[go: up one dir, main page]

WO2018146754A1 - スラグのフォーミング抑制方法 - Google Patents

スラグのフォーミング抑制方法 Download PDF

Info

Publication number
WO2018146754A1
WO2018146754A1 PCT/JP2017/004613 JP2017004613W WO2018146754A1 WO 2018146754 A1 WO2018146754 A1 WO 2018146754A1 JP 2017004613 W JP2017004613 W JP 2017004613W WO 2018146754 A1 WO2018146754 A1 WO 2018146754A1
Authority
WO
WIPO (PCT)
Prior art keywords
slag
pan
converter
discharged
molten
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2017/004613
Other languages
English (en)
French (fr)
Inventor
政樹 宮田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to CN201780082285.XA priority Critical patent/CN110139938A/zh
Priority to KR1020197018163A priority patent/KR20190089018A/ko
Priority to PCT/JP2017/004613 priority patent/WO2018146754A1/ja
Publication of WO2018146754A1 publication Critical patent/WO2018146754A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/46Details or accessories

Definitions

  • the present invention particularly relates to a method for suppressing the slag discharged to the slag pan after hot metal treatment from forming (foaming) in the slag pan.
  • FeO (iron oxide) in the slag reacts with C in the molten iron, or FeO in the slag reacts with C in the granular iron contained in the slag.
  • a large amount of fine CO bubbles may be generated and form.
  • the forming in the slag pan is suppressed or quickly settled down. It is necessary to.
  • a technique for suppressing forming or quickly calming down and maintaining the calmed state is indispensable.
  • said dephosphorization and slopping can be suppressed by increasing the amount of CaO used by decarburization blowing after exhausting.
  • the amount of slag having a high CaO concentration is increased, which is not preferable from the viewpoint of not only the refining cost but also the slag treatment.
  • Patent Document 2 discloses a calming method in which carbon powder is sprayed onto a forming slag at a rate of 5 to 100 kg / min. Since carbon is difficult to wet with slag, when carbon powder is blown into the forming slag, coalescence and floating separation of fine CO bubbles are promoted through the carbon powder, so that the forming is calmed down.
  • Patent Document 3 discloses a method of spraying sprayed water on the surface of the slag in the slag pan as a method for suppressing slag forming in the slag pan. It is said that forming can be suppressed by cooling and solidifying the slag surface layer in the slag pan.
  • the present invention provides a slag forming suppression method that efficiently suppresses foaming without extending the slag discharge time when discharging slag from a converter to a waste ladle. With the goal.
  • the present inventor has found that the above problem can be solved by introducing water and crushed slag, which are inexpensive and easily available, with simple equipment into the slag pan as a forming inhibitor. Completed the invention.
  • the present invention is listed below. (1) After the hot metal treatment is performed in the converter, the molten slag is discharged from the converter to the discharge pan at a rate of 3 tons or more per minute, and after the discharge starts until the end of the discharge.
  • the molten slag discharged from the converter from 50.0 kg to 200 kg per minute of water from above the drain pan and 50.0 kg to 200 kg of crushed slag having a particle size of 5.0 mm to 30 mm per minute.
  • crushed slag is at least one selected from the group consisting of desiliconized slag, hot metal dephosphorized slag, converter slag, and ladle slag. Suppression method.
  • the slag discharge time is not extended and the forming can be efficiently suppressed.
  • FIG. 1 is a diagram for explaining a method of suppressing slag forming in the slag pan.
  • FIG. 1 is a view for explaining a method of suppressing slag forming in the slagging pan 2.
  • the example shown in FIG. 1 shows an example in which molten slag is discharged from the converter 1 to the discharge pan 2 in the multi-function converter method.
  • the converter 1 is tilted while the hot metal remains in the converter 1, and melted from the furnace port 3 of the converter 1 to the slag pan 2 installed below the converter 1.
  • Slag is discharged, for example, 12t to 14t.
  • the molten slag surface It is necessary to put the molten slag surface in a range where the surface of the slag is flowing vigorously.
  • the range is an area surrounded by a circumference 1 m away from the outer circumference of the slag flow at the position where the molten slag flow arrives.
  • the formation of molten slag in the waste pan 2 is suppressed.
  • the molten slag was discharged for about 3 minutes.
  • the mass of the molten slag in waste can be measured with the weighing machine attached to the mobile trolley which installs the waste pan 2, the mass of molten slag may be estimated from operation conditions and results. . However, the mass of the crushed slag introduced from the chute is subtracted and calculated.
  • the crushed slag it is preferable to wet the crushed slag with water in advance, and it is more preferable to keep it hydrated. This is because the water and the crushed slag can be more reliably involved in the forming slag.
  • water and crushed slag may be supplied together from the pipe 4. In the example shown in FIG. 1, an example is shown in which water and crushed slag are put together from a pipe 4. In this case, the diameter of the pipe 4 only needs to be large enough to prevent crushing slag from being blocked in the pipe.
  • the molten slag discharged from the converter 1 to the waste pan 2 has, for example, a CaO / SiO 2 mass ratio (basicity) of 0.8 to 2.0 and an FeO concentration of 10 to 40 mass%. .
  • the molten slag is struck against the bottom of the sewage pan 2, so that the molten slag is vigorously stirred and the fine CO bubbles inside the molten slag are combined and floated.
  • emitted molten slag is rapidly cooled by contacting with the bottom of the discharge pan 2, the solid-phase rate of molten slag rises.
  • the solid phase rate of the bottom side of the waste pan 2 and the surface layer of the molten slag is increased, forming is temporarily suppressed, but the molten slag in the waste pan 2 is discharged from the converter 1 one after another. When it comes into contact with the molten slag and melts again, it begins to form.
  • the crushed slag that is introduced together with water destroys the solidified surface layer of the molten slag in the slag pan 2, water enters the molten slag in the slag pan 2 and is cooled to further form. Can be suppressed.
  • a slag pool is generated in the slag pan 2, and molten slag is discharged from the converter 1 to the slag pool one after another. Then, water and crushed slag are continuously introduced to the vicinity of the position where the molten slag discharged from the converter 1 reaches the inside of the slagging pan 2, and the water and crushed slag are entrained in the molten slag, which is the same as the initial stage of sewage Such an effect is exhibited.
  • the range that can enter the molten slag is limited, and the forming suppression effect is also limited.
  • the crushed slag is not added, when the water is vaporized, the surrounding molten slag is rapidly cooled to form a solidified shell, and most of the water vapor generated by the vaporization is blown upward. This narrows the cooling range of the molten slag.
  • the crushed slag when crushed slag is added together with water, the crushed slag physically breaks the solidified shell of the slag generated by the vaporization of water, so water enters the molten slag from the portion where the solidified shell is broken into the molten slag.
  • the molten slag can be cooled in a wider range to increase the solid phase ratio, and forming can be efficiently suppressed.
  • the speed of discharging the molten slag to a discharge slag pot having an internal volume of 30 m 3 ⁇ 70m 3 shall be more than 3 tons per minute from the viewpoint of not extending the operating time of the converter.
  • it is 4 tons or more.
  • it does not specifically limit about an upper limit, Since the momentum of the molten slag which falls will increase and it will become easy to jump out of a waste pan, it is preferable to set it as 6 tons or less per minute. More preferably, it is 5 tons or less.
  • crushed slag having a particle size of less than 5.0 mm, the solidified shell of molten slag generated by rapid cooling by vaporization of water cannot be destroyed.
  • the crushed slag to be added may contain crushed slag having a particle size of less than 5.0 mm and greater than 30 mm, and at least 50.0 kg to 200 kg of crushed slag having a particle size of 5.0 mm to 30 mm is charged per minute. do it. More preferably, the particle size of the crushed slag is 8.0 mm to 20 mm, more preferably 10 mm to 15 mm. The input amount of crushed slag will be described later.
  • the amount of water is preferably 70 kg to 150 kg per minute, more preferably 100 kg to 120 kg.
  • the crushed slag is 70 kg to 150 kg per minute, more preferably 100 kg to 120 kg.
  • any of converter slag, desiliconization slag, hot metal dephosphorization slag, ladle slag (ingot slag) may be sufficient. This is because the above-described strength and specific gravity are required to break down the slag solidified shell generated when water is vaporized.
  • the representative composition of the slag is shown in Table 1.
  • Converter slag is slag discharged from the furnace after decarburization and blowing in the converter, and the basicity is generally about 3 to 5.
  • the desiliconized slag is slag having a high SiO 2 concentration that is produced when iron oxide or oxygen gas is added to the hot metal to oxidize [Si] in the hot metal.
  • the hot metal dephosphorization slag is a slag in which CaO, iron oxide and oxygen gas are added to oxidize [P] in the hot metal to (P 2 O 5 ) and take it in.
  • the ladle slag is a slag having a high concentration of Al 2 O 3 remaining in the ladle after discharging the molten steel to the continuous casting machine.
  • the present invention will be further described based on examples, but the conditions in the examples are one example of conditions adopted for confirming the feasibility and effects of the present invention. It is not limited to the example conditions.
  • the present invention can adopt various conditions as long as the object of the present invention is achieved without departing from the gist of the present invention.
  • Example 1 After the hot metal dephosphorization process by the multi-functional converter method, the converter is tilted while the hot metal remains in the converter, and the furnace furnace port is placed at the discharge pan with a volume of 50 m 3 installed below the furnace body. From about 14 tons of molten slag having a basicity of about 1 was discharged over about 3 minutes. In addition, when discharging molten slag, from immediately after the start of sewage to the end of sewage, 100 kg of water per minute is introduced from the pipe, and at the same time, converter slag having a composition shown in Table 1 of 200 kg per minute (particle size 5 (0.0 mm to 30 mm) was introduced from the chute.
  • the slag discharge time is not extended and the forming can be efficiently suppressed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

転炉で溶銑処理が行われた後に、前記転炉から排滓鍋へ溶融スラグを1分当たり3トン以上の速度で排出し、前記排出し始めた後から排滓終了時点以降まで、前記排滓鍋の上方から水を1分当たり50.0kg~200kg、及び粒径5.0mm~30mmの破砕スラグを1分当たり50.0kg~200kgを、前記転炉から排出された溶融スラグが前記排滓鍋内に到達する位置付近へ投入し続ける。

Description

スラグのフォーミング抑制方法
 本発明は、特に溶銑処理後に排滓鍋へ排出したスラグが、排滓鍋内でフォーミング(泡立ち)するのを抑制する方法に関する。
 近年、溶銑を精錬して溶鋼を製造する際に、転炉で溶銑脱りん処理を行った後に、転炉内で生成されたスラグの一部を転炉の下に設置された排滓鍋に排出し、引き続き脱炭処理を行う方法(多機能転炉法)が行われている(特許文献1参照)。この方法では、転炉内においてスラグ成分のCaO/SiO2質量比(以下、塩基度と称す)を0.8~1.5に調整し、スラグの粘性を高めてスラグが激しく泡立つ現象(以下、フォーミング)を起こり易くすることにより、スラグの排出性を良好にしている。
 このように製鋼工程では、スラグ中のFeO(酸化鉄)と溶鉄中のCとが界面で反応したり、スラグ中のFeOとスラグ内部に含まれる粒鉄中のCとが反応したりして微細なCO気泡が多量に発生し、フォーミングする場合がある。
 例えば、転炉からスラグを排滓鍋へ排出した際に、スラグが落下したエネルギーによりスラグとスラグ中の粒鉄とで攪拌及び混合が激しく生じ、スラグ中のFeOと粒鉄中のCとが急激に反応して微細なCO気泡が多量に発生する。その結果、排滓鍋へ排出された直後からスラグは急速にフォーミングし易くなる。また、一旦フォーミングを沈静させても、次々に排出されてくるスラグによって継続的にフォーミングし易い。
 従って、排滓鍋からスラグが横溢することを防止しつつ、このようなスラグを転炉より短時間に大量に排滓鍋内へ排出するには、排滓鍋におけるフォーミングを抑制もしくは迅速に沈静することが必要である。そのためには、フォーミングを抑制させるか、または迅速に沈静させ、且つその沈静状態を持続させる技術が不可欠である。
 なお、排滓鍋内のフォーミング抑制効果が不足している場合は、排滓鍋からスラグが横溢することを回避するために、排滓速度を低減したり排滓量を削減したりする必要がある。この場合には、転炉のサイクルタイムが延長して生産性が低下したり、排滓後の脱炭処理における復りんが増大したり、スロッピングが発生したりするという問題を引き起こしてしまう。
 なお、排滓後の脱炭吹錬でCaO使用量を増やすことにより上記の復りんおよびスロッピングを抑制できる。ところが、この場合には、CaO濃度が高いスラグの生成量が増加することになり、精錬コストだけでなく、スラグ処理の観点からも好ましくない。
 一方、フォーミング沈静材として炭素粉が有効であることが知られている。例えば特許文献2には、フォーミングしているスラグに炭素粉を5~100kg/分の速度で吹き付ける沈静方法が開示されている。炭素はスラグと濡れ難いため、フォーミングしているスラグに炭素粉を吹き込むと、炭素粉を介して微細なCO気泡同士の合体及び浮上分離が促進されるため、フォーミングが沈静されるとしている。
 また、特許文献3には、排滓鍋(スラグパン)内のスラグのフォーミング抑制方法として、排滓鍋内のスラグ表面に噴霧状の水を散布する方法が開示されている。排滓鍋内のスラグ表層部を冷却して固化することにより、フォーミングを抑制できるとしている。
 排滓鍋においてフォーミングを沈静するために、特許文献2に記載の方法のように炭素粉をスラグ表面へ吹き付ける場合、炭素粉は比重が小さく、体積も小さいため、炭素粉がスラグ内部へ侵入し難い。その結果、炭素粉の効果はスラグ表面側のみに現れ、激しくフォーミングする状況下ではほとんど効果が無い。また、炭素粉をスラグ中へ吹き込むには、吹き込み用ランスの昇降装置等の複雑で高価な設備を排滓鍋付近に設置する必要があるという問題がある。
 また、特許文献3に記載の方法のように排滓鍋内のスラグ表面に噴霧状の水を散布して排滓鍋内のスラグ表面を冷却及び固化してフォーミングを抑制しようとすることも考えられる。しかしながら、転炉からスラグが次々に排出される状況では、スラグ落下流により攪拌混合が激しく生じ、スラグ表面が継続的に更新されてしまうため、フォーミングを抑制するのは難しい。
特許第2582692号公報 特開平4-180507号公報 特開平8-325619号公報
