / 25 m /, FIG. 2, or the length of one sleepers / 2.75 m /, FIG. 1, connected by reinforced concrete cross ties 2, FIG. 1, 2, spaced from each other each other at a distance of 2.8 or 4 m, depending on the complexity of the track / climb, descent, turns / or, respectively, in the middle of one sleepers / 1.35 m /, / sharp turns, arrows, etc. / and serve to increase the reliability of railway the way. The production of blocks of sleepers is carried out at a reinforced concrete plant by pouring cement of prepared reinforcement of a prestressed structure to increase the strength to variable loads (3).

Для стыковки блоков ж/б шпал изготавливается «стыковочная» ж/б шпала 1, ФИГ.1, 2, в которую вмонтированы стыковочные сквозные узлы - стальная труба (штырь) 9, ФИГ.1, 2, 3, диаметром 30 мм, толщиной 3-4 мм, длиной 40-50 см, входящая в гнездо 8 блока ж/б шпал, ФИГ.1, 2, диаметром 30+/3-5/ мм, толщиной 3-4 мм, длиной 40-50 см и фиксируется горизонтальным болтом 12, ФИГ.1, 2 (4 шт.) при окончании глухой стыковки укладываемых блоков ж/б шпал. При этом предусматривается температурный зазор и возможность поворота блока по оси ж/д линии на угол 15-20°. При предварительном монтаже блоков ж/б шпал «стыковочная» ж/б шпала наглухо присоединяется к готовому для монтажа блоку ж/б шпал и затем уже на полотне стыкуется с последующим блоком ж/б шпал, глухо. После стыковки производится сварка рельсов либо стыковка посредством болтов. Для повышения сопротивления к продольным и поперечным перемещениям под каждую поперечную ж/б шпалу, в том числе «стыковочную», устанавливаются и скрепляются со шпалой /не показано/ прямые или бочкообразные чугунные цилиндры 11, ФИГ.1, 2, 3, диаметром до 1 м, высотой до 0,3 м, с толщиной стенки 3-4 мм, которые заполняются балластом /щебнем/ и служат для нивелировки ж/д полотна, повышают надежность пути и уменьшают профилактические работы.For joining the blocks of reinforced concrete sleepers, a “connecting” reinforced concrete sleepers 1, FIG. 1, 2 is made, into which docking through nodes are mounted - a steel pipe (pin) 9, FIG. 1, 2, 3, with a diameter of 30 mm, thickness 3-4 mm, 40-50 cm long, included in the slot 8 of the block of reinforced concrete sleepers, FIGS. 1, 2, with a diameter of 30 + / 3-5 / mm, 3-4 mm thick, 40-50 cm long and fixed horizontal bolt 12, FIG. 1, 2 (4 pcs.) at the end of the dead joint of stacked blocks of reinforced concrete sleepers. In this case, a temperature gap and the possibility of turning the block along the axis of the railway line by an angle of 15-20 ° are provided. During the preliminary installation of the blocks of reinforced concrete sleepers, the “docking” reinforced concrete sleepers are tightly connected to the ready-made block of reinforced concrete sleepers and then joined to the subsequent block of reinforced concrete sleepers, deafly. After joining, the rails are welded or docked by means of bolts. To increase resistance to longitudinal and transverse movements under each transverse reinforced concrete sleepers, including the “docking”, are installed and fastened with a sleeper / not shown / straight or barrel-shaped cast-iron cylinders 11, FIGS. 1, 2, 3, with a diameter of up to 1 m, a height of up to 0.3 m, with a wall thickness of 3-4 mm, which are filled with ballast / gravel / and are used to level the railroad tracks, increase track reliability and reduce maintenance work.

На ФИГ.1 изображен блок ж/б шпал длиной одной шпалы /2,75 м/. На ФИГ.2 изображен ж/б блок шпал длиной в один рельс /25 м/. На ФИГ.3 изображен вид А. Приняты следующие обозначения: 1 - поперечная «стыковочная» шпала, 2 - поперечные промежуточные шпалы, 3 - рельс, 4 - подставка под рельс, 5 - болт, 6 - узел крепления рельса, 7 - гайка, 8 - металлическое гнездо /труба/, 9 - труба /либо стальной штырь/ диаметром 30 мм, в «стыковочной» шпале, 10 - продольный блок ж/б шпал, 11 - чугунный цилиндр, 12 - болт, соединяющий трубу /штырь/ «стыковочной» шпалы с трубой в продольном блоке ж/б шпал.Figure 1 shows a block of reinforced concrete sleepers with a length of one sleepers / 2.75 m /. Figure 2 shows the reinforced concrete block of sleepers in the length of one rail / 25 m /. Figure 3 shows a view A. The following notation is adopted: 1 - transverse "docking" sleepers, 2 - transverse intermediate sleepers, 3 - rail, 4 - stand under the rail, 5 - bolt, 6 - rail mount, 7 - nut, 8 - a metal socket / pipe /, 9 - a pipe / or a steel pin / with a diameter of 30 mm, in the "docking" tie, 10 - a longitudinal block of reinforced concrete sleepers, 11 - a cast-iron cylinder, 12 - a bolt connecting the pipe / pin / " docking "sleepers with a pipe in the longitudinal block of reinforced concrete sleepers.

Эмпирическая оценка использования блоков ж/б шпал дает следующий технический результат:An empirical assessment of the use of blocks of reinforced concrete sleepers gives the following technical result:

- экономия расходных материалов от 40 до 50%;- saving of consumables from 40 to 50%;

- снижение шума более 30%;- noise reduction of more than 30%;

- повышение скорости ж/д транспорта более 30%;- increase the speed of railway transport more than 30%;

- снижение трудозатрат при эксплуатации ж/д пути до 40%;- reduction of labor costs during the operation of the railway track up to 40%;

- снижение вероятности схода с рельсов вагонов при теракте.- reduction in the probability of derailment of wagons during a terrorist attack.

Предлагаемый способ изготовления и укладки блоков в ж/б шпал легко применим для укладки трамвайных рельсов и ж/д рельсов в метро с добавлением третьего рельса съема напряжения /не показано/, которые крепятся болтами к «стыковочной» и промежуточным ж/б шпалам.The proposed method for the manufacture and stacking of blocks in reinforced concrete sleepers is easily applicable for laying tram rails and railway rails in the subway with the addition of a third voltage removal rail (not shown), which are bolted to the “docking” and intermediate reinforced concrete sleepers.

РАБОТА ПО ИЗГОТОВЛЕНИЮ И УКЛАДКЕ Ж/Б ШПАЛ НА Ж/Д ПУТИWORK ON MANUFACTURE AND LAYING R / W TEMPLES ON THE RAILWAY

На ж/б заводе изготовление ж/б блоков шпал в длину одной шпалы и в длину одного рельса производится заливкой бетона в предварительно напряженную конструкцию арматуры блоков шпал. Отдельно таким же способом изготавливается «стыковочная» шпала. «Стыковочная» ж/б шпала стыковочными узлами одномоментно, глухо, присоединяется с помощью горизонтальных болтов к одной стороне ж/б блока шпал, пристыковываются два рельса и укладываются на подготовленное ж/д полотно, пристыковываются к ранее уложенному блоку ж/б шпал. Далее рельсы либо свариваются, либо стыкуются с помощью болтов, соблюдая повороты колеи ж/д пути. Для прокладки ж/д пути с крутыми поворотами для стрелок и стыков рельс используются ж/б блоки длиной одной шпалы /не показано/. После укладки ж/б блоков шпал производится подсыпка, утрамбовка и нивелировка ж/д пути.At the reinforced concrete plant, the production of reinforced concrete blocks of sleepers in the length of one sleepers and in the length of one rail is made by pouring concrete into the prestressed structure of the reinforcement of the blocks of sleepers. Separately, in the same way a “docking” railroad tie is made. A “docking” reinforced concrete railroad tie by connecting nodes simultaneously, deafly, joins with the help of horizontal bolts to one side of the reinforced concrete railroad ties block, joins two rails and stacks on the prepared railroad cloth, joins to the previously laid-out railroad rail ties block. Further, the rails are either welded or joined with bolts, observing the turns of the railway track. To lay railway tracks with sharp turns for arrows and rail joints, reinforced concrete blocks with the length of one railway sleepers are used (not shown). After laying the reinforced concrete blocks of the sleepers, the railway is filled, rammed and leveled.

ИСТОЧНИКИ ИНФОРМАЦИИINFORMATION SOURCES

1. ПАТЕНТ №2262565 C1 от 20.10.2005 г.1. PATENT No. 2262565 C1 of 10.20.2005.

2. ПАТЕНТ №2155836 C1 от 10.09.2000 г.2. PATENT No. 2155836 C1 of 09/10/2000

3. БЭС, №20, ИЗД. «СОВ. ЭНЦИКЛОПЕДИЯ», 1975 г., г.Москва, СТР.501.3. BES, No. 20, ED. "OWL. ENCYCLOPEDIA ", 1975, Moscow, P. 501.

Claims (1)

Способ укладки железобетонных (ж/б) шпал на железнодорожные (ж/д) пути, отличающийся тем, что нити рельсов укладываются на продольные ж/б блоки длиной одного рельса 25 м, либо на ж/б блоки длиной одной шпалы 2,75 м; ж/б блоки скрепляются между собой поперечными ж/б шпалами, расположенными на расстоянии друг от друга 2, 3 или 4 м в зависимости от сложности пути, а для ж/б блоков длиной одной шпалы поперечная шпала укладывается на расстоянии половины шпалы 1,35 м; готовые блоки ж/б шпал соединяются между собой по оси пути отдельной «стыковочной» шпалой, снабженной стыковочными узлами по обе стороны длиной 40-50 см, состоящей из стальной трубы толщиной 3-4 мм либо стального штыря диаметром 30 мм, которые последовательно вводятся в стыковочные гнезда в торцах блоков ж/б шпал при их укладке на ж/д полотно; стыковочные гнезда ж/б блоков представляют стальные трубы диаметром 30+(3-5 мм), предпочтительно 30+(5-7 мм), толщиной 3-4 мм, глубиной 40-50 см, и при стыковке фиксируются со штырем либо с трубой «стыковочной» ж/б шпалы стальными болтами в количестве 4 шт., с температурным зазором и возможностью поворота по оси ж/д полотна на угол 15-20°. A method of laying reinforced concrete (reinforced concrete) sleepers on railway (railway) tracks, characterized in that the rails are laid on longitudinal reinforced concrete blocks with a length of one rail of 25 m, or on reinforced concrete blocks with a length of one sleepers 2.75 m ; reinforced concrete blocks are fastened together by transverse reinforced concrete sleepers located at a distance of 2, 3 or 4 m from each other, depending on the complexity of the path, and for reinforced concrete blocks of the length of one sleepers, the lateral sleepers are laid at a distance of half the sleepers 1.35 m; finished blocks of reinforced concrete sleepers are connected to each other along the axis of the path by a separate “connecting” sleepers equipped with docking nodes on both sides 40-50 cm long, consisting of a steel pipe 3-4 mm thick or a steel pin with a diameter of 30 mm, which are sequentially inserted into docking sockets at the ends of the blocks of reinforced concrete sleepers when laying them on the railway bed; the docking sockets of the reinforced concrete blocks are steel pipes with a diameter of 30+ (3-5 mm), preferably 30+ (5-7 mm), a thickness of 3-4 mm, a depth of 40-50 cm, and when docked they are fixed with a pin or pipe "Docking" reinforced concrete sleepers with steel bolts in an amount of 4 pcs., With a temperature gap and the ability to rotate along the axis of the railway track at an angle of 15-20 °.
RU2009147181/11A 2009-12-21 2009-12-21 Method to lay reinforced concrete sleepers onto railway lines RU2419701C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2009147181/11A RU2419701C1 (en) 2009-12-21 2009-12-21 Method to lay reinforced concrete sleepers onto railway lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2009147181/11A RU2419701C1 (en) 2009-12-21 2009-12-21 Method to lay reinforced concrete sleepers onto railway lines

