[go: up one dir, main page]

Follow
G Edward Gibson Jr
G Edward Gibson Jr
Professor Emeritus of Construction Management and Engineering, Civil Engineering, Arizona State
Verified email at asu.edu - Homepage
Title
Cited by
Cited by
Year
An empirical comparison of design/build and design/bid/build project delivery methods
G D. R. Hale, Shrestha, P., Gibson G. E., Miggliaccio
Journal of Construction Engineering and Management 135 (7), 2009
4572009
Performance comparison of large design-build and design-bid-build highway projects
PP Shrestha, JT O’Connor, GE Gibson Jr
Journal of construction engineering and management 138 (1), 1-13, 2012
2432012
Building project scope definition using project definition rating index
CS Cho, GE Gibson Jr
Journal of architectural engineering 7 (4), 115-125, 2001
2372001
What is preproject planning, anyway?
GE Gibson Jr, YR Wang, CS Cho, MP Pappas
Journal of management in engineering 22 (1), 35-42, 2006
2142006
Scope management using project definition rating index
PR Dumont, GE Gibson Jr, JR Fish
Journal of management in engineering 13 (5), 54-60, 1997
2091997
A study of preproject planning and project success using ANNs and regression models
YR Wang, GE Gibson Jr
Automation in Construction 19 (3), 341-346, 2010
2082010
Planning for computer integrated construction
Y Jung, GE Gibson
Journal of computing in civil engineering 13 (4), 217-225, 1999
1961999
Partnering-project performance in US Army Corps of Engineers
DC Weston, GE Gibson Jr
Journal of Management in Engineering 9 (4), 410-425, 1993
1791993
Preproject-planning process for capital facilities
GE Gibson Jr, JH Kaczmarowski, HE Lore Jr
Journal of construction engineering and management 121 (3), 312-318, 1995
1711995
Quantification of costs for dispute resolution procedures in the construction industry
RJ Gebken, GE Gibson
Journal of professional issues in engineering education and practice 132 (3 …, 2006
1642006
Benchmarking preproject planning effort
MR Hamilton, GE Gibson Jr
Journal of Management in Engineering 12 (2), 25-33, 1996
1531996
Alignment during preproject planning
AF Griffith, GE Gibson Jr
Journal of Management in Engineering 17 (2), 69-76, 2001
1202001
International project risk assessment: Methods, procedures, and critical factors
J Walewski, G Gibson
Report 31, Center for Construction Industry Studies, University of Texas at …, 2003
116*2003
Project Definition Rating Index (PDRI) for Industrial Projects
GE Gibson, PR Dumont
Source Document 113-11, The Construction Industry Institute, 1995
113*1995
Project success index for capital facility construction projects
AF Griffith, GE Gibson, MR Hamilton, AL Tortora, CT Wilson
Journal of performance of constructed facilities 13 (1), 39-45, 1999
1121999
Serious games for learning prevention through design concepts: An experimental study
ZU Din, GE Gibson Jr
Safety science 115, 176-187, 2019
1092019
Analysis of pre-project planning effort and success variables for capital facility projects
GE Gibson, MR Hamilton
Source Document 105, The Construction Industry Institute, The University of …, 1994
109*1994
Development of a project scope definition and assessment tool for small industrial construction projects
W Collins, K Parrish, GE Gibson Jr
Journal of management in engineering 33 (4), 04017015, 2017
1022017
Benchmarking of large design–build highway projects: One-to-one comparison and comparison with design–bid–build projects
PP Shrestha, GC Migliaccio, JT O'Connor, GE Gibson Jr
Transportation Research Record 1994 (1), 17-25, 2007
1022007
Development of a project definition rating index (PDRI) for general building projects
CS Cho, GE Gibson, Jr
Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000
1002000
The system can't perform the operation now. Try again later.
Articles 1–20