[go: up one dir, main page]

Follow
Carl Haas
Carl Haas
Professor of Engineering, University of Waterloo
Verified email at uwaterloo.ca - Homepage
Title
Cited by
Cited by
Year
The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas
Automation in construction 49, 201-213, 2015
6602015
Measuring the impact of rework on construction cost performance
BG Hwang, SR Thomas, CT Haas, CH Caldas
Journal of construction engineering and management 135 (3), 187-198, 2009
5362009
Automated progress tracking using 4D schedule and 3D sensing technologies
Y Turkan, F Bosche, CT Haas, R Haas
Automation in construction 22, 414-421, 2012
5022012
State of research in automatic as-built modelling
V Pătrăucean, I Armeni, M Nahangi, J Yeung, I Brilakis, C Haas
Advanced Engineering Informatics 29 (2), 162-171, 2015
4442015
US construction labor productivity trends, 1970–1998
E Allmon, CT Haas, JD Borcherding, PM Goodrum
Journal of construction engineering and management 126 (2), 97-104, 2000
4122000
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
J Song, CT Haas, C Caldas, E Ergen, B Akinci
Automation in construction 15 (2), 166-177, 2006
3772006
Automated retrieval of 3D CAD model objects in construction range images
F Bosche, CT Haas
Automation in Construction 17 (4), 499-512, 2008
3592008
Tracking the location of materials on construction job sites
J Song, CT Haas, CH Caldas
Journal of construction engineering and management 132 (9), 911-918, 2006
3272006
Tool to design for construction worker safety
JA Gambatese, JW Hinze, CT Haas
Journal of Architectural Engineering 3 (1), 32-41, 1997
3261997
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas
Journal of computing in civil engineering 28 (4), 05014004, 2014
2752014
Assignment and allocation optimization of partially multiskilled workforce
JE Gomar, CT Haas, DP Morton
Journal of construction Engineering and Management 128 (2), 103-109, 2002
2622002
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
J Teizer, CH Caldas, CT Haas
Journal of Construction Engineering and Management 133 (11), 880-888, 2007
2412007
Supplier selection process in an integrated construction materials management model
M Safa, A Shahi, CT Haas, KW Hipel
Automation in construction 48, 64-73, 2014
2292014
Circular economy applications in the construction industry: A global scan of trends and opportunities
BC Guerra, S Shahi, A Mollaei, N Skaf, O Weber, F Leite, C Haas
Journal of cleaner production 324, 129125, 2021
2202021
A novel selective disassembly sequence planning method for adaptive reuse of buildings
B Sanchez, C Haas
Journal of Cleaner Production 183, 998-1010, 2018
2132018
Assessing the impact of materials tracking technologies on construction craft productivity
D Grau, CH Caldas, CT Haas, PM Goodrum, J Gong
Automation in construction 18 (7), 903-911, 2009
2112009
US construction labor productivity trends, 1970–1998
P Teicholz, PM Goodrum, CT Haas
Journal of Construction Engineering and Management 127 (5), 427-429, 2001
2012001
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
F Bosche, CT Haas, B Akinci
Journal of Computing in Civil Engineering 23 (6), 311-318, 2009
1942009
Capital project planning for a circular economy
B Sanchez, C Haas
Construction management and economics 36 (6), 303-312, 2018
1792018
Activity analysis for direct-work rate improvement in construction
MC Gouett, CT Haas, PM Goodrum, CH Caldas
Journal of Construction Engineering and Management 137 (12), 1117-1124, 2011
1772011
The system can't perform the operation now. Try again later.
Articles 1–20