EP0085790B1 - Railway track reconditioning train - Google Patents

Railway track reconditioning train Download PDF

Info

Publication number
EP0085790B1
EP0085790B1 EP82200150A EP82200150A EP0085790B1 EP 0085790 B1 EP0085790 B1 EP 0085790B1 EP 82200150 A EP82200150 A EP 82200150A EP 82200150 A EP82200150 A EP 82200150A EP 0085790 B1 EP0085790 B1 EP 0085790B1
Authority
EP
European Patent Office
Prior art keywords
train
excavator
car
track
digging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP82200150A
Other languages
German (de)
French (fr)
Other versions
EP0085790A1 (en
Inventor
Frédy Scheuchzer
Fritz Bühler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LES FILS D'AUGUSTE SCHEUCHZER SA
Original Assignee
LES FILS D'AUGUSTE SCHEUCHZER SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LES FILS D'AUGUSTE SCHEUCHZER SA filed Critical LES FILS D'AUGUSTE SCHEUCHZER SA
Priority to DE8282200150T priority Critical patent/DE3265499D1/en
Priority to EP82200150A priority patent/EP0085790B1/en
Priority to AT82200150T priority patent/ATE15088T1/en
Priority to US06/353,486 priority patent/US4400897A/en
Priority to ES511424A priority patent/ES8304248A1/en
Priority to CA000401020A priority patent/CA1201937A/en
Priority to DD82245704A priority patent/DD209006A5/en
Publication of EP0085790A1 publication Critical patent/EP0085790A1/en
Application granted granted Critical
Publication of EP0085790B1 publication Critical patent/EP0085790B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/02Removing or re-contouring ballast
    • E01B2203/024Inclined chain
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/03Displacing or storing ballast
    • E01B2203/034Displacing or storing ballast using storing containers
    • E01B2203/038Displacing or storing ballast using storing containers detachable from the vehicle
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/08Levelling ballast or ground beneath
    • E01B2203/083Ploughs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/08Levelling ballast or ground beneath
    • E01B2203/086Rotating brooms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/12Tamping devices
    • E01B2203/127Tamping devices vibrating the track surface
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/141Way of locomotion or support on the track to be treated

Definitions

  • the invention relates to a train for carrying out the renewal of a railway track
  • a working wagon formed by a frame wagon with an empty frame of a length greater than the length of a span having two bogies, the rear bogie being on the new track and the front bogie on the old track and, at the head of the frame wagon, a train of wagons fitted with equipment for loading excavated material and, behind the said working wagon, transport wagons for the spans, sand and ballast, tracks installed on the transport wagons and the frame wagon, two gantry cranes which can roll on these tracks installed on the transport wagons and the frame wagon and being equipped with a lifting device for a span and with an operating device for skips for the transport of sand and ballast and a rolling carriage moving on said tracks, placed in front of the two gantries, and which is suspended at least one height-adjustable excavation element constructed either for the entire excavation width, or of a reduced width and laterally movable or pivoting to excavate the ballast.
  • This train is already known according to patent CH No. 583 822 which describes a process and a train for the complete renewal of a railway track comprising the operations of removing the old track, stripping-screening of the ballast and laying of the new track, the progress of these three operations taking place continuously, in the order indicated, in a single pass of the renewal train provided for this purpose.
  • this device does not make it possible to clean up the track, that is to say the replacement of the platform.
  • ballast and the platform are excavated using this excavator, then the excavated earth is replaced by a layer of sand forming the new platform and which is brought by skips, fixed on the gantries of the first train, and emptied through the frame of the work car. We then proceed to the leveling and tamping of the sand. We bring, distribute and compact the ballast and finally we put the new spans always using the first train.
  • the purpose of the present invention is to rationalize the remediation work while saving the working time, the means used and the movement of the train provided for these works.
  • the train according to the invention is characterized in that it is arranged to also carry out the cleaning of the track and that it comprises for this purpose an orientable digging element mounted behind the excavation element , preferably consisting of a chain with transverse spirals, said digging element being provided with hydraulic jacks for its movement in the vertical and longitudinal plane, this digging element being designed in such a way that it can dig deeper than the excavation element and covers the entire excavation width.
  • the machine works step by step, without interruption, to carry out all the operations necessary for the sanitation of the platform with the possibility of laying with the gantry cranes new spans, or old spans if they are recoverable , or spans consisting of old rails and new sleepers.
  • the excavation operation can be carried out in two stages: first the ballast which can possibly be recovered, then the platform and the unloading of gravel can be done directly behind the excavator.
  • the leveling blade fitted with hydraulic cylinders, can make movements similar to the bucket of a mechanical shovel. To improve the penetration of the blade, it can be designed in three units each with an independent control.
  • large stones that cannot be transported with the chain are put out of the platform using leveling blades. For this purpose, the large stones are wedged between the blade, the chain and the spirals and will be moved laterally until the stones arrive on the shoulders.
  • the train partially shown in Figure 1, and driven by a locomotive not shown, consists of several head wagons 1 intended for the loading of excavated material which is transported by a system of telescopic conveyor belts 2.
  • This empty frame 6 is provided with tracks, extending on the rear wagons, and intended to support the different gantry cranes, two gantry cranes 9 equipped with a lifting device for a span and an operating device for skips 11 for transporting sand and ballast and, in front of these two gantry cranes 9, a rolling cart 10 to which is suspended an excavator 12 which, in principle, can be similar to that described in Swiss Patent No.
  • This train further comprises rear wagons 13 for the transport of skips loaded with sand and new ballast and for the transport of new spans or new rails.
  • FIG. 2 which illustrates in more detail the working wagon 3, we can see that the excavator 12, supported by the carriage 10, is provided with a hydraulic cylinder 13 which allows its height adjustment , other cylinders, not shown, allowing its transverse and longitudinal adjustment.
  • This excavator 12 consists of an excavation chain 14 with two lateral spirals 15, 15 '(fig. 3), a digging element 16 constituted by a blade which will be described below in more detail, and behind the digging blade 16, a tamper 17 also controlled by hydraulic cylinders.
  • This excavator 12 could, moreover, be pivotally mounted on a vertical axis.
  • the frame of the working wagon 3 is kept horizontal or inclined according to the slope of the platform using pendulums.
  • the frame is mounted on the rear bogie 5 via a hydraulic cylinder 40 which allows its height adjustment.
  • the excavation chain with the spirals 15, 15 ' makes it possible to excavate the bench seat to a depth of, for example, 90 cm and over a width of 5 m.
  • the chain brings the material excavated on the conveyor belt 2, telescopic, mounted on the front wagon 1 and which links with the trash removal train placed at the head of the machine.
  • the digging blade 16 is mounted directly on the excavator 12 which allows, as will be described later, collaboration between the blade and the excavator to remove large stones. Furthermore, in this embodiment, the excavator 12 also supports the tamper 17.
  • the digging blade of a length, for example, of 2.6 m, it is designed in three lateral segments 16a, 16b, 16c (fig. 3 to 7), each controlled independently by hydraulic cylinders. 28a, 28b, 28c, to which they are articulated by a pin 30, these jacks being themselves mounted on arms 18a, 18b, 18c articulated by a pin 32 on the excavator 12 and which are also each controlled by hydraulic cylinders 29 articulated at 31 and only one of which is visible in FIG. 6.
  • These different controls and articulations allow print individually or simultaneously with each segment 16a, 16b, 16c movements similar to those of a bucket of a mechanical shovel, this to allow excavation of large stones, rocks or large pieces of agglomerated ballast.
  • the blade 16 could be manufactured in a single segment, in two segments or in addition to three segments, but it is obvious that a blade in several segments, individually adjustable, allows better removal of the stones and easier handling. than with a large blade.
  • a single segment 16c can be lowered by a height h with respect to the level of the other segments 16a, 16b to tear off a stone which would be there, or as illustrated in FIG. 5, the segments 16a, 16b can be lowered by the same height h2 from the level of the excavator.
  • a blade composed of several lateral segments it would also be possible to provide a pivoting of each segment on an individual vertical axis.
  • the excavator 12 is moved to the working wagon 3 using winches mounted on the front and rear wagons.
  • the gravel and the ballast are equalized with the blade 16 and spirals 15 which allow the material to be transported outside either with an orientable blade mounted on the suspension of the groomer, as will be described later.
  • the lower part of the blade 16 is provided with teeth 19 which ensure better stripping of the ballast but which have no disadvantage when using the blade for leveling of the platform or bench, these teeth forming only small unimportant grooves.
  • the digging element is constituted by a rake-puller 20, consisting of three lateral parts 20a, 20b, 20c adjustable in the longitudinal plane and in depth and which allow further improve the excavation of the old ballast.
  • Each part 20a, 20b, 20c of the rake-puller is mounted on an arm 22 articulated by an axis 26 to a second arm 21 itself articulated on the excavator 12 by an axis 32.
  • the arm 21 can be tilted around the axis 32 by a hydraulic cylinder 29 while the arm 22 can tilt around the axis 26 under the action of a hydraulic cylinder 25 which is articulated on the one hand by an axis 25 'on the arm 21, d' on the other hand by a pin 25 "on the arm 22.
  • This rake-tearer 20 is also combined with a leveling blade 23, also consisting of three segments 23a, 23b, 23c and which is independently adjustable in depth, by means of jacks 24a etc, so that the three segments of this blade can work, or not, on the same level as the three parts 20a, 20b, 20c of the rake.
  • the excavator 12 comprises only the excavation chain 14 and the spirals 15, 15 ′, but it is not combined, as in the embodiment previously described, with the digging and leveling blade or a groomer.
  • the digging blade 36 subjected to the action of a system of hydraulic cylinders 38, shown diagrammatically, is in this case mounted on an independent carriage 35 which rolls on the track of the working wagon, behind the carriage 10 supporting the excavator 12 and this carriage 35 is provided with an independent traction system so that it can be moved independently of the excavator 12.
  • This carriage 35 can also support the groomer 37.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

