WO2019039592A1 - 曲げ加工装置 - Google Patents
曲げ加工装置 Download PDFInfo
- Publication number
- WO2019039592A1 WO2019039592A1 PCT/JP2018/031370 JP2018031370W WO2019039592A1 WO 2019039592 A1 WO2019039592 A1 WO 2019039592A1 JP 2018031370 W JP2018031370 W JP 2018031370W WO 2019039592 A1 WO2019039592 A1 WO 2019039592A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- robot
- workpiece
- bending
- joint
- bending mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D7/00—Bending rods, profiles, or tubes
- B21D7/12—Bending rods, profiles, or tubes with programme control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D7/00—Bending rods, profiles, or tubes
- B21D7/02—Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment
- B21D7/024—Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment by a swinging forming member
- B21D7/025—Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment by a swinging forming member and pulling or pushing the ends of the work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/006—Feeding elongated articles, such as tubes, bars, or profiles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/10—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by grippers
- B21D43/105—Manipulators, i.e. mechanical arms carrying a gripper element having several degrees of freedom
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/12—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by chains or belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D7/00—Bending rods, profiles, or tubes
- B21D7/02—Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment
- B21D7/024—Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment by a swinging forming member
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J11/00—Manipulators not otherwise provided for
- B25J11/005—Manipulators for mechanical processing tasks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J5/00—Manipulators mounted on wheels or on carriages
- B25J5/02—Manipulators mounted on wheels or on carriages travelling along a guideway
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/0084—Programme-controlled manipulators comprising a plurality of manipulators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/0084—Programme-controlled manipulators comprising a plurality of manipulators
- B25J9/0087—Dual arms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/0093—Programme-controlled manipulators co-operating with conveyor means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/0096—Programme-controlled manipulators co-operating with a working support, e.g. work-table
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/16—Programme controls
- B25J9/1679—Programme controls characterised by the tasks executed
- B25J9/1682—Dual arm manipulator; Coordination of several manipulators
Definitions
- the present disclosure relates to a bending apparatus configured to bend an elongated workpiece.
- a bending apparatus for bending a long workpiece at a plurality of locations is known (see, for example, Patent Document 1).
- a bending mechanism configured to grip and bend a workpiece is attached to the tip of the articulated robot.
- a pair of track devices are arranged in parallel so as to extend in parallel straight lines, and each track device is mounted with an articulated robot. It is also described that the base is movably provided on the respective track devices. In that case, bending of the workpiece can be performed quickly by cooperation of the two articulated robots.
- the workpiece is supplied to the bending device so that the extending direction of the track device and the longitudinal direction of the workpiece become parallel.
- the workpiece supply device for automatically supplying the workpiece is arranged in parallel with each of the track devices.
- one aspect of the present disclosure is to provide a workpiece supply device on one end side in the direction in which the track device extends, and to improve the degree of freedom of the layout as the entire bending device.
- the bending apparatus of the present disclosure is a bending apparatus configured to bend an elongated workpiece, and includes a first track device, a second track device, a first base, and a second base. And a first robot, a second robot, a first bending mechanism, a second bending mechanism, and a workpiece supply device.
- the first track device and the second track device are arranged in parallel so as to extend in a straight line parallel to each other.
- the first base is mounted on the first track device and is movable on the first track device.
- the first robot is mounted on the first base.
- the second base is mounted on the second track device and is movable on the second track device.
- the second robot is mounted on the second base.
- the first bending mechanism disposed at one end of the first robot and the second bending mechanism disposed at one end of the second robot are configured to perform gripping and bending of the workpiece.
- the workpiece supply device is provided at one end side in the extending direction of the first track device and the second track device, and configured to supply the workpiece.
- the first robot has a first joint that rotates the first robot about a vertical axis with respect to the first base on which the first robot is mounted, and an axis that is not parallel to the axis of the first joint of the first robot And an articulated robot including a plurality of joints including at least a second joint for bending the first robot, and the first bending mechanism is moved by the operation of the first joint and the second joint of the first robot.
- the second robot has a first joint that rotates the second robot about a vertical axis with respect to the second base on which the second robot is mounted, and an axis that is not parallel to the axis of the first joint of the second robot And an articulated robot including a plurality of joints including at least a second joint for bending the second robot, and the movement of the joints moves the second bending mechanism.
- the workpiece supply device is provided at a position where at least one of the first bending mechanism and the second bending mechanism can reach. The workpiece supply device supplies the workpiece such that the longitudinal direction of the workpiece is orthogonal to the direction in which the first track device and the second track device extend.
- the workpiece supply device is provided at one end side in the direction in which the first track device and the second track device extend, and configured to supply the workpiece. Moreover, the workpiece supply device supplies the workpiece such that the longitudinal direction of the workpiece is orthogonal to the direction in which the first track device and the second track device extend. Thereby, the freedom degree of the layout as the whole bending apparatus can be improved.
- the first robot is at least a first joint that rotates the first robot about a vertical axis with respect to a first base on which the first robot is mounted, and a non-parallel axis of the first joint of the first robot And a second joint for bending the first robot around an axis.
- the first robot can move the first bending mechanism configured to perform gripping and bending of the workpiece in various directions with respect to the first base.
- the second robot includes at least a first joint for rotating the second robot about a vertical axis with respect to the second base on which the second robot is mounted, and an axis of the first joint of the second robot And a second joint for bending the second robot about a non-parallel axis.
- the second robot can move the second bending mechanism configured to perform gripping and bending of the workpiece in various directions with respect to the second base.
- the workpiece supply device is provided at a position where at least one of the first bending mechanism and the second bending mechanism can reach. Therefore, even if the workpiece supply device is disposed at one end side in the extending direction of the first track device and the second track device as described above, the workpiece supplied from the workpiece supply device is bent by the first bending. It can be easily gripped through at least one of the mechanism and the second bending mechanism, and bending can be performed.
- the first track device and the second track device are disposed separately from the first track device and the second track device, and configured to grip the workpiece.
- the chuck device may further be provided.
- the chuck device may be configured to grip the workpiece transferred from the workpiece supply device by at least one of the first robot and the second robot.
- the workpiece conveyed by at least one of the first robot and the second robot from the workpiece supply device is gripped by the chuck device, and bending is performed by the first bending mechanism and the second bending mechanism. It can be applied to Therefore, in this case, the processing speed for the workpiece can be further improved.
- control devices are provided so that the connection relationship between each joint and the first bending mechanism of the first robot and the connection relationship between each joint and the second bending mechanism of the second robot become the same. It may be configured.
- the controller is configured to control the operation of the first base, the second base, the first robot, the second robot, the first bending mechanism, the second bending mechanism, and the chuck device.
- the control device causes the first bending mechanism and the second bending mechanism to grip the workpiece supplied by the workpiece supply device, the control device performs the operations of the first joint and the second joint of the first robot and the second robot, respectively.
- the rotational position about the first joint differs by 180 ° between the first robot and the second robot, and the direction from the second joint of the first robot to the first bending mechanism, and The directions from the second joint of the robot to the second bending mechanism are in the directions from the second joint to the workpiece supply device.
- the workpiece is gripped by the chuck device provided between the first track device and the second track device, and the workpiece is bent by the first robot and the second robot configured in the same manner.
- the first robot and the second robot are often in a state of being directed in a direction different by 180 ° around the vertical axis. This is because the first robot and the second robot have a side (hereinafter referred to as the front side) which is easier to bend when facing the workpiece side, and the first robot is the workpiece held by the chuck device. And it is preferable to face the front side of the second robot.
- the control device is a workpiece supplied from the workpiece supply device by the first bending mechanism and the second bending mechanism from a state in which the first robot and the second robot are directed 180 degrees apart around the vertical axis. Hold the From this state, the operation of each robot until the workpiece is gripped by the chuck device and bending is started is at least the same as the operation around the vertical axis.
- the connection relationship of each joint of the first robot and the first bending mechanism (for example, the distance between the joints) and the connection relationship of each joint of the second robot and the second bending mechanism are configured to be the same. Thus, at least a part of the control programs and the like related to the first robot and the second robot can be made common.
- the workpiece supply device may include the following first conveyor, second conveyor, and third conveyor.
- the first conveyor includes a plurality of holders configured to hold the workpiece one by one and to raise and lower it once.
- the second conveyor is configured to supply the workpiece to the holding portion of the first conveyor.
- the third conveyor conveys one by one to a position where it can be gripped by at least one of the first bending mechanism and the second bending mechanism. Configured
- workpieces can be held in advance one by one in the holding portion of the first conveyor.
- the holding part travels along a descending track after rising once.
- the first conveyor can be provided with a large number of holders even with a small installation space. Therefore, in this case, the operation of supplying the workpieces one by one is stably performed.
- the second conveyor supplies the workpiece to the holding unit of the first conveyor.
- the workpieces once raised and then lowered by the holding portion of the first conveyor are conveyed one by one to the position where they can be gripped by at least one of the first bending mechanism and the second bending mechanism by the third conveyor.
- the drive of the second conveyor is more than when the number of holders holding the workpiece is a predetermined number or more. It may further comprise a speed control configured to increase the speed.
- each of the first bending mechanism and the second bending mechanism has a bending die and a clamping die engaged with the bending die, and sandwiches a workpiece by the bending die and the clamping die.
- the workpiece may be configured to be gripped and bent.
- the workpiece can be accurately bent along the bending die, and the workpiece can be accurately bent.
- each of the first robot and the second robot may be a vertical articulated robot having six or more axes.
- the degree of freedom of operation of the first bending mechanism and the second bending mechanism and in other words, the degree of freedom of bending with respect to the workpiece can be made higher.
- vertical “orthogonal” and “identical” are not limited to vertical or orthogonal or identical in the strict meaning, and strictly vertical or orthogonal or identical if the desired effect is exhibited. It does not have to be.
- Second track device First track device 5
- First base Second base 10
- First robot 11
- First robot device 12 Second robot 13
- Second robot Device 16 Chuck device 18: Workpiece 20: Workpiece supply device 50a: First bending mechanism 50b: Second bending mechanism 52: First rocking joint 54: Second rocking joint 56: Third rocking joint 58 ... first pivot joint 60 ... second pivot joint 62 ... third pivot joint 66 ... first pivot platform 68 ... first arm 70 ... second arm 80 ... bending type 88 ... clamping type 90 ... pressure type 102 ... first Auxiliary track device 122: Controller 202: Second auxiliary track device 204: First conveyor 206: Second conveyor 208: Third conveyor 216: First chain 244: Second chain Down 220 ... holding portion 234 ... belt 236 ... stopper 246 ... receiving portion 250 ... supply Spot
- the bending apparatus 2 of the first embodiment includes a first track device 4, a second track device 5, a first base 6, a second base 8, and A robot 10 and a second robot 12 are provided.
- the first track device 4 and the second track device 5 are arranged in parallel so as to extend linearly in the left-right direction (hereinafter referred to as the X direction) in FIG.
- the first base 6 is mounted on the first track device 4 and is movable in the longitudinal direction (X direction) of the first track device 4.
- the second base 8 is mounted on the second track device 5 and is movable in the longitudinal direction (X direction) of the second track device 5.
- the first robot 10 is mounted on a first base 6.
- the second robot 12 is mounted on a second base 8.
- the first base 6 and the first robot 10 will be referred to as a first robot device 11.
- the second base 8 and the second robot 12 will be referred to as a second robot device 13.
- the bending apparatus 2 includes a chuck device 16, a workpiece supply device 20 (i.e., a loader), and a shooter 21.
- the chuck device 16 is disposed between the first track device 4 and the second track device 5 separately from them.
- the chuck device 16 grips the workpiece 18 such that the longitudinal direction of a long workpiece 18 (i.e., a workpiece) such as a pipe matches the X direction.
- the workpiece supply device 20 supplies the workpiece 18 so that the longitudinal direction of the workpiece 18 is orthogonal to the direction in which the first track device 4 and the second track device 5 extend (that is, the X direction). .
- the shooter 21 is disposed within the working range of at least one of the first robot apparatus 11 and the second robot apparatus 13 (in the example shown in FIG. 1, in the range indicated by the two-dot chain line 21).
- the workpiece 18 after bending is carried out to the shooter 21.
- the range surrounded by the two-dot chain line L1 in FIG. 1 is the operating range of the first robot device 11 (more specifically, the range in which the operation for gripping the workpiece 18 is possible).
- the range surrounded by the two-dot chain line L2 in FIG. 1 is the operating range of the second robot device 13 (more specifically, the range in which the operation for gripping the workpiece 18 is possible).
- the first robot device 11 and the second robot device 13 basically have the same configuration. That is, the connection relationship between each joint of the first robot device 11 and the first bending mechanism 50a described later and the connection relationship between each joint of the second robot device 13 and the second bending mechanism 50b described later are the same. Be done. Further, the first track device 4 and the second track device 5 basically have the same configuration. So, below, it demonstrates using the 1st track device 4 and the 1st robot device 11 as an example.
- First track device 4 As shown in FIG. 3, the first base 6 is disposed on the first track device 4 so as to be movable in a direction (X direction) perpendicular to the paper surface of FIG. 3.
- the first track device 4 includes a first rail 26 and a second rail 28.
- the first rail 26 is disposed on the convex first base 22 shown in the left portion of FIG. 5 and extends parallel to the X direction.
- the second rail 28 is disposed on the second base 24 shown in the right portion of FIG. 5 and extends parallel to the X direction.
- the cross-sectional shape of the first rail 26 has recesses 26 a on both sides in the left-right direction (Y direction, that is, the direction orthogonal to the X direction and the vertical direction) in FIG. 5.
- the cross-sectional shape of the second rail 28 has recesses 28 a on both sides in the left-right direction (Y direction) in FIG.
- the first guide 30 and the second guide 32 are disposed on the lower surface of the first base 6.
- the center-to-center distance between the first guide 30 and the second guide 32 in the Y direction is the same as the center-to-center distance between the first rail 26 and the second rail 28 in the Y direction.
- the first guide 30 is, for example, a well-known LM guide (registered trademark), and a lower surface side thereof is formed with a first groove 34 fitted with the first rail 26.
- the second guide 32 is, for example, a well-known LM Guide (registered trademark), and on the lower surface side thereof, a second groove 36 fitted to the second rail 28 is formed.
- First protrusions 30a are formed on the both sides of the first groove 34 in the Y direction to engage with the recesses 26a on both sides of the first rail 26 in the Y direction in the vertical direction of FIG. Is configured not to drop out in the upper part of FIG.
- Second protrusions 32a are formed on both sides of the second groove 36 in the Y direction to engage with the recesses 28a on both sides of the second rail 28 in the Y direction in the vertical direction in FIG. Is configured not to drop out in the upper part of FIG.
- a rack (rack gear) 38 is formed along the X direction at the upper right end (right side in FIG. 5) in FIG. 5 of the first base 22.
- a base motor 40 (see FIG. 3) is fixed to the upper surface side of the first base 6.
- a pinion gear 44 driven by a base motor 40 is disposed on the lower surface side of the first base 6. The rack 38 and the pinion gear 44 are arranged to mesh with each other.
- the first robot 10 is an articulated robot (articulated robot) having a plurality of arms and joints.
- a first bending mechanism 50a is attached which holds or bends a long workpiece 18 such as a pipe.
- the first robot 10 is jointed to three first to third rocking joints 52, 54, and 56 that allow two jointed members to perform rocking or bending operations. It comprises three first to third pivot joints 58, 60, 62 which allow one to pivot about the other.
- the direction of the axis of the swing joint is perpendicular to the link direction of the two members.
- the direction of the axis of the pivot joint is the same as the link direction of the two members.
- the first robot 10 includes a fixed portion 64 attached to the first base 6, and the fixed portion 64 and the first pivot base 66 are connected by a first pivot joint 58.
- the first pivot joint 58 has a mechanism for rotationally driving the first pivot base 66 at a predetermined angle around the vertical axis CV1.
- the turning direction of the first swivel base 66 is indicated by the arrow A.
- first arm 68 is connected to the first swivel base 66 via a first swing joint 52.
- the first swing joint 52 has a mechanism for rotationally driving the first arm 68 at a predetermined angle around the horizontal axis CH1.
- the horizontal axis CH1 of the first swing joint 52 and the vertical axis CV1 of the first swing joint 58 are orthogonal to each other.
- the rotation direction of the first arm 68 is indicated by an arrow B in FIG.
- the other end of the first arm 68 and one end of the second arm 70 are connected via the second swing joint 54.
- the second swing joint 54 has a mechanism for rotationally driving the second arm 70 at a predetermined angle around an axis CH2 parallel to the horizontal axis CH1 of the first swing joint 52.
- the rotation direction of the second arm 70 is indicated by the arrow C in FIG.
- the second arm 70 is provided with a second pivot joint 60.
- the rear portion 70b of the second arm 70 performs a twisting motion with respect to the front portion 70a about a pivot axis about the axis of the second arm 70. It can be performed.
- the rotation direction of the rear portion 70 b is indicated by the arrow D in FIGS. 3 and 4.
- the second swivel base 72 is connected to the other end of the second arm 70 via the third swivel joint 62.
- the third pivot joint 62 rotates the second pivot platform 72 at a predetermined angle around an axis CV2 orthogonal to the horizontal axis CH1 of the first pivot joint 52 and the horizontal axis CH2 of the second pivot joint 54.
- the rotation direction of the second swivel base 72 is indicated by an arrow E in FIG.
- a tip arm 74 is connected to the second swivel base 72 via a third swing joint 56.
- the third rocking joint 56 pivots the tip arm 74 about an axis CH3 shown in FIG.
- the rotation direction of the distal end arm 74 is indicated by an arrow F in FIG. It should be noted that the third pivot joint 62 and the second pivot platform 72 shown in FIG. 4 are hidden from other members in FIG. 3 and do not appear.
- a rotatable auxiliary joint 76 is provided at the tip of the tip arm 74.
- the first bending mechanism 50 a is attached to the auxiliary joint 76.
- the auxiliary joint 76 is mechanically connected to the third rocking joint 56 by a gear mechanism (not shown).
- the gear mechanism is a well-known gearbox configured to increase the number of rotations of the output more than the number of rotations of the input.
- the first bending mechanism 50a is rotated by 360 degrees or more by the auxiliary joint 76. With the above-described configuration, it is possible to rotate the first bending mechanism 50 a around the workpiece 18 without using the workpiece 18 as an obstacle.
- auxiliary joint 76 is mechanically connected to the third rocking joint 56 by the gear mechanism (not shown) in the above example, the present disclosure is not limited thereto.
- the auxiliary joint 76 may be configured to pivot independently of the third swing joint 56 by, for example, another drive motor.
- the 1st bending mechanism 50a is equipped with the bending type
- mold 80 is made into one type in the example shown in FIG. 3, this indication is not limited to this.
- a plurality of groove portions corresponding to a plurality of types of bending radii may be stacked in the axial direction of the bending die 80.
- the first bending mechanism 50 a includes a clamp 88 that holds the workpiece 18 in cooperation with the bending die 80.
- the clamp 88 is driven by the cylinder 89 to move toward the bending die 80.
- a pressure die 90 is provided side by side with the clamping die 88 to receive a reaction force during bending.
- the pressure die 90 is driven by a cylinder (not shown) provided independently of the cylinder 89 to move toward the bending die 80.
- the clamping die 88 can revolve around the bending die 80 in a state in which the workpiece 18 is gripped with the groove portion 82, and can bend the workpiece 18 at a predetermined angle.
- the chuck device 16 is placed on the first auxiliary track device 102 extending in the X direction, and can be manually moved in the direction (X direction) perpendicular to the paper surface of FIG. 2.
- the chuck device 16 is movably supported in the X direction by the first auxiliary track device 102 and is supported at the upper end of the erected support 100.
- the chuck device 16 includes a first claw portion 104 and a second claw portion 106 provided at the upper end of the support 100.
- a portion of the first claw portion 104 and the second claw portion 106 above the shaft 108 is pivotable in the Y direction about an axis 108 extending in the X direction provided at the upper end of the support 100.
- Recesses are formed on opposite sides of the upper ends of the first claw portion 104 and the second claw portion 106, and the upper ends of the first claw portion 104 and the second claw portion 106 are close to each other above the shaft 108 Thus, the workpiece 18 can be gripped.
- the first claw portion 104 and the second claw portion 106 are driven such that the upper ends of the first claw portion 104 and the second claw portion 106 approach or are separated by a link mechanism (not shown) and a driving device (not shown).
- the chuck device 16 is configured such that the workpiece 18 gripped by the chuck device 16 is in a horizontal state, that is, orthogonal to the vertical axis CV1 of the first pivot joint 58. .
- the workpiece supply device 20 includes a first conveyor 204, a second conveyor 206, and a third conveyor 208 movable in the Y direction along the second auxiliary track device 202.
- the first conveyor 204 is a so-called stock conveyor
- the second conveyor 206 is a so-called tube conveyor
- the third conveyor 208 is a so-called bender conveyor.
- the relative positions of the first conveyor 204, the second conveyor 206, and the third conveyor 208 are determined by the frame 210. As the frame 210 moves along the second auxiliary track device 202, the first conveyor 204, the second conveyor 206, and the third conveyor 208 move in the Y direction while maintaining their relative positions.
- the first conveyor 204 has a configuration in which a chain 216 is bridged between the first sprocket 212 and the second sprocket 214 disposed vertically, and rotates in the counterclockwise direction in FIG.
- a holder 220 ie, a stocker
- the first conveyor 204 has a configuration in which a chain 216 is bridged between the first sprocket 212 and the second sprocket 214 disposed vertically, and rotates in the counterclockwise direction in FIG.
- a holder 220 ie, a stocker
- Each holding portion 220 includes a first flat plate portion 222, a second flat plate portion 224, and a third flat plate portion 226 obtained by bending a metal.
- the first flat plate portion 222 moves while rotating along the link direction of the chain 216.
- the second flat plate portion 224 is connected to an end edge on the front side in the rotational direction of the first flat plate portion 222, and is inclined to the front side in the rotational direction with respect to a normal to the first flat plate portion 222.
- the third flat plate portion 226 is connected to the tip end of the second flat plate portion 224 (that is, the end edge opposite to the first flat plate portion 222), and is inclined rearward in the rotational direction than the normal to the first flat plate portion 222 Do.
- the second conveyor 206 is horizontally constructed by the first roller 230 and the second roller 232, which are disposed side by side in the left-right direction (that is, the X direction) in FIG. 6, and the first roller 230 and the second roller 232. And a belt 234.
- the belt 234 transfers the workpiece 18 placed on the belt 234 onto the first conveyor 204. Transport it toward you.
- the transport path of the second conveyor 206 is provided with a stopper 236 whose projection / retraction is switched by an actuator (not shown).
- the stopper 236 controls the projection / retraction timing according to the size (for example, the diameter) of the workpiece 18.
- the workpieces 18 conveyed by the belt 234 are separated one by one downstream (i.e., cut out) by the operation of the stopper 236 and are conveyed.
- the user of the bending apparatus 2 places the workpiece 18 conveyed by a carriage or the like. Thereafter, the workpiece 18 conveyed to the left end in FIG. 6 of the belt 234 falls along the first guide 238 toward the first conveyor 204. Then, the workpiece 18 is held one by one by the first flat plate portion 222 of the holding portion 220 and the second flat plate portion 224 of the holding portion 220 adjacent to the holding portion 220 at the rear in the rotational direction. The object 18 is transported upward.
- the holding portion 220 passes above the upper second sprocket 214, the workpiece 18 is held by the second flat portion 224 and the third flat portion 226 of the holding portion 220 on the front side in the rotational direction, and is lowered.
- the workpiece 18 is lowered to a predetermined position, it engages with the second guide 248, and the workpiece 18 drops toward the third conveyor 208.
- the third conveyor 208 has a configuration in which a chain 244 is bridged between the first sprocket 240 and the second sprocket 242 arranged side by side in the left-right direction (that is, the X direction) in FIG. Rotate around.
- a receiving portion 246 is provided for each predetermined frame of the chain 244.
- the receiving portion 246 is formed in a plate shape that protrudes further upward, and a notch 246a that receives the workpiece 18 is formed in the center.
- the workpieces 18 dropped along the second guide 248 are conveyed one by one to the left in FIG. 6 by being received in the notches 246 a, and are disposed adjacent to the left in FIG. 6 of the third conveyor 208.
- a notch 250 a for receiving the workpiece 18 is formed on the top surface of the supply spot 250, and the workpiece 18 conveyed by the third conveyor 208 is received in the notch 250 a.
- Such sets of first to third conveyors 204, 206, 208 are provided symmetrically on the track of the second auxiliary track device 202 so that at least two of them face each other.
- the workpiece 18 is received at both ends in the notches 250a of the pair of supply spots 250. It is kept in the The workpiece 18 gripped in this manner can be gripped by the following operations of the first robot device 11 and the second robot device 13.
- the position of the first robot device 11 in the X direction can be determined by controlling the movement of the first base 6 in the X direction.
- the position of the second robot device 13 in the X direction can be determined by controlling the movement of the second base 8 in the X direction with respect to the second robot device 13.
- the first to third swing joints 52, 54, 56, and the first to third swing joints 58, 60, 62 are turned By doing this, it is possible to control the attitudes and movement positions of the first bending mechanism 50a and the second bending mechanism 50b.
- the first bending mechanism 50a and the second bending mechanism 50b are moved so that the axial direction of the workpiece 18 and the tangential direction of the groove 82 of the bending die 80 coincide with each other according to the position at which the workpiece 18 is gripped. it can. Further, the first bending mechanism 50a and the second bending mechanism 50b can be moved so that the bending direction of the workpiece 18 and the radial direction of the groove 82 of the bending die 80 coincide with each other according to the bending direction of the workpiece 18 .
- the postures of the first bending mechanism 50a and the second bending mechanism 50b can be changed according to the gripping position and the bending direction of the workpiece 18.
- the third rocking joint 56 and the auxiliary joint 76 have a synchronized fixed relationship. Therefore, if the gripping position and the bending direction are determined, the positions of the distal end arm 74 and the third swing joint 56 are determined.
- the position of the second rocking joint 54 is on a circular arc whose center is the first rocking joint 52 and whose radius is the distance between the first rocking joint 52 and the second rocking joint 54. It is on a circular arc whose center is the rocking joint 56 and whose radius is the distance between the second rocking joint 54 and the third rocking joint 56. Therefore, if the second swing joint 54 is at the intersection of these two arcs, the position of the bending die 80 is determined. At this time, there may be two intersection points, in which case the second arm 70 interferes with the workpiece 18 or the tip of the workpiece 18 after bending interferes with the second arm 70. Select an intersection point that does not
- the angle between the fixed portion 64 and the first arm 68, the angle between the first arm 68 and the second arm 70, The angle between the second arm 70 and the tip arm 74 is determined respectively.
- the first arm 68, the second arm 70, and the tip arm 74 are pivoted to a predetermined angle by the first to third rocking joints 52, 54, and 56 according to the determined angles.
- the groove 82 of the bending die 80 is moved to abut on the workpiece 18.
- the first base 6 or the second base 8 When moving the position of the first bending mechanism 50a of the first robot 10 or the second bending mechanism 50b of the second robot 12 in the X direction, the first base 6 or the second base 8 is moved by a predetermined amount in the X direction It is possible to respond by moving to.
- the first base 6 When the workpiece 18 held with both ends received by the notches 250a of the pair of feed spots 250 is subjected to bending, the first base 6 is on the workpiece feeding device 20 side of the first track device 4
- the second base 8 is moved to the end, and the second base 8 is moved to the end of the second track device 5 on the workpiece supply device 20 side.
- the workpiece 18 whose both ends are received by the notch 250 a as described above is a first object of the first robot 10. It can be gripped by the bending mechanism 50 a and the second bending mechanism 50 b of the second robot 12.
- the first arm 68 and the second arm 70 are extended to the front side and held with the left side (hereinafter referred to as the front side) of the first robot 10 shown in FIG. It is a method (hereinafter, referred to as forward reception). Another method is to extend the first arm 68 and the second arm 70 to the rear side with the right side (hereinafter referred to as the rear side) of the first robot 10 shown in FIG. 3 directed to the workpiece supply device 20. It is a method of gripping (hereinafter referred to as back surface reception).
- the workpiece 18 gripped in this manner is conveyed to the upper portion of the chuck device 16 by appropriately moving the first bending mechanism 50a and the second bending mechanism 50b as described above, and the first claw portion 104 and the first claw portion 104 are After being gripped by the second claw portion 106, bending processing as described above is performed.
- Each of the first robot 10 and the second robot 12 may be designed so that bending of the workpiece 18 can be easily performed when the front side is directed to the workpiece 18.
- Control of Bending Apparatus 2> the control at the time of conveying the workpiece 18 from the workpiece supply device 20 to the chuck device 16 by the first robot device 11 and the second robot device 13 will be described in detail. First, the electrical configuration of the bending apparatus 2 will be described.
- the bending apparatus 2 is drive-controlled by the host computer 120 and the controller 122 to process the workpiece 18.
- the host computer 120 includes a CPU 124, a ROM 126, and a RAM 128 as main components of the logic operation circuit.
- the CPU 124, the ROM 126, and the RAM 128 are connected via a common bus 136 to an input / output circuit 134 that inputs / outputs signals between the input device 130 and the display device 132.
- the input device 130 may be a known keyboard or a touch panel, but is not limited thereto.
- Data on processing or processing performed on the workpiece 18 is input to the host computer 120 from an input device 130 operated by an operator.
- a program for operating the first robot device 11, the second robot device 13, the first bending mechanism 50a, the second bending mechanism 50b, and the chuck device 16 is created, and the created program is the host computer 120.
- the control device 122 is sent to the control device 122 from FIG.
- the controller 122 includes a CPU 138, a ROM 140, and a RAM 142 as main components of the logic operation circuit.
- the CPU 138, the ROM 140, and the RAM 142 are connected to the input / output circuit 146 via the common bus 144.
- the input / output circuit 146 includes the first robot 11, the second robot 13, the first bending mechanism 50a, and the second bending.
- the mechanism 50 b, the chuck device 16 and the workpiece supply device 20 are connected.
- FIG. 8 The process shown in FIG. 8 is started when the workpiece 18 is received at both ends in the notch 250a of the feed spot 250 and a signal indicating that is received from the workpiece feeder 20 to the controller 122. .
- This process is executed by the CPU 138 based on programs stored in the ROM 140 and the RAM 142 as storage media.
- control device 122 instructs the first robot device 11 to receive the workpiece 18 by the above-described forward surface reception (S110), and the second robot device 13 receives the above-described back surface reception.
- An instruction to receive the workpiece 18 is given (S210).
- S represents a step (the same applies to the following).
- the first robot device 11 and the second robot device 13 are the end portions of the first track device 4 and the second stage device 5 on the workpiece supply device 20 side. Move up to each.
- the rotation around each first turning joint 58 such that the front side of the first robot 10 faces the workpiece supply device 20 and the rear side of the second robot 12 faces the workpiece supply device 20 Is done.
- the first bending mechanism 50 a of the first robot 10 reaches the workpiece 18 by the first arm 68 and the second arm 70 of the first robot 10 being extended to the front side of the first robot 10.
- the second bending mechanism 50 b of the second robot 12 reaches the workpiece 18 by the first arm 68 and the second arm 70 of the second robot 12 being extended to the rear side of the second robot 12.
- both ends of the workpiece 18 abut on the groove 82 of the first bending mechanism 50 a of the first robot device 11 and the groove 82 of the second bending mechanism 50 b of the second robot device 13 by the above processing.
- the control device 122 executes the following processing of S112 and S212.
- the clamp 88 is clamped toward the groove 82 by the cylinder 89, whereby the workpiece 18 is clamped between the clamp 88 and the groove 82 in the first robot device 11.
- the workpiece 18 is gripped by the first bending mechanism 50 a of the first robot device 11 so as not to shift in the longitudinal direction or in the thickness direction.
- control device 122 executes the processing of synchronization waiting A in S114 and S214.
- This process is a process of waiting until both the operation of tightening the clamp 88 in the process of S112 and the operation of partially tightening the pressure mold 90 in the process of S212 are completed.
- the control device 122 executes the processing of S116 and S216.
- the control device 122 causes the first robot 10 to take an attitude (hereinafter, a Banzai attitude) in which the first arm 68 and the second arm 70 are extended upward.
- the control device 122 causes the second robot 12 to take a Banzai attitude.
- the control device 122 executes the processing of synchronization waiting B in S118 and S218.
- This process is a process of waiting until the first robot 10 and the second robot 12 complete the operation of taking the Banzai attitude by the process of S116 and S216 described above.
- the buffer area of the first robot 10 and the second robot 12 becomes smaller as schematically shown in FIG. It is possible to suppress interference with surrounding members when the first robot 10 or the second robot 12 is pivoted through.
- the control device 122 executes the processing of S120 and S220. That is, the control unit 122 causes the first robot device 11 and the second robot device 13 to move to the opposing position (that is, the central position) with the chuck device 16 by causing the first base 6 and the second base 8 to travel. Move it. Subsequently, the control device 122 executes the process of synchronization waiting C in S121 and S221. This process is a process of waiting until the movement to the central position by the process of S120, 220 described above is completed. At this time, as schematically shown in FIG. 11, the first robot 10 and the second robot 12 maintain the Banzai attitude.
- the control device 122 executes the processing of S122 and S222.
- the first to third rocking joints 52, 54, 56 i.e., three axes
- the first base 6 and the second robot 12 are moved as needed.
- the center of the workpiece 18 is disposed above the chuck device 16.
- the first arm 68 and the second arm 70 of the second robot 12 are inclined to the front side of the second robot 12 from the state inclined to the rear side of the second robot 12 Displace to state.
- control device 122 executes the processing of synchronization waiting D in S124 and S224.
- This process is a process of waiting until the movement of the three axes and the first base 6 and the second base 8 is completed as described above and the center of the workpiece 18 is disposed above the chuck device 16. is there.
- the controller 122 executes the processing of S126 and S226. As shown schematically in FIG. 13, these processes move the first base 6, the second base 8, the first robot 10 and the second robot 12 so that the workpiece 18 can be introduced into the sky position. It is processing to move up to.
- the loading position is a position at which the workpiece 18 can be gripped by the first claw portion 104 and the second claw portion 106 of the chuck device 16, and the loading / empty position is the position of each of the first robot 10 and the second robot 12.
- the workpiece 18 can be disposed at the input position by moving the first arm 68 and the second arm 70 to lower the workpiece 18.
- the control device 122 executes the processing of synchronization waiting E in S128 and S228.
- This process is a process of waiting until the work of the workpiece 18 is disposed above the input position after the operations of the first robot apparatus 11 and the second robot apparatus 13 according to the above-described S126 and S226 are completed.
- the control device 122 executes the processing of S130 and S230. These processes are performed by moving the first arm 68 and / or the second arm 70 (or any one of them) of the first robot 10 and the second robot 12 as schematically shown in FIG. This is a process of moving 18 to the insertion position.
- control device 122 executes the processing of synchronization waiting F in S132 and S232.
- This process is a process of waiting until the operations of the first robot apparatus 11 and the second robot apparatus 13 according to the above-described S130 and S230 are completed and the workpiece 18 is disposed at the insertion position.
- the control device 122 executes the process of S134.
- the control device 122 grips the workpiece 18 disposed at the insertion position by the first claw portion 104 and the second claw portion 106 of the chuck device 16.
- the control for the chuck device 16 is incorporated into a series of processes for the first robot apparatus 11, but may be incorporated into a series of processes for the second robot apparatus 13 or may be an independent process.
- the control device 122 executes the process of synchronization waiting G in S136 and S236. This process is a process of waiting until the operation of the chuck device 16 according to S134 described above is completed and the workpiece 18 is gripped by the chuck device 16.
- the control device 122 executes the processing of S138 and S238.
- the controller 122 half-tightens the pressure molds 90 of the first robot 10 and the second robot 12.
- the first robot device 11 and the second robot device 13 can move in the longitudinal direction of the workpiece 18.
- the control device 122 moves the first robot device 11 and the second robot device 13 in the longitudinal direction of the workpiece 18, thereby the first bending mechanism 50a of the first robot 10 and the first bending mechanism 50a.
- the second bending mechanism 50b of the second robot 12 is moved to the advance position (that is, the position at which bending with respect to the workpiece 18 is started).
- the processing by the control device 122 after the first bending mechanism 50a and the second bending mechanism 50b are moved to the advance position is a known bending device such as the processing disclosed in Patent Document 1, for example. Since the process is the same as in the process in FIG.
- the controller 122 starts the process of FIG. 8 when the workpiece 18 is received at both ends in the notch 250 a of the supply spot 250 in the workpiece supply device 20, but the process can be started early.
- the controller 122 may execute the following control.
- the operation for supplying the workpiece 18 to the third conveyor 208 is extremely stable. Can be implemented immediately.
- the number of holding portions 220 holding the workpiece 18 is small, for example, immediately after activation of the bending apparatus 2, for example, when no workpiece 18 is held by the holding portion 220, It is difficult to immediately supply the workpieces 18 to the three conveyors 208. In such a case, the driving speed of the second conveyor 206 is increased as compared with the case where the workpiece 18 can be supplied immediately. By this control, the time during which the workpieces 18 can not be supplied to the third conveyor 208 can be shortened, and the process of FIG. 8 can be started early.
- the workpiece supply device 20 is provided at one end side in the direction in which the first track device 4 and the second track device 5 extend, and supplies the workpiece 18 Configured to Moreover, the workpiece supply device 20 supplies the workpiece 18 so that the longitudinal direction of the workpiece 18 is orthogonal to the direction in which the first track device 4 and the second track device 5 extend. Thereby, the freedom degree of the layout as the bending apparatus 2 whole can be improved.
- the first robot 10 in the first embodiment includes at least a first swing joint 58 for rotating the first robot 10 about the vertical axis CV1 with respect to the first base 6 on which the first robot 10 is mounted;
- the first rocking joint 52 and the second rocking rocking joint 54 that bend the first robot 10 around an axis that is not parallel to the axis of the first turning joint 58 are provided.
- the first robot 10 can move the first bending mechanism 50 a in various directions with respect to the first base 6.
- the second robot 12 in the first embodiment rotates the second robot 12 at least around the vertical axis CV1 with respect to the second base 8 on which the second robot 12 is mounted.
- the second robot 12 can move the second bending mechanism 50 b in various directions with respect to the second base 8.
- the workpiece supply device 20 is provided at a position where the first bending mechanism 50 a of the first robot 10 and the second bending mechanism 50 b of the second robot 12 can reach.
- the workpiece supplied from the workpiece supply device 20 18 can be easily grasped via the first bending mechanism 50a of the first robot 10 and the second bending mechanism 50b of the second robot 12, and bending can be performed.
- the chuck device 16 is provided between the first track device 4 and the second track device 5, and the chuck device 16 is connected to the first robot from the workpiece supply device 20.
- the workpiece 18 conveyed by the apparatus 11 and the second robot apparatus 13 is gripped.
- the workpiece 18 can be gripped by the chuck device 16, and bending can be applied to the workpiece 18 by the first bending mechanism 50 a of the first robot 10 and the second bending mechanism 50 b of the second robot 12. . Therefore, the processing speed for the workpiece 18 can be further improved.
- connection relationship between each joint of the first robot 10 and the first bending mechanism 50a is the same as the connection relationship between each joint of the second robot 12 and the second bending mechanism 50b.
- the control device 122 causes the first bending mechanism 50 a of the first robot 10 and the second bending mechanism 50 b of the second robot 12 to grip the workpiece 18 supplied by the workpiece supply device 20, the first robot 10 is made to receive the forward side, and the second robot 12 is made to receive the back side. That is, the control device 122 causes the workpiece 18 to be gripped from the state in which the first robot 10 and the second robot 12 are directed in directions different by 180 ° around the vertical axis.
- control programs and the like related to the first robot 10 and the second robot 12 can be at least partially shared.
- the workpiece supply device 20 can hold the workpieces 18 one by one in advance in the holding unit 220 of the first conveyor 204. Thereby, the operation of supplying the workpieces 18 one by one can be stably performed.
- the holding unit 220 travels along a path which once goes up along the first conveyor 204 and then goes down. As a result, the first conveyor 204 can be provided with a large number of holders 220 even with a small installation space. Therefore, the operation of supplying the workpieces 18 one by one can be performed more stably.
- the control device 122 drives the second conveyor 206 as compared to during normal bending. Raise the speed. Thereby, the time which can not supply the to-be-processed object 18 to the 3rd conveyor 208 can be shortened, and the bending process by the bending apparatus 2 can be started early.
- the first robot 10 placed on the first base 6 and the second robot 12 placed on the second base 8 are each provided with multiple joints as described above. It is an articulated robot. Therefore, the first bending mechanism is moved by moving the first base 6 and the second base 8 along the first track device 4 and the second track device 5 and bending the joints of the articulated robot in a desired direction.
- the 50a and the second bending mechanism 50b can be arranged at desired positions. Therefore, the workpiece 18 gripped by at least one of the first bending mechanism 50a and the second bending mechanism 50b can be disposed at a desired position.
- the workpiece 18 when the workpiece 18 is transported or bent, it can be easily moved to a position where the workpiece 18 does not interfere with surrounding devices or a position suitable for transportation (a position where the transportation time is short). it can.
- a position where the transportation time is short a position where the transportation time is short.
- bending of one end side and the other end side of the workpiece 18 can be performed at such a preferable position, so that the degree of freedom of processing is improved and the processing time is also increased. It can be shortened.
- the first bending mechanism 50a of the first robot 10 and the second bending mechanism 50b of the second robot 12 sandwich the workpiece 18 with the bending die 80 and the clamping die 88, respectively. , Grip or bend the workpiece 18. Therefore, the workpiece 18 can be bent accurately along the bending die 80, and the workpiece 18 can be accurately bent.
- Second Embodiment Although the bending apparatus 2 of 2nd Embodiment of this indication is demonstrated, description of the same content as 1st Embodiment is abbreviate
- the bending apparatus 2 of the second embodiment has the same mechanical configuration as the bending apparatus 2 of the first embodiment. However, the processing performed by the control device 122 differs in that the workpiece 18 supplied from the workpiece supply device 20 is gripped by only the second robot 12 as follows. The processing in the second embodiment will be described below.
- the process shown in FIG. 15 is performed when the workpiece 18 is received at both ends in the notch 250 a of the supply spot 250 and a signal indicating that is input from the workpiece supply device 20 to the control device 122.
- the control device 122 first executes the process of S310 for the first robot apparatus 11 and executes the process of S410 for the second robot apparatus 13.
- the first base 6 is sent in the direction away from the workpiece supply device 20 and placed at the relief position.
- the escape position is a position at which the first robot device 11 does not interfere with either the second robot device 13 or the workpiece 18 when the workpiece 18 is gripped by the chuck device 16 only by the second robot 12.
- the second base 8 is fed to the end of the track device 5 on the side of the workpiece supply device 20, and as schematically shown in FIG.
- the center of gravity is gripped by the second bending mechanism 50b of the second robot 12 by the forward surface support.
- control device 122 subsequently executes the processing of synchronization waiting A at S312 and S412.
- This process is a process of waiting until the movement to the relief position by the process of S310 described above and the operation of gripping (receiving) by the process of S410 are both completed.
- the control device 122 moves the second base 8 to the loading standby position (S414).
- the loading standby position is a position where the workpiece 18 can be gripped by the chuck device 16 without moving the second base 8 by rotating each joint of the second robot 12.
- the control device 122 rotates the joints of the second robot 12 so that the workpiece can be moved to the input position where the first claw portion 104 and the second claw portion 106 of the chuck device 16 can hold the workpiece. Move 18
- the workpiece 18 placed at the input position is gripped by the first claw portion 104 and the second claw portion 106 of the chuck device 16.
- the processing for the chuck device 16 is incorporated into a series of processing for the second robot device 13.
- the control device 122 executes the processing of synchronization waiting B in S320 and S420.
- This process is a process of waiting until the operation of the chuck device 16 according to S418 described above is completed and the workpiece 18 is gripped by the chuck device 16.
- a series of processing for the first robot device 11 continues to be in a standby state from the processing of synchronization waiting A at S312 described above to the processing of synchronization waiting B at S320.
- the control device 122 executes the processes of S321 and S322 on the first robot device 11.
- the control device 122 moves the first base 6 to the reception standby position, as schematically shown in FIG.
- the reception standby position is a position opposite to the second bending mechanism 50 b of the second robot 12 as viewed from the chuck device 16 by rotating each joint of the first robot 10.
- the first bending mechanism 50 a is a position at which the workpiece 18 can be gripped.
- the control device 122 grips the workpiece 18 gripped by the chuck device 16 by driving each joint of the first robot 10 and the first bending mechanism 50a.
- the control device 122 executes the processing of synchronization waiting C in S324 and S424.
- This process is a process of waiting until the operation of the first robot 10 according to the above-described S322 is completed and the workpiece 18 is gripped by the first bending mechanism 50a of the first robot 10.
- the series of processing for the second robot device 13 continues to be in a standby state from the processing of synchronization waiting B in S420 described above to the processing of synchronization waiting C in S424.
- the control device 122 executes the same process as S138, S140, S238 and S240 in the first embodiment. That is, the pressure molds 90 of the first robot 10 and the second robot 12 are half tightened (S326, S426), and the second bending mechanism 50b of the first robot 10 and the second robot 12 is moved to the forward position (S340, S440). Also in the present embodiment, the processing by the control device 122 after the first bending mechanism 50a and the second bending mechanism 50b are moved to the advance position is, for example, a known bending process like the process disclosed in Patent Document 1. The processing is the same as the processing in the apparatus, so the description is omitted here.
- first pivot joint 58 corresponds to an example of the first joint.
- first rocking joint 52 and the second rocking joint 54 correspond to an example of a second joint.
- the control device 122 corresponds to an example of the speed control unit.
- the number of axes of the first robot 10 and the second robot 12 is “6 axes”, but the number of axes of the articulated robot in the present disclosure is not limited to “6 axes”.
- the number of axes of the articulated robot may be "7 axes" or more, or "4 axes” or "5 axes”. That is, the articulated robot in the present disclosure includes a first joint that rotates the robot about a vertical axis with respect to the base, and a second joint that bends the robot about an axis that is not parallel to the axis of the first joint. Any articulated robot may be used as long as it has a plurality of joints including at least.
- the chuck device 16 is movable along the first auxiliary track device 102 in each embodiment, the present invention is not limited to this.
- the chuck devices 16 may be fixed, and multiple (eg, three) chuck devices may be provided along the first auxiliary track device 102.
- the plurality of functions of one component in each embodiment may be realized by a plurality of components, or one function of one component may be realized by a plurality of components.
- a plurality of functions possessed by a plurality of components may be realized by one component, or a single function realized by a plurality of components may be realized by one component.
- a part of the configuration of the embodiment may be omitted. At least a part of the configuration of an embodiment may be added to or replaced with the configuration of another embodiment. All aspects included in the technical concept specified by only the words described in the claims are the embodiments of the present disclosure.
- a system having the bending apparatus as a component, a program for causing a computer to function as a part of the bending apparatus, non-transient actual recording medium such as a semiconductor memory recording this program can also be realized in various forms, such as a bending apparatus control method.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Robotics (AREA)
- Bending Of Plates, Rods, And Pipes (AREA)
- Manipulator (AREA)
Abstract
曲げ加工装置は、互いに平行な直線状に伸びるように並列配置された第1軌道装置及び第2軌道装置を備える。第1基台及び第1ロボットは第1軌道装置上を移動可能であり、第2基台及び第2ロボットは第2軌道装置上を移動可能である。第1ロボット及び第2ロボットのそれぞれは多関節ロボットであり、被加工物の把持及び曲げ加工を行う第1曲げ機構及び第2曲げ機構が、第1ロボットの一端及び第2ロボットの一端にそれぞれ配置される。被加工物を供給する被加工物供給装置は、第1軌道装置及び第2軌道装置が伸びる方向の一端側の位置であって、第1曲げ機構及び第2曲げ機構の少なくとも一方が到達可能な位置に設けられ、被加工物の長尺方向が第1軌道装置及び第2軌道装置が伸びる方向と直交するように、被加工物を供給するように構成される。
Description
本国際出願は、2017年8月25日に日本国特許庁に出願された日本国特許出願第2017-162643号に基づく優先権を主張するものであり、日本国特許出願第2017-162643号の全内容を本国際出願に参照により援用する。
本開示は、長尺状の被加工物を曲げ加工するように構成された曲げ加工装置に関する。
従来、長尺状の被加工物を複数箇所で曲げ加工する曲げ加工装置が知られている(例えば特許文献1参照)。この曲げ加工装置では、多関節型ロボットの先端に、被加工物の把持及び曲げ加工を行うように構成された曲げ機構が取り付けられる。また、特許文献1には、被加工物の加工速度を向上させるため、平行な直線状に伸びるように一対の軌道装置を並列配置し、各軌道装置に、それぞれが多関節型ロボットを搭載した基台をそれぞれの軌道装置上を移動可能に設けることも記載されている。その場合、2台の多関節型ロボットが協働することにより、被加工物の曲げ加工を迅速に行うことができる。
従来の曲げ加工装置では、前述のような軌道装置を設けた場合、軌道装置が伸びる方向と被加工物の長尺方向とが平行となるように、被加工物を曲げ加工装置に供給するのが一般的であった。そうすると、一対の軌道装置を平行に並列配置した場合、被加工物を自動供給するための被加工物供給装置は、各軌道装置と平行に配置されることになる。ただし、工場のレイアウト等によっては、一対の軌道装置に対して、各軌道装置が伸びる方向の一端側に、被加工物供給装置が設けられる方が好ましい場合もある。そのため、曲げ加工装置全体としてのレイアウトの自由度が向上されることが望ましい。
そこで、本開示の一局面は、軌道装置が伸びる方向の一端側に被加工物供給装置を設けて、曲げ加工装置全体としてのレイアウトの自由度を向上させることを目的とする。
本開示の曲げ加工装置は、長尺状の被加工物を曲げ加工するように構成された曲げ加工装置であって、第1軌道装置、第2軌道装置、第1基台、第2基台、第1ロボット、第2ロボット、第1曲げ機構、第2曲げ機構、及び、被加工物供給装置を備える。
第1軌道装置及び第2軌道装置は、互いに平行な直線状に伸びるように並列配置される。第1基台は、第1軌道装置に載置され、第1軌道装置上を移動可能である。第1ロボットは、第1基台に搭載される。第2基台は、第2軌道装置に載置され、第2軌道装置上を移動可能である。第2ロボットは第2基台に搭載される。第1ロボットの一端に配置された第1曲げ機構と、第2ロボットの一端に配置された第2曲げ機構は、被加工物の把持及び曲げ加工を行うように構成される。被加工物供給装置は、第1軌道装置及び第2軌道装置が伸びる方向の一端側に設けられ、被加工物を供給するように構成される。
第1ロボットは、第1ロボットが搭載された第1基台に対して鉛直軸回りに第1ロボットを回動させる第1関節と、第1ロボットの第1関節の軸と非平行な軸回りに第1ロボットを屈曲させる第2関節と、を少なくとも含む複数の関節を備えた多関節ロボットであり、第1ロボットの第1関節及び第2関節の動作により第1曲げ機構を移動させる。第2ロボットは、第2ロボットが搭載された第2基台に対して鉛直軸回りに第2ロボットを回動させる第1関節と、第2ロボットの第1関節の軸と非平行な軸回りに第2ロボットを屈曲させる第2関節と、を少なくとも含む複数の関節を備えた多関節ロボットであり、関節の動作により第2曲げ機構を移動させる。被加工物供給装置は、第1曲げ機構及び第2曲げ機構のうち少なくとも一方が到達可能な位置に設けられる。被加工物供給装置は、被加工物の長尺方向が第1軌道装置及び第2軌道装置が伸びる方向と直交するように、被加工物を供給する。
このように構成された曲げ加工装置では、被加工物供給装置は、第1軌道装置及び第2軌道装置が伸びる方向の一端側に設けられ、被加工物を供給するように構成される。しかも、被加工物供給装置は、被加工物の長尺方向が第1軌道装置及び第2軌道装置が伸びる方向と直交するように、被加工物を供給する。それにより、曲げ加工装置全体としてのレイアウトの自由度を向上させることができる。
第1ロボットは、少なくとも、第1ロボットが搭載された第1基台に対して鉛直軸回りに第1ロボットを回動させる第1関節と、第1ロボットの第1関節の軸と非平行な軸回りに第1ロボットを屈曲させる第2関節と、を備える。それにより、第1ロボットは、被加工物の把持及び曲げ加工を行うように構成された第1曲げ機構を、第1基台に対して種々の方向に移動させることができる。同様に、第2ロボットは、少なくとも、第2ロボットが搭載された第2基台に対して鉛直軸回りに第2ロボットを回動させる第1関節と、第2ロボットの第1関節の軸と非平行な軸回りに第2ロボットを屈曲させる第2関節と、を備える。それにより、第2ロボットは、被加工物の把持及び曲げ加工を行うように構成された第2曲げ機構を、第2基台に対して種々の方向に移動させることができる。しかも、被加工物供給装置は、第1曲げ機構及び第2曲げ機構の少なくとも一方が到達可能な位置に設けられる。そのため、前述のように被加工物供給装置を第1軌道装置及び第2軌道装置が伸びる方向の一端側に配置しても、被加工物供給装置から供給された被加工物を、第1曲げ機構及び第2曲げ機構の少なくとも一方を介して容易に把持することができ、曲げ加工を施すことができる。
本開示の曲げ加工装置において、第1軌道装置と第2軌道装置との間に、第1軌道装置及び第2軌道装置とは別体に配置され、被加工物を把持するように構成されたチャック装置を、更に備えてもよい。チャック装置は、被加工物供給装置から第1ロボット及び第2ロボットの少なくとも一方によって搬送された被加工物を把持するように構成されてもよい。
その場合、被加工物供給装置から第1ロボット及び第2ロボットの少なくとも一方によって搬送された被加工物をチャック装置によって把持し、第1曲げ機構及び第2曲げ機構によって、曲げ加工を被加工物に施すことができる。従って、この場合、被加工物に対する加工速度を一層良好に向上させることができる。
更にその場合、次のような制御装置を備え、第1ロボットの各関節及び第1曲げ機構の接続関係と、第2ロボットの各関節及び第2曲げ機構の接続関係とが同一となるように構成されてもよい。制御装置は、第1基台、第2基台、第1ロボット、第2ロボット、第1曲げ機構、第2曲げ機構、及び、チャック装置の動作を制御するように構成される。制御装置は、第1曲げ機構及び第2曲げ機構に被加工物供給装置が供給する被加工物を把持させる際、第1ロボットと第2ロボットのそれぞれの第1関節及び第2関節の動作を制御して、第1ロボットと第2ロボットとの間で、第1関節回りの回動位置が180°異なり、かつ、第1ロボットの第2関節から第1曲げ機構に向かう方向、及び、第2ロボットの第2関節から第2曲げ機構に向かう方向とが、いずれも、第2関節から被加工物供給装置に向かう方向となるようにする。
前述のように、第1軌道装置と第2軌道装置との間に設けられたチャック装置で被加工物を把持して、同様に構成された第1ロボット及び第2ロボットで被加工物を曲げ加工する場合、第1ロボット及び第2ロボットは、鉛直軸回りに180°異なる方向に向けた状態とされる場合が多い。これは、第1ロボット及び第2ロボットには被加工物側に向けた方が曲げ加工が容易になる側(以下、前側と称する)あり、チャック装置に把持された被加工物に第1ロボット及び第2ロボットの前側を向けることが好ましいからである。
制御装置は、第1ロボット及び第2ロボットを、鉛直軸回りに180°異なる方向に向けた状態から、第1曲げ機構及び第2曲げ機構によって、被加工物供給装置から供給された被加工物を把持させる。その状態から、チャック装置で被加工物を把持して曲げ加工を開始するまでの各ロボットの動作は、少なくとも鉛直軸回りの動作等が同様となる。第1ロボットの各関節及び第1曲げ機構の接続関係(例えば、関節間の距離)と、第2ロボットの各関節及び第2曲げ機構の接続関係とが同一となるように構成される。それにより、第1ロボット及び第2ロボットに係る制御プログラム等を、少なくとも一部共通化することができる。
本開示において、被加工物供給装置は、次のような第1コンベア、第2コンベア及び第3コンベアを備えたものであってもよい。第1コンベアは、被加工物を1つずつ保持して一旦上昇させた後に下降させるように構成された保持部を、複数備える。第2コンベアは、第1コンベアの保持部に被加工物を供給するように構成される。第3コンベアは、第1コンベアの保持部により一旦上昇された後に下降された被加工物を、第1曲げ機構及び第2曲げ機構の少なくとも一方によって把持可能な位置へ1つずつ搬送するように構成される。
この場合、第1コンベアの保持部に、予め被加工物を1つずつ保持しておくことができる。保持部は、一旦上昇した後に下降する軌道を通る。それにより、第1コンベアには、少ない設置スペースであっても多数の保持部を設けることが可能となる。従って、この場合、被加工物を1つずつ供給する動作が、安定して実行される。
第1コンベアの保持部へは、第2コンベアが被加工物を供給する。第1コンベアの保持部により一旦上昇された後に下降された被加工物は、第3コンベアによって、第1曲げ機構及び第2曲げ機構の少なくとも一方によって把持可能な位置へ1つずつ搬送される。
その場合、第1コンベアにおける被加工物を保持した保持部の数が所定個未満である合、被加工物を保持した保持部の数が所定個以上である場合に比べて第2コンベアの駆動速度を上昇させるように構成された速度制御部を、更に備えてもよい。
第1コンベアの所定個以上の保持部に被加工物が1つずつ保持された場合、特に、例えば、全ての保持部にそれぞれ1つずつ被加工物が保持された場合、被加工物を第3コンベアに1つずつ供給する動作が極めて安定して即時に実行可能となる。ところが、被加工物を保持した保持部の数が所定個未満である場合、例えば、保持部に1つも被加工物が保持されていない場合、第3コンベアへ被加工物を即時に供給することが困難となる。そのような場合、被加工物を保持した保持部の数が所定個以上である場合に比べて第2コンベアの駆動速度を上昇させることにより、第3コンベアへの被加工物の供給が停滞する時間を短縮することができる。
本開示の曲げ加工装置において、第1曲げ機構及び第2曲げ機構のそれぞれは、曲げ型と、曲げ型と係合する締め型とを有し、曲げ型と締め型とにより被加工物を挟み込むことで、被加工物を把持及び曲げ加工するように構成されてもよい。その場合、曲げ型に沿って被加工物を正確に曲げることができ、被加工物に対して正確な曲げ加工を施すことができる。
本開示の曲げ加工装置において、第1ロボット及び第2ロボットのそれぞれは、6軸以上の垂直多関節ロボットであってもよい。その場合、第1曲げ機構及び第2曲げ機構の動作の自由度、延いては、被加工物に対する曲げ加工の自由度を、より高いものとすることができる。
本開示において、「鉛直」及び「直交」及び「同一」とは、厳密な意味での鉛直又は直交又は同一に限るものではなく、目的とする効果を奏するのであれば厳密に鉛直又は直交又は同一でなくてもよい。
2…曲げ加工装置 4…第1軌道装置 5…第2軌道装置
6…第1基台 8…第2基台 10…第1ロボット
11…第1ロボット装置 12…第2ロボット 13…第2ロボット装置
16…チャック装置 18…被加工物 20…被加工物供給装置
50a…第1曲げ機構 50b…第2曲げ機構 52…第1揺動関節
54…第2揺動関節 56…第3揺動関節 58…第1旋回関節
60…第2旋回関節 62…第3旋回関節 66…第1旋回台
68…第1アーム 70…第2アーム 80…曲げ型
88…締め型 90…圧力型 102…第1補助軌道装置
122…制御装置 202…第2補助軌道装置
204…第1コンベア 206…第2コンベア 208…第3コンベア
216…第1チェーン 244…第2チェーン 220…保持部
234…ベルト 236…ストッパ 246…受け部
250…供給スポット
6…第1基台 8…第2基台 10…第1ロボット
11…第1ロボット装置 12…第2ロボット 13…第2ロボット装置
16…チャック装置 18…被加工物 20…被加工物供給装置
50a…第1曲げ機構 50b…第2曲げ機構 52…第1揺動関節
54…第2揺動関節 56…第3揺動関節 58…第1旋回関節
60…第2旋回関節 62…第3旋回関節 66…第1旋回台
68…第1アーム 70…第2アーム 80…曲げ型
88…締め型 90…圧力型 102…第1補助軌道装置
122…制御装置 202…第2補助軌道装置
204…第1コンベア 206…第2コンベア 208…第3コンベア
216…第1チェーン 244…第2チェーン 220…保持部
234…ベルト 236…ストッパ 246…受け部
250…供給スポット
以下、本開示の実施形態について図面を用いて説明する。なお、本開示は、下記の実施形態に何ら限定されることはなく、本開示の技術的範囲に属する限り種々の形態を採りうる。
[第1実施形態]
まず、第1実施形態の曲げ加工装置の全体構成を説明する。
[第1実施形態]
まず、第1実施形態の曲げ加工装置の全体構成を説明する。
図1,図2に示すように、第1実施形態の曲げ加工装置2は、第1軌道装置4と、第2軌道装置5と、第1基台6と、第2基台8と、第1ロボット10と、第2ロボット12と、を備える。
第1軌道装置4及び第2軌道装置5は、図1における左右方向(以下、X方向)に直線状に伸びるように並列に配置される。第1基台6は、第1軌道装置4に搭載されて第1軌道装置4の長手方向(X方向)に移動可能である。第2基台8は、第2軌道装置5に搭載されて第2軌道装置5の長手方向(X方向)に移動可能である。第1ロボット10は、第1基台6に搭載される。第2ロボット12は、第2基台8に搭載される。第1基台6及び第1ロボット10を第1ロボット装置11と称する。第2基台8及び第2ロボット12を第2ロボット装置13と称する。
更に、曲げ加工装置2は、チャック装置16と、被加工物供給装置20(すなわち、ローダー)と、シューター21と、を備える。チャック装置16は、第1軌道装置4と第2軌道装置5との間に、それらとは別体のものとして配置される。チャック装置16は、パイプ等の長尺状の被加工物18(すなわち、ワーク)の長尺方向がX方向と一致するように被加工物18を把持する。被加工物供給装置20は、被加工物18の長尺方向が第1軌道装置4及び第2軌道装置5が伸びる方向(すなわち、X方向)と直交するように、被加工物18を供給する。シューター21は、第1ロボット装置11及び第2ロボット装置13の少なくとも一方の稼働範囲内に(図1の例では、二点差線21にて示す範囲に)配置される。シューター21へ、曲げ加工後の被加工物18が搬出される。
図1の二点鎖線L1で囲まれた範囲が、第1ロボット装置11の稼働範囲(詳しくは被加工物18を把持する動作が可能な範囲)である。図1の二点鎖線L2で囲まれた範囲が、第2ロボット装置13の稼働範囲(詳しくは被加工物18を把持する動作が可能な範囲)である。
次に、曲げ加工装置2の各部の構成について詳細に説明する。第1ロボット装置11と第2ロボット装置13は、基本的に同様な構成を備える。すなわち、第1ロボット装置11の各関節及び後述の第1曲げ機構50aの接続関係と、第2ロボット装置13の各関節及び後述の第2曲げ機構50bの接続関係とが同一となるように構成される。また、第1軌道装置4と第2軌道装置5とも、基本的に同様な構成を備える。そこで、以下では、第1軌道装置4及び第1ロボット装置11を例として用いて説明する。
<第1軌道装置4>
図3に示すように、第1軌道装置4上には、第1基台6が、図3の紙面と垂直な方向(X方向)に移動可能に配置される。
図3に示すように、第1軌道装置4上には、第1基台6が、図3の紙面と垂直な方向(X方向)に移動可能に配置される。
より詳しくは、図5に模式的に示すように、第1軌道装置4は第1レール26及び第2レール28を含む。第1レール26は、図5の左側部分に示されるの凸状の第1基部22の上に配置され、X方向に平行に延びる。第2レール28は、図5の右側部分に示される第2基部24の上に配置され、X方向に平行に延びる。第1レール26の断面形状は図5における左右方向(Y方向、すなわち、X方向及び鉛直方向に直交する方向)の両側に凹部26aを有する。第2レール28の断面形状は図5における左右方向(Y方向)の両側に凹部28aを有する。
第1基台6の下面には、第1ガイド30と第2ガイド32とが配置される。Y方向における第1ガイド30と第2ガイド32との中心間距離は、Y方向における第1レール26と第2レール28との中心間距離と同一である。第1ガイド30は、例えば周知のLMガイド(登録商標)であり、その下面側には、第1レール26と嵌合する第1溝34が形成される。第2ガイド32は、例えば周知のLMガイド(登録商標)であり、その下面側には、第2レール28と嵌合する第2溝36が形成される。
Y方向における第1溝34の両側には、Y方向における第1レール26の両側の凹部26aに対して、図5の上下方向に係合する第1凸部30aが形成され、第1ガイド30が、図5の上方に脱落しないように構成される。Y方向における第2溝36の両側には、Y方向における第2レール28の両側の凹部28aに対して、図5の上下方向に係合する第2凸部32aが形成され、第2ガイド32が、図5の上方に脱落しないように構成される。
第1基部22の図5における右上の端部(図5における右面側)には、X方向に沿ってラック(ラックギア)38が形成される。第1基台6の上面側には、基台用モータ40(図3参照)が固定される。第1基台6の下面側には、基台用モータ40によって駆動されるピニオンギア44が配置される。ラック38とピニオンギア44とは噛み合うように配置される。
従って、基台用モータ40が駆動されると、ラック38とピニオンギア44とにより、第1基台6(従って第1ロボット装置11)が、第1軌道装置4に沿ってX方向に移動する。
<第1ロボット10>
図3及び図4に示すように、第1ロボット10は、複数のアームや関節を備えた関節型ロボット(多関節ロボット)である。第1ロボット10の先端には、パイプ等の長尺状の被加工物18を把持したり曲げ加工したりする第1曲げ機構50aが取り付けられる。
図3及び図4に示すように、第1ロボット10は、複数のアームや関節を備えた関節型ロボット(多関節ロボット)である。第1ロボット10の先端には、パイプ等の長尺状の被加工物18を把持したり曲げ加工したりする第1曲げ機構50aが取り付けられる。
第1ロボット10は、関節で接続された2つの部材が揺動つまり屈曲動作を行うことを可能にする3個の第1~第3揺動関節52,54,56と、関節で接続された一方の部材に対して他方の部材が旋回動作を行うことを可能とする3個の第1~第3旋回関節58,60,62とを備える。揺動関節の軸の方向は、2つの部材のリンク方向に対して直角である。旋回関節の軸の方向は、2つの部材のリンク方向と同じである。
より詳しくは、第1ロボット10は、第1基台6に取り付けられた固定部64を備え、固定部64と第1旋回台66とは、第1旋回関節58により接続される。第1旋回関節58は、鉛直軸CV1回りに第1旋回台66を所定角度で回動駆動する機構を有する。図3及び図4に、第1旋回台66の回動方向を矢印Aで示す。
第1旋回台66には、第1アーム68の一端が第1揺動関節52を介して接続される。第1揺動関節52は水平軸CH1回りに第1アーム68を所定角度で回動駆動する機構を有する。第1揺動関節52の水平軸CH1と第1旋回関節58の鉛直軸CV1とは直交する。図3に、第1アーム68の回動方向を矢印Bで示す。
第1アーム68の他端と第2アーム70の一端とが第2揺動関節54を介して接続される。第2揺動関節54は第1揺動関節52の水平軸CH1と平行な軸CH2回りに第2アーム70を所定角度で回動駆動する機構を有する。図3に、第2アーム70の回動方向を矢印Cで示す。
第2アーム70には、第2旋回関節60が設けられており、第2アーム70の軸を中心とした旋回軸を中心として、第2アーム70の後部70bは前部70aに対してひねり運動を行うことができる。図3及び図4に、後部70bの回動方向を矢印Dで示す。
図4に示すように、第2アーム70の他端には、第2旋回台72が第3旋回関節62を介して接続される。第3旋回関節62は、第1揺動関節52の水平軸CH1及び第2揺動関節54の水平軸CH2と直交する軸CV2回りに第2旋回台72を所定角度で回動駆動する機構を有する。図4に、第2旋回台72の回動方向を矢印Eで示す。
第2旋回台72には、先端アーム74の一端が第3揺動関節56を介して接続される。第3揺動関節56は、先端アーム74を図3に示す軸CH3回りに回動する。図3に、先端アーム74の回動方向を矢印Fで示す。図4に示す第3旋回関節62及び第2旋回台72は、図3においては別の部材に隠れており、現れていないことに留意されたい。
図4に示すように、先端アーム74の先端に回転可能な補助関節76が設けられている。補助関節76に第1曲げ機構50aが取り付けられる。補助関節76は、第3揺動関節56と図示しないギア機構により機械的に接続される。ギア機構は、入力の回転数よりも出力の回転数が増加するように構成された周知のギアボックスである。
第3揺動関節56により先端アーム74が360°旋回すると、補助関節76により第1曲げ機構50aは360°以上旋回するように構成される。以上のような構成により、被加工物18を障害とすることなく第1曲げ機構50aを被加工物18の廻りに回動させることなどが可能である。
上記例では補助関節76は、第3揺動関節56と図示しないギア機構により機械的に接続されていたが、本開示はこれに限るものではない。補助関節76は、例えば別の駆動モータにより、第3揺動関節56と独立して旋回する構成でもよい。
<第1曲げ機構50a>
図3,図4に示すように、第1曲げ機構50aは、曲げ型80を備えており、曲げ型80は、その軸回りに溝部82が形成される。図3に示す例では曲げ型80の溝部82を1種類としているが、本開示はこれに限るものではない。例えば、曲げ型80の軸方向に複数種類の曲げ半径に応じた複数の溝部が積み重ねられて形成されていてもよい。
図3,図4に示すように、第1曲げ機構50aは、曲げ型80を備えており、曲げ型80は、その軸回りに溝部82が形成される。図3に示す例では曲げ型80の溝部82を1種類としているが、本開示はこれに限るものではない。例えば、曲げ型80の軸方向に複数種類の曲げ半径に応じた複数の溝部が積み重ねられて形成されていてもよい。
第1曲げ機構50aは、曲げ型80と協働して被加工物18を把持する締め型88を備えている。締め型88は、シリンダ89により駆動されて曲げ型80に向かって移動する。更に、締め型88に並んで曲げ加工時の反力を受ける圧力型90が設けられる。圧力型90は、シリンダ89とは独立して設けられた図示省略したシリンダにより駆動されて曲げ型80に向かって移動する。締め型88は、被加工物18を溝部82との間に把持した状態で曲げ型80の回りを公転し、被加工物18を所定の角度曲げ加工することができる。
<チャック装置16>
図2に示すように、チャック装置16は、X方向に伸びる第1補助軌道装置102上に載置されており、手動により図2の紙面と垂直な方向(X方向)に移動可能である。チャック装置16は、第1補助軌道装置102によってX方向へ移動可能に支持されて立設された支柱100の上端に支持される。
図2に示すように、チャック装置16は、X方向に伸びる第1補助軌道装置102上に載置されており、手動により図2の紙面と垂直な方向(X方向)に移動可能である。チャック装置16は、第1補助軌道装置102によってX方向へ移動可能に支持されて立設された支柱100の上端に支持される。
チャック装置16は、支柱100の上端に設けられた第1爪部104及び第2爪部106を備える。第1爪部104及び第2爪部106は、支柱100の上端に設けられたX方向に伸びる軸108を中心にして、その軸108よりも上側の部分がY方向に揺動可能である。第1爪部104及び第2爪部106の上端部には、互いに対向する側に凹部が形成され、軸108の上方で第1爪部104及び第2爪部106の上端同士が近接しあうことにより、被加工物18を把持することができる。第1爪部104及び第2爪部106は、図示しないリンク機構及び図示しない駆動装置によって、第1爪部104及び第2爪部106の上端同士が近接又は離間するように駆動される。本例では、チャック装置16は、チャック装置16に把持された被加工物18が、水平な状態となるように、つまり、第1旋回関節58の鉛直軸CV1と直交するように、構成される。
<被加工物供給装置20>
被加工物供給装置20は、図6に示すように、第2補助軌道装置202に沿ってY方向に移動可能な第1コンベア204,第2コンベア206,第3コンベア208を備える。第1コンベア204は、いわゆるストックコンベアであり、第2コンベア206は、いわゆる素管コンベアであり、第3コンベア208は、いわゆるベンダーコンベアである。第1コンベア204,第2コンベア206,第3コンベア208の相対位置は、フレーム210によって決められる。フレーム210が第2補助軌道装置202に沿って移動することにより、第1コンベア204,第2コンベア206,第3コンベア208は、相対位置を維持したままY方向に移動する。
被加工物供給装置20は、図6に示すように、第2補助軌道装置202に沿ってY方向に移動可能な第1コンベア204,第2コンベア206,第3コンベア208を備える。第1コンベア204は、いわゆるストックコンベアであり、第2コンベア206は、いわゆる素管コンベアであり、第3コンベア208は、いわゆるベンダーコンベアである。第1コンベア204,第2コンベア206,第3コンベア208の相対位置は、フレーム210によって決められる。フレーム210が第2補助軌道装置202に沿って移動することにより、第1コンベア204,第2コンベア206,第3コンベア208は、相対位置を維持したままY方向に移動する。
第1コンベア204は、上下に配設された第1スプロケット212及び第2スプロケット214の間にチェーン216を架設した構成を有し、図6における反時計回り方向に回転する。チェーン216には、チェーン216の1コマ毎に保持部220(すなわち、ストッカー)が設けられる。
各保持部220は、金属を折り曲げ加工して得られる第1平板部222,第2平板部224,第3平板部226を備える。第1平板部222は、チェーン216のリンク方向に沿って回転しながら移動する。第2平板部224は、第1平板部222の回転方向前方側の端縁に連接され、第1平板部222に対する法線よりも回転方向前方側に傾斜する。第3平板部226は、第2平板部224の先端(すなわち、第1平板部222とは反対側の端縁)に連接され、第1平板部222に対する法線よりも回転方向後方側に傾斜する。
第2コンベア206は、図6における左右方向(すなわち、X方向)に並べて配設された第1のローラ230及び第2ローラ232と、第1ローラ230及び第2ローラ232によって水平方向に架設されたベルト234と、を備える。第1ローラ230及び第2ローラ232の少なくとも一方が図6における反時計方向に回転駆動されることにより、ベルト234は、ベルト234の上に載置された被加工物18を第1コンベア204に向けて搬送する。第2コンベア206における搬送経路には、図示省略したアクチュエータにより突出/退避が切り換えられるストッパ236が設けられる。ストッパ236は、被加工物18の大きさ(例えば、直径)に応じて突出/退避のタイミングが制御される。ベルト234によって搬送された被加工物18は、ストッパ236の動作により、ストッパ236よりも下流側へ1つずつ分離されて(すなわち、切り出されて)搬送される。
ベルト234の上には、曲げ加工装置2の使用者が、台車等によって搬送した被加工部18を乗せる。その後、ベルト234の図6における左端まで搬送された被加工物18は、第1ガイド238に沿って第1コンベア204に向けて落下する。すると、保持部220の第1平板部222と、その保持部220と回転方向後方にて隣接する保持部220の第2平板部224とによって、被加工物18が1つずつ保持され、被加工物18は上方へ搬送される。
保持部220が上側の第2スプロケット214の上方を通過すると、被加工物18は、回転方向前方側の保持部220の第2平板部224及び第3平板部226によって保持され、下降する。被加工物18が所定位置まで下降すると、第2ガイド248に係合して、被加工物18は第3コンベア208に向けて落下する。
第3コンベア208は、図6における左右方向(すなわち、X方向)に並べて配設された第1スプロケット240及び第2スプロケット242の間にチェーン244を架設した構成を有し、図6における反時計回り方向に回転する。そのチェーン244の外周には、チェーン244の所定コマ毎に受け部246が設けられる。受け部246は、チェーン244の上方に配置されたとき、更に上方に突出する板状に構成され、中央に、被加工物18を受け入れる切欠き246aが形成される。
第2ガイド248に沿って落下した被加工物18は、切欠き246aに受け入れられることによって1つずつ図6における左方へ搬送され、第3コンベア208の図6における左側に隣接配置された供給スポット250に落とされる。供給スポット250の上面には、被加工物18を受け入れる切欠き250aが形成され、第3コンベア208によって搬送された被加工物18は切欠き250aに受け入れられる。
このような第1~第3コンベア204,206,208の組は、第2補助軌道装置202の軌道上に少なくとも2つ互いに向き合うように対称に設けられる。被加工物18の長尺方向両端が第1~第3コンベア204,206,208の各組によって搬送されると、被加工物18は、一対の供給スポット250の切欠き250aに両端を受け入れられた状態で保持される。このように把持された被加工物18は、第1ロボット装置11及び第2ロボット装置13による次のような動作により、把持できる。
<第1ロボット装置11及び第2ロボット装置13の基本動作>
第1ロボット装置11については、第1基台6のX方向への動作を制御することにより、第1ロボット装置11のX方向の位置を決めることができる。第2ロボット装置13については、第2基台8のX方向への動作を制御することにより、第2ロボット装置13のX方向の位置を決めることができる。第1ロボット装置11及び第2ロボット装置13のそれぞれについて、X方向への移動と共に、第1~第3揺動関節52,54,56、第1~第3旋回関節58,60,62を旋回することにより、第1曲げ機構50a及び第2曲げ機構50bの姿勢や移動位置を制御することができる。
第1ロボット装置11については、第1基台6のX方向への動作を制御することにより、第1ロボット装置11のX方向の位置を決めることができる。第2ロボット装置13については、第2基台8のX方向への動作を制御することにより、第2ロボット装置13のX方向の位置を決めることができる。第1ロボット装置11及び第2ロボット装置13のそれぞれについて、X方向への移動と共に、第1~第3揺動関節52,54,56、第1~第3旋回関節58,60,62を旋回することにより、第1曲げ機構50a及び第2曲げ機構50bの姿勢や移動位置を制御することができる。
例えば、被加工物18を把持する位置に応じて、被加工物18の軸方向と曲げ型80の溝部82の接線方向とが一致するように第1曲げ機構50aや第2曲げ機構50bを移動できる。また、被加工物18の曲げ方向に応じて、被加工物18の曲げ方向と曲げ型80の溝部82の半径方向とが一致するように第1曲げ機構50aや第2曲げ機構50bを移動できる。
つまり、被加工物18の把持位置や曲げ方向に対応させて、第1曲げ機構50aや第2曲げ機構50bの姿勢を変えることができる。第1実施形態では、第3揺動関節56と補助関節76とは同期した一定の関係がある。そのため、把持位置や曲げ方向が定まれば、先端アーム74及び第3揺動関節56の位置は定まる。
第2揺動関節54の位置は、第1揺動関節52を中心とし、第1揺動関節52と第2揺動関節54との間の距離を半径とする円弧上にあると共に、第3揺動関節56を中心とし、第2揺動関節54と第3揺動関節56との間の距離を半径とする円弧上にある。よって、第2揺動関節54はこれらの両円弧の交点にあれば、曲げ型80の位置が定まる。このとき、交点は2点存在する場合があるが、その場合には、第2アーム70が被加工物18と干渉したり、曲げ加工後の被加工物18の先端が第2アーム70と干渉したりしない交点を選択する。
こうして、各第1~第3揺動関節52,54,56の位置が定まることにより、固定部64と第1アーム68とのなす角度、第1アーム68と第2アーム70とのなす角度、第2アーム70と先端アーム74とのなす角度が各々求められる。この求めた各角度に応じて、各第1~第3揺動関節52,54,56により第1アーム68,第2アーム70,先端アーム74が所定の角度に旋回する。これにより、曲げ型80の溝部82が被加工物18に当接するように移動される。
第1ロボット10の第1曲げ機構50a又は第2ロボット12の第2曲げ機構50bの位置を、X方向に移動させる場合には、第1基台6又は第2基台8を所定量X方向に移動させることによって対応することが可能である。一対の供給スポット250の切欠き250aに両端を受け入れられた状態で保持された被加工物18に曲げ加工を施す場合、第1基台6は第1軌道装置4の被加工物供給装置20側端部まで移動し、第2基台8は第2軌道装置5の被加工物供給装置20側端部まで移動する。その移動後、第1ロボット10及び第2ロボット12の各関節を適宜回動させれば、前述のように切欠き250aに両端を受け入れられた被加工物18を、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bによって把持できる。
このようにして、切欠き250aに両端を受け入れられた被加工物18を把持する(すなわち、受け取る)場合、次のような2つの方法が考えられる。1つの方法は、図3に示す第1ロボット10の左側(以下、前側と称する)を被加工物供給装置20側に向けて、第1アーム68及び第2アーム70を前側に伸ばして把持する方法(以下、順面受け取りと称する)である。もう1つの方法は、図3に示す第1ロボット10の右側(以下、後側と称する)を被加工物供給装置20に向けて、第1アーム68及び第2アーム70を後側に伸ばして把持する方法(以下、背面受け取りと称する)である。このようして把持された被加工物18は、前述のように第1曲げ機構50a及び第2曲げ機構50bが適宜移動されることによってチャック装置16の上部まで搬送され、第1爪部104及び第2爪部106によって把持された後、前述のような曲げ加工を施される。第1ロボット10及び第2ロボット12のそれぞれは、前側を被加工物18に向けた方が被加工物18に対する曲げ加工を容易に実行できるよう設計されてもよい。
<曲げ加工装置2の制御>
以下、第1ロボット装置11及び第2ロボット装置13によって、被加工物18を被加工物供給装置20からチャック装置16まで搬送する際の制御について、詳細に説明する。まず、曲げ加工装置2の電気的構成について説明する。
<曲げ加工装置2の制御>
以下、第1ロボット装置11及び第2ロボット装置13によって、被加工物18を被加工物供給装置20からチャック装置16まで搬送する際の制御について、詳細に説明する。まず、曲げ加工装置2の電気的構成について説明する。
図7に示すように、曲げ加工装置2は、ホストコンピュータ120及び制御装置122によって、駆動制御されて被加工物18の加工を行う。ホストコンピュータ120は、CPU124、ROM126及びRAM128を、論理演算回路の主たる構成として備える。CPU124、ROM126及びRAM128は、入力機器130及び表示装置132との間の信号の入出力を行う入出力回路134に、コモンバス136を介して、接続される。入力機器130は、周知のキーボードであってもよいし、タッチパネル式であってもよいが、これらに限られない。
被加工物18に対して行われる加工或いは処理に関するデータは、オペレータにより操作される入力機器130からホストコンピュータ120に入力される。ホストコンピュータ120では、第1ロボット装置11,第2ロボット装置13、第1曲げ機構50a、第2曲げ機構50b及びチャック装置16を作動させるためのプログラムが作成され、作成されたプログラムがホストコンピュータ120から制御装置122に送信される。
制御装置122は、CPU138、ROM140及びRAM142を論理演算回路の主たる構成として備える。CPU138、ROM140及びRAM142は、コモンバス144を介して、入出力回路146に接続され、この入出力回路146には、第1ロボット装置11,第2ロボット装置13、第1曲げ機構50a、第2曲げ機構50b、チャック装置16及び被加工物供給装置20が接続される。
次に、曲げ加工装置2の制御処理について説明する。ここでは、曲げ加工装置2の主な動作のうち、第1曲げ機構50a、第2曲げ機構50bを用いた曲げ加工が開始されるまでの動作について、制御装置122において行われる処理を、図8のフローチャートに基づいて説明する。図8に示す処理は、供給スポット250の切欠き250aに被加工物18が両端を受け入れられ、そのことを示す信号が被加工物供給装置20から制御装置122へ入力されたときに開始される。この処理は、記憶媒体としてのROM140及びRAM142に記憶されたプログラムに基づき、CPU138によって実行される。
処理が開始されると、制御装置122は、第1ロボット装置11に前述した順面受け取りによる被加工物18の受け取りを指示し(S110)、第2ロボット装置13には、前述した背面受け取りによる被加工物18の受け取りを指示する(S210)。なお、Sはステップを表す(以下同様)。
この指示に応じて、図9に模式的に示すように、第1ロボット装置11及び第2ロボット装置13は第1軌道装置4及び第2期同装置5の被加工物供給装置20側端部までそれぞれ移動する。また、第1ロボット10の前側が被加工物供給装置20に対向し、かつ、第2ロボット12の後側が被加工物供給装置20と対向するように、各第1旋回関節58回りの回動がなされる。更に、第1ロボット10の第1曲げ機構50aは、第1ロボット10の第1アーム68及び第2アーム70が第1ロボット10の前側に伸ばされることにより被加工物18に達する。また、第2ロボット12の第2曲げ機構50bは、第2ロボット12の第1アーム68及び第2アーム70が第2ロボット12の後側に伸ばされることにより被加工物18に達する。
図8に戻って、以上の処理により、第1ロボット装置11の第1曲げ機構50aの溝部82及び第2ロボット装置13の第2曲げ機構50bの溝部82に被加工物18の両端が当接するタイミングで、制御装置122は、次のS112,S212の処理を実行する。S112では、シリンダ89によって締め型88が溝部82に向けて締め付けられることにより、第1ロボット装置11における締め型88と溝部82との間に被加工物18が締め付けられる。その結果、被加工物18は、第1ロボット装置11の第1曲げ機構50aによって、長尺方向にも太さ方向にもずれないように把持される。
一方S212では、第2ロボット装置13における圧力型90が溝部82に向けてある程度の力で締め付けられる。その結果、被加工物18は、第2ロボット装置13の第2曲げ機構50bによって、長尺方向には摺動することが可能であっても太さ方向にはずれないように把持される。以下、このような把持状態を半締めと称する。
続いて、制御装置122はS114,S214による同期待ちAの処理を実行する。この処理は、前述のS112の処理による締め型88を締める動作及びS212の処理による圧力型90を半締めする動作が共に完了するまで待機する処理である。
締める動作及び半締めする動作が共に完了すると、制御装置122は、S116,S216の処理を実行する。S116では、制御装置122は、第1ロボット10に、第1アーム68及び第2アーム70を上方に向けて伸ばした姿勢(以下、バンザイ姿勢)を取らせる。S216では、制御装置122は、第2ロボット12にバンザイ姿勢を取らせる。
続いて、制御装置122はS118,S218による同期待ちBの処理を実行する。この処理は、前述のS116,S216の処理によるバンザイ姿勢を取る動作が、第1ロボット10及び第2ロボット12で共に完了するまで待機する処理である。このように第1ロボット10及び第2ロボット12がバンザイ姿勢を取ることにより、図10に模式的に示すように第1ロボット10及び第2ロボット12の緩衝域が小さくなり、第1旋回関節58を介して第1ロボット10又は第2ロボット12が回動するときに周囲の部材と干渉するのを抑制することができる。
図8に戻ってバンザイ姿勢を取る動作が共に完了すると、制御装置122は、S120,S220の処理を実行する。すなわち、制御部122は、第1基台6及び第2基台8を走行させることにより、第1ロボット装置11及び第2ロボット装置13をチャック装置16との対向位置(すなわち、中央位置)へ移動させる。続いて、制御装置122はS121,S221による同期待ちCの処理を実行する。この処理は、前述のS120,220の処理による中央位置への移動が共に完了するまで待機する処理である。このとき、図11に模式的に示すように、第1ロボット10及び第2ロボット12は、バンザイ姿勢を維持したままである。
図8に戻って、中央位置への移動が共に完了すると、制御装置122は、S122,S222の処理を実行する。これらの処理では、第1ロボット10及び第2ロボット12それぞれの第1~第3揺動関節52,54,56(すなわち、3軸)が駆動され、必要に応じて第1基台6及び第2基台8が移動されることにより、被加工物18の中心がチャック装置16の上方に配置される。このとき、図12に模式的に示すように、第2ロボット12の第1アーム68及び第2アーム70は、第2ロボット12の後側に傾斜した状態から第2ロボット12の前側に傾斜した状態に変位する。図8に戻って、続いて制御装置122はS124,S224による同期待ちDの処理を実行する。この処理は、前述のように3軸及び第1基台6及び第2基台8の移動が完了して、被加工物18の中心がチャック装置16の上方に配置されるまで待機する処理である。
図8に戻って、第1~第3揺動関節52,54,56の3軸、第1基台6及び第2基台8の移動が完了して、被加工物18の中心がチャック装置16の上方に配置されると、制御装置122は、S126,S226の処理を実行する。これらの処理は、図13に模式的に示すように、第1基台6,第2基台8、第1ロボット10及び第2ロボット12を移動させることにより、被加工物18を投入上空位置まで移動させる処理である。投入位置とは、チャック装置16の第1爪部104及び第2爪部106によって被加工物18を把持可能な位置であり、投入上空位置とは、第1ロボット10及び第2ロボット12それぞれの第1アーム68及び第2アーム70を移動させて被加工物18を下降させることにより被加工物18を投入位置に配設可能な位置である。
図8に戻って、続いて制御装置122はS128,S228による同期待ちEの処理を実行する。この処理は、前述のS126,S226に係る第1ロボット装置11及び第2ロボット装置13の動作が完了し、被加工物18が投入位置上空に配置されるまで待機する処理である。被加工物18が投入上空位置に配置されると、制御装置122は、S130,S230の処理を実行する。これらの処理は、図14に模式的に示すように、第1ロボット10及び第2ロボット12の第1アーム68及び第2アーム70(もしくはそのいずれか一方)を移動させることにより、被加工物18を投入位置まで移動させる処理である。図8に戻って、続いて制御装置122はS132,S232による同期待ちFの処理を実行する。この処理は、前述のS130,S230に係る第1ロボット装置11及び第2ロボット装置13の動作が完了し、被加工物18が投入位置に配置されるまで待機する処理である。
続いて、制御装置122は、S134の処理を実行する。この処理では、制御装置122は、投入位置に配置された被加工物18をチャック装置16の第1爪部104及び第2爪部106によって把持する。本例では、チャック装置16に対する制御を第1ロボット装置11に対する一連の処理に組み込んでいるが、第2ロボット装置13に対する一連の処理に組み込んでもよく、あるいは、独立した処理としてもよい。続いて制御装置122はS136,S236による同期待ちGの処理を実行する。この処理は、前述のS134に係るチャック装置16の動作が完了し、被加工物18がチャック装置16に把持されるまで待機する処理である。
続いて、制御装置122は、S138,S238の処理を実行する。これらの処理では、制御装置122は、第1ロボット10及び第2ロボット12の圧力型90を半締めにする。これによって、第1ロボット装置11及び第2ロボット装置13が被加工物18の長尺方向に移動可能となる。更に、続くS140,240では、制御装置122は、第1ロボット装置11及び第2ロボット装置13を被加工物18の長尺方向に移動させることにより、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bを前出し位置(すなわち、被加工物18に対する曲げ加工を開始する位置)へ移動させる。このように、第1曲げ機構50a及び第2曲げ機構50bが前出し位置へ移動された後の制御装置122による処理は、例えば特許文献1に開示された処理のように、周知の曲げ加工装置における処理と同様であるので、ここでは説明を省略する。
制御装置122は、加工物供給装置20における供給スポット250の切欠き250aに被加工物18が両端を受け入れられたときに、図8の処理を開始したが、処理が早期に開始できるように、制御装置122は次のような制御を実行してもよい。
すなわち、第1コンベア204における所定個以上の保持部220のそれぞれに被加工物18が1つずつ保持された場合、被加工物18を第3コンベア208に1つずつ供給する動作が極めて安定して即時に実行可能である。一方、曲げ加工装置2の起動直後などのように、被加工物18を保持した保持部220の数が少ない場合、例えば、保持部220に1つも被加工物18が保持されていない場合、第3コンベア208へ被加工物18を即時に供給することが困難である。そのような場合、被加工物18を即時に供給することが可能な場合に比べて第2コンベア206の駆動速度を上昇させる。この制御により、第3コンベア208へ被加工物18を供給できない時間を短縮し、図8の処理を早期に開始することができる。
<第1実施形態の効果>
以上詳述した第1実施形態によれば、以下の効果が得られる。
(1a)第1実施形態の曲げ加工装置2では、被加工物供給装置20は、当該第1軌道装置4及び第2軌道装置5が伸びる方向の一端側に設けられ、被加工物18を供給するように構成される。しかも、被加工物供給装置20は、被加工物18の長尺方向が第1軌道装置4及び第2軌道装置5が伸びる方向と直交するように、被加工物18を供給する。それにより、曲げ加工装置2全体としてのレイアウトの自由度を向上させることができる。
以上詳述した第1実施形態によれば、以下の効果が得られる。
(1a)第1実施形態の曲げ加工装置2では、被加工物供給装置20は、当該第1軌道装置4及び第2軌道装置5が伸びる方向の一端側に設けられ、被加工物18を供給するように構成される。しかも、被加工物供給装置20は、被加工物18の長尺方向が第1軌道装置4及び第2軌道装置5が伸びる方向と直交するように、被加工物18を供給する。それにより、曲げ加工装置2全体としてのレイアウトの自由度を向上させることができる。
第1実施形態における第1ロボット10は、少なくとも、第1ロボット10が搭載された第1基台6に対して鉛直軸CV1回りに第1ロボット10を回動させる第1旋回関節58と、第1旋回関節58の軸と非平行な軸回りに第1ロボット10を屈曲させる第1揺動関節52及び第2揺動揺動関節54と、を備える。それにより、第1ロボット10は第1曲げ機構50aを第1基台6に対して種々の方向に移動させることができる。同様に、第1実施形態における第2ロボット12は、少なくとも、第2ロボット12が搭載された第2基台8に対して鉛直軸CV1回りに第2ロボット12を回動させる第1旋回関節58と、第1旋回関節58の軸と非平行な軸回りに第2ロボット12を屈曲させる第1揺動関節52及び第2揺動揺動関節54と、を備える。それにより、第2ロボット12は第2曲げ機構50bを第2基台8に対して種々の方向に移動させることができる。しかも、被加工物供給装置20は、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bが到達可能な位置に設けられる。それにより、前述のように被加工物供給装置20を第1軌道装置4及び第2軌道装置5が伸びる方向の一端側に配置しても、被加工物供給装置20から供給された被加工物18を、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bを介して容易に把持することができ、曲げ加工を施すことができる。
(1b)第1実施形態の曲げ加工装置2では、第1軌道装置4と第2軌道装置5との間にチャック装置16を備え、チャック装置16は、被加工物供給装置20から第1ロボット装置11及び第2ロボット装置13によって搬送された被加工物18を把持する。それにより、被加工物18をチャック装置16によって把持し、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bによって、曲げ加工を被加工物18に施すことができる。従って、被加工物18に対する加工速度を一層良好に向上させることができる。
(1c)第1ロボット10の各関節及び第1曲げ機構50aの接続関係と、第2ロボット12の各関節及び第2曲げ機構50bの接続関係とが同一となるように構成される。また、制御装置122は、被加工物供給装置20が供給する被加工物18を第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bに把持させる際、第1ロボット10には順面受け取りをさせ、第2ロボット12には背面受け取りをさせる。すなわち、制御装置122は、第1ロボット10及び第2ロボット12を、鉛直軸回りに180°異なる方向に向けた状態から、被加工物18を把持させる。その状態から、チャック装置16で被加工物18を把持して曲げ加工を開始するまでの第1ロボット10及び第2ロボット12の動作は、少なくとも鉛直軸回りの動作等が同様となる。従って、第1実施形態では、第1ロボット10及び第2ロボット12に係る制御プログラム等を、少なくとも一部共通化することができる。
(1d)被加工物供給装置20は、第1コンベア204の保持部220に、予め被加工物18を1つずつ保持しておくことができる。それにより、被加工物18を1つずつ供給する動作が、安定して実行できる。また、保持部220は、第1コンベア204に沿って一旦上昇した後に下降する軌道を通る。それにより、第1コンベア204には、少ない設置スペースであっても多数の保持部220を設けることが可能となる。従って、被加工物18を1つずつ供給する動作が、一層安定して実行できる。
(1e)曲げ加工装置2の起動直後などのように、被加工物18を保持した保持部220の数が少ない場合、制御装置122は、通常の曲げ加工中に比べて第2コンベア206の駆動速度を上昇させる。それにより、第3コンベア208へ被加工物18を供給できない時間を短縮し、曲げ加工装置2による曲げ加工を早期に開始することができる。
(1f)第1実施形態では、第1基台6に載置された第1ロボット10と第2基台8に載置された第2ロボット12は、それぞれ前述のような関節を備えた多関節ロボットである。そのため、第1基台6及び第2基台8を第1軌道装置4及び第2軌道装置5に沿って移動すると共に、多関節ロボットの関節を所望の方向に曲げることにより、第1曲げ機構50a及び第2曲げ機構50bを所望の位置に配置することができる。よって、第1曲げ機構50a及び第2曲げ機構50bの少なくとも一方に把持した被加工物18を所望の位置に配置することができる。
つまり、被加工物18の搬送や曲げ加工を行う際に、被加工物18が周囲の装置等に干渉しない位置や、搬送に適した位置(搬送時間が短い位置)に容易に移動させることができる。本実施形態では、このような好ましい位置にて、例えば被加工物18の一端側や他端側等の曲げ加工などを行うことができるので、加工の自由度を向上させ、かつ、加工時間も短縮することができる。
(1g)第1実施形態では、第1ロボット10の第1曲げ機構50a及び第2ロボット12の第2曲げ機構50bは、それぞれ曲げ型80と締め型88とにより被加工物18を挟み込むことで、被加工物18を把持したり曲げ加工したりする。そのため、曲げ型80に沿って被加工物18を正確に曲げることができ、被加工物18に対して正確な曲げ加工を施すことができる。
<第2実施形態>
次に、本開示の第2実施形態の曲げ加工装置2について説明するが、第1実施形態と同様な内容の説明は省略する。第2実施形態の曲げ加工装置2は、機械的な構成は第1実施形態の曲げ加工装置2と同様である。但し、制御装置122が実行する処理は、次のように、被加工物供給装置20から供給された被加工物18を第2ロボット12のみによって把持する点で異なる。以下、第2実施形態における処理について説明する。
<第2実施形態>
次に、本開示の第2実施形態の曲げ加工装置2について説明するが、第1実施形態と同様な内容の説明は省略する。第2実施形態の曲げ加工装置2は、機械的な構成は第1実施形態の曲げ加工装置2と同様である。但し、制御装置122が実行する処理は、次のように、被加工物供給装置20から供給された被加工物18を第2ロボット12のみによって把持する点で異なる。以下、第2実施形態における処理について説明する。
本実施形態では、供給スポット250の切欠き250aに被加工物18が両端を受け入れられ、そのことを示す信号が被加工物供給装置20から制御装置122へ入力されたとき、図15に示す処理が開始される。この処理では、制御装置122は、先ず、第1ロボット装置11対してS310の処理を実行し、第2ロボット装置13に対してS410の処理を実行する。S310では、図16に模式的に示すように、第1基台6が被加工物供給装置20から離れる方向に送られ、逃げ位置に配置される。逃げ位置とは、第2ロボット12のみによって被加工物18をチャック装置16に把持させる際に、第1ロボット装置11が第2ロボット装置13とも被加工物18とも干渉しない位置である。
また、S410では、第2基台8が軌道装置5における被加工物供給装置20側の端部まで送られ、図16に模式的に示すように、被加工物18の長尺方向中心(すなわち、重心)が、第2ロボット12の第2曲げ機構50bにより順面受けによって把持される。
図15に戻って、制御装置122は、続いてS312,S412による同期待ちAの処理を実行する。この処理は、前述のS310の処理による逃げ位置への移動と、S410の処理による把持(受け取り)の動作とが共に完了するまで待機する処理である。
S412による同期待ちAの処理が終了すると、図17に模式的に示すように、制御装置122は、第2基台8を、投入待機位置まで移動させる(S414)。投入待機位置とは、第2ロボット12の各関節を回動させることにより、第2基台8を移動させなくても被加工物18をチャック装置16に把持させることが可能な位置である。S414に続くS416では、制御装置122は、第2ロボット12の各関節を回動させることにより、チャック装置16の第1爪部104及び第2爪部106によって把持可能な投入位置まで被加工物18を移動させる。
更に続くS418では、投入位置に配置された被加工物18をチャック装置16の第1爪部104及び第2爪部106によって把持する。本例では、このチャック装置16に対する処理を、第2ロボット装置13に対する一連の処理に組み込んでいる。
続いて制御装置122はS320,S420による同期待ちBの処理を実行する。この処理は、前述のS418に係るチャック装置16の動作が完了し、被加工物18がチャック装置16に把持されるまで待機する処理である。第1ロボット装置11に対する一連の処理は、前述のS312による同期待ちAの処理から、このS320による同期待ちBの処理まで、継続して待機状態となる。
S320による同期待ちBの処理が終了すると、制御装置122は、第1ロボット装置11に対してS321,S322の処理を実行する。S321では、制御装置122は、図18に模式的に示すように、第1基台6を、受け取り待機位置まで移動させる。受け取り待機位置とは、第1ロボット10の各関節を回動させることにより、チャック装置16から見て第2ロボット12の第2曲げ機構50bとは反対側の位置で、第1ロボット10の第1曲げ機構50aが被加工物18を把持可能となる位置である。S322では、制御装置122は、図19に模式的に示すように、第1ロボット10の各関節及び第1曲げ機構50aを駆動することにより、チャック装置16に把持される被加工物18を把持させる。
図15に戻って、続いて制御装置122はS324,S424による同期待ちCの処理を実行する。この処理は、前述のS322に係る第1ロボット10の動作が完了し、被加工物18が第1ロボット10の第1曲げ機構50aに把持されるまで待機する処理である。なお、第2ロボット装置13に対する一連の処理は、前述のS420による同期待ちBの処理から、このS424による同期待ちCの処理まで、継続して待機状態となる。
S324,S424による同期待ちCの処理が終了すると、制御装置122は、第1実施形態のS138,S140,S238,S240と同様の処理を実行する。すなわち、第1ロボット10及び第2ロボット12の圧力型90を半締めにし(S326,S426)、第1ロボット10及び第2ロボット12の第2曲げ機構50bを前出し位置へ移動させる(S340,S440)。本実施形態でも、第1曲げ機構50a及び第2曲げ機構50bが前出し位置へ移動された後の制御装置122による処理は、例えば特許文献1に開示された処理のように、周知の曲げ加工装置における処理と同様であるので、ここでは説明を省略する。
<第2実施形態の効果>
本実施形態でも、前述した第1実施形態における(1a),(1b),(1d)~(1g)の効果が同様に生じる。
本実施形態でも、前述した第1実施形態における(1a),(1b),(1d)~(1g)の効果が同様に生じる。
<請求の範囲の要素との対応>
各実施形態において、第1旋回関節58は第1関節の一例に対応する。第1揺動関節52及び第2揺動関節54は第2関節の一例に対応する。制御装置122は速度制御部の一例に対応する。
各実施形態において、第1旋回関節58は第1関節の一例に対応する。第1揺動関節52及び第2揺動関節54は第2関節の一例に対応する。制御装置122は速度制御部の一例に対応する。
<他の実施形態>
以上、本開示を実施するための形態について説明したが、本開示は上述の実施形態に限定されることなく、種々変形して実施することができる。
以上、本開示を実施するための形態について説明したが、本開示は上述の実施形態に限定されることなく、種々変形して実施することができる。
例えば、各実施形態では、第1ロボット10及び第2ロボット12の軸数をそれぞれ「6軸」としていたが、本開示における多関節ロボットの軸数は、「6軸」に限るものではない。例えば、多関節ロボットの軸数は、「7軸」以上であってもよいし、「4軸」や「5軸」であってもよい。すなわち、本開示における多関節ロボットは、基台に対して鉛直軸回りにロボットを回動させる第1関節と、第1関節の軸と非平行な軸回りにロボットを屈曲させる第2関節と、を少なくとも含む複数の関節を備えた多関節ロボットであれば、どのようなものであってもよい。
各実施形態では、チャック装置16を第1補助軌道装置102に沿って移動可能としたが、これに限られるものではない。例えば、チャック装置16は固定されていてもよく、第1補助軌道装置102に沿って複数(例えば、3つ)のチャック装置が設けられてもよい。
各実施形態における1つの構成要素が有する複数の機能を、複数の構成要素によって実現したり、1つの構成要素が有する1つの機能を、複数の構成要素によって実現したりしてもよい。複数の構成要素が有する複数の機能を、1つの構成要素によって実現したり、複数の構成要素によって実現される1つの機能を、1つの構成要素によって実現したりしてもよい。実施形態の構成の一部を省略してもよい。実施形態の構成の少なくとも一部を、他の実施形態の構成に対して付加又は置換してもよい。請求の範囲に記載した文言のみによって特定される技術思想に含まれるあらゆる態様が本開示の実施形態である。
上述した曲げ加工装置の他、曲げ加工装置を構成要素とするシステム、曲げ加工装置の一部としてコンピュータを機能させるためのプログラム、このプログラムを記録した半導体メモリ等の非遷移的実態的記録媒体、曲げ加工装置制御方法など、種々の形態で本開示を実現することもできる。
Claims (7)
- 長尺状の被加工物を曲げ加工するように構成された曲げ加工装置であって、
互いに平行な直線状に伸びるように並列配置された第1軌道装置及び第2軌道装置と、
前記第1軌道装置に載置され、該第1軌道装置上を移動可能な第1基台と、
前記第2軌道装置に載置され、該第2軌道装置上を移動可能な第2基台と、
前記第1基台に搭載された第1ロボットと、
前記第2基台に搭載された第2ロボットと、
前記第1ロボットの一端に配置され、前記被加工物の把持及び曲げ加工を行うように構成された第1曲げ機構と、
前記第2ロボットの一端に配置され、前記被加工物の把持及び曲げ加工を行うように構成された第2曲げ機構と、
前記第1軌道装置及び前記第2軌道装置が伸びる方向の一端側に設けられ、前記被加工物を供給するように構成された被加工物供給装置と、
を備え、
前記第1ロボットは、前記第1ロボットが搭載された前記第1基台に対して鉛直軸回りに前記第1ロボットを回動させる第1関節と、前記第1ロボットの前記第1関節の軸と非平行な軸回りに前記第1ロボットを屈曲させる第2関節と、を少なくとも含む複数の関節を備えた多関節ロボットであり、前記第1ロボットの前記第1関節と前記第2関節の動作により前記第1曲げ機構を移動させ、
前記第2ロボットは、前記第2ロボットが搭載された前記第2基台に対して鉛直軸回りに前記第2ロボットを回動させる第1関節と、前記第2ロボットの前記第1関節の軸と非平行な軸回りに前記第2ロボットを屈曲させる第2関節と、を少なくとも含む複数の関節を備えた多関節ロボットであり、前記第2ロボットの前記第1関節と前記第2関節の動作により前記第2曲げ機構を移動させ、
前記被加工物供給装置は、前記第1曲げ機構及び前記第2曲げ機構の少なくとも一方が到達可能な位置に設けられ、前記被加工物の長尺方向が前記第1軌道装置及び前記第2軌道装置が伸びる方向と直交するように、前記被加工物を供給するように構成された曲げ加工装置。 - 請求項1に記載の曲げ加工装置であって、
前記第1軌道装置と前記第2軌道装置との間に、前記第1軌道装置及び前記第2軌道装置とは別体に配置され、前記被加工物を把持するように構成されたチャック装置を、
更に備え、
前記チャック装置は、前記第1ロボット及び前記第2ロボットの少なくとも一方によって前記被加工物供給装置から搬送された前記被加工物を把持するように構成された曲げ加工装置。 - 請求項2に記載の曲げ加工装置において、
前記第1基台、前記第2基台、前記第1ロボット、前記第2ロボット、前記第1曲げ機構、前記第2曲げ機構、及び、前記チャック装置の動作を制御するように構成された制御装置を備え、
前記第1ロボットの前記各関節及び前記第1曲げ機構の接続関係と、前記第2ロボットの前記各関節及び前記第2曲げ機構の接続関係とは同一となるように構成され、
前記制御装置は、前記第1曲げ機構及び前記第2曲げ機構に前記被加工物供給装置が供給する前記被加工物を把持させる際、前記第1関節回りの回動位置が前記第1ロボットと前記第2ロボットとで180°異なり、かつ、前記第1ロボットの前記第2関節から前記第1曲げ機構に向かう方向と、前記第2ロボットの前記第2関節から前記第2曲げ機構に向かう方向とが、いずれも前記第2関節から前記被加工物供給装置に向かう方向となるように、前記第1ロボットの前記第1関節及び前記第2関節の動作及び前記第2ロボットの前記第1関節及び前記第2関節の動作を制御するように構成された曲げ加工装置。 - 請求項1~3のいずれか1項に記載の曲げ加工装置であって、
前記被加工物供給装置は、
前記被加工物を1つずつ保持して一旦上昇させた後に下降させるように構成された保持部を、複数備えた第1コンベアと、
前記第1コンベアの前記保持部に前記被加工物を供給するように構成された第2コンベアと、
前記第1コンベアの前記保持部により一旦上昇された後に下降された前記被加工物を、前記第1曲げ機構及び第2曲げ機構の少なくとも一方によって把持可能な位置へ1つずつ搬送するように構成された第3コンベアと、
を備えた曲げ加工装置。 - 請求項4に記載の曲げ加工装置において、
前記第1コンベアにおける前記被加工物を保持した前記保持部の数が所定個未満である合、前記数が前記所定個以上である場合に比べて前記第2コンベアの駆動速度を上昇させるように構成された速度制御部を、
更に備えた曲げ加工装置。 - 請求項1~5のいずれか1項に記載の曲げ加工装置であって、
前記第1曲げ機構及び前記第2曲げ機構のそれぞれは、曲げ型と、前記曲げ型と係合する締め型とを有し、前記曲げ型と前記締め型とにより前記被加工物を挟み込むことで、前記被加工物を把持及び曲げ加工するように構成された曲げ加工装置。 - 請求項1~6のいずれか1項に記載の曲げ加工装置であって、
前記第1ロボット及び前記第2ロボットのそれぞれは、6軸以上の垂直多関節ロボットである曲げ加工装置。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020207005785A KR20200045490A (ko) | 2017-08-25 | 2018-08-24 | 벤딩 가공장치 |
| EP18848810.0A EP3674010A4 (en) | 2017-08-25 | 2018-08-24 | BENDING MACHINE |
| US16/641,784 US20200353523A1 (en) | 2017-08-25 | 2018-08-24 | Bending machine |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017-162643 | 2017-08-25 | ||
| JP2017162643A JP2019038019A (ja) | 2017-08-25 | 2017-08-25 | 曲げ加工装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019039592A1 true WO2019039592A1 (ja) | 2019-02-28 |
Family
ID=65439985
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2018/031370 Ceased WO2019039592A1 (ja) | 2017-08-25 | 2018-08-24 | 曲げ加工装置 |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20200353523A1 (ja) |
| EP (1) | EP3674010A4 (ja) |
| JP (1) | JP2019038019A (ja) |
| KR (1) | KR20200045490A (ja) |
| TW (1) | TW201919789A (ja) |
| WO (1) | WO2019039592A1 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116038694A (zh) * | 2022-12-28 | 2023-05-02 | 东方电气集团东方汽轮机有限公司 | 一种管道柔性装配系统和装配方法 |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7278930B2 (ja) * | 2019-11-29 | 2023-05-22 | 川崎重工業株式会社 | 保持装置、ロボット、及びロボットシステム |
| CN113664069B (zh) * | 2020-05-14 | 2024-04-02 | 泰科电子(上海)有限公司 | 冲压带卷筒更换系统 |
| US20220212307A1 (en) * | 2021-01-06 | 2022-07-07 | Machina Labs, Inc. | System and Method for Selectively Treating Part with Ultrasonic Vibrations |
| CN115366116A (zh) * | 2021-05-20 | 2022-11-22 | 上海大界机器人科技有限公司 | 一种柔性施工工具头及卸力机构 |
| CN113579022B (zh) * | 2021-07-30 | 2022-04-08 | 南京航空航天大学 | 并联轨道式智能机器人复合弯曲成形加工方法及装置 |
| CN114115113B (zh) * | 2021-10-15 | 2023-11-21 | 上海发那科机器人有限公司 | 一种基于双机器人弯管系统的智能弯管轨迹的生成方法 |
| CN114310949B (zh) * | 2021-12-29 | 2024-07-09 | 广州铁路职业技术学院(广州铁路机械学校) | 一种协同式轨道移动检修机器人 |
| CN114260342B (zh) * | 2021-12-31 | 2024-07-09 | 山东街景智能制造科技股份有限公司 | 一种金属板材连续折弯设备 |
| KR102809837B1 (ko) * | 2024-11-01 | 2025-05-21 | 주식회사 나이스맥 | 벤딩장치 및 이의 제어방법 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0394921A (ja) * | 1989-09-08 | 1991-04-19 | Chuo Electric Mfg Co Ltd | 曲げ加工装置 |
| JP2006116604A (ja) * | 2004-09-27 | 2006-05-11 | Opton Co Ltd | 曲げ加工装置 |
| JP2016203181A (ja) | 2015-04-15 | 2016-12-08 | 株式会社オプトン | 曲げ加工装置 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE502007005038D1 (de) * | 2007-02-07 | 2010-10-28 | Wafios Ag | Biegemaschine |
-
2017
- 2017-08-25 JP JP2017162643A patent/JP2019038019A/ja not_active Withdrawn
-
2018
- 2018-08-24 KR KR1020207005785A patent/KR20200045490A/ko not_active Withdrawn
- 2018-08-24 TW TW107129691A patent/TW201919789A/zh unknown
- 2018-08-24 WO PCT/JP2018/031370 patent/WO2019039592A1/ja not_active Ceased
- 2018-08-24 EP EP18848810.0A patent/EP3674010A4/en not_active Withdrawn
- 2018-08-24 US US16/641,784 patent/US20200353523A1/en not_active Abandoned
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0394921A (ja) * | 1989-09-08 | 1991-04-19 | Chuo Electric Mfg Co Ltd | 曲げ加工装置 |
| JP2006116604A (ja) * | 2004-09-27 | 2006-05-11 | Opton Co Ltd | 曲げ加工装置 |
| JP2016203181A (ja) | 2015-04-15 | 2016-12-08 | 株式会社オプトン | 曲げ加工装置 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP3674010A4 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116038694A (zh) * | 2022-12-28 | 2023-05-02 | 东方电气集团东方汽轮机有限公司 | 一种管道柔性装配系统和装配方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019038019A (ja) | 2019-03-14 |
| KR20200045490A (ko) | 2020-05-04 |
| TW201919789A (zh) | 2019-06-01 |
| US20200353523A1 (en) | 2020-11-12 |
| EP3674010A1 (en) | 2020-07-01 |
| EP3674010A4 (en) | 2021-05-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2019039592A1 (ja) | 曲げ加工装置 | |
| KR102448070B1 (ko) | 밴딩가공장치 | |
| JP4808737B2 (ja) | 曲げ加工機 | |
| CN104070399B (zh) | 机床 | |
| JP2011156647A (ja) | 作業システム、ロボット装置、機械製品の製造方法 | |
| JP5403120B2 (ja) | ハンドリング方法 | |
| JP6101454B2 (ja) | ワーク加工装置及び該ワーク加工装置における金型の移動方法 | |
| JP5187048B2 (ja) | ハンドリングシステム | |
| JP4471938B2 (ja) | 自動溶接システム | |
| JP5125129B2 (ja) | ワーク給排装置 | |
| KR20110136870A (ko) | 굽힘 가공장치 | |
| KR101632459B1 (ko) | 굽힘 가공장치 | |
| KR102694787B1 (ko) | 유지 장치, 로봇 및 로봇 시스템 | |
| JP2016002601A (ja) | ワーク保持確認装置、及びワーク保持確認方法 | |
| KR20140123207A (ko) | 자재 생산 설비 내에서의 자재 회전을 위한 컨베이어 장치 | |
| JP4715266B2 (ja) | パネル搬送装置 | |
| KR101632458B1 (ko) | 굽힘 가공장치 | |
| JP4667780B2 (ja) | 搬送ロボット | |
| JP6661031B2 (ja) | 多関節ロボットアーム | |
| JP2001205343A (ja) | ワーク搬入装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18848810 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2018848810 Country of ref document: EP Effective date: 20200325 |