[go: up one dir, main page]

RU2455488C2 - Method to recover outbalance reserves in combined development of coal beds - Google Patents

Method to recover outbalance reserves in combined development of coal beds Download PDF

Info

Publication number
RU2455488C2
RU2455488C2 RU2010139709/03A RU2010139709A RU2455488C2 RU 2455488 C2 RU2455488 C2 RU 2455488C2 RU 2010139709/03 A RU2010139709/03 A RU 2010139709/03A RU 2010139709 A RU2010139709 A RU 2010139709A RU 2455488 C2 RU2455488 C2 RU 2455488C2
Authority
RU
Russia
Prior art keywords
reserves
mining
coal
outbalance
beds
Prior art date
Application number
RU2010139709/03A
Other languages
Russian (ru)
Other versions
RU2010139709A (en
Inventor
Петр Назарович Васильев (RU)
Петр Назарович Васильев
Владимир Леонидович Гаврилов (RU)
Владимир Леонидович Гаврилов
Original Assignee
Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН filed Critical Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН
Priority to RU2010139709/03A priority Critical patent/RU2455488C2/en
Publication of RU2010139709A publication Critical patent/RU2010139709A/en
Application granted granted Critical
Publication of RU2455488C2 publication Critical patent/RU2455488C2/en

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

FIELD: mining.
SUBSTANCE: method to recover outbalance reserves includes open mining and boring a bed according to the underground technology of deep mining of coal beds. When mining a series of flat-dipping beds, including a coal bed with outbalance reserves, overburden rocks are divided into ledges, and a working site of one of ledges is placed on the soil of the bed with outbalance reserves. Then these reserves are bored with the help of a complex of deep mining of beds for the maximum possible depth of chambers. Overburden works and extraction of lower payable beds is carried out with a delay from drilling works. Upon extraction of payable beds, works to bore outbalance reserves are continued, and they are performed cyclically until final mining of this bed in the field of the coal strip mine.
EFFECT: recovery of outbalance reserves available within borders of a coal strip mine field.
2 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при комбинированной разработке угольных пластов для извлечения забалансовых запасов угля.The invention relates to the mining industry and can be used in the combined development of coal seams to extract off-balance coal reserves.

Известен способ комбинированной разработки пологих пластов угольных месторождений, включающий ведение открытых горных работ, выбуривание пласта по подземной технологии глубокой разработки угольных пластов ([1] - прототип).A known method of the combined development of shallow seams of coal deposits, including conducting opencast mining, drilling a seam using underground technology for the deep development of coal seams ([1] - prototype).

Основным недостатком данной технологии является то, что по известной технологии могут быть извлечены запасы угля только одной полосы вдоль остановленных открытых горных работ.The main disadvantage of this technology is that according to the known technology, coal reserves of only one strip can be extracted along the stopped opencast mining.

Кроме того, работы по известной технологии выполняются на одном пласте.In addition, work on known technology is performed on one layer.

Технической задачей являлась возможность извлечения забалансовых запасов угля на всей площади пласта в поле угольного разреза.The technical task was the ability to extract off-balance coal reserves over the entire area of the seam in the coal mine field.

Предлагаемый способ отличается тем, что при разработке свиты пологопадающих пластов, включающей пласт угля с забалансовыми запасами, вскрышные породы делят на уступы, рабочую площадку одного из уступов размещают на почве пласта с забалансовыми запасами, производят выбуривание этих запасов с помощью комплекса глубокой разработки пластов на максимально возможную глубину камер, вскрышные работы и выемку нижележащих рабочих пластов ведут с отставанием от работ по выбуриванию, а после выемки рабочих пластов работы по выбуриванию забалансовых запасов повторяют и выполняют их циклически до полной отработки этого пласта в поле угольного разреза.The proposed method is characterized in that during the development of a suite of shallow beds, including a coal seam with off-balance reserves, overburden is divided into ledges, the working platform of one of the benches is placed on the soil of the seam with off-balance reserves, and these reserves are drilled using a deep formation development complex to the maximum possible depth of chambers, overburden operations and excavation of underlying workings are lagging behind drilling operations, and after excavation of workings, drilling operations are unbalanced O reserves are repeated and carry them cyclically to the complete working out of the formation into the coal mine field.

Введенный в формулу такой существенный признак, как то, что вскрышные породы делят на уступы, рабочую площадку одного из уступов размещают на почве пласта с забалансовыми запасами, позволяет размещать оборудование комплекса для глубокой разработки пластов без дополнительной подсыпки пород.The essential feature introduced into the formula, such as the fact that overburden is divided into ledges, the working platform of one of the ledges is placed on the soil of the formation with off-balance reserves, allows you to place complex equipment for deep formation development without additional bedding.

Существенный признак о том, что производят выбуривание забалансовых запасов на максимально возможную глубину камер, обеспечивает при разовом выбуривании запасов ведение вскрышных работ несколькими заходками.An essential sign that off-balance reserves are drilled to the maximum possible depth of the chambers provides for one-time drilling of reserves overburden operations in several rounds.

Существенный признак о том, что вскрышные работы и выемку нижележащих рабочих пластов ведут с отставанием от работ по выбуриванию, дает возможность своевременно произвести выемку забалансовых запасов.An essential sign that stripping operations and excavation of underlying workings are lagging behind drilling operations makes it possible to timely excavate off-balance reserves.

Следующий существенный признак о том, что после выемки рабочих пластов работы по выбуриванию забалансовых запасов повторяют и выполняют их циклически, обеспечивает полноту выемки этих запасов в поле угольного разреза.The next significant sign that after excavation of working seams, work on drilling off-balance reserves is repeated and performed cyclically, ensures the completeness of the extraction of these reserves in the coal mine field.

Сущность способа поясняется чертежами, где на фиг.1 показан в плане участок открытых горных работ и подземного выбуривания забалансовых запасов, на фиг.2 - разрез А-А на фиг.1.The essence of the method is illustrated by drawings, where figure 1 shows in plan a section of open cast mining and underground drilling of off-balance reserves, figure 2 - section aa in figure 1.

Условные обозначения, принятые на чертежах:Symbols adopted in the drawings:

1 - угольное месторождение; 2 - свита пластов; 3 - пласт с забалансовыми запасами; 4 - рабочая площадка уступа; 5 - почва пласта с забалансовыми запасами; 6 - КГРП; 7 - выбуриваемые камеры; 8 - рабочий пласт; 9 - межкамерные угольные целики.1 - coal deposit; 2 - formation retinue; 3 - reservoir with off-balance reserves; 4 - working platform ledge; 5 - formation soil with off-balance reserves; 6 - HGRF; 7 - drilled chambers; 8 - working layer; 9 - interchamber coal pillars.

Способ осуществляют следующим образом.The method is as follows.

