KR19980026677A - High structure construction method and device - Google Patents
High structure construction method and device Download PDFInfo
- Publication number
- KR19980026677A KR19980026677A KR1019960045203A KR19960045203A KR19980026677A KR 19980026677 A KR19980026677 A KR 19980026677A KR 1019960045203 A KR1019960045203 A KR 1019960045203A KR 19960045203 A KR19960045203 A KR 19960045203A KR 19980026677 A KR19980026677 A KR 19980026677A
- Authority
- KR
- South Korea
- Prior art keywords
- block member
- height
- lifting mechanism
- block
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000004904 shortening Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 description 10
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
하이 타워, 교각, 굴뚝 등 높이가 높은 구조물 시공에 있어 안전성이 뛰어날 뿐만 아니라 신속한 작업진행을 가능케 해주며, 소정 위치에 차례대로 상호 연결하여 필요한 높이까지 기둥을 형성할 수 있고 적어도 일측에는 지지수단이 형성되어 있는 다수의 블록부재, 블록부재를 따라 상·하 이동 가능하고 필요에 따라 고정수단으로 소정 높이의 블록부재에 고정할 수 있는 슬라이드 부재, 블록부재를 따라 상·하 이동 가능케 설치되어 필요에 따라 고정 수단으로 임의의 높이의 블록 부재에 고정할 수 있고 길이 조정할 수 있는 실린더 기구를 구비하여 슬라이드 부재를 상승시킬 수 있는 리프팅 가구 및 슬라이드 부재 상에 배치되어 구조물을 쌓아 올리기 위한 소정 넓이의 작업공간을 제공하는 플랫폼을 포함하는 구성으로 이루어진 구조물 시공장치 및 이 구조물 시공장치를 통해 구현된 구조물 시공방법.In the construction of high-height structures such as high towers, bridges, and chimneys, it not only provides excellent safety, but also enables rapid work progress, and can be interconnected to a predetermined position in order to form columns up to the required height, and at least one side has support means. A plurality of block members formed, a slide member that can be moved up and down along the block member, and can be fixed to a block member of a predetermined height by means of fixing means, and is installed to be able to move up and down along the block member as needed. According to the above, there is provided a lifting mechanism capable of raising the slide member and having a predetermined length of the working space for stacking the structure by lifting the slide member with a cylinder mechanism which can be fixed to the block member of any height by fixing means. Structure construction device consisting of a configuration including a platform providing a The structure construction method implemented by this structure construction unit.
Description
본 발명은 구조물 시공방법 및 그 장치에 관한 것으로, 특히 하이 타워(hight tower), 교각, 굴뚝 등 높이가 높은 구조물을 시공하는 방법 및 그 장치에 관한 것이다.The present invention relates to a method for constructing a structure and an apparatus thereof, and more particularly, to a method and apparatus for constructing a structure having a high height such as a high tower, a pier, a chimney.
일반적으로 하이 타워, 교각, 굴뚝 등 높은 구조물을 시공할 때 구조물 재료, 각종 장비 등을 필요한 높이까지 들어올리기 위해 크레인이 사용된다. 구조물의 높이가 높아지면 크레인도 높아져야 된다. 종래에는 앵글 등으로 철구조물을 만들어 그 높이를 높혀가면서 크레인의 높이를 조정하였다. 또한 구조물 시공 시에는 작업자가 작업할 공간이 필요한 데, 종래에는 시공하는 구조물에 작업자가 활동할 수 있는 작업공간을 마련하여 구조물을 시공하였다.Generally, when constructing high structures such as high towers, piers, and chimneys, cranes are used to lift the structure materials and various equipment to the required height. The higher the structure, the higher the crane. Conventionally, the height of the crane was adjusted while increasing its height by making steel structures with angles and the like. In addition, when constructing a structure, a worker needs a space to work, and in the related art, a structure was constructed by providing a work space for the worker to work on the structure to be constructed.
