[go: up one dir, main page]

WO2018135716A1 - Dispositif de stockage d'énergie et système de stockage d'énergie le comprenant - Google Patents

Dispositif de stockage d'énergie et système de stockage d'énergie le comprenant Download PDF

Info

Publication number
WO2018135716A1
WO2018135716A1 PCT/KR2017/008590 KR2017008590W WO2018135716A1 WO 2018135716 A1 WO2018135716 A1 WO 2018135716A1 KR 2017008590 W KR2017008590 W KR 2017008590W WO 2018135716 A1 WO2018135716 A1 WO 2018135716A1
Authority
WO
WIPO (PCT)
Prior art keywords
pcs
energy storage
battery
distributed power
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2017/008590
Other languages
English (en)
Korean (ko)
Inventor
이충우
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LS Electric Co Ltd
Original Assignee
LSIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LSIS Co Ltd filed Critical LSIS Co Ltd
Publication of WO2018135716A1 publication Critical patent/WO2018135716A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Definitions

  • the present invention relates to an energy storage device and an energy storage system including the same.
  • Energy Storage System is a system that saves the generated power in each linked system including power plants, substations and transmission lines, and then uses it selectively and efficiently when the power is needed to increase energy efficiency.
  • the energy storage system improves the overall load rate by leveling the electric load with large fluctuations in time and season, it can lower the cost of generating power and reduce the investment cost and operation cost required for the expansion of electric power facilities. can do.
  • These energy storage systems are installed and used in power generation, transmission and distribution, and customers in the power system, and include frequency regulation, stabilization of generator output using renewable energy, peak shaving, and load leveling. It is used as a function of emergency power.
  • Energy storage systems can be classified into physical energy storage and chemical energy storage.
  • Physical energy storage includes a method using pumped power generation, compressed air storage, flywheel, etc.
  • chemical energy storage includes a method using a lithium ion battery, a lead acid battery, and a Nas battery.
  • a power system that generates power in such an energy storage system in particular, a renewable energy system has a problem that it is difficult to predict the power flow due to the unstable output.
  • a power supply system i.e., a distributed power supply system
  • an energy storage device is installed near each power supply system to assist the power output of the power supply system.
  • FIG. 1 is a view for explaining a conventional energy storage device
  • Figure 2 is a view for explaining the PCS of FIG.
  • the conventional energy storage devices E1 and E2 are connected to distributed power supply systems DG1 and DG2, respectively.
  • the first distributed power supply system DG1 may be managed by a first power condition system (PCS) 60a.
  • the power generated in the first distributed power supply system DG1 may be stored in the first battery 70a or provided to the grid GRID or the first load L1.
  • the first PCS 60a may transfer power stored in the first battery 70a to the grid GRID or the first load L1, and transmit power supplied from the grid GRID to the first battery 70a.
  • the second distributed power supply system DG2 may be managed with a power state by the second PCS 60b.
  • the power generated by the second distributed power supply system DG2 may be stored in the second battery 70b or provided to the grid GRID or the second load L2.
  • the second PCS 60b may transfer the power stored in the second battery 70b to the grid GRID or the second load L2, and transfer the power supplied from the grid GRID to the second battery 70b. Can also be stored in
  • FIG. 2 a control scheme of the PCS (either the first PCS 60a or the second PCS 60b) is illustrated.
  • the PCS is based on the active power command value P_ref * and the actual measured active power value P_pcs received from the host controller 5 (for example, PMS (Power Management System) or EMS (Energy Management System)).
  • the active power controller 20 and the integrator 25 are used to generate the q-axis current command value Iq_ref.
  • the PCS uses the reactive power controller 10 and the integrator 15 based on the reactive power command value Q_ref * and the actual measured reactive power value Q_pcs received from the host controller 5 to determine the d-axis current command value ( Id_ref).
  • the PCS inputs the actual measured three-phase voltages Va, Vb, and Vc into a phase locked loop 35 and the actual measured three-phase currents Ia, Ib, and Ic. ) Is input to the coordinate transformation unit 40 to extract the normal portions (Idq_pcs).
  • the PCS obtains the final voltage command values Vd_ref * and Vq_ref * through the current controller 30 using the q-axis current command value Iq_ref *, the d-axis current command value Id_ref * and the normal value Idq_pcs. .
  • the final voltage command values Vd_ref * and Vq_ref * obtained as described above are extracted from the three-phase voltage command values Va_ref *, Vb_ref * and Vc_ref * through the coordinate axis inverse transform unit 45, and the extracted three-phase voltage command values ( Va_ref *, Vb_ref *, and Vc_ref *) are provided to a pulse width modulation (PWM) generator 50 to produce a final output.
  • PWM pulse width modulation
  • the charge / discharge of the battery may be controlled by the final output generated by the PCS.
  • At least one of the first distributed power supply system DG1 and the first battery 70a supplies power to the first load L1. At least one of the second distributed power supply system DG2 and the second battery 70b supplies power to the second load L2.
  • the first distributed power supply system DG1 and the second distributed power supply system DG2 may have more power supply than usual, which may cause a problem in power quality.
  • the PCS also has a problem that it is difficult to solve the above problems that may occur in the system (GRID) accident by the conventional control method.
  • the present invention provides an energy storage system and an energy storage system including the same, which can solve the power supply problem of the distributed power supply system by operating the PCS independently as a voltage source when a problem occurs in the system and the connection between the system and the PCS is cut off. It aims to do it.
  • the present invention provides an energy storage system and an energy storage system including the same, the power storage of the external device passing through the system is passed through the plurality of PCS connected through the DC link, the power supply is smoothly maintained when the system is disconnected It aims to provide.
  • the energy storage device of the present invention is an energy storage device connected to a plurality of distributed power systems and systems, and manages power of the plurality of distributed power systems and systems, and through a direct current (DC) link.
  • a plurality of power condition systems (PCSs) connected to each other; And a battery connected to the DC link and charged or discharged by the plurality of PCS.
  • the plurality of PCS includes a first PCS and a second PCS, the first PCS, one end is connected to any one of the plurality of distributed power supply system, the other end is connected to the second PCS via a DC link, the second One end of the PCS is connected to the other of the plurality of distributed power supply systems, and the other end is connected to the first PCS through the DC link.
  • the plurality of PCS When the connection between the system and the plurality of PCS is interrupted, the plurality of PCS provides power stored in the battery to the plurality of distributed power supply systems.
  • the plurality of PCSs are driven based on the voltage reference value and the frequency reference value of the system provided from the host controller.
  • the power of the external device provided from one point to another point via the grid is provided to another point via a plurality of PCS at one point when the system is disconnected.
  • the energy storage system of the present invention manages power of a plurality of distributed power supply systems, a plurality of distributed power supply systems and systems connected to a grid, a grid, and generates power, and is connected to each other through a DC link. It includes a battery connected to a plurality of PCS (Power Condition System) and DC link, and charged or discharged by the plurality of PCS.
  • PCS Power Condition System
  • the plurality of distributed power supply systems include a first distributed power supply system and a second distributed power supply system
  • the plurality of PCSs include a first PCS and a second PCS
  • the first PCS has one end connected to the first distributed power supply system. The other end is connected to the second PCS through the DC link, the second PCS, one end is connected to the second distributed power supply system, the other end is connected to the first PCS through the DC link.
  • a battery management system for monitoring a state of the battery and controlling charging and discharging of the battery, and a PMS (power management system) for controlling a plurality of PCSs based on data related to the battery provided from the BMS;
  • an EMS Electronicgy Management System
  • EMS Electronicgy Management System
  • the plurality of PCSs are connected to the system and the plurality of distributed power systems, and when the connection between the system and the plurality of PCSs is cut off, the plurality of PCSs are driven based on the voltage reference value and the frequency reference value of the system provided from the PMS or EMS.
  • the PCS is independently driven by a voltage source to supply power to the distributed power system or to act as a transmission line to maintain the power supply smoothly and to solve the problems that may occur during a system accident There is this.
  • FIG. 1 is a view for explaining a conventional energy storage device.
  • FIG. 2 is a diagram for explaining the PCS of FIG. 1.
  • FIG 3 is a view illustrating an energy storage device according to an embodiment of the present invention.
  • FIG. 4 and 5 are diagrams illustrating how the energy storage device of FIG. 3 is driven when a problem occurs in a system.
  • FIG. 6 is a diagram illustrating a method in which the PCS of FIG. 3 is controlled when a problem occurs in a system.
  • FIG. 7 is a view for explaining an energy storage system according to another embodiment of the present invention.
  • FIG. 8 is a view for explaining an energy storage system according to another embodiment of the present invention.
  • FIG. 3 is a view illustrating an energy storage device according to an embodiment of the present invention.
  • 4 and 5 are diagrams illustrating how the energy storage device of FIG. 3 is driven when a problem occurs in a system.
  • FIG. 6 is a diagram illustrating a method in which the PCS of FIG. 3 is controlled when a problem occurs in a system.
  • an energy storage device 100 may include a plurality of PCSs PCS1 and PCS2 and a battery 104.
  • the energy storage device 100 is connected to the plurality of distributed power systems DG1 and DG2 and the grid GRID.
  • the plurality of PCSs 101a and 101b manage power of the plurality of distributed power supply systems DG1 and DG2 and the grid GRID, and may be connected to each other through a direct current link 103.
  • the plurality of PCSs 101a and 101b may include a first PCS 101a and a second PCS 101b.
  • the first PCS 101a may store the power generated in the first distributed power supply system DG1 in the battery 104, or may transfer the generated power to the grid GRID and the first load L1. In addition, the first PCS 101a may transmit power stored in the battery 104 to the grid GRID or the first load L1. The first PCS 101a may store the power supplied from the grid GRID in the battery 104.
  • the first PCS 101a may control the charging and discharging of the battery 104 based on the state of charge (hereinafter, referred to as “SOC level”) of the battery 104, and the DC link 103. It may be connected to the second PCS (101b) through.
  • SOC level state of charge
  • one end of the first PCS 101a may be connected to the first distributed power supply system DG1, and the other end thereof may be connected to the second PCS 101b through the DC link 103.
  • the first PCS 101a may use an energy storage system (eg, FIG. 7 of FIG. 7) based on the power price of the power market, the power generation plan of the first distributed power supply system DG1, the amount of power generated, and the power demand of the grid GRID.
  • a schedule for the operation of 200 may be generated. Details thereof will be described later.
  • the second PCS 101b may store power generated in the second distributed power supply system DG2 in the battery 104, or may transfer the generated power to the grid GRID and the second load L2. In addition, the second PCS 101b may transfer power stored in the battery 104 to the grid GRID or the second load L2. The second PCS 101b may store the power supplied from the grid GRID in the battery 104.
  • the second PCS 101b may control the charging and discharging of the battery 104 based on the state of charge (hereinafter, referred to as “SOC level”) of the battery 104, and the DC link 103. It may be connected to the first PCS 101a through.
  • SOC level state of charge
  • one end of the second PCS 101b may be connected to the second distributed power supply system DG2, and the other end thereof may be connected to the first PCS 101a through the DC link 103.
  • the second PCS 101b may use an energy storage system (eg, FIG. 7 of FIG. 7) based on the power price of the power market, the power generation plan of the second distributed power supply system DG2, the amount of power generated, and the power demand of the grid GRID.
  • a schedule for the operation of 200 may be generated. Details thereof will be described later.
  • the battery 104 is connected to the DC link 103 and may be charged or discharged by the plurality of PCSs 101a and 101b.
  • the battery 104 may receive and store at least one of the powers of the first distributed power supply system DG1, the second distributed power supply system DG2, and the grid GRID, and store the stored power in the grid GRID, One or more of the first load L1 and the second load L2 may be supplied.
  • the power stored in the battery 104 may be provided to the first distributed power supply system DG1 or the second distributed power supply system DG2 during a GRID accident.
  • the battery 104 may include at least one battery cell, and each battery cell may include a plurality of bare cells.
  • the first distributed power supply system DG1 and the second distributed power supply system DG2 are connected to the grid GRID and are spaced apart from each other as a system for generating power using an energy source. That is, the first distributed power supply system DG1 and the second distributed power supply system DG2 may be located in separate locations from each other, but may be located closer to each other than the other distributed power supply systems.
  • the first distributed power supply system DG1 and the second distributed power supply system DG2 may generate electric power using at least one of fossil fuel, nuclear fuel, and renewable energy.
  • the first distributed power supply system DG1 and the second distributed power supply system DG2 may be renewable power generation systems using renewable energy such as photovoltaic power generation systems, wind power generation systems, and tidal power generation systems.
  • the GRID can include power plants, substations, power lines, and the like.
  • the grid GRID may supply power to at least one of the first PCS 101a, the second PCS 101b, the first load L1, and the second load L2 when the grid GRID is in a steady state. Power may be supplied from 101a or the second PCS 101b.
  • the grid GRID when the grid GRID is in an abnormal state, it becomes difficult to supply power to at least one of the first PCS 101a, the second PCS 101b, the first load L1, and the second load L2. It may be difficult to receive power from the first PCS 101a or the second PCS 101b.
  • the first load L1 receives power from at least one of the first distributed power supply system DG1, the battery 104, and the grid GRID, and consumes the supplied power.
  • the second load L2 receives power from at least one of the second distributed power supply system DG2, the battery 104, and the grid GRID, and consumes the supplied power.
  • the first load L1 and the second load L2 may include a home, a large building, a factory, and the like.
  • FIG. 4 illustrates a state in which an accident occurs in the grid GRID, so that the first switch SW1 and the second switch SW2 are switched to an off state (that is, cut off).
  • the first PCS 101a and the second PCS. 101b can be driven independently through the control algorithm (method) shown in FIG. Accordingly, the first distributed power supply system DG1, the second distributed power supply system DG2, the first load L1, and the second load L2 recognize that the grid GRID is connected as before. Can be driven.
  • the first PCS 101a and the second PCS 101b may be driven as voltage sources, respectively.
  • the first PCS 101a and the second PCS 101b may be configured with a voltage reference value of a grid GRID provided from an upper control device (for example, PMS (Power Management System) or EMS (Energy Management System)). Can be driven independently based on the frequency reference value, the details thereof will be described later.
  • PMS Power Management System
  • EMS Electronicgy Management System
  • the first PCS 101a and the second PCS 101b can normally charge or discharge the battery 104 within the rated range.
  • the first PCS 101a when an accident occurs in the grid GRID, the first PCS 101a provides the first distributed power supply system DG1 with power stored in the battery 104 through independent operation.
  • the second PCS 101b provides power stored in the battery 104 to the second distributed power supply system DG2 through independent operation.
  • the first PCS 101a and the second PCS 101b are driven independently through the control algorithm (method) shown in FIG. 6, as mentioned in FIG.
  • Power may be provided to the distributed power supply system DG1 and the second distributed power supply system DG2, but may also serve as a power transmission line as shown in FIG. 5.
  • the power of an external device (not shown) provided to the other point via the grid GRID at one point may cause the plurality of PCSs 101a and 101b to be disconnected at the point when the grid GRID is disconnected. It may be provided to the other point through.
  • the control method of the first PCS 101a will be described below.
  • the second PCS 101b is also driven in the same manner as the first PCS 101a, a detailed description thereof will be omitted.
  • the first PCS 101a when the first PCS 101a operates as a voltage source, since there is no reference for the voltage and frequency of the grid GRID, the first PCS 101a includes the host controller 105 (for example, PMS or EMS). ) Can receive the voltage command value Vac_ref * of the system GRID and the actually measured voltage value Vac_inv. The first PCS 101a uses the second controller 120 and the integrator 125 based on the voltage command value Vac_ref * and the actually measured voltage value Vac_inv of the received grid GRID to provide the q-axis current command value. You can create (Iq_ref *).
  • the first PCS 101a may receive the frequency command value F_ref * and the actually measured frequency value F of the system GRID from the upper controller 105.
  • the first PCS 101a uses the first controller 110 and the integrator 115 based on the received frequency command value F_ref * and the actually measured frequency value F of the grid GRID. You can create (Id_ref *).
  • the host controller 105 calculates the voltage (eg, rated voltage) and the frequency (eg, rated frequency) of the grid (GRID) in advance in preparation for the grid (GRID) accident by first calculating the PCS 101a.
  • the voltage eg, rated voltage
  • the frequency eg, rated frequency
  • the first PCS 101a inputs the actual measured three-phase voltages Va_inv, Vb_inv, and Vc_inv to the phase locked loop 135, and the measured three-phase currents Ia_inv, Ib_inv, and Ic_inv. ) Is input to the coordinate axis conversion unit 140 to extract the normal part Idq_inv. Thereafter, the first PCS 101a uses the q-axis current command value Iq_ref *, the d-axis current command value Id_ref *, and the normal value Idq_inv to determine the final voltage command values Vd_ref * and Vq_ref through the current controller 130. Acquire *).
  • the final voltage command values Vd_ref * and Vq_ref * obtained as described above are extracted from the three-phase voltage command values Va_ref *, Vb_ref * and Vc_ref * through the coordinate axis inverse transform unit 145, and the extracted three-phase voltage command values ( Va_ref *, Vb_ref *, Vc_ref *) are provided to the PWM generator 150 to produce the final output.
  • the first PCS 101a may be driven independently to serve as a voltage source.
  • the first PCS 101a and the second PCS 101b connected through the DC link 103 in a system accident are independently driven as a voltage source.
  • the power supply can be maintained smoothly and problems that may occur in a system accident can be solved.
  • the energy storage device 1 since the energy storage device 1 according to the exemplary embodiment of the present invention is managed by one host controller (for example, PMS or EMS) at the same time, power flow can be easily confirmed even in a system unit.
  • one host controller for example, PMS or EMS
  • the first PCS 101a and the second PCS 101b are connected through the DC link 103 to be implemented in a microgrid manner, thereby being distributed. If there is a problem in power supply of one of the power supply systems, there is an advantage that the power generated by the other distributed power supply system can supply the necessary power.
  • FIG. 7 is a view for explaining an energy storage system according to another embodiment of the present invention.
  • the energy storage system 200 includes the energy storage device 100 according to an embodiment of the present invention, and thus description of the energy storage device 100 will be omitted. .
  • the energy storage system 200 may include a grid GRID, a plurality of distributed power supply systems DG1 and DG2, an energy storage device 100, and a first switch SW1.
  • the second switch SW2, the first load L1, the second load L2, the battery management system 160, the power management system 170, and the energy management system EMS 180. ) May be included.
  • the BMS 160 may monitor the state of the battery 104 and control charging and discharging operations of the battery 104.
  • the BMS 160 may also monitor the state of the battery 104, including the SOC level being the state of charge of the battery 104, and monitor the state of the monitored battery 104 (eg, voltage, current, temperature, residuals). Power amount, lifetime, state of charge, etc.) may be provided to the first PCS 101a and the second PCS 101b.
  • the BMS 160 may perform a protection operation to protect the battery 104.
  • the BMS 160 may perform one or more of an overcharge protection function, an over discharge protection function, an overcurrent protection function, an overvoltage protection function, an overheat protection function, and a cell balancing function for the battery 104.
  • the BMS 160 may adjust the SOC level of the battery 104.
  • the BMS 160 may receive a control signal from the first PCS 101a or the second PCS 101b and adjust the SOC level of the battery 104 based on the received signal.
  • the PMS 170 may control the plurality of PCSs 101a and 101b based on data related to the battery 104 received from the BMS 160.
  • the PMS 170 may monitor the state of the battery 104 and may monitor the state of the plurality of PCSs 101a and 101b. That is, the PMS 170 may control the plurality of PCSs 101a and 101b based on the respective efficiency based on the data related to the battery 104 received from the BMS 160.
  • the PMS 170 may provide the EMS 180 with data related to the battery 104 collected by monitoring the state of the battery 104 through the BMS 160.
  • the EMS 180 generates information about the maintenance and repair of the battery 104 based on data about the battery 104 received from the PMS 170, and the information about the maintenance and repair of the generated battery 104. May be provided to the BMS 160 through the PMS 170.
  • Energy storage system 200 can manage the power of the grid (GRID) and a plurality of distributed power system (DG1, DG2) through the configuration as described above, accidents in the grid (GRID) Is generated and the connection between the system GRID and the plurality of PCSs 101a and 101b is interrupted, the plurality of PCSs 101a and 101b are connected to the system GRID provided from the PMS 170 or the EMS 180. It can be driven independently based on the voltage reference value and the frequency reference value.
  • FIG. 8 is a view for explaining an energy storage system according to another embodiment of the present invention.
  • the energy storage system 300 includes the energy storage system 200 according to another embodiment of the present invention.
  • two energy storage systems as shown in FIG. 7 may exist in parallel.
  • the energy storage system 300 includes the energy storage device 400, the second BMS 460, the third load L3, the fourth load L4, the third switch SW3, and the fourth switch SW4. ), A third distributed power supply system DG3, and a fourth distributed power supply system DG4.
  • GRID grid
  • PMS 570
  • EMS EMS
  • each energy storage system may be efficiently managed. have.
  • stable power supply and management are possible for distributed power supply systems DG1 to DG4 distributed in a larger area than the energy storage system 200 of FIG. 7.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

La présente invention concerne un dispositif de stockage d'énergie et un système de stockage d'énergie le comprenant. Un dispositif de stockage d'énergie selon un mode de réalisation de la présente invention concerne un dispositif de stockage d'énergie connecté à une pluralité de systèmes de production distribuée d'énergie et à un réseau, comprenant : une pluralité de systèmes d'état d'alimentation (PCS) qui gèrent la puissance de la pluralité de systèmes de production distribuée d'énergie et du réseau, et sont connectés les uns aux autres par l'intermédiaire d'une liaison à courant continu ; et une batterie qui est connectée à la liaison à courant continu, et qui est chargée ou déchargée par la pluralité de PCS.
PCT/KR2017/008590 2017-01-19 2017-08-09 Dispositif de stockage d'énergie et système de stockage d'énergie le comprenant Ceased WO2018135716A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2017-0008988 2017-01-19
KR1020170008988A KR102197177B1 (ko) 2017-01-19 2017-01-19 에너지 저장 장치 및 이를 포함하는 에너지 저장 시스템

Publications (1)

Publication Number Publication Date
WO2018135716A1 true WO2018135716A1 (fr) 2018-07-26

Family

ID=62908603

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2017/008590 Ceased WO2018135716A1 (fr) 2017-01-19 2017-08-09 Dispositif de stockage d'énergie et système de stockage d'énergie le comprenant

Country Status (2)

Country Link
KR (1) KR102197177B1 (fr)
WO (1) WO2018135716A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110048513A (zh) * 2019-02-28 2019-07-23 深圳市科陆电子科技股份有限公司 梯次利用车用动力电池储能系统

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102213831B1 (ko) 2019-10-04 2021-02-05 한전케이디엔주식회사 Ems에 의한 에너지 저장 장치의 배터리 보호 시스템 및 보호 방법
KR102256434B1 (ko) * 2020-08-14 2021-05-25 목포대학교 산학협력단 다수의 분산 에너지저장시스템 통합제어 장치

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110144822A1 (en) * 2009-12-15 2011-06-16 Samsung Sdi Co., Ltd. Grid-connected energy storage system and method of controlling grid-connected energy storage system
KR20140104179A (ko) * 2013-02-20 2014-08-28 한국에너지기술연구원 분산 전원 제어 시스템 및 방법
KR20150008767A (ko) * 2013-07-15 2015-01-23 엘지이노텍 주식회사 에너지 저장 시스템
KR101626911B1 (ko) * 2015-02-26 2016-06-02 연세대학교 산학협력단 복수개의 에너지 저장 장치를 위한 전력 제어 시스템 및 방법
KR20160109880A (ko) * 2015-03-13 2016-09-21 엘에스산전 주식회사 에너지 저장 시스템의 모니터링 시스템 및 방법

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102211363B1 (ko) * 2014-02-11 2021-02-03 삼성에스디아이 주식회사 에너지 저장 시스템과 그의 구동방법
JP6199804B2 (ja) * 2014-05-26 2017-09-20 京セラ株式会社 電力制御システム、電力制御システムの制御方法、及び電力制御装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110144822A1 (en) * 2009-12-15 2011-06-16 Samsung Sdi Co., Ltd. Grid-connected energy storage system and method of controlling grid-connected energy storage system
KR20140104179A (ko) * 2013-02-20 2014-08-28 한국에너지기술연구원 분산 전원 제어 시스템 및 방법
KR20150008767A (ko) * 2013-07-15 2015-01-23 엘지이노텍 주식회사 에너지 저장 시스템
KR101626911B1 (ko) * 2015-02-26 2016-06-02 연세대학교 산학협력단 복수개의 에너지 저장 장치를 위한 전력 제어 시스템 및 방법
KR20160109880A (ko) * 2015-03-13 2016-09-21 엘에스산전 주식회사 에너지 저장 시스템의 모니터링 시스템 및 방법

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110048513A (zh) * 2019-02-28 2019-07-23 深圳市科陆电子科技股份有限公司 梯次利用车用动力电池储能系统
CN110048513B (zh) * 2019-02-28 2023-08-18 深圳市科陆电子科技股份有限公司 梯次利用车用动力电池储能系统

Also Published As

Publication number Publication date
KR20180085453A (ko) 2018-07-27
KR102197177B1 (ko) 2020-12-31

Similar Documents

Publication Publication Date Title
WO2012043919A1 (fr) Système de conversion de puissance pour système de stockage d'énergie et procédé de commande associé
WO2012033254A1 (fr) Système de stockage d'énergie et procédé de commande associé
WO2018212404A1 (fr) Système de de stockage d'énergie hybride
WO2019225834A1 (fr) Système et procédé de commande d'alimentation électrique utilisant un dispositif d'accumulation d'énergie et une génération d'énergie photovoltaïque
WO2018056504A1 (fr) Procédé de commande de fréquence d'un microréseau autonome et convertisseur de puissance pour dispositif de stockage d'énergie pour commander celui-ci
WO2019031686A1 (fr) Système de stockage d'énergie
WO2022196846A1 (fr) Système de gestion hiérarchique de système de stockage d'énergie
WO2017116087A2 (fr) Dispositif de gestion de batterie et système de stockage d'énergie de batterie
WO2021187673A1 (fr) Appareil de gestion d'alimentation électrique et de demande et procédé associé
WO2020040350A1 (fr) Nouveau système de production d'énergie hybride à énergie renouvelable et son procédé de production d'énergie
KR102369839B1 (ko) 에너지 저장 시스템(ess)의 비상발전기 대체 방법 및 이를 포함하는 시스템
WO2019059489A1 (fr) Système de miniréseaux
WO2018230831A1 (fr) Système de stockage d'énergie
WO2013002438A1 (fr) Dispositif de commutation et procédé de gestion d'énergie utilisant celui-ci
WO2018135716A1 (fr) Dispositif de stockage d'énergie et système de stockage d'énergie le comprenant
WO2019107802A1 (fr) Système de stockage d'énergie
WO2018216899A1 (fr) Système de microréseau militaire
CN109586326B (zh) 一种超大规模储能系统控制保护装置
WO2019221361A1 (fr) Système de gestion d'énergie
WO2022204987A1 (fr) Procédé de commande pour dispositif d'accumulation d'énergie, dispositif d'accumulation d'énergie et système de génération d'énergie photovoltaïque
WO2015102398A1 (fr) Système et procédé pour stocker de l'énergie pour générateur éolien
WO2019151656A1 (fr) Procédé et dispositif de distribution de sorties d'ess
CN112968475B (zh) 车载燃气轮机发电机组与储能组合的微电网系统和方法
WO2019235657A1 (fr) Système de stockage d'énergie solaire divisé en mode diurne et nocturne, son procédé de fonctionnement et son procédé de remplacement de batterie
WO2019132493A1 (fr) Dispositif de charge comprenant un module de puissance

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17892287

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17892287

Country of ref document: EP

Kind code of ref document: A1