1. Train for renewing a railway track, which comprises a working car (3) consisting of a frame-car with an empty frame of a length (L) in excess of the length (l) of one track span, said car having two trucks, the rear truck (5) being on the new track and the front truck (4) on the old track and, ahead of said frame-car, a set of cars provided with equipments for loading the excavation and, at the rear of said frame-car, transport cars for transporting the track spans, the sand and the ballast, guide rails installed on said transport cars and said rame-car, two gantries (9) adapted to roll on said guide rails installed on said transport cars and said frame-car, said gantries supporting hoisting means for lifting a track span and means for handling buckets (11) for transporting the sand and ballast, and a rolling truck (10) movable on said guide rails ahead of said two gantries and from which at least one vertically adjustable excavator (12) is suspended, said excavator covering either the full width of the excavation or only a reduced width and being movable laterally or adapted to pivot for excavating the ballast, characterized in that said train is adapted to perform also the draining of the railway track and comprises for this purpose an adjustable digging device (16, 20) mounted at the rear of said excavator (12), and consisting preferably of an endless chain (14) associated with helical transverse fins (15, 15'), said digging device being provided with hydraulic cylinders (28, 29) for moving same in the vertical and longitudinal plane, said digging device being so designed that it can dig to a depth greater than the excavator and covers the full excavation width.

Description

L'invention concerne un train pour effectuer le renouvellement d'une voie de chemin de fer comportant un wagon de travail formé par un wagon-cadre avec un cadre vide d'une longueur supérieure à la longueur d'une travée ayant deux boggies, le boggie arrière se trouvant sur la nouvelle voie et le boggie avant sur l'ancienne voie et, en tête du wagon-cadre, une rame de wagons munis d'équipements de chargement du matériel excavé et, à l'arrière dudit wagon de travails, des wagons de transport pour les travées, le sable et le ballast, des chemins de roulement installés sur les wagons de transport et le wagon-cadre, deux portiques pouvant rouler sur ces chemins de roulement installés sur les wagons de transport et le wagon-cadre et étant équipés d'un dispositif de levage pour une travée et d'un dispositif de manoeuvre pour des bennes pour le transport de sable et du ballast et un chariot roulant se déplaçant sur lesdits chemins de roulement, disposé en avant des deux portiques, et auquel est suspendu au moins un élément d'excavation réglable en hauteur construit soit pour toute la largeur d'excavation, soit d'une largeur réduite et latéralement mobile ou pivotant pour excaver le ballast.The invention relates to a train for carrying out the renewal of a railway track comprising a working wagon formed by a frame wagon with an empty frame of a length greater than the length of a span having two bogies, the rear bogie being on the new track and the front bogie on the old track and, at the head of the frame wagon, a train of wagons fitted with equipment for loading excavated material and, behind the said working wagon, transport wagons for the spans, sand and ballast, tracks installed on the transport wagons and the frame wagon, two gantry cranes which can roll on these tracks installed on the transport wagons and the frame wagon and being equipped with a lifting device for a span and with an operating device for skips for the transport of sand and ballast and a rolling carriage moving on said tracks, placed in front of the two gantries, and which is suspended at least one height-adjustable excavation element constructed either for the entire excavation width, or of a reduced width and laterally movable or pivoting to excavate the ballast.

Ce train est déjà connu selon le brevet CH No. 583 822 qui décrit un procédé et un train pour le renouvellement complet d'une voie de chemin de fer comprenant les opérations de dépose de l'ancienne voie, de dégarnissage-criblage du ballast et de pose de la nouvelle voie, le déroulement de ces trois opérations s'opérant de façon continue, dans l'ordre indiqué, en un seul passage du train de renouvellement prévu à cet effet. Cependant, ce dispositif ne permet pas d'opérer un assainissement de la voie, c'est-à-dire le remplacement de la plate-forme.This train is already known according to patent CH No. 583 822 which describes a process and a train for the complete renewal of a railway track comprising the operations of removing the old track, stripping-screening of the ballast and laying of the new track, the progress of these three operations taking place continuously, in the order indicated, in a single pass of the renewal train provided for this purpose. However, this device does not make it possible to clean up the track, that is to say the replacement of the platform.

On a déjà proposé dans la demande de brevet européen No. 28 668 un procédé et un train pour faire cet assainissement, le déroulement des travaux étant le suivant: à l'aide d'un wagon de travail, de deux portiques et de wagons de transport équipés de chemins de roulement, le tout faisant partie d'une première rame, on procède au démontage des anciennes travées lesquelles sont remplacées par des travées de travail. Sur ces travées de travail, on fait avancer une excavatrice précédée des wagons de transport faisant partie d'une deuxième rame qui se trouve en avant de la première rame dans le sens d'avance des travaux. On excave le ballast et la plate-forme à l'aide de cette excavatrice puis on remplace la terre excavée par une couche de sable formant la nouvelle plate-forme et qui est amenée par des bennes, fixées sur les portiques de la première rame, et que l'on vide à travers le cadre du wagon de travail. On procède ensuite au régalage et au damage du sable. On amène, distribue et compacte le ballast et enfin on pose les nouvelles travées toujours à l'aide de la première rame.We have already proposed in European patent application No. 28 668 a method and a train for this sanitation, the progress of the work being as follows: using a working wagon, two gantry cranes and wagons of transport equipped with tracks, all part of a first train, we proceed to the dismantling of the old spans which are replaced by working spans. On these working spans, an excavator is advanced, preceded by transport wagons which are part of a second train which is located in front of the first train in the direction of work advance. The ballast and the platform are excavated using this excavator, then the excavated earth is replaced by a layer of sand forming the new platform and which is brought by skips, fixed on the gantries of the first train, and emptied through the frame of the work car. We then proceed to the leveling and tamping of the sand. We bring, distribute and compact the ballast and finally we put the new spans always using the first train.

Cette solution, quoique satisfaisante de par son efficacité, présente l'inconvénient de devoir disposer de deux rames distinctes, le début des opérations c'est-à-dire l'enlèvement des anciennes travées, devant être accompli par la première rame puis l'excavation par la deuxième rame après la mise en place de travées de travail, ensuite c'est de nouveau la première rame qui distribue et compacte la nouvelle plate-forme et le nouveau ballast.This solution, although satisfactory in terms of its efficiency, has the disadvantage of having to have two separate trains, the start of operations, that is to say the removal of the old spans, having to be accomplished by the first train then the excavation by the second train after the installation of working spans, then it is again the first train which distributes and compacts the new platform and the new ballast.

Les procédés utilisés antérieurement pour cet assainissement consistaient à utiliser simplement des engins excavateurs totalement indépendants de la voie, par exemple des excavatrices ou pelleteuses montées sur chenilles, ce qui rendait difficile l'obtention d'un creusage régulier et surtout présentait des difficultés pour l'évacuation et le transport du matériel excavé.The methods used previously for this remediation consisted in simply using excavating machines completely independent of the track, for example excavators or excavators mounted on crawlers, which made it difficult to obtain regular digging and above all presented difficulties for the evacuation and transport of excavated material.

Le but de la présente invention est de rationaliser les travaux d'assainissement tout en économisant le temps de travail, les moyens utilisés et les déplacements du train prévu pour ces travaux.The purpose of the present invention is to rationalize the remediation work while saving the working time, the means used and the movement of the train provided for these works.

A cet effet le train selon l'invention est caractérisé en ce qu'il est agencé pour effectuer également l'assainissement de la voie et qu'il comprend à cet effet un élément de creusage orientable monté en arrière de l'élément d'excavation, préférablement constitué d'une chaîne avec des spirales transversales, ledit élément de creusage étant muni de vérins hydrauliques pour son déplacement dans le plan vertical et longitudinal, cet élément de creusage étant conçu de telle manière qu'il peut creuser plus profondément que l'élément d'excavation et couvre toute la largeur d'excavation.To this end the train according to the invention is characterized in that it is arranged to also carry out the cleaning of the track and that it comprises for this purpose an orientable digging element mounted behind the excavation element , preferably consisting of a chain with transverse spirals, said digging element being provided with hydraulic jacks for its movement in the vertical and longitudinal plane, this digging element being designed in such a way that it can dig deeper than the excavation element and covers the entire excavation width.

Les avantages obtenus grâce à cette invention sont avant tout l'amélioration du rendement comparativement aux trains connus jusqu'à ce jour, l'utilisation d'une seule rame qui prend appui par le boggie arrière sur la nouvelle voie et par le boggie avant sur l'ancienne voie, la suppression d'une voie de travail intermédiaire, la réduction de la zone de travail à la longueur d'une travée plus la zone de stockage. En outre, la machine travaille pas à pas, sans interruption, pour effectuer l'ensemble des opérations nécessaires à l'assainissement de la plate-forme avec la possibilité de poser avec les portiques des nouvelles travées, ou des anciennes travées si elles sont récupérables, ou des travées se composant d'anciens rails et de nouvelles traverses. L'opération d'excavation peut être exécutée en deux étapes: tout d'abord le ballast qui peut éventuellement être récupéré, puis la plate-forme et le déchargement des graviers peut être fait directement derrière l'excavatrice.The advantages obtained thanks to this invention are above all the improvement in performance compared to trains known to date, the use of a single train which is supported by the rear bogie on the new track and by the front bogie on the old track, the elimination of an intermediate work track, the reduction of the work area to the length of a span plus the storage area. In addition, the machine works step by step, without interruption, to carry out all the operations necessary for the sanitation of the platform with the possibility of laying with the gantry cranes new spans, or old spans if they are recoverable , or spans consisting of old rails and new sleepers. The excavation operation can be carried out in two stages: first the ballast which can possibly be recovered, then the platform and the unloading of gravel can be done directly behind the excavator.

Un autre avantage de ce train d'assainissement est une utilisation rationnelle de l'élément de creusage qui est préférablement constitué par une lame laquelle peut remplir deux fonctions soit pour le régalage soit pour le creusage en la réglant plus profondément que la chaîne pour libérer la matière à excaverAnother advantage of this sanitation train is a rational use of the digging element which is preferably constituted by a blade which can fulfill two functions either for leveling or for digging by adjusting it more deeply than the chain to release the material to excavate

Par ailleurs, pour excaver des grandes pierres ou des rochers, la lame d'égalisation, munie de vérins hydrauliques, peut faire des mouvements similaires au godet d'une pelle mécanique. Pour améliorer la pénétration de la lame, celle-ci peut être conçue en trois unités ayant chacune une commande indépendante. D'autre part, les grandes pierres qui ne peuvent pas être transportées avec la chaîne sont mises hors de la plate-forme à l'aide de lames d'égalisation. A cet effet, les grandes pierres sont coincées entre la lame, la chaîne et les spirales et seront déplacées latéralement jusqu'à ce que les pierres arrivent sur les épaulements. Il faut en outre noter que comme toutes les opérations, et en particulier celles d'excavation et de régalage, se font directement depuis le wagon-cadre porté par la voie, la régularité du creusage de la plate-forme est assurée, celui-ci s'effectuant dans le sens de la voie, à une profondeur choisie, ce qui permet d'obtenir une parfaite planéité du sol après l'enlèvement de l'ancienne plate-forme et donc une bonne préparation avant la mise en place de la nouvelle plate-forme.In addition, to excavate large stones or boulders, the leveling blade, fitted with hydraulic cylinders, can make movements similar to the bucket of a mechanical shovel. To improve the penetration of the blade, it can be designed in three units each with an independent control. On the other hand, large stones that cannot be transported with the chain are put out of the platform using leveling blades. For this purpose, the large stones are wedged between the blade, the chain and the spirals and will be moved laterally until the stones arrive on the shoulders. It should also be noted that like all operations, and in particular those of excavation and leveling, are done directly from the frame wagon carried by the track, the regularity of the digging of the platform is ensured, this one taking place in the direction of the track, at a chosen depth, which makes it possible to obtain perfect flatness of the ground after the removal of the old platform and therefore good preparation before the installation of the new platform.

Dans ce qui suit, l'invention est exposée plus en détail à l'aide de dessins représentant plusieurs modes d'exécution:

  • La figure 1 représente schématiquement une vue d'ensemble du train d'assainissement.
  • La figure 2 représente, à plus grande échelle, le wagon-cadre et son équipement.
  • La figure 3 représente, schématiquement, une vue en coupe de l'excavatrice munie de spirales latérales.
  • La figure 4 représente la même vue que la figure 3, mais avec une lame abaissée par rapport aux autres lames.
  • La figure 5 montre une vue détaillée d'une spirale avec l'élément de creusage formé par une lame en position abaissée par rapport au niveau de l'excavatrice.
  • La figure 6 représente une vue de profil de l'extrémité de l'excavatrice et de la lame de creusage repliée en position de travail.
  • La figure 7 représente une vue schématique, en perspective, de la lame et de ses dispositifs de commande indépendants.
  • La figure 8 représente une vue de profil d'une variante d'exécution de la lame munie d'un râteau-arracheur.
  • La figure 9 représente une vue partielle, de face, de la lame selon la figure 8.
  • La figure 10 représente schématiquement une vue d'ensemble d'une variante d'exécution du wagon-cadre.
In what follows, the invention is explained in more detail using drawings representing several embodiments:
  • Figure 1 schematically shows an overview of the sanitation train.
  • Figure 2 shows, on a larger scale, the frame wagon and its equipment.
  • Figure 3 shows, schematically, a sectional view of the excavator provided with lateral spirals.
  • Figure 4 shows the same view as Figure 3, but with a blade lowered relative to the other blades.
  • FIG. 5 shows a detailed view of a spiral with the digging element formed by a blade in the lowered position relative to the level of the excavator.
  • FIG. 6 represents a profile view of the end of the excavator and of the digging blade folded back into the working position.
  • Figure 7 shows a schematic perspective view of the blade and its independent control devices.
  • Figure 8 shows a side view of an alternative embodiment of the blade provided with a rake-puller.
  • FIG. 9 represents a partial front view of the blade according to FIG. 8.
  • Figure 10 schematically shows an overview of an alternative embodiment of the frame wagon.

Le train, montré partiellement sur la figure 1, et entraîné par une locomotive non représentée, se compose de plusieurs wagons de tête 1 destinés au chargement du matériel excavé lequel est transporté par un système de tapis roulants télescopiques 2. Un wagon de travail 3 supporté par deux boggies 4 et 5, comporte un cadre vide 6 d'une longueur L supérieure à la longueur I d'une travée I. Ce cadre vide 6 est muni de voies de roulement, se prolongeant sur les wagons arrières, et destinées à supporter les différents portiques, deux portiques 9 équipés d'un dispositif de levage pour une travée et d'un dispositif de manoeuvre pour des bennes 11 pour le transport du sable et du ballast et, en avant de ces deux portiques 9, un chariot roulant 10 auquel est suspendue une excavatrice 12 qui, en principe, peut être similaire à celle décrite dans le brevet suisse No. 583 822 et conçue soit pour toute la largeur d'excavation e, soit comme illustré figure 3, pour une largeur réduite et latéralement mobile selon la flèche F. Ce train comporte en outre des wagons arrières 13 pour le transport des bennes chargées du sable et du nouveau ballast et pour le transport des nouvelles travées ou des nouveaux rails.The train, partially shown in Figure 1, and driven by a locomotive not shown, consists of several head wagons 1 intended for the loading of excavated material which is transported by a system of telescopic conveyor belts 2. A working wagon 3 supported by two bogies 4 and 5, has an empty frame 6 of a length L greater than the length I of a span I. This empty frame 6 is provided with tracks, extending on the rear wagons, and intended to support the different gantry cranes, two gantry cranes 9 equipped with a lifting device for a span and an operating device for skips 11 for transporting sand and ballast and, in front of these two gantry cranes 9, a rolling cart 10 to which is suspended an excavator 12 which, in principle, can be similar to that described in Swiss Patent No. 583 822 and designed either for the entire excavation width e, or as illustrated in FIG. 3, for a reduced width and laterally t mobile according to arrow F. This train further comprises rear wagons 13 for the transport of skips loaded with sand and new ballast and for the transport of new spans or new rails.

En se référant à la figure 2 qui illustre d'une manière plus détaillée le wagon de travail 3, on peut voir que l'excavatrice 12, supportée par le chariot 10, est munie d'un vérin hydraulique 13 qui permet son réglage en hauteur, d'autres vérins, non illustrés, permettant son réglage transversal et longitudinal. Cette excavatrice 12 se compose d'une chaîne d'excavation 14 avec deux spirales latérales 15, 15' (fig. 3), un élément de creusage 16 constitué par une lame qui sera décrite ci-après plus en détail, et en arrière de la lame de creusage 16, une dameuse 17 commandée également par des vérins hydrauliques. Cette excavatrice 12 pourrait, en outre, être montée pivotante sur un axe vertical.Referring to Figure 2 which illustrates in more detail the working wagon 3, we can see that the excavator 12, supported by the carriage 10, is provided with a hydraulic cylinder 13 which allows its height adjustment , other cylinders, not shown, allowing its transverse and longitudinal adjustment. This excavator 12 consists of an excavation chain 14 with two lateral spirals 15, 15 '(fig. 3), a digging element 16 constituted by a blade which will be described below in more detail, and behind the digging blade 16, a tamper 17 also controlled by hydraulic cylinders. This excavator 12 could, moreover, be pivotally mounted on a vertical axis.

Pour garantir une profondeur de creusage et une inclinaison de la plate-forme parfaites, le cadre du wagon de travail 3 est maintenu horizontal ou incliné en fonction de la pente de la plate-forme à l'aide de pendules. Pour maintenir le profil en long, c'est-à-dire pour permettre d'orienter à tout moment le cadre 6 parallèlement à la plate-forme, respectivement à la banquette, le cadre est monté sur le boggie arrière 5 par l'intermédiaire d'un vérin hydraulique 40 qui permet son réglage en hauteur.To guarantee perfect digging depth and inclination of the platform, the frame of the working wagon 3 is kept horizontal or inclined according to the slope of the platform using pendulums. To maintain the longitudinal profile, that is to say to allow to orient at any time the frame 6 parallel to the platform, respectively to the bench, the frame is mounted on the rear bogie 5 via a hydraulic cylinder 40 which allows its height adjustment.

La chaîne d'excavation avec les spirales 15, 15' permet d'excaver la banquette jusqu'à une profondeur de, par exemple, 90 cm et sur une largeur de 5 m. La chaîne amène le matériel excavé sur le tapis roulant 2, télescopique, monté sur le wagon avant 1 et qui fait liaison avec le train d'évacuation des détritus placé en tête de la machine.The excavation chain with the spirals 15, 15 'makes it possible to excavate the bench seat to a depth of, for example, 90 cm and over a width of 5 m. The chain brings the material excavated on the conveyor belt 2, telescopic, mounted on the front wagon 1 and which links with the trash removal train placed at the head of the machine.

Dans cette première forme d'exécution considérée, la lame de creusage 16 est montée directement sur l'excavatrice 12 ce qui permet, comme cela sera décrit ultérieurement, une collaboration entre la lame et l'excavatrice pour enlever les grosses pierres. En outre, dans cette forme d'exécution, l'excavatrice 12 supporte également la dameuse 17.In this first embodiment considered, the digging blade 16 is mounted directly on the excavator 12 which allows, as will be described later, collaboration between the blade and the excavator to remove large stones. Furthermore, in this embodiment, the excavator 12 also supports the tamper 17.

Pour améliorer la pénétration de la lame de creusage, d'une longueur, par exemple, de 2,6 m, celle-ci est conçue en trois segments latéraux 16a, 16b, 16c (fig. 3 à 7), commandés chacun indépendamment par des vérins hydrauliques . 28a, 28b, 28c, auxquels ils sont articulés par un axe 30, ces vérins étant montés eux-mêmes sur des bras 18a, 18b, 18c articulés par un axe 32 sur l'excavatrice 12 et qui sont commandés également chacun par des vérins hydrauliques 29 articulés en 31 et dont un seul est visible sur la figure 6. Ces différentes commandes et articulations permettent d'imprimer individuellement ou simultanément à chaque segment 16a, 16b, 16c des mouvements similaires à ceux d'un godet d'une pelle mécanique, ceci pour permettre d'excaver de grandes pierres, des rochers ou des gros morceaux de ballast agglomérés. Ces pierres excavées par la lame sont ensuite ramenées par les spirales 15, 15' vers la chaîne 14 de l'excavatrice et les pierres de trop gros volume qui ne peuvent pas être transportées avec la chaîne, sont mises hors de la plate-forme à l'aide des lames 16a, 16b, 16c. A cet effet, les grandes pierres seront coincées entre la lame 16, la chaîne 14 et les spirales 15 et le tout sera déplacé latéralement jusqu'à ce que les pierre arrivent sur les épaulements.To improve the penetration of the digging blade, of a length, for example, of 2.6 m, it is designed in three lateral segments 16a, 16b, 16c (fig. 3 to 7), each controlled independently by hydraulic cylinders. 28a, 28b, 28c, to which they are articulated by a pin 30, these jacks being themselves mounted on arms 18a, 18b, 18c articulated by a pin 32 on the excavator 12 and which are also each controlled by hydraulic cylinders 29 articulated at 31 and only one of which is visible in FIG. 6. These different controls and articulations allow print individually or simultaneously with each segment 16a, 16b, 16c movements similar to those of a bucket of a mechanical shovel, this to allow excavation of large stones, rocks or large pieces of agglomerated ballast. These stones excavated by the blade are then brought back by the spirals 15, 15 'towards the chain 14 of the excavator and the stones of too large volume which cannot be transported with the chain, are put out of the platform to using blades 16a, 16b, 16c. For this purpose, the large stones will be wedged between the blade 16, the chain 14 and the spirals 15 and the whole will be moved laterally until the stones arrive on the shoulders.

Bien entendu, la lame 16 pourrait être fabriquée en un seul segment, en deux segments ou en plus de trois segments, mais il est évident q'une lame en plusieurs segments, réglables individuellement, permet un meilleur arrachage des pierres et une manipulation plus facile qu'avec une grande lame. Comme illustré figure 4, en cas de besoin, un seul segment 16c peut être abaissé d'une hauteur h par rapport au niveau des autres segments 16a, 16b pour arracher une pierre qui se trouverait à cet endroit, ou comme illustré figure 5, les segments 16a, 16b peuvent être abaissés de la même hauteur h2 par rapport au niveau de l'excavatrice. Dans le cas d'une lame composée de plusieurs segments latéraux, il serait également possible de prévoir un pivotement de chaque segment sur un axe individuel vertical.Of course, the blade 16 could be manufactured in a single segment, in two segments or in addition to three segments, but it is obvious that a blade in several segments, individually adjustable, allows better removal of the stones and easier handling. than with a large blade. As illustrated in FIG. 4, if necessary, a single segment 16c can be lowered by a height h with respect to the level of the other segments 16a, 16b to tear off a stone which would be there, or as illustrated in FIG. 5, the segments 16a, 16b can be lowered by the same height h2 from the level of the excavator. In the case of a blade composed of several lateral segments, it would also be possible to provide a pivoting of each segment on an individual vertical axis.

Pour garantir une force d'arrachage suffisante, l'excavatrice 12 est déplacée sur le wagon de travail 3 à l'aide de treuils montés sur les wagons avant et arrière.To guarantee a sufficient breakout force, the excavator 12 is moved to the working wagon 3 using winches mounted on the front and rear wagons.

L'égalisation du gravier et du ballast est effectuée avec la lame 16 et des spirales 15 qui permettent de transporter le matériel à l'extérieur soit avec une lame orientable montée sur la suspension de la dameuse, comme il sera décrit ultérieurement.The gravel and the ballast are equalized with the blade 16 and spirals 15 which allow the material to be transported outside either with an orientable blade mounted on the suspension of the groomer, as will be described later.

Selon la forme d'exécution représentée sur les figures 3 à 7, la partie inférieure de la lame 16 est munie de dents 19 qui assurent un meilleur arrachage du ballast mais qui ne présentent aucun inconvénient lors de l'utilisation de la lame pour le régalage de la plate-forme ou banquette, ces dents ne formant que de petites rainures sans importance.According to the embodiment shown in Figures 3 to 7, the lower part of the blade 16 is provided with teeth 19 which ensure better stripping of the ballast but which have no disadvantage when using the blade for leveling of the platform or bench, these teeth forming only small unimportant grooves.

Selon une autre variante d'exécution illustrée figures 8 et 9, l'élément de creusage est constitué par un râteau-arracheur 20, constitué de trois parties latérales 20a, 20b, 20c réglables dans le plan longitudinal et en profondeur et qui permettent d'améliorer encore l'excavation de l'ancien ballast. Chaque partie 20a, 20b, 20c du râteau-arracheur est montée sur un bras 22 articulé par un axe 26 à un deuxième bras 21 lui-même articulé sur l'excavatrice 12 par un axe 32. Le bras 21 peut être basculé autour de l'axe 32 par un vérin hydraulique 29 tandis que le bras 22 peut basculer autour de l'axe 26 sous l'action d'un vérin hydraulique 25 qui est articulé d'une part par un axe 25' sur le bras 21, d'autre part par un axe 25" sur le bras 22. Ce râteau-arracheur 20 est en outre combiné à une lame de régalage 23, constituée également de trois segments 23a, 23b, 23c et qui est réglable indépendamment en profondeur, au moyen de vérins 24a etc, de sorte que les trois segments de cette lame peuvent travailler, ou non, sur le même niveau que les trois parties 20a, 20b, 20c du râteau.According to another alternative embodiment illustrated in Figures 8 and 9, the digging element is constituted by a rake-puller 20, consisting of three lateral parts 20a, 20b, 20c adjustable in the longitudinal plane and in depth and which allow further improve the excavation of the old ballast. Each part 20a, 20b, 20c of the rake-puller is mounted on an arm 22 articulated by an axis 26 to a second arm 21 itself articulated on the excavator 12 by an axis 32. The arm 21 can be tilted around the axis 32 by a hydraulic cylinder 29 while the arm 22 can tilt around the axis 26 under the action of a hydraulic cylinder 25 which is articulated on the one hand by an axis 25 'on the arm 21, d' on the other hand by a pin 25 "on the arm 22. This rake-tearer 20 is also combined with a leveling blade 23, also consisting of three segments 23a, 23b, 23c and which is independently adjustable in depth, by means of jacks 24a etc, so that the three segments of this blade can work, or not, on the same level as the three parts 20a, 20b, 20c of the rake.

Selon une autre variante d'exécution, telle qu'illustrée figure 10, l'excavatrice 12 comporte seulement la chaîne d'excavation 14 et les spirales 15, 15', mais elle n'est pas combinée, comme dans la forme d'exécution précédemment décrite, à la lame de creusage et égalisatrice ni à une dameuse. La lame de creusage 36, soumise à l'action d'un système de vérins hydrauliques 38, représenté schématiquement, est dans ce cas montée sur un chariot indépendant 35 qui roule sur le chemin de roulement du wagon de travail, en arrière du chariot 10 supportant l'excavatrice 12 et ce chariot 35 est muni d'un système de traction indépendant pour pouvoir être déplacé indépendamment de l'excavatrice 12. Ce chariot 35 peut également supporter la dameuse 37.According to another alternative embodiment, as illustrated in FIG. 10, the excavator 12 comprises only the excavation chain 14 and the spirals 15, 15 ′, but it is not combined, as in the embodiment previously described, with the digging and leveling blade or a groomer. The digging blade 36, subjected to the action of a system of hydraulic cylinders 38, shown diagrammatically, is in this case mounted on an independent carriage 35 which rolls on the track of the working wagon, behind the carriage 10 supporting the excavator 12 and this carriage 35 is provided with an independent traction system so that it can be moved independently of the excavator 12. This carriage 35 can also support the groomer 37.

Le déroulement des travaux qui s'effectue toujours à travers le cadre vide est le suivant:

  • - démontage des anciennes travées au moyen des portiques 9,
  • - excavation de l'ancien ballast et de l'ancienne plate-forme et transport du matériel à l'aide des tapis roulant 2 sur les wagons 1 en tête du train,
  • - égalisation et compactage de la plate-forme ou banquette,
  • - transport et déchargement du nouveau gravier au moyen des portiques. Cette opération peut être exécutée dès que les premiers mètres de la plate-forme sont excavés et damés,
  • - égalisation du gravier avec la lame d'égalisation et compactage,
  • - transport et déchargement du nouveau ballast au moyen des portiques,
  • - égalisation et compactage du nouveau ballast,
  • - pose des nouvelles ou des anciennes travées ou des travées se composant d'anciens rails et de nouvelles traverses, à l'aide des portiques,
  • - avancement du train d'assainissement.
The work which is always done through the empty frame is as follows:
  • - dismantling of the old spans by means of gantries 9,
  • - excavation of the old ballast and the old platform and transport of the material using the conveyor belts 2 on the wagons 1 at the head of the train,
  • - equalization and compacting of the platform or bench,
  • - transport and unloading of new gravel by means of gantry cranes. This operation can be carried out as soon as the first meters of the platform are excavated and groomed,
  • - leveling of gravel with the leveling and compaction blade,
  • - transport and unloading of the new ballast by gantry cranes,
  • - equalization and compaction of the new ballast,
  • - laying new or old spans or spans consisting of old rails and new sleepers, using gantries,
  • - advancement of the sanitation train.

Claims (11)

1. Train for renewing a railway track, which comprises a working car (3) consisting of a frame-car with an empty frame of a length (L) in excess of the length (I) of one track span, said car having two trucks, the rear truck (5) being on the new track and the front truck (4) on the old track and, ahead of said frame-car, a set of cars provided with equipments for loading the excavation and, at the rear of said frame-car, transport cars for transporting the track spans, the sand and the ballast, guide rails installed on said transport cars and said rame-car, two gantries (9) adapted to roll on said guide rails installed on said transport cars and said frame-car, said gantries supporting hoisting means for lifting a track span and means for handling buckets (11) for transporting the sand and ballast, and a rolling truck (10) movable on said guide rails ahead of said two gantries and from which at least one vertically adjustable excavator (12) is suspended, said excavator covering either the full width of the excavation or only a reduced width and being movable laterally or adapted to pivot for excavating the ballast, characterized in that said train is adapted to perform also the draining of the railway track and comprises for this purpose an adjustable digging device (16, 20) mounted at the rear of said excavator (12), and consisting preferably of an endless chain (14) associated with helical transverse fins (15, 15'), said digging device being provided with hydraulic cylinders (28, 29) for moving same in the vertical and longitudinal plane, said digging device being so designed that it can dig to a depth greater than the excavator and covers the full excavation width.
2. Train as claimed in claim 1, characterized in that the digging device (16, 20) is so designed that it can be utilized as a means for levelling the formation of the roadbed foundation, the sand and the ballast.
3. Train as claimed in claims 1 and 2, characterized in that the digging device (16) consists of a blade made of several pivotally-mounted lateral sections (16a, 16b, 16c) each provided with hydraulic cylinders (28a, 28b, 28c) so that they can be moved separately or together in the vertical and longitudinal plane in the fashion of a power shovel bucket.
4. Train as claimed in claims 1 and 2, characterized in that the digging device (20) is constructed like a grubbing rake adjustable in the longitudinal plane and for depth, said digging device comprising a grading blade (23) disposed above said grubbing rake and adjustable independently in depth so that the blade can also operate at the same level as the excavator.
5. Train as claimed in claim 4, characterized in that the grubbing rake (20) and the grading blade (23) consist each of several pivotally-mounted sections (20a, 20b; 23a, 23b); each section being controlled independently of, or in conjunction with, one another, by means of hydraulic cylinders (29, 25; 24).
6. Train as claimed in claims 1 to 5, characterized in that the digging device (16, 20) also acting as a leveller is adapted to be tilted along the track axis for obtaining the proper slant of the formation of the roadbed foundation.
7. Train as claimed in claims 1 to 5, characterized in that said digging device (16) is mounted to the excavator (12) and so arranged as to cooperate with said excavator.
8. Train as claimed in claim 7, characterized in that a rammer (17) for compacting the formation of the roadbed foundation, the sand and the ballast is mounted to said excavator (12) behind said digging device (16), and is adjustable both vertically and for inclination.
9. Train as claimed in claims 1 to 6, characterized in that said adjustable digging device (36) is mounted to an independent truck (35) rolling on the guide rails of said frame-car, behind said excavator, and provided with independent traction means so that it can be moved independently of the excavator, said truck (35) being preferably provided also with a rammer (37).
10. Train as claimed in claims 1 to 9, characterized in that traction means are provided for moving said excavator (12) and said truck (35) respectively supporting said digging device, said traction means comprising a winch mounted on the front and rear cars.
11. Train as claimed in claims 1 to 10, characterized in that the rear end of the empty frame (6) is mounted to the rear truck (5) by means of a hydraulic cylinder (40) so that the height of said empty frame can be adjusted to a position parallel to the formation of the roadbed foundation or the bench.
EP82200150A 1979-11-08 1982-02-09 Railway track reconditioning train Expired EP0085790B1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE8282200150T DE3265499D1 (en) 1982-02-09 1982-02-09 Railway track reconditioning train
EP82200150A EP0085790B1 (en) 1982-02-09 1982-02-09 Railway track reconditioning train
AT82200150T ATE15088T1 (en) 1982-02-09 1982-02-09 CONSTRUCTION TRAIN FOR THE RENEWAL OF A RAILWAY TRACK.
US06/353,486 US4400897A (en) 1979-11-08 1982-03-01 Method and railway train for draining a railway track
ES511424A ES8304248A1 (en) 1982-02-09 1982-04-14 Railway track reconditioning train.
CA000401020A CA1201937A (en) 1982-02-09 1982-04-15 Railway track renewal train
DD82245704A DD209006A5 (en) 1982-02-09 1982-12-08 RAILWAY TRAIN FOR THE RENEWAL OF RAILWAY RAILS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP82200150A EP0085790B1 (en) 1982-02-09 1982-02-09 Railway track reconditioning train

Publications (2)

Publication Number Publication Date
EP0085790A1 EP0085790A1 (en) 1983-08-17
EP0085790B1 true EP0085790B1 (en) 1985-08-21

Family

ID=8189460

Family Applications (1)

Application Number Title Priority Date Filing Date
EP82200150A Expired EP0085790B1 (en) 1979-11-08 1982-02-09 Railway track reconditioning train

Country Status (6)

Country Link
EP (1) EP0085790B1 (en)
AT (1) ATE15088T1 (en)
CA (1) CA1201937A (en)
DD (1) DD209006A5 (en)
DE (1) DE3265499D1 (en)
ES (1) ES8304248A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5664498A (en) * 1995-10-31 1997-09-09 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machgine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1209585B (en) * 1961-02-23 1966-01-27 Mannix Co Ltd Device for clearing out ballast under a track
CH583822A5 (en) * 1974-07-11 1977-01-14 Scheuchzer Auguste Les Fils De
US4102066A (en) * 1977-05-11 1978-07-25 Christoff James W Scarifying apparatus and method for railroad bed ballast removal
CH620005A5 (en) * 1978-04-19 1980-10-31 Scheuchzer Auguste Les Fils D
ATE7159T1 (en) * 1979-11-08 1984-05-15 Les Fils D'auguste Scheuchzer S.A. CONSTRUCTION TRAIN FOR STABILIZING A RAILWAY TRACK.

Also Published As

Publication number Publication date
ES511424A0 (en) 1983-02-16
CA1201937A (en) 1986-03-18
ES8304248A1 (en) 1983-02-16
EP0085790A1 (en) 1983-08-17
DE3265499D1 (en) 1985-09-26
ATE15088T1 (en) 1985-09-15
DD209006A5 (en) 1984-04-18

Similar Documents

Publication Publication Date Title
FR2487394A1 (en) MOBILE INSTALLATION FOR SANITIZING THE SUPPORT OF RAILWAYS AND METHOD OF SANITATION OBTAINED WITH SUCH A INSTALLATION
EP0004985A1 (en) Train for the renewal of a railway track
FR2473575A1 (en) MOBILE INSTALLATION FOR SANITATION OF INFRASTRUCTURE OF RAILWAYS AND METHOD FOR PERFORMING SANITATION USING SUCH FACILITY
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
EP0971071B1 (en) Method and device for laying railway track elements using a tracked vehicle
FR2480815A1 (en) RAILWAY CONSTRUCTION MACHINE COMPRISING A DEVICE FOR DEBLAYING AND PLACING THE BALLAST LAYER
EP0085790B1 (en) Railway track reconditioning train
US4400897A (en) Method and railway train for draining a railway track
EP0028668B1 (en) Train for stabilising a railway track
US4119154A (en) Method and apparatus for treating ballast
EP1348057B1 (en) Ballast removal method and apparatus
CH655333A5 (en) ROLLING MACHINE FOR EXCAVATING THE BALLAST OF RAILWAYS.
EP1156163B1 (en) Self-floating earthmoving machine
EP0162750A1 (en) Method and apparatus for renewing railway switches
FR2504829A1 (en) DEVICE FOR EXCAVATING RIGOLES FROM BLAST FURNACES AND THE LIKE
FR2736367A1 (en) Installation for continuous repair of rail track - comprises several pivoted machine chassis, supported on wheels, having systems for placing new sleepers, lifting old sleepers from track and ballast cleaning and ejection
EP0775780B1 (en) Method for renewing railway tracks
FR2538425A1 (en) Railway ballast mobile clearing and levelling machine
BE493189A (en)
FR3150530A1 (en) Work train.
FR2588023A1 (en) Method and machine for clearing the ballast from a railway track
FR3019566B1 (en) MACHINE FOR THE CONTINUOUS CONCRETE MILLING OF PITS PROVIDED WITH A WINCH
CH291449A (en) Installation for the maintenance of railway tracks.
CH426919A (en) Method for moving sets of tracks and apparatus for carrying out this method
BE352418A (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI NL

17P Request for examination filed

Effective date: 19840123

ITF It: translation for a ep patent filed
GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI NL

REF Corresponds to:

Ref document number: 15088

Country of ref document: AT

Date of ref document: 19850915

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3265499

Country of ref document: DE

Date of ref document: 19850926

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19891231

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19900221

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19900228

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19910118

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19910209

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19910214

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19910225

Year of fee payment: 10

ITTA It: last paid annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19910228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19910901

GBPC Gb: european patent ceased through non-payment of renewal fee
NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19920209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19921030

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19921103

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20010130

Year of fee payment: 20

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20020208

Ref country code: CH

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20020208

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL