| Location-based management for construction: Planning, scheduling and control R Kenley, O Seppänen Routledge, 2006 | 459 | 2006 |
| The combination of last planner system and location-based management system O Seppänen, G Ballard, S Pesonen Lean construction journal, 43-54, 2010 | 280 | 2010 |
| A shared ontology suite for digital construction workflow Y Zheng, S Törmä, O Seppänen Automation in Construction 132, 103930, 2021 | 141 | 2021 |
| Comparison between location based management and takt time planning AG Frandson, O Seppänen, ID Tommelein Proceedings of the 23rd annual conference of the international group for …, 2015 | 137 | 2015 |
| Direct digital construction: Technology-based operations management practice for continuous improvement of construction industry performance M Tetik, A Peltokorpi, O Seppänen, J Holmström Automation in construction 107, 102910, 2019 | 130 | 2019 |
| Location-based management of construction projects: Part of a new typology for project scheduling methodologies R Kenley, O Seppänen Proceedings of the 2009 Winter Simulation Conference (WSC), 2563-2570, 2009 | 129 | 2009 |
| Empirical research on the success of production control in building construction projects O Seppänen Teknillinen korkeakoulu, 2009 | 125 | 2009 |
| Real-time resource tracking for analyzing value-adding time in construction J Zhao, O Seppänen, A Peltokorpi, B Badihi, H Olivieri Automation in Construction 104, 52-65, 2019 | 123 | 2019 |
| Construction flow index: a metric of production flow quality in construction R Sacks, O Seppänen, V Priven, J Savosnick Construction management and economics 35 (1-2), 45-63, 2017 | 122 | 2017 |
| Categorizing modularization strategies to achieve various objectives of building investments A Peltokorpi, H Olivieri, AD Granja, O Seppänen Construction management and economics 36 (1), 32-48, 2018 | 107 | 2018 |
| Survey comparing critical path method, last planner system, and location-based techniques H Olivieri, O Seppänen, TCL Alves, NM Scala, V Schiavone, M Liu, ... Journal of construction engineering and management 145 (12), 04019077, 2019 | 97 | 2019 |
| Effects of the location-based management system on production rates and productivity O Seppänen, J Evinger, C Mouflard Construction management and economics 32 (6), 608-624, 2014 | 95 | 2014 |
| Improving workflow and resource usage in construction schedules through location-based management system (LBMS) H Olivieri, O Seppänen, A Denis Granja Construction management and economics 36 (2), 109-124, 2018 | 81 | 2018 |
| How takt production contributes to construction production flow: a theoretical model J Lehtovaara, O Seppänen, A Peltokorpi, P Kujansuu, M Grönvall Construction management and economics 39 (1), 73-95, 2021 | 75 | 2021 |
| Ontology-based knowledge representation of industrial production workflow C Yang, Y Zheng, X Tu, R Ala-Laurinaho, J Autiosalo, O Seppänen, ... Advanced Engineering Informatics 58, 102185, 2023 | 68 | 2023 |
| A new perspective of construction logistics and production control: An exploratory study M Ghanem, F Hamzeh, O Seppänen, E Zankoul Annual Conference of the International Group for Lean Construction, 992-1001, 2018 | 68 | 2018 |
| Can ChatGPT exceed humans in construction project risk management? R Nyqvist, A Peltokorpi, O Seppänen Engineering, Construction and Architectural Management 31 (13), 223-243, 2024 | 67 | 2024 |
| Takt time planning in cruise ship cabin refurbishment: Lessons for lean construction A Heinonen, O Seppänen Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, IGLC …, 2016 | 67* | 2016 |
| A comparison of takt time and LBMS planning methods O Seppänen Annual Conference of the International Group for Lean Construction, 2014 | 62 | 2014 |
| A case study of line-of-balance based schedule planning and control system O Seppänen, E Aalto Proceedings of the 13th Annual Conference of the International Group for …, 2005 | 62 | 2005 |