 本発明は前述の問題点に鑑み、転炉から排滓鍋へスラグを排出する際に、スラグの排出時間を延長させないようにして、効率良くフォーミングを抑制するスラグのフォーミング抑制方法を提供することを目的とする。
 本発明者は、鋭意検討を重ねた結果、簡便な設備により安価で入手が容易な水と破砕スラグとをフォーミング抑制材として排滓鍋へ投入することにより上記課題を解決できることを知見し、本発明を完成した。本発明は、以下に列記の通りである。
(1)転炉で溶銑処理が行われた後に、前記転炉から排滓鍋へ溶融スラグを1分当たり3トン以上の速度で排出し、前記排出し始めた後から排滓終了時点以降まで、前記排滓鍋の上方から水を1分当たり50.0kg~200kg、及び粒径5.0mm~30mmの破砕スラグを1分当たり50.0kg~200kgを、前記転炉から排出された溶融スラグが前記排滓鍋内に到達する位置付近へ投入し続けることを特徴とするスラグのフォーミング抑制方法。
(2)前記破砕スラグが、脱珪スラグ、溶銑脱りんスラグ、転炉スラグ、及び取鍋スラグからなる群から選ばれる1種以上であることを特徴とする(1)に記載のスラグのフォーミング抑制方法。
 本発明によれば、転炉から排滓鍋へスラグを排出する際に、スラグの排出時間を延長させないようにして、効率良くフォーミングを抑制することができる。
図1は、排滓鍋内におけるスラグのフォーミングを抑制する方法を説明するための図である。
 以下、添付した図面を参照しつつ、本発明を具体化した実施形態について説明する。
 図1は、排滓鍋2内におけるスラグのフォーミングを抑制する方法を説明するための図である。
 図1に示す例は、多機能転炉法において転炉1から溶融スラグを排滓鍋2へ排滓する例を示している。まず、脱りん処理を行った後に溶銑を転炉1内に残したまま転炉1を傾転させ、転炉1の下方に設置した排滓鍋2へ、転炉1の炉口3から溶融スラグを例えば12t~14t排滓する。その際に、排滓開始直後から排滓終了時点以降まで、排滓鍋2の上方に設置した配管4から水を投入するとともに、排滓鍋2の上方に設置した不図示のシュートから破砕した破砕スラグを投入する。このとき、転炉1から排出された溶融スラグ流が排滓鍋2内に到達する位置付近へ水及び破砕スラグを投入する。なお、溶融スラグ流が排滓鍋2内に到達する位置とは、排滓鍋2内の溶融スラグの表面に溶融スラグ流が到達する位置であって、水及び破砕スラグはその到達位置付近の溶融スラグ表面が激しく流動している範囲内へ投入する必要がある。その範囲内とは、溶融スラグ流が到達する位置でのスラグ流外周から1m離れた周で囲まれた領域である。これによって、排滓鍋2内の溶融スラグのフォーミングを抑制する。後述する実験では、この溶融スラグの排出時間は、約3分とした。なお、排滓中の溶融スラグの質量は、排滓鍋2を設置する移動台車に取り付けた秤量機で測定することができるが、操業条件と実績とから溶融スラグの質量を推定してもよい。但し、上記シュートから投入した破砕スラグの質量は差し引いて計算する。
 なお、予め破砕スラグを水に濡らしておくことが好ましく、含水させておくことがさらに好ましい。その方がフォーミングスラグ中へより確実に水と破砕スラグとを巻き込ませられるからである。また、配管4の径が比較的大きい場合には、配管4から水と破砕スラグとを一緒に投入してもよい。図1に示す例では、水と破砕スラグとを配管4から一緒に投入している例を示している。この場合、配管4の径は破砕スラグが配管内で閉塞しない程度の大きさであればよい。
 次に、転炉1から排滓鍋2へ溶融スラグを排出し始めた後から排滓終了時点以降まで、溶融スラグが排滓鍋2内に到達する位置付近へ水及び破砕スラグを投入することによって、排滓鍋2内における溶融スラグのフォーミングを抑制できる機構について詳述する。
 転炉1から排滓鍋2へ排出される溶融スラグは、例えばCaO/SiO2質量比(塩基度)が0.8~2.0であり、FeO濃度が10質量%~40質量%である。排滓初期においては、排滓鍋2の底に溶融スラグが叩き付けられるため、溶融スラグが強烈に攪拌されて溶融スラグ内部の微細なCO気泡が合体及び浮上分離される。また、排出された溶融スラグが排滓鍋2の底と接触することによって急冷されるため、溶融スラグの固相率が上昇する。このように溶融スラグの固相率が上昇した状態で、排滓鍋2の上方から水及び破砕スラグが投入されるため、転炉1から排出された溶融スラグは水分の気化によって更に急激に冷却され、溶融スラグの固相率がさらに増加して、フォーミングが更に顕著に抑制される。