Publications (1)

Publication Number Publication Date
RU2419701C1 true RU2419701C1 (en) 2011-05-27

Family

ID=44734899

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2009147181/11A RU2419701C1 (en) 2009-12-21 2009-12-21 Method to lay reinforced concrete sleepers onto railway lines

Country Status (1)

Country Link
RU (1) RU2419701C1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1446202A1 (en) * 1987-01-15 1988-12-23 Всесоюзный Научно-Исследовательский Институт Железнодорожного Транспорта Railway track structure
US6581848B1 (en) * 1998-09-16 2003-06-24 Peter Plica Sleeper frame for a rail system for rail-mounted vehicles, especially for a ballasted track
PT1274901E (en) * 2000-04-17 2007-03-30 Composite Damping Material Nv Railway comprising successive sleepers
JP3987875B1 (en) * 2006-11-27 2007-10-10 東海旅客鉄道株式会社 Sleeper structure and sleeper structure manufacturing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1446202A1 (en) * 1987-01-15 1988-12-23 Всесоюзный Научно-Исследовательский Институт Железнодорожного Транспорта Railway track structure
US6581848B1 (en) * 1998-09-16 2003-06-24 Peter Plica Sleeper frame for a rail system for rail-mounted vehicles, especially for a ballasted track
PT1274901E (en) * 2000-04-17 2007-03-30 Composite Damping Material Nv Railway comprising successive sleepers
JP3987875B1 (en) * 2006-11-27 2007-10-10 東海旅客鉄道株式会社 Sleeper structure and sleeper structure manufacturing method

Similar Documents

Publication Publication Date Title
CN206538637U (en) A kind of track strengthening device for existing railway
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN104631219B (en) Construction method of replacing integral ballast bed with floating slab ballast bed in subway operating line tunnel
CN204282185U (en) A kind of armful rail magnetic levitation track traffic bridge
CN109183530B (en) Line temporary overhead device and method for ballastless track disease remediation
CN203065950U (en) Railway bridge composed of simply-supported T-shaped beams
CN104480805A (en) Framed sleeper unit
CN105178164B (en) Prefabrication and lifting fish belly Wavelike steel webplate prestressing with bond combined box beam and its construction method
CN209538017U (en) Paving structure at highway bridge deck expansion joint
CN209798444U (en) A truss sleeper ballastless track for super-slope cog railway
CN105239475B (en) Track strengthening structure under complicated existing railway line in culvert jack-in process
RU2003127024A (en) FLOORING FOR RAILWAY
CN203546516U (en) Longitudinal continuous limit ballastless track on steel truss girder bridge
RU2419701C1 (en) Method to lay reinforced concrete sleepers onto railway lines
CN208009170U (en) Plate-type ballastless track on a kind of steel truss girder bridge
CN103911948B (en) Be applied to horizontal purlin formula steel work and the construction method thereof of wide concrete rib plate-girder
CN110219250A (en) The continuous combined overhead beam of multilayer
CN115354529A (en) Assembled suspension track beam
CN105696455A (en) Box type web simply supported U-shaped girder of double-track railway
CN210439155U (en) Multi-layer continuous combined overhead beam
CN110258190B (en) Ballast blocking wall structure of corrugated steel web of common-speed and heavy-load railway and construction method of ballast blocking wall structure
CN107974878A (en) A kind of rail yard track switch reinforcement means and structure
CN202194031U (en) A ballastless track large unit track slab
CN204959604U (en) A board -like ballastless track bridge floor for rushing to repair girder steel
CN204919326U (en) Adopt ultra high performance concrete's simply supported girder bridge bridge floor to construct in succession

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20121222