WO2018179476A1 - 廃水処理システム、空気供給量制御装置及び空気供給量制御方法 - Google Patents
廃水処理システム、空気供給量制御装置及び空気供給量制御方法 Download PDFInfo
- Publication number
- WO2018179476A1 WO2018179476A1 PCT/JP2017/028302 JP2017028302W WO2018179476A1 WO 2018179476 A1 WO2018179476 A1 WO 2018179476A1 JP 2017028302 W JP2017028302 W JP 2017028302W WO 2018179476 A1 WO2018179476 A1 WO 2018179476A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- air
- pipe
- pressure
- amount
- blower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/006—Regulation methods for biological treatment
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/008—Control or steering systems not provided for elsewhere in subclass C02F
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/02—Aerobic processes
- C02F3/12—Activated sludge processes
- C02F3/20—Activated sludge processes using diffusers
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F3/00—Biological treatment of water, waste water, or sewage
- C02F3/02—Aerobic processes
- C02F3/12—Activated sludge processes
- C02F3/26—Activated sludge processes using pure oxygen or oxygen-rich gas
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/001—Upstream control, i.e. monitoring for predictive control
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/005—Processes using a programmable logic controller [PLC]
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/03—Pressure
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/04—Oxidation reduction potential [ORP]
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/14—NH3-N
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/15—N03-N
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/22—O2
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2209/00—Controlling or monitoring parameters in water treatment
- C02F2209/38—Gas flow rate
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W10/00—Technologies for wastewater treatment
- Y02W10/10—Biological treatment of water, waste water, or sewage
Definitions
- the present invention relates to a wastewater treatment system, an air supply amount control device for a wastewater treatment device, and an air supply amount control method for a wastewater treatment device.
- the air for aeration treatment in the reaction tank is supplied from a blower through a blower pipe.
- the blower controls the amount of air to be supplied so that the amount of air necessary for biological treatment in the reaction tank is obtained.
- the blower may supply air so that the pressure in the blower pipe is constant.
- the pressure in the blow pipe is set to such a value that a necessary amount of air can be supplied in order to reliably perform biological treatment in the reaction tank. Therefore, the pressure in the blast pipe is assumed to have the largest load of wastewater that has flowed into the reaction tank (for example, the concentration of ammoniacal nitrogen and BOD that are biological treatment targets), and biological treatment is possible even at the assumed maximum load.
- Patent Document 2 describes a technique for determining the internal pressure of a blower pipe so that an opening degree of an air introduction valve to an aeration tank that maximizes a required air amount among a plurality of aeration tanks is maximized. Yes.
- the present invention has been made in view of the above, and includes a wastewater treatment system, an air supply amount control device, and an air supply amount control method that appropriately supply air to each tank while suppressing energy consumption required for blowing air.
- the purpose is to provide.
- a wastewater treatment system of the present disclosure includes a plurality of reaction tanks that perform biological treatment on wastewater, and a blower pipe that is a pipe connected to the plurality of reaction tanks, A blower unit that supplies air for performing the biological treatment to a plurality of the reaction tanks via the blower pipe, and an air supply amount control unit that controls an air supply amount to the reaction tanks,
- the air supply amount control unit is provided in the reaction tank, measures a state of waste water in the reaction tank, and determines the waste water in the reaction tank based on a measurement result of the water quality measurement unit.
- Air blower loss pressure which is the air pressure Calculating a target pipe pressure in the blow pipe based on the blow pipe loss pressure, and changing the target pipe pressure to be calculated according to a change in the required air amount; and in the blow pipe
- a ventilation control unit that controls the supply of air from the blowing unit so that the pressure in the air reaches the target pipe internal pressure.
- the target pipe internal pressure calculation unit includes the blower pipe loss pressure, a loss pressure due to a pressure loss of an air diffuser provided in the reaction tank to diffuse air from the blower pipe into the reaction tank, and the reaction It is preferable to calculate the target pipe pressure so that the head pressure of the wastewater in the tank is summed and the target pipe pressure is equal to or higher than the total value.
- the blower pipe includes a mother pipe connected to the blower unit, a plurality of branch pipes branched from the mother pipe and respectively connected to the plurality of reaction vessels, an introduction valve provided in the branch pipe, A branch pipe air quantity measuring unit that measures the amount of air supplied to each of the branch pipes as a detected air quantity, and the air supply amount control unit is configured such that the detected air quantity is the required air in each of the branch pipes. It is preferable to have an introduction air control unit that adjusts the opening degree of the introduction valve so that the amount becomes equal.
- the air supply amount control unit is configured such that a total detected air amount that is a total value of the detected air amount for each branch pipe is a total value of the necessary air amount for each reaction tank. If the required air amount is different from the required air amount, a difference air amount calculating unit that calculates a difference air amount that is a difference between the required air amount and the detected air amount for each reaction tank is further provided, and the target pipe pressure calculating unit includes The target pipe internal pressure is corrected based on a loss pressure due to pressure loss in the blow pipe when air of a differential air amount is supplied into the blow pipe, and the blow control unit is configured to correct the target pressure in the blow pipe. It is preferable to control the air supply from the blower unit so that the internal pressure of the pipe is reached.
- the required air amount acquisition unit stores a relationship between the amount of air supplied to the reaction tank and the amount of water quality air that is the relationship between the amount of change in water quality in the reaction tank when that amount of air is supplied. Based on the storage unit, the water quality air quantity relationship, the water quality measurement result by the water quality measurement unit, and the target water quality, the amount of air necessary for changing the waste water quality to the target water quality It is preferable to have a required air amount calculation unit that calculates the amount.
- the relationship storage unit stores the water quality air amount relationship as a first-order lag system in which a change in water quality of the wastewater is delayed with respect to a change in the amount of air supplied into the reaction tank, and the required air amount calculation unit is It is preferable that the required air amount is updated based on the water quality measurement result at every elapse of a predetermined time by the water quality measurement unit.
- an air supply amount control device of the present disclosure includes a plurality of reaction vessels that perform biological treatment on wastewater, and a blower tube that is a tube connected to the plurality of reaction vessels. And an air supply amount control device for controlling an air supply amount of a wastewater treatment device having a blower unit for supplying air for performing the biological treatment to a plurality of the reaction tanks through the air blow pipe.
- a water quality measurement unit that is provided in the reaction tank and measures the state of waste water in the reaction tank, and the waste water in the reaction tank is required to have a predetermined target water quality based on the measurement result of the water quality measurement unit.
- a required air amount acquisition unit that acquires an air amount for each reaction tank, and a blower pipe loss that is a pressure of air that is lost due to a pressure loss in the blower pipe when air of the required air amount is supplied into the blower pipe.
- Calculate the pressure and A target pipe internal pressure in the blow pipe is calculated based on a loss pressure, and a target pipe internal pressure calculation unit for changing the target pipe internal pressure to be calculated according to a change in the required air amount; and a pressure in the blow pipe is set in the target pipe
- a blower control unit that controls supply of air from the blower unit so as to achieve pressure.
- an air supply amount control method of the present disclosure includes a plurality of reaction tanks that perform biological treatment on wastewater, and a blower pipe that is a pipe connected to the plurality of reaction tanks. And an air supply amount control method for controlling an air supply amount of a wastewater treatment device having a blower unit that supplies air for performing the biological treatment to a plurality of the reaction tanks via the air blow pipe.
- the measurement step for measuring the state of waste water in the reaction tank and the amount of air necessary for the waste water in the reaction tank to have a predetermined target water quality are obtained for each reaction tank based on the measurement result of the state of the waste water.
- a necessary air amount obtaining step and calculating a blower pipe loss pressure, which is a pressure of air lost due to a pressure loss in the blower pipe when air of the necessary air quantity is supplied into the blower pipe, and the blower pipe loss Based on pressure Calculating a target pipe internal pressure in the blow pipe and changing the target pipe internal pressure to be calculated according to a change in the required air amount; and a pressure in the blow pipe to be the target pipe internal pressure.
- an air blowing control step for controlling air supply from the air blowing unit.
- air can be appropriately supplied to each tank while suppressing energy consumption required for blowing air.
- FIG. 1 is a schematic diagram of a wastewater treatment system according to the first embodiment.
- FIG. 2 is a block diagram illustrating a configuration of the control unit according to the first embodiment.
- FIG. 3 is a graph for explaining the water quality air quantity relationship.
- FIG. 4 is a graph showing an example of the relationship between the required air amount and the target pipe internal pressure.
- FIG. 5 is a flowchart for explaining a control flow for supplying the required amount of air to each reaction tank using the pressure in the blower pipe as the target pipe internal pressure.
- FIG. 6 is a flowchart for explaining control of the blower by the blower control unit.
- FIG. 7 is a graph for explaining the control of the blower by the blower.
- FIG. 8 is a block diagram illustrating a configuration of a control unit according to the second embodiment.
- FIG. 9 is a flowchart for explaining a correction flow of the pipe internal pressure according to the second embodiment.
- FIG. 1 is a schematic diagram of a wastewater treatment system according to the first embodiment.
- the wastewater treatment system 1 according to the first embodiment includes reaction tanks 10 ⁇ / b> A, 10 ⁇ / b> B, and 10 ⁇ / b> C, a blower unit 20, a blower pipe 30, and an air supply amount control unit 40.
- the wastewater treatment system 1 supplies the air from the blower unit 20 into the reaction tank 10 through the blower pipe 30 while controlling the amount of air supplied into the reaction tank 10 with the air supply amount control unit 40.
- the internal wastewater W is biologically treated with the activated sludge.
- Reaction tanks 10A, 10B, and 10C are tanks that have an air diffuser 12 inside and store activated sludge.
- waste water W flows from a sedimentation basin (not shown).
- the waste water W is water after a part of solid matter is separated from raw water by a sedimentation basin (not shown).
- Raw water here refers to waste water and sewage discharged from homes and factories.
- the air diffuser 12 aerates the stored activated sludge with the air supplied from the blower unit 20.
- the reaction tanks 10A, 10B, and 10C perform biological treatment on the waste water W using the aerated activated sludge, and discharge the treated water, which is the waste water W after the biological treatment, to a solid-liquid separation tank (not shown).
- a solid-liquid separation tank (not shown)
- the treated water is further subjected to solid-liquid separation processing, and the water after the solid-liquid separation processing is discharged to the external environment, for example, after disinfection processing.
- Reaction tanks 10A, 10B, and 10C are provided in parallel. That is, the waste water W is supplied to the reaction tanks 10A, 10B, and 10C in parallel from the settling basin.
- the reaction vessels 10A, 10B, and 10C may be arranged in series with each other. That is, the reaction tank 10A may be connected to the reaction tank 10A, the waste water W after biological treatment in the reaction tank 10A may be introduced into the reaction tank 10B, and the biological treatment may be performed again in the reaction tank 10B.
- reaction tank 10A, 10B, 10C is a total of three aerobic tanks, the number is also arbitrary.
- an anaerobic tank and an oxygen-free tank may be connected in series with the reaction tanks 10A, 10B, and 10C.
- the reaction vessels 10A, 10B, and 10C are not distinguished from each other, they are referred to as the reaction vessel 10.
- the blower unit 20 includes a plurality of blowers 22A, 22B, 22C, and 22D.
- the blowers 22A, 22B, 22C, and 22D are blowers having functions similar to each other.
- the blowers 22A, 22B, 22C, and 22D introduce air from the outside through the inlet vane, and exhaust the air introduced by the rotating blade portion.
- the opening degree of the inlet vane can be adjusted, and the rotation speed of the blade portion can also be adjusted.
- blowers 22 ⁇ / b> A, 22 ⁇ / b> B, 22 ⁇ / b> C, and 22 ⁇ / b> D are connected to the blower pipe 30 in parallel with each other, and discharge air to the blower pipe 30.
- the blowers 22 ⁇ / b> A, 22 ⁇ / b> B, 22 ⁇ / b> C, and 22 ⁇ / b> D are referred to as the blower 22 when not distinguished from each other.
- the number of the air blowers 22 which the air blow unit 20 has is arbitrary.
- the blower tube 30 is a tube that conducts air inside.
- the blower pipe 30 includes an introduction pipe 31, a mother pipe 32, branch pipes 34 ⁇ / b> A, 34 ⁇ / b> B, 34 ⁇ / b> C, and an introduction valve 36.
- One end of the introduction pipe 31 is branched and connected to the blower 22, and air is supplied from the blower 22.
- the other end of the introduction pipe 31 is connected to the mother pipe 32, and the air from each blower 22 is merged and the merged air A is conducted to the mother pipe 32.
- the mother pipe 32 is a single pipe.
- the branch pipes 34C, 34B, and 34A are connected in this order from the upstream side of the flow of the air A, that is, the blower 22 side.
- the branch pipe 34A is connected to the diffuser 12 of the reaction tank 10A on the side opposite to the connection part of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10A.
- the branch pipe 34B is connected to the diffuser 12 of the reaction tank 10B on the side opposite to the connection part of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10B.
- the branch pipe 34C is connected to the diffuser 12 of the reaction tank 10C on the side opposite to the connection part of the mother pipe 32, and supplies a part of the air A from the mother pipe 32 to the reaction tank 10C.
- the introduction valve 36 is attached to the branch pipes 34A, 34B, and 34C.
- the introduction valve 36 is a valve that is opened and closed by the air supply amount control unit 40, and adjusts the air supply amount to each reaction tank 10 by adjusting the opening thereof.
- the branch pipes 34 ⁇ / b> A, 34 ⁇ / b> B, 34 ⁇ / b> C will be referred to as branch pipes 34 when not distinguished from each other.
- the air supply amount control unit 40 as an air supply amount control device includes a control unit 42, a nitric acid meter 43 and an ammonia meter 44 as water quality measurement units, an intake air measurement unit 46, a mother pipe internal pressure measurement unit 47, and branch pipe air. A quantity measuring unit 48.
- the control unit 42 controls the amount of air supplied into each reaction tank 10 based on the measurement results of the nitric acid meter 43, the ammonia meter 44, the intake air measurement unit 46, the mother pipe internal pressure measurement unit 47, and the branch pipe air amount measurement unit 48. It is a control device. Details of the control unit 42 will be described later. Note that the air supply amount control unit 40 controls the air supply amount to the plurality of reaction tanks 10, but one air supply amount control unit 40 is provided for each reaction tank 10. The air supply amount may be controlled.
- the nitric acid meter 43 is a sensor that is provided in each reaction tank 10 and measures the nitric acid concentration of the waste water W in the reaction tank 10.
- nitric acid in the waste water W is nitric acid (HNO 3 ), nitrous acid (HNO 2 ), nitrate nitrogen (NO 3 —N), nitrite nitrogen (NO 2 —N), nitrate nitrogen.
- HNO 3 nitric acid
- NO 2 nitrous acid
- NO 3 —N nitrate nitrogen
- NO 2 —N nitrite nitrogen
- the nitric acid concentration in the present embodiment is any one of nitric acid, nitrous acid, nitrate nitrogen, nitrite nitrogen, aggregation of nitrate nitrogen and nitrite nitrogen, and NO x indicating both nitric acid and nitrite. May be the concentration.
- the ammonia meter 44 is a sensor that is provided in each reaction tank 10 and measures the ammonia concentration of the waste water W in the reaction tank 10.
- the ammonia concentration of the waste water W is a concept including ammonia and ammoniacal nitrogen in the present embodiment. That is, the ammonia concentration in this embodiment may be any concentration of ammonia (NH 3 ) and ammoniacal nitrogen (NH 4 —N). That is, it can be said that the nitric acid meter 43 and the ammonia meter 44 measure the state of the waste water W in the reaction tank 10.
- the water quality measurement part ie, the nitric acid meter 43 and the ammonia meter 44, are provided for each reaction tank 10, one water quality measurement part is provided in the plurality of reaction tanks 10. Also good.
- the intake measurement unit 46 is provided on the intake side of each blower 22 and measures the amount of air taken by the blower 22.
- the mother pipe internal pressure measurement unit 47 is attached to the mother pipe 32 and measures the pressure in the mother pipe 32, that is, the pressure of the air supplied by each blower 22. More specifically, the mother pipe internal pressure measurement unit 47 is provided on the upstream side of the air A flow with respect to the branch pipe 34C, that is, on the upstream side of the air A flow with respect to the connection parts with all the branch pipes 34.
- the branch air quantity measuring unit 48 is provided in each branch pipe 34 and measures the amount of air supplied from each branch pipe 34 to the reaction tank 10.
- the branch air amount measurement unit 48 is provided upstream of the introduction valve 36 in the air flow, that is, between the introduction valve 36 and the mother pipe 34 in the branch pipe 34.
- the branch pipe air amount measurement unit 48 measures the amount of air supplied to the branch pipe 34, more specifically, the amount of air upstream of the introduction valve 36 in the branch pipe 34 as the detected air amount. That is, the branch air quantity measuring unit 48 measures the amount of air supplied from the branch pipe 34 to the reaction tank 10 via the introduction valve 36 as the detected air quantity.
- nitrification reaction that is, ammonia nitrogen (NH 4 -N) in the water to be treated is expressed by the following reaction formula (1) by nitrifying bacteria which are aerobic microorganisms in activated sludge under aerobic conditions.
- reaction formula (1) by nitrifying bacteria which are aerobic microorganisms in activated sludge under aerobic conditions.
- NO 2 —N nitrite nitrogen
- NO 3 —N nitrate nitrogen
- the nitric acid meter 43 detects the progress of the denitrification reaction, that is, the degree of decomposition of nitric acid, by measuring the nitric acid concentration of the waste water W in the reaction tank 10.
- the ammonia meter 44 detects the degree of progress of the nitrification reaction, that is, the degree of decomposition of ammonia, by measuring the ammonia concentration of the waste water W in the reaction tank 10.
- the air supply amount control unit 40 controls the amount of air supplied to the reaction tank 10 based on the measurement results of the nitric acid meter 43 and the ammonia meter 44.
- the air supply amount control unit 40 determines that the denitrification reaction is insufficient and reduces the amount of air supplied to the reaction tank 10 so that the nitric acid concentration is a predetermined numerical value.
- the temperature is lower than the range, the amount of air supplied to the reaction tank 10 is increased on the assumption that the denitrification reaction proceeds so much that the nitrification reaction is insufficient.
- the air supply amount control unit 40 determines that the nitrification reaction is insufficient and increases the amount of air supplied to the reaction tank 10 so that the ammonia concentration is a predetermined numerical value.
- the nitric acid meter 43 detects the relative progress of the denitrification reaction with respect to the progress of the nitrification reaction.
- the reaction tank 10 is operated so that the activated sludge concentration is constant, and the rate of nitrification reaction by one nitrifying bacterium and the denitrification rate by one nitrifying bacterium are substantially constant at room temperature.
- the waste water W has a water quality, that is, an ammonia concentration that is kept within a predetermined concentration by a predetermined design water quality, and is substantially constant.
- the inflow amount of the waste water W into the reaction tank 10 is fluctuating.
- the reaction tank 10 in which nitrification reaction and denitrification reaction occur in parallel, it is divided into an aerobic region and an anaerobic region.
- the aerobic region is an oxygen-rich region and is a region where nitrification reaction proceeds mainly.
- the anaerobic region is a region where anoxia or oxygen concentration is low, and is a region where denitrification reaction proceeds mainly.
- the amount of nitrification (the amount of nitrification) and the amount of denitrification (the amount of denitrification) at the position where the nitric acid meter 43 is provided correspond to the ratio between the aerobic region and the anaerobic region.
- the nitric acid concentration corresponds to a value obtained by subtracting the denitrification amount from the nitrification amount.
- the nitric acid meter 43 detects the concentration of nitric acid, thereby detecting the volume difference between the aerobic region and the anaerobic region from the upstream in the reaction tank 10 to the position where the nitric acid meter 43 is provided.
- the total volume from the upstream in the reaction tank 10 to the position where the nitric acid meter 43 is provided is known from the size of the reaction tank 10. Therefore, the nitric acid meter 43 can detect the denitrification amount, that is, the progress of the denitrification reaction by detecting the nitric acid concentration.
- the progress of the denitrification reaction is detected by the nitric acid meter 43.
- the nitric acid meter 43 a pair of dissolved oxygen concentrations A meter, a pair of ORP meters, a pair of ammonia meters, and the like may be used.
- the nitric acid meter 43 is arranged on the upstream side of the waste water W in the reaction tank 10 from the ammonia meter 44, that is, on the side where the waste water is supplied (the sedimentation basin side not shown).
- the inside of the reaction tank 10 is from the upstream side to the downstream side of the waste water W, that is, the side from which the treated water is discharged from the side where the waste water W is supplied (the sedimentation pond side not shown) (the solid separation not shown).
- the tank is divided into an upstream processing area and a downstream processing area.
- the upstream region and the downstream region are regions in which progress degrees of the nitrification treatment and the denitrification treatment are different from each other.
- the upstream region is a region on the upstream side of the waste water W, and is a region where the nitrification process and the denitrification process proceed at substantially the same predetermined ratio, for example.
- the downstream region is a region on the downstream side of the waste water W from the upstream region, and nitrification treatment and denitrification treatment are performed as in the upstream region.
- the progress speed of the nitrification process in the downstream area is higher than the progress speed of the nitrification process in the upstream area and the progress speed of the denitrification process in the downstream area.
- the nitric acid meter 43 is provided between the upstream region and the downstream region (for example, the central position when the waste water W extends from the upstream side to the downstream side), and the ammonia meter 44 is located downstream of the nitric acid meter 43. Arranged in the downstream region.
- the air supply amount control unit 40 controls the amount of air in the reaction tank 10 based on the detection results of the nitric acid meter 43 and the ammonia meter 44, and performs nitrification treatment and denitrification in the reaction tank 10. Perform simultaneous nitrification and denitrification control including both biological treatment and treatment.
- the air supply amount control unit 40 may not perform the simultaneous nitrification denitrification process in the reaction tank 10.
- the air supply amount control unit 40 may have one of the nitric acid meter 43 and the ammonia meter 44, and may control the air amount in the reaction tank 10 based on the measurement result.
- the air supply amount control unit 40 has a dissolved oxygen meter that measures the amount of dissolved oxygen in the waste water W in the reaction tank 10 as a water quality measurement unit instead of the nitric acid meter 43 and the ammonia meter 44. Also good.
- the air supply amount control unit 40 controls the amount of air supplied to the reaction tank 10 based on the amount of dissolved oxygen in the waste water W measured by the dissolved oxygen meter so that the amount of dissolved oxygen becomes a constant value ( Control of dissolved oxygen amount).
- an anaerobic tank or an oxygen-free tank may be connected in series with the reaction tank 10, and the waste water W after nitrification in the reaction tank 10 may be denitrified.
- the air supply amount control unit 40 may have a flow meter that measures the inflow amount of the waste water W in the reaction tank 10 as a water quality measurement unit instead of the nitric acid meter 43 and the ammonia meter 44.
- the air supply amount control unit 40 is based on the inflow amount of the waste water W into the reaction tank 10 measured by the flow meter, and supplies air to the reaction tank 10 to set the amount of waste water W to the target concentration.
- the amount is controlled (inflow water amount control).
- an anaerobic tank or an oxygen-free tank may be connected in series to the reaction tank 10, and the waste water W after nitrification in the reaction tank 10 may be denitrified.
- the wastewater treatment system 1 controls the amount of air supplied to the reaction tank 10 based on the measurement result of the water quality measurement unit, the simultaneous nitrification denitrification control, dissolved oxygen amount control, inflow water amount described above Arbitrary air amount control other than control may be performed.
- the wastewater treatment system 1 divides a series for performing different treatments (for example, a series for performing simultaneous nitrification denitrification control and a series for performing dissolved oxygen amount control), and performs any one of the treatments (for example, for each reaction tank 10) Any one of a series performing simultaneous nitrification denitrification control and a series performing dissolved oxygen amount control) may be performed.
- FIG. 2 is a block diagram illustrating a configuration of the control unit according to the first embodiment.
- the control unit 42 is an arithmetic device such as a computer. As shown in FIG. 2, the control unit 42 includes a water quality measurement result acquisition unit 70, a detected air amount acquisition unit 71, a necessary air amount acquisition unit 72, a target pipe pressure calculation unit 74, a blower control unit 76, And an introduction air control unit 78.
- the water quality measurement result acquisition unit 70 acquires from the nitric acid meter 43 and the ammonia meter 44 the state of the waste water W in the reaction tank 10, that is, the measurement results of the nitric acid concentration and ammonia concentration of the waste water W.
- the water quality measurement unit is a dissolved oxygen meter
- the water quality measurement result acquisition unit 70 acquires the amount of dissolved oxygen in the reaction tank 10 as the state of the waste water W.
- the water quality measurement unit is a flow meter
- the water quality measurement result acquisition unit 70 acquires the amount of waste water W that has flowed into the reaction tank 10 as the state of the waste water W. That is, the state of the waste water W in the reaction tank 10 is a measurement target measured by the water quality measurement unit.
- the water quality measurement unit can measure at least one of the nitric acid concentration, the ammonia concentration, the dissolved oxygen amount, and the inflow amount of the waste water W in the reaction tank 10 as the state of the waste water W.
- the detected air amount acquisition unit 71 acquires the value of the detected air amount of each branch pipe 34 from the branch air amount measurement unit 48, that is, the value of the amount of air supplied from the introduction valve 36 of each branch pipe 34 to the reaction tank 10. To do.
- the required air amount acquisition unit 72 is configured to calculate the required air amount for making the water quality of the waste water W in the reaction tank 10 a predetermined target water quality based on the measurement result of the state of the waste water W acquired by the water quality measurement result acquisition unit 70. Acquired for each reaction tank 10. A method for obtaining the required air amount will be described later.
- the target pipe pressure calculation unit 74 calculates the target pipe pressure based on the value of the required air amount.
- the target pipe internal pressure is the pressure of the air in the blast pipe necessary for supplying the required amount of air to each reaction tank 10. A method for calculating the target pipe pressure will be described later.
- the air blowing control unit 76 controls the air supply from the air blowing unit 20 so that the pressure in the air blowing tube 30 becomes the target pipe internal pressure calculated by the target pipe internal pressure calculating unit 74. Specifically, the air blowing control unit 76 obtains the value of the air pressure in the mother pipe 32 measured by the mother pipe internal pressure measuring unit 47, and the air blowing unit so that the air pressure in the mother pipe 32 becomes the target pipe internal pressure. The air supply amount from 20 is controlled.
- the introduction air control unit 78 acquires the value of the air amount supplied to each branch 34 measured by each branch air amount measurement unit 48 from the detected air amount acquisition unit 71. More specifically, the introduction air control unit 78 acquires the value of the detected air amount of each branch pipe 34, that is, the value of the amount of air supplied from the introduction valve 36 of each branch pipe 34 to the reaction tank 10. The introduction air control unit 78 adjusts the opening of each introduction valve 36 based on the necessary air amount and the acquired detected air amount so that the air supply amount from the branch pipe 34 to the reaction tank 10 becomes the necessary air amount. To do. That is, the introduction air control unit 78 adjusts the opening degree of each introduction valve 36 so that the detected air amount matches the required air amount. A method for adjusting the opening degree of the introduction valve 36 will be described later.
- the required air amount acquisition unit 72 includes a relationship storage unit 82 and a required air amount calculation unit 84.
- the water quality mentioned below means the density
- the relationship storage unit 82 stores the water quality / air amount relationship.
- the water quality air amount relationship is a relationship between the amount of air supplied to the reaction vessel 10 and the amount of change in water quality in the reaction vessel 10 when that amount of air is supplied.
- the relationship storage unit 82 stores the water / air relationship as a primary delay system in which a change in the water quality in the reaction tank 10 is delayed with respect to a change in the amount of air supplied to the reaction tank 10. This will be specifically described below.
- FIG. 3 is a graph for explaining the relationship between water quality and air quantity.
- FIG. 3 is a graph showing an example of the amount of change in the ammonia concentration when air is supplied to the reaction vessel 10.
- the horizontal axis of FIG. 3 indicates time, the left side of the vertical axis indicates the amount of supply air supplied to the reaction tank 10, and the right side of the vertical axis indicates the ammonia concentration of the waste water W in the reaction tank 10.
- a line segment L1 in FIG. 3 indicates the amount of supplied air for each hour.
- a line segment L2 indicates the ammonia concentration for each time when the ammonia concentration changes according to the water quality air amount relationship when the supply air amount changes as in the line segment L1.
- the supply air amount is increased from M 1 to M 2 at time t 1 .
- ammonia concentration is from time t 1 to time t 2 delayed remain concentration P 1
- it starts to decrease the ammonia concentration from time t 2 the ammonia concentration lowered at a constant speed until time t 3, the rate of decrease in ammonia concentration decreases from time t 3, reaches the concentration P 2 at time t 4, converges remain concentration P 2.
- the change value of the supply air amount when the supply air amount is changed from M 1 to M 2 is defined as the change amount of the supply air per unit (for example, the change amount of air is 1 m 3 ).
- the variation in the concentration of the ammonia concentration P 1 in this case to P 2 ie the variation in water quality after the convergence in the case of varying only the unit amount supplied air quantity, and K.
- the time from time t 2 to t 3, i.e. the first-order lag time is Ts.
- the relationship storage unit 82 stores a water quality air amount relationship in which the values of K, Ls, and Ts measured in advance are applied to the above equation (11). For example, based on the detection result of the time from time t 2 to t 4 , the relationship storage unit 82 calculates a predetermined ratio (here 63%) of the detected time from time t 2 to t 3. Is stored as Ts which is the time of. In this example, the relationship between the ammonia concentration and the supply air amount has been described. However, if the values of K, Ls, and Ts are measured in advance, the water quality air amount relationship is the relationship between the nitric acid concentration and the supply air amount.
- the present invention can also be applied to the relationship between each water quality and the supply air amount, such as the relationship between the oxygen amount and the supply air amount.
- the relationship storage unit 82 in the present embodiment stores different water quality air amount relationships for the relationship between the ammonia concentration and the supply air amount and the relationship between the nitric acid concentration and the supply air amount.
- the necessary air amount calculation unit 84 illustrated in FIG. 2 reads the water quality air amount relationship from the relationship storage unit 82.
- the required air amount calculation unit 84 acquires a predetermined target water quality of the waste water W in the reaction tank 10, here a target concentration that is a value of the target ammonia concentration and the target nitric acid concentration.
- This target density is a predetermined numerical range set in advance.
- the target concentration in the nitric acid concentration is a predetermined numerical range of 5.0 mg or less.
- the target concentration in the ammonia concentration is 1.0 mg / L or more and 5.0 mg / L or less, and more preferably 1.0 mg / L or more and 2.0 mg / L or less.
- the required air amount calculation unit 84 calculates the required air amount of the reaction tank 10 based on the water quality air amount relationship, the target concentration, and the current nitric acid concentration and ammonia concentration of the waste water W acquired by the water quality measurement result acquisition unit 70. To do.
- the required air amount calculation unit 84 calculates the required air amount in the reaction tank 10 so that the nitric acid concentration of the waste water W becomes the target concentration and the ammonia concentration of the waste water W becomes the target concentration.
- the required amount of air is necessary (and sufficient) to make the water quality of the reaction tank a predetermined target water quality, that is, to make both the ammonia concentration and the nitric acid concentration of the waste water W in the reaction tank the target concentration. It is the amount of air and is calculated as an absolute value.
- the required air amount calculation unit 84 calculates a difference concentration that is a difference between the target concentration and the concentration calculated by the water quality measurement result acquisition unit 70, and the ammonia concentration of the wastewater W is set to the difference concentration on the target concentration side.
- the required air amount is calculated so that the nitric acid concentration of the wastewater W changes by the difference concentration toward the target concentration side. Therefore, it can be said that the required air amount changes according to the value of the differential concentration. For example, when the ammonia concentration is taken into account, the required air amount calculation unit 84, when the calculated ammonia concentration is lower than the target concentration, the nitrification process proceeds too much as the differential concentration increases, that is, as the current ammonia concentration decreases. As a result, the required air amount is lowered.
- the required air amount calculation unit 84 increases the required air amount, assuming that the nitrification is not sufficient as the differential concentration increases, that is, the current ammonia concentration increases. Further, when considering the nitric acid concentration, the required air amount calculation unit 84 assumes that the nitrification treatment is not sufficient as the difference concentration increases, that is, the current nitric acid concentration decreases when the calculated nitric acid concentration is lower than the target concentration. Increase the required air volume. When the calculated concentration of nitric acid is higher than the target concentration, the required air amount calculation unit 84 decreases the required air amount because the denitrification process is not sufficient as the differential concentration increases, that is, the current nitric acid concentration increases.
- the required air amount calculation unit 84 calculates the required air amount for all the reaction tanks 10.
- the required air amount calculation unit 84 may add up the required air amounts calculated for all of the reaction tanks 10 and calculate the total value as the total required air amount. Since the required air amount changes based on the current state of the waste water W in the reaction tank 10, that is, the nitric acid concentration and the ammonia concentration, the total required air amount is similarly based on the current state of the waste water W in the reaction tank 10. Change.
- the required air amount calculation unit 84 reads the water quality air amount relationship indicating the relationship between the dissolved oxygen amount and the supply air amount, and the current quality acquired by the water quality measurement result acquisition unit 70 Based on the amount of dissolved oxygen in the wastewater W, the required amount of air in the reaction tank 10 is calculated so that the wastewater W has a predetermined target water quality (target dissolved oxygen amount). Moreover, when performing the above-mentioned inflow water amount control, the required air amount calculation part 84 calculates the required air amount for setting it as target water quality according to the inflow amount of the waste water W to the reaction tank 10. FIG.
- the required air amount calculation unit 84 stores the relationship, assuming that the required air amount for achieving the target water quality has a relationship according to the inflow amount of the waste water W into the reaction tank 10, and obtains a water quality measurement result acquisition unit. Based on the inflow amount of the wastewater W acquired by 70, the required air amount is calculated.
- the target pipe internal pressure calculation unit 74 acquires the value of the required air amount from the required air amount calculation unit 84, and calculates the blower pipe loss pressure based on the value of the required air amount.
- the blower pipe loss pressure is a pressure of air lost due to a pressure loss in the blower pipe 30 when a necessary amount of air is supplied into the blower pipe 30. That is, the blower pipe loss pressure is the same value as the pressure loss in the blower pipe 30 when air of a necessary amount of air is supplied into the blower pipe 30.
- the target pipe pressure calculation unit 74 calculates the target pipe pressure based on this blower pipe loss pressure. This target pipe pressure changes according to the value of the required air amount. In other words, the target pipe pressure calculation unit 74 changes the target pipe pressure to be calculated according to the change in the required air amount.
- the pressure loss H of the pipe is generally calculated from the following equations (12) and (13).
- Expression (12) is an expression for calculating the pressure loss H when the pipe is a straight pipe.
- Formula (13) is a formula for calculating the pressure loss H when the pipe is a deformed pipe other than a straight pipe.
- f 1 and f 2 are loss coefficients, which are predetermined constants. For example, f 1 and f 2 are calculated in advance based on the measurement result obtained by measuring the pressure loss of the pipe in advance.
- l is the pipe length (m) of the straight pipe
- d is the inner diameter (m) of the straight pipe, and these are constants determined in advance by the shape of the pipe.
- ⁇ is an air density (kg / m 3 ), which is a predetermined constant.
- v is the flow velocity (m / s) of the flowing air.
- the variable is the flow velocity v. Therefore, the pressure loss H of the tube changes according to the flow velocity v. Further, the flow velocity v is proportional to the air flow rate Q (Bernoulli's theorem) as in the following equation (14).
- a in the equation (14) is a channel area, which is also a constant determined in advance by the shape of the pipe.
- the pressure loss H of the pipe can be calculated from the air flow rate Q.
- the pressure loss H corresponds to the blower pipe loss pressure
- the flow rate Q corresponds to the required air amount.
- the target pipe internal pressure calculation unit 74 calculates the air flow velocity v when air corresponding to the required air amount is supplied to the mother pipe 32 and the branch pipe 34.
- the flow velocity v here is a flow velocity in the mother pipe 32 and the branch pipe 34.
- the target pipe internal pressure calculation unit 74 sets a term other than the flow velocity v to a value set in advance in calculating the pressure loss of the pipe as shown in the equations (12) and (13), based on the set value, calculates the blower tube loss pressure H P.
- Blowpipe loss pressure H P the flow rate v, i.e. in proportion to the change of the required air quantity, the value is changed.
- Target pipe pressure calculation unit 74 for each branch pipe 34, calculates the blower tube loss pressure H P. That is, in the example of this embodiment, the target pipe pressure calculation section 74, a blower pipe loss pressure H P, and the blower pipe loss pressure H PA of branch pipes 34A, a blower pipe loss pressure H PB of branch pipes 34B, the branch pipe 34C It calculates the blower tube loss pressure H PC.
- the blower pipe loss pressure HPA is a pressure loss when air of a necessary amount of air calculated for the reaction tank 10A is supplied to the path of the blower pipe 30 from the blower unit 20 to the reaction tank 10A. More specifically, blast pipe loss pressure H PA is the substrate tube 32 inlet from (connection portion between the main pipe 32 and the inlet pipe 31) to the outlet of the main pipe 32 (connecting portion between the main pipe 32 and branch pipe 34A) The total required amount of air is supplied to the path, and the reaction tank is connected to the path from the inlet of the branch pipe 34A (the connection part between the mother pipe 32 and the branch pipe 34A) to the outlet of the branch pipe 34A (the connection part between the branch pipe 34A and the diffuser 12). This is the pressure loss in the path from the inlet of the mother pipe 32 to the outlet of the branch pipe 34A when the necessary air amount calculated for 10A is supplied.
- the blower pipe loss pressure HPB is a pressure loss when air of the necessary air amount calculated for the reaction tank 10B is supplied to the path of the blower pipe 30 from the blower unit 20 to the reaction tank 10B. More specifically, the blower pipe loss pressure HPB is from the inlet of the mother pipe 32 (connecting part between the mother pipe 32 and the introduction pipe 31) to the outlet of the mother pipe 32 (connecting part between the mother pipe 32 and the branch pipe 34B). The total required amount of air is supplied to the path, and the reaction tank is connected to the path from the inlet of the branch pipe 34B (the connection part between the mother pipe 32 and the branch pipe 34B) to the outlet of the branch pipe 34B (the connection part between the branch pipe 34B and the diffuser 12). This is the pressure loss in the path from the inlet of the mother pipe 32 to the outlet of the branch pipe 34B when the air of the necessary air amount calculated for 10B is supplied.
- Blowpipe loss pressure H PC is in the path of the air tube 30 leading to the reaction vessel 10C from the blower unit 20, a pressure loss when air was supplied in the required air amount calculated for the reaction vessel 10C. More specifically, blast pipe loss pressure H PC is the main pipe 32 inlet from (connection portion between the main pipe 32 and the inlet pipe 31) to the outlet of the main pipe 32 (connecting portion between the main pipe 32 and branch pipe 34C) The total required amount of air is supplied to the path, and the reaction tank enters the path from the inlet of the branch pipe 34C (the connection part between the mother pipe 32 and the branch pipe 34C) to the outlet of the branch pipe 34C (the connection part between the branch pipe 34C and the diffuser 12).
- blower tube loss pressure H PA blower tube loss pressure
- blower tube loss pressure H PB blower tube loss pressure
- H PC path in the blower tube loss pressure
- the target pipe pressure calculation unit 74 calculates the target pipe pressure P Y.
- h is the head pressure of the waste water W in the reaction tank 10.
- H C is the pressure of the air is lost by the pressure loss due to the air filtration unit (not shown) provided to the blower 22 (flow resistance).
- H M is the pressure of the air is lost by the pressure loss due to the branch pipe air amount measuring unit 48 (flow resistance).
- H A is the pressure of air lost due to pressure loss (passage resistance) by the air diffuser 12. That is, the target pipe pressure calculation unit 74 sums the blower tube loss pressure H P and head pressure h and air filtration apparatus loss pressure H C and the branch pipe air amount measuring unit loss pressure H M and spraying component loss pressure H A Te, and it calculates the total value as the target pipe pressure P Y.
- the target pipe pressure calculation unit 74 sums the blower tube loss pressure H P and head pressure h and branch pipe air amount measuring unit loss pressure H M and spraying component loss pressure H A, the target pipe pressure P Y are formed so that their total value or more, may calculate the target pipe pressure P Y.
- the water head pressure h may be a value set in advance from the volume of the reaction tank 10. Further, a sensor may be provided in the reaction tank 10, the water level or the amount of the waste water W in the reaction tank 10 may be detected by this sensor, and the target pipe pressure calculation unit 74 may calculate the water head pressure h from this detected value. .
- the air filter loss pressure H C , the branch air amount measurement part loss pressure H M , and the diffuser part loss pressure H A are, for example, design values or values measured in advance. That is, the target pipe pressure calculation unit 74 sets the air filter loss pressure H C , the branch air amount measurement unit loss pressure H M , and the air diffuser loss pressure H A as predetermined constants, If it exists, use that measurement.
- Target pipe pressure calculation section 74 a predetermined value in this manner the terms other than H P as a constant or a calculated value, by summing the this predetermined value and the blowing pipe loss pressure H P, the sum value It can be said that the target pipe pressure PY is calculated.
- the target pipe pressure calculation unit 74 calculates the target pipe pressure for each 10, the target pipe internal pressure becomes the maximum among them, the target pipe pressure P Y.
- the target pipe pressure calculation unit 74 calculates the target pipe pressure P YA , the target pipe pressure P YB , and the target pipe pressure P YC .
- Target pipe pressure PY A includes a blower tube loss pressure H PA, and head pressure h the reaction vessel 10A, a air filtration apparatus loss pressure H C, branch pipe air amount measuring unit loss branch pipe air amount measuring unit 48 in the branch pipe 34A a pressure H M, the total value of the spraying component loss pressure H a of the diffuser portion 12 of the reaction vessel 10A.
- the target pipe pressure PY B includes a blower tube loss pressure H PB, and head pressure h the reaction vessel 10B, and an air filtration apparatus loss pressure H C, branch pipe air amount of the branch pipe air amount measuring unit 48 in the branch pipe 34B a measurement unit loss pressure H M, the total value of the spraying component loss pressure H a of the diffuser portion 12 of the reaction vessel 10B.
- the target pipe pressure PY C includes a blower tube loss pressure H PC, a head pressure h of reactor 10C, an air filtration apparatus loss pressure H C, branch pipe air amount of the branch pipe air amount measuring unit 48 in the branch pipe 34C a measurement unit loss pressure H M, the total value of the spraying component loss pressure H a of the diffuser portion 12 of the reaction vessel 10C.
- the target pipe pressure calculation unit 74 determines a maximum value among the target pipe pressure P YA , the target pipe pressure P YB , and the target pipe pressure P YC as the target pipe pressure P Y.
- the target pipe pressure calculation unit 74, with respect to the target pipe pressure Pr that this decision adds a predetermined margin to a predetermined may be the added value as the actual target pipe pressure P Y.
- the target pipe pressure P YA , the target pipe pressure P YB , and the target pipe pressure P YC may be calculated as a value common to each reaction tank 10 (predetermined value J). That is, the target pipe pressure calculation unit 74 calculates the target pipe pressure P YA by adding the blower pipe loss pressure H PA and the predetermined value J, and calculates the blow pipe loss pressure H PB and the predetermined value J.
- the target pipe pressure P YB is calculated by summing, and the target pipe pressure P YC is calculated by adding the blower pipe loss pressure H PC and the predetermined value J, and the maximum value among them is calculated as the target pipe pressure P Y May be determined as
- the total value with J1 may be calculated as the target pipe pressure PYA . In this case, the target pipe pressure P YB and the target pipe pressure P YC are similarly calculated.
- the target pipe pressure calculation unit 74, the blower tube loss for each branch pipe 34 (each path to each reaction vessel 10) Pressure H PA, H PB, and calculates the H PC, the blower tube loss pressure H PA, H PB, based on H PC, calculates the target pipe pressure P YA, P YB, the P YC each branch pipe 34.
- Target pipe pressure calculation unit 74, branch pipe 34 the target pipe pressure P YA calculated for each, P YB, the maximum value of P YC, the target pipe pressure P Y.
- FIG. 4 is a graph showing an example of the relationship between the required air amount and the target pipe internal pressure.
- the target pipe pressure calculation unit 74 calculates the blower tube loss pressure H P of the blower tube 30 when the supply quantity of air necessary for the air to the blower tube 30, on the basis of the blower tube loss pressure H P A target pipe pressure PY is calculated.
- Blowpipe loss pressure H P varies in accordance with the value of the required air quantity. Therefore, as shown in FIG. 4, the target pipe pressure PY also changes according to the value of the required air amount.
- the target pipe pressure P Y is varied in proportion to two-dimensionally curved to the value of the required air quantity.
- the blower control unit 76 shown in FIG. 2, the pressure in the blower tube 30 is such that the target pipe pressure P Y target pipe pressure calculation section 74 is calculated, to control the air supply from the blower unit 20.
- the pressure in the blowing pipe 30 (main pipe 32) is kept at the target pipe pressure P Y, also in accordance with a change in the calculated value of the target pipe pressure P Y, to follow the change.
- the pressure in the blower pipe 30 is a pressure at a position where this pressure is measured, that is, a position where the mother pipe internal pressure measurement unit 47 measures the pressure of the blower pipe 30.
- the target pipe pressure PY is a target pipe pressure at a position where this pressure is measured.
- the introduction air control unit 78 acquires the value of the detected air amount of each branch pipe 34, that is, the value of the amount of air supplied from the introduction valve 36 of each branch pipe 34 to the reaction tank 10.
- the introduction air control unit 78 adjusts the opening of each introduction valve 36 based on the necessary air amount and the acquired detected air amount so that the air supply amount from the branch pipe 34 to the reaction tank 10 becomes the necessary air amount. To do. That is, when the amount of air in the branch pipe 34 is larger than the required amount of air, the introduction air control unit 78 reduces the opening of the introduction valve 36 (decreases the opening area) and increases the amount of air flowing into the reaction tank 10.
- the introduction air control unit 78 increases the opening degree of the introduction valve 36 (increases the opening area) when the necessary air amount fluctuates and increases, and when the necessary air amount decreases, the introduction air control unit 78 introduces the air.
- the opening degree of the valve 36 is lowered.
- the pressure of the air tube 30 is controlled so that the target pipe pressure P Y. Accordingly, the mother pipe 32 is supplied with air that is equal to or greater than the total required air amount.
- the introduction air control unit 78 adjusts the opening degree of the introduction valve 36 of each branch pipe 34 so that air corresponding to the necessary amount of air is supplied to each branch pipe 34 so that the air in the mother pipe 32 is supplied to each branch pipe 34. Is distributed. Therefore, for example, even when the length and shape of each branch pipe 34 are different and the pressure loss is different for each branch pipe 34, the opening degree of the introduction valve 36 is adjusted for each branch pipe 34. The amount of air can be supplied.
- the air blowing control unit 76 changes the pipe internal pressure in the air blowing pipe 30 according to the required air amount, and supplies air so that the air amount follows the required air amount. Therefore, the amount of adjustment of the opening degree of the introduction valve 36 is lower in the introduction air control unit 78 than in the case where the target pipe pressure is kept constant. In other words, since the amount of air is always supplied to the blower pipe 30 as much as necessary, the introduction air control unit 78 introduces the air within a range in which the opening degree of the introduction valve 36 does not become too low. The opening degree of the valve 36 can be controlled.
- FIG. 5 is a flowchart for explaining a control flow for supplying the required amount of air to each reaction tank 10 by setting the pressure in the blower pipe to the target pipe pressure.
- the air supply amount control unit 40 first measures the nitric acid concentration and the ammonia concentration of the waste water W in each reaction tank 10 using the nitric acid meter 43 and the ammonia meter 44 (step S10).
- the air supply amount control unit 40 uses the required air amount calculation unit 84 to calculate the required air amount of each reaction tank 10 based on the water quality air amount relationship and the measured concentration and target concentration. Calculate (step S12). Specifically, the required air amount calculation unit 84 reads the water quality air amount relationship for each of the relationship between the ammonia concentration and the supply air amount and the relationship between the nitric acid concentration and the supply air amount from the relationship storage unit 82. The required air amount calculation unit 84 acquires a target concentration value for each of the ammonia concentration and the nitric acid concentration.
- the required amount of air in the reaction tank 10 is calculated so that the nitric acid concentration of the waste water W becomes the target concentration and the ammonia concentration of the waste water W becomes the target concentration.
- the required air amount calculation unit 84 calculates the required air amount for all the reaction vessels 10.
- the target pipe pressure calculation unit 74 calculates the blower tube loss pressure H P from required air amount (step S16), and based on the air duct losses pressure H P A target pipe pressure PY is calculated (step S18).
- Target pipe pressure calculation unit 74 the pressure loss of the air tube 30 in the case of supplying the required amount of air to the blower tube 30, is calculated as a blowing pipe loss pressure H P.
- the target pipe pressure calculation unit 74 sums the predetermined value J and the blowing pipe loss pressure H P, and calculates the total value as the target pipe pressure P Y.
- the target pipe pressure calculation unit 74 calculates the target pipe pressure P YA , the target pipe pressure P YB , and the target pipe pressure P YC for each path to each reaction tank 10, and the maximum value among them is calculated.
- the target pipe pressure PY is set.
- the air supply amount control unit 40, the blower controller 76, the blower tube 30 is such that the target pipe pressure P Y, controls the air supply blower 22 (step S20 ).
- the air blow control unit 76 controls the number of air blowers 22 to be operated, the opening degree of the inlet vane of the air blower 22, and the number of rotations of the blades, and adjusts the amount of air discharged from the air blower 22 to adjust the air pressure in the mother pipe 32. Is the target pipe pressure.
- a specific control flow of the air blowing control unit 76 will be described later.
- the air supply amount control unit 40 sets the opening degree of the introduction valve 36 so that the introduction air control unit 78 supplies the necessary amount of air to each reaction tank 10. Adjust (step S22). After step S20 and step S22, the process proceeds to step S24, and when the process is not terminated (step S24; No), the process returns to step S10 and the same process is repeated. That is, the air supply amount control unit 40 measures the nitric acid concentration and the ammonia concentration of the wastewater W in each reaction tank 10 every predetermined time, updates the necessary air amount and the target pipe pressure based on the measurement results, The amount of air discharged from the blower 22 is sequentially controlled so as to achieve the updated target pipe pressure. Further, the air supply amount control unit 40 sequentially controls the opening degree of the introduction valve 36 so that the renewed required amount of air is supplied to the reaction tank 10. In addition, when the process ends in step S24 (step S24; Yes), this process ends.
- the dissolved oxygen amount in the reaction vessel 10 is calculated in step S10, and the required air amount is calculated in step S12 so that the dissolved oxygen amount becomes the target amount (target water quality).
- the target amount target water quality
- FIG. 6 is a flowchart for explaining control of the blower by the blower control unit.
- FIG. 7 is a graph for explaining the control of the blower by the blower.
- the blower control unit 76 first acquires the value of the target pipe pressure from the target pipe pressure calculation unit 74 (step S30).
- the air blow control unit 76 determines whether the pipe internal pressure at the maximum output of the blower 22 is equal to or higher than the target pipe internal pressure (step S32).
- the maximum output of the blower 22 is an output when the outputs of all the blowers 22 are maximized in the current number of operating fans 22. Furthermore, the output when the opening degree of the inlet vane of the blower 22 is maximized and the rotation speed of the blade portion is maximized becomes the maximum output.
- the horizontal axis in FIG. 7 is the output value of the blower 22, and the vertical axis is the pipe internal pressure of the blower pipe 30. As shown in FIG. 7, the pipe pressure when one blower 22 is operating is the pipe pressure Pr 1 at the maximum output.
- the pipe internal pressure when two blowers 22 are operating increases to the pipe internal pressure Pr 2 at the rated output, and further increases to the pipe internal pressure Pr 3 as the maximum output is increased.
- the pipe internal pressure when three blowers 22 are operating increases, for example, to the pipe internal pressure Pr 4 at the rated output, and further increases to the pipe internal pressure Pr 5 as the maximum output is increased.
- the pipe internal pressure increases, for example, to the pipe internal pressure Pr 6 at the rated output, and further increases as the maximum output is increased.
- the target pipe pressure is a value between the pipe pressure Pr 3 and the pipe pressure Pr 4 is described.
- the marginal pipe internal pressure is a value larger than the target pipe internal pressure
- the margin pipe internal pressure is a value between the pipe internal pressure Pr 5 and the pipe internal pressure Pr 6 is described.
- step S34 When the pipe internal pressure at the maximum output is not equal to or higher than the target pipe internal pressure (step S32; No), that is, lower than the target pipe internal pressure, the blower control unit 76 increases the number of operating fans 22 (step S34). In the example of FIG. 7, the pipe pressure at the maximum output when two blowers 22 are operating is lower than the target pipe pressure, and in this case, the blow control unit 76 sets the number of operating units to three. When the operating number is increased, the process returns to step S32, and it is determined whether the maximum output of the blower 22 in the increased operating number is equal to or higher than the target pipe pressure.
- the blower control unit 76 determines whether the pipe internal pressure at the maximum output of the blower 22 is equal to or less than the margin pipe internal pressure (step S36). ). When the pipe internal pressure at the maximum output is equal to or less than the margin pipe internal pressure (step S36; Yes), the air blowing control unit 76 outputs the output of the operating blower 22 so as to reach the target pipe internal pressure without changing the number of operating units. Control is performed (step S38).
- the pipe internal pressure at the maximum output when three blowers 22 are operating is equal to or higher than the target pipe internal pressure and equal to or less than the marginal pipe internal pressure.
- the output is made smaller than the rated output by controlling the opening degree of the inlet vane and the rotational speed of the blade portion, and the pipe internal pressure becomes the target pipe internal pressure. Like that.
- step S40 When the pipe internal pressure at the maximum output is not less than or equal to the surplus pipe internal pressure (step S36; No), that is, when the pipe internal pressure is higher than the surplus pipe internal pressure, the number of operating fans 22 is decreased (step S40).
- the pipe internal pressure at the maximum output when four blowers 22 are operating is lower than the surplus pipe internal pressure, and in this case, the air blow control unit 76 sets the number of operating units to three.
- the process proceeds to step S38, and the output of the operating blower 22 is controlled so that the target pipe pressure is reached.
- step S38 the process proceeds to step S42, and when the process is not terminated (step S42; No), the process returns to step S30, and the updated target pipe pressure information is acquired and the same target pipe pressure is obtained. Repeat the process.
- step S42; Yes this process is ended.
- the wastewater treatment system 1 includes a plurality of reaction tanks 10 that perform biological treatment on the wastewater W, a blower pipe 30 that is a pipe connected to the plurality of reaction tanks 10, and a blower pipe.
- the air supply unit 20 that supplies air for performing biological treatment to the plurality of reaction vessels 10 and the air supply amount control unit 40 that controls the amount of air supply to the reaction vessel 10 are provided.
- the air supply amount control unit 40 includes a water quality measurement unit (in this embodiment, a nitric acid meter 43 and an ammonia meter 44), a necessary air amount acquisition unit 72, a target pipe pressure calculation unit 74, and a ventilation control unit 76.
- the water quality measurement unit is provided in the reaction tank 10 and measures the state of the waste water W in the reaction tank 10 (in this embodiment, the nitric acid concentration and the ammonia concentration of the waste water W).
- the required air amount acquisition unit 72 sets the required air amount for making the waste water W in the reaction tank 10 a predetermined target water quality (target concentration in the present embodiment) for each reaction tank 10 based on the measurement result of the water quality measurement unit. get.
- Target pipe pressure calculation unit 74 calculates the blower tube loss pressure H P is the pressure of the air is lost by the pressure loss of the air tube in the case of supplying the required air volume of air blower tube 30.
- Target pipe pressure calculation unit 74 based on the air duct losses pressure H P, and calculates the target pipe pressure P Y in the blower tube 30.
- Target pipe pressure calculation unit 74 in response to changes in the quantity of air necessary, changing the target pipe pressure P Y to calculate.
- the wastewater treatment system 1 measures the current state of the wastewater W, calculates the necessary amount of air necessary for making the wastewater W the target water quality, and supplies the air of the necessary amount of air to the blower pipe 30. calculating the blower tube loss pressure H P. Wastewater treatment system 1, the pressure in the blower tube 30 so that the target pipe pressure P Y calculated based on the air duct losses pressure H P, and controls the blower unit 20. The wastewater treatment system 1, necessary amount of air, i.e. depending on the current water quality, and to change the target pipe pressure P Y. That is, the wastewater treatment system 1 controls the pipe pressure so as to supply the air necessary for the biological treatment to the blower unit 20 based on the current water quality.
- the wastewater treatment system 1 can suppress supply of air unnecessary for biological treatment and suppress energy consumption required for blowing.
- air blowing by the blower unit 20 occupies most of the power consumption. Therefore, the power consumption can be effectively reduced by suppressing the air blowing pressure.
- waste water treatment system 1 calculates all the target pipe pressure P Y on the basis of the required amount of air into the reaction vessel 10 and, more, the target based on the pressure loss of the piping that is connected to a plurality of transport tanks 10 The in-pipe pressure PY is calculated. Therefore, the wastewater treatment system 1 can appropriately supply a necessary amount of air to each reaction tank 10 even when the degree of pressure loss of the pipes connected to each reaction tank 10 is different. It becomes. As described above, the wastewater treatment system 1 according to this embodiment can appropriately supply air to each reaction tank 10 while suppressing energy consumption required for blowing air.
- the target pipe pressure calculation unit 74 includes a blower duct losses pressure H P, the pressure loss of the diffuser section 12 for aeration in the air from the blower pipe 30 provided in the reaction vessel 10 the reaction vessel 10 (diffuser a gas unit loss pressure H a), and sum of the water head pressure h of waste water in the reaction vessel 10, so that the target pipe pressure P Y is the total value or calculates the target pipe pressure P Y.
- the target pipe pressure calculation unit 74, the target pipe pressure P Y is set to be equal to or greater than the sum of the blast pipe loss pressure H P and spraying component loss pressure H A and head pressure h. Therefore, the wastewater treatment system 1 can appropriately supply a necessary amount of air even when there is a pressure loss of the blower pipe 30 or the air diffuser 12 or a head pressure due to the wastewater W.
- the blower pipe 30 includes a mother pipe 32 connected to the blower unit 20, a plurality of branch pipes 34 branched from the mother pipe 32 and connected to the plurality of reaction vessels 10, and an introduction valve provided in the branch pipe 34. 36 and a branch air amount measuring unit 48 that measures the amount of air supplied to each of the plurality of branch pipes 34 as a detected air amount.
- the air supply amount control unit 40 includes an introduction air control unit 78 that adjusts the opening degree of the introduction valve 36 so that the detected air amount becomes the necessary air amount in each of the branch pipes 34.
- the pressure of the air tube 30 by the target pipe pressure P Y, air of the total quantity of air necessary to the substrate tube 32 is to be appropriately supplied.
- the introduction air control unit 78 adjusts the opening degree of the introduction valve 36 of each branch pipe 34 so that the air in the mother pipe 32 is supplied to each branch pipe 34 so that only the necessary air amount is supplied. It distributes to the branch pipe 34. Therefore, the wastewater treatment system 1 can appropriately supply the necessary air amount to each branch pipe 34 even when the pressure loss differs for each branch pipe 34.
- the air blow control unit 76 controls at least one of the number of operating blowers 22, the opening degree of the inlet vane, and the rotational speed of the blade part. Therefore, the wastewater treatment system 1 can appropriately set the pipe internal pressure of the blower pipe 30 to the target pipe internal pressure.
- the water quality measurement unit as the state of the waste water W in the reaction tank 10, includes nitrate nitrogen concentration, ammonia nitrogen concentration, dissolved oxygen amount, and inflow amount of waste water into the reaction tank. Measure at least one of the following. Therefore, the wastewater treatment system 1 can appropriately calculate the required air amount.
- the water quality measurement unit measures at least one of the nitrate nitrogen concentration, the ammonia nitrogen concentration, and the dissolved oxygen amount of the waste water W as the water quality of the waste water W in the reaction tank 10, and the necessary air amount acquisition unit 72. Calculates the required air amount so that the water quality of the waste water W becomes the target water quality. Since the wastewater treatment system 1 measures the water quality and calculates the required air amount so that the water quality becomes a target value, the required air amount can be calculated more accurately. In addition, the waste water treatment system 1 may perform simultaneous nitrification denitrification treatment.
- the nitrification treatment which is an aerobic treatment
- the denitrification treatment which is an anaerobic treatment
- the necessary air amount acquisition unit 72 includes a relationship storage unit 82 and a necessary air amount calculation unit 84.
- the relationship storage unit 82 is a relationship between the amount of air supplied to the reaction tank 10 and the amount of change in the quality of the waste water W (here, nitric acid concentration and ammonia concentration) when that amount of air is supplied.
- the required air amount calculation unit 84 is an air amount necessary for changing the water quality of the wastewater W to the target water quality based on the water quality air quantity relationship, the water quality measurement result by the water quality measurement unit, and the target water quality (here, the target concentration). Is calculated as the required air amount. Since the required air amount calculation unit 84 calculates the required air amount based on the water quality air amount relationship, the required air amount can be calculated more accurately.
- the relationship storage unit 82 stores the water quality / air amount relationship as a first-order lag system in which the change in the quality of the waste water W is delayed with respect to the change in the amount of air supplied into the reaction tank 10.
- the required air amount calculation unit 84 updates the required air amount based on the water quality measurement results for each elapse of a predetermined time. Since this wastewater treatment system 1 calculates the required air amount as a first-order lag system, it can predict the amount of water quality change for each hour. Furthermore, since the wastewater treatment system 1 repeats the calculation of the required air amount and updates the calculation result, the air supply amount can be more accurately controlled based on the latest measurement result. That is, the wastewater treatment system 1 can more accurately control the air supply amount by performing feedforward control.
- the air supply amount control unit 40A has a differential air amount calculation unit 79A, and the internal pressure of the blower pipe 30 is based on the differential air amount calculated by the differential air amount calculation unit 79A.
- This is different from the first embodiment in that In the second embodiment, description of portions having the same configuration as that of the first embodiment is omitted.
- FIG. 8 is a block diagram illustrating a configuration of a control unit according to the second embodiment.
- the control unit 42A according to the second embodiment includes a differential air amount calculation unit 79A.
- the difference air amount calculation unit 79A acquires the value of the total required air amount from the required air amount acquisition unit 72.
- the total required air amount is a value obtained by summing all the required air amounts calculated for each reaction tank 10.
- the difference air amount calculation unit 79A calculates the detected air amount of each branch pipe 34 from the detected air amount acquisition unit 71, that is, the value of the actual air amount supplied to the branch pipe 34 measured by the branch air amount measurement unit 48. get. Thereby, the difference air amount calculation unit 79A acquires the total detected air amount that is the total value of the detected air amounts of the respective branch pipes 34.
- the target pipe pressure calculation unit 74 sets the target pipe pressure P Y on the basis of the quantity of air necessary. Accordingly, the mother pipe 32 is supplied with air having a pressure capable of supplying the necessary amount of air to all the reaction tanks 10. Further, the introduction air control unit 78 distributes the air in the mother pipe 32 to each branch pipe 34 by adjusting the opening degree of the introduction valve 36. Therefore, normally, each branch pipe 34 is supplied with air corresponding to the required air quantity, and the detected air quantity of each branch pipe 34 is the required air quantity of each branch pipe 34. The total detected air amount coincides with the total required air amount.
- the value (predetermined constant) the pressure loss of each part used in the calculation of the target pipe pressure P Y is The actual value may be different. In such cases, it may actually internal pressure to provide the necessary amount of air into the reaction vessel 10 is larger than the calculated target pipe pressure P Y. That is, the total detected air amount that is the total value of the air amount actually supplied is smaller than the total required air amount. In this case, there is a possibility that the necessary air cannot be properly supplied to the reaction vessel 10. Further, actually the internal pressure for feeding the required amount of air into the reaction vessel 10, in some cases less than the calculated target pipe pressure P Y.
- the total detected air amount actually supplied is larger than the total required air amount.
- the internal pressure for feeding the required amount of air into the reaction vessel 10 is, when the calculated target pipe pressure P Y different, fear that the total required air quantity and the total detection air amount becomes a different value is there.
- the difference air amount calculation unit 79A calculates the difference air amount when the total required air amount and the total detected air amount are different.
- the difference air amount is a difference value between the required air amount and the detected air amount.
- the difference air amount calculation unit 79A calculates the difference air amount for all the reaction tanks 10. When the total required air amount and the total detected air amount are different, the required air amount and the detected air amount for at least one reaction tank 10 are different.
- the target pipe internal pressure calculation unit 74 calculates a differential blower pipe loss pressure based on the differential air amount.
- the differential blower pipe loss pressure is the pressure of air lost due to the pressure loss in the blower pipe 30 when air of this differential air amount is supplied to the blower pipe 30.
- Target pipe pressure calculation section 74 in the same way as the calculation method of the blower tube loss pressure H P described in the first embodiment, calculates the difference blowpipe loss pressure. That is, the target pipe pressure calculation unit 74 replaces the need air volume used for the calculation of the blower tube loss pressure H P to the difference air quantity, further, the total necessary amount of air used for the calculation of the blower tube loss pressure H P
- the differential air flow loss pressure is calculated by substituting the total differential air amount.
- the total difference air amount is a total value of the difference air amounts, that is, a difference value between the total necessary air amount and the total detected air amount. Then, the target pipe pressure calculation unit 74 calculates the differential pipe pressure based on the differential blower pipe loss pressure.
- Target pipe pressure calculation section 74 in the same manner as the method of calculating the target pipe pressure P Y described in the first embodiment, it calculates the difference pipe internal pressure.
- the target pipe pressure calculation unit 74, the blower tube loss pressure H P used for calculating the target pipe pressure P Y, by replacing the difference blowpipe loss pressure calculates the difference pipe internal pressure.
- the target pipe pressure calculation unit 74 calculates the differential pipe pressure for each path to the reaction tanks 10A, 10B, and 10C, and determines the maximum value of the differential pipe pressure as the actual maximum value.
- Target pipe pressure calculation unit 74 based on the difference pipe internal pressure, corrects the target pipe pressure P Y. Specifically, the target pipe pressure calculation unit 74, when the total detected amount of air is less than the total required amount of air, the value obtained by adding the difference pipe pressure to the target pipe pressure P Y, is calculated as a correction target pipe pressure. The target pipe pressure calculation unit 74, the total detection air amount when the total required larger amount of air, the value obtained by subtracting the difference pipe pressure from the target pipe pressure P Y, is calculated as a correction target pipe pressure.
- the blower control unit 76 controls the air supply from the blower unit 20 so that the pressure in the blower pipe 30 becomes the corrected target pipe internal pressure.
- the introduction air control unit 78 adjusts the air amount to the branch pipes 34 by adjusting the opening degree of the introduction valve 36 again, so that the detected air amount of each branch pipe 34 matches the required air amount. Thereby, for example, even when the pressure loss fluctuates due to deterioration or the like, it is possible to appropriately supply the necessary air to the reaction tank 10. For example, when the amount of air detected by one branch pipe 34 is not sufficient, the opening of the introduction valve connected to this branch pipe 34 or the opening of the introduction valve 36 connected to another branch pipe 34 is opened.
- FIG. 9 is a flowchart for explaining a correction flow of the pipe internal pressure according to the second embodiment.
- Figure 9 is executing the process shown in FIG. 5, the blowing tube 30 (main pipe 32) is the process after a target pipe pressure P Y.
- the difference air amount calculation unit 79A acquires the value of the total detected air amount from the detected air amount acquisition unit 71, and acquires the value of the total required air amount from the required air amount acquisition unit 72.
- the air supply amount control unit 40A determines whether the total detected air amount is different from the total required air amount by the differential air amount calculation unit 79A (step S50).
- the difference air amount calculation unit 79A determines that the total detected air amount is different from the total required air amount when the difference between the total detected air amount and the total required air amount is equal to or greater than a predetermined threshold, When the difference from the total required air amount is lower than a predetermined threshold, it may be determined that the total detected air amount is the same as the total required air amount. When the total detected air amount is not different from the total required air amount (step S50; No), the process moves to step S62.
- the air supply amount control unit 40A calculates the differential air amount by the differential air amount calculation unit 79A (step S52), and calculates the target pipe pressure.
- the unit 74 calculates a differential blower pipe loss pressure from the differential air amount (step S54), and calculates a differential pipe internal pressure from the differential blower pipe loss pressure (step S56).
- the air supply amount control unit 40A uses the target pipe pressure calculation unit 74 to calculate a corrected target pipe pressure from the differential pipe pressure and the target pipe pressure (step S58). That is, the target pipe pressure calculation unit 74 corrects the target pipe pressure with the differential pipe pressure, and sets the corrected value as the corrected target pipe pressure.
- the air supply amount control unit 40A causes the air supply control unit 76 to output the air pressure from the blower unit 20 so that the pressure in the blow pipe 30 (the mother pipe 32) becomes the corrected target pipe internal pressure. Air supply is controlled (step S60). Thereafter, the process moves to step S62, and when the process is terminated (step S62; Yes), this process is terminated, and when the process is not terminated (step S62; No), the process returns to step S50 and the process is repeated.
- the air supply amount control unit 40A includes the differential air amount calculation unit 79A.
- the difference air amount calculation unit 79A calculates a difference air amount that is a difference between the required air amount and the detected air amount for each reaction tank 10 when the total detected air amount is different from the total required air amount.
- the target pipe internal pressure calculation unit 74 uses the target pipe internal pressure P based on the pressure loss in the blow pipe 30 (differential blow pipe loss pressure) when air of a differential air amount is supplied into the blow pipe 30. Y is corrected.
- the air blowing control unit 76 controls the air supply from the air blowing unit 20 so that the pressure in the air blowing pipe 30 becomes the corrected target pipe internal pressure P Y (corrected target pipe internal pressure).
- the wastewater treatment system 1 according to the second embodiment corrects the target pipe internal pressure P Y based on the differential blow pipe loss pressure, and changes the pressure in the blow pipe 30. Then, the corrected target pipe pressure P Y (corrected target pipe pressure) is corrected. Therefore, the wastewater treatment system 1 according to the second embodiment can appropriately supply the necessary air to the reaction tank 10 even when the pressure loss fluctuates due to, for example, deterioration.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Organic Chemistry (AREA)
- Biodiversity & Conservation Biology (AREA)
- Microbiology (AREA)
- Molecular Biology (AREA)
- Health & Medical Sciences (AREA)
- Activated Sludge Processes (AREA)
- Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
Abstract
送風に要するエネルギー消費を抑制しつつ、各槽に適切に空気を供給する。廃水処理システム(1)は、複数の反応槽(10)と、送風管(30)と、送風ユニット(20)と、空気供給量制御部(40)と、を有する。空気供給量制御部(40)は、反応槽(10)内の廃水の状態を測定する水質測定部と、水質測定部の測定結果に基づき、反応槽(10)の廃水を所定の目標水質にするための必要空気量を各反応槽(10)毎に取得する必要空気量取得部と、必要空気量の空気を送風管(30)内に供給した場合の送風管損失圧力を算出し、送風管損失圧力に基づき目標管内圧を算出し、必要空気量の変化に応じて、算出する目標管内圧を変化させる目標管内圧算出部と、送風管(30)内における圧力が目標管内圧となるように、送風ユニット(20)からの空気供給を制御する送風制御部と、を有する。
Description
本発明は、廃水処理システム、廃水処理装置の空気供給量制御装置、廃水処理装置の空気供給量制御方法に関する。
生活排水または工場排水等の廃水を処理する廃水処理システムとして、標準活性汚泥法をはじめ、様々な処理法が実用化されている。廃水処理システムにおいては、反応槽内に処理対象の廃水を流入させつつ、この反応槽内に存在する好気性微生物に対して空気を供給する曝気処理を行う。これによって、反応槽内の廃水中に含まれる有機物は、好気性微生物の生物処理によって分解され、安定した処理水質が得られる。
反応槽内での曝気処理用の空気は、送風管を介して送風機から供給される。例えば特許文献1に示されるように、送風機は、反応槽内での生物処理に必要な空気量となるように、供給する空気量を制御する。また、送風機は、送風管内での圧力が一定になるように空気を供給する場合がある。送風管内の圧力を一定にする場合、送風管内の圧力は、反応槽内での生物処理を確実に行うために、必要な量の空気を供給しきれるような値に設定される。そのため、送風管内の圧力は、反応槽に流入した廃水の負荷(例えば生物処理対象であるアンモニア性窒素の濃度及びBOD等)が最も大きい場合を想定し、その想定した最大負荷においても生物処理が十分できるような値に設定される。また、特許文献2には、複数の曝気槽のうち、必要空気量を最大とする曝気槽への空気導入弁の開度が最大となるように、送風管内圧を決定する技術が記載されている。
しかし、最大負荷を想定して送風管内の圧力を設定した場合、反応槽内の負荷が最大負荷よりも低い場合、必要以上の空気を供給してしまうことになる。この場合、送風管内に設けた弁で反応槽内への空気量を制限するが、送風機自体は最大負荷を想定した圧力となるよう空気供給しているため、その送風に要するエネルギーの一部が無駄になる。すなわち、送風管内の圧力を一定にするよう制御した場合、送風に要するエネルギー消費が、実際に必要な送風に要するエネルギーより高くなる。また、複数の曝気槽に送風する場合、それぞれの曝気槽に接続される配管ごとに、圧力損失の度合いが異なる。従って、特許文献2のように、1つの曝気槽の必要空気量から管内圧を設定した場合、その管内圧では他の曝気槽へ適切な空気量を供給できなくなるおそれがある。例えば、1つの曝気槽の必要風量から設定した管内圧では、圧力損失の度合いが大きい他の曝気槽へ必要な量の空気を供給できなくなるおそれがある。このように、廃水処理システムにおいて、送風に要するエネルギー消費を抑制しつつ、各槽に適切に空気を供給することが求められている。
本発明は、上記に鑑みてなされたものであって、送風に要するエネルギー消費を抑制しつつ、各槽に適切に空気を供給する廃水処理システム、空気供給量制御装置及び空気供給量制御方法を提供することを目的とする。
上述した課題を解決し、目的を達成するために、本開示の廃水処理システムは、廃水に生物処理を行う複数の反応槽と、複数の前記反応槽に接続される管である送風管と、前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、前記反応槽への空気供給量を制御する空気供給量制御部と、を有し、前記空気供給量制御部は、前記反応槽に設けられて、前記反応槽内の廃水の状態を測定する水質測定部と、前記水質測定部の測定結果に基づき、前記反応槽内の廃水を所定の目標水質にするための必要空気量を前記各反応槽毎に取得する必要空気量取得部と、前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出部と、前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御部と、を有する。
前記目標管内圧算出部は、前記送風管損失圧力と、前記反応槽内に設けられて前記送風管からの空気を反応槽内に散気する散気部の圧力損失による損失圧力と、前記反応槽内の廃水の水頭圧とを合計して、前記目標管内圧がその合計値以上となるように、前記目標管内圧を算出することが好ましい。
前記送風管は、前記送風ユニットに接続される母管と、前記母管から分岐して複数の前記反応槽にそれぞれ接続される複数の支管と、前記支管に設けられた導入弁と、複数の前記支管のそれぞれに供給される空気量を検出空気量として測定する支管空気量測定部と、を有し、前記空気供給量制御部は、前記支管のそれぞれにおいて、前記検出空気量が前記必要空気量となるように、前記導入弁の開度を調整する導入空気制御部を有することが好ましい。
前記空気供給量制御部は、前記空気供給量制御部は、前記支管毎の前記検出空気量の合計値である総検出空気量が、前記必要空気量の前記反応槽毎の合計値である総必要空気量と異なる場合に、前記必要空気量と前記検出空気量の差分である差分空気量を反応槽毎に算出する差分空気量算出部を更に有し、前記目標管内圧算出部は、前記差分空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失による損失圧力に基づき、前記目標管内圧を補正し、前記送風制御部は、前記送風管内における圧力が補正した前記目標管内圧となるように、前記送風ユニットからの空気供給を制御することが好ましい。
前記必要空気量取得部は、前記反応槽に供給される空気量とその量の空気が供給された場合の前記反応槽内の水質の変化量との関係である水質空気量関係を記憶する関係記憶部と、前記水質空気量関係と、前記水質測定部による水質測定結果と、前記目標水質とに基づき、前記廃水の水質を前記目標水質に変化させるために必要な空気量を、前記必要空気量として算出する必要空気量算出部と、を有することが好ましい。
前記関係記憶部は、前記廃水の水質の変化が前記反応槽内に供給される空気量の変化に対して遅れる一次遅れ系として、前記水質空気量関係を記憶し、前記必要空気量算出部は、前記水質測定部による所定の時間の経過毎の前記水質測定結果に基づき、前記必要空気量を更新することが好ましい。
上述した課題を解決し、目的を達成するために、本開示の空気供給量制御装置は、廃水に生物処理を行う複数の反応槽と、複数の前記反応槽に接続される管である送風管と、前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、を有する廃水処理装置の空気供給量を制御する空気供給量制御装置であって、前記反応槽に設けられて、前記反応槽内の廃水の状態を測定する水質測定部と、前記水質測定部の測定結果に基づき、前記反応槽の廃水が所定の目標水質となるための必要空気量を前記反応槽毎に取得する必要空気量取得部と、前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出部と、前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御部と、を有する。
上述した課題を解決し、目的を達成するために、本開示の空気供給量制御方法は、廃水に生物処理を行う複数の反応槽と、複数の前記反応槽に接続される管である送風管と、前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、を有する廃水処理装置の空気供給量を制御する空気供給量制御方法であって、前記反応槽内の廃水の状態を測定する測定ステップと、前記廃水の状態の測定結果に基づき、前記反応槽の廃水が所定の目標水質となるための必要空気量を前記反応槽毎に取得する必要空気量取得ステップと、前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出ステップと、前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御ステップと、を有する。
本発明によれば、送風に要するエネルギー消費を抑制しつつ、各槽に適切に空気を供給することができる。
以下に、本発明に係る廃水処理システムの好適な実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。
(第1実施形態)
(廃水処理システムの構成)
図1は、第1実施形態に係る廃水処理システムの模式図である。図1に示すように、第1実施形態に係る廃水処理システム1は、反応槽10A、10B、10C、送風ユニット20、送風管30、及び空気供給量制御部40を有する。廃水処理システム1は、空気供給量制御部40で反応槽10内に供給する空気量を制御しつつ、送風ユニット20からの空気を送風管30で反応槽10内に供給し、反応槽10内の活性汚泥により、内部の廃水Wの生物処理を行う。
(廃水処理システムの構成)
図1は、第1実施形態に係る廃水処理システムの模式図である。図1に示すように、第1実施形態に係る廃水処理システム1は、反応槽10A、10B、10C、送風ユニット20、送風管30、及び空気供給量制御部40を有する。廃水処理システム1は、空気供給量制御部40で反応槽10内に供給する空気量を制御しつつ、送風ユニット20からの空気を送風管30で反応槽10内に供給し、反応槽10内の活性汚泥により、内部の廃水Wの生物処理を行う。
反応槽10A、10B、10Cは、内部に散気部12を有し、活性汚泥が貯留される槽である。反応槽10A、10B、10Cは、図示しない沈殿池から廃水Wが流入する。廃水Wは、図示しない沈殿池によって原水から一部の固形物が分離された後の水である。ここでいう原水とは、家庭や工場などから排出された排水及び下水である。散気部12は、送風ユニット20から供給された空気で、貯留した活性汚泥を曝気する。反応槽10A、10B、10Cは、曝気された活性汚泥によって廃水Wに生物処理を行い、生物処理を行った後の廃水Wである処理水を、図示しない固液分離槽に排出する。この図示しない固液分離槽では、処理水についてさらに固液分離処理を行い、その固液分離処理後の水を、例えば消毒処理後に外部環境に排出する。
反応槽10A、10B、10Cは、それぞれ並列に設けられている。すなわち、反応槽10A、10B、10Cには、沈殿池からそれぞれ並列に廃水Wが供給される。ただし、反応槽10A、10B、10Cは、互いに直列に配置されていてもよい。すなわち、反応槽10Aに反応槽10Bが接続され、反応槽10Aで生物処理した後の廃水Wを反応槽10Bに導入し、反応槽10B内で再度生物処理を行ってもよい。また、反応槽10A、10B、10Cは、合計3つの好気槽であるが、その数も任意である。また、反応槽10A、10B、10Cには、嫌気槽や無酸素槽が直列に接続されていてもよい。以下、反応槽10A、10B、10Cを互いに区別しない場合は、反応槽10と記載する。
図1に示すように、送風ユニット20は、複数の送風機である送風機22A、22B、22C、22Dを有する。送風機22A、22B、22C、22Dは、互いに同様の機能を有するブロアである。送風機22A、22B、22C、22Dは、インレットベーンを介して外部から空気を導入し、回転する羽根部によって導入した空気を排気する。送風機22A、22B、22C、22Dは、インレットベーンの開度が調整可能になっており、羽根部の回転数も調整可能になっている。送風機22A、22B、22C、22Dは、羽根部から空気を吐出する側が、互いに並列に送風管30に接続されており、それぞれが吐出した空気を送風管30に吐出する。以下、送風機22A、22B、22C、22Dを互いに区別しない場合は、送風機22と記載する。なお、送風ユニット20が有する送風機22の数は、任意である。
送風管30は、内部に空気を導通する管である。送風管30は、導入管31と、母管32と、支管34A、34B、34Cと、導入弁36とを有する。導入管31は、一方の端部が分岐してそれぞれ送風機22に接続されており、送風機22から空気が供給される。導入管31は、他方の端部が母管32に接続されており、各送風機22からの空気を合流させて、合流させた空気Aを母管32に導通する。母管32は、一本の管である。母管32は、空気Aの流れの上流側、すなわち送風機22側から、支管34C、34B、34Aがこの順で接続されている。
支管34Aは、母管32の接続部と反対側が反応槽10Aの散気部12に接続されており、母管32からの空気Aの一部を反応槽10Aに供給する。支管34Bは、母管32の接続部と反対側が反応槽10Bの散気部12に接続されており、母管32からの空気Aの一部を反応槽10Bに供給する。支管34Cは、母管32の接続部と反対側が反応槽10Cの散気部12に接続されており、母管32からの空気Aの一部を反応槽10Cに供給する。導入弁36は、支管34A、34B、34Cに取り付けられている。導入弁36は、空気供給量制御部40によって開閉操作される弁であり、その開度調整によって、各反応槽10への空気供給量を調整する。以下、支管34A、34B、34Cを互いに区別しない場合は、支管34と記載する。
空気供給量制御装置としての空気供給量制御部40は、制御部42と、水質測定部としての硝酸計43及びアンモニア計44と、吸気測定部46と、母管内圧測定部47と、支管空気量測定部48とを有する。制御部42は、硝酸計43、アンモニア計44、吸気測定部46、母管内圧測定部47、及び支管空気量測定部48の測定結果に基づき、各反応槽10内への空気供給量を制御する制御装置である。制御部42の詳細は後述する。なお、空気供給量制御部40は、複数の反応槽10への空気供給量を制御するものであるが、1つの反応槽10毎にそれぞれ1つずつ設けられて、1つの反応槽10への空気供給量を制御してもよい。
硝酸計43は、各反応槽10内に設けられており、反応槽10内の廃水Wの硝酸濃度を測定するセンサである。廃水Wの硝酸とは、本実施形態においては、硝酸(HNO3)、亜硝酸(HNO2)、硝酸性窒素(NO3-N)、亜硝酸性窒素(NO2-N)、硝酸性窒素と亜硝酸性窒素との集合、および硝酸と亜硝酸とをともに示すNOxを含む概念である。すなわち、本実施形態における硝酸濃度は、硝酸、亜硝酸、硝酸性窒素、亜硝酸性窒素、硝酸性窒素と亜硝酸性窒素との集合、および硝酸と亜硝酸とをともに示すNOxの、いずれの濃度であってもよい。
アンモニア計44は、各反応槽10内に設けられており、反応槽10内の廃水Wのアンモニア濃度を測定するセンサである。廃水Wのアンモニア濃度とは、本実施形態においては、アンモニアおよびアンモニア性窒素を含む概念である。すなわち、本実施形態におけるアンモニア濃度は、アンモニア(NH3)およびアンモニア性窒素(NH4-N)のいずれの濃度であってもよい。すなわち、硝酸計43及びアンモニア計44は、反応槽10内の廃水Wの状態を計測するといえる。なお、水質測定部、すなわち硝酸計43及びアンモニア計44は、反応槽10毎に1つずつ設けられているが、複数の反応槽10に1つの水質測定部が設けられている構成であってもよい。
吸気測定部46は、各送風機22の吸気側に設けられており、送風機22が吸気する空気量を測定する。母管内圧測定部47は、母管32に取付けられ、母管32内の圧力、すなわち各送風機22が供給した空気の圧力を測定する。より詳しくは、母管内圧測定部47は、支管34Cよりも空気Aの流れの上流側、すなわち全ての支管34との接続部よりも空気Aの流れの上流側に設けられている。支管空気量測定部48は、各支管34に設けられ、各支管34から反応槽10に供給される空気量を測定する。より詳しくは、支管空気量測定部48は、導入弁36よりも空気の流れの上流側、すなわち支管34において導入弁36と母管34との間に設けられている。支管空気量測定部48は、支管34に供給される空気量、より具体的には、支管34内における導入弁36より上流側の空気量を、検出空気量として測定する。すなわち、支管空気量測定部48は、支管34から導入弁36を介して反応槽10に供給される空気量を、検出空気量として測定する。
(反応槽内での水処理)
次に、反応槽10内での廃水Wの生物処理について説明する。反応槽10内では、好気性条件下で活性汚泥中の好気性微生物である硝化菌により、硝化反応、すなわち、被処理水中のアンモニア性窒素(NH4-N)が、下記の反応式(1)~(3)のように、亜硝酸性窒素(NO2-N)や硝酸性窒素(NO3-N)に硝化される。
次に、反応槽10内での廃水Wの生物処理について説明する。反応槽10内では、好気性条件下で活性汚泥中の好気性微生物である硝化菌により、硝化反応、すなわち、被処理水中のアンモニア性窒素(NH4-N)が、下記の反応式(1)~(3)のように、亜硝酸性窒素(NO2-N)や硝酸性窒素(NO3-N)に硝化される。
NH3+O2+2e-+2H+→NH2OH+H2O …(1)
NH2OH+H2O→NO2 -+5H++4e- …(2)
NO2 -+0.5O2→NO3 - …(3)
NH2OH+H2O→NO2 -+5H++4e- …(2)
NO2 -+0.5O2→NO3 - …(3)
一方、反応槽10における被処理水中の酸素量が少ない領域においては、酸素量が少ないことから脱窒菌による脱窒反応(嫌気反応)が発生する。この脱窒反応を生じる領域(脱窒反応領域)に充分な炭素源を供給すれば、脱窒反応も充分に進行させることができる。その結果、反応槽10において部分的に、脱窒反応が行われる領域が発生する。これにより、下記の反応式(4)~(10)のように、硝化が不充分であることによって発生した亜酸化窒素(N2O)ガスを分解したり、亜酸化窒素を発生させることなく亜硝酸を還元したりして、窒素と二酸化炭素とに分解させて、窒素除去を行うことができる。
NO2
-+3H++2e- → 0.5N2O+1.5H2O …(4)
NO2 -+H++2(H) → 0.5N2O+1.5H2O …(5)
NO3 -+H++5(H) → 0.5N2+3H2O …(6)
NO3 -+2H → NO2 -+H2O …(7)
NO2 -+H++(H) → NO+H2O …(8)
NO+(H) → 0.5N2O+0.5H2O …(9)
N2O+2(H) → N2+H2O …(10)
NO2 -+H++2(H) → 0.5N2O+1.5H2O …(5)
NO3 -+H++5(H) → 0.5N2+3H2O …(6)
NO3 -+2H → NO2 -+H2O …(7)
NO2 -+H++(H) → NO+H2O …(8)
NO+(H) → 0.5N2O+0.5H2O …(9)
N2O+2(H) → N2+H2O …(10)
硝酸計43は、反応槽10内の廃水Wの硝酸濃度を測定することで、脱窒反応の進行度、すなわち硝酸の分解度合いを検出する。アンモニア計44は、反応槽10内の廃水Wのアンモニア濃度を測定することで、硝化反応の進行度、すなわちアンモニアの分解度合いを検出する。空気供給量制御部40は、この硝酸計43とアンモニア計44との測定結果に基づき、反応槽10に供給する空気量を制御する。例えば、空気供給量制御部40は、硝酸濃度が所定の数値範囲内より高い場合、脱窒反応が不足しているとして、反応槽10に供給する空気量を低下させ、硝酸濃度が所定の数値範囲内より低い場合、脱窒反応が進み過ぎて硝化反応が不足しているとして、反応槽10に供給する空気量を増加させる。同様に、空気供給量制御部40は、アンモニア濃度が所定の数値範囲内より高い場合、硝化反応が不足しているとして、反応槽10に供給する空気量を増加させ、アンモニア濃度が所定の数値範囲内より低い場合、硝化反応が進み過ぎて脱窒反応が不足しているとして、反応槽10に供給する空気量を低下させる。言い換えれば、硝酸計43は、硝化反応の進行度合いに対する脱窒反応の相対的な進行度合いを検出する。
硝酸計43による脱窒反応の進行度合いの確認の例について、補足的に説明する。本実施形態において、反応槽10では、活性汚泥濃度が一定となるように運転され、1つの硝化菌による硝化反応の速度と、1つの脱窒菌による脱窒速度は、常温下においてほぼ一定である。また、廃水Wは、水質、すなわちアンモニア濃度が、所定の設計水質により、所定濃度以内に保たれ、ほぼ一定となっている。また、反応槽10内への廃水Wの流入量は、変動している。そして、硝化反応と脱窒反応とが平行して起こる反応槽10内では、好気領域と嫌気領域とに区分されている。好気領域は、酸素リッチの領域であり、主に硝化反応が進行する領域である。嫌気領域は、無酸素又は酸素濃度が低い領域であり、主に脱窒反応が進行する領域である。例えば硝酸計43が設けられた位置での硝化量(硝化された量)と脱窒量(脱窒された量)とは、この好気領域と嫌気領域との比率に対応する。そして、硝酸濃度は、硝化量から脱窒量を差し引いた値に対応する。硝酸計43は、硝酸濃度を検出することで、反応槽10内の上流から硝酸計43が設けられた位置までにおける、好気領域と嫌気領域との容積の差分を検出する。そして、反応槽10内の上流から硝酸計43が設けられた位置までの全容積は、反応槽10のサイズにより既知である。従って、硝酸計43は、硝酸濃度を検出することで、脱窒量、すなわち脱窒反応の進行度合いを検出することができる。なお、本実施形態では、脱窒反応の進行度合いを硝酸計43で検出していたが、脱窒反応の進行度合いを確認できるものであれば硝酸計43に限られず、例えば一対の溶存酸素濃度計、一対のORP計、一対のアンモニア計などであってもよい。
硝酸計43は、アンモニア計44よりも、反応槽10内における廃水Wの上流側、すなわち廃水が供給される側(図示しない沈殿池側)に配置される。反応槽10内は、廃水Wの上流側から下流側に向かって、すなわち廃水Wが供給される側(図示しない沈殿池側)から生物処理後の処理水が排出される側(図示しない固形分離槽側)に向かって、上流側処理領域と下流側処理領域とに区分される。上流側領域と下流側領域は、硝化処理及び脱窒処理との進行度合いが互いに異なる領域である。上流側領域は、廃水Wの上流側の領域であり、硝化処理と脱窒処理とが、例えばほぼ同一の所定比率で進行する領域である。下流側領域は、上流側領域よりも廃水Wの下流側の領域であり、上流側領域と同様に硝化処理と脱窒処理とが行われている。ただし、下流側領域の硝化処理の進行速度は、上流側領域の硝化処理の進行速度、及び下流側領域の脱窒処理の進行速度より高い。硝酸計43は、この上流側領域と下流側領域との間(例えば廃水Wの上流側から下流側に沿った場合の中央位置)に設けられ、アンモニア計44は、硝酸計43より下流側の下流側領域に配置される。
以上のように、空気供給量制御部40は、硝酸計43とアンモニア計44との検出結果に基づき、反応槽10内での空気量を制御して、反応槽10内で硝化処理と脱窒処理との両方の生物処理を含む同時硝化脱窒制御を実行する。ただし、空気供給量制御部40は、反応槽10内で同時硝化脱窒処理を行わなくてもよい。例えば、空気供給量制御部40は、硝酸計43及びアンモニア計44のいずれか一方を有していてもよく、その測定結果に基づき反応槽10内での空気量を制御してもよい。また、例えば、空気供給量制御部40は、硝酸計43及びアンモニア計44の代わりに、水質測定部として、反応槽10内の廃水Wの溶存酸素量を測定する溶存酸素計を有していてもよい。この場合、空気供給量制御部40は、溶存酸素計が測定した廃水W中の溶存酸素量に基づき、溶存酸素量が一定の値となるように反応槽10に供給する空気量を制御する(溶存酸素量制御)。この溶存酸素量制御の場合、反応槽10に対し直列に嫌気槽や無酸素槽を接続し、反応槽10で硝化処理した後の廃水Wを脱窒処理してもよい。
また、空気供給量制御部40は、硝酸計43及びアンモニア計44の代わりに、水質測定部として、反応槽10内の廃水Wの流入量を計測する流量計を有していてもよい。この場合、空気供給量制御部40は、流量計が測定した反応槽10内への廃水W中の流入量に基づき、その量の廃水Wを目標濃度とするために反応槽10に供給する空気量を制御する(流入水量制御)。この流入量制御の場合、反応槽10に対し直列に嫌気槽や無酸素槽を接続し、反応槽10で硝化処理した後の廃水Wを脱窒処理してもよい。このように、廃水処理システム1は、水質測定部の測定結果に基づき反応槽10に供給する空気量を制御するものであれば、以上説明した同時硝化脱窒制御、溶存酸素量制御、流入水量制御以外の任意の空気量制御を行ってもよい。また、廃水処理システム1は、異なる処理を行う系列(例えば、同時硝化脱窒制御を行う系列と溶存酸素量制御を行う系列)を区分して、反応槽10毎に各処理のいずれか(例えば、同時硝化脱窒制御を行う系列と溶存酸素量制御を行う系列とのいずれか)を行わせてもよい。
(制御部の構成)
次に、空気供給量制御部40が有する制御部42について説明する。図2は、第1実施形態に係る制御部の構成を示すブロック図である。制御部42は、例えばコンピュータなどの演算装置である。図2に示すように、制御部42は、水質測定結果取得部70と、検出空気量取得部71と、必要空気量取得部72と、目標管内圧算出部74と、送風制御部76と、導入空気制御部78とを有する。
次に、空気供給量制御部40が有する制御部42について説明する。図2は、第1実施形態に係る制御部の構成を示すブロック図である。制御部42は、例えばコンピュータなどの演算装置である。図2に示すように、制御部42は、水質測定結果取得部70と、検出空気量取得部71と、必要空気量取得部72と、目標管内圧算出部74と、送風制御部76と、導入空気制御部78とを有する。
水質測定結果取得部70は、硝酸計43及びアンモニア計44から、反応槽10内の廃水Wの状態、すなわち廃水Wの硝酸濃度及びアンモニア濃度の測定結果を取得する。なお、水質計測部が溶存酸素計である場合、水質測定結果取得部70は、廃水Wの状態として、反応槽10内の溶存酸素量を取得する。また、水質計測部が流量計である場合、水質測定結果取得部70は、廃水Wの状態として、反応槽10内に流入した廃水Wの量を取得する。すなわち、反応槽10内の廃水Wの状態とは、水質計測部が計測した計測対象である。言い換えれば、水質計測部は、廃水Wの状態として、反応槽10内の廃水Wの硝酸濃度、アンモニア濃度、溶存酸素量、及び流入量の少なくともいずれか一つを計測するということができる。
検出空気量取得部71は、支管空気量測定部48から、各支管34の検出空気量の値、すなわち、各支管34の導入弁36から反応槽10へ供給されている空気量の値を取得する。
必要空気量取得部72は、水質測定結果取得部70が取得した廃水Wの状態の測定結果に基づき、反応槽10内の廃水Wの水質を所定の目標水質にするための必要空気量を、反応槽10毎に取得する。必要空気量の取得方法については後述する。
目標管内圧算出部74は、必要空気量の値に基づき、目標管内圧を算出する。目標管内圧は、各反応槽10に必要空気量を供給するために必要な送風管内における空気の圧力である。目標管内圧の算出方法については、後述する。
送風制御部76は、送風管30内における圧力が、目標管内圧算出部74が算出した目標管内圧となるように、送風ユニット20からの空気供給を制御する。具体的には、送風制御部76は、母管内圧測定部47が測定した母管32内の空気圧の値を取得しつつ、母管32内の空気圧が目標管内圧となるように、送風ユニット20からの空気供給量を制御する。
導入空気制御部78は、検出空気量取得部71から、各支管空気量測定部48が測定した各支管34に供給される空気量の値を取得する。さらに詳しくは、導入空気制御部78は、各支管34の検出空気量の値、すなわち、各支管34の導入弁36から反応槽10へ供給されている空気量の値を取得する。導入空気制御部78は、必要空気量と、取得した検出空気量とに基づき、支管34から反応槽10への空気供給量が必要空気量となるように、各導入弁36の開度を調整する。すなわち、導入空気制御部78は、検出空気量が必要空気量に一致するように、各導入弁36の開度を調整する。導入弁36の開度調整方法については、後述する。
(必要空気量の取得)
以下に、必要空気量取得部72による必要空気量の取得方法について説明する。必要空気量取得部72は、関係記憶部82と、必要空気量算出部84とを有する。なお、以下でいう水質とは、廃水Wに含まれる所定の成分の濃度、又は量のことをいい、本実施形態の例では廃水Wの硝酸濃度及びアンモニア濃度である。また、水質は、例えば廃水Wの溶存酸素量であってもよい。
以下に、必要空気量取得部72による必要空気量の取得方法について説明する。必要空気量取得部72は、関係記憶部82と、必要空気量算出部84とを有する。なお、以下でいう水質とは、廃水Wに含まれる所定の成分の濃度、又は量のことをいい、本実施形態の例では廃水Wの硝酸濃度及びアンモニア濃度である。また、水質は、例えば廃水Wの溶存酸素量であってもよい。
関係記憶部82は、水質空気量関係を記憶する。水質空気量関係とは、反応槽10に供給される空気量と、その量の空気が供給された場合の反応槽10内の水質の変化量との関係である。関係記憶部82は、反応槽10内の水質の変化が、反応槽10に供給される空気量の変化に対して遅れる一次遅れ系として、水質空気量関係を記憶している。以下、具体的に説明する。
図3は、水質空気量関係を説明するためのグラフである。図3は、反応槽10に空気を供給した場合における、アンモニア濃度の変化量の一例を示すグラフである。図3の横軸は時間を示し、縦軸の左側は反応槽10に供給する供給空気量を示し、縦軸の右側は反応槽10内の廃水Wのアンモニア濃度を示す。図3の線分L1は、時間毎の供給空気量を示す。線分L2は、線分L1のように供給空気量が変化した場合に、水質空気量関係に従ってアンモニア濃度が変化した場合の時間毎のアンモニア濃度を示している。
線分L1に示すように、図3の例では、時刻t1において、供給空気量をM1からM2に増加させている。線分L2に示すように、水質空気量関係に従った場合、アンモニア濃度は、時刻t1から遅れた時刻t2までは濃度P1のままであり、時刻t2からアンモニア濃度が低下し始め、時刻t3まで一定の速度でアンモニア濃度が低下し、時刻t3からアンモニア濃度の低下速度が低下し、時刻t4において濃度P2に達して、濃度P2のまま収束する。ここで、供給空気量をM1からM2に変化させた場合の供給空気量の変化値を、単位あたりの供給空気の変化量(例えば空気の変化量が1m3)とする。そして、この場合におけるアンモニア濃度P1からP2への濃度の変化量、すなわち供給空気量を単位量だけ変化させた場合の収束後の水質の変化量を、Kとする。そして、時刻t1からt2までの間の時間、すなわちむだ時間をLsとする。そして、時刻t2からt3までの間の時間、すなわち一次遅れ時間をTsとする。そして、アンモニア濃度の、供給空気量と時間とに関する伝達関数をyとすると、水質空気量関係は、次の式(11)に示すものとなる。
y=(K・e-Ls)/(1+Ts) ・・・(11)
関係記憶部82は、予め計測されたK、Ls、Tsの値を上記式(11)に当てはめた水質空気量関係を記憶している。関係記憶部82は、例えば、時刻t2からt4までの間の時間の検出結果に基づき、その検出した時間の所定の割合(ここでは63%)を、時刻t2からt3までの間の時間であるTsとして記憶する。この例ではアンモニア濃度と供給空気量との関係について説明したが、それぞれK、Ls、Tsの値を予め計測していれば、水質空気量関係は、硝酸濃度と供給空気量との関係、溶存酸素量と供給空気量との関係など、各水質と供給空気量との関係に対しても適用できる。本実施形態における関係記憶部82は、アンモニア濃度と供給空気量との関係、及び硝酸濃度と供給空気量との関係のそれぞれについて、異なる水質空気量関係を記憶している。
図2に示す必要空気量算出部84は、関係記憶部82から、水質空気量関係を読み出す。そして、必要空気量算出部84は、予め定められた反応槽10内の廃水Wの目標水質、ここでは目標のアンモニア濃度と目標の硝酸濃度との値である目標濃度を取得する。この目標濃度は、予め設定された一定の数値範囲である。例えば、硝酸濃度における目標濃度は、5.0mg以下の予め定められた数値範囲である。また、例えば、アンモニア濃度における目標濃度は、1.0mg/L以上5.0mg/L以下、より好適には1.0mg/L以上2.0mg/L以下である。必要空気量算出部84は、水質空気量関係と、目標濃度と、水質測定結果取得部70が取得した現在の廃水Wの硝酸濃度及びアンモニア濃度とに基づき、反応槽10の必要空気量を算出する。必要空気量算出部84は、廃水Wの硝酸濃度がその目標濃度となり、かつ、廃水Wのアンモニア濃度がその目標濃度となるように、反応槽10の必要空気量を算出する。必要空気量とは、反応槽の水質を所定の目標水質にするために、すなわち反応槽内の廃水Wのアンモニア濃度と硝酸濃度との双方を、目標濃度とするために必要(かつ十分)な空気量であり、絶対値として算出されるものである。
具体的には、必要空気量算出部84は、目標濃度と水質測定結果取得部70が算出した濃度との差分である差分濃度を算出し、廃水Wのアンモニア濃度がその目標濃度側に差分濃度だけ変化し、かつ、廃水Wの硝酸濃度がその目標濃度側に差分濃度だけ変化するように、必要空気量を算出する。従って、必要空気量は、差分濃度の値に従って変化するということができる。例えば、アンモニア濃度を考慮した場合、必要空気量算出部84は、算出したアンモニア濃度が目標濃度より低い場合、差分濃度が大きくなるほど、すなわち現在のアンモニア濃度が小さくなるほど、硝化処理が進みすぎているとして、必要空気量を低くする。必要空気量算出部84は、算出したアンモニア濃度が目標濃度より高い場合、差分濃度が大きくなるほど、すなわち現在のアンモニア濃度が高くなるほど、硝化処理が十分でないとして、必要空気量を高くする。また、硝酸濃度を考慮した場合、必要空気量算出部84は、算出した硝酸濃度が目標濃度より低い場合、差分濃度が大きくなるほど、すなわち現在の硝酸濃度が小さくなるほど、硝化処理が十分でないとして、必要空気量を高くする。必要空気量算出部84は、算出した硝酸濃度が目標濃度より高い場合、差分濃度が大きくなるほど、すなわち現在の硝酸濃度が高くなるほど、脱窒処理が十分でないとして、必要空気量を低くする。
必要空気量算出部84は、反応槽10の全てについて、必要空気量を算出する。また、必要空気量算出部84は、反応槽10の全てについて算出した必要空気量を合計して、その合計値を総必要空気量として算出してもよい。必要空気量は、現在の反応槽10内の廃水Wの状態、すなわち硝酸濃度及びアンモニア濃度に基づき変化するため、総必要空気量も、同様に現在の反応槽10内の廃水Wの状態に基づき変化する。
なお、上述の溶存酸素量制御を行う場合、必要空気量算出部84は、溶存酸素量と供給空気量との関係を示す水質空気量関係を読み出し、水質測定結果取得部70が取得した現在の廃水Wの溶存酸素量に基づき、廃水Wが所定の目標水質(目標溶存酸素量)となるように、反応槽10の必要空気量を算出する。また、上述の流入水量制御を行う場合、必要空気量算出部84は、目標水質とするための必要空気量を、反応槽10への廃水Wの流入量に応じて算出する。必要空気量算出部84は、目標水質とするための必要空気量が、反応槽10への廃水Wの流入量に応じた関係を有するとして、その関係を記憶しておき、水質測定結果取得部70が取得した廃水Wの流入量に基づき、必要空気量を算出する。
(目標管内圧の算出)
次に、目標管内圧算出部74による目標管内圧の算出方法について説明する。目標管内圧算出部74は、必要空気量算出部84から必要空気量の値を取得し、必要空気量の値に基づき、送風管損失圧力を算出する。送風管損失圧力は、必要空気量の空気を送風管30内に供給した場合に、送風管30内の圧力損失により損失される空気の圧力である。すなわち、送風管損失圧力は、必要空気量の空気を送風管30内に供給した場合の送風管30内の圧力損失と同一の値である。そして、目標管内圧算出部74は、この送風管損失圧力に基づき、目標管内圧を算出する。この目標管内圧は、必要空気量の値に応じて変化する。言い換えれば、目標管内圧算出部74は、必要空気量の変化に応じて、算出する目標管内圧を変化させる。
次に、目標管内圧算出部74による目標管内圧の算出方法について説明する。目標管内圧算出部74は、必要空気量算出部84から必要空気量の値を取得し、必要空気量の値に基づき、送風管損失圧力を算出する。送風管損失圧力は、必要空気量の空気を送風管30内に供給した場合に、送風管30内の圧力損失により損失される空気の圧力である。すなわち、送風管損失圧力は、必要空気量の空気を送風管30内に供給した場合の送風管30内の圧力損失と同一の値である。そして、目標管内圧算出部74は、この送風管損失圧力に基づき、目標管内圧を算出する。この目標管内圧は、必要空気量の値に応じて変化する。言い換えれば、目標管内圧算出部74は、必要空気量の変化に応じて、算出する目標管内圧を変化させる。
以下、より詳細に説明する。管の圧力損失Hは、一般的に、以下の式(12)、(13)から算出される。
H=4・f1・(l/d)・(γ・v2/2) ・・・(12)
H=f2・(γ・v2/2) ・・・(13)
H=f2・(γ・v2/2) ・・・(13)
式(12)は、管が直管の場合における圧力損失Hの算出式である。式(13)は、管が直管以外の異形管である場合における圧力損失Hの算出式である。f1、f2は、損失係数であり、予め定められた定数である。f1、f2は、例えば管の圧力損失を予め計測し、その計測結果に基づき予め算出される。lは、直管の配管長(m)であり、dは、直管の内径(m)であり、これらも配管の形状により予め定められた定数である。γは、空気密度(kg/m3)であり、予め定められた定数である。vは、流れる空気の流速(m/s)である。すなわち、式(12)、(13)において、変数は、流速vである。従って、管の圧力損失Hは、流速vに応じて変化する。また、流速vは、以下の式(14)のように、空気の流量Qに比例する(ベルヌーイの定理)。式(14)のAは、流路面積であり、こちらも配管の形状により予め定められた定数となる。
Q=A・v ・・・(14)
従って、管の圧力損失Hは、空気の流量Qによって算出可能である。本実施形態においては、圧力損失Hは、送風管損失圧力に相当し、流量Qは、必要空気量に相当する。目標管内圧算出部74は、式(14)に基づき、必要空気量分の空気を母管32及び支管34に供給した場合の、空気の流速vを算出する。ここでの流速vは、母管32及び支管34における流速である。そして、目標管内圧算出部74は、式(12)、(13)で示したように、配管の圧力損失の算出の上で、流速v以外の項を予め設定した値とし、流速vとこの設定した値とに基づき、送風管損失圧力HPを算出する。送風管損失圧力HPは、流速v、すなわち必要空気量の変化に比例して、値が変化する。
目標管内圧算出部74は、支管34毎に、送風管損失圧力HPを算出する。すなわち、本実施形態の例では、目標管内圧算出部74は、送風管損失圧力HPとして、支管34Aの送風管損失圧力HPAと、支管34Bの送風管損失圧力HPBと、支管34Cの送風管損失圧力HPCとを算出する。
送風管損失圧力HPAは、送風ユニット20から反応槽10Aに至る送風管30の経路に、反応槽10Aについて算出された必要空気量の空気を供給した場合の圧力損失である。より詳しくは、送風管損失圧力HPAは、母管32の入口(母管32と導入管31との接続部)から母管32の出口(母管32と支管34Aとの接続部)までの経路に総必要空気量を供給し、支管34Aの入口(母管32と支管34Aとの接続部)から支管34Aの出口(支管34Aと散気部12との接続部)までの経路に反応槽10Aについて算出された必要空気量を供給した場合における、母管32の入口から支管34Aの出口までの経路の圧力損失である。
送風管損失圧力HPBは、送風ユニット20から反応槽10Bに至る送風管30の経路に、反応槽10Bについて算出された必要空気量の空気を供給した場合の圧力損失である。より詳しくは、送風管損失圧力HPBは、母管32の入口(母管32と導入管31との接続部)から母管32の出口(母管32と支管34Bとの接続部)までの経路に総必要空気量を供給し、支管34Bの入口(母管32と支管34Bとの接続部)から支管34Bの出口(支管34Bと散気部12との接続部)までの経路に反応槽10Bについて算出された必要空気量の空気を供給した場合における、母管32の入口から支管34Bの出口までの経路の圧力損失である。
送風管損失圧力HPCは、送風ユニット20から反応槽10Cに至る送風管30の経路に、反応槽10Cについて算出された必要空気量の空気を供給した場合の圧力損失である。より詳しくは、送風管損失圧力HPCは、母管32の入口(母管32と導入管31との接続部)から母管32の出口(母管32と支管34Cとの接続部)までの経路に総必要空気量を供給し、支管34Cの入口(母管32と支管34Cとの接続部)から支管34Cの出口(支管34Cと散気部12との接続部)までの経路に反応槽10Cについて算出された必要空気量の空気を供給した場合における、母管32の入口から支管34Cの出口までの経路の圧力損失である。ただし、送風管損失圧力HPA、送風管損失圧力HPB、及び送風管損失圧力HPCでの経路は、それぞれ、導入管31の入口(送風機22が接続されている箇所)から、支管34A、34B、34Cの出口までの経路の圧力損失であってもよい。
そして、目標管内圧算出部74は、次の式(15)に基づき、目標管内圧PYを算出する。
PY=h+HC+HP+HM+HA ・・・(15)
ここで、hは、反応槽10内の廃水Wの水頭圧である。HCは、送風機22に設けられた図示しない空気ろ過機による圧力損失(通過抵抗)によって損失される空気の圧力である。HMは、支管空気量測定部48による圧力損失(通過抵抗)によって損失される空気の圧力である。HAは、散気部12による圧力損失(通過抵抗)によって損失される空気の圧力である。すなわち、目標管内圧算出部74は、送風管損失圧力HPと水頭圧hと空気ろ過機損失圧力HCと支管空気量測定部損失圧力HMと散気部損失圧力HAとを合計して、その合計値を目標管内圧PYとして算出する。ただし、例えば、目標管内圧算出部74は、送風管損失圧力HPと水頭圧hと支管空気量測定部損失圧力HMと散気部損失圧力HAとを合計して、目標管内圧PYがその合計値以上となるように、目標管内圧PYを算出してもよい。
なお、水頭圧hは、反応槽10の容積から予め設定された値であってもよい。また、反応槽10にセンサを設け、このセンサにより反応槽10内の廃水Wの水位又は水量を検出して、目標管内圧算出部74が、この検出値により水頭圧hを算出してもよい。空気ろ過機損失圧力HC、支管空気量測定部損失圧力HM、及び散気部損失圧力HAは、例えば設計値や予め計測された値である。すなわち、目標管内圧算出部74は、空気ろ過機損失圧力HC、支管空気量測定部損失圧力HM、散気部損失圧力HAを、予め定められた定数とし、予め計測された値が存在すれば、その計測値を使用する。目標管内圧算出部74は、このようにHP以外の項を定数や算出値として予め定めた値として、送風管損失圧力HPとこの予め定めた値とを合計して、その合計値を目標管内圧PYとして算出しているということができる。
さらに詳しくは、目標管内圧算出部74は、反応槽10毎に目標管内圧を算出し、そのうちで最大となる目標管内圧を、目標管内圧PYとする。本実施形態の例では、目標管内圧算出部74は、目標管内圧PYA、目標管内圧PYB、及び目標管内圧PYCを算出する。目標管内圧PYAは、送風管損失圧力HPAと、反応槽10Aの水頭圧hと、空気ろ過機損失圧力HCと、支管34A内の支管空気量測定部48の支管空気量測定部損失圧力HMと、反応槽10A内の散気部12の散気部損失圧力HAとの合計値である。同様に、目標管内圧PYBは、送風管損失圧力HPBと、反応槽10Bの水頭圧hと、空気ろ過機損失圧力HCと、支管34B内の支管空気量測定部48の支管空気量測定部損失圧力HMと、反応槽10B内の散気部12の散気部損失圧力HAとの合計値である。同様に、目標管内圧PYCは、送風管損失圧力HPCと、反応槽10Cの水頭圧hと、空気ろ過機損失圧力HCと、支管34C内の支管空気量測定部48の支管空気量測定部損失圧力HMと、反応槽10C内の散気部12の散気部損失圧力HAとの合計値である。目標管内圧算出部74は、これら目標管内圧PYA、目標管内圧PYB、及び目標管内圧PYCのうちの最大値を、目標管内圧PYとして決定する。また、目標管内圧算出部74は、この決定した目標管内圧Prに対し、予め定められた所定のマージンを加算し、その加算した値を実際の目標管内圧PYとしてもよい。
ただし、目標管内圧算出部74は、送風管損失圧力HP以外の値、すなわち水頭圧hと空気ろ過機損失圧力HCと支管空気量測定部損失圧力HMと散気部損失圧力HAとの合計値を、各反応槽10毎に共通する値(予め定めた値J)として、目標管内圧PYA、目標管内圧PYB、及び目標管内圧PYCを算出してもよい。すなわち、目標管内圧算出部74は、送風管損失圧力HPAと予め定めた値Jとを合計して目標管内圧PYAを算出し、送風管損失圧力HPBと予め定めた値Jとを合計して目標管内圧PYBを算出し、送風管損失圧力HPCと予め定めた値Jとを合計して目標管内圧PYCを算出し、それらのうちの最大値を目標管内圧PYとして決定してもよい。また、目標管内圧算出部74は、送風管損失圧力HP及び水頭圧h以外の値を予め定めた値J1として、反応槽10Aの水頭圧hと送風管損失圧力HPAと予め定めた値J1との合計値を、目標管内圧PYAとして算出してもよい。この場合、目標管内圧PYB、目標管内圧PYCも同様に算出する。
このように、目標管内圧算出部74は、支管34毎(各反応槽10への経路毎)に送風管損失圧力HPA、HPB、HPCを算出し、その送風管損失圧力HPA、HPB、HPCに基づき、支管34毎に目標管内圧PYA、PYB、PYCを算出する。目標管内圧算出部74は、支管34毎に算出された目標管内圧PYA、PYB、PYCのうちの最大値を、目標管内圧PYとする。
図4は、必要空気量と目標管内圧との関係の例を示すグラフである。以上のように、目標管内圧算出部74は、必要空気量の空気を送風管30に供給した場合の送風管30の送風管損失圧力HPを算出し、その送風管損失圧力HPに基づき目標管内圧PYを算出する。送風管損失圧力HPは、必要空気量の値に応じて変化する。従って、図4に示すように、目標管内圧PYも、必要空気量の値に応じて変化する。図4に示すように、目標管内圧PYは、必要空気量の値に二次元曲線的に比例して変化する。
そして、図2に示す送風制御部76は、送風管30内における圧力が、目標管内圧算出部74が算出した目標管内圧PYとなるように、送風ユニット20からの空気供給を制御する。これにより、送風管30(母管32)内の圧力は、目標管内圧PYに保たれ、また、目標管内圧PYの算出値の変化に応じて、その変化に追従する。なお、ここでの送風管30内における圧力とは、この圧力を測定する位置、すなわち母管内圧測定部47が送風管30の圧力を測定する位置における圧力である。また、目標管内圧PYは、この圧力を測定する位置における目標管内圧である。
(導入弁の開度調整)
次に、導入空気制御部78による導入弁36の開度調整について説明する。導入空気制御部78は、各支管34の検出空気量の値、すなわち、各支管34の導入弁36から反応槽10へ供給されている空気量の値を取得する。導入空気制御部78は、必要空気量と、取得した検出空気量とに基づき、支管34から反応槽10への空気供給量が必要空気量となるように、各導入弁36の開度を調整する。すなわち、導入空気制御部78は、支管34での空気量が必要空気量より大きい場合、導入弁36の開度を低くし(開口面積を小さくし)、反応槽10へ流入する空気量が大きくなり過ぎないようにする。また、導入空気制御部78は、必要空気量が変動して必要空気量が増加した場合、導入弁36の開度を高くし(開口面積を大きくし)、必要空気量が減少した場合、導入弁36の開度を低くする。
次に、導入空気制御部78による導入弁36の開度調整について説明する。導入空気制御部78は、各支管34の検出空気量の値、すなわち、各支管34の導入弁36から反応槽10へ供給されている空気量の値を取得する。導入空気制御部78は、必要空気量と、取得した検出空気量とに基づき、支管34から反応槽10への空気供給量が必要空気量となるように、各導入弁36の開度を調整する。すなわち、導入空気制御部78は、支管34での空気量が必要空気量より大きい場合、導入弁36の開度を低くし(開口面積を小さくし)、反応槽10へ流入する空気量が大きくなり過ぎないようにする。また、導入空気制御部78は、必要空気量が変動して必要空気量が増加した場合、導入弁36の開度を高くし(開口面積を大きくし)、必要空気量が減少した場合、導入弁36の開度を低くする。
本実施形態においては、送風管30の圧力を目標管内圧PYとなるように制御している。従って、母管32には、総必要空気量分以上の空気が供給されている。導入空気制御部78は、各支管34の導入弁36の開度を調整することで、各支管34に必要空気量分だけの空気が供給されるように、母管32の空気を各支管34に分配している。従って、例えば支管34毎の長さや形状などが異なり、支管34毎に圧力損失が異なる場合にも、支管34毎に導入弁36の開度を調整しているため、各支管34に適切に必要空気量を供給することができる。なお、本実施形態においては、送風制御部76が送風管30内の管内圧を必要空気量に応じて変化させ、必要空気量に追従した空気量となるように空気を供給している。従って、導入空気制御部78は、目標管内圧を一定にした場合よりも、導入弁36の開度の調整量が低くなる。言い換えれば、送風管30には、常に必要最低限に近い分だけの空気量が供給されているため、導入空気制御部78は、導入弁36の開度が低くなりすぎない範囲内で、導入弁36の開度を制御することができる。
以上説明した、送風管30内の圧力を目標管内圧として必要空気量を各反応槽10に供給するための制御フローを、フローチャートで説明する。図5は、送風管内の圧力を目標管内圧して必要空気量を各反応槽10に供給するための制御フローを説明するフローチャートである。図5に示すように、空気供給量制御部40は、最初に、硝酸計43及びアンモニア計44により、各反応槽10内の廃水Wの硝酸濃度及びアンモニア濃度を計測する(ステップS10)。
硝酸濃度及びアンモニア濃度を計測した後、空気供給量制御部40は、必要空気量算出部84により、水質空気量関係と計測した濃度と目標濃度とに基づき、各反応槽10の必要空気量を算出する(ステップS12)。具体的には、必要空気量算出部84は、関係記憶部82からアンモニア濃度と供給空気量との関係、及び硝酸濃度と供給空気量との関係のそれぞれについて、水質空気量関係を読み出す。必要空気量算出部84は、アンモニア濃度と硝酸濃度とのそれぞれについての目標濃度の値を取得する。廃水Wの硝酸濃度がその目標濃度となり、かつ、廃水Wのアンモニア濃度がその目標濃度となるように、反応槽10の必要空気量を算出する。必要空気量算出部84は、全ての反応槽10について、必要空気量を算出する。
必要空気量を算出した後、空気供給量制御部40は、目標管内圧算出部74により、必要空気量から送風管損失圧力HPを算出し(ステップS16)、送風管損失圧力HPに基づき目標管内圧PYを算出する(ステップS18)。目標管内圧算出部74は、送風管30に必要空気量を供給した場合における送風管30の圧力損失を、送風管損失圧力HPとして算出する。そして、目標管内圧算出部74は、送風管損失圧力HPと予め定めた値Jとを合計して、その合計値を目標管内圧PYとして算出する。より詳しくは、目標管内圧算出部74は、各反応槽10への経路毎に、目標管内圧PYA、目標管内圧PYB、及び目標管内圧PYCを算出し、そのうちの最大値を、目標管内圧PYとする。
目標管内圧PYを算出した後、空気供給量制御部40は、送風制御部76により、送風管30内が目標管内圧PYとなるように、送風機22の空気供給を制御する(ステップS20)。送風制御部76は、送風機22の運転する台数、送風機22のインレットベーンの開度、及び羽根部の回転数を制御して、送風機22から吐き出す空気量を調整して、母管32内の空気圧を目標管内圧とする。具体的な送風制御部76の制御フローは後述する。
また、必要空気量を算出した後、空気供給量制御部40は、導入空気制御部78により、各反応槽10に必要空気量分の空気が供給されるように、導入弁36の開度を調整する(ステップS22)。ステップS20及びステップS22の後、ステップS24に移り、処理を終了しない場合(ステップS24;No)、ステップS10に戻り、同様の処理を繰り返す。すなわち、空気供給量制御部40は、所定の時間毎に各反応槽10内の廃水Wの硝酸濃度及びアンモニア濃度を計測し、その計測結果に基づき必要空気量及び目標管内圧を更新して、その更新した目標管内圧になるように、送風機22から吐出される空気量を逐次制御する。また、空気供給量制御部40は、更新された必要空気量分の空気が反応槽10に供給されるように、導入弁36の開度を逐次制御する。また、ステップS24で処理を終了する場合(ステップS24;Yes)、この処理を終了する。
なお、上述の溶存酸素量制御の場合、ステップS10で反応槽10内の溶存酸素量を算出し、ステップS12で溶存酸素量が目標量(目標水質)となるように必要空気量を算出する。その他の処理は、上記説明と同様である。
(送風制御部による送風機の制御)
次に、送風制御部76による送風機22の制御について説明する。図6は、送風機制御部による送風機の制御を説明するフローチャートである。図7は、送風機による送風機の制御を説明するグラフである。図6に示すように、送風制御部76は、最初に、目標管内圧算出部74から目標管内圧の値を取得する(ステップS30)。
次に、送風制御部76による送風機22の制御について説明する。図6は、送風機制御部による送風機の制御を説明するフローチャートである。図7は、送風機による送風機の制御を説明するグラフである。図6に示すように、送風制御部76は、最初に、目標管内圧算出部74から目標管内圧の値を取得する(ステップS30)。
送風制御部76は、送風機22の最大出力における管内圧が、目標管内圧以上であるかを判断する(ステップS32)。送風機22の最大出力とは、現在の送風機22の運転台数において、全ての送風機22の出力を最大とした場合の出力である。さらに言えば、送風機22のインレットベーンの開度を最大にし、かつ、羽根部の回転数を最大にした場合の出力が、最大出力となる。図7の横軸は、送風機22の出力値であり、縦軸は送風管30の管内圧である。図7に示すように、送風機22が一台稼働している場合の管内圧は、最大出力において管内圧Pr1になる。送風機22が二台稼働している場合の管内圧は、例えば定格出力において管内圧Pr2まで上昇し、さらに最大出力に上げるに従って、管内圧Pr3まで上昇する。送風機22が三台稼働している場合の管内圧は、例えば定格出力において管内圧Pr4まで上昇し、さらに最大出力に上げるに従って、管内圧Pr5まで上昇する。送風機22が四台稼働している場合の管内圧は、例えば定格出力において管内圧Pr6まで上昇し、最大出力に上げるに従ってさらに上昇する。図7の例では、目標管内圧が、管内圧Pr3と管内圧Pr4との間の値であった場合を説明している。また、余裕管内圧は、目標管内圧より大きい値であり、図7の例では、管内圧Pr5と管内圧Pr6との間の値であった場合を説明している。
最大出力における管内圧が、目標管内圧以上でない(ステップS32;No)、すなわち目標管内圧より低い場合、送風制御部76は、送風機22の稼働台数を増加させる(ステップS34)。図7の例では、送風機22を二台稼働している場合の最大出力における管内圧は、目標管内圧より低くなり、この場合、送風制御部76は、稼働台数を三台にする。稼働台数を増加させたら、ステップS32に戻り、増加した稼働台数における送風機22の最大出力が、目標管内圧以上であるかを判断する。
最大出力における管内圧が、目標管内圧以上である場合(ステップS32;Yes)、送風制御部76は、送風機22の最大出力における管内圧が、余裕管内圧以下であるかを判断する(ステップS36)。最大出力における管内圧が余裕管内圧以下である場合(ステップS36;Yes)、送風制御部76は、稼働台数をそのままにして、目標管内圧となるように、稼働している送風機22の出力を制御する(ステップS38)。図7の例では、送風機22を三台稼働している場合の最大出力における管内圧は、目標管内圧以上であり、余裕管内圧以下である。図7の例では、送風機22を三台稼働している場合、インレットベーンの開度と羽根部の回転数を制御することで出力を定格出力より小さくして、管内圧が目標管内圧となるようにする。
最大出力における管内圧が余裕管内圧以下でない(ステップS36;No)、すなわち管内圧が余裕管内圧より高い場合、送風機22の稼働台数を減少させる(ステップS40)。図7の例では、送風機22を四台稼働している場合の最大出力における管内圧は、余裕管内圧より低くなり、この場合、送風制御部76は、稼働台数を三台にする。稼働台数を減少させたら、ステップS38に移り、目標管内圧となるように、稼働している送風機22の出力を制御する。ステップS38の後はステップS42に進み、処理を終了しない場合(ステップS42;No)、ステップS30に戻り、更新された目標管内圧の情報を取得し、その目標管内圧になるように、同様の処理を繰り返す。また、処理を終了する場合(ステップS42;Yes)、この処理を終了する。
以上説明したように、本実施形態に係る廃水処理システム1は、廃水Wに生物処理を行う複数の反応槽10と、複数の反応槽10に接続される管である送風管30と、送風管30を介して、複数の反応槽10に生物処理を行うための空気を供給する送風ユニット20と、反応槽10への空気供給量を制御する空気供給量制御部40と、を有する。空気供給量制御部40は、水質測定部(本実施形態では硝酸計43及びアンモニア計44)、必要空気量取得部72、目標管内圧算出部74、及び送風制御部76を有する。水質測定部は、反応槽10に設けられて、反応槽10内の廃水Wの状態(本実施形態では廃水Wの硝酸濃度及びアンモニア濃度)を測定する。必要空気量取得部72は、水質測定部の測定結果に基づき、反応槽10内の廃水Wを所定の目標水質(本実施形態では目標濃度)にするための必要空気量を反応槽10毎に取得する。目標管内圧算出部74は、必要空気量の空気を送風管30内に供給した場合における送風管内の圧力損失により損失される空気の圧力である送風管損失圧力HPを算出する。目標管内圧算出部74は、送風管損失圧力HPに基づき、送風管30内の目標管内圧PYを算出する。目標管内圧算出部74は、必要空気量の変化に応じて、算出する目標管内圧PYを変化させる。
この廃水処理システム1は、現在の廃水Wの状態を測定し、廃水Wを目標水質にするために必要な必要空気量を算出し、その必要空気量の空気を供給した場合の送風管30の送風管損失圧力HPを算出する。廃水処理システム1は、送風管30内の圧力が、送風管損失圧力HPに基づき算出した目標管内圧PYとなるように、送風ユニット20を制御している。そして、廃水処理システム1は、必要空気量、すなわち現在の水質に応じて、目標管内圧PYを変化させている。すなわち、廃水処理システム1は、現在の水質に基づき、送風ユニット20に対し、生物処理のために必要最小限の空気を供給するように管内圧を制御している。従って、廃水処理システム1は、生物処理に不要な空気を供給することを抑制して、送風に要するエネルギー消費を抑制することができる。廃水処理システム1においては、送風ユニット20によって送風を行うことが消費電力の多くを占めているため、この送風圧を抑制することで、消費電力の削減を効果的に行うことができる。また、廃水処理システム1は、全ての反応槽10への必要空気量に基づき目標管内圧PYを算出し、さらに言えば、複数の搬送槽10に接続されている配管の圧力損失に基づき目標管内圧PYを算出している。従って、廃水処理システム1は、各反応槽10に接続されている配管の圧力損失の度合いが異なる場合にも、それぞれの反応槽10に対して、必要な空気量を適切に供給することが可能となる。以上のように、本実施形態に係る廃水処理システム1は、送風に要するエネルギー消費を抑制しつつ、各反応槽10に適切に空気を供給することができる。
また、目標管内圧算出部74は、送風管損失圧力HPと、反応槽10内に設けられて送風管30からの空気を反応槽10内に散気する散気部12の圧力損失(散気部損失圧力HA)と、反応槽10内の廃水の水頭圧hとを合計して、目標管内圧PYがその合計値以上となるように、目標管内圧PYを算出する。この目標管内圧算出部74は、目標管内圧PYを、送風管損失圧力HPと散気部損失圧力HAと水頭圧hとの合計値以上となるように設定している。従って、この廃水処理システム1は、送風管30や散気部12の圧力損失や、廃水Wによる水頭圧があった場合にも、必要な空気量を適切に供給することが可能となる。
また、送風管30は、送風ユニット20に接続される母管32と、母管32から分岐して複数の反応槽10にそれぞれ接続される複数の支管34と、支管34に設けられた導入弁36と、複数の支管34のそれぞれに供給される空気量を検出空気量として測定する支管空気量測定部48と、を有する。空気供給量制御部40は、支管34のそれぞれにおいて、検出空気量が必要空気量となるように、導入弁36の開度を調整する導入空気制御部78を有する。本実施形態においては、送風管30の圧力を目標管内圧PYとすることで、母管32に総必要空気量の空気が適切に供給できるようにしている。さらに、導入空気制御部78は、各支管34の導入弁36の開度を調整することで、各支管34に必要空気量分だけの空気が供給されるように、母管32の空気を各支管34に分配している。従って、この廃水処理システム1は、支管34毎に圧力損失が異なる場合にも、各支管34に適切に必要空気量を供給することができる。
また、送風制御部76は、送風機22の稼働台数、インレットベーンの開度、及び羽根部の回転数の少なくともいずれか一つを制御する。従って、この廃水処理システム1は、送風管30の管内圧を適切に目標管内圧とすることができる。
また、水質測定部は、反応槽10内の廃水Wの状態として、反応槽10内の廃水Wの硝酸性窒素濃度、アンモニア性窒素濃度、溶存酸素量、及び反応槽内への廃水の流入量の少なくともいずれか一つを測定する。従って、この廃水処理システム1は、適切に必要空気量を算出することができる。
また、水質測定部は、反応槽10内の廃水Wの水質として、廃水Wの硝酸性窒素濃度、アンモニア性窒素濃度及び溶存酸素量の少なくともいずれか一つを測定し、必要空気量取得部72は、廃水Wの水質が目標水質となるように、必要空気量を算出する。この廃水処理システム1は、水質を測定し、その水質が目標の値となるように必要空気量を算出するため、必要空気量をより正確に算出することができる。なお、廃水処理システム1は、同時硝化脱窒処理を行ってもよい。同時硝化脱窒処理は、好気処理である硝化処理及び嫌気処理である脱窒処理を同じ槽内で行うため、消費酸素量の変動が大きく、必要空気量の変動も大きくなる。必要空気量の変動が大きくなるということは、必要空気量が低くなることが多くなるため、エネルギー消費の抑制をより大きく行うことができる。
また、必要空気量取得部72は、関係記憶部82と必要空気量算出部84とを有する。関係記憶部82は、反応槽10に供給される空気量とその量の空気が供給された場合の廃水Wの水質(ここでは硝酸濃度及びアンモニア濃度)の変化量との関係である水質空気量関係を記憶する。必要空気量算出部84は、水質空気量関係と、水質測定部による水質測定結果と目標水質(ここでは目標濃度)とに基づき、廃水Wの水質を目標水質に変化させるために必要な空気量を、必要空気量として算出する。必要空気量算出部84は、水質空気量関係に基づき必要空気量を算出するため、より正確に必要空気量を算出することができる。
また、関係記憶部82は、廃水Wの水質の変化が反応槽10内に供給される空気量の変化に対して遅れる一次遅れ系として、水質空気量関係を記憶する。必要空気量算出部84は、所定の時間の経過毎の水質測定結果に基づき、必要空気量を更新する。この廃水処理システム1は、一次遅れ系として必要空気量を算出しているため、時間毎の水質変化量を予測することができる。さらに、廃水処理システム1は、必要空気量の算出を繰り返して、算出結果を更新するため、最新の測定結果に基づき、空気供給量の制御をより正確に行うことができる。すなわち、廃水処理システム1は、フィードフォワード制御を行うことで、空気供給量の制御をより正確に行うことができる。
(第2実施形態)
次に、第2実施形態について説明する。第2実施形態に係る廃水処理システム1は、空気供給量制御部40Aが差分空気量算出部79Aを有し、差分空気量算出部79Aが算出した差分空気量に基づき、送風管30の管内圧を補正する点で、第1実施形態とは異なる。第2実施形態において第1実施形態と構成が共通する箇所は、説明を省略する。
次に、第2実施形態について説明する。第2実施形態に係る廃水処理システム1は、空気供給量制御部40Aが差分空気量算出部79Aを有し、差分空気量算出部79Aが算出した差分空気量に基づき、送風管30の管内圧を補正する点で、第1実施形態とは異なる。第2実施形態において第1実施形態と構成が共通する箇所は、説明を省略する。
図8は、第2実施形態に係る制御部の構成を示すブロック図である。図8に示すように、第2実施形態に係る制御部42Aは、差分空気量算出部79Aを有する。差分空気量算出部79Aは、必要空気量取得部72から、総必要空気量の値を取得する。総必要空気量は、各反応槽10について算出した必要空気量の全てを合計した値である。また、差分空気量算出部79Aは、検出空気量取得部71から、各支管34の検出空気量、すなわち、支管空気量測定部48が測定した支管34に供給される実際の空気量の値を取得する。これにより、差分空気量算出部79Aは、各支管34の検出空気量の合計値である総検出空気量を取得している。
ここで、目標管内圧算出部74は、必要空気量に基づき目標管内圧PYを設定している。従って、母管32には、全ての反応槽10に必要空気量を供給可能な圧力の空気が供給されている。また、導入空気制御部78は、導入弁36の開度を調整することで、母管32の空気を各支管34に分配している。従って、通常であれば、各支管34には、必要空気量の分だけの空気が供給され、各支管34の検出空気量は、各支管34の必要空気量となっている。そして、総検出空気量は、総必要空気量と一致している。
しかし、例えば支管34の劣化や、散気部12の空気の排出口の目詰りなどで、目標管内圧PYの算出の際に用いた各部の圧力損失の値(予め定めた定数)が、実際の値とは異なった値となるおそれがある。このような場合、実際に反応槽10に必要空気量を供給するための管内圧が、算出した目標管内圧PYより大きくなる場合がある。すなわち、実際に供給されている空気量の合計値である総検出空気量が、総必要空気量より小さくなる。この場合、反応槽10に必要な空気を適切に供給できなくなるおそれがある。さらに、実際に反応槽10に必要空気量を供給するための管内圧が、算出した目標管内圧PYより小さくなる場合もある。この場合、実際に供給されている総検出空気量が、総必要空気量より大きくなる。このように、実際に反応槽10に必要空気量を供給するための管内圧が、算出した目標管内圧PYと異なる場合、総必要空気量と総検出空気量とが異なる値となるおそれがある。
差分空気量算出部79Aは、総必要空気量と総検出空気量とが異なる場合、差分空気量を算出する。差分空気量とは、必要空気量と検出空気量との差分値である。差分空気量算出部79Aは、全ての反応槽10について、差分空気量を算出する。総必要空気量と総検出空気量とが異なる場合、少なくとも1つの反応槽10に対する必要空気量と検出空気量とは異なっている。第2実施形態に係る目標管内圧算出部74は、この差分空気量に基づき、差分送風管損失圧力を算出する。差分送風管損失圧力とは、この差分空気量の空気を送風管30に供給した場合における送風管30内の圧力損失によって損失される空気の圧力である。目標管内圧算出部74は、第1実施形態で説明した送風管損失圧力HPの算出方法と同じ方法で、差分送風管損失圧力を算出する。すなわち、目標管内圧算出部74は、送風管損失圧力HPの算出に用いた必要空気量をこの差分空気量に置き換え、さらに、送風管損失圧力HPの算出に用いた総必要空気量を総差分空気量に置き換えて、差分送風管損失圧力を算出する。なお、総差分空気量とは、差分空気量の合計値、すなわち総必要空気量と総検出空気量と差分値である。そして、目標管内圧算出部74は、差分送風管損失圧力に基づき、差分管内圧を算出する。目標管内圧算出部74は、第1実施形態で説明した目標管内圧PYの算出方法と同じ方法で、差分管内圧を算出する。すなわち、目標管内圧算出部74は、目標管内圧PYの算出に用いた送風管損失圧力HPを、この差分送風管損失圧力に置き換えて、差分管内圧を算出する。目標管内圧算出部74は、反応槽10A、10B、10Cへの経路毎に差分管内圧を算出し、それらの差分管内圧の最大値を、実際の最大値として決定する。
目標管内圧算出部74は、この差分管内圧に基づき、目標管内圧PYを補正する。具体的には、目標管内圧算出部74は、総検出空気量が総必要空気量より小さい場合、目標管内圧PYに差分管内圧を加えた値を、補正目標管内圧として算出する。また、目標管内圧算出部74は、総検出空気量が総必要空気量より大きい場合、目標管内圧PYから差分管内圧を差し引いた値を、補正目標管内圧として算出する。送風制御部76は、送風管30内における圧力が、補正目標管内圧となるように、送風ユニット20からの空気供給を制御する。これにより、送風管30内の圧力を、実際に反応槽10に必要空気量を供給するための管内圧に近づけることができ、総検出空気量を総必要空気量と一致させることが可能となる。導入空気制御部78は、導入弁36の開度を再度調整することで、支管34への空気量を調整し、各支管34の検出空気量を必要空気量に一致させる。これにより、例えば劣化などにより圧力損失に変動が生じた場合も、反応槽10に必要な空気を適切に供給することが可能となる。例えば、1つの支管34での検出空気量が必要空気量に足りていない場合、この支管34に接続されている導入弁の開度や、別の支管34に接続されている導入弁36の開度を調整して、他の支管34に供給されている空気を、空気が足りていない支管34に補填することも考えられる。しかし、その支管34において検出空気量が必要空気量に足りていない場合、圧損によりその支管34での圧力が不足している場合が考えられる。従って、この場合、例え導入弁36を調整しても圧力が上がらず、支管34に空気を補填することができないおそれがある。それに対し、本実施形態では、圧損を加味して管内圧を上昇させているため、導入弁36を調整しても空気を補填できない場合であっても、適切に必要な空気を補填することができる。
以上説明した第2実施形態における送風管30の管内圧の補正フローを、フローチャートに基づき説明する。図9は、第2実施形態に係る管内圧の補正フローを説明するフローチャートである。図9は、図5に示す処理を実行しており、送風管30(母管32)が、目標管内圧PYとなった後の処理である。そして、差分空気量算出部79Aは、検出空気量取得部71から総検出空気量の値を取得し、必要空気量取得部72から、総必要空気量の値を取得している。図9に示すように、空気供給量制御部40Aは、差分空気量算出部79Aにより、総検出空気量が総必要空気量と異なるかを判断する(ステップS50)。差分空気量算出部79Aは、総検出空気量と総必要空気量との差が所定の閾値以上である場合に、総検出空気量が総必要空気量と異なると判断し、総検出空気量と総必要空気量との差が所定の閾値より低い場合に、総検出空気量が総必要空気量と同じであると判断してもよい。総検出空気量が総必要空気量と異ならない場合(ステップS50;No)、ステップS62に移動する。
総検出空気量が総必要空気量と異なる場合(ステップS50;Yes)、空気供給量制御部40Aは、差分空気量算出部79Aにより、差分空気量を算出し(ステップS52)、目標管内圧算出部74により、差分空気量から差分送風管損失圧力を算出し(ステップS54)、差分送風管損失圧力から差分管内圧を算出する(ステップS56)。差分管内圧を算出した後、空気供給量制御部40Aは、目標管内圧算出部74により、差分管内圧と目標管内圧とから補正目標管内圧を算出する(ステップS58)。すなわち、目標管内圧算出部74は、差分管内圧で目標管内圧を補正して、補正した値を補正目標管内圧とする。補正目標管内圧を算出した後、空気供給量制御部40Aは、送風制御部76により、送風管30(母管32)内における圧力が、補正目標管内圧となるように、送風ユニット20からの空気供給を制御する(ステップS60)。その後、ステップS62に移動し、処理を終了する場合(ステップS62;Yes)、本処理を終了し、処理を終了しない場合(ステップS62;No)、ステップS50に戻り処理を繰り返す。
以上説明したように、第2実施形態に係る空気供給量制御部40Aは、差分空気量算出部79Aを有する。差分空気量算出部79Aは、総検出空気量が総必要空気量と異なる場合に、必要空気量と検出空気量の差分である差分空気量を、反応槽10毎に算出する。第2実施形態に係る目標管内圧算出部74は、差分空気量の空気を送風管30内に供給した場合における送風管30内の圧力損失(差分送風管損失圧力)に基づき、目標管内圧PYを補正する。第2実施形態に係る送風制御部76は、送風管30内における圧力が補正した目標管内圧PY(補正目標管内圧)となるように、送風ユニット20からの空気供給を制御する。
第2実施形態に係る廃水処理システム1は、総検出空気量が総必要空気量と異なる場合に、差分送風管損失圧力に基づき、目標管内圧PYを補正し、送風管30内の圧力を、その補正した目標管内圧PY(補正目標管内圧)に補正する。従って、第2実施形態に係る廃水処理システム1は、例えば劣化などにより圧力損失に変動が生じた場合も、反応槽10に必要な空気を適切に供給することが可能となる。
以上、本発明の実施形態を説明したが、これら実施形態等の内容により実施形態が限定されるものではない。また、前述した構成要素には、当業者が容易に想定できるもの、実質的に同一のもの、いわゆる均等の範囲のものが含まれる。さらに、前述した構成要素は適宜組み合わせることが可能である。さらに、前述した実施形態等の要旨を逸脱しない範囲で構成要素の種々の省略、置換又は変更を行うことができる。
1 廃水処理システム
10 反応槽
12 散気部
20 送風ユニット
22 送風機
30 送風管
31 導入管
32 母管
34 支管
40 空気供給量制御部
42 制御部
43 硝酸計
44 アンモニア計
46 吸気測定部
47 母管内圧測定部
48 支管空気量測定部
70 水質測定結果取得部
72 必要空気量取得部
74 目標管内圧算出部
76 送風制御部
78 導入空気制御部
82 関係記憶部
84 必要空気量算出部
W 廃水
10 反応槽
12 散気部
20 送風ユニット
22 送風機
30 送風管
31 導入管
32 母管
34 支管
40 空気供給量制御部
42 制御部
43 硝酸計
44 アンモニア計
46 吸気測定部
47 母管内圧測定部
48 支管空気量測定部
70 水質測定結果取得部
72 必要空気量取得部
74 目標管内圧算出部
76 送風制御部
78 導入空気制御部
82 関係記憶部
84 必要空気量算出部
W 廃水
Claims (8)
- 廃水に生物処理を行う複数の反応槽と、
複数の前記反応槽に接続される管である送風管と、
前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、
前記反応槽への空気供給量を制御する空気供給量制御部と、を有し、
前記空気供給量制御部は、
前記反応槽に設けられて、前記反応槽内の廃水の状態を測定する水質測定部と、
前記水質測定部の測定結果に基づき、前記反応槽内の廃水を所定の目標水質にするための必要空気量を前記各反応槽毎に取得する必要空気量取得部と、
前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出部と、
前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御部と、
を有する、廃水処理システム。 - 前記目標管内圧算出部は、前記送風管損失圧力と、前記反応槽内に設けられて前記送風管からの空気を前記反応槽内に散気する散気部の圧力損失による損失圧力と、前記反応槽内の廃水の水頭圧とを合計して、前記目標管内圧がその合計値以上となるように、前記目標管内圧を算出する、請求項1に記載の廃水処理システム。
- 前記送風管は、前記送風ユニットに接続される母管と、前記母管から分岐して複数の前記反応槽にそれぞれ接続される複数の支管と、前記支管に設けられた導入弁と、複数の前記支管のそれぞれに供給される空気量を検出空気量として測定する支管空気量測定部と、を有し、
前記空気供給量制御部は、前記支管のそれぞれにおいて、前記検出空気量が前記必要空気量となるように、前記導入弁の開度を調整する導入空気制御部を有する、請求項1又は請求項2に記載の廃水処理システム。 - 前記空気供給量制御部は、前記支管毎の前記検出空気量の合計値である総検出空気量が、前記必要空気量の前記反応槽毎の合計値である総必要空気量と異なる場合に、前記必要空気量と前記検出空気量の差分である差分空気量を、前記反応槽毎に算出する差分空気量算出部を更に有し、
前記目標管内圧算出部は、前記差分空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失による損失圧力に基づき、前記目標管内圧を補正し、
前記送風制御部は、前記送風管内における圧力が補正した前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する、請求項1から請求項3のいずれか1項に記載の廃水処理システム。 - 前記必要空気量取得部は、
前記反応槽に供給される空気量とその量の空気が供給された場合の前記反応槽内の水質の変化量との関係である水質空気量関係を記憶する関係記憶部と、
前記水質空気量関係と、前記水質測定部による水質測定結果と、前記目標水質とに基づき、前記廃水の水質を前記目標水質に変化させるために必要な空気量を、前記必要空気量として算出する必要空気量算出部と、を有する、請求項1から請求項4のいずれか1項に記載の廃水処理システム。 - 前記関係記憶部は、前記廃水の水質の変化が前記反応槽内に供給される空気量の変化に対して遅れる一次遅れ系として、前記水質空気量関係を記憶し、
前記必要空気量算出部は、前記水質測定部による所定の時間の経過毎の前記水質測定結果に基づき、前記必要空気量を更新する、請求項5に記載の廃水処理システム。 - 廃水に生物処理を行う複数の反応槽と、複数の前記反応槽に接続される管である送風管と、前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、を有する廃水処理装置の空気供給量を制御する空気供給量制御装置であって、
前記反応槽に設けられて、前記反応槽内の廃水の状態を測定する水質測定部と、
前記水質測定部の測定結果に基づき、前記反応槽の廃水が所定の目標水質となるための必要空気量を前記各反応槽毎に取得する必要空気量取得部と、
前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出部と、
前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御部と、
を有する、
空気供給量制御装置。 - 廃水に生物処理を行う複数の反応槽と、複数の前記反応槽に接続される管である送風管と、前記送風管を介して、複数の前記反応槽に前記生物処理を行うための空気を供給する送風ユニットと、を有する廃水処理装置の空気供給量を制御する空気供給量制御方法であって、
前記反応槽内の廃水の状態を測定する測定ステップと、
前記廃水の状態の測定結果に基づき、前記反応槽の廃水が所定の目標水質となるための必要空気量を前記各反応槽毎に取得する必要空気量取得ステップと、
前記必要空気量の空気を前記送風管内に供給した場合における前記送風管内の圧力損失により損失される空気の圧力である送風管損失圧力を算出し、前記送風管損失圧力に基づき前記送風管内の目標管内圧を算出し、前記必要空気量の変化に応じて、算出する前記目標管内圧を変化させる目標管内圧算出ステップと、
前記送風管内における圧力が前記目標管内圧となるように、前記送風ユニットからの空気供給を制御する送風制御ステップと、
を有する、
空気供給量制御方法。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP17904334.4A EP3604236A4 (en) | 2017-03-30 | 2017-08-03 | WASTE WATER TREATMENT SYSTEM, AIR DISTRIBUTION VOLUME REFERENCE DEVICE AND AIR DISTRIBUTION VOLUME REGULATION PROCESS |
| US16/583,755 US11597667B2 (en) | 2017-03-30 | 2019-09-26 | Wastewater treatment system, air supply amount control device, and air supply amount control method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017-069281 | 2017-03-30 | ||
| JP2017069281A JP2018167249A (ja) | 2017-03-30 | 2017-03-30 | 廃水処理システム、空気供給量制御装置及び空気供給量制御方法 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/583,755 Continuation US11597667B2 (en) | 2017-03-30 | 2019-09-26 | Wastewater treatment system, air supply amount control device, and air supply amount control method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018179476A1 true WO2018179476A1 (ja) | 2018-10-04 |
Family
ID=63674662
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2017/028302 Ceased WO2018179476A1 (ja) | 2017-03-30 | 2017-08-03 | 廃水処理システム、空気供給量制御装置及び空気供給量制御方法 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US11597667B2 (ja) |
| EP (1) | EP3604236A4 (ja) |
| JP (3) | JP2018167249A (ja) |
| WO (1) | WO2018179476A1 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4043407A4 (en) * | 2019-10-07 | 2023-11-01 | Metawater Co., Ltd. | WATER TREATMENT SYSTEM, WATER TREATMENT PROCESS AND PROGRAM |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL2018967B1 (en) * | 2017-05-23 | 2018-12-04 | Haskoningdhv Nederland Bv | Controlled simultaneous nitrification and denitrification in wastewater treatment |
| CN113213646A (zh) * | 2021-04-29 | 2021-08-06 | 北京城市排水集团有限责任公司 | 一种污水处理系统鼓风机控制装置及控制方法 |
| CA3239335A1 (en) * | 2021-12-02 | 2023-06-08 | Amit Gupta | Use of a chlorine dioxide precursor for controlling ion metabolism of bacteria in cooling water systems |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS56129088U (ja) | 1980-02-29 | 1981-10-01 | ||
| JPS56129088A (en) * | 1980-03-13 | 1981-10-08 | Ebara Corp | Control of air blow in sewage disposal |
| JPS5827692A (ja) * | 1981-08-11 | 1983-02-18 | Toshiba Corp | 曝気槽風量制御装置 |
| JPS60125297A (ja) * | 1983-12-12 | 1985-07-04 | Toshiba Corp | 曝気槽の溶存酸素濃度制御方法 |
| JPS61129092A (ja) * | 1984-11-29 | 1986-06-17 | Japan Organo Co Ltd | 曝気槽の送気量制御装置 |
| JPS61157397A (ja) * | 1984-12-29 | 1986-07-17 | Shinko Electric Co Ltd | 溶存酸素濃度制御装置 |
| JPS61143697U (ja) * | 1985-02-28 | 1986-09-04 | ||
| JPH0947780A (ja) | 1995-08-10 | 1997-02-18 | Meidensha Corp | 循環式硝化脱窒法における硝化反応制御方法及び装置 |
| JP2015182036A (ja) * | 2014-03-25 | 2015-10-22 | 三機工業株式会社 | 散気装置及び洗浄方法 |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR1414886A (fr) * | 1964-09-08 | 1965-10-22 | Epuration & D Assainissement S | Installation de surpression de fluide gazeux à débit variable |
| JPS5648231B2 (ja) | 1974-03-15 | 1981-11-14 | ||
| US6878856B2 (en) * | 2002-03-14 | 2005-04-12 | The United States Of America As Represented By The Secretary Of The Army | System and method for bioremediating wastestreams containing energetics |
| US7320749B2 (en) * | 2004-02-09 | 2008-01-22 | Eco-Oxygen Technologies, Llc | Method and apparatus for control of a gas or chemical |
| US7282141B2 (en) * | 2005-05-16 | 2007-10-16 | Koopmans Richard J | Mixer and process controller for use in wastewater treatment processes |
| US7153429B1 (en) * | 2005-05-25 | 2006-12-26 | Pedros Philip B | Method of optimizing influent conditions and chemical addition control for biological denitrification |
| CN1837088A (zh) * | 2006-04-20 | 2006-09-27 | 上海昊沧系统控制技术有限责任公司 | 鼓风曝气系统配气调节方法 |
| US7695624B2 (en) * | 2008-06-09 | 2010-04-13 | Otv Sa | Method and system for treating water and utilizing a membrane filtering system |
| JP5177802B2 (ja) * | 2009-03-25 | 2013-04-10 | 株式会社日立プラントテクノロジー | 廃水処理方法及び廃水処理装置 |
| EP2437870A1 (en) * | 2009-06-02 | 2012-04-11 | Siemens Industry, Inc. | Membrane cleaning with pulsed gas slugs and global aeration |
| JP5775296B2 (ja) | 2010-12-27 | 2015-09-09 | 株式会社ウォーターエージェンシー | 下水処理場の運転支援装置及び運転支援方法 |
| EP2824081B1 (en) * | 2012-03-09 | 2022-02-23 | Metawater Co., Ltd. | Wastewater treatment method |
| EP2824080A4 (en) * | 2012-03-09 | 2015-10-28 | Metawater Co Ltd | WASTEWATER PROCESSING DEVICE, WASTEWATER PROCESSING, WASTEWATER PROCESSING SYSTEM, CONTROL DEVICE, CONTROL PROCESS AND PROGRAM |
| US20170313608A1 (en) * | 2013-03-14 | 2017-11-02 | Frontier Water Systems, Llc | Fail Safe Flushing BioReactor for Selenium Water Treatment |
| US10894724B2 (en) * | 2015-07-08 | 2021-01-19 | California Institute Of Technology | Maintenance self-diagnosis and guide for a self-contained wastewater treatment system |
| US9994466B2 (en) * | 2016-10-04 | 2018-06-12 | Georgia Aquarium Inc. | Removing nitrate from water |
| US10258952B2 (en) * | 2017-03-31 | 2019-04-16 | Larry John Dove | Method for increasing gas components in a fluid |
-
2017
- 2017-03-30 JP JP2017069281A patent/JP2018167249A/ja active Pending
- 2017-08-03 EP EP17904334.4A patent/EP3604236A4/en active Pending
- 2017-08-03 WO PCT/JP2017/028302 patent/WO2018179476A1/ja not_active Ceased
-
2019
- 2019-09-26 US US16/583,755 patent/US11597667B2/en active Active
-
2021
- 2021-08-06 JP JP2021130238A patent/JP7247283B2/ja active Active
-
2023
- 2023-03-16 JP JP2023042406A patent/JP7586949B2/ja active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS56129088U (ja) | 1980-02-29 | 1981-10-01 | ||
| JPS56129088A (en) * | 1980-03-13 | 1981-10-08 | Ebara Corp | Control of air blow in sewage disposal |
| JPS5827692A (ja) * | 1981-08-11 | 1983-02-18 | Toshiba Corp | 曝気槽風量制御装置 |
| JPS60125297A (ja) * | 1983-12-12 | 1985-07-04 | Toshiba Corp | 曝気槽の溶存酸素濃度制御方法 |
| JPS61129092A (ja) * | 1984-11-29 | 1986-06-17 | Japan Organo Co Ltd | 曝気槽の送気量制御装置 |
| JPS61157397A (ja) * | 1984-12-29 | 1986-07-17 | Shinko Electric Co Ltd | 溶存酸素濃度制御装置 |
| JPS61143697U (ja) * | 1985-02-28 | 1986-09-04 | ||
| JPH0947780A (ja) | 1995-08-10 | 1997-02-18 | Meidensha Corp | 循環式硝化脱窒法における硝化反応制御方法及び装置 |
| JP2015182036A (ja) * | 2014-03-25 | 2015-10-22 | 三機工業株式会社 | 散気装置及び洗浄方法 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4043407A4 (en) * | 2019-10-07 | 2023-11-01 | Metawater Co., Ltd. | WATER TREATMENT SYSTEM, WATER TREATMENT PROCESS AND PROGRAM |
| US12378143B2 (en) | 2019-10-07 | 2025-08-05 | Metawater Co., Ltd. | Water treatment system, water treatment method, and recording medium |
Also Published As
| Publication number | Publication date |
|---|---|
| US20200017386A1 (en) | 2020-01-16 |
| JP7247283B2 (ja) | 2023-03-28 |
| JP2023063543A (ja) | 2023-05-09 |
| EP3604236A4 (en) | 2020-12-02 |
| US11597667B2 (en) | 2023-03-07 |
| JP2018167249A (ja) | 2018-11-01 |
| EP3604236A1 (en) | 2020-02-05 |
| JP2021176638A (ja) | 2021-11-11 |
| JP7586949B2 (ja) | 2024-11-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7586949B2 (ja) | 水処理システム、制御装置及び制御方法 | |
| JP5685504B2 (ja) | 水処理システムおよびその曝気風量制御方法 | |
| CN101913699A (zh) | 在废水处理生物反应器区室中提供需氧介质的方法及相关系统 | |
| JP5733785B2 (ja) | 排水処理方法及び排水処理装置 | |
| WO2016014723A1 (en) | A method for deammonification process control using ph, specific conductivity, or ammonia | |
| CN110862141B (zh) | 溶解氧自适应控制装置及其方法 | |
| JP2012170883A (ja) | 活性汚泥処理装置及びその処理方法 | |
| JP7194628B2 (ja) | 排水処理装置及び排水処理方法 | |
| CN211546081U (zh) | 溶解氧自适应控制装置 | |
| JP6677502B2 (ja) | 廃水処理システム、空気供給量制御装置及び空気供給量制御方法 | |
| KR101871931B1 (ko) | 하폐수처리 설비의 통합 질소제어 시스템의 운전방법 | |
| JP6246624B2 (ja) | 排水の処理装置および排水の処理方法 | |
| JP6391325B2 (ja) | N2o抑制型水処理方法及び処理装置 | |
| CN108025935B (zh) | 水处理系统 | |
| JP2015054271A (ja) | 排水の処理装置および排水の処理方法 | |
| JP2016159277A (ja) | 曝気風量制御装置及び曝気風量制御システム | |
| CN113354069B (zh) | 一种mbr工艺精确曝气控制系统及方法 | |
| JP6893546B2 (ja) | 下水処理システムおよび下水処理方法 | |
| US12378143B2 (en) | Water treatment system, water treatment method, and recording medium | |
| CN111217449A (zh) | 基于精准控制氧气输入的污水处理装置及方法 | |
| JP2021171726A (ja) | 風量制御装置及び風量制御方法 | |
| JP2015054270A (ja) | 排水の処理装置および排水の処理方法 | |
| JP5802426B2 (ja) | 生物学的水処理装置 | |
| Puig et al. | On-line oxygen uptake rate as a new tool for monitoring and controlling the SBR process | |
| CN106068511B (zh) | 用于好氧处理的设备和控制方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17904334 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2017904334 Country of ref document: EP Effective date: 20191030 |