На угольном месторождении 1, представленном свитой пологопадающих пластов 2, имеется пласт 3 с запасами, относящимися к забалансовым, например, из-за малой мощности пласта. Как правило, такие пласты извлекаются вместе с породой вскрыши и могут являться причиной горения породных отвалов. Сначала планируют вести вскрышные работы таким образом, чтобы рабочая площадка 4 одного из уступов совпала с почвой пласта 5, имеющего малую мощность и забалансовые запасы. После всрытия выходов этого пласта 5 начинают его выбуривать комплексом глубокой разработки пластов 6 (КГРП). При этом глубину (длину) камер 7 выполняют максимально возможной. Практика работы КГРП в Кузбассе и Южной Якутии показала, что длина камер может быть 300 м. Затем ведут вскрышные работы как выше выбуренного пласта 5, так и ниже его, обнажая и извлекая рабочий пласт 8. В процессе извлечения пород вскрыши выше пласта 5 пустоты камер 7 и межкамерные угольные целики 9 затруднений для работы тяжелой горной техники не вызывают. Для выемки пласта 8 необходимо произвести несколько заходок при одном проходе КГРП. Следующее выбуривание пласта 5 ведут после выемки пласта 8 и повторяют такую выемку циклически до полной отработки пласта 5, находящегося в поле угольного разреза.Coal deposit 1, represented by a retinue of gently dipping seams 2, has a seam 3 with reserves related to off-balance, for example, due to the low power of the seam. As a rule, such layers are extracted together with the overburden rock and can cause the burning of waste dumps. First, they plan to conduct overburden work so that the working platform 4 of one of the ledges coincides with the soil of formation 5, which has low power and off-balance reserves. After opening the exits of this formation 5, they begin to drill it with a complex of deep development of formations 6 (fracturing). In this case, the depth (length) of the chambers 7 is performed as high as possible. The practice of fracturing in Kuzbass and South Yakutia showed that the chambers can be 300 m long. Overburden work is then carried out both above and below the drilled formation 5, exposing and removing working reservoir 8. In the process of extracting overburden rocks above the reservoir, 5 chamber voids 7 and interchamber coal pillars 9 do not cause difficulties for the operation of heavy mining equipment. For excavation of the reservoir 8, it is necessary to make several calls in one pass of the hydraulic fracturing. The next drilling of the formation 5 is carried out after the excavation of the formation 8 and repeat such excavation cyclically until the complete development of the formation 5, which is in the field of the coal mine.

Преимуществами предлагаемого способа являются:The advantages of the proposed method are:

- дополнительная выемка угольных забалансовых запасов;- additional extraction of coal off-balance reserves;

- исключение возгорания породных отвалов.- the exclusion of ignition of waste dumps.

Источники информацииInformation sources

1. Патент РФ №2312218, Кл.7 E21C 41/00, 2007 г.1. RF patent No. 2312218, Cl. 7 E21C 41/00, 2007

Claims (1)

Способ извлечения забалансовых запасов при комбинированной разработке угольных пластов, включающий ведение открытых горных работ, выбуривание пласта по подземной технологии глубокой разработки угольных пластов, отличающийся тем, что при разработке свиты пологопадающих пластов, включающей пласт угля с забалансовыми запасами, вскрышные породы делят на уступы, рабочую площадку одного из уступов размещают на почве пласта с забалансовыми запасами, производят выбуривание этих запасов с помощью комплекса глубокой разработки пластов на максимально возможную глубину камер, вскрышные работы и выемку нижележащих рабочих пластов ведут с отставанием от работ по выбуриванию, а после выемки рабочих пластов работы по выбуриванию забалансовых запасов повторяют и выполняют их циклически до полной отработки этого пласта в поле угольного разреза. The method of extraction of off-balance reserves in the combined development of coal seams, including open pit mining, drilling of the seam using underground technology for deep mining of coal seams, characterized in that during the development of a suite of shallow seams, including a coal seam with off-balance reserves, overburden is divided into ledges, working the site of one of the ledges is placed on the soil of the formation with off-balance reserves, and these reserves are drilled using a complex of deep development of reservoirs at maximum DUTY possible depth cameras stripping recess and underlying layers are working with a lag of works for drilling out, and after drilling out of the recess of the working stocks off-balance layers and perform their repeated cyclically to complete the formation of a mining coal mine field.
RU2010139709/03A 2010-09-27 2010-09-27 Method to recover outbalance reserves in combined development of coal beds RU2455488C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010139709/03A RU2455488C2 (en) 2010-09-27 2010-09-27 Method to recover outbalance reserves in combined development of coal beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010139709/03A RU2455488C2 (en) 2010-09-27 2010-09-27 Method to recover outbalance reserves in combined development of coal beds

Publications (2)

Publication Number Publication Date
RU2010139709A RU2010139709A (en) 2012-04-10
RU2455488C2 true RU2455488C2 (en) 2012-07-10

Family

ID=46031277

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010139709/03A RU2455488C2 (en) 2010-09-27 2010-09-27 Method to recover outbalance reserves in combined development of coal beds

Country Status (1)

Country Link
RU (1) RU2455488C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2514252C1 (en) * 2012-11-22 2014-04-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук Method to extract non-commercial reserves in development of coal beds

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917349A (en) * 1974-04-16 1975-11-04 Jr James Mansfield Cleary Mining method involving sliding block of overburden on gel lubricant
SU1751333A1 (en) * 1990-07-09 1992-07-30 Концерн "Кузнецкуголь" Method of combined mining of bed mineral deposits
RU2117155C1 (en) * 1996-08-06 1998-08-10 Институт горного дела Севера СО РАН Method for combined development of deposits
RU2194858C2 (en) * 2001-02-26 2002-12-20 Институт горного дела Севера СО РАН Method of combined mining of bedded mineral deposits
RU2205955C1 (en) * 2001-11-13 2003-06-10 Нецветаев Александр Глебович Method of mineral extraction in filled flanks of opencast

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917349A (en) * 1974-04-16 1975-11-04 Jr James Mansfield Cleary Mining method involving sliding block of overburden on gel lubricant
SU1751333A1 (en) * 1990-07-09 1992-07-30 Концерн "Кузнецкуголь" Method of combined mining of bed mineral deposits
RU2117155C1 (en) * 1996-08-06 1998-08-10 Институт горного дела Севера СО РАН Method for combined development of deposits
RU2194858C2 (en) * 2001-02-26 2002-12-20 Институт горного дела Севера СО РАН Method of combined mining of bedded mineral deposits
RU2205955C1 (en) * 2001-11-13 2003-06-10 Нецветаев Александр Глебович Method of mineral extraction in filled flanks of opencast

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2514252C1 (en) * 2012-11-22 2014-04-27 Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук Method to extract non-commercial reserves in development of coal beds

Also Published As

Publication number Publication date
RU2010139709A (en) 2012-04-10

Similar Documents

Publication Publication Date Title
RU2339818C1 (en) Degassing method of set of contiguous coal beds for barrier method
CN105089493B (en) Ground vertical well combines pressure released seam gas pumping method with underground layer-through drilling
CN106321025B (en) A kind of coal and the green harmonic extraction system of oil gas and application process
CN102828730A (en) Nonmetallic mineral underground in-situ drilling corrosion mining new technology
RU2536541C1 (en) Method of underground mining of pitching and underlay lodes
RU2430236C2 (en) Method of combined development of coal minefield
RU2376475C1 (en) Method of gas extraction from coal-bearing strata
RU2005126999A (en) METHOD FOR RECULTIVATION OF OPEN MINING
RU2455488C2 (en) Method to recover outbalance reserves in combined development of coal beds
RU2117155C1 (en) Method for combined development of deposits
RU2312218C2 (en) Combined development method for flat-laying seams of coal field
RU94026581A (en) Method for exploitation minerals deposits
RU2345216C2 (en) In-situ coal series gasification method
RU2498065C1 (en) Method to mine mineral beds
RU2370643C1 (en) Method of integrated opening of coal deposit
RU2394991C1 (en) Procedure for solid coal weakening
RU2102592C1 (en) Method for development of strata deposits of minerals
RU2311531C2 (en) Method for underground coal gasification
RU2418166C1 (en) Compound development method of series of gently sloping beds of mine fields
RU2704061C1 (en) Method for combined development of flat seams of coal deposits
RU2435956C1 (en) Method of open underground development of thick flat coal bed
RU2418168C1 (en) Compound development method of series of gently sloping beds of mine fields
SU825962A1 (en) Method of controlling hard-to-cave roofs
RU2425216C1 (en) Complex development method of bed series of anticline deposits
RU2459082C2 (en) Method for extraction of hard mineral resources from deep-lying water-flooded deposit

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20160928