 なお、排滓鍋2の底側および溶融スラグの表層の固相率が上昇してフォーミングが一時的に抑制されるが、排滓鍋2内の溶融スラグが転炉1から次々と排出される溶融スラグと接触して再度溶融すると、フォーミングし始めてしまう。それに対し、水と共に投入される破砕スラグが排滓鍋2中の溶融スラグの固化した表層部を破壊するため、排滓鍋2中の溶融スラグの内部まで水が入って冷却され、フォーミングを更に抑制できる。
 その後は、排滓鍋2内にスラグ溜まりが生じ、そのスラグ溜まりへ転炉1から溶融スラグが次々に排出されることになる。そして、転炉1から排出された溶融スラグが排滓鍋2内に到達する位置付近へ引き続き水及び破砕スラグが投入され、溶融スラグ中へ水及び破砕スラグが巻き込まれて、排滓初期と同じような効果が発揮される。このように、排滓初期から継続して水及び破砕スラグを投入し続けることにより、溶融スラグ中へ水及び破砕スラグを巻き込ませ、転炉1から排出された溶融スラグを順次冷却して溶融スラグの固相率を上昇させていくことにより、排滓鍋2内のスラグ溜まりのフォーミングを抑制することができる。この効果を確実に享受するためには、水及び破砕スラグを少なくとも排滓終了時点まで投入し続ける必要があるが、より確実にするためには排滓終了時点以降も水及び破砕スラグの投入を続けることが好ましい。この排滓終了時点以降の投入継続時間は、長過ぎても時間的に、かつ、コスト的に好ましくない上に、溶融スラグを完全に固めてしまう必要もないので、20秒間以内が適当である。
 ここで、水を投入するだけでは、溶融スラグへ侵入できる範囲が限られ、フォーミング抑制効果も限定的となる。破砕スラグを投入しない場合には、水が気化する際に周囲の溶融スラグを急冷し、凝固殻を形成してしまい、気化で生成した水蒸気の大部分が上方へ吹き出してしまう。これにより、溶融スラグの冷却範囲が狭くなってしまうのである。これに対し、水と共に破砕スラグを投入すると、水の気化で生じたスラグの凝固殻を破砕スラグが物理的に破壊するため、凝固殻が破壊された部分から破砕スラグと共に水が溶融スラグ中へ侵入することができ、より広い範囲で溶融スラグを冷却して固相率を上昇させてフォーミングを効率良く抑制できるようになる。
 次に、更なる好適な条件について述べる。以下、転炉で溶銑処理を行った後、排滓鍋へ溶融スラグを1分間に3トン以上排出し、水を1分当たり30.0kg~250kg、粒径1.0mm~50mmの破砕スラグを1分当たり30.0kg~250kg投入する条件範囲で検討し、得られた望ましい条件範囲について説明する。
 まず、内容積30m3~70m3の排滓鍋へ溶融スラグを排出する速度は、転炉の操業時間を延長させないという観点から1分当たり3トン以上とする。好ましくは4トン以上である。また、上限について特に限定しないが、速くするほど落下する溶融スラグの勢いが増して排滓鍋から飛び出しやすくなることから1分当たり6トン以下とすることが好ましい。より好ましくは5トン以下である。
 次に、水を1分当たり50.0kg~200kg、破砕スラグを1分当たり50.0kg~200kg量投入する条件で、破砕スラグの粒径範囲を変更させたところ、効果の得られる破砕スラグの粒径は5.0mm~30mmであることが分かった。5.0mm未満の粒径の破砕スラグでは、水の気化によって急冷して生成された溶融スラグの凝固殻を破壊することができない。
 一方、30mmを超える粒径の破砕スラグは重過ぎるため、転炉から排出された溶融スラグ流が排滓鍋内に到達する位置付近へ投入しても、落下してきた溶融スラグの運動エネルギーをもってしても破砕スラグが排滓鍋内であまり分散されない。なお、投入する破砕スラグに粒径が5.0mm未満および30mmを超える破砕スラグが含まれていてもよく、少なくとも5.0mm~30mmの粒径の破砕スラグを1分当たり50.0kg~200kg投入すればよい。より好ましくは破砕スラグの粒径が8.0mm~20mm、さらに好ましくは10mm~15mmである。破砕スラグの投入量については後述する。
 次に、粒径5.0mm~30mmの破砕スラグを1分当たり50.0kg~200kg量投入する条件で、水の投入速度を変更させたところ、水量は、1分当たり50.0kg~200kgとすることによって効果が得られることが分かった。また、この傾向は、破砕スラグを1分当たり50.0kg投入した場合も200kg投入した場合も同様であることがわかった。1分当たりの水量が50.0kgより少ないと、転炉から排出される溶融スラグを順次冷却しきれず、排滓途中からフォーミングが激しくなって排滓鍋上端から横溢してしまう。一方、1分当たりの水量が200kg以上にしても、排滓鍋内の溶融スラグのフォーミングは十分に抑制されているため、効果が飽和し水が無駄となる。好ましくは水量が1分当たり70kg~150kgで、より好ましくは100kg~120kgである。
 次に、水を1分当たり50.0kg~200kg投入し、破砕スラグの粒径を5.0mm~30mmとする条件で、破砕スラグの投入速度を変更させたところ、破砕スラグは1分当たり50.0kg~200kg投入することによって効果が得られることが分かった。また、この傾向は、水を1分当たり50.0kg投入した場合も200kg投入した場合も同様であることがわかった。1分当たりの破砕スラグ量が50.0kg未満だと、水の気化によって急冷して生成されたスラグの凝固殻を破砕スラグで破壊できる範囲が限られてしまい、溶融スラグの冷却範囲が狭くなってしまう。その結果、排滓途中からフォーミングが激しくなって排滓鍋上端から横溢してしまう。一方、1分当たりの破砕スラグ量が200kgを超えても、排滓鍋内の溶融スラグのフォーミングは十分に抑制されているため、効果が飽和し破砕スラグが無駄となる。好ましくは破砕スラグが1分当たり70kg~150kgで、より好ましくは100kg~120kgである。
 また、破砕スラグの種類としては、転炉スラグ、脱珪スラグ、溶銑脱りんスラグ、取鍋スラグ(造塊スラグ)のいずれでもよい。それは、上記した水の気化時に生成するスラグ凝固殻を破壊できる程度の強度と比重とを要しているためである。なお、上記スラグの代表組成を表1に記す。
Figure JPOXMLDOC01-appb-T000001
 転炉スラグは、転炉で脱炭吹錬した後に炉内から排出されたスラグで、塩基度は3~5程度が一般的である。脱珪スラグは、溶銑へ酸化鉄や酸素ガスを添加して溶銑中[Si]を酸化したときに生成するSiO濃度の高いスラグである。溶銑脱りんスラグは、CaOや酸化鉄、酸素ガスを添加して溶銑中[P]を酸化して(P)にし、それを取り込んだスラグである。取鍋スラグは、溶鋼を連続鋳造機へ排出した後、取鍋内に残っているAl濃度が高いスラグである。
 次に、本発明を実施例に基づいて更に説明するが、実施例での条件は、本発明の実施可能性及び効果を確認するために採用した一条件例であり、本発明は、この一条件例に限定されるものではない。本発明は、本発明の要旨を逸脱せず、本発明の目的を達成する限りにおいて、種々の条件を採用し得るものである。
 [実施例1]
 多機能転炉法により溶銑脱りん処理を行った後に、溶銑を転炉内に残したまま転炉を傾転させ、炉体下方に設置した容積が50m3の排滓鍋へ転炉炉口から塩基度約1の溶融スラグ約14tを、約3分間かけて排出した。また、溶融スラグを排出する際に、排滓開始直後から排滓終了まで、1分当たり100kgの水を配管から投入すると同時に1分当たり200kgの表1に示す組成の転炉スラグ(粒径5.0mm~30mm)をシュートから投入した。このとき、水及び転炉スラグを転炉から排出された溶融スラグ流が排滓鍋内に到達する位置付近へ投入し続けた。なお、排滓中の溶融スラグの質量は、排滓鍋を設置する移動台車に取り付けた秤量機で測定せず、操業条件と実績から推定した。但し、上記シュートから投入した破砕スラグの質量は差し引いた。
 その結果、転炉から排滓鍋内へ排出された溶融スラグはあまりフォーミングせず、排滓鍋から横溢することは無かった。
 [比較例1]
 多機能転炉法により溶銑脱りん処理を行った後に溶銑を転炉内に残したまま転炉を傾転させ、炉体下方に設置した容積が50m3の排滓鍋へ転炉炉口から塩基度約1の溶融スラグ約14tを、約3分間かけて排出した。また、溶融スラグを排出する際に、排滓開始直後から排滓終了まで、1分当たり40.0kgの水を配管から投入すると同時に1分当たり300kgの表1に示す組成の転炉スラグ(粒径5.0mm~30mm)をシュートから投入した。このとき、水及び転炉スラグを転炉から排出された溶融スラグ流が排滓鍋内に到達する位置付近へ投入し続けた。なお、排滓中の溶融スラグの質量は、操業条件と実績とから推定した。但し、上記シュートから投入した転炉スラグの質量は差し引いた。
 その結果、転炉から排滓鍋内へ排滓開始後、1.5分を過ぎた頃から、排滓鍋内の溶融スラグが激しくフォーミングして、排滓鍋から横溢した。
 本発明によれば、転炉から排滓鍋へスラグを排出する際に、スラグの排出時間を延長させないようにして、効率良くフォーミングを抑制することができる。

Claims (2)

  1.  転炉で溶銑処理が行われた後に、前記転炉から排滓鍋へ溶融スラグを1分当たり3トン以上の速度で排出し、前記排出し始めた後から排滓終了時点以降まで、前記排滓鍋の上方から水を1分当たり50.0kg~200kg、及び粒径5.0mm~30mmの破砕スラグを1分当たり50.0kg~200kgを、前記転炉から排出された溶融スラグが前記排滓鍋内に到達する位置付近へ投入し続けることを特徴とするスラグのフォーミング抑制方法。
  2.  前記破砕スラグが、脱珪スラグ、溶銑脱りんスラグ、転炉スラグ、及び取鍋スラグからなる群から選ばれる1種以上であることを特徴とする請求項1に記載のスラグのフォーミング抑制方法。
PCT/JP2017/004613 2017-02-08 2017-02-08 スラグのフォーミング抑制方法 Ceased WO2018146754A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201780082285.XA CN110139938A (zh) 2017-02-08 2017-02-08 抑制炉渣起泡的方法
KR1020197018163A KR20190089018A (ko) 2017-02-08 2017-02-08 슬래그의 포밍 억제 방법
PCT/JP2017/004613 WO2018146754A1 (ja) 2017-02-08 2017-02-08 スラグのフォーミング抑制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/004613 WO2018146754A1 (ja) 2017-02-08 2017-02-08 スラグのフォーミング抑制方法

Publications (1)

Publication Number Publication Date
WO2018146754A1 true WO2018146754A1 (ja) 2018-08-16

Family

ID=63108034

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/004613 Ceased WO2018146754A1 (ja) 2017-02-08 2017-02-08 スラグのフォーミング抑制方法

Country Status (3)

Country Link
KR (1) KR20190089018A (ja)
CN (1) CN110139938A (ja)
WO (1) WO2018146754A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08325619A (ja) * 1995-05-29 1996-12-10 Nippon Steel Corp 製鋼スラグのフォーミング抑制方法
JP2016148061A (ja) * 2015-02-10 2016-08-18 Jfeスチール株式会社 溶融スラグのフォーミング鎮静方法及びスラグ製品の製造方法
JP2017031446A (ja) * 2015-07-29 2017-02-09 新日鐵住金株式会社 スラグのフォーミング抑制方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR920004938B1 (ko) * 1989-12-28 1992-06-22 포항종합제철 주식회사 슬래그 포밍 진정제
JP2596470B2 (ja) 1990-11-14 1997-04-02 新日本製鐵株式会社 スロッピング抑制方法
JP2582692B2 (ja) 1991-11-16 1997-02-19 新日本製鐵株式会社 転炉製鋼法
JP4580435B2 (ja) * 2008-05-27 2010-11-10 新日本製鐵株式会社 排滓鍋スラグのフォーミング鎮