KR20140092217A - Construction method of the pier with the working bardge - Google Patents
Construction method of the pier with the working bardge Download PDFInfo
- Publication number
- KR20140092217A KR20140092217A KR1020130156900A KR20130156900A KR20140092217A KR 20140092217 A KR20140092217 A KR 20140092217A KR 1020130156900 A KR1020130156900 A KR 1020130156900A KR 20130156900 A KR20130156900 A KR 20130156900A KR 20140092217 A KR20140092217 A KR 20140092217A
- Authority
- KR
- South Korea
- Prior art keywords
- pier
- space
- water
- bridge pier
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000010276 construction Methods 0.000 title abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 37
- 238000000034 method Methods 0.000 claims abstract description 33
- 238000009434 installation Methods 0.000 claims abstract description 19
- 238000001363 water suppression through gradient tailored excitation Methods 0.000 claims abstract description 10
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 5
- 239000011435 rock Substances 0.000 claims description 20
- 239000000463 material Substances 0.000 claims description 8
- 239000002689 soil Substances 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000004567 concrete Substances 0.000 claims description 4
- 238000004873 anchoring Methods 0.000 claims description 3
- 239000000969 carrier Substances 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000003190 augmentative effect Effects 0.000 claims description 2
- 238000011900 installation process Methods 0.000 abstract description 3
- 230000007613 environmental effect Effects 0.000 abstract description 2
- 230000004075 alteration Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005273 aeration Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 241000195493 Cryptophyta Species 0.000 description 1
- 238000006424 Flood reaction Methods 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000007730 finishing process Methods 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002341 toxic gas Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/28—Barges or lighters
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1607—Shapes round, e.g. circle
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Transportation (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
- Foundations (AREA)
Abstract
Description
본 발명은 임시 물막이 설치공정을 생략하기 위한 작업선을 이용한 교각의 수중설치공법에 관한 것으로, 더욱 상세하게는, 기초공간 및 중심파일공간과 출입공간을 가지도록 지상에서 제작된 교각을 해저 암반에 타설된 중심파일에 끼워 세우고 배수된 기초공간에서 연약지반을 제거한 후에도 상단이 수면에 노출되도록 암반에 내려 앉히거나 파일로 연결한 후에 기초공간과 출입공간을 철근 콘크리트로 채워 고정하고 조립된 상판이나 수상구조물에서 잔여공사가 마무리되는 공정이 각종 공사장비를 갖춘 바지선에서 추진되는 작업선을 이용한 교각의 수중설치공법에 관한 것이다.
The present invention relates to an underwater installation method of a pier using a work line for omitting a temporary water film installation process. More particularly, the present invention relates to a method of installing a pier in an underwater rocky ground with a base space, After removing the soft ground in the drained basement, it is placed on the rock so that the top is exposed to the water. After connecting to the pile, the foundation space and the entrance space are filled with reinforced concrete, The process of finishing the remaining construction in the structure is related to the underwater installation method of the bridge pier using the work line propelled by the barge with various construction equipments.
유속이 빠른 강이나 조석간만과 파도가 높은 바다에서 교량이나 조력발전소 또는 수상건물을 건설하기 위해서 교각 기초공간보다 훨씬 넓은 작업공간을 임시 물막이 공사로 확보해왔다.In order to construct bridges, tidal power plants or water buildings in river or tidal tidal and high-wave waters with fast flow rates, we have secured a work area much larger than the pier foundation area as a provisional tundish.
그러나 건설해역의 수심과 통과수량, 연약지반의 깊이 및 구조물 높이에 따라서 터파기와 잔토(殘土) 처리, 장비의 작업공간, 진입로, 및 소요자재를 적재할 면적을 확보해야 하므로 수심이 깊을수록, 그리고 육지에서 멀리 떨어져 있을수록 임시 물막이공사에 투입되는 비용과 시간이 기하급수적으로 증가하고 붕괴로 인한 침수 위험도 배제될 수 없다.However, depending on the depth of the construction area and the amount of water passing through, the depth of the soft ground, and the height of the structure, it is necessary to secure the area for loading the terrazzo, the residual soil, the equipment working space, the access road, And, the farther away from the land, the exponential increase in the cost and time for the temporary dam construction and the risk of flooding due to the collapse can not be ruled out.
특히 조류가 드나드는 해협이나 강물이 흐르는 곳은 통과수량과 공사진척도에 따라 우회 수로 축조와 해체가 수차례 반복되어야하고 파고가 높을 때나 홍수 때 통과수량 증가에 대한 대비책이 전제되어야 한다.In particular, straits or streams where the tidal currents flow into the tidal flats should be constructed several times depending on the number of passes and the progress of the construction, and countermeasures should be taken against the increase in the number of tidal flats or floods.
