[go: up one dir, main page]

CN116084684A - A roof formwork support structure with large overhanging eaves - Google Patents

A roof formwork support structure with large overhanging eaves Download PDF

Info

Publication number
CN116084684A
CN116084684A CN202310019797.9A CN202310019797A CN116084684A CN 116084684 A CN116084684 A CN 116084684A CN 202310019797 A CN202310019797 A CN 202310019797A CN 116084684 A CN116084684 A CN 116084684A
Authority
CN
China
Prior art keywords
formwork
push
locking
push plate
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310019797.9A
Other languages
Chinese (zh)
Other versions
CN116084684B (en
Inventor
徐扬
张骏
安宝全
刘震
王金明
赵珊珊
程国杰
刘亚辉
谢桂云
姚玉霞
焦立群
曾春荣
杨程遥
贾冠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongbei Huayu Construction Engineering Co ltd
Original Assignee
Zhongbei Huayu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongbei Huayu Construction Engineering Co ltd filed Critical Zhongbei Huayu Construction Engineering Co ltd
Priority to CN202310019797.9A priority Critical patent/CN116084684B/en
Publication of CN116084684A publication Critical patent/CN116084684A/en
Application granted granted Critical
Publication of CN116084684B publication Critical patent/CN116084684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本申请涉及一种楼顶屋面大挑檐支模结构,涉及屋面大挑檐的技术领域,包括模板、支撑机构,模板上还是设置有推动机构,支撑机构包括:支撑架,设置在屋面楼顶上;拉绳,设置在模板上且与支撑架连接并用于对模板进行支撑;收卷组件,设置在支撑架上且用于收卷或放出拉绳。本申请通过固定组件将模板固定安装到悬挑梁上,然后将拉绳与模板连接在一起,然后收卷组件启动拉紧模板对模板进行支撑定位,接着在模板上浇注混凝土,因此不会对下层结构施工造成不利影响,从而提高施工效率。

Figure 202310019797

This application relates to a formwork support structure for large overhanging eaves on the roof, and relates to the technical field of overhanging eaves on the roof, including a formwork and a supporting mechanism. The formwork is still provided with a pushing mechanism. The supporting mechanism includes: a support frame, which is arranged on the roof of the roof on; the drawstring is arranged on the formwork and is connected with the support frame and is used to support the formwork; the winding component is arranged on the support stand and is used for winding up or releasing the stayrope. In this application, the formwork is fixedly installed on the cantilever beam through the fixing component, and then the pull rope is connected with the formwork, and then the winding component starts to tighten the formwork to support and position the formwork, and then pours concrete on the formwork, so there will be no damage to the formwork. The construction of the substructure will cause adverse effects, thereby improving the construction efficiency.

Figure 202310019797

Description

一种楼顶屋面大挑檐支模结构A roof formwork support structure with large overhanging eaves

技术领域technical field

本申请涉及屋面大挑檐的技术领域,尤其是涉及一种楼顶屋面大挑檐支模结构。The present application relates to the technical field of large overhanging eaves on roofs, in particular to a formwork support structure for large overhanging eaves on roofs.

背景技术Background technique

许多建筑工程屋面为悬挑现浇屋面,大挑檐是指屋面挑出外墙的部分,主要是为了方便做屋面排水,对外墙也起到保护作用。The roof of many construction projects is a cantilevered cast-in-place roof. The overhanging eaves refer to the part of the roof protruding from the outer wall. It is mainly for the convenience of roof drainage and also protects the outer wall.

屋面一般包括悬挑梁和多个用于支撑悬挑梁的支杆,下层的楼面结构与支杆连接,而在对楼顶的屋面大挑檐进行施工时需要在屋面上安装浇注的模板,浇注的模板需要设置用于固定的结构,现有的技术中一般是在下层楼面结构中固定安装工字钢,工字钢悬挑出楼板,工字钢上搭设脚手架对模板进行支撑,但是脚手架需要等混凝土结构强度达到之后才能拆除,而下层结构也会进行装饰或地面施工,而脚手架的存在会对下层内的施工造成不利影响,从而降低了施工效率,还有一种是设置三角架对模板进行支撑,但是相邻支杆之间的距离较大,因此使得设置在支杆上三角架稳定性较差,无法满足对模板的支撑效果,从而导致施工时的稳定性较差。The roof generally consists of cantilevered beams and multiple struts used to support the cantilevered beams. The floor structure of the lower floor is connected to the struts. When constructing the large roof eaves on the roof, it is necessary to install a cast formwork on the roof. , the poured formwork needs to be provided with a fixed structure. In the existing technology, I-beams are generally fixedly installed in the lower floor structure. However, the scaffolding needs to be removed after the concrete structure reaches its strength, and the lower structure will also be decorated or ground construction, and the existence of the scaffolding will adversely affect the construction in the lower layer, thereby reducing the construction efficiency, and there is another way to set up a tripod The formwork is supported, but the distance between adjacent poles is large, so the stability of the tripod set on the poles is poor, which cannot meet the supporting effect on the formwork, resulting in poor stability during construction.

发明内容Contents of the invention

为了提高施工效率和稳定性,本申请提供了一种楼顶屋面大挑檐支模结构。In order to improve construction efficiency and stability, the application provides a formwork support structure with large overhanging eaves on the roof.

本申请提供的一种楼顶屋面大挑檐支模结构,采用如下的技术方案:The formwork support structure of a large overhanging eaves on the roof provided by the application adopts the following technical scheme:

一种楼顶屋面大挑檐支模结构,包括通过固定组件设置在悬挑梁上的模板、设置在屋面楼顶上且用于对模板进行支撑的支撑机构,所述模板上还设置有驱动模板与混凝土脱离的推动机构,所述支撑机构包括:A large eaves formwork support structure on the roof, including a formwork set on the cantilever beam through a fixed assembly, a support mechanism set on the roof and used to support the formwork, and the formwork is also provided with a drive The pushing mechanism for separating the formwork from the concrete, and the supporting mechanism includes:

支撑架,所述支撑架设置在屋面楼顶上;A support frame, the support frame is arranged on the roof of the roof;

拉绳,所述拉绳设置在模板上且与支撑架连接并用于对模板进行支撑;A stay rope, the stay rope is arranged on the formwork and is connected with the support frame and used to support the formwork;

收卷组件,所述收卷组件设置在支撑架上且用于收卷或放出拉绳。The winding assembly is arranged on the supporting frame and is used for winding or releasing the pull rope.

通过采用上述技术方案,通过固定组件将模板固定安装到悬挑梁上,然后将拉绳与模板连接在一起,然后收卷组件启动的收卷拉绳,使得拉绳拉紧模板对模板进行支撑定位,然后在模板上浇注混凝土,因此不会对下层结构施工造成不利影响,从而提高施工效率;而等混凝土结构强度达到后,解锁固定组件将模板和混凝土分拆开,然后推动机构推动混凝土使得混凝土和模板脱离,从而节省了拆除模板所花费的时间,因此进一步提高施工效率。By adopting the above technical scheme, the formwork is fixedly installed on the cantilever beam through the fixing component, and then the stay rope is connected with the formwork, and then the rewinding stay rope activated by the winding component makes the stay rope tighten the formwork to support the formwork Positioning, and then pouring concrete on the formwork, so it will not adversely affect the construction of the substructure, thereby improving construction efficiency; and after the concrete structure strength is reached, unlock the fixing components to separate the formwork and concrete, and then the pushing mechanism pushes the concrete so that Concrete and formwork are detached, thereby saving time spent on removing formwork, thus further improving construction efficiency.

同时拉绳对模板进行支撑定位,从而提高了使用模板进行施工时的稳定性,因此同时提高了施工效率和施工的稳定性。At the same time, the stay rope supports and positions the formwork, thereby improving the stability when the formwork is used for construction, thus improving the construction efficiency and construction stability at the same time.

可选的,所述模板上开设有安装孔,所述固定组件包括:Optionally, mounting holes are provided on the template, and the fixing components include:

固定螺杆,所述固定螺杆穿过安装孔和悬挑梁且直径小于安装孔直径;a fixing screw, the fixing screw passes through the installation hole and the cantilever beam and has a diameter smaller than that of the installation hole;

固定凸台,所述固定凸台设置在固定螺杆上且呈倾斜的圆台状并抵压在安装孔上进行定位;A fixed boss, the fixed boss is arranged on the fixed screw rod and is in the shape of an inclined circular platform and pressed against the mounting hole for positioning;

固定螺母,所述固定螺母螺纹连接在固定螺杆上且抵紧在悬挑梁上进行定位。The fixing nut is threadedly connected to the fixing screw rod and pressed against the cantilever beam for positioning.

通过采用上述技术方案,将固定螺杆穿过安装孔和悬挑梁,然后将固定螺母螺纹连接到固定螺杆上,使得固定螺母抵紧在悬挑梁,而固定凸台抵压在安装孔上进行定位,因此固定螺杆与安装孔侧壁之间形成有避位空间,而需要拆除模板时,拧动固定螺母远离悬挑梁,敲击固定螺杆使得固定凸台与安装孔脱离,然后推动机构启动推动混凝土和模板脱离,因此无需将固定螺母和固定螺杆拆除即能启动推动机构将模板和混凝土分开,提高了拆装模板时的便利性,从而提高了施工效率;By adopting the above technical solution, the fixing screw rod is passed through the mounting hole and the cantilever beam, and then the fixing nut is threadedly connected to the fixing screw rod, so that the fixing nut is pressed against the cantilever beam, and the fixing boss is pressed against the mounting hole. Positioning, so there is an avoidance space between the fixing screw and the side wall of the mounting hole. When the formwork needs to be removed, turn the fixing nut away from the cantilever beam, tap the fixing screw to separate the fixing boss from the mounting hole, and then push the mechanism to start Push the concrete and formwork to separate, so the pushing mechanism can be activated to separate the formwork from the concrete without removing the fixing nuts and fixing screws, which improves the convenience of disassembling and assembling the formwork, thereby improving the construction efficiency;

同时模板和混凝土分开后,固定螺杆还能继续对模板进行定位,使得模板不会直接掉落而发生危险,然后取下固定螺母和固定螺杆即能实现模板的拆卸,因此在提高了施工效率同时也提高了施工时的安全性。At the same time, after the formwork and concrete are separated, the fixing screw can continue to position the formwork, so that the formwork will not fall directly and cause danger, and then remove the fixing nut and fixing screw to realize the disassembly of the formwork, so the construction efficiency is improved at the same time It also improves the safety during construction.

可选的,所述固定凸台上通过螺纹孔螺纹连接在固定螺杆上且抵紧在固定螺杆头部上进行定位;所述固定凸台设置有抵压在模板侧壁上的第一定位环和卡接安装在安装孔上的第二定位环。Optionally, the fixing boss is threadedly connected to the fixing screw through a threaded hole and positioned against the head of the fixing screw; the fixing boss is provided with a first positioning ring pressed against the side wall of the formwork and the second positioning ring snap-fitted on the mounting hole.

通过采用上述技术方案,第一定位环对固定凸台受到的力进行分散,而第二定位环卡接安装在安装孔上进行支撑分力,从而降低了固定凸台和固定螺杆损坏的概率,因此提高了对模板的固定效果,提高了模板使用时的稳定性;固定凸台、第一定位环和第二定位环能够根据不同的安装孔大小进行适配,而且固定凸台、第一定位环和第二定位环损坏后还能更换,因此提高了固定凸台、第一定位环和第二定位环的适应范围和固定凸台的支撑效果。By adopting the above technical solution, the first positioning ring disperses the force received by the fixed boss, and the second positioning ring is clamped and installed on the mounting hole to support the component force, thereby reducing the probability of damage to the fixed boss and the fixed screw. Therefore, the fixing effect on the template is improved, and the stability of the template is improved; the fixed boss, the first positioning ring and the second positioning ring can be adapted according to different mounting hole sizes, and the fixed boss, the first positioning The ring and the second positioning ring can also be replaced after being damaged, thus improving the adaptation range of the fixing boss, the first positioning ring and the second positioning ring and the supporting effect of the fixing boss.

可选的,所述推动机构包括:Optionally, the pushing mechanism includes:

推板,所述推板滑移设置在模板上;a push plate, the push plate is slidably arranged on the formwork;

多个推杆,多个所述推杆设置在推板上且滑移穿设在模板上并用于推动模板与混凝土脱离;A plurality of push rods, the plurality of push rods are arranged on the push plate and slide through the formwork and are used to push the formwork away from the concrete;

推动组件,所述推动组件设置在模板上且用于驱动推板移动。The push assembly is arranged on the formwork and is used to drive the push plate to move.

通过采用上述技术方案,推动组件启动带动推板移动,推板移动带动多个推杆同时推动混凝土,混凝土产生反作用力使得模板与混凝土脱离,从而实现模板与混凝土脱离,而且通过多个推杆同时推动混凝土,从而降低了对混凝土造成损伤的概率,因此提高了模板和混凝土分开时便利性,因此提高施工效率同时也提高了施工的质量。By adopting the above-mentioned technical scheme, the pusher component starts to drive the push plate to move, and the push plate moves to drive multiple push rods to push the concrete at the same time, and the concrete generates a reaction force to separate the formwork from the concrete, thereby realizing the separation of the formwork from the concrete, and through multiple push rods at the same time Push the concrete, thereby reducing the probability of damage to the concrete, thus improving the convenience when the formwork and concrete are separated, thus improving the construction efficiency and the quality of the construction.

可选的,所述推动组件包括:Optionally, the pushing components include:

推动螺母,所述推动螺母设置在推板上;push the nut, the push nut is arranged on the push plate;

推动螺杆,所述推动螺杆转动设置在模板上且与推动螺母螺纹连接;Pushing the screw rod, the said pushing screw rod is rotatably arranged on the template and threadedly connected with the push nut;

推动盘,所述推动盘设置在推动螺杆底端上,当所述推杆与模板上表面齐平时,所述推动螺母抵压在推动盘上进行定位,而所述推动盘与模板之间形成有能供推板移动的活动空间。A push plate, the push plate is arranged on the bottom end of the push screw, when the push rod is flush with the upper surface of the formwork, the push nut presses against the push plate for positioning, and the push plate and the formwork form a There is a movable space for the push plate to move.

通过采用上述技术方案,推动螺杆转动带动推板上移使得混凝土与模板分开,同时推板抵压在模板上进行定位,因此可以根据需要设计推板和模板之间活动空间的大小,从而降低了拧动推动螺杆使得推杆移动距离过大而增大推杆对混凝土造成的损伤,因此在满足将混凝土和模板分开的同时也提高了施工质量;同时当推杆和模板上表面齐平时,推动螺母抵压在推动盘上进行定位,因此使得推杆回移后位置一定,从而使得模板上表面和推杆顶端形成水平的平面,降低了混凝土进入推杆和模板之间间隙而将推杆和模板连接在一起的概率,因此提高了拆除模板时的便利性,以此来提高了施工效率。By adopting the above technical scheme, the rotation of the push screw drives the push plate to move to separate the concrete from the formwork, and at the same time the push plate presses against the formwork for positioning, so the size of the movable space between the push plate and the formwork can be designed according to the needs, thereby reducing the concrete and formwork. Turning the push screw makes the push rod move too far and increases the damage caused by the push rod to the concrete. Therefore, the construction quality is improved while the concrete and the formwork are separated; at the same time, when the push rod is flush with the upper surface of the formwork, the push rod The nut is pressed against the push plate for positioning, so that the position of the push rod is fixed after it moves back, so that the upper surface of the formwork and the top of the push rod form a horizontal plane, reducing the concrete entering the gap between the push rod and the formwork and the push rod and the formwork. The probability that the formwork is connected together improves the convenience of removing the formwork, thereby improving the construction efficiency.

可选的,所述推杆顶端设置有用于推动混凝土的推盘,所述推盘直径大于推杆直径且滑移穿设在推板上,所述推盘外侧壁上还设置有防磨损层。Optionally, the top of the push rod is provided with a push plate for pushing concrete, and the diameter of the push plate is larger than the diameter of the push rod and is slid on the push plate, and the outer wall of the push plate is also provided with an anti-wear layer .

通过采用上述技术方案,推盘增大了推杆与混凝土的接触面积,从而降低了对混凝土造成损伤的概率,提高了施工质量;同时防磨损层降低了推盘移动中受到磨损的概率,因此降低了混凝土浇注时进入推盘与模板之间间隙而将推盘和模板连接在一起的概率,从而降低了混凝土的损耗同时也提高了混凝土和模板分拆时的便利性;推盘的设置也减少了设置防磨损层的面积,因此推盘在提高施工质量同时也降低了成本。By adopting the above technical scheme, the push plate increases the contact area between the push rod and the concrete, thereby reducing the probability of damage to the concrete and improving the construction quality; at the same time, the anti-wear layer reduces the probability of wear during the movement of the push plate, so It reduces the probability of connecting the push plate and the formwork by entering the gap between the push plate and the formwork when pouring concrete, thereby reducing the loss of concrete and improving the convenience of separating the concrete and formwork; the setting of the push plate also The area for setting the anti-wear layer is reduced, so the push plate improves the construction quality and also reduces the cost.

可选的,所述收卷组件包括:Optionally, the winding assembly includes:

收卷辊,所述收卷辊转动设置在支撑架上且用于收卷拉绳,所述拉绳两端分别与模板靠近或远离悬挑梁的两侧可拆卸连接;所述支撑架上还设置有驱动收卷辊转动的转动组件;Rewinding roller, the rewinding roller is rotatably arranged on the support frame and is used to rewind the stay rope, and the two ends of the stay rope are detachably connected to the two sides of the formwork that are close to or away from the cantilever beam; There is also a rotating assembly that drives the winding roller to rotate;

锁定盘,所述锁定盘设置在收卷辊上且绕收卷辊轴线圆周阵列设置有多个锁定槽;A locking disc, the locking disc is arranged on the winding roller and is provided with a plurality of locking grooves in a circumferential array around the axis of the winding roller;

锁定杆,所述锁定杆滑移设置在支撑架上且卡接安装在锁定槽上进行定位;a locking rod, the locking rod is slidably arranged on the support frame and clamped and installed on the locking groove for positioning;

锁定螺杆,所述锁定螺杆螺纹连接在支撑架上且与锁定杆转动连接并使得锁定杆抵压在锁定槽上进行定位。A locking screw, the locking screw is threadedly connected to the support frame and is rotatably connected to the locking rod so that the locking rod presses against the locking groove for positioning.

通过采用上述技术方案,拧动锁定螺杆带动锁定杆与转动槽脱离,因此收卷辊即能自由转动,然后转动组件启动带动收卷辊转动,收卷辊转动用于收卷或放出拉绳,拆除时放出拉绳以便于模板的拆卸,而安装时收卷拉绳以便于模板的固定,模板固定完成后,拧动锁定螺杆使得锁定杆卡接且抵紧在转动槽上,以此来实现拉绳的固定,因此拉绳在模板拆卸和安装时都能对模板进行吊装定位,从而提高了模板安装和拆卸的便利性和安全性,而拉绳两端对模板进行定位,从而提高了模板在施工过程中的稳定性。By adopting the above technical scheme, turning the locking screw drives the locking rod to disengage from the rotating groove, so that the winding roller can rotate freely, and then the rotating assembly starts to drive the winding roller to rotate, and the winding roller rotates for winding or releasing the pull rope. Release the drawstring to facilitate the disassembly of the formwork during dismantling, and wind up the drawcord to facilitate the fixation of the formwork during installation. After the formwork is fixed, turn the locking screw so that the locking rod is clamped and pressed against the rotating groove to achieve The stay rope is fixed, so the stay rope can hoist and position the formwork when the formwork is disassembled and installed, thereby improving the convenience and safety of formwork installation and disassembly, and the two ends of the stay rope can position the formwork, thereby improving the formwork Stability during construction.

可选的,所述支撑架上设置有与锁定杆连接的连接弹簧,所述锁定杆上开设有容纳槽,所述锁定螺杆伸至容纳槽内且开设有环形的环形槽,所述锁定杆上螺纹连接有伸至环形槽内的防脱螺杆。Optionally, the support frame is provided with a connecting spring connected to the locking rod, and the locking rod is provided with a receiving groove, and the locking screw extends into the receiving groove and is provided with an annular groove, and the locking rod The upper screw connection is provided with an anti-off screw rod extending into the annular groove.

通过采用上述技术方案,需要转动收卷辊时,拧动防脱螺杆与环形槽脱离,然后拧动锁定螺杆与容纳槽脱离,然后转动组件启动带动收卷辊转动,收卷辊转动带动锁定盘转动,锁定盘转动挤压锁定杆使得锁定杆与锁定槽脱离,而转动组件停止转动后,锁定杆在连接弹簧作用下卡接安装到锁定槽上进行定位,从而降低了收卷辊发生回转的概率,因此无需人工对收卷辊进行定位,因此提高了转动收卷辊带动拉绳移动时的便利性,移动完成后,拧动锁定螺杆抵压到容纳槽槽底上进行定位,然后拧动防脱螺杆伸至缓冲槽内进行定位,以此来实现对拉绳进行定位。By adopting the above-mentioned technical scheme, when it is necessary to rotate the winding roller, turn the anti-loosening screw to disengage from the annular groove, then turn the locking screw to disengage from the receiving groove, and then start the rotating assembly to drive the winding roller to rotate, and the rotation of the winding roller drives the locking disc Rotate, the locking disc rotates and squeezes the locking rod so that the locking rod is separated from the locking groove, and after the rotating assembly stops rotating, the locking rod is clamped and installed on the locking groove under the action of the connecting spring for positioning, thereby reducing the rotation of the winding roller. Probability, so there is no need to manually position the winding roller, so it improves the convenience when turning the winding roller to drive the pull cord to move. The anti-off screw rod extends into the buffer groove for positioning, so as to realize the positioning of the stay rope.

而需要拆卸模板时,拧动锁定螺杆转动带动锁定杆与锁定槽脱离,因此收卷辊能自由转动,然后推动机构启动将模板和混凝土分开,而固定螺杆能对模板进行定位,然后拧动防脱螺杆与环形槽脱离,锁定杆即能在连接弹簧作用下卡接安装在锁定槽上进行定位,因此拉绳对模板进行定位,然后即能取下固定螺杆和固定螺母,接着将拉绳和模板分拆后即能取下模板,因此固定螺杆和拉绳相互交替对模板进行定位,从而提高了模板拆装时的便利性和安装性。When the formwork needs to be disassembled, turn the locking screw to drive the locking rod to disengage from the locking groove, so the winding roller can rotate freely, and then the pushing mechanism starts to separate the formwork from the concrete, and the fixing screw can position the formwork, and then turn the anti- The take-off screw is separated from the annular groove, and the locking rod can be clamped and installed on the locking groove under the action of the connecting spring for positioning, so the pull rope can position the template, and then the fixing screw and the fixing nut can be removed, and then the pull rope and the template can be removed. The formwork can be removed after being disassembled, so the fixing screw rods and pull ropes alternately position the formwork, thereby improving the convenience and installation of the formwork during disassembly and assembly.

可选的,所述模板上设置有两个吊环,所述拉绳两端上设置有勾设到吊环上的挂钩,所述屋面楼顶上设置有对支撑架进行支撑分力的分力组件。Optionally, two suspension rings are provided on the template, hooks hooked to the suspension rings are provided at both ends of the stay rope, and a force component for supporting the support frame is provided on the roof .

通过采用上述技术方案,将挂钩勾设到吊环上进行定位,从而提高了拉绳连接到模板上时的便利性,分力组件对支撑架进行支撑分力,从而提高了支撑架的稳定性,因此提高了对模板的支撑效果,以此来提高了施工的稳定性。By adopting the above technical solution, the hook is hooked to the suspension ring for positioning, thereby improving the convenience when the stay rope is connected to the formwork, and the force component supports the support frame, thereby improving the stability of the support frame. Therefore, the supporting effect on the formwork is improved, thereby improving the stability of the construction.

可选的,所述转动组件包括:Optionally, the rotating assembly includes:

副齿轮,所述副齿轮设置在收卷辊上;A pinion gear, the pinion gear is arranged on the winding roller;

主齿轮,所述主齿轮转动设置在支撑架上且与副齿轮啮合,所述主齿轮齿数大于副齿轮齿数。The main gear, the main gear is rotatably arranged on the support frame and meshes with the auxiliary gear, and the number of teeth of the main gear is greater than the number of teeth of the auxiliary gear.

通过采用上述技术方案,转动主齿轮转动带动副齿轮转动,副齿轮转动带动收卷辊转动,以此来实现转动主齿轮带动收卷辊转动,而主齿轮齿数达到副齿轮齿数,从而使得转动收卷辊时省力。By adopting the above technical scheme, rotating the main gear drives the auxiliary gear to rotate, and the rotation of the auxiliary gear drives the winding roller to rotate, so as to realize the rotation of the main gear to drive the winding roller to rotate, and the number of teeth of the main gear reaches the number of teeth of the auxiliary gear, so that the rotation of the winding roller Save effort when rolling the roller.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

通过固定组件将模板固定安装到悬挑梁上,然后将拉绳与模板连接在一起,然后收卷组件启动拉紧模板对模板进行支撑定位,接着在模板上浇注混凝土,因此不会对下层结构施工造成不利影响,从而提高施工效率;而等混凝土结构强度达到后,解锁固定组件将模板和混凝土分拆开,然后推动机构推动混凝土使得混凝土和模板脱离,从而节省了拆除模板所花费的时间,因此进一步提高施工效率。The formwork is fixedly installed on the cantilever beam through the fixing component, and then the stay rope is connected with the formwork, and then the winding component starts to tighten the formwork to support and position the formwork, and then pours concrete on the formwork, so that the substructure will not be damaged The construction will cause adverse effects, thereby improving the construction efficiency; after the concrete structure strength is reached, the fixed components will be unlocked to separate the formwork from the concrete, and then the pushing mechanism will push the concrete to separate the concrete from the formwork, thereby saving the time spent on removing the formwork. Therefore, the construction efficiency is further improved.

附图说明Description of drawings

图1是本申请的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present application;

图2是本申请中固定组件的结构示意图,其中对主框架和悬挑梁的进行了剖视;Fig. 2 is a structural schematic diagram of the fixed assembly in the present application, wherein the main frame and the cantilever beam are cut-away;

图3是本申请中推动机构的结构示意图,其中对主框架、模体板和推板的进行了剖视;Fig. 3 is the structural representation of pushing mechanism among the present application, wherein carried out section to main frame, template body plate and push plate;

图4是本申请中支撑架和分力组件的结构示意图;Fig. 4 is a structural schematic diagram of a support frame and a force component in the present application;

图5是本申请中收卷组件的结构示意图;Fig. 5 is a schematic structural view of the winding assembly in the present application;

图6是图5中A部的放大示意图。FIG. 6 is an enlarged schematic view of part A in FIG. 5 .

附图标记:1、悬挑梁;11、固定孔;12、连接弹簧;13、防脱螺杆;14、固定座;15、转动杆;16、活动空间;17、屋面楼顶;2、模板;21、主框架;22、模体板;23、安装孔;3、固定组件;31、固定螺杆;32、固定凸台;33、固定螺母;35、第一定位环;36、第二定位环;4、推动机构;41、推板;42、推杆;43、滑移孔;44、容纳孔;45、推盘;5、推动组件;51、推动螺母;52、推动螺杆;53、推动盘;54、推动柱;6、支撑机构;61、支撑架;62、拉绳;63、第一挂杆;64、第二挂杆;65、吊环;66、挂钩;7、收卷组件;71、收卷辊;72、锁定盘;73、锁定杆;74、锁定螺杆;75、锁定槽;76、第一安装板;77、第二安装板;78、容纳槽;8、转动组件;81、副齿轮;82、主齿轮;83、摇杆;9、分力组件;91、分力架;92、第一分力拉索;93、第二分力拉索;94、第三分力拉索;95、第四分力拉索。Reference signs: 1, cantilever beam; 11, fixing hole; 12, connecting spring; 13, anti-loosening screw; 14, fixed seat; 15, rotating rod; 16, activity space; 17, roof; 2, template 21, main frame; 22, template body plate; 23, mounting hole; 3, fixed assembly; 31, fixed screw rod; 32, fixed boss; 33, fixed nut; 35, first positioning ring; 36, second positioning Ring; 4, push mechanism; 41, push plate; 42, push rod; 43, sliding hole; 44, accommodation hole; 45, push plate; 5, push assembly; 51, push nut; 52, push screw rod; 53, Push plate; 54, push column; 6, support mechanism; 61, support frame; 62, drawstring; 63, first hanging rod; 64, second hanging rod; 65, suspension ring; 66, hook; 7, winding assembly ; 71, winding roller; 72, locking disc; 73, locking rod; 74, locking screw; 75, locking groove; 76, first mounting plate; 77, second mounting plate; 78, receiving groove; 8, rotating assembly ; 81, secondary gear; 82, main gear; 83, rocker; 9, force component; 91, force frame; 92, first force component cable; Component force cable; 95, the fourth component force cable.

具体实施方式Detailed ways

以下结合附图对1-6对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with drawings 1-6.

本申请实施例公开一种楼顶屋面大挑檐支模结构。The embodiment of the present application discloses a formwork support structure for large overhanging eaves on a roof.

参照图1,楼顶屋面大挑檐支模结构包括通过固定组件3设置在悬挑梁1侧壁上的模板2、设置在屋面楼顶17上对模板2进行支撑的支撑机构6,模板2还设置有推动混凝土的推动机构4。Referring to Fig. 1, the formwork support structure of the large roof overhanging eaves includes a formwork 2 arranged on the side wall of the cantilever beam 1 through a fixed assembly 3, a support mechanism 6 arranged on the roof 17 to support the formwork 2, and the formwork 2 A pushing mechanism 4 for pushing concrete is also provided.

参照图1和图2,模板2包括主框架21和模体板22,主框架21由四个角钢固定安装连接形成呈长方体状的框架机构,且主框架21在竖直方向上的投影呈“口”字形;而模体板22固定安装在主框架21的上表面上,且模体板22也呈长方体状,同时模体板22四个侧壁分别与主框架21的四个侧壁齐平,且模体板22和主框架21长度方向的侧壁与悬挑梁1侧壁接触;模体板22上表面和悬挑梁1侧壁形成用于浇注混凝土的浇注空间,向浇注空间内浇注混凝土形成屋面大挑檐,大挑檐与悬挑梁1固定连接在一起,而且模体板22和主框架21结构的形状和尺寸还能根据大挑檐的形状尺寸不同进行匹配。Referring to Fig. 1 and Fig. 2, the template 2 includes a main frame 21 and a template body plate 22, the main frame 21 is fixedly installed and connected by four angle steels to form a rectangular parallelepiped frame mechanism, and the projection of the main frame 21 in the vertical direction is " and the template body plate 22 is fixedly installed on the upper surface of the main frame 21, and the template body plate 22 is also in the shape of a cuboid, and the four side walls of the template body plate 22 are respectively flush with the four side walls of the main frame 21 flat, and the formwork plate 22 and the side walls in the length direction of the main frame 21 are in contact with the sidewalls of the cantilever beam 1; the upper surface of the formwork plate 22 and the sidewall of the cantilever beam 1 form a pouring space for pouring concrete. In-pouring concrete forms the large overhanging eaves of the roof, which are fixedly connected with the cantilever beam 1, and the shape and size of the formwork plate 22 and the main frame 21 structure can also be matched according to the shape and size of the overhanging eaves.

参照图1和图2,主框架21靠近悬挑梁1一侧的内侧壁上开设有安装孔23,而悬挑梁1侧壁上开设有轴线和安装孔23轴线重合的固定孔11,固定组件3沿主框架21长度方向间隔设置有多个。1 and 2, the main frame 21 is provided with a mounting hole 23 on the inner wall near the cantilever beam 1 side, and the cantilever beam 1 side wall is provided with a fixing hole 11 whose axis coincides with the axis of the mounting hole 23. There are multiple components 3 arranged at intervals along the length direction of the main frame 21 .

参照图1和图2,固定组件3包括固定螺杆31、固定凸台32和固定螺母33,而固定螺杆31直径和固定孔11直径相同且小于安装孔23直径,固定凸台32呈圆台状且同轴开设有螺纹孔,且螺纹孔螺纹连接在固定螺杆31上,而固定凸台32抵紧在固定螺杆31头部上进行定位,同时固定凸台32靠近固定螺杆31头部一端直径大于安装孔23直径,而固定凸台32远离固定螺杆31头部一端直径小于安装孔23直径,固定螺杆31穿过安装孔23和固定孔11;固定螺母33螺纹连接在固定螺杆31上,且固定螺母33抵紧在悬挑梁1背离主框架21一侧的侧壁上,同时使得固定凸台32抵压在安装孔23上进行定位,因此固定螺杆31和安装孔23之间存有能活动的间隙。1 and 2, the fixing assembly 3 includes a fixing screw 31, a fixing boss 32 and a fixing nut 33, and the fixing screw 31 has the same diameter as the fixing hole 11 and is smaller than the diameter of the mounting hole 23, and the fixing boss 32 is in the shape of a truncated cone and A threaded hole is provided coaxially, and the threaded hole is threadedly connected to the fixed screw rod 31, and the fixed boss 32 is pressed against the head of the fixed screw rod 31 for positioning, and the diameter of the end of the fixed boss 32 near the head of the fixed screw rod 31 is larger than that Hole 23 diameter, and fixed boss 32 is away from fixed screw rod 31 head end diameters less than mounting hole 23 diameters, and fixing screw rod 31 passes mounting hole 23 and fixing hole 11; 33 is pressed against the side wall of the cantilever beam 1 away from the side of the main frame 21, and at the same time the fixed boss 32 is pressed against the mounting hole 23 for positioning, so there is a movable gap between the fixing screw 31 and the mounting hole 23. gap.

参照图1和图2,固定凸台32外侧壁上同轴固定安装有第一定位环35和第二定位环36,且第一定位环35位于第二定位环36靠近固定螺杆31头部一侧,而第二定位环36卡接安装在安装孔23上进行支撑定位,且第一定位环35在固定螺母33作用下抵压在主框架21侧壁上进行定位。Referring to Fig. 1 and Fig. 2, the first positioning ring 35 and the second positioning ring 36 are coaxially fixedly installed on the outer wall of the fixed boss 32, and the first positioning ring 35 is located near the head of the second positioning ring 36 near the fixed screw rod 31. side, and the second positioning ring 36 is clamped and installed on the mounting hole 23 for supporting and positioning, and the first positioning ring 35 is pressed against the side wall of the main frame 21 for positioning under the action of the fixing nut 33 .

参照图1和图2,将固定螺杆31依次穿过安装孔23和固定孔11,使得第二定位环36卡接安装到固定孔11上进行支撑,而第一定位环35抵触在主框架21内侧壁上,然后将固定螺母33螺纹连接到固定螺杆31上,使得固定螺母33抵紧在悬挑梁1上,而第一定位环35抵压在主框架21侧壁上进行定位;然后向浇注空间内浇注混凝土,使得混凝土与悬挑梁1连接在一起;混凝土结构强度达到后,拧动固定螺母33远离悬挑梁1,然后敲击固定螺杆31使得第二定位环36与安装孔23脱离,因此主框架21因为固定螺杆31与安装孔23之间存在间隙而能下移,然后推动机构4启动推动混凝土,使得模体板22和混凝土分开,然后继续拆除固定螺杆31和固定螺母33,从而即能实现整个模板2的拆卸。1 and 2, the fixing screw 31 is sequentially passed through the mounting hole 23 and the fixing hole 11, so that the second positioning ring 36 is clamped and installed on the fixing hole 11 for support, while the first positioning ring 35 is in contact with the main frame 21 On the inner side wall, then the fixed nut 33 is threadedly connected to the fixed screw rod 31, so that the fixed nut 33 is pressed against the cantilever beam 1, and the first positioning ring 35 is pressed against the main frame 21 side wall for positioning; Pouring concrete in the pouring space, so that the concrete and the cantilever beam 1 are connected together; after the concrete structure strength is reached, screw the fixing nut 33 away from the cantilever beam 1, and then knock the fixing screw 31 to make the second positioning ring 36 and the installation hole 23 Detach, so the main frame 21 can move down because there is a gap between the fixing screw rod 31 and the mounting hole 23, then the pushing mechanism 4 starts to push the concrete, so that the formwork plate 22 and the concrete are separated, and then continue to remove the fixing screw rod 31 and the fixing nut 33 , so that the entire formwork 2 can be disassembled.

参照图1和图3,推动机构4包括推板41、多个推杆42和推动组件5,推板41呈长方体状且四个侧壁与主框架21四个侧壁抵触,从而使得推板41能竖向滑移安装在主框架21内侧壁上,且推板41位于固定螺杆31上方;模体板22上表面上水平间隔开设有多个贯穿模体板22的滑移孔43,而每个滑移孔43顶端同轴开设有容纳孔44;多个推杆42固定安装在推板41上表面上,且多个推杆42与多个滑移孔43一一对应设置,同时多个推杆42呈竖直状态,且推杆42滑移穿设在滑移孔43上;推杆42顶端上同轴固定安装在推盘45,且推盘45直径大于推杆42直径,同时推盘45滑移穿设在容纳孔44上,且推盘45外侧壁上设置有降低磨损的防磨损层,而防磨损层直径和容纳孔44直径相同,同时推盘45顶端和模体板22上表面齐平时,推盘45底端抵触在容纳孔44底端上。Referring to Fig. 1 and Fig. 3, the pushing mechanism 4 comprises a push plate 41, a plurality of push rods 42 and a push assembly 5, the push plate 41 is in the shape of a cuboid and the four side walls interfere with the four side walls of the main frame 21, so that the push plate 41 can be vertically slidably installed on the inner wall of the main frame 21, and the push plate 41 is located above the fixed screw rod 31; The top of each sliding hole 43 is coaxially provided with an accommodating hole 44; a plurality of push rods 42 are fixedly mounted on the upper surface of the push plate 41, and the plurality of push rods 42 are arranged in one-to-one correspondence with the plurality of sliding holes 43. Two push rods 42 are in a vertical state, and the push rod 42 slides and passes through the sliding hole 43; the top end of the push rod 42 is coaxially fixed on the push plate 45, and the diameter of the push plate 45 is greater than the diameter of the push rod 42, and at the same time The push plate 45 slides and is installed on the accommodation hole 44, and the outer wall of the push plate 45 is provided with an anti-wear layer that reduces wear, and the diameter of the anti-wear layer is the same as the diameter of the accommodation hole 44, while the top of the push plate 45 and the template plate When the upper surface of 22 is flush, the bottom end of the push plate 45 is in contact with the bottom end of the receiving hole 44 .

参照图1和图3,推动组件5设置在模板2上且用于驱动推板41移动,推动组件5包括推动螺母51、推动螺杆52和推动盘53;推动螺母51固定安装在推板41下表面上,推动螺杆52顶端转动安装在模体板22下表面上,且推动螺杆52竖向穿过推板41,同时推动螺杆52与推动螺母51螺纹连接,且推动螺杆52底端伸至推动螺母51下方;推动盘53上表面上同轴固定安装有推动柱54,且推动柱54顶端与推动螺杆52底端同轴连接;当推盘45顶端和模体板22上表面上齐平时,推板41上表面和模板2下表面之间形成有活动空间16,且活动空间16以供推板41上下移动,同时推动螺母51抵紧在推动柱54上进行定位。Referring to Fig. 1 and Fig. 3, push assembly 5 is arranged on template 2 and is used for driving push plate 41 to move, push assembly 5 comprises push nut 51, push screw rod 52 and push plate 53; Push nut 51 is fixedly installed under push plate 41 On the surface, the top of the push screw 52 is rotated and installed on the lower surface of the template body plate 22, and the push screw 52 passes through the push plate 41 vertically, and the push screw 52 is threaded with the push nut 51 simultaneously, and the bottom end of the push screw 52 extends to the push plate 41. Below the nut 51; on the upper surface of the push plate 53, a push post 54 is coaxially fixedly installed, and the top of the push post 54 is coaxially connected with the bottom end of the push screw rod 52; A movable space 16 is formed between the upper surface of the push plate 41 and the lower surface of the template 2, and the movable space 16 is used for the push plate 41 to move up and down, and the push nut 51 is pressed against the push column 54 for positioning.

参照图1和图3,转动推动盘53转动带动推板41上移,推板41上移带动推杆42和推盘45上移,而混凝土固定,从而使得模体板22下移与混凝土脱离,然后回转使得推板41和推盘45下移,而推板41抵压到推动柱54上时,推盘45顶端和模体板22上表面齐平,以此来实现将混凝土和模板2分开。Referring to Fig. 1 and Fig. 3, the rotation of the push plate 53 drives the push plate 41 to move upward, and the upward movement of the push plate 41 drives the push rod 42 and the push plate 45 to move upward, while the concrete is fixed, so that the formwork plate 22 moves downward and is separated from the concrete. , and then rotate to make the push plate 41 and the push plate 45 move down, and when the push plate 41 is pressed against the push column 54, the top of the push plate 45 is flush with the upper surface of the formwork plate 22, so as to realize the concrete and the formwork 2 separate.

参照图1和图4,支撑机构6包括支撑架61、拉绳62和收卷组件7,支撑架61固定安装在屋面楼顶17上表面上,屋面楼顶17上设置有对支撑架61进行支撑分力的分力组件9,分力组件9包括分力架91、第一分力拉索92、第二分力拉索93、第三分力拉索94、第四分力拉索95,分力架91固定安装在屋面楼顶17上表面上,而分力架91位于支撑架61远离模板2一侧,且分力架91形状和尺寸大小和支撑架61一样,同时分力架91和支撑架61均由多个槽钢通过螺杆和螺母固定连接在一起,且分力架91和支撑架61底部也通过螺杆与屋面楼顶17固定连接;第一分力拉索92一端固定安装在支撑架61侧壁上,而第二分力拉索93固定安装在分力架91侧壁上,同时第一分力拉索92和第二分力拉索93另一端均与屋面楼顶17固定连接,第一分力拉索92和第二分力拉索93顶端与分力架91之间的角度大于或等于45度;第三分力拉索94和第四分力拉索95两端均固定安装在支撑架61和分力架91相对一侧的侧壁上,且第三分力拉索94和第四分力拉索95之间相互交叉配合形成“X”形,以此来实现对支撑架61受到的拉力进行分力。With reference to Fig. 1 and Fig. 4, support mechanism 6 comprises support frame 61, stay cord 62 and winding assembly 7, and support frame 61 is fixedly installed on the upper surface of roof 17, and roof roof 17 is provided with support frame 61. The force component assembly 9 supporting the force component, the force component assembly 9 includes a force component frame 91, a first force component cable 92, a second force component cable 93, a third force component cable 94, and a fourth force component cable 95 , the component frame 91 is fixedly installed on the upper surface of the roof 17, and the component frame 91 is located on the side of the support frame 61 away from the formwork 2, and the shape and size of the component frame 91 are the same as the support frame 61, while the component frame 91 and the support frame 61 are all fixedly connected together by a plurality of channel steels through screw rods and nuts, and the bottom of the force component frame 91 and the support frame 61 is also fixedly connected with the roof 17 by screw rods; Installed on the side wall of the support frame 61, and the second force component cable 93 is fixedly installed on the side wall of the force component frame 91, while the other ends of the first force component cable 92 and the second force component cable 93 are connected to the roof floor. The top 17 is fixedly connected, and the angle between the top of the first force component cable 92 and the second component force cable 93 and the component frame 91 is greater than or equal to 45 degrees; the third component force cable 94 and the fourth component force cable Both ends of 95 are fixedly installed on the side wall on the opposite side of the support frame 61 and the force component frame 91, and the third component force cable 94 and the fourth component force cable 95 are cross-fitted to form an "X" shape, In this way, the force component of the pulling force on the support frame 61 is realized.

参照图1,主框架21长度方向两端的侧壁上均固定安装有第一挂杆63和第二挂杆64,且第一挂杆63位于第二挂杆64远离支撑架61一侧,且第一挂杆63和第二挂杆64顶端均竖向伸至模体板22和屋面楼顶17上方并均固定安装有吊环65;拉绳62设置有两个且与主框架21两端一一对应设置,拉绳62安装在支撑架61上且两端均固定安装有挂钩66,且两个挂钩66分别勾设在位于第一挂杆63和第二挂杆64的吊环65上,因此位于主框架21两端处的两个拉绳62共同对主框架21和模体板22进行定位。Referring to Fig. 1 , the side walls at both ends of the main frame 21 in the length direction are fixed with a first hanging rod 63 and a second hanging rod 64, and the first hanging rod 63 is located on the side away from the second hanging rod 64 away from the support frame 61, and The first hanging rod 63 and the second hanging rod 64 tops all vertically extend to the top of the formwork panel 22 and the roof 17 and are fixedly equipped with a suspension ring 65; One corresponding setting, the stay rope 62 is installed on the support frame 61 and both ends are fixedly equipped with a hook 66, and the two hooks 66 are respectively hooked on the suspension ring 65 located at the first hanging rod 63 and the second hanging rod 64, so The two pull cords 62 located at both ends of the main frame 21 jointly position the main frame 21 and the template plate 22 .

参照图1和图5,支撑架61靠近主框架21一侧的侧壁上沿主框架21长度方向间隔固定安装有两个固定座14,收卷组件7设置在两个固定座14上且用于收卷或放出拉绳62,收卷组件7包括收卷辊71、锁定盘72、锁定杆73和锁定螺杆74;两个固定座14相对一侧的侧壁水平转动安装有转动杆15,且转动杆15轴线和主框架21长度方向平行;收卷辊71设置有两个且与两个拉绳62一一对应设置,两个收卷辊71均同轴固定在转动杆15上,而两个拉绳62分别卷绕在两个收卷辊71上,因此收卷辊71转动同时放出拉绳62或者收卷拉绳62,使得拉绳62两端同时移动。Referring to Fig. 1 and Fig. 5, on the side wall of the support frame 61 close to the side of the main frame 21, two fixed seats 14 are fixedly installed at intervals along the length direction of the main frame 21, and the winding assembly 7 is arranged on the two fixed seats 14 and used For rewinding or releasing the pull cord 62, the rewinding assembly 7 includes a rewinding roller 71, a locking disc 72, a locking rod 73 and a locking screw 74; And the axis of the rotating rod 15 is parallel to the length direction of the main frame 21; there are two winding rollers 71 corresponding to the two stay cords 62, and the two winding rollers 71 are coaxially fixed on the rotating rod 15, and The two pull cords 62 are respectively wound on the two take-up rollers 71 , so the take-up rollers 71 rotate and release the stay rope 62 or wind up the stay rope 62 at the same time, so that both ends of the stay rope 62 move simultaneously.

参照图1和图5,转动杆15其中一端穿出固定座14外,固定座14还设置有驱动收卷辊71转动的转动组件8,转动组件8包括副齿轮81和主齿轮82,副齿轮81键连接在转动杆15穿出固定座14外的一端上,而主齿轮82转动安装在固定座14侧壁上,且主齿轮82与副齿轮81啮合,同时主齿轮82齿数大于副齿轮81齿数,且主齿轮82上固定安装有便于转动主齿轮82的摇杆83。Referring to Fig. 1 and Fig. 5, one end of the rotating rod 15 passes outside the fixed seat 14, and the fixed seat 14 is also provided with a rotating assembly 8 that drives the winding roller 71 to rotate. The rotating assembly 8 includes a pinion gear 81 and a main gear 82, and the pinion gear 81 keys are connected to the end of the rotating rod 15 passing out of the fixed seat 14, and the main gear 82 is rotatably mounted on the side wall of the fixed seat 14, and the main gear 82 meshes with the auxiliary gear 81, and the number of teeth of the main gear 82 is greater than that of the auxiliary gear 81 Teeth number, and the rocking bar 83 that is convenient to rotate main gear 82 is fixedly installed on main gear 82.

参照图5和图6,锁定盘72同轴固定安装在转动杆15穿出固定座14外的一端上,锁定盘72位于副齿轮81和固定座14之间,且锁定盘72绕收卷辊71轴线圆周阵列开设有多个锁定槽75,同时锁定槽75呈半圆弧状,且锁定槽75槽口处也开设有倒圆角;位于锁定盘72上方的固定座14侧壁上竖向间隔固定安装有第一安装板76和第二安装板77,且第一安装板76位于第二安装板77下方;锁定杆73竖向滑移穿设在第一安装板76上,且锁定杆73顶端上开设有圆形的容纳槽78。Referring to Fig. 5 and Fig. 6, the locking disc 72 is coaxially and fixedly installed on one end of the rotating rod 15 passing through the fixing seat 14, the locking disc 72 is located between the pinion gear 81 and the fixing seat 14, and the locking disc 72 is wound around the winding roller A plurality of locking grooves 75 are provided in the circumferential array of the 71 axis, and the locking grooves 75 are in the shape of a semicircle arc, and rounded corners are also provided at the openings of the locking grooves 75; The first mounting plate 76 and the second mounting plate 77 are installed, and the first mounting plate 76 is located below the second mounting plate 77; the locking rod 73 vertically slides through the first mounting plate 76, and the top end of the locking rod 73 A circular accommodating groove 78 is opened thereon.

参照图1和图5,第二安装板77下表面上固定安装有与锁定杆73顶端固定连接的连接弹簧12,且锁定杆73底端在连接弹簧12作用下卡接安装在锁定槽75上;锁定螺杆74竖向穿过第二安装板77上表面,且锁定螺杆74与第二安装板77螺纹连接,同时锁定螺杆74穿过连接弹簧12伸至容纳槽78内且抵压在容纳槽78槽底上;位于容纳槽78内的锁定螺杆74上同轴开设有环形的环形槽,锁定杆73上螺纹连接有伸至环形槽内的防脱螺杆13,防脱螺杆13用于阻挡锁定螺杆74与锁定杆73脱离,同时锁定螺杆74由于环形槽使得能与锁定杆73相对转动,而锁定螺杆74用于阻挡锁定杆73与锁定槽75脱离,同时拧动防脱螺杆13与环形槽脱离后即能将锁定螺杆74与锁定杆73分开。1 and 5, the lower surface of the second mounting plate 77 is fixedly installed with the connecting spring 12 fixedly connected to the top end of the locking rod 73, and the bottom end of the locking rod 73 is clamped and installed on the locking groove 75 under the action of the connecting spring 12 ; The locking screw 74 vertically passes through the upper surface of the second mounting plate 77, and the locking screw 74 is threadedly connected with the second mounting plate 77, while the locking screw 74 passes through the connecting spring 12 and extends into the receiving groove 78 and presses against the receiving groove On the bottom of 78 grooves; on the locking screw rod 74 in the accommodation groove 78, an annular annular groove is coaxially provided with, and the locking rod 73 is threadedly connected with an anti-off screw rod 13 extending into the annular groove, and the anti-off screw rod 13 is used to block the locking Screw rod 74 disengages from locking rod 73, while locking screw rod 74 can rotate relative to locking rod 73 due to the annular groove, and locking screw rod 74 is used to stop locking rod 73 from disengaging from locking groove 75, and twist the anti-off screw rod 13 and annular groove simultaneously After disengaging, the locking screw 74 can be separated from the locking rod 73 .

参照图1、图5和图6,需要自动转动收卷辊71时,拧动锁定螺杆74带动锁定杆73与锁定槽75脱离,因此收卷辊71即能自由转动,收卷辊71转动带动拉绳62收卷拉动模板2上移,当模板2即将到达预定位置时,拧动防脱螺杆13与环形槽脱离,因此锁定杆73在连接弹簧12作用下卡接安装到锁定槽75上,然后继续转动收卷辊71上移模板2,收卷辊71转动能使得锁定杆73与锁定槽75脱离,以此来实现收卷辊71转动,因此收卷辊71转动完成后即被锁定杆73锁定,从而降低了收卷辊71回转的概率,然后固定模板2,接着继续收卷拉绳62使得拉绳62张紧,接着拧动锁定螺杆74抵压到容纳槽78槽底上,最后拧动防脱螺杆13伸至环形槽内,以此来实现对拉绳62和模板2进行定位。Referring to Fig. 1, Fig. 5 and Fig. 6, when it is necessary to automatically rotate the take-up roller 71, turn the lock screw 74 to drive the lock lever 73 to disengage from the lock groove 75, so the take-up roller 71 can rotate freely, and the turn of the take-up roller 71 drives The stay cord 62 is rewound and pulls the template 2 to move upwards. When the template 2 is about to reach the predetermined position, the anti-loosening screw 13 is turned to disengage from the annular groove, so the locking rod 73 is clamped and installed on the locking groove 75 under the action of the connecting spring 12. Then continue to rotate the winding roller 71 to move up the template 2, and the rotation of the winding roller 71 can make the locking lever 73 break away from the locking groove 75, so as to realize the rotation of the winding roller 71, so that the winding roller 71 is locked by the locking lever after the rotation of the winding roller 71 is completed. 73 locking, thereby reducing the probability of winding roll 71 rotation, then fix the template 2, then continue to wind the stay cord 62 so that the stay cord 62 is tensioned, then turn the locking screw 74 to press against the bottom of the accommodation groove 78, and finally Turn the anti-off screw rod 13 to extend into the annular groove, so as to realize the positioning of the stay cord 62 and the template 2 .

参照图1、图2和图6,需要拆除模板2时,拧动锁定螺杆74带动锁定杆73与锁定槽75脱离,然后拧动固定螺母33远离悬挑梁1,然后敲击固定螺杆31使得第二定位环36与安装孔23脱离,然后推动机构4启动推动模体板22与混凝土脱离,接着拧动防脱螺杆13与环形槽脱离,锁定杆73卡接安装到锁定槽75上进行定位,然后即能取下固定螺杆31和固定螺母33,接着即能取下拉绳62上的挂钩66,以此来实现模板2的拆卸。Referring to Fig. 1, Fig. 2 and Fig. 6, when the formwork 2 needs to be removed, turn the locking screw 74 to drive the locking rod 73 to disengage from the locking groove 75, then turn the fixing nut 33 away from the cantilever beam 1, and then tap the fixing screw 31 so that The second positioning ring 36 is disengaged from the mounting hole 23, and then the pushing mechanism 4 is started to push the template plate 22 to disengage from the concrete, and then the anti-loosening screw 13 is turned to disengage from the annular groove, and the locking rod 73 is clamped and installed on the locking groove 75 for positioning , and then the fixing screw 31 and the fixing nut 33 can be taken off, and then the hook 66 on the pull rope 62 can be taken off, so as to realize the disassembly of the template 2 .

本申请实施例的工作原理为:The working principle of the embodiment of the present application is:

将拉绳62两端的挂钩66勾设位于主框架21同一端的两个吊环65,而同时将另一个拉绳62两端挂钩66勾设到另外两个吊环65上,转动主齿轮82带动收卷辊71转动带动模板2上移,上移到预定位置后,锁定杆73在连接弹簧12作用下卡接安装在锁定槽75上进行定位,然后推动主框架21上移,然后将固定螺杆31穿过安装孔23和固定孔11,使得第二定位环36卡接安装到安装孔23上,然后将固定螺母33螺纹连接到固定螺杆31上,使得固定螺母33抵紧在悬挑梁1上,而第一定位环35抵压在主框架21上进行定位,然后继续转动主齿轮82使得拉绳62张紧,锁定杆73卡接安装到锁定槽75上进行定位,然后拧动锁定螺杆74抵紧在容纳槽78槽底上用于对锁定杆73进行定位,然后在模体板22上浇注混凝土。Hook the hooks 66 at both ends of the stay rope 62 to the two suspension rings 65 located at the same end of the main frame 21, and at the same time hook the hooks 66 at the two ends of the other stay rope 62 to the other two suspension rings 65, and rotate the main gear 82 to drive the winding The rotation of the roller 71 drives the template 2 to move up. After moving up to the predetermined position, the locking rod 73 is clamped and installed on the locking groove 75 under the action of the connecting spring 12 for positioning, and then the main frame 21 is pushed to move up, and then the fixing screw 31 is passed through. Through the mounting hole 23 and the fixing hole 11, the second positioning ring 36 is clamped and installed on the mounting hole 23, and then the fixing nut 33 is screwed to the fixing screw rod 31, so that the fixing nut 33 is pressed against the cantilever beam 1, The first positioning ring 35 presses against the main frame 21 for positioning, and then continues to rotate the main gear 82 to make the stay rope 62 tense, and the locking rod 73 is clamped and installed on the locking groove 75 for positioning, and then the locking screw 74 is turned to resist. It is used to locate the locking rod 73 on the bottom of the receiving groove 78, and then concrete is poured on the formwork plate 22.

混凝土结构强度达到后,拧动锁定螺杆74带动锁定杆73与锁定槽75脱离,因此收卷辊71能自由转动,拧动固定螺母33远离悬挑梁1,然后敲击固定螺杆31使得第二定位环36与安装孔23脱离,然后拧动推动盘53带动推板41和多个推盘45上移,多个推盘45同时推动混凝土,使得模体板22下移而与混凝土分开,而固定螺杆31用于对模板2进行阻挡定位,然后拧动防脱螺杆13与缓冲槽脱离,而锁定杆73在连接弹簧12作用下卡接安装到锁定盘72上对拉绳62进行定位,然后即能拆卸固定螺杆31和固定螺母33,而拉绳62对模板2进行定位,最后将挂钩66从吊环65上取下即能完成模板2的拆卸,从而实现屋面大挑檐的施工,因此提高了施工效率和施工质量。After the strength of the concrete structure is reached, turn the locking screw rod 74 to drive the locking rod 73 to disengage from the locking groove 75, so the winding roller 71 can rotate freely, turn the fixing nut 33 away from the cantilever beam 1, and then knock the fixing screw rod 31 to make the second Locating ring 36 breaks away from mounting hole 23, and then twisting push plate 53 drives push plate 41 and a plurality of push plates 45 to move up, and a plurality of push plates 45 pushes concrete simultaneously, makes template body plate 22 move down and separates with concrete, and The fixing screw 31 is used to block and position the template 2, and then turn the anti-loosening screw 13 to disengage from the buffer groove, and the locking rod 73 is clamped and installed on the locking disc 72 under the action of the connecting spring 12 to position the stay rope 62, and then That is, the fixing screw 31 and the fixing nut 33 can be disassembled, and the stay rope 62 positions the formwork 2, and finally the hook 66 can be removed from the suspension ring 65 to complete the disassembly of the formwork 2, thereby realizing the construction of large overhanging eaves on the roof. Improve construction efficiency and construction quality.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (10)

1.一种楼顶屋面大挑檐支模结构,其特征在于:包括通过固定组件(3)设置在悬挑梁(1)上的模板(2)、设置在屋面楼顶(17)上且用于对模板(2)进行支撑的支撑机构(6),所述模板(2)上还设置有驱动模板(2)与混凝土脱离的推动机构(4),所述支撑机构(6)包括:1. A roof formwork structure with large overhanging eaves, characterized in that it includes a formwork (2) set on the cantilever beam (1) through a fixing component (3), set on the roof (17) and A support mechanism (6) for supporting the template (2), the template (2) is also provided with a push mechanism (4) that drives the template (2) to separate from the concrete, and the support mechanism (6) includes: 支撑架(61),所述支撑架(61)设置在屋面楼顶(17)上;A support frame (61), the support frame (61) is arranged on the roof (17); 拉绳(62),所述拉绳(62)设置在模板(2)上且与支撑架(61)连接并用于对模板(2)进行支撑;A stay rope (62), the stay rope (62) is arranged on the formwork (2) and connected with the support frame (61) and used to support the formwork (2); 收卷组件(7),所述收卷组件(7)设置在支撑架(61)上且用于收卷或放出拉绳(62)。The winding assembly (7), the winding assembly (7) is arranged on the support frame (61) and is used for winding or releasing the pull rope (62). 2.根据权利要求1所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述模板(2)上开设有安装孔(23),所述固定组件(3)包括:2. A formwork support structure for large overhanging eaves on roofs and roofs according to claim 1, characterized in that: the formwork (2) is provided with installation holes (23), and the fixing component (3) includes: 固定螺杆(31),所述固定螺杆(31)穿过安装孔(23)和悬挑梁(1)且直径小于安装孔(23)直径;A fixing screw (31), the fixing screw (31) passes through the installation hole (23) and the cantilever beam (1) and has a diameter smaller than that of the installation hole (23); 固定凸台(32),所述固定凸台(32)设置在固定螺杆(31)上且呈倾斜的圆台状并抵压在安装孔(23)上进行定位;The fixed boss (32), the fixed boss (32) is arranged on the fixed screw rod (31) and has an inclined circular truncated shape and presses against the mounting hole (23) for positioning; 固定螺母(33),所述固定螺母(33)螺纹连接在固定螺杆(31)上且抵紧在悬挑梁(1)上进行定位。A fixing nut (33), the fixing nut (33) is threadedly connected to the fixing screw rod (31) and pressed against the cantilever beam (1) for positioning. 3.根据权利要求2所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述固定凸台(32)通过螺纹孔螺纹连接在固定螺杆(31)上且抵紧在固定螺杆(31)头部上进行定位;所述固定凸台(32)设置有抵压在模板(2)侧壁上的第一定位环(35)和卡接安装在安装孔(23)上的第二定位环(36)。3. A formwork support structure for large roof eaves according to claim 2, characterized in that: the fixed boss (32) is threadedly connected to the fixed screw rod (31) through a threaded hole and pressed against the fixed Positioning on the head of the screw (31); the fixed boss (32) is provided with a first positioning ring (35) pressed against the side wall of the formwork (2) and a snap-fit mounting ring (35) mounted on the mounting hole (23). Second positioning ring (36). 4.根据权利要求1所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述推动机构(4)包括:4. A formwork support structure for roof overhanging eaves according to claim 1, characterized in that: the pushing mechanism (4) includes: 推板(41),所述推板(41)滑移设置在模板(2)上;a push plate (41), the push plate (41) is slidably arranged on the template (2); 多个推杆(42),多个所述推杆(42)设置在推板(41)上且滑移穿设在模板(2)上并用于推动模板(2)与混凝土脱离;A plurality of push rods (42), the plurality of push rods (42) are arranged on the push plate (41) and slide through the formwork (2) to push the formwork (2) away from the concrete; 推动组件(5),所述推动组件(5)设置在模板(2)上且用于驱动推板(41)移动。A push assembly (5), the push assembly (5) is arranged on the template (2) and is used to drive the push plate (41) to move. 5.根据权利要求4所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述推动组件(5)包括:5. A formwork support structure for roof overhanging eaves according to claim 4, characterized in that: the push assembly (5) includes: 推动螺母(51),所述推动螺母(51)设置在推板(41)上;Pushing the nut (51), the pushing nut (51) is arranged on the push plate (41); 推动螺杆(52),所述推动螺杆(52)转动设置在模板(2)上且与推动螺母(51)螺纹连接;Pushing the screw (52), the pushing screw (52) is rotatably arranged on the template (2) and threadedly connected with the pushing nut (51); 推动盘(53),所述推动盘(53)设置在推动螺杆(52)底端上,当所述推杆(42)与模板(2)上表面齐平时,所述推动螺母(51)抵压在推动盘(53)上进行定位,而所述推动盘(53)与模板(2)之间形成有能供推板(41)移动的活动空间(16)。Push plate (53), the push plate (53) is set on the bottom end of the push screw (52), when the push rod (42) is flush with the upper surface of the template (2), the push nut (51) Positioning is carried out by pressing on the push plate (53), and a movable space (16) for the movement of the push plate (41) is formed between the push plate (53) and the template (2). 6.根据权利要求4所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述推杆(42)顶端设置有用于推动混凝土的推盘(45),所述推盘(45)直径大于推杆(42)直径且滑移穿设在推板(41)上,所述推盘(45)外侧壁上还设置有防磨损层。6. A formwork support structure for roof overhanging eaves according to claim 4, characterized in that: the top of the push rod (42) is provided with a push plate (45) for pushing concrete, and the push plate ( 45) The diameter is larger than the diameter of the push rod (42) and is slipped on the push plate (41), and the outer wall of the push plate (45) is also provided with an anti-wear layer. 7.根据权利要求1所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述收卷组件(7)包括:7. The roof formwork support structure with large overhanging eaves according to claim 1, characterized in that: the rolling assembly (7) includes: 收卷辊(71),所述收卷辊(71)转动设置在支撑架(61)上且用于收卷拉绳(62),所述拉绳(62)两端分别与模板(2)靠近或远离悬挑梁(1)的两侧可拆卸连接;所述支撑架(61)上还设置有驱动收卷辊(71)转动的转动组件(8);Rewinding roller (71), the rewinding roller (71) is rotatably arranged on the support frame (61) and is used for rewinding the drawstring (62), and the two ends of the drawstring (62) are respectively connected with the template (2) The two sides close to or far from the cantilever beam (1) are detachably connected; the support frame (61) is also provided with a rotating assembly (8) that drives the winding roller (71) to rotate; 锁定盘(72),所述锁定盘(72)设置在收卷辊(71)上且绕收卷辊(71)轴线圆周阵列设置有多个锁定槽(75);A locking disc (72), the locking disc (72) is arranged on the winding roller (71) and is provided with a plurality of locking grooves (75) in a circumferential array around the axis of the winding roller (71); 锁定杆(73),所述锁定杆(73)滑移设置在支撑架(61)上且卡接安装在锁定槽(75)上进行定位;A locking lever (73), the locking lever (73) is slidably disposed on the support frame (61) and clamped and installed on the locking groove (75) for positioning; 锁定螺杆(74),所述锁定螺杆(74)螺纹连接在支撑架(61)上且与锁定杆(73)转动连接并使得锁定杆(73)抵压在锁定槽(75)上进行定位。A locking screw (74), the locking screw (74) is threadedly connected to the support frame (61) and is rotatably connected to the locking rod (73) so that the locking rod (73) presses against the locking groove (75) for positioning. 8.根据权利要求7所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述支撑架(61)上设置有与锁定杆(73)连接的连接弹簧(12),所述锁定杆(73)上开设有容纳槽(78),所述锁定螺杆(74)伸至容纳槽(78)内且开设有环形的环形槽,所述锁定杆(73)上螺纹连接有伸至环形槽内的防脱螺杆(13)。8. A formwork support structure for large roof overhanging eaves according to claim 7, characterized in that: the support frame (61) is provided with a connecting spring (12) connected to the locking rod (73), so that There is a receiving groove (78) on the locking rod (73), the locking screw rod (74) extends into the receiving groove (78) and is provided with an annular groove, and the locking rod (73) is threaded with an extension to the anti-loosening screw (13) in the annular groove. 9.根据权利要求7所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述模板(2)上设置有两个吊环(65),所述拉绳(62)两端上设置有勾设到吊环(65)上的挂钩(66),所述屋面楼顶(17)上设置有对支撑架(61)进行支撑分力的分力组件(9)。9. A formwork support structure for large overhanging eaves on roofs and roofs according to claim 7, characterized in that: the formwork (2) is provided with two suspension rings (65), and the two ends of the stay rope (62) A hook (66) hooked to the suspension ring (65) is provided on the top, and a force component (9) for supporting the support frame (61) is provided on the roof (17). 10.根据权利要求7所述的一种楼顶屋面大挑檐支模结构,其特征在于:所述转动组件(8)包括:10. A formwork support structure for large roof overhanging eaves according to claim 7, characterized in that: the rotating assembly (8) includes: 副齿轮(81),所述副齿轮(81)设置在收卷辊(71)上;A pinion gear (81), the pinion gear (81) is arranged on the winding roller (71); 主齿轮(82),所述主齿轮(82)转动设置在支撑架(61)上且与副齿轮(81)啮合,所述主齿轮(82)齿数大于副齿轮(81)齿数。The main gear (82), the main gear (82) is rotatably arranged on the support frame (61) and meshes with the auxiliary gear (81), the number of teeth of the main gear (82) is greater than the number of teeth of the auxiliary gear (81).
CN202310019797.9A 2023-01-06 2023-01-06 A large overhanging eaves formwork structure for roof Active CN116084684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310019797.9A CN116084684B (en) 2023-01-06 2023-01-06 A large overhanging eaves formwork structure for roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310019797.9A CN116084684B (en) 2023-01-06 2023-01-06 A large overhanging eaves formwork structure for roof

Publications (2)

Publication Number Publication Date
CN116084684A true CN116084684A (en) 2023-05-09
CN116084684B CN116084684B (en) 2025-01-28

Family

ID=86200441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310019797.9A Active CN116084684B (en) 2023-01-06 2023-01-06 A large overhanging eaves formwork structure for roof

Country Status (1)

Country Link
CN (1) CN116084684B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19858186A1 (en) * 1998-01-16 1999-07-22 Domesle Stahlverschalungs Gmbh Formwork for concreting cantilevered concrete components, especially caps, cornices and superstructures
US20080060283A1 (en) * 2006-09-13 2008-03-13 Michael Aranda Concrete eave system
US20080203252A1 (en) * 2007-02-28 2008-08-28 Brand Services, Llc Overhang bracket
CN208844915U (en) * 2018-09-03 2019-05-10 中国华西企业有限公司 A hanging seat and a climbing formwork device
CN212050299U (en) * 2020-09-30 2020-12-01 江阴市亚杰环保设备有限公司 Anti-reversion device for manual winch of converter gas cabinet
CN115522731A (en) * 2022-11-03 2022-12-27 中铁建工集团有限公司 A system and construction method for early demolition and support of formwork by suspension method in the construction of cantilevered structures
CN218205711U (en) * 2022-09-15 2023-01-03 中北华宇建筑工程公司 Hang and pick board die block structure convenient to form removal
CN115559588A (en) * 2022-11-24 2023-01-03 中国二十二冶集团有限公司 Construction Method of Using Sliding Form Support Rod to Support Overhanging Eaves Formwork on Silo Roof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19858186A1 (en) * 1998-01-16 1999-07-22 Domesle Stahlverschalungs Gmbh Formwork for concreting cantilevered concrete components, especially caps, cornices and superstructures
US20080060283A1 (en) * 2006-09-13 2008-03-13 Michael Aranda Concrete eave system
US20080203252A1 (en) * 2007-02-28 2008-08-28 Brand Services, Llc Overhang bracket
CN208844915U (en) * 2018-09-03 2019-05-10 中国华西企业有限公司 A hanging seat and a climbing formwork device
CN212050299U (en) * 2020-09-30 2020-12-01 江阴市亚杰环保设备有限公司 Anti-reversion device for manual winch of converter gas cabinet
CN218205711U (en) * 2022-09-15 2023-01-03 中北华宇建筑工程公司 Hang and pick board die block structure convenient to form removal
CN115522731A (en) * 2022-11-03 2022-12-27 中铁建工集团有限公司 A system and construction method for early demolition and support of formwork by suspension method in the construction of cantilevered structures
CN115559588A (en) * 2022-11-24 2023-01-03 中国二十二冶集团有限公司 Construction Method of Using Sliding Form Support Rod to Support Overhanging Eaves Formwork on Silo Roof

Also Published As

Publication number Publication date
CN116084684B (en) 2025-01-28

Similar Documents

Publication Publication Date Title
JP5026936B2 (en) Derrick for steel tower assembly / disassembly and removal method
CN116084684A (en) A roof formwork support structure with large overhanging eaves
CN109057309A (en) A kind of suspended operating platform and its mounting and dismounting method
CN114481863B (en) Wave form steel web bridge cantilever construction auxiliary assembly
CN218911158U (en) Telescopic and lifting bearing device for hollow pier diaphragm construction
CN111486397A (en) Solar street lamp convenient to dismantle
CN115807538A (en) Comprehensive library high formwork supporting system and construction method
CN211084009U (en) Stage lighting fixing device
CN205558249U (en) Steel pipe scaffold
CN118874112B (en) A kind of urban high-altitude rotary spray dust suppression device
CN209970667U (en) Roller type photovoltaic glass assembly platform
CN115450120B (en) Large-span walking type steel box girder pushing construction equipment
CN113215990A (en) Construction device and method for quickly dismantling prefabricated bent cap bottom formwork
CN105735665A (en) Horizontal-shifting preventing method and horizontal limiting device for high-rise building jacking deviation correction
CN119308420B (en) A multi-transformation high-rise structure system and construction control method
CN208763390U (en) A suspended operating platform
CN221801394U (en) A monitoring device for building construction
CN115045500B (en) A beam-slab combined support frame
CN115788016B (en) Floor formwork system and building method of house construction
CN219137321U (en) Inclined plane template supporting system
CN223374080U (en) Platform template and supporting bench die
CN209052313U (en) The support construction of overhang steel
CN221002242U (en) Can have enough to meet need wire rope and enclose fender
CN221590092U (en) Integrated ceiling
CN220723218U (en) Horizontal cable unreeling disc

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant