ES2527417T3 - Loader comprising arm section and parallel struts with an open cross section - Google Patents
Loader comprising arm section and parallel struts with an open cross section Download PDFInfo
- Publication number
- ES2527417T3 ES2527417T3 ES05783774.2T ES05783774T ES2527417T3 ES 2527417 T3 ES2527417 T3 ES 2527417T3 ES 05783774 T ES05783774 T ES 05783774T ES 2527417 T3 ES2527417 T3 ES 2527417T3
- Authority
- ES
- Spain
- Prior art keywords
- arm
- section
- parallel
- loader
- strut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/38—Cantilever beams, i.e. booms;, e.g. manufacturing processes, forms, geometry or materials used for booms; Dipper-arms, e.g. manufacturing processes, forms, geometry or materials used for dipper-arms; Bucket-arms
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/34—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
- E02F3/431—Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like
- E02F3/432—Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like for keeping the bucket in a predetermined position or attitude
- E02F3/433—Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like for keeping the bucket in a predetermined position or attitude horizontal, e.g. self-levelling
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Shovels (AREA)
- Forklifts And Lifting Vehicles (AREA)
- Ladders (AREA)
- Chain Conveyers (AREA)
- Lifting Devices For Agricultural Implements (AREA)
- Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)
- Body Structure For Vehicles (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Un cargador que comprende dos construcciones (2a, 2b) de brazo dispuestas en paralelo una con relación a la otra, y que a su vez comprenden secciones (3, 3a) de brazo extendidas y puntales (7) paralelos dispuestos encima de las secciones (3, 3a) de brazo extendidas, caracterizado por que cada puntal (7) paralelo está constituido por una construcción de viga extendida con una sección transversal abierta que presenta una abertura (Y) longitudinal dirigida hacia la sección (3, 3a) de brazo.A loader comprising two arm constructions (2a, 2b) arranged in parallel with respect to each other, and which in turn comprise extended arm sections (3, 3a) and parallel struts (7) arranged above the sections ( 3, 3a) of extended arm, characterized in that each parallel strut (7) is constituted by an extended beam construction with an open cross section that has a longitudinal opening (Y) directed towards the arm section (3, 3a).
Description
5 5
15 fifteen
25 25
35 35
45 Four. Five
55 55
65 65
E05783774 E05783774
07-01-2015 01-07-2015
DESCRIPCIÓN DESCRIPTION
Cargador que comprende sección de brazo y puntales paralelos con una sección transversal abierta Loader comprising arm section and parallel struts with an open cross section
La presente invención se refiere a un cargador de acuerdo con la introducción de la reivindicación 1. The present invention relates to a charger according to the introduction of claim 1.
Los vehículos, normalmente tractores que se utilizan para diferentes tipos de trabajo, por ejemplo para trabajos de elevación, son conocidos. Los vehículos se disponen normalmente con una configuración, por ejemplo, que tiene una base, elementos de fijación de hierro, soportes, o similares, en los que se monta un elemento de brazo habitualmente conocido como “cargador”. Vehicles, usually tractors that are used for different types of work, for example for lifting jobs, are known. Vehicles are normally arranged with a configuration, for example, which has a base, iron fasteners, brackets, or the like, on which an arm element usually known as a "loader" is mounted.
El cargador es una construcción extendida, una construcción de brazo, que comprende dos brazos dispuestos en paralelo uno al otro y que comprende unas secciones de brazo extendidas, unos sistemas de interconexión y unas construcciones de articulación. El cargador tiene en uno de sus extremos, el extremo que está orientado hacia el vehículo, dos partes dispuestas en paralelo una con relación a la otra y que terminan los brazos, a las que están fijados unos cilindros y otras partes de los brazos. Estas partes se conocen como “cajas de rodamientos”·. Cada caja de rodamientos está montada sobre, y conectada a, el vehículo. The loader is an extended construction, an arm construction, comprising two arms arranged in parallel to each other and comprising extended arm sections, interconnection systems and articulation constructions. The loader has at one of its ends, the end that is oriented towards the vehicle, two parts arranged in parallel with respect to each other and which terminate the arms, to which some cylinders and other parts of the arms are fixed. These parts are known as “bearing boxes”. Each bearing housing is mounted on, and connected to, the vehicle.
El cargador tiene en su segundo extremo, el extremo más adelantado, el extremo orientado en dirección opuesta al vehículo, en dirección al área de trabajo, una disposición de unión que permite conectar equipo al extremo más externo del cargador. The charger has at its second end, the most advanced end, the end oriented in the opposite direction to the vehicle, in the direction of the work area, a connection arrangement that allows equipment to be connected to the outermost end of the charger.
La construcción de brazo del cargador comprende dos secciones de brazo, que se extienden desde la caja de rodamientos correspondiente hasta una primera articulación en el brazo correspondiente, y un elemento de viga esencialmente cuadrado o rectangular, con un perfil cerrado, o una construcción en varilla, que actúa como un puntal paralelo en cada brazo. La suciedad, tierra, nieve y materiales similares en los alrededores del cargador tienden a quedar atrapados entre el puntal paralelo y el brazo, y esto afecta negativamente el aspecto de limpieza del cargador y dificulta la movilidad del cargador. The loader arm construction comprises two arm sections, which extend from the corresponding bearing housing to a first joint in the corresponding arm, and an essentially square or rectangular beam element, with a closed profile, or a rod construction , which acts as a parallel strut in each arm. Dirt, dirt, snow and similar materials around the loader tend to get caught between the parallel strut and the arm, and this negatively affects the cleaning aspect of the loader and hinders the mobility of the loader.
Un ejemplo de cargador frontal o trasero dotado de un brazo se describe en DE2928278. Una herramienta de trabajo, o equipo, está articulado de manera pivotante u oscilante en un punto de unión de equipo, y el equipo es desplazado hacia arriba y hacia debajo sustancialmente en paralelo por medio de un sistema de conexión. An example of a front or rear loader equipped with an arm is described in DE2928278. A work tool, or equipment, is pivotally or oscillatingly articulated at an equipment junction point, and the equipment is moved up and down substantially in parallel by means of a connection system.
Un objeto de la presente invención es ofrecer un puntal paralelo y un cargador con un diseño que permita resolver, o al menos reducir, el problema descrito anteriormente. An object of the present invention is to offer a parallel strut and a magazine with a design that allows solving, or at least reducing, the problem described above.
Este objeto se consigue mediante un cargador que tiene las características técnicas que se especifican en la parte caracterizadora de la reivindicación 1. This object is achieved by a charger having the technical characteristics specified in the characterizing part of claim 1.
La invención se describirá con mayor detalle más adelante con referencia a las figuras. The invention will be described in greater detail below with reference to the figures.
La Figura 1 muestra un cargador de acuerdo con la presente invención. La Figura 2 muestra un puntal paralelo de acuerdo con la invención. La Figura 3 muestra una sección transversal S a través de la sección de brazo del cargador y el puntal paralelo de acuerdo con la invención. Figure 1 shows a charger according to the present invention. Figure 2 shows a parallel strut according to the invention. Figure 3 shows a cross section S through the arm section of the magazine and the parallel strut according to the invention.
La Figura 1 muestra un cargador 1 de acuerdo con la presente invención. El cargador 1 está constituido por una construcción extendida, una construcción de brazo, que comprende dos brazos 2a y 2b dispuestos en paralelo uno con relación al otro. Aquellas partes que están presentes en ambos brazos y que tienen el mismo diseño han recibido el mismo número de referencia. Figure 1 shows a charger 1 according to the present invention. The magazine 1 is constituted by an extended construction, an arm construction, comprising two arms 2a and 2b arranged in parallel with respect to each other. Those parts that are present in both arms and that have the same design have received the same reference number.
Cada brazo 2a y 2b comprende a su vez unas secciones 3 de brazo extendidas y articulaciones 4. El cargador tiene en uno de sus extremos, el extremo que está orientado hacia el vehículo, dos partes 5 que son paralelas una con relación a otra y que terminan las partes de brazo a las que están conectados los cilindros 6 de control y otras partes de brazo. Estas partes 5 son conocidas como “cajas de rodamientos”. Cada caja 5 de rodamientos está montada sobre, y conectada a, el vehículo, que no se muestra en la figura. Each arm 2a and 2b in turn comprises extended arm sections 3 and joints 4. The loader has at one of its ends, the end that is oriented towards the vehicle, two parts 5 that are parallel to each other and that the arm parts to which the control cylinders 6 and other arm parts are connected are terminated. These parts 5 are known as "bearing boxes". Each bearing box 5 is mounted on, and connected to, the vehicle, which is not shown in the figure.
Las primeras secciones 3a de brazo extendidas de los dos brazos se extienden entre la caja 5 de rodamientos correspondiente y la primera articulación 4 de los brazos 2a y 2b correspondiente. The first extended arm sections 3a of the two arms extend between the corresponding bearing housing 5 and the first joint 4 of the corresponding arms 2a and 2b.
Cada brazo 2a y 2b respectivo comprende unos puntales 7 paralelos de acuerdo con la presente invención. Los puntales 7 paralelos, dos de ellos para cada cargador, están dispuestos encima de las primeras secciones 3a extendidas de los dos brazos y están conectados en su primer extremo 7a a la caja 5 de rodamientos correspondiente y en su segundo extremo 7b a la articulación 4 correspondiente. Each respective arm 2a and 2b comprises parallel struts 7 in accordance with the present invention. The parallel struts 7, two of them for each loader, are arranged on top of the first extended sections 3a of the two arms and are connected at their first end 7a to the corresponding bearing housing 5 and at their second end 7b to the joint 4 correspondent.
Cada puntal 7 paralelo está constituido por una construcción de viga extendida con una sección transversal abierta, Each parallel strut 7 is constituted by an extended beam construction with an open cross section,
2 5 2 5
10 10
15 fifteen
20 twenty
25 25
30 30
35 35
40 40
45 Four. Five
E05783774 E05783774
07-01-2015 01-07-2015
véase la Figura 2. La construcción de viga tiene esencialmente la forma de una “C” o una “U” cuando se observa según una sección perpendicular a la dirección longitudinal de la construcción de viga. La forma de C o la forma de U implica que la viga tiene dos secciones 7.1 y 7.2 laterales y una sección 7.3 central que conecta las dos secciones laterales una con otra. Las secciones 7.1 y 7.2 laterales están dispuestas esencialmente en paralelo una a la otra. Un espacio X interior abierto surge dentro de las secciones 7.1 y 7.2 laterales y la sección 7.3 central, y una abertura Y extendida que se extiende a lo largo de toda la longitud L del puntal paralelo se forma entre las partes 7.1 y 7.2 exteriores de las secciones laterales. El puntal 7 paralelo en su diseño básico es abierto en las secciones 7a y 7b de extremo, pero para hacer posible montar el puntal 7 paralelo con las partes que lo rodean en la construcción de brazo y de ese modo posibilitar la transferencia de fuerza desde el puntal 7 paralelo a las partes que están dispuestas más cerca, hay en las secciones 7a y 7b de extremo del puntal paralelo unos casquillos Q fijados por soldadura que ofrecen puntos de fijación y puntos de montaje. Estos casquillos Q ocupan parte del espacio dentro de las secciones de extremo del puntal paralelo. see Figure 2. The beam construction is essentially in the form of a "C" or a "U" when viewed in a section perpendicular to the longitudinal direction of the beam construction. The C-shape or the U-shape implies that the beam has two lateral sections 7.1 and 7.2 and a central section 7.3 that connects the two lateral sections with each other. The lateral sections 7.1 and 7.2 are arranged essentially parallel to each other. An open interior X space arises within the lateral sections 7.1 and 7.2 and the central section 7.3, and an extended Y opening extending along the entire length L of the parallel strut is formed between the outer parts 7.1 and 7.2 of the side sections The parallel strut 7 in its basic design is opened in the end sections 7a and 7b, but to make it possible to mount the strut 7 parallel with the surrounding parts in the arm construction and thereby enable the transfer of force from the strut 7 parallel to the parts that are arranged closer together, there are in the end sections 7a and 7b of the parallel strut welded fasteners Q which offer fixing points and mounting points. These caps Q occupy part of the space within the end sections of the parallel strut.
Cada puntal 7 paralelo está ubicado de tal modo que la sección 7.3 central está dispuesta encima y a lo largo de la primera sección 3a de brazo correspondiente, ver la Figura 3. La abertura Y del puntal paralelo está orientada hacia abajo en dirección a la sección 3a de brazo. El puntal 7 paralelo está dispuesto con relación a la primera sección 3a de brazo de modo que el puntal 7 paralelo queda a horcajadas de la primera sección 3a de brazo. Las secciones 7.1 y 7.2 laterales están extendidas hacia abajo una cierta cantidad Z a cada lado de la primera sección 3a de brazo y cubren de este modo una región en cada lado 3.1 y 3.2 exterior que está en cada lado opuesto y enfrentado en la dirección opuesta de la primera sección 3a de brazo extendida correspondiente. El espacio X queda entonces limitado por, y rodeado por, el puntal 7 paralelo junto con la primera sección 3a de brazo. El puntal 7 paralelo y la primera sección 3a de brazo se fijan uno conectado a la otra, y esto permite la flexibilidad que es necesaria entre estas partes 3a y 7, ya que llevan a cabo movimientos individuales cuando se utiliza el cargador. Each parallel strut 7 is located in such a way that the central section 7.3 is arranged above and along the first corresponding arm section 3a, see Figure 3. The opening Y of the parallel strut is oriented downward in the direction of the section 3a of arm. The parallel strut 7 is arranged relative to the first arm section 3a so that the parallel strut 7 is astride the first arm section 3a. The lateral sections 7.1 and 7.2 are extended down a certain amount Z on each side of the first arm section 3a and thus cover a region on each outer side 3.1 and 3.2 that is on each opposite side and facing in the opposite direction of the first corresponding extended arm section 3a. The space X is then limited by, and surrounded by, the parallel strut 7 together with the first arm section 3a. The parallel strut 7 and the first arm section 3a are fixed one connected to the other, and this allows the flexibility that is necessary between these parts 3a and 7, since they carry out individual movements when the loader is used.
Como se puede decir que el puntal 7 paralelo y la primera sección 3a de brazo forman conjuntamente una unidad y dado que ya no hay ningún espacio, ninguna superficie o volumen entre el puntal 7 paralelo y la primera sección 3a de brazo donde puedan quedar atrapados la suciedad o la nieve, el cargador resulta ser más fácil de limpiar y su movilidad mejora. As it can be said that the parallel strut 7 and the first arm section 3a together form a unit and since there is no longer any space, any surface or volume between the parallel strut 7 and the first arm section 3a where the dirt or snow, the charger turns out to be easier to clean and its mobility improves.
Como el puntal 7 paralelo tiene, de acuerdo con la invención, la forma de una C o una U, y por tanto tiene una sección superior redondeada representada por la sección 7.3 central, la suciedad y la nieve deslizarán hacia fuera del puntal 7 paralelo, lo que mejora aún más la posibilidad de mantener el cargador 1 limpio, también mejora la movilidad del cargador. As the parallel strut 7 has, in accordance with the invention, the shape of a C or a U, and therefore has a rounded upper section represented by the central section 7.3, dirt and snow will slide out of the parallel strut 7, which further improves the possibility of keeping the charger 1 clean, also improves the mobility of the charger.
El puntal 7 paralelo presenta una forma que es, parcial o completamente, curva a lo largo de su dirección longitudinal. El puntal 7 paralelo, la sección 7.3 central, es, a lo largo de toda su longitud L o a lo largo de parte de su longitud, curvo. Esta curva a lo largo de la dirección longitudinal contribuye a facilitar que la nieve y la suciedad deslicen y caigan del puntal 7 paralelo. The parallel strut 7 has a shape that is, partially or completely, curved along its longitudinal direction. The parallel strut 7, the central section 7.3, is, along its entire length L or along part of its length, curved. This curve along the longitudinal direction helps to make the snow and dirt slide and fall from the parallel strut 7.
Esta descripción no debe interpretarse como una limitación de la invención. Debe interpretarse como una guía para una completa comprensión de la invención en todas sus partes. Se debe apreciar que son posibles otros diseños diferentes de aquellos que se han descrito anteriormente y mostrado en las figuras, y que son posibles partes dentro del ámbito del concepto innovador que se especifica en las reivindicaciones adjuntas. This description should not be construed as a limitation of the invention. It should be interpreted as a guide for a complete understanding of the invention in all its parts. It should be appreciated that other designs different from those described above and shown in the figures are possible, and that parts are possible within the scope of the innovative concept specified in the appended claims.
3 3
Claims (6)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE0402364 | 2004-09-29 | ||
| SE0402364A SE528914C2 (en) | 2004-09-29 | 2004-09-29 | Loaders comprising two parallel mounted arm structures which in turn comprise elongated arm portions and parallel bars |
| PCT/SE2005/001372 WO2006036105A1 (en) | 2004-09-29 | 2005-09-20 | Loader comprising arm section and parallel struts with an open cross section |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| ES2527417T3 true ES2527417T3 (en) | 2015-01-23 |
Family
ID=33414865
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES05783774.2T Expired - Lifetime ES2527417T3 (en) | 2004-09-29 | 2005-09-20 | Loader comprising arm section and parallel struts with an open cross section |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20070292255A1 (en) |
| EP (1) | EP1799917B1 (en) |
| AU (1) | AU2005287953B2 (en) |
| CA (1) | CA2581974C (en) |
| ES (1) | ES2527417T3 (en) |
| PL (1) | PL1799917T3 (en) |
| SE (1) | SE528914C2 (en) |
| WO (1) | WO2006036105A1 (en) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006044533A1 (en) * | 2006-09-21 | 2008-04-03 | Wilhelm Stoll Maschinenfabrik Gmbh | Front loader with mechanical parallel guidance |
| AU321299S (en) * | 2007-09-28 | 2008-10-01 | Challenge Implements Holdings Pty Ltd | Front end loader |
| NZ586004A (en) * | 2007-12-12 | 2012-01-12 | Challenge Implements Holdings Pty Ltd | Linkage and attachment systems for front end loaders with one arm receivable within the other |
| USD672373S1 (en) | 2011-01-10 | 2012-12-11 | Alo Aktiebolag | Front loader for a tractor |
| USD656523S1 (en) * | 2011-07-07 | 2012-03-27 | Alo Aktiebolag | Front loader assembly |
| USD739446S1 (en) | 2011-07-08 | 2015-09-22 | Alo Aktiebolag | Front loader for a tractor |
| USD769335S1 (en) * | 2014-04-16 | 2016-10-18 | Deere & Company | Frontloader |
| USD768731S1 (en) * | 2014-04-16 | 2016-10-11 | Deere & Company | Frontloader |
| CA160237S (en) * | 2014-06-23 | 2016-01-27 | Deere & Co | Frontloader |
| JP6782526B2 (en) * | 2014-10-24 | 2020-11-11 | ヤンマーパワーテクノロジー株式会社 | Work vehicle |
| USD766343S1 (en) * | 2015-05-20 | 2016-09-13 | Deere & Company | Front end final loader |
| EP3369866B1 (en) * | 2015-10-27 | 2021-12-01 | Yanmar Power Technology Co., Ltd. | Front loader |
| USD807407S1 (en) * | 2016-10-28 | 2018-01-09 | Kubota Corporation | Bucket work machine for a loader |
| EP3431668B1 (en) | 2017-07-17 | 2019-10-16 | Wilhelm Stoll Maschinenfabrik GmbH | Front loader and front loader part cladding |
| USD943641S1 (en) | 2020-01-23 | 2022-02-15 | Deere & Company | Loader arms |
| USD923062S1 (en) * | 2020-02-20 | 2021-06-22 | Hankuk Chain Industrial Co., Ltd. | Front end loader of tractor |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2782946A (en) * | 1954-07-22 | 1957-02-26 | Hough Co Frank | Power loaders |
| US2961106A (en) * | 1956-02-01 | 1960-11-22 | Davis Engineering Inc | Hydraulically operated mobile digging machine |
| DK123156A (en) * | 1967-05-15 | |||
| US3848749A (en) * | 1973-11-05 | 1974-11-19 | Owatonna Tool Co | Combination crane and jack unit |
| DE2928278A1 (en) * | 1979-07-13 | 1981-01-29 | Stoll Maschf Gmbh Wilhelm | Front or rear earthmoving loader - has multiple variously spaced guide rod hinge points for deflecting piece |
| JPS618138Y2 (en) * | 1980-08-26 | 1986-03-13 | ||
| JPS58177292A (en) * | 1982-04-05 | 1983-10-17 | 株式会社豊田中央研究所 | Industrial robot arm and its manufacture |
| US4431364A (en) * | 1982-06-21 | 1984-02-14 | J. I. Case Company | Self-leveling linkage assembly for material handling equipment |
| JPH0726415B2 (en) * | 1989-12-13 | 1995-03-22 | 株式会社クボタ | Work implement boom assembly |
| US5232330A (en) * | 1992-06-29 | 1993-08-03 | Deere & Company | Structure for mounting hydraulic hoses for a power loader |
| JPH08311914A (en) * | 1995-05-12 | 1996-11-26 | Yutani Heavy Ind Ltd | Telescopic arm device of construction machinery |
| US5533856A (en) * | 1995-05-22 | 1996-07-09 | Deere & Company | Combined loaded self-leveling and implement tilt linkages for effecting true level and enhanced roll back and dump characteristics throughout lift range of loader |
| US6171050B1 (en) * | 1997-08-29 | 2001-01-09 | Gehl Company | Load arm assembly for a skid steer loader |
| GB2340816B (en) * | 1998-08-25 | 2002-10-09 | Agco Gmbh & Co | Adjustable arm length for front-end loader |
-
2004
- 2004-09-29 SE SE0402364A patent/SE528914C2/en not_active IP Right Cessation
-
2005
- 2005-09-20 EP EP05783774.2A patent/EP1799917B1/en not_active Expired - Lifetime
- 2005-09-20 CA CA2581974A patent/CA2581974C/en not_active Expired - Lifetime
- 2005-09-20 PL PL05783774T patent/PL1799917T3/en unknown
- 2005-09-20 AU AU2005287953A patent/AU2005287953B2/en not_active Ceased
- 2005-09-20 US US11/664,156 patent/US20070292255A1/en not_active Abandoned
- 2005-09-20 WO PCT/SE2005/001372 patent/WO2006036105A1/en not_active Ceased
- 2005-09-20 ES ES05783774.2T patent/ES2527417T3/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| CA2581974A1 (en) | 2006-04-06 |
| US20070292255A1 (en) | 2007-12-20 |
| SE0402364L (en) | 2006-03-30 |
| EP1799917A1 (en) | 2007-06-27 |
| EP1799917B1 (en) | 2014-10-15 |
| PL1799917T3 (en) | 2015-03-31 |
| WO2006036105A1 (en) | 2006-04-06 |
| AU2005287953B2 (en) | 2011-06-30 |
| SE528914C2 (en) | 2007-03-13 |
| AU2005287953A1 (en) | 2006-04-06 |
| EP1799917A4 (en) | 2013-11-20 |
| SE0402364D0 (en) | 2004-09-29 |
| CA2581974C (en) | 2011-08-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| ES2527417T3 (en) | Loader comprising arm section and parallel struts with an open cross section | |
| ES2395785T3 (en) | Mobile crane with hose guide | |
| AU2005287952B2 (en) | Loader comprising arm sections that have a space that runs along the arm in which tubes or cables are arranged | |
| ES2311492T3 (en) | VEHICLE FOR SOIL CLEANING DIRECTED BY ARTICULATION. | |
| ES2268325T3 (en) | MOBILE DEVICE FOR THE MOVEMENT OF LANDS AND OTHER OPERATIONS, LIKE THE LIFTING AND THE DISPLACEMENT OF LOADS. | |
| ES2221138T3 (en) | FEATHER ELEMENT FOR TOWER CRANE. | |
| WO2018167340A1 (en) | System, vehicle and method for cleaning parabolic troughs, heliostats and photovoltaic panels | |
| ES2561300T3 (en) | Axle suspension for industrial vehicles | |
| ES2366157T3 (en) | VEHICLE WITH PROTECTION AND CLEANING DEVICE LOCATED ON THE FRONT. | |
| ES2385501T3 (en) | Multifunctional tool holder that is fixed on the back of a transport machine | |
| ES2246942T3 (en) | DEVICE FOR FOLDING IN ACCORDION OF THE CANVAS COVER OF A TRANSPORT VEHICLE. | |
| ES2217351T3 (en) | SUSPENSION FOR CATENARY FOR RAILWAY OR SIMILAR ROADS. | |
| ES2223313T3 (en) | BRACKET CONDUCT SUPPORT. | |
| JP6597355B2 (en) | Cylinder protection structure and work machine | |
| ES2375859A1 (en) | Cleaning device for photovoltaic panels and solar thermal panels | |
| US4241945A (en) | Motor vehicle bumper | |
| KR101026906B1 (en) | Mobile Shelter | |
| ES2256392T3 (en) | DUSTER INSTALLATION FOR MOTOR VEHICLE BODIES. | |
| ES2766905T3 (en) | Temporary articulation device of a vehicle door | |
| ES2413062T3 (en) | Vehicle crane | |
| ES2312131T3 (en) | ASSEMBLY OF MOTOR VEHICLE BODY ELEMENTS AND SAID ASSEMBLY PROCEDURE ASSEMBLY ON THE AUTOMOBILE VEHICLE. | |
| US10472794B2 (en) | Front loader and work vehicle equipped with the same | |
| ES2928357T3 (en) | Attachment mechanism for a plant material shredding/cutting device on a vehicle, in particular a tractor or the like | |
| ES2478715B1 (en) | PLANTS DEBRUSHED EQUIPMENT | |
| ES2281063T3 (en) | CARRIAGE WITH GALGA AND TRANSPORTATION WHEELS AND REVERSIBLE CARRIER TRANSPORTED EQUIPPED WITH SUCH CAR. |