400여m의 조력발전소를 건설한 시화조력발전소가 한쪽에 이미 완성된 도로를 겸한 방조제를 끼고도 무려 2km나 되는 물막이 공사가 진행되었고, 그럼에도 임시 물막이제방 붕괴로 침수사태가 발생하여 6개월간 공사가 중단됐었다. 그뿐만 아니라 들어낸 토사가 수천 평의 인공 섬을 만들 수 있는 분량이었음이 이를 증명한다.The Sihwa tidal power plant, which built 400 m of tidal power plant, was constructed with a water tide of 2km or so along with the sea tide that was already completed on the road. However, due to the collapse of the embankment, It was stopped. In addition to this, it proves that the reclaimed soil was enough to make artificial islands of several thousand pyeong.
해상에 풍력발전기를 설치하거나 유추공을 뚫을 때 연약지반 층이 두꺼운 해저에서는 파일을 타설하거나 파일 내강에 진공을 걸어 박는 방법이 이용되고 있지만, 연약지반 층이 얇은 곳은 단단한 암반을 드릴로 뚫어야 하고 조력발전소와 같은 구조물은 이와 같은 파일만으로 기초를 대체할 수도 없다.When a wind turbine is installed on the sea or an analogue pier is pierced, a method of piling a pile or applying a vacuum to a pile of a pile is used in a thick underwater floor, but in a thin layer of soft pile, a hard rock is drilled Structures such as tidal power plants can not replace the foundation with only such files.
그러므로 임시물막이 공사를 하지 않고도 설계된 위치에서 교각 상단이 수면에 드러나도록 암반에 고정되고 상단(上端)을 상판으로 연결하거나 수상구조물을 설치할 수 있는 공법이 요구된다. 잔여공사는 상기 상판이나 수상구조물에서 마무리될 수 있기 때문이다.
Therefore, there is a need for a method of connecting the upper end to the upper plate or installing a water structure so that the upper end of the bridge can be exposed to the water surface at the designed position without the provision of a temporary waterwall. This is because the remaining construction can be finished in the above-mentioned roof or the water structure.
그것은 지상에서 제작된 교각이 수면에 노출되도록 암반에 박은 파일을 지지대로 세워놓고 하단을 암반에 고정하는 것이다. It is to fix the pile on the rock to the support so that the pier made on the ground is exposed to the water and fix the bottom to the rock.
교각을 암반에 정확히 고정하려면 교각 1개에 2개 내지 3개의 파일이 정 위치에 정확히 타설되고 교각과의 유격이 거의 없어야 하며, 교각을 파일에 끼워 맞추기 위해서는 가벼워야 하고, 작업자가 교각 하단으로 접근하는 통로와 작업공간이 확보되어야 하며, 작업하기 위해서 배수했을 때 교각 밑에서 침수터널이 형성되거나 부력으로 솟구치지 않아야 한다.In order to accurately fix the bridge to the rock, two or three piles should be correctly pushed in place on one pier and there should be little clearance between the bridge and the pier. The pier must be light enough to fit in the pile, And a drainage tunnel should not be formed beneath the pier when draining to work, or buoyancy should not be generated.
조력발전소와 같이 교각으로 형성된 수로에 수중구조물을 설치할 때는 양쪽에 호형 수문이 임시 물막이로 가설된다. 평면형 수문보다 큰 수압을 견딜 수 있도록 골격 보강이 용이하고 수차기초나 수중보와 같은 수중구조물은 수로 밖으로 연장될 수 있기 때문이다.When an underwater structure is installed on a waterway formed by a pier like a tidal power plant, an arc-shaped water gate is installed on both sides. It is easy to reinforce the skeleton so that it can withstand the water pressure greater than the flat water gate, and underwater structures such as aberration bases and underwater beams can extend out of the waterway.
이와 같은 공정이 수중에서 추진되기 위해서는 교각과 같은 구조물을 제작 공급하는 지상지원기지와 각종 공사장비를 갖춘 바지선, 및 자재운반선에서 제반 공정이 분업과 협업으로 수행되며, 작업자가 기초공간에서 작업할 때 기계에서 발생하거나 지하에서 분출되는 유독가스를 배출할 수 있는 환기장치가 필요하다.In order for such a process to be carried out in water, the ground support base for constructing and supplying structures such as piers, barges with various construction equipments, and material carriers are carried out by division and cooperation, and when the worker is working in the basic space Ventilation is required to discharge toxic gases from the machine or spewed from underground.
이러한 공법으로 임시 물막이공사는 물론 임시 교량가설까지 생략되고, 터파기 면적이 교각기초 단면으로 국한되므로 잔토량(殘土量)이 적으며, 되메우기 또는 해체공정이 생략되거나 축소되고 공사 중에도 강물 또는 조류의 정상적인 유동이 유지되므로 환경변화가 최소화되며 태풍이나 지진과 같은 재해가 발생하지 않는 한 공정이 끊기는 일이 없다.
This method omits the construction of temporary trenches as well as the temporary bridge construction, the trenching area is limited to the foundation section of the pier, so the amount of residual soil is small, and the backfilling or dismantling process is omitted or reduced, The normal flow of water is maintained and environmental changes are minimized and the process is not interrupted unless a disaster such as a typhoon or an earthquake occurs.
본 발명은 임시 물막이나 임시교량 가설공사를 하지 않고도 교각을 해저 암반에 고정하고 상단을 수면에 노출함으로써 잔여공사가 수상에서 마무리 가능하도록 작업선을 이용한 교각의 수중설치공법을 개발하는데 목적이 있다.
The object of the present invention is to develop an underwater installation method of a pier using a work line so that the pier is fixed to the submarine rock bed and the upper part is exposed to the water surface without finishing a provisional waterwall or temporary bridge construction work.
상기 목적을 달성하기 위하여, 작업선을 이용한 교각의 수중설치공법은 선적부두를 가진 지상지원기지 또는 부양기능과 정박기능을 가진 바지선에서 제작되되, 하단에 쐐기형 비트를 가진 기초공간 벽으로 형성된 기초공간과 상기 기초공간 벽과 일체형으로 형성된 본체가 상하로 관통한 복수의 중심파일공간 및 출입공간으로 경량화(輕量化)된 교각과, 상기 중심파일공간에 삽입가능한 중심파일, 및 상기 교각에 조립되는 부속구조물 제작공정;In order to accomplish the above object, the underwater installation method of a pier using a work line is a ground support base having a loading dock or a foundation formed of a base space wall having a wedge-type bit at the lower end, A center pillar formed integrally with the base space wall and having a plurality of central pile spaces vertically penetrating therethrough and an entrance space; a center pile insertable into the central pile space; Substructure fabrication process;
상기 교각이 암반에 고정된 복수의 상기 중심파일에 끼워 세워지고 상기 쐐기형 비트와 해저 사이에 형성된 틈이 상기 기초공간에 투입된 토사로 메워지며 수면에 노출된 상기 교각 상부에서 주변 해저까지 밀착된 방수커튼으로 배수 후의 침수와 부양(浮揚)이 방지되는 교각설치 및 방수공정;Wherein the bridge pier is sandwiched between a plurality of the center piles fixed to the rock, a gap formed between the wedge-shaped bit and the sea bed is filled with the gravel charged into the foundation space, and waterproofed from the upper part of the bridge, exposed to the water surface, Piers installed and waterproofed to prevent flooding and flooding after draining with curtains;
상기 쐐기형 비트가 암반에 도달하도록 연약지반과 무른 암석이 제거되거나 바닥에 복수의 파일이 타설되고 상기 기초공간과 상기 출입공간 및 상기 중심파일공간 중 잔여공간이 철근콘크리트로 채워지는 교각고정공정;A pier fixing step of removing the soft ground and loose rock so that the wedge-shaped bit reaches the rock, or a plurality of piles are laid on the floor, and the remaining space of the base space, the access space and the center pile space is filled with reinforced concrete;
상기 방수커튼이 해체된 교각으로 형성된 수로 양쪽에 호형 수문이 가설되며 상기 호형 수문 외측과 해저에 방수커튼이 밀착되고 배수된 임시 물막이 내부에서 추진되는 수중 구조물 설치공정;An underwater structure installation step in which an arc-shaped water gate is installed on both sides of the water channel formed by the pier with the waterproof curtains disassembled and the water curtain is adhered to the outside of the arc-shaped water gate and the seabed and drained;
상기 교각 또는 상기 수중 구조물에 조립된 수상 구조물에서 마무리되는 잔여공정으로 구분되되;And a remaining process to be completed in the pier or the augmented structure assembled in the underwater structure;
제반 공정이 드릴 머신(drill machine)과 파일 타설 장비와 크레인과 준설장비와 콘크리트 타설 장비와 발전기 및 환기장치가 탑재되고 부양기능과 기동력 및 정박기능을 가진 복수의 바지(barge)선과 자재운반선으로 추진되는 것을 특징으로 한다.
All processes are carried out by drill machines, pile installation equipment, crane and dredging equipment, concrete pouring equipment, generators and ventilators, multiple barge lines and material carriers with lifting, maneuvering and anchoring functions. .
상기 교각은 설치 해역의 수심과 노출높이 또는 중량에 따라서 다단계로 분할제작되어 상기 중심파일공간에 삽입된 중심파일로 연결가능한 것을 특징으로 한다.
The bridge pier may be divided into a plurality of steps according to the depth of water and the exposure height or weight of the installation area and connected to the center file inserted in the center file space.
상기 방수커튼은 내 주변(內周邊)이 상기 교각 단면과 일치하고 외 주변(外周邊)은 타원형 또는 원형으로 재단된 바닥재와, 상기 바닥재 내 주변과 봉합되고 상기 기초공간 벽에서 상기 교각 상단 또는 상기 교각에 가설된 난간까지 연장된 내피, 및 하단이 상기 바닥재 외 주변과 봉합되고 밧줄 또는 와이어로 보강된 상단에 부표(buoy)와 철괴가 함께 부착된 외피로 형성되되, 설치 및 해체가 용이하도록 상기 교각 외형에 따라 복수 조각(pieces)으로 분리 재단되고 재단부분이 분리가능하게 봉합되어 상기 바닥재가 해저에 밀착되도록 상기 교각 주변에 형성된 ∪형 주머니에 토사가 투입된 것을 특징으로 한다.
Wherein the waterproof curtain has a floor material whose inner periphery coincides with the cross section of the pier and whose outer periphery is cut into an ellipse or a circular shape, An inner skin extending to the railing provided on the bridge pier, and an outer cover having a buoy and a steel block attached together at the upper end of which the lower end is sealed with the outer periphery of the floor and is reinforced with a sling or a wire. And the soil is inserted into the ∪ -type bag formed around the pier so that the bottom portion can be closely attached to the seabed so that the cutting portion is seamably detachable in a plurality of pieces according to the external shape of the pier.
방수커튼의 해체는 부표가 제거되어 외피가 철괴의 무게로 가라앉은 ∪형 주머니에서 토사가 제거되고 봉합된 재단부분을 풀어 한 조각씩 분리되는 것을 특징으로 한다.
The dismantling of the waterproof curtain is characterized in that the buoy is removed and the soil is removed from the ∪-type pouch whose envelope sinks to the weight of the steel bar, and the piece of cut-off is loosened and separated one by one.
본 발명은 임시 물막이공정이 생략되고 교각 등 구조물 제작과 설치로부터 잔여공사까지 모든 공정이 분업 내지 협업으로 추진되므로 기상조건이 허락되는 한 공사기간이 획기적으로 단축되고, 붕괴위험이나 되메우기 및 임시 물막이 해체공정도 거의 없으며, 작업선과 운반선은 물론 호형 수문과 방수커튼까지 재활용이 가능하므로 공사비용이 대폭 절감되고, 공사기간 중에도 조석간만이나 강물의 흐름이 정상적으로 유지되는 것이 특징이다.
In the present invention, since the temporary water filming process is omitted and all the processes from the manufacture and installation of the bridge pillar structure to the remaining construction are promoted through the division of labor or collaboration, the construction period is shortened as long as the weather condition is allowed and the risk of collapse, There is almost no process, and it can be recycled to arc-shaped water curtains and waterproof curtains as well as work lines and carrier ships, which greatly reduces the construction cost and maintains normal tidal flow and river flow during the construction period.
제1도는 중심파일과 파일로 암반에 고정된 교량 교각 입면도이고.
제2도는 중심파일과 파일로 암반에 고정된 교량 교각 측면도.
제3도는 교각 본체를 성형하는 내부 및 외부 거푸집 횡단면도.
제4도는 수차집과 일체형인 복류식 수차발전소 교각의 본체 평면도.
제5도는 수차집과 일체형인 복류식 수차발전소 교각의 기초공간 평면도.
제6도는 원형교각 본체부분 평면도.
제7도는 원형교각의 기초공간 평면도.
제8도는 교각의 방수커튼 설치 입면도.
제9도는 교각으로 형성된 수로 양쪽에 설치된 호형 수문 단면도이다.Figure 1 is an elevation view of a bridge pier fixed to a rock with a central file and a file.
Figure 2 is a side view of a bridge pier fixed to a rock with a central file and file.
Figure 3 is an internal and external cross-sectional view of the piercing body;
FIG. 4 is a top view of the main body of a double-bladed aeration power plant pier integrated with a waterfall housing.
Fig. 5 is a floor plan view of the basic space of a pumped aeration power plant pier which is integrated with a waterfall house.
Figure 6 is a plan view of the circular pillar body.
Figure 7 is a floor plan view of a circular pier.
Figure 8 is an elevation view of the waterproof curtain installed on the pier.
FIG. 9 is a cross-sectional view of an arc-shaped water gate installed on both sides of a waterway formed by a pier.
이하 도면을 참조하여 본 발명의 바람직한 실시 예에 따른 작업선을 이용한 교각의 수중설치공법에 대하여 설명한다.
Hereinafter, an underwater installation method of a pier using a work line according to a preferred embodiment of the present invention will be described with reference to the drawings.
도 1은 중심파일(148)과 파일(147)로 암반(156)에 고정된 교량 교각(59) 입면(종단면)도이고, 도 2는 상기 교각(59) 측면(횡단면)도이며, 도 3은 교각(95)을 성형하는 내측 거푸집(152a)과 외측 거푸집(152b) 횡단면도로, 선적부두를 가진 지상지원기지 또는 부양기능과 정박기능을 가진 바지선에서 교각(95)과 상기 교각(95)을 해저에 세우는 중심파일(148)과, 상기 교각(95)에 조립되는 상판과 같은 구조물이 제작된다.
1 is a top view of a bridge bridge 59 fixed to a
상기 교각(95)은 하단에 쐐기형 비트(154)를 가진 기초공간 벽(151a)으로 형성된 기초공간(151)과 상기 기초공간(151)에서 상단까지 관통한 복수의 중심파일공간(148a)과 출입공간(149)으로 경량화(輕量化)된 본체가 일체형으로 제작되되, 수심과 노출높이 또는 중량에 따라 다단계로 분할제작될 수도 있으며 이 경우 중심파일공간에 삽입된 복수의 중심파일로 연결되고 연결부분이 콘크리트나 접착제로 접합된다.
The
도 4는 수차집(24)과 일체형으로 축조된 조력발전소 교각(95) 본체 평면도, 도 5는 상기 교각(95)의 기초공간(151) 평면도이며, 도 6은 원형 교각(95)의 본체평면도이고, 도 7은 상기 원형 교각(95)의 기초공간(151) 평면도로, 설치용도에 따라 규격화된 교각(95)이 암반(156)에 고정될 때까지 설치위치가 변경되거나 기울어지지 않도록 암반(156)에 미리 고정된 복수의 중심파일(148)에 끼워 세워진다.
5 is a plan view of the
기초공간(151)에서 연약지반을 제거하기 위하여 배수했을 때 비트(154) 밑으로 침수터널이 형성되거나 연결부분 사이로의 누수(漏水)를 차단하고 교각(95)이 부력으로 부상하지 못하도록 교각 본체와 기초공간 벽(151a) 주변 해저에 설치된 방수커튼(158)의 ∪형 주머니를 토사(159)로 눌러 해저에 밀착시킨다.
A water immersion tunnel is formed beneath the
방수커튼(158)은 바닥재(158c) 내 주변이 교각(95) 단면과 일치된 모양으로 재단되고 외 주변은 교각(95) 외형에 따라 원형이나 타원형으로 재단되며, 상기 바닥재(158c) 내 주변과 봉합된 내피(158a)는 교각(95)에 밀착된 상태로 상단(124)까지 연장되어 상단(124)을 가로질러 고정하거나 상단에 가설된 난간(155)에 밧줄(162)로 결속되고, 토사(159)가 유실되지 않도록 하단이 상기 바닥재(158c) 외 주변과 봉합된 외피(158b)로 ∪형 주머니가 형성되도록 와이어나 밧줄(163)로 보강된 상단에 철괴(161)와 부표(160)가 결속되되, 설치와 해체가 용이하도록 교각(95) 외형에 따라 복수 조각(pieces)으로 분할제작되어 재단 부분이 지퍼(zipper)나 테이프로 봉합된다.
The
교각(95)이 놓인 해저 바닥이 울퉁불퉁한 암반이거나 경사가 심해 해저와 비트(154) 사이에 공간이 형성되면 ∪형 주머니에 토사(159)를 투입하기 전에 미리 기초공간(151)에 투입된 토사로 상기 공간을 막아 방수커튼(158)이 밀려 들어오지 못하도록 한다.
If the bottom of the
배수된 기초공간(151)에서 연약지반(157)과 무른 암석이 제거되면 교각(95) 하중이나 가벼운 타격으로 비트(154)를 암반(156)에 내려 앉힐 수 있다. 연약지반(157) 층이 깊을 때는 연약지반(157)을 걷어내서 교각(95)을 내려 앉힌 바닥에 파일(147)을 박아 암반(156)과 연결하고 기초공간(151)과 출입공간(149) 및 중심파일공간(148a) 중 잔여공간을 철근콘크리트로 채워 고정한다.
When the
방수커튼(158) 해체는 부표(160)를 제거하여 외피(158b)를 철괴(161)의 무게로 가라앉히고 유속이나 물대포로 토사(159)를 제거하며 봉합된 재단부분을 풀고 크레인으로 한 조각씩 분리한다.
The
교각(95)으로 형성된 수로에 수차발전소나 수월구 등 기타 수중 구조물(96)이 설치될 때, 방수커튼(158)이 해체된 교각(95)으로 형성된 수로 양쪽에 수압으로 변형되지 않도록 골격이 보강된 1쌍의 호형 수문(76)이 수문홈이나 교각(95)을 지지대로 설치되고 방수커튼으로 누수를 차단한 후에 배수한다.
When the aquatic power plant, the aqueduct or other
상판(124)이나 구조물이 교각(95)이나 수중구조물에 조립되면 도로 난간이나 수상구조물, 수차발전기, 수문타워 설치 등 잔여공사가 수상에서 마무리된다.
When the
이상과 같은 모든 공정이 자재운반선과, 설치위치가 GPS로 조정되는 수중 타공(打孔) 장비(drill machine)와 파일 타설 장비, 대형 크레인, 와이어형 굴삭기, 준설펌프, 콘크리트 펌프, 발전기, 및 환기장치 등이 탑재되고, 파도나 조류에도 전혀 밀리지 않고 수평상태로 고정될 수 있는 정박기능, 및 수심이 얕은 곳에서도 이동하여 정박할 수 있는 부양기능과 기동력을 갖춘 작업선을 이용하여 분업과 협업으로 추진되고 임시 물막이 해체, 되메우기, 잔토 처리 같은 마무리공정까지 생략되거나 대폭 축소되므로 공기가 획기적으로 단축되고 투자비가 절감되는 것을 특징으로 한다.
All of the above processes are performed by the material carrier, the underwater drill machine and pile installation equipment where the installation position is adjusted by GPS, the large crane, the wire excavator, the dredging pump, the concrete pump, It is equipped with an anchorage function that can be installed horizontally without being hit by waves or algae at all, and a work line with lifting and maneuvering ability that can be moored at shallow water depths. And the finishing process such as dismantling temporary tear film, backfilling, and residual treatment is omitted or drastically reduced, thereby remarkably shortening the air and reducing the investment cost.
교각의 수중설치공법은 교량공사는 물론 조력발전소나 파력발전소, 또는 해안이나 대륙붕에 해상구조물을 건설할 때, 및 대형 선박이 가까이 접안하도록 수심이 깊은 수직형 부두를 건설할 때 등 기초가 암반에 고정되어야하는 어떠한 구조물도 방대한 임시 물막이공사 없이 설치가능하다.The underwater installation method of a pier is not limited to bridges, but also to tidal power plants, wave power plants, or when constructing offshore structures on the coast or continental shelf, and when constructing a vertical pier, Any structure that needs to be fixed can be installed without the need for extensive temporary cofferdams.
또한 작업선 대신 운반차량과 이동식 작업차량이 접근할 수 있는 진입로 설치가 가능하다면 지상에서도 동일한 방법으로 교각을 설치할 수 있다.
The piers can also be installed in the same way on the ground if the access roads are accessible for transport vehicles and mobile working vehicles instead of work lines.
24; 수차집 76; 호형 수문 95; 교각
96; 수중 구조물 103; 수차기초 123; 수문홈
123a; 수차홈 124; 상판 124a; 도로
147; 파일 148; 중심파일 148a; 중심파일공간
149; 출입공간 150; 조립라인 151; 기초공간
151a; 기초공간 벽 152; 거푸집 152a; 내부 거푸집
152b; 외부 거푸집 154; 비트 155; 난간
156; 암석지반(암반) 157; 연약지반 158; 방수커튼
158a; (방수커튼)내피 158b; (방수커튼)외피 158c; (방수커튼)바닥재
159; 토사 160; 풍선 또는 부력괴 161; 철괴
162; 밧줄 163; 밧줄 또는 와이어24; Aqueduct 76; Arc-
96; An underwater structure 103;
123a;
147;
149;
151a; A
152b;
156; Rock ground (bedrock) 157;
158a; (Waterproof curtain)
159;
162;
Claims (4)
상기 교각이 암반에 고정된 복수의 상기 중심파일에 끼워 세워지고 상기 쐐기형 비트와 해저 사이에 형성된 틈이 상기 기초공간에 투입된 토사로 메워지며 수면에 노출된 상기 교각 상부에서 주변 해저까지 밀착된 방수커튼으로 배수 후의 침수와 부양(浮揚)이 방지되는 교각설치 및 방수공정;
상기 쐐기형 비트가 암반에 도달하도록 연약지반과 무른 암석이 제거되거나 바닥에 복수의 파일이 타설되고 상기 기초공간과 상기 출입공간 및 상기 중심파일공간 중 잔여공간이 철근콘크리트로 채워지는 교각고정공정;
상기 방수커튼이 해체된 교각으로 형성된 수로 양쪽에 호형 수문이 가설되며 상기 호형 수문 외측과 해저에 방수커튼이 밀착되고 배수된 임시 물막이 내부에서 추진되는 수중 구조물 설치공정;
상기 교각 또는 상기 수중 구조물에 조립된 수상 구조물에서 마무리되는 잔여공정으로 구분되되;
제반 공정이 드릴 머신(drill machine)과 파일 타설 장비와 크레인과 준설장비와 콘크리트 타설 장비와 발전기 및 환기장치가 탑재되고 부양기능과 기동력 및 정박기능을 가진 복수의 바지(barge)선과 자재운반선으로 추진되는 것을 특징으로 하는 작업선을 이용한 교각의 수중설치공법.
A ground supporting base having a loading dock or a barge having a buoyancy function and an anchoring function, wherein the base space is formed of a basic space wall having a wedge-shaped bit at the lower end thereof and a plurality of vertically penetrating bodies formed integrally with the base space wall A center pile inserted into the central file space, and a subsidiary structure assembled to the pier;
Wherein the bridge pier is sandwiched between a plurality of the center piles fixed to the rock, a gap formed between the wedge-shaped bit and the sea bed is filled with the gravel charged into the foundation space, and waterproofed from the upper part of the bridge, exposed to the water surface, Piers installed and waterproofed to prevent flooding and flooding after draining with curtains;
A pier fixing step of removing the soft ground and loose rock so that the wedge-shaped bit reaches the rock, or a plurality of piles are laid on the floor, and the remaining space of the base space, the access space and the center pile space is filled with reinforced concrete;
An underwater structure installation step in which an arc-shaped water gate is installed on both sides of the water channel formed by the pier with the waterproof curtains disassembled and the water curtain is adhered to the outside of the arc-shaped water gate and the seabed and drained;
And a remaining process to be completed in the pier or the augmented structure assembled in the underwater structure;
All processes are carried out by drill machines, pile installation equipment, crane and dredging equipment, concrete pouring equipment, generators and ventilators, multiple barge lines and material carriers with lifting, maneuvering and anchoring functions. Wherein the method comprises the steps of:
상기 교각은 설치 해역의 수심과 노출높이 또는 중량에 따라서 다단계로 분할제작되어 상기 중심파일공간에 삽입된 중심파일로 연결가능한 것을 특징으로 하는 작업선을 이용한 교각의 수중설치공법.
The method according to claim 1,
Wherein the bridge pier is divided into a plurality of stages and connected to a central file inserted in the center file space according to the depth of water and the exposure height or weight of the installation area.
상기 방수커튼은 내 주변(內周邊)이 상기 교각 단면과 일치하고 외 주변(外周邊)은 타원형 또는 원형으로 재단된 바닥재와, 상기 바닥재 내 주변과 봉합되고 상기 기초공간 벽에서 상기 교각 상단 또는 상기 교각에 가설된 난간까지 연장된 내피, 및 하단이 상기 바닥재 외 주변과 봉합되고 밧줄 또는 와이어로 보강된 상단에 부표(buoy)와 철괴가 함께 부착된 외피로 형성되되, 설치 및 해체가 용이하도록 상기 교각 외형에 따라 복수 조각(pieces)으로 분리 재단되고 재단부분이 분리가능하게 봉합되며 상기 바닥재가 해저에 밀착되도록 상기 교각 주변에 형성된 ∪형 주머니에 토사가 투입된 것을 특징으로 하는 작업선을 이용한 교각의 수중설치공법.
The method according to claim 1,
Wherein the waterproof curtain has a floor material whose inner periphery coincides with the cross section of the pier and whose outer periphery is cut into an ellipse or a circular shape, An inner skin extending to the railing provided on the bridge pier, and an outer cover having a buoy and a steel block attached together at the upper end of which the lower end is sealed with the outer periphery of the floor and is reinforced with a sling or a wire. Shaped pouch formed around the pier so that the bottom part can be closely attached to the seabed, and the gravel-like material is inserted into the pouch-shaped pouch formed around the pier. Underwater installation method.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR20130003728 | 2013-01-14 | ||
| KR1020130003728 | 2013-01-14 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR20140092217A true KR20140092217A (en) | 2014-07-23 |
Family
ID=51739041
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020130156900A Ceased KR20140092217A (en) | 2013-01-14 | 2013-12-17 | Construction method of the pier with the working bardge |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR20140092217A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108797616A (en) * | 2018-06-15 | 2018-11-13 | 华北水利水电大学 | The adjustable base assembling structure of steel cofferdam |
| CN114223595A (en) * | 2022-01-25 | 2022-03-25 | 珠海深远海洋科技有限公司 | Movable bottom-mounted marine platform cage structure and its construction method |
| KR20220169483A (en) * | 2021-06-20 | 2022-12-27 | 홍문표 | Construction of tidal and wave power generating station under water |
| CN116219909A (en) * | 2022-12-30 | 2023-06-06 | 中铁隧道集团三处有限公司 | In-situ active underpinning bridge reinforcement construction method suitable for navigable water area |
| CN119503097A (en) * | 2024-12-17 | 2025-02-25 | 中国船舶集团有限公司第七一九研究所 | A hull transfer method for multi-load conditions under size constraints |
-
2013
- 2013-12-17 KR KR1020130156900A patent/KR20140092217A/en not_active Ceased
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108797616A (en) * | 2018-06-15 | 2018-11-13 | 华北水利水电大学 | The adjustable base assembling structure of steel cofferdam |
| KR20220169483A (en) * | 2021-06-20 | 2022-12-27 | 홍문표 | Construction of tidal and wave power generating station under water |
| CN114223595A (en) * | 2022-01-25 | 2022-03-25 | 珠海深远海洋科技有限公司 | Movable bottom-mounted marine platform cage structure and its construction method |
| CN116219909A (en) * | 2022-12-30 | 2023-06-06 | 中铁隧道集团三处有限公司 | In-situ active underpinning bridge reinforcement construction method suitable for navigable water area |
| CN119503097A (en) * | 2024-12-17 | 2025-02-25 | 中国船舶集团有限公司第七一九研究所 | A hull transfer method for multi-load conditions under size constraints |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| HK1212404A1 (en) | Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier | |
| CN102561371B (en) | Steel caisson enclosure structure at island-tunnel combination part and construction method thereof | |
| KR101256265B1 (en) | Construction method of the pier without the temporary dike | |
| CN111502725B (en) | Artificial island type middle well structure of submarine tunneling tunnel | |
| KR20140092217A (en) | Construction method of the pier with the working bardge | |
| JP2015519489A (en) | Partially floating offshore platform for offshore wind power, bridges and offshore structures, and construction method | |
| Rasmussen | Concrete immersed tunnels—Forty years of experience | |
| RU2386755C1 (en) | Method for arrangement of shallow subway at water area bottom | |
| JPH06146305A (en) | Underwater foundation and installation method thereof | |
| JP2006161402A (en) | Construction method for improving water breaking structure | |
| CN218374182U (en) | Drainage pipeline system is got to bank | |
| JP2004108078A (en) | Construction method of underwater shaft, underwater shaft, connection method of shaft and side shaft, shaft structure | |
| JP5669189B2 (en) | Construction method of transmission type sea area control structure | |
| JP4018288B2 (en) | Artificial ground made of box that can pass water and its construction method | |
| RU81505U1 (en) | UNDERWATER TRANSPORT TUNNEL SYSTEM | |
| CN118007744A (en) | Construction method of steel caisson type bank pump house | |
| JP7389893B2 (en) | Offshore structures and construction methods | |
| JP2003020611A (en) | Floating structure | |
| CN115233711A (en) | Construction method of double-wall steel-jacketed box cofferdam for pebble riverbed | |
| RU2465408C1 (en) | Method to construct and repair water conduits and headers of shallow waste water on bottom of rivers and water reservoirs | |
| EP1793047B1 (en) | Method for building a shallow tunnel at a water area bottom and a system for temporally dewatering a bottom area | |
| CN203846518U (en) | Sheet pile combination type cofferdam | |
| KR20250096097A (en) | Submarine mortarboard partition | |
| JP4776694B2 (en) | Harbor structure and method for constructing such a structure | |
| EP2189576A1 (en) | Foundation system for marine structures in deep water |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20131217 |
|
| PA0201 | Request for examination | ||
| PG1501 | Laying open of application | ||
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20141224 Patent event code: PE09021S01D |
|
| E601 | Decision to refuse application | ||
| PE0601 | Decision on rejection of patent |
Patent event date: 20150309 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 20141224 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |