How takt production contributes to construction production flow: a theoretical model
J Lehtovaara, O Seppänen, A Peltokorpi, P Kujansuu, Grönvall, M
Construction Management and Economics, 2020
752020
Implementing Takt Planning and Takt Control Into Residential Construction
J Lehtovaara, I Mustonen, P Peuronen, O Seppänen, A Peltokorpi
Proc. 27th Annual Conference of the International Group for Lean …, 2019
412019
Takt Maturity Model: From Individual Successes Towards Systemic Change in Finland
J Lehtovaara, A Heinonen, R Lavikka, M Ronkainen, P Kujansuu, ...
28th Annual Conference of the International Group for Lean Construction …, 2020
402020
COMBINING TAKT PRODUCTION WITH INDUSTRIALIZED LOGISTICS IN CONSTRUCTION
M Tetik, A Peltokorpi, O Seppänen, A Viitanen, J Lehtovaara
332019
Fostering process innovations in construction through industry–university consortium
R Lavikka, O Seppänen, A Peltokorpi, J Lehtovaara
Construction Innovation 20 (4), 569-586, 2020
262020
So Many Flows!
ID Tommelein, VV Singh, RV Coelho, J Lehtovaara
30th Annual Conference of the International Group for Lean Construction …, 2022
222022
Improving construction management with decentralised production planning and control: exploring the production crew and manager perspectives through a multi-method approach
J Lehtovaara, O Seppänen, A Peltokorpi
Construction Management and Economics, 1-24, 2022
222022
How Does Takt Production Contribute to Trade Flow in Construction?
P Kujansuu, J Lehtovaara, S Salerto, O Seppänen, A Peltokorpi
28th Annual Conference of the International Group for Lean Construction …, 2020
152020
Improving Non-Repetitive Takt Production With Visual Management
M Grönvall, H Ahoste, J Lehtovaara, A Reinbold, O Seppänen
29th Annual Conference of the International Group for Lean Construction …, 2021
132021
Building 2030 - Tahti suunnittelussa ja tuotannossa loppuraportti
J Lehtovaara, O Seppänen, A Heinonen, L Tomunen, I Kulta, P Kujansuu, ...
https://www.aalto.fi/sites/g/files/flghsv161/files/2019-02 …, 2019
132019
Achieving a 4-Hour Takt Time – and Driving Change With It
J Riekki, J Rannisto, J Lehtovaara, O Seppänen, A Peltokorpi
31st Annual Conference of the International Group for Lean Construction …, 2023
112023
Takt Production as Operations Strategy: Client’s Perspective to Value-Creation and Flow
J Lehtovaara, O Heinonen, M Ronkainen, O Seppänen, A Peltokorpi
29th Annual Conference of the International Group for Lean Construction …, 2021
112021
Takt production and decentralized decision-making: improving construction production flow with novel planning & control approaches
J Lehtovaara
Aalto University, 2023
102023
Combining decentralized decision-making and takt production in construction planning and control to increase production flow
J Lehtovaara, O Seppänen, A Peltokorpi, E Lappalainen, P Uusitalo
Frontiers in Built Environment 8, 893790, 2022
102022
DEVELOPING A FRAMEWORK FOR SYSTEMIC TRANSFORMATION OF THE CONSTRUCTION INDUSTRY
A Peltokorpi, O Seppänen, J Lehtovaara, E Pikas, O Alhava
29th Annual Conference of the International Group for Lean Construction …, 2021
102021
Improving the Learning of Design Management Operations by Exploiting Production’s Feedback: Design Science Approach
J Lehtovaara, O Seppänen, A Peltokorpi
Lean Construction Journal, pp. 64-75, 2019
102019
How a Takt Plan Can Fail: Applying Failure Modes and Effects Analysis in Takt Control
J Lehtovaara, ID Tommelein, O Seppänen
30th Annual Conference of the International Group for Lean Construction …, 2022
92022
Building 2030-Hukan mittaaminen suunnittelussa ja tuotannossa loppuraportti
O Seppänen, J Lehtovaara, P Uusitalo, E Lappalainen, A Ruohomäki, ...
Aalto University, Building 2030 project, 2020
82020
Implementing Takt Production in Renovation Projects
J Sahlberg, J Lehtovaara, O Seppänen
29th Annual Conference of the International Group for Lean Construction …, 2021
72021
Comparison of Collaboration and Trade Partner Commitment in Takt Implementation Cases
P Kujansuu, J Lehtovaara, M Grönvall, O Seppänen, A Peltokorpi
Proc. 27th Annual Conference of the International Group for Lean …, 2019
62019