제 1 도는 종래의 하이 타워 시공상태를 나타낸 도면이다. 제 1 도에는 시공중인 하이 타워(10)가 도시되어 있다. 이 하이 타워(10)에는 일 측면을 따라 사다리(12)가 설치되어 있고, 그 상단 부근에는 작업자가 시공작업을 수행할 수 있도록 작업대(20)가 마련되어 있다. 이러한 하이 타워(10) 옆쪽에 앵글 등으로 조립한 철구조물(30)이 하이 타워(10)와 평행하게 배치되어 있다. 이 철구조물(30) 꼭대기에 필요한 물건을 들어올리기 위한 크레인(40)이 설치되어 있다. 이 철구조물(30)과 시공하고자 하는 하이 타워(10) 사이에 연결 프레임(32)이 설치되어 있다.1 is a view showing a conventional high tower construction state. 1 shows a high tower 10 under construction. The high tower 10 is provided with a ladder 12 along one side thereof, and a work platform 20 is provided near the upper end thereof so that an operator can perform a construction work. The steel structure 30 assembled at an angle or the like on the side of the high tower 10 is disposed in parallel with the high tower 10. On top of this steel structure 30, a crane 40 for lifting a necessary object is installed. The connecting frame 32 is installed between the steel structure 30 and the high tower 10 to be constructed.
즉, 제 1 도에서 알 수 있는 바와 같이 종래에는 크레인을 설치하기 위한 많은 수의 앵글 형태의 부재로 철구조물(30)을 구성하였다. 이 철구조물(30)의 높이가 올라갈수록 운반물의 인양 거리가 길어져 시간당 운반량의 감소를 초래하며 이에 따라 생산성이 현저히 저하된다. 또한 운반에 따른 안전사고의 위험도 따른다. 뿐만 아니라 종래에는 작업대(20)를 하이 타워(10) 등 시공하고 있는 구조물 상에 설치하였기 때문에 일정 높이마다에서 작업대(20)를 설치하고 철거하는 과정을 여러 번 반복하여야 했다.That is, as can be seen in Figure 1, in the prior art, the steel structure 30 is composed of a large number of angle-shaped members for installing the crane. As the height of the steel structure 30 increases, the lifting distance of the package increases, leading to a decrease in the amount of transportation per hour, and thus the productivity is significantly reduced. It also carries the risk of a safety accident due to transportation. In addition, in the related art, since the work table 20 was installed on a structure such as the high tower 10, the process of installing and removing the work table 20 at a predetermined height had to be repeated several times.
즉, 종래에는 높이가 높은 하이 타워, 교각, 굴뚝 등의 시공에 있어 안전사고의 우려가 높고 시간이 많이 걸리며 생산성도 떨어진다는 단점이 있었다.That is, in the related art, the construction of high towers, bridges, chimneys, and the like has high disadvantages of safety accidents, time consuming, and low productivity.
본 발명의 목적은 하이 타워, 교각, 굴뚝 등 높이가 높은 구조물 시공에 있어 안전성이 뛰어날 뿐만 아니라 신속한 작업진행을 해주는 구조물 시공방법을 제공하는 데 있다.An object of the present invention is to provide a method for constructing a structure that provides excellent safety as well as rapid work progress in the construction of high towers, bridges, chimneys, high heights.
본 발명의 다른 목적은 본 발명의 방법을 구현하기 위한 구조물 시공장치를 제공하는 데 있다.Another object of the present invention is to provide a structural factory for implementing the method of the present invention.
제 1 도는 종래의 하이 타워 시공상태를 나타낸 도면,1 is a view showing a conventional high tower construction state,
제 2 도는 본 발명에 따른 구조물 시공장치의 설치상태를 나타낸 정면도이고,2 is a front view showing the installation state of the structure construction apparatus according to the present invention,
제 3 도는 그 평면도,Third degree that top view,
제 4 도는 제 2 도 리프팅 기구 및 슬라이드의 구성과 그 동작과정을 설명하기 위한 도면이다.4 is a view for explaining the configuration and the operation of the second lifting mechanism and the slide.
