|
US7240537B2
(en)
*
|
2001-08-02 |
2007-07-10 |
Eni S.P.A. |
Method for the determination of the wall friction profile along pipes by pressure transients measurements
|
|
JP4291659B2
(ja)
*
|
2003-09-30 |
2009-07-08 |
パナソニック株式会社 |
送信装置及び送信方法
|
|
US20050284659A1
(en)
*
|
2004-06-28 |
2005-12-29 |
Hall David R |
Closed-loop drilling system using a high-speed communications network
|
|
US7983846B2
(en)
*
|
2004-09-14 |
2011-07-19 |
The Trustees Of Columbia University In The City Of New York |
Systems and methods for determining in-situ gas hydrate saturation
|
|
GB2438333B
(en)
*
|
2005-01-31 |
2008-12-17 |
Baker Hughes Inc |
Apparatus and method for mechanical caliper measurements during drilling and logging-while-drilling operations
|
|
US7142986B2
(en)
*
|
2005-02-01 |
2006-11-28 |
Smith International, Inc. |
System for optimizing drilling in real time
|
|
US20060180349A1
(en)
*
|
2005-02-16 |
2006-08-17 |
Baker Hughes Incorporated |
Time and depth correction of MWD and wireline measurements using correlation of surface and downhole measurements
|
|
US20060254764A1
(en)
*
|
2005-05-10 |
2006-11-16 |
Zuilekom Anthony H V |
Wireless sensor in a downhole operation
|
|
GB0522015D0
(en)
*
|
2005-10-28 |
2005-12-07 |
Intellitect Water Ltd |
Improvements in or relating to sensing apparatus
|
|
GB2436872A
(en)
*
|
2006-04-06 |
2007-10-10 |
Qinetiq Ltd |
Fibre-optic sensor package
|
|
CA2544457C
(en)
*
|
2006-04-21 |
2009-07-07 |
Mostar Directional Technologies Inc. |
System and method for downhole telemetry
|
|
US7798246B2
(en)
*
|
2006-05-30 |
2010-09-21 |
Schlumberger Technology Corporation |
Apparatus and method to control the rotation of a downhole drill bit
|
|
US7505871B2
(en)
*
|
2006-08-11 |
2009-03-17 |
Varco I/P, Inc. |
Diagnosis and troubleshooting for above-ground well systems
|
|
US9359882B2
(en)
|
2006-09-27 |
2016-06-07 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations and simulations
|
|
WO2008039523A1
(en)
*
|
2006-09-27 |
2008-04-03 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations and simulations
|
|
US7548817B2
(en)
*
|
2006-09-28 |
2009-06-16 |
Baker Hughes Incorporated |
Formation evaluation using estimated borehole tool position
|
|
US8190369B2
(en)
|
2006-09-28 |
2012-05-29 |
Baker Hughes Incorporated |
System and method for stress field based wellbore steering
|
|
US8902695B2
(en)
*
|
2006-12-06 |
2014-12-02 |
Baker Hughes Incorporated |
Apparatus and method for clock shift correction for measurement-while-drilling measurements
|
|
US10502051B2
(en)
*
|
2006-12-27 |
2019-12-10 |
Schlumberger Technology Corporation |
Method and apparatus for downloading while drilling data
|
|
US8031081B2
(en)
*
|
2006-12-28 |
2011-10-04 |
Schlumberger Technology Corporation |
Wireless telemetry between wellbore tools
|
|
US7789171B2
(en)
*
|
2007-01-08 |
2010-09-07 |
Halliburton Energy Services, Inc. |
Device and method for measuring a property in a downhole apparatus
|
|
US8504342B2
(en)
|
2007-02-02 |
2013-08-06 |
Exxonmobil Upstream Research Company |
Modeling and designing of well drilling system that accounts for vibrations
|
|
US7688674B2
(en)
*
|
2007-03-05 |
2010-03-30 |
Schlumberger Technology Corporation |
Methods and apparatus for performing moving checkshots
|
|
US8489544B2
(en)
*
|
2007-06-04 |
2013-07-16 |
John P. Ford |
System and method for prioritization and display of aggregated data
|
|
US20080314641A1
(en)
*
|
2007-06-20 |
2008-12-25 |
Mcclard Kevin |
Directional Drilling System and Software Method
|
|
US8244473B2
(en)
*
|
2007-07-30 |
2012-08-14 |
Schlumberger Technology Corporation |
System and method for automated data analysis and parameter selection
|
|
US8447523B2
(en)
*
|
2007-08-29 |
2013-05-21 |
Baker Hughes Incorporated |
High speed data transfer for measuring lithology and monitoring drilling operations
|
|
US20090076873A1
(en)
*
|
2007-09-19 |
2009-03-19 |
General Electric Company |
Method and system to improve engineered system decisions and transfer risk
|
|
US8069932B2
(en)
*
|
2007-11-29 |
2011-12-06 |
Schlumberger Technology Corporation |
Method and apparatus for determining formation pararmeters using a seismic tool array
|
|
US7963323B2
(en)
*
|
2007-12-06 |
2011-06-21 |
Schlumberger Technology Corporation |
Technique and apparatus to deploy a cement plug in a well
|
|
US20090145661A1
(en)
*
|
2007-12-07 |
2009-06-11 |
Schlumberger Technology Corporation |
Cuttings bed detection
|
|
US9638830B2
(en)
*
|
2007-12-14 |
2017-05-02 |
Westerngeco L.L.C. |
Optimizing drilling operations using petrotechnical data
|
|
US8860583B2
(en)
*
|
2008-04-03 |
2014-10-14 |
Baker Hughes Incorporated |
Mud channel characterization over depth
|
|
US20090251993A1
(en)
*
|
2008-04-04 |
2009-10-08 |
Pile Dynamics, Inc. |
Shear wave transducer and method of using the same
|
|
US9038746B2
(en)
*
|
2008-04-07 |
2015-05-26 |
Schlumberger Technology Corporation |
Method for determining wellbore position using seismic sources and seismic receivers
|
|
US10227862B2
(en)
*
|
2008-04-07 |
2019-03-12 |
Schlumberger Technology Corporation |
Method for determining wellbore position using seismic sources and seismic receivers
|
|
US8256534B2
(en)
|
2008-05-02 |
2012-09-04 |
Baker Hughes Incorporated |
Adaptive drilling control system
|
|
WO2009143409A2
(en)
*
|
2008-05-23 |
2009-11-26 |
Martin Scientific, Llc |
Reliable downhole data transmission system
|
|
US20090294174A1
(en)
*
|
2008-05-28 |
2009-12-03 |
Schlumberger Technology Corporation |
Downhole sensor system
|
|
EP2291792B1
(en)
*
|
2008-06-17 |
2018-06-13 |
Exxonmobil Upstream Research Company |
Methods and systems for mitigating drilling vibrations
|
|
US20100082258A1
(en)
*
|
2008-09-26 |
2010-04-01 |
Baker Hughes Incorporated |
System and method for modeling fluid flow profiles in a wellbore
|
|
EP3236384B1
(en)
|
2008-11-21 |
2018-12-05 |
Exxonmobil Upstream Research Company |
Methods and systems for modeling, designing, and conducting drilling operations that consider vibrations
|
|
US20100169019A1
(en)
*
|
2008-12-27 |
2010-07-01 |
Schlumberger Technology Corporation |
Formation evaluation using local dynamic under-balance in perforating
|
|
US8180614B2
(en)
*
|
2008-12-31 |
2012-05-15 |
Schlumberger Technology Corporation |
Modeling vibration effects introduced by mud motor
|
|
US8028764B2
(en)
*
|
2009-02-24 |
2011-10-04 |
Baker Hughes Incorporated |
Methods and apparatuses for estimating drill bit condition
|
|
NO338750B1
(no)
|
2009-03-02 |
2016-10-17 |
Drilltronics Rig Systems As |
Fremgangsmåte og system for automatisert styring av boreprosess
|
|
MY158679A
(en)
*
|
2009-05-27 |
2016-10-31 |
Halliburton Energy Services Inc |
Vibration detection in a drill string based on multi-positioned sensors
|
|
US8731837B2
(en)
*
|
2009-06-11 |
2014-05-20 |
Schlumberger Technology Corporation |
System and method for associating time stamped measurement data with a corresponding wellbore depth
|
|
FR2948145B1
(fr)
|
2009-07-20 |
2011-08-26 |
Vam Drilling France |
Tige de forage et train de tiges de forage correspondant
|
|
US9127530B2
(en)
*
|
2009-08-07 |
2015-09-08 |
Schlumberger Technology Corporation |
Collision avoidance system with offset wellbore vibration analysis
|
|
US20110067882A1
(en)
*
|
2009-09-22 |
2011-03-24 |
Baker Hughes Incorporated |
System and Method for Monitoring and Controlling Wellbore Parameters
|
|
US9482077B2
(en)
*
|
2009-09-22 |
2016-11-01 |
Baker Hughes Incorporated |
Method for controlling fluid production from a wellbore by using a script
|
|
US8261855B2
(en)
|
2009-11-11 |
2012-09-11 |
Flanders Electric, Ltd. |
Methods and systems for drilling boreholes
|
|
WO2011094432A1
(en)
*
|
2010-01-27 |
2011-08-04 |
Halliburton Energy Services, Inc. |
Drilling dynamics monitor
|
|
US8695729B2
(en)
|
2010-04-28 |
2014-04-15 |
Baker Hughes Incorporated |
PDC sensing element fabrication process and tool
|
|
US8746367B2
(en)
|
2010-04-28 |
2014-06-10 |
Baker Hughes Incorporated |
Apparatus and methods for detecting performance data in an earth-boring drilling tool
|
|
US8800685B2
(en)
*
|
2010-10-29 |
2014-08-12 |
Baker Hughes Incorporated |
Drill-bit seismic with downhole sensors
|
|
US8775145B2
(en)
|
2011-02-11 |
2014-07-08 |
Schlumberger Technology Corporation |
System and apparatus for modeling the behavior of a drilling assembly
|
|
BR112013023134A2
(pt)
*
|
2011-03-10 |
2017-04-25 |
Landmark Graphics Corp |
método para monitorar dados de operações para múltiplos poços em tempo real, dispositivo não transitório portador de programa carregando tangivelmente instruções executáveis por computador e dispositivo não transitório portador de programa carregando uma estrutura de dados
|
|
CN102182452B
(zh)
*
|
2011-04-28 |
2014-09-10 |
北京昊科航科技有限责任公司 |
毛细管测压装置
|
|
US9250347B2
(en)
|
2011-06-10 |
2016-02-02 |
Baker Hughes Incorporated |
Method to look ahead of the bit
|
|
US9222350B2
(en)
|
2011-06-21 |
2015-12-29 |
Diamond Innovations, Inc. |
Cutter tool insert having sensing device
|
|
US8973676B2
(en)
|
2011-07-28 |
2015-03-10 |
Baker Hughes Incorporated |
Active equivalent circulating density control with real-time data connection
|
|
US8695692B2
(en)
*
|
2011-07-29 |
2014-04-15 |
Baker Hughes Incorporated |
Downhole condition alert system for a drill operator
|
|
US20130049981A1
(en)
*
|
2011-08-31 |
2013-02-28 |
Baker Hughes Incorporated |
Drilling dynamics data visualization in real time
|
|
US9334723B2
(en)
|
2011-11-15 |
2016-05-10 |
Saudi Arabian Oil Company |
Methods for geosteering a drill bit in real time using surface acoustic signals
|
|
US9593567B2
(en)
|
2011-12-01 |
2017-03-14 |
National Oilwell Varco, L.P. |
Automated drilling system
|
|
CN104094137A
(zh)
*
|
2012-01-06 |
2014-10-08 |
普拉德研究及开发股份有限公司 |
用于地震勘测的光纤井部署
|
|
GB201204815D0
(en)
*
|
2012-03-19 |
2012-05-02 |
Halliburton Energy Serv Inc |
Drilling system failure risk analysis method
|
|
US9953114B2
(en)
|
2012-03-27 |
2018-04-24 |
Exxonmobil Upstream Research Company |
Designing a drillstring
|
|
WO2013154535A1
(en)
|
2012-04-10 |
2013-10-17 |
Halliburton Energy Services, Inc. |
Methods and apparatus for transmission of telemetry data
|
|
US20130327138A1
(en)
*
|
2012-06-07 |
2013-12-12 |
Bennett M. Richard |
Systems and Methods for Distributed Downhole Sensing Using a Polymeric Sensor System
|
|
US9157319B2
(en)
*
|
2012-07-27 |
2015-10-13 |
Landmark Graphics Corporation |
Stratigraphic modeling using production data density profiles
|
|
US9946445B2
(en)
*
|
2012-08-10 |
2018-04-17 |
Landmark Graphics Corporation |
Navigating to failures in drilling system displays
|
|
US9970284B2
(en)
*
|
2012-08-14 |
2018-05-15 |
Schlumberger Technology Corporation |
Downlink path finding for controlling the trajectory while drilling a well
|
|
US9081110B2
(en)
*
|
2012-12-18 |
2015-07-14 |
Schlumberger Technology Corporation |
Devices, systems and methods for low frequency seismic borehole investigations
|
|
US20140169129A1
(en)
*
|
2012-12-18 |
2014-06-19 |
Schlumberger Technology Corporation |
Downhole Receiver Systems and Methods for Low Frequency Seismic Investigations
|
|
EP2749906A1
(en)
|
2012-12-28 |
2014-07-02 |
Services Pétroliers Schlumberger |
Determining seismic sensor orientation in a wellbore
|
|
US9007231B2
(en)
|
2013-01-17 |
2015-04-14 |
Baker Hughes Incorporated |
Synchronization of distributed measurements in a borehole
|
|
US9442243B2
(en)
|
2013-01-30 |
2016-09-13 |
Cree, Inc. |
Waveguide bodies including redirection features and methods of producing same
|
|
US9291320B2
(en)
|
2013-01-30 |
2016-03-22 |
Cree, Inc. |
Consolidated troffer
|
|
US10436969B2
(en)
|
2013-01-30 |
2019-10-08 |
Ideal Industries Lighting Llc |
Optical waveguide and luminaire incorporating same
|
|
US9366396B2
(en)
|
2013-01-30 |
2016-06-14 |
Cree, Inc. |
Optical waveguide and lamp including same
|
|
US9869432B2
(en)
|
2013-01-30 |
2018-01-16 |
Cree, Inc. |
Luminaires using waveguide bodies and optical elements
|
|
US9625638B2
(en)
|
2013-03-15 |
2017-04-18 |
Cree, Inc. |
Optical waveguide body
|
|
US10428637B2
(en)
|
2013-03-04 |
2019-10-01 |
Fereidoun Abbassian |
System and console for monitoring and managing well site operations
|
|
US20180179881A1
(en)
*
|
2013-03-12 |
2018-06-28 |
Chevron U.S.A. Inc. |
System and method for detecting structural integrity of a well casing
|
|
US9798072B2
(en)
|
2013-03-15 |
2017-10-24 |
Cree, Inc. |
Optical element and method of forming an optical element
|
|
US10209429B2
(en)
|
2013-03-15 |
2019-02-19 |
Cree, Inc. |
Luminaire with selectable luminous intensity pattern
|
|
US9366799B2
(en)
|
2013-03-15 |
2016-06-14 |
Cree, Inc. |
Optical waveguide bodies and luminaires utilizing same
|
|
US9429008B2
(en)
|
2013-03-15 |
2016-08-30 |
Smith International, Inc. |
Measuring torque in a downhole environment
|
|
US10379278B2
(en)
*
|
2013-03-15 |
2019-08-13 |
Ideal Industries Lighting Llc |
Outdoor and/or enclosed structure LED luminaire outdoor and/or enclosed structure LED luminaire having outward illumination
|
|
US10502899B2
(en)
*
|
2013-03-15 |
2019-12-10 |
Ideal Industries Lighting Llc |
Outdoor and/or enclosed structure LED luminaire
|
|
RU2613688C1
(ru)
*
|
2013-03-28 |
2017-03-21 |
Шлюмбергер Текнолоджи Б.В. |
Автоматическая оценка скважинного исследования
|
|
US9534475B2
(en)
*
|
2013-05-27 |
2017-01-03 |
Landmark Graphics Corporation |
GUI-facilitated centralizing methods and systems
|
|
US9316758B2
(en)
*
|
2013-05-29 |
2016-04-19 |
Liquid Robotics Oil and Gas LLC |
Earth surveying for improved drilling applications
|
|
US9631446B2
(en)
|
2013-06-26 |
2017-04-25 |
Impact Selector International, Llc |
Impact sensing during jarring operations
|
|
WO2015002905A2
(en)
|
2013-06-30 |
2015-01-08 |
Fereidoun Abbassian |
System and console for monitoring data stream quality in drilling and production operations at a well site
|
|
US11047221B2
(en)
|
2013-06-30 |
2021-06-29 |
Fereidoun Abbassian |
System and console for monitoring and managing well site operations
|
|
WO2015030790A1
(en)
*
|
2013-08-30 |
2015-03-05 |
Halliburton Energy Services, Inc. |
Automating downhole drilling using wellbore profile energy and shape
|
|
FR3010192B1
(fr)
*
|
2013-09-04 |
2017-04-28 |
Ifp Energies Now |
Procede d'exploitation d'un gisement souterrain comprenant au moins un affleurement geologique au moyen d'une photogrammetrie
|
|
US9845671B2
(en)
|
2013-09-16 |
2017-12-19 |
Baker Hughes, A Ge Company, Llc |
Evaluating a condition of a downhole component of a drillstring
|
|
US9260943B2
(en)
|
2013-10-23 |
2016-02-16 |
Schlumberger Technology Corporation |
Tool health evaluation system and methodology
|
|
CA2931099C
(en)
*
|
2013-12-20 |
2019-03-26 |
Halliburton Energy Services, Inc. |
Closed-loop drilling parameter control
|
|
US10209388B2
(en)
*
|
2013-12-20 |
2019-02-19 |
Schlumberger Technology Corporation |
Method and apparatus to generate a crosswell data set
|
|
US9651740B2
(en)
|
2014-01-09 |
2017-05-16 |
Cree, Inc. |
Extraction film for optical waveguide and method of producing same
|
|
SG11201604472PA
(en)
*
|
2014-01-30 |
2016-07-28 |
Landmark Graphics Corp |
Depth range manager for drill string analysis
|
|
US10323502B2
(en)
|
2014-05-02 |
2019-06-18 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing tripping operations at a well site
|
|
US10301923B2
(en)
|
2014-05-02 |
2019-05-28 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing well site drilling operations
|
|
US10436014B2
(en)
|
2014-05-02 |
2019-10-08 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing pressure testing operations at a well site
|
|
US10260332B2
(en)
|
2014-05-02 |
2019-04-16 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing well site operations
|
|
AU2014396852B2
(en)
*
|
2014-06-09 |
2018-05-10 |
Landmark Graphics Corporation |
Employing a target risk attribute predictor while drilling
|
|
US10677041B2
(en)
|
2014-06-16 |
2020-06-09 |
Sensia Llc |
Fault detection in electric submersible pumps
|
|
WO2015200259A1
(en)
*
|
2014-06-23 |
2015-12-30 |
Smith International, Inc. |
Methods for analyzing and optimizing drilling tool assemblies
|
|
CN104181579B
(zh)
*
|
2014-08-12 |
2017-01-25 |
西南科技大学 |
一种全数字三分量vsp系统及其测量方法
|
|
US10053913B2
(en)
*
|
2014-09-11 |
2018-08-21 |
Baker Hughes, A Ge Company, Llc |
Method of determining when tool string parameters should be altered to avoid undesirable effects that would likely occur if the tool string were employed to drill a borehole and method of designing a tool string
|
|
WO2016061376A1
(en)
*
|
2014-10-17 |
2016-04-21 |
Applied Technologies Associates, Inc. |
Active magnetic azimuthal toolface for vertical borehole kickoff in magnetically perturbed environments
|
|
GB2547852B
(en)
*
|
2014-12-09 |
2020-09-09 |
Sensia Netherlands Bv |
Electric submersible pump event detection
|
|
CA2969418C
(en)
*
|
2014-12-31 |
2020-08-18 |
Halliburton Energy Services, Inc. |
Continuous locating while drilling
|
|
US9835025B2
(en)
|
2015-02-16 |
2017-12-05 |
Schlumberger Technology Corporation |
Downhole assembly employing wired drill pipe
|
|
US9951602B2
(en)
|
2015-03-05 |
2018-04-24 |
Impact Selector International, Llc |
Impact sensing during jarring operations
|
|
CA2971712C
(en)
|
2015-03-06 |
2020-07-14 |
Halliburton Energy Services, Inc. |
Optimizing sensor selection and operation for well monitoring and control
|
|
RU2619563C2
(ru)
*
|
2015-03-18 |
2017-05-16 |
Сергей Феодосьевич Коновалов |
Способ азимутальной акустической коррекции инклинометра
|
|
US10544656B2
(en)
|
2015-04-01 |
2020-01-28 |
Schlumberger Technology Corporation |
Active fluid containment for mud tanks
|
|
CA2992710A1
(en)
|
2015-08-27 |
2017-03-02 |
Halliburton Energy Services, Inc. |
Determining sources of erroneous downhole predictions
|
|
US10876391B2
(en)
|
2015-08-27 |
2020-12-29 |
Halliburton Energy Services, Inc. |
Tuning predictions of wellbore operation parameters
|
|
US11053792B2
(en)
|
2015-08-27 |
2021-07-06 |
Halliburton Energy Services, Inc. |
Predicting wellbore operation parameters
|
|
US20170122092A1
(en)
|
2015-11-04 |
2017-05-04 |
Schlumberger Technology Corporation |
Characterizing responses in a drilling system
|
|
US10261209B2
(en)
*
|
2016-02-29 |
2019-04-16 |
China Petroleum & Chemical Corporation |
Near-bit ultradeep measurement system for geosteering and formation evaluation
|
|
US11719882B2
(en)
|
2016-05-06 |
2023-08-08 |
Ideal Industries Lighting Llc |
Waveguide-based light sources with dynamic beam shaping
|
|
US10416377B2
(en)
|
2016-05-06 |
2019-09-17 |
Cree, Inc. |
Luminaire with controllable light emission
|
|
CN106154333B
(zh)
*
|
2016-06-23 |
2018-12-21 |
中国石油集团钻井工程技术研究院 |
一种四分量vsp随钻测量系统及方法
|
|
CN106644446B
(zh)
*
|
2016-12-29 |
2023-04-07 |
中国地质大学(北京) |
推靠式导向钻具执行机构模拟测试装置
|
|
US10472952B2
(en)
*
|
2017-02-22 |
2019-11-12 |
Baker Hughes, A Ge Company, Llc |
Arrangement and method for deploying downhole tools to locate casing collar using xy magnetometers
|
|
US11371314B2
(en)
|
2017-03-10 |
2022-06-28 |
Schlumberger Technology Corporation |
Cement mixer and multiple purpose pumper (CMMP) for land rig
|
|
GB2573694B
(en)
*
|
2017-06-14 |
2022-03-30 |
Landmark Graphics Corp |
Modeling geological strata using weighted parameters
|
|
WO2019147689A1
(en)
|
2018-01-23 |
2019-08-01 |
Baker Hughes, A Ge Company, Llc |
Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods
|
|
RU2720115C1
(ru)
*
|
2018-01-24 |
2020-04-24 |
Общество с ограниченной ответственностью "Геонавигационные технологии" |
Способ автоматизированного процесса геологической проводки скважин и система для его осуществления
|
|
CA3092875C
(en)
|
2018-03-23 |
2024-04-23 |
Conocophillips Company |
Virtual downhole sub
|
|
AU2019242740B2
(en)
*
|
2018-03-27 |
2023-07-06 |
Conocophillips Company |
Data stream controller with configurable barrier for join and aggregation
|
|
US11293275B2
(en)
|
2018-05-04 |
2022-04-05 |
Schlumberger Technology Corporation |
Recording device for measuring downhole parameters
|
|
US10808517B2
(en)
|
2018-12-17 |
2020-10-20 |
Baker Hughes Holdings Llc |
Earth-boring systems and methods for controlling earth-boring systems
|
|
US20200399988A1
(en)
*
|
2019-06-21 |
2020-12-24 |
Schlumberger Technology Corporation |
Rig equipment analysis using a health index
|
|
FR3099589B1
(fr)
*
|
2019-08-01 |
2021-11-05 |
A3Ip |
capteur intelligent autonome de mesure de données physiques d’un milieu comportant au moins un géophone
|
|
WO2021034337A1
(en)
*
|
2019-08-21 |
2021-02-25 |
Landmark Graphics Corporation |
Conveyance deployment systems and methods to deploy conveyances
|
|
CN110567623B
(zh)
*
|
2019-08-31 |
2021-03-09 |
中国石油集团川庆钻探工程有限公司 |
确定水力振荡器在钻具上安装位置的方法
|
|
WO2022072866A1
(en)
*
|
2020-10-02 |
2022-04-07 |
Erdos Miller, Inc. |
Intra-bottom hole assembly (bha) wireless communication system
|
|
US20220268152A1
(en)
*
|
2021-02-22 |
2022-08-25 |
Saudi Arabian Oil Company |
Petro-physical property prediction
|
|
US12264577B2
(en)
*
|
2021-10-06 |
2025-04-01 |
Halliburton Energy Services, Inc. |
Downhole pressure calculation based on strain gauge measurements
|
|
WO2023067391A1
(en)
|
2021-10-22 |
2023-04-27 |
Exebenus AS |
System and method for predicting and optimizing drilling parameters
|
|
US12474494B2
(en)
*
|
2022-11-29 |
2025-11-18 |
Saudi Arabian Oil Company |
Method to determine a time-depth model
|
|
US12326061B2
(en)
|
2023-03-17 |
2025-06-10 |
Schlumberger Technology Corporation |
Methodology and system for utilizing rig mud pump assembly
|
|
CN118622258B
(zh)
*
|
2024-06-25 |
2025-11-14 |
中国石油大学(北京) |
井下测量装置和井下测量方法
|
|
CN120100313B
(zh)
*
|
2025-05-08 |
2025-08-05 |
中国煤炭地质总局勘查研究总院 |
用于矿井水深部地质封存的复合钻井设备及钻井方法
|