WO2024161066A1 - Mineral material processing plant with multifunctional support legs - Google Patents
Mineral material processing plant with multifunctional support legs Download PDFInfo
- Publication number
- WO2024161066A1 WO2024161066A1 PCT/FI2024/050033 FI2024050033W WO2024161066A1 WO 2024161066 A1 WO2024161066 A1 WO 2024161066A1 FI 2024050033 W FI2024050033 W FI 2024050033W WO 2024161066 A1 WO2024161066 A1 WO 2024161066A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- frame
- transport
- support legs
- mineral material
- actuator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C21/00—Disintegrating plant with or without drying of the material
- B02C21/02—Transportable disintegrating plant
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B07—SEPARATING SOLIDS FROM SOLIDS; SORTING
- B07B—SEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
- B07B1/00—Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
- B07B1/005—Transportable screening plants
Definitions
- the present disclosure generally relates to a mineral material processing plant and a method of operating a mineral material processing plant.
- the disclosure relates particularly, though not exclusively, a mineral material processing plan with multifunctional support legs and a method of bringing a mineral material processing plant to an operating position.
- Crushing mineral material involves large forces and causes significant movement and vibrations to the equipment used. Accordingly, the structures of a mineral material crushing plant need to be sturdy and often heavy, in particular any support legs. Furthermore, any equipment of the crushing plant that is sensitive to vibrations needs to be protected therefrom.
- a frame arrangement for a mineral material processing plant comprising a transport frame comprising a transport base; an actuator frame detachably attached to the transport frame and configured to support an actuator comprising a mineral material crusher or a screen; a set of first support legs, said set of first support legs comprising at least two first support legs; wherein each first support leg is attached to the actuator frame; and each first support leg comprises a hydraulically extendable leg configured to be extended from a transport position to a first position and to a second position; wherein the first position comprises a position in which the transport base is raised from the ground; and the second position comprises a position in which the actuator base is detached from the transport frame and raised above it.
- the frame arrangement for a mineral material processing plant may further comprise a set of second support legs, said set of second support legs comprising at least two second support legs; wherein each second support leg is attached to the transport frame and is configured to be moved from a transport position to an operating position.
- the set of first support legs may comprise at least two pairs of first support legs, each pair of first support legs comprising at least one first support leg on each side of the actuator frame.
- the set of second support legs may comprise at least two pairs of second support legs, each pair of second support legs comprising at least one second support leg on each side of the transport frame.
- the actuator frame may comprise on both ends thereof at least one first frame connector and the transport frame may comprise at least two second frame connectors at positions corresponding to the positions of the first frame connectors in a transport position of the mineral material processing plant, the first and second frame connectors being configured to be detachably attached to each other for detachably attaching the actuator frame to the transport frame.
- the first and second frame connectors may be configured to be detachably attached to each other with a locking pin placed through holes provided in the first and second frame connectors.
- a mineral material processing plant comprising the frame arrangement of the first example aspect; and an actuator comprising a mineral material crusher or a screen.
- the mineral material processing plant may further comprise an electrical center and a conveyor supported on the transport frame.
- a method for bringing a mineral material plant to an operating position comprising raising a transport frame of the mineral material processing plant and an actuator frame detachably attached to the transport frame by extending first support legs from a transport position to a first position in such a way that a transport base of the transport frame is raised off the ground; moving second support legs attached to the transport frame from a transport position to an operating position so that the transport frame is supported on the ground by the second support legs; detaching the actuator frame from the transport frame by detaching first frame connectors attached to the actuator frame from second frame connectors attached to the transport frame; and raising the actuator frame and an actuator supported thereon above the transport frame by extending first support legs from a first position to a second position.
- FIG. 1 schematically shows a mineral material processing plant according to an example embodiment of the invention in a transport position
- Fig. 2 schematically shows a mineral material processing plant according to an example embodiment of the invention in an intermediate position
- Fig. 3 schematically shows a mineral material processing plant according to an example embodiment of the invention in an operating position
- Fig. 4A schematically shows a frame connector of a mineral material processing plant according to an example embodiment of the invention in a transport position
- Fig. 4B schematically shows a frame connector of a mineral material processing plant according to an example embodiment of the invention in an operating position
- Fig. 5 shows a flow chart of a method according to an example embodiment of the invention.
- Fig. 1 schematically shows a mineral material processing plant according to an example embodiment of the invention in a transport position.
- the mineral material processing plant comprises a transport frame 10.
- the transport frame comprises a carriage or a flatbed configured to be town with a vehicle such as a tractor or a truck.
- the transport frame comprises a frame constructed of for example I-beams.
- the transport frame 10 comprises a transport base 20.
- the transport base 20 comprises wheels.
- the transport base comprises tracks.
- the transport base is configured to support the transport frame while the mineral material processing plant is being transported, for example on a road or transported shorter distances at the site on which the plant is being operated.
- the mineral material processing plant 100 further comprises an actuator frame 40.
- the actuator frame supports thereon an actuator 30.
- the actuator 30 comprises a mineral material crusher or a screen.
- the mineral material crusher is a cone crusher or a gyratory crusher.
- the mineral material crusher is a jaw crusher.
- the mineral material processing plant 100 further comprises a set of first support legs comprising at least two first support legs (50a, 50b).
- the set of first support legs comprises at least two pairs of first support legs 50a, 50b.
- Each pair of first support legs 50a, 50b comprises at least one first support leg 50a, 50b on each side of the actuator frame 40.
- each first support leg 50a, 50b is positioned on the inside of the outer edge of the transport frame 10.
- Each first support leg 50a, 50b is attached to the actuator frame in a conventional manner, for example by welding or with a bolt connection.
- the set of first support legs comprises an odd number of first support legs 50a, 50b, for example three first support legs. The number, position and form of the first support legs is chosen in such a way that the first support legs are able to provide the function they are configured for and used for as hereinafter explained.
- Each first support leg comprises a hydraulically extendable leg.
- the hydraulic operation of the first support legs is provided by a hydraulics system comprised in the mineral material processing plant (not shown in Figs.) in a conventional manner.
- Fig. 1 shows the first support legs in their transport position, i.e. the first support legs have been retracted towards the actuator frame 40.
- Each first support leg is configured to be extended from the transport position shown in Fig. 1 to a first, intermediate, position and to a second, operating, position as will be explained in more detail with reference to Figs. 2 and 3 hereinafter.
- the mineral material processing plant 100 further comprises further elements typical to a mineral material processing plant, such as a conveyor 70 and an electrical center 60.
- the mineral material processing plant comprises further elements not shown in the Figures.
- all or substantially all elements other than the actuator 30 and the elements needed in immediate contact therewith, such as the motor for driving the actuator, are supported on the transport frame.
- Fig. 2 schematically shows a mineral material processing plant according to an example embodiment of the invention in an intermediate position.
- the intermediate position of the mineral material processing plant comprises a position in which each first support leg 50a, 50b has been extended to the first position in which the actuator frame 40 and the transport frame 10 attached therewith is raised to such a height that the transport base 20 is raised from the ground.
- the mineral material processing plant 100 further comprises a set of second support legs 80a, 80b comprising at least two second support legs.
- a set of second support legs 80a, 80b comprising at least two second support legs.
- the set of second support legs comprises at least two pairs of second support legs 80a, 80b comprises one second support leg 80a, 80b on each side of the transport frame.
- Each second support leg is attached to the transport frame 10 and is configured to be moved from a transport position to an operating position.
- the set of second support legs comprises an odd number of second support legs 50a, 50b, for example three first support legs. The number, position and form of the second support legs is chosen in such a way that the second support legs are able to carry out the function they are configured for.
- Fig. 2 shows the set of second support legs 80a, 80b in the operating position, i.e. the transport frame is supported on the ground by the second support legs 80a, 80b.
- each second support leg comprises a support leg configured to be pivoted under the transport frame 10 in the transport position and pivoted in an upright position in the operating position and locked in place with conventional means, such as a locking pin.
- each second support leg comprises hydraulically extendable legs.
- locking of each first support leg into the operating position and or the transport position is configured to be caried out automatically, for example using a locking pin actuated with a linear actuator.
- Fig. 3 schematically shows a mineral material processing plant according to an example embodiment of the invention in an operating position.
- the operating position of the mineral material processing plant 100 comprises a position in which the actuator frame 40 has been detached from the transport frame 10 in a manner described hereinafter with reference to Figs. 4A and 4B.
- Each first support leg 50a, 50b has been extended to the second position in which the actuator frame 40 is raised above the transport frame 10 and supported on the ground by the first support legs.
- the detachment of the actuator frame 40 from the transport frame 10 enables supporting the actuator frame 40 and the actuator 30 thereon much closer to the centre of mass thereof and accordingly, the forces that result from the operation of the actuator have an impact on a frame the support points of which are much closer to each other thus reducing any detrimental effect of the forces and decreasing the structural strength requirements of the transport frame 10 and the actuator frame 40. Furthermore, as only the actuator 30 and the elements needed in immediate contact therewith, such as the motor for driving the actuator, are supported on the actuator frame 40, the vibrations caused by the operation of the actuator 30 substantially do not affect further components of the mineral material processing plant 100.
- Fig. 4A schematically shows a frame connector of a mineral material processing plant according to an example embodiment of the invention in a transport position.
- Fig. 4A shows one end of the actuator frame 40 and a part of the transport frame 10.
- Fig. 4A further shows the upper part of a first support leg 50 attached to the actuator frame 40.
- the actuator frame 40 comprises at both ends thereof at least one first frame connector 45.
- the actuator frame comprises at both ands thereof at least two first frame connectors 45, for example on both sides of the actuator frame 30.
- the transport frame 10 comprises at positions corresponding to the position of the actuator frame in the transport position of the mineral material processing plant at least two second frame connectors 15. The number and position of the second frame connectors corresponds to the number and position of the first frame connectors 45.
- the first 45 and second 15 frame connectors each comprise a protrusion with a hole.
- the actuator frame 40 and the transport frame are attached together in the transport position of the mineral material processing plant 100 shown in Fig. 4A by attaching the first 45 and second 15 frame connectors together with a suitable element, such as a locking pin placed through the respective holes.
- a suitable element such as a locking pin placed through the respective holes.
- the locking pin is of a conventional type and installed manually.
- the locking pin is operated automatically for example using a linear actuator.
- first 45 and second 15 frame connectors comprise an arrangement other than holed protrusions.
- the second frame connectors comprise a horizontal bar and the first frame connectors comprise a pivotable hook-shaped latch that is attached to the bar and locked in place.
- Fig. 4B schematically shows a frame connector of a mineral material processing plant according to an example embodiment of the invention in an operating position.
- the first and second frame connectors are separated in the operating position as the actuator frame 30 has been raised above the transport frame 10.
- Fig. 5 shows a flow chart of a method according to an example embodiment of the invention.
- the mineral material processing plant 100 is in a transport position.
- the transport frame 10 and the actuator frame 40 are detachably attached to each other with the first 45 and second 15 frame connectors.
- the transport frame 40 is supported on the ground by the transport base 20.
- the mineral material processing plant 100 is raised to the intermediate position by extending the first support legs to the first position.
- the transport base 20 is raised from the ground.
- the second support legs are moved to the operating position and locked in place either manually or automatically.
- the transport frame 10 is supported on the ground by the second support legs.
- the actuator frame 40 is detached from the transport frame 10 by releasing the first 45 and second 15 frame connectors from each other either manually or automatically. Subsequently, at step 550, the first support legs are extended to the second position and the actuator frame 40 is raised above the transport frame 10 and separated therefrom by predetermined distance chosen according to the situation. The transport frame is supported on the ground by the second support legs and the actuator frame is supported on the ground by the first support legs.
- the mineral material processing plant is at the operating position.
- the steps described hereinbefore are reversed and carried out in reverse order.
- the system according to example embodiments of the invention shown in Figs 1-4B is configured to enable operating a mineral material processing plant in such a way that the detrimental effect of forces resulting from mineral material processing is minimized.
- the system according to example embodiments of the invention shown in Figs. 1-4B is further configured to enable operating a mineral material processing plant in such a way that the detrimental effect of vibrations resulting from mineral material processing is minimized.
- a technical effect of example embodiment of the invention is to minimize the effects of forces and vibrations resulting from mineral material processing.
- a further technical effect of the example embodiments of the invention is to enable lighter structures due to lower structural strength requirements.
- a still further technical effect of the example embodiments of the invention is to increase the lifetime of elements of the mineral material processing plant by reducing their exposure to forces and vibrations.
- a still further technical effect of the example embodiments of the invention is to simplify the structure of the mineral material processing plant by allowing the positioning of sensitive elements integrally with the transport frame.
- words comprise; include; and contain are each used as open-ended expressions with no intended exclusivity.
Landscapes
- Engineering & Computer Science (AREA)
- Food Science & Technology (AREA)
- Disintegrating Or Milling (AREA)
- Cultivation Of Plants (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202480010160.6A CN120677019A (en) | 2023-02-03 | 2024-01-29 | Mineral material processing equipment with multifunctional supporting legs |
| KR1020257029018A KR20250144418A (en) | 2023-02-03 | 2024-01-29 | Mineral processing plant with multi-functional support legs |
| EP24703229.5A EP4658413A1 (en) | 2023-02-03 | 2024-01-29 | Mineral material processing plant with multifunctional support legs |
| AU2024214584A AU2024214584A1 (en) | 2023-02-03 | 2024-01-29 | Mineral material processing plant with multifunctional support legs |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FI20235101 | 2023-02-03 | ||
| FI20235101A FI130716B1 (en) | 2023-02-03 | 2023-02-03 | Mineral material processing plant with multi-purpose support legs |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2024161066A1 true WO2024161066A1 (en) | 2024-08-08 |
Family
ID=89766944
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/FI2024/050033 Ceased WO2024161066A1 (en) | 2023-02-03 | 2024-01-29 | Mineral material processing plant with multifunctional support legs |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP4658413A1 (en) |
| KR (1) | KR20250144418A (en) |
| CN (1) | CN120677019A (en) |
| AU (1) | AU2024214584A1 (en) |
| FI (1) | FI130716B1 (en) |
| WO (1) | WO2024161066A1 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2072532A (en) | 1980-03-19 | 1981-10-07 | Haahjem Mekaniske As | Stone crushing mill |
| US20060186239A1 (en) * | 2005-02-22 | 2006-08-24 | Koontz Steve C | Hydraulic loading and leveling system for heavy equipment |
| WO2017042427A1 (en) | 2015-09-09 | 2017-03-16 | Metso Minerals, Inc. | Split frame |
| WO2019215387A1 (en) | 2018-05-08 | 2019-11-14 | Metso Minerals, Inc. | Mobile screen body and mobile mineral material processing plant with support legs |
-
2023
- 2023-02-03 FI FI20235101A patent/FI130716B1/en active
-
2024
- 2024-01-29 CN CN202480010160.6A patent/CN120677019A/en active Pending
- 2024-01-29 WO PCT/FI2024/050033 patent/WO2024161066A1/en not_active Ceased
- 2024-01-29 KR KR1020257029018A patent/KR20250144418A/en active Pending
- 2024-01-29 AU AU2024214584A patent/AU2024214584A1/en active Pending
- 2024-01-29 EP EP24703229.5A patent/EP4658413A1/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2072532A (en) | 1980-03-19 | 1981-10-07 | Haahjem Mekaniske As | Stone crushing mill |
| US20060186239A1 (en) * | 2005-02-22 | 2006-08-24 | Koontz Steve C | Hydraulic loading and leveling system for heavy equipment |
| WO2017042427A1 (en) | 2015-09-09 | 2017-03-16 | Metso Minerals, Inc. | Split frame |
| WO2019215387A1 (en) | 2018-05-08 | 2019-11-14 | Metso Minerals, Inc. | Mobile screen body and mobile mineral material processing plant with support legs |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20250144418A (en) | 2025-10-10 |
| CN120677019A (en) | 2025-09-19 |
| FI20235101A1 (en) | 2024-02-06 |
| AU2024214584A1 (en) | 2025-08-14 |
| FI130716B1 (en) | 2024-02-06 |
| EP4658413A1 (en) | 2025-12-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3790668B1 (en) | Mobile screen body and mobile mineral material processing plant with support legs | |
| JP5671373B2 (en) | Bridge removal method and new construction method | |
| CA2946063A1 (en) | Land-based rig with on-board crane | |
| FI130716B1 (en) | Mineral material processing plant with multi-purpose support legs | |
| JP6974233B2 (en) | Floor slab replacement method and floor slab replacement device | |
| JP2005271790A (en) | Placing method of heavy article and its system | |
| JP5473294B2 (en) | Overhead crane installation method and installation system | |
| JP4507913B2 (en) | Transporting and loading heavy objects | |
| JP2016142098A (en) | Removal method for ceiling board | |
| JP4339778B2 (en) | How to remove a bridge | |
| JP3591931B2 (en) | Working device that can be disassembled and assembled | |
| JP2007146443A (en) | Bridge girder construction and removal method and bridge girder construction equipment | |
| AU2016319392B2 (en) | Split frame | |
| JP6622514B2 (en) | Installation method of construction machine and car body weight | |
| RU2787096C2 (en) | Case of mobile screen and mobile installation for processing of mineral material with support legs | |
| JP6627177B2 (en) | Construction method of vehicle-mounted lifter and pier | |
| FI131273B1 (en) | Maintenance access to pre-screen media at mobile plants | |
| CN104477267A (en) | Base, traveling device and crawler crane | |
| JP7591789B2 (en) | Rail double-sided loading and unloading machine | |
| SU1444453A2 (en) | Track-laying machine on road/rail undercarriage | |
| JPH11107534A (en) | Construction method for directly hanging large roof | |
| CN117202997A (en) | Dividing hoppers and transport screening units | |
| KR20150098374A (en) | Girder construction method in case lower obstacle being | |
| JP6501660B2 (en) | Crawler-type construction machine, method of removing crawler and method of transporting construction machine body | |
| CN113042187A (en) | Portable rubble screening equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 24703229 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2501004988 Country of ref document: TH |
|
| WWE | Wipo information: entry into national phase |
Ref document number: AU2024214584 Country of ref document: AU |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202480010160.6 Country of ref document: CN |
|
| ENP | Entry into the national phase |
Ref document number: 2024214584 Country of ref document: AU Date of ref document: 20240129 Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202517077741 Country of ref document: IN |
|
| ENP | Entry into the national phase |
Ref document number: 1020257029018 Country of ref document: KR Free format text: ST27 STATUS EVENT CODE: A-0-1-A10-A15-NAP-PA0105 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWP | Wipo information: published in national office |
Ref document number: 202480010160.6 Country of ref document: CN |
|
| WWP | Wipo information: published in national office |
Ref document number: 202517077741 Country of ref document: IN Ref document number: 1020257029018 Country of ref document: KR |
|
| WWP | Wipo information: published in national office |