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
110 : 구조물120 : 기둥110: structure 120: column
122 : 중간 지지프레임130 : 블록부재122: intermediate support frame 130: block member
132, 144, 154 : 핀 구멍140 : 리프팅 기구132, 144, 154: pin hole 140: lifting mechanism
142 : 몸체146 : 실린더 기구142 body 146 cylinder mechanism
148, 152 : 핀150 : 슬라이드 부재148, 152: pin 150: slide member
160 : 플랫폼166 : 제 1 구멍160: platform 166: the first hole
168 : 제 2 구멍170 : 크레인168: second hole 170: crane
본 발명의 목적은 하이 타워, 굴뚝, 교각 등 소정 높이의 구조물을 시공하기 위한 구조물 시공방법에 있어서, 시공하기 위한 구조물 부근에 소정 높이의 블록부재를 설치하는 단계, 소정의 리프팅 기구 실린더 기구의 길이를 길게 하여 슬라이드 부재를 소정 높이까지 상승시켜 제 1 블록부재에 고정하는 단계, 리프팅 기구의 고정을 해제하고 실린더 기구를 짧게 하여 리프팅 기구를 상승시켜 제 2 블록부재에 고정하는 단계, 구조물을 제 1 높이까지 쌓는 제 1 시공단계, 제 1 블록부재 상에 제 3 블록부재를 결합하는 단계, 제 1 블록부재에서의 고정을 해제하고 실린더 기구로 슬라이드 부재를 제 3 블록부재까지 상승시켜 제 3 블록부재에 고정하는 단계, 리프팅 기구의 고정을 해제하고 실린더 기구로 리프팅 기구를 제 1 블록부재까지 상승시켜 제 1 블록부재에 고정하는 단계 및 구조물을 제 2 높이까지 쌓는 제 2 시공단계를 포함하는 것을 특징으로 하는 구조물 시공방법에 의해 달성 가능하다.SUMMARY OF THE INVENTION An object of the present invention is a structure construction method for constructing a structure having a predetermined height such as a high tower, a chimney, and a pier, the method comprising: installing a block member having a predetermined height near a structure for construction, and a predetermined lifting mechanism cylinder mechanism length. Lengthening the slide member to a predetermined height to fix it to the first block member, releasing the fixing of the lifting mechanism and shortening the cylinder mechanism to raise the lifting mechanism to fix it to the second block member, the structure being first A first construction step of stacking up to a height, combining the third block member on the first block member, releasing the fixing on the first block member and raising the slide member to the third block member with a cylinder mechanism to raise the third block member. To the first block member by releasing the fixing of the lifting mechanism and raising the lifting mechanism to the first block member by a cylinder mechanism. Can be achieved by the steps and structures that hold the material in the structure construction method characterized in that it comprises a second stage building construction to two heights.
본 발명의 다른 목적은 하이 타워, 굴뚝, 교각 등 소정 높이의 구조물을 시공하기 위한 구조물 시공장치에 있어서, 소정 위치에 차례대로 상호 연결하여 필요한 높이까지 기둥을 형성할 수 있고 적어도 일측에는 지지수단이 형성되어 있는 다수의 블록부재, 블록부재를 따라 상·하 이동 가능하고 필요에 따라 고정수단으로 소정 높이의 블록부재에 고정할 수 있는 슬라이드 부재, 블록부재를 따라 상·하 이동 가능케 설치되어 필요에 따라 고정 수단으로 임의의 높이의 블록부재에 고정할 수 있고 길이 조정할 수 있는 실린더 기구를 구비하여 슬라이드 부재를 상승시킬 수 있는 리프팅 기구 및 슬라이드 부재 상에 배치되어 구조물을 쌓아 올리기 위한 소정 넓이의 작업공간을 제공하는 워킹 플랫폼을 포함하는 것을 특징으로 하는 구조물 시공장치에 의해 달성 가능하다.Another object of the present invention is a structure construction apparatus for constructing a structure having a predetermined height, such as a high tower, a chimney, a piers, can be connected to a predetermined position in order to form a column to the required height and at least one side support means A plurality of block members formed, a slide member that can be moved up and down along the block member, and can be fixed to a block member of a predetermined height by means of fixing means, and is installed to be able to move up and down along the block member as needed. Accordingly, a lifting mechanism capable of raising the slide member by a cylinder mechanism that can be fixed to a block member having an arbitrary height by a fixing means and having a length adjustable thereon, and a workspace having a predetermined width for stacking the structure arranged on the slide member According to the structure construction apparatus comprising a working platform to provide a It is possible to achieve.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.
제 2 도는 본 발명에 따른 구조물 시공장치의 설치상태를 나타낸 정면도이고, 제 3 도는 그 평면도이다. 제 2 도에는 시공중인 구조물(110)이 도시되어 있다. 이 구조물(110) 양 측면으로 소정 높이까지 한 쌍의 기둥이 설치되어 있다. 이 기둥(120)은 다수의 블록부재(130)를 볼트 등으로 순서대로 결합하여 구성한 것이다. 이 기둥(120)과 시공중인 구조물(110) 사이에는 중간 지지프레임(122)이 각각 설치되어 있다. 이 중간 지지프레임(122)은 기둥(120)과 구조물(110)을 서로 연결하여 서로를 지지해주기 위한 것이다.2 is a front view showing the installation state of the structure construction apparatus according to the present invention, 3 is a plan view. 2 shows the construction 110 under construction. A pair of pillars are provided at both sides of the structure 110 up to a predetermined height. The pillar 120 is configured by combining a plurality of block members 130 in order, such as bolts. An intermediate support frame 122 is installed between the pillar 120 and the structure 110 under construction. The intermediate support frame 122 is for supporting the column 120 and the structure 110 by connecting to each other.
기둥(120) 상단에는 리프팅 기구(140)와 슬라이드 부재(150)가 각각 설치되어 있고, 슬라이드 부재(150) 위에 작업자가 필요한 작업을 수행할 수 있도록 작업 공간을 제공하는 플랫폼(160)이 수평되게 탑재되어 있다. 리프팅 기구(140)와 슬라이드 부재(150)의 구성과 그 동작과정에 관해서는 제 4 도를 통해 뒤에서 더 상세히 설명한다.A lifting mechanism 140 and a slide member 150 are respectively installed on the top of the pillar 120, and the platform 160 providing a work space for the operator to perform necessary work on the slide member 150 is horizontally positioned. It is mounted. The construction and operation of the lifting mechanism 140 and the slide member 150 will be described in more detail later with reference to FIG. 4.
제 2, 제 3 도에 나타낸 바와 같이 플랫폼(160) 상에는 필요한 물건을 들어올리기 위한 크레인(170), 휴게실(162), 배쳐 플랜트(batcher plant) (164) 등이 설치되어 있다. 이 플랫폼(160)에는 제 3 도에 나타낸 바와 같이 플랫폼(160) 상에서 구조물(110)을 쌓을 수 있도록 중앙부위에 제 1 구멍(166)이 형성되어 있고, 기둥(120)의 상단에 블록부재(130)를 결합할 수 있도록 기둥(120)에 대응되는 위치에 한 쌍의 제 2 구멍(168)이 각각 형성되어 있다.As shown in FIG. 2, FIG. 3, on the platform 160, the crane 170, the resting room 162, the batcher plant 164, etc. for lifting a necessary thing are provided. As shown in FIG. 3, the platform 160 has a first hole 166 formed at a central portion thereof so that the structure 110 can be stacked on the platform 160. A pair of second holes 168 are formed at positions corresponding to the pillars 120 so as to engage the 130.
즉, 제 1 구멍(166)을 통해 플랫폼(160) 상에서 콘크리트 블록(112)으로 구조물(110)을 쌓아올리고, 제 2 구멍(168)을 통해 플랫폼(160) 상에서 블록부재(130)의 결합작업을 수행하도록 되어 있다. 따라서 구조물(110) 시공작업 및 블록부재(130) 결합작업이 용이할 뿐만 아니라 안전사고의 위험도 뒤따르지 않는다.That is, the structure 110 is stacked up to the concrete block 112 on the platform 160 through the first hole 166 and the coupling operation of the block member 130 on the platform 160 through the second hole 168. It is supposed to perform Therefore, not only the construction work and the block member 130 coupling work is easy, but also does not follow the risk of safety accidents.
블록부재(130)를 기둥(120) 상단에 결합하여 기둥(120)의 높이를 높인 다음 리프팅 기구(140)가 플랫폼(160)을 상승시켜 소정 높이에 고정하고 크레인(170)을 이용하여 구조물(110)을 쌓는 작업을 한다. 그 높이에서의 작업이 끝나면 다시 블록부재(130)를 기둥(120) 상단에 결합하여 위에서의 과정을 되풀이하면서 작업을 진행하여 결국 플랫폼(160)은 2점쇄선으로 나타낸 위치까지 상승되고 구조물(110)도 완성할 수 있게 된다.The block member 130 is coupled to the top of the pillar 120 to increase the height of the pillar 120, and then the lifting mechanism 140 raises the platform 160 to fix it at a predetermined height, and uses the crane 170 to construct the structure ( 110) to work. When the work at the height is over again, the block member 130 is coupled to the top of the pillar 120 again and proceeds while repeating the above process, and eventually the platform 160 is raised to the position indicated by the dashed line and the structure 110 ) Can also be completed.
즉, 종래에서와 같이 작업자의 작업공간을 마련해주기 위하여 작업대를 구조물 상에 설치하고 작업이 끝난 후 다시 해체한 다음 또 다시 그 위에 작업대를 설치하는 과정을 반복할 필요가 없고, 필요시마다 블록부재(130)를 기둥(120) 상단에 결합하고 리프팅 기구(140)로 플랫폼(160)을 상승시켜 가면서 구조물(110) 시공작업을 하면 되므로 작업시간도 적게 소요된다.That is, as in the prior art, in order to provide a work space for the worker, the work table is installed on the structure, dismantled again after the work is finished, and there is no need to repeat the process of installing the work table on it again. 130 is coupled to the top of the column 120 and lifting the platform 160 to the lifting mechanism 140, while constructing the construction 110, the work time is less required.
제 4 도는 제 2 도 리프팅 기구 및 슬라이드 부재의 구성과 그 동작과정을 설명하기 위한 도면이다. 제 4 도에는 소정 높이의 블록부재(130)들이 차례대로 연결되어 구성된 기둥(120)이 도시되어 있다. 이러한 기둥(120)을 구성하는 블록부재(130) 외주면에는 다수의 핀 구멍(132)이 형성되어 있다. 기둥(120)의 내부에는 사람이 오르내릴 수 있는 사다리(114)가 설치되어 있다. 이러한 기둥(120) 상단부근 외주면에는 리프팅 기구(140)가 설치되어 있다.4 is a view for explaining the configuration of the lifting mechanism and the slide member 2 and the operation process thereof. 4 illustrates a pillar 120 formed by sequentially connecting block members 130 having a predetermined height. A plurality of pin holes 132 are formed on the outer circumferential surface of the block member 130 constituting the pillar 120. Inside the pillar 120, a ladder 114 is provided which allows a person to climb up and down. The lifting mechanism 140 is installed on the outer circumferential surface near the upper end of the pillar 120.
이 리프팅 기구(140)는 기둥(120)을 구성하는 블록부재(130) 외주면을 따라 상·하 이동할 수 있도록 구성된 링 형태의 몸체(142)를 구비하고 있다. 이 몸체(142)에는 다수의 핀 구멍(144)이 형성되어 있고, 위쪽으로는 길이 조정할 수 있는 실린더 기구(146)가 장착되어 있다.The lifting mechanism 140 has a ring-shaped body 142 configured to move up and down along the outer circumferential surface of the block member 130 constituting the pillar 120. The body 142 is formed with a plurality of pin holes 144, and is mounted with a cylinder mechanism 146 which can be adjusted upwardly.
실린더 기구(146)의 상부 끝단에는 슬라이드 부재(150)가 연결되어 있다. 이 슬라이드 부재(150) 역시 기둥(120)을 구성하는 블록부재(130)를 따라 상·하 이동할 수 있으며 필요에 따라 핀(152)을 이용해 소정 높이의 블록부재(130)에 고정할 수 있도록 형성된 다수의 핀 구멍(154)을 구비하고 있다. 이 슬라이드 부재(150) 상단에 플랫폼(160)이 설치된다.The slide member 150 is connected to the upper end of the cylinder mechanism 146. The slide member 150 may also move up and down along the block member 130 constituting the pillar 120 and may be fixed to the block member 130 having a predetermined height by using the pin 152 as necessary. A plurality of pin holes 154 are provided. The platform 160 is installed on the top of the slide member 150.
즉, 핀(148)으로 리프팅 기구(140)를 소정 높이의 블록부재(130)에 고정하고 슬라이드 부재(150)에서는 핀(152)를 뽑아 고정을 해제한 다음 실린더 기구(146)의 길이를 길게 조정하여 슬라이드 부재(150)를 소정 높이까지 상승시킨다. 이에 따라 플랫폼의 높이는 높아진다. 그런 다음 핀(152)으로 슬라이드 부재(150)를 블록부재(130)에 고정한다.That is, the lifting mechanism 140 is fixed to the block member 130 having a predetermined height with the pin 148, and the pin 152 is pulled out of the slide member 150 to release the fixing, and then the length of the cylinder mechanism 146 is extended. By adjusting, the slide member 150 is raised to a predetermined height. This raises the height of the platform. Then, the slide member 150 is fixed to the block member 130 with a pin 152.
리프닝 기구(140)에서는 다시 핀(148)을 뽑아 고정을 해제한 상태에서 실린더 기구(146)의 길이를 짧게 하여 리프팅 기구(140) 자체를 상승시킨 다음 그 높이의 블록부재(130)에 핀(148)으로 고정한다. 이렇나 상태에서 플랫폼에서 필요한 구조물 시공작업을 수행한다.In the lifting mechanism 140, the length of the cylinder mechanism 146 is shortened by pulling the pin 148 out again to release the pin 148 to lift the lifting mechanism 140 itself, and then the pin to the block member 130 having the height. Fix it with (148). In this state, the construction work required for the platform is performed.
그 높이에서의 구조물 시공작업이 끝나면 크레인으로 블록부재(130)를 플랫폼으로 들어 올려 제 3 도에서 설명한 제 2 구멍(168)을 통해 기둥(120) 상단에 탑재한다. 그런 다음 작업자가 블록부재 내부로 사다리를 타고 내려가 볼트 등으로 탑재된 블록부재(130)를 기둥 상단(120)에 체결한다.When the structure construction work at that height is finished, the block member 130 is lifted by the crane to the platform and mounted on the top of the pillar 120 through the second hole 168 described in FIG. Then, the worker rides down the ladder into the block member and fastens the block member 130 mounted with a bolt or the like to the top of the column 120.
블록부재(130)의 체결작업이 끝나면 슬라이드 부재(150)를 지지하고 있는 핀(152)을 뽑고 다시 실린더 기구(146)를 동작시켜 슬라이드 부재(150)를 상승시켜 블록부재(130)에 다시 고정한다. 이에 따라 플랫폼의 높이도 높아진다. 그런 다음 리프팅 기구(140)를 지지하고 있는 핀(148)을 뽑고 실린더 기구(146)를 동작시켜 리프팅 기구(140)를 상승시킨 다음 핀으로 다시 블록부재(130)에 고정한다. 이러한 과정을 되풀이하면서 하이 타워, 굴뚝, 교각 등 높은 구조물을 시공하면 된다.After the fastening of the block member 130 is completed, the pin 152 supporting the slide member 150 is pulled out and the cylinder mechanism 146 is operated again to raise the slide member 150 to fix the block member 130 again. do. This raises the height of the platform. Then, the pin 148 supporting the lifting mechanism 140 is pulled out and the cylinder mechanism 146 is operated to raise the lifting mechanism 140, and then fix the pin 148 to the block member 130 again with a pin. This process can be repeated to construct high structures such as high towers, chimneys and piers.
이상, 설명한 본 발명에 따른 높은 구조물 시공방법 및 그 장치를 이용하면 구조물 시공에 소요되는 시간을 단축할 수 있을 뿐만 아니라 안전사고의 위험도 적어 높은 구조물 시공에 획기적인 발전을 기할 수 있다.As described above, using the high structure construction method and apparatus according to the present invention can not only shorten the time required for the construction of the structure, but also reduce the risk of safety accidents, which can result in breakthrough development for high structure construction.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1019960045203A KR19980026677A (en) | 1996-10-11 | 1996-10-11 | High structure construction method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1019960045203A KR19980026677A (en) | 1996-10-11 | 1996-10-11 | High structure construction method and device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR19980026677A true KR19980026677A (en) | 1998-07-15 |
Family
ID=66289056
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1019960045203A Ceased KR19980026677A (en) | 1996-10-11 | 1996-10-11 | High structure construction method and device |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR19980026677A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101101355B1 (en) * | 2009-04-16 | 2012-01-02 | 한국엔지니어링 주식회사 | Special tower crane system |
-
1996
- 1996-10-11 KR KR1019960045203A patent/KR19980026677A/en not_active Ceased
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101101355B1 (en) * | 2009-04-16 | 2012-01-02 | 한국엔지니어링 주식회사 | Special tower crane system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0654571B1 (en) | Zone module construction method of steel structure construction | |
| JP7193151B2 (en) | Self-climbing device and method of operation for vertical and near-vertical concrete surfaces | |
| JP5394334B2 (en) | Construction method of work floor for work at height | |
| KR102386880B1 (en) | Constructing Method of Tower Structure with Ascending and Descending of Work Deck and Form, and Tower Structure constructed by such method | |
| KR101889064B1 (en) | Construction method of a long span bridge main tower | |
| JP2016145477A (en) | Dismantling system and dismantling method | |
| US20130263549A1 (en) | Safety screen system for steel erection work | |
| JP2015203239A (en) | Mobile lifting scaffold for assembling temporary elevated jetty | |
| KR20190041189A (en) | Modular work platform of a long span bridge main tower rebar and construction method using the same | |
| JP6712501B2 (en) | High-rise building demolition system and demolition method | |
| JP2957328B2 (en) | Peripheral holding self-elevating construction method | |
| KR19980026677A (en) | High structure construction method and device | |
| JPH0571225A (en) | Temporarily set roof of complete weather type | |
| JPH0932120A (en) | Method of construction of structure | |
| JP3553370B2 (en) | Work stage device for steel tower construction and steel tower construction method | |
| JPH10115084A (en) | Suspending device for working scaffold, and constructing method for structure using the device | |
| JPH062434A (en) | How to build a steel frame roof | |
| JPH03125755A (en) | Constructing method for cylindrical multistoried structure | |
| JP3368483B2 (en) | Bridge pier construction method | |
| JP2854389B2 (en) | Steel construction method | |
| JP2607384B2 (en) | Scaffold assembly and disassembly methods | |
| JP7158304B2 (en) | Transport system and installation method | |
| JP2671967B2 (en) | High-rise building construction method and construction beam assembly equipment | |
| JPH06101348A (en) | How to build a tower | |
| KR200267717Y1 (en) | Lifter for construction of a pier |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 19961011 |
|
| A201 | Request for examination | ||
| PA0201 | Request for examination |
Patent event code: PA02012R01D Patent event date: 19971231 Comment text: Request for Examination of Application Patent event code: PA02011R01I Patent event date: 19961011 Comment text: Patent Application |
|
| PG1501 | Laying open of application | ||
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 19990816 Patent event code: PE09021S01D |
|
| E601 | Decision to refuse application | ||
| PE0601 | Decision on rejection of patent |
Patent event date: 19991111 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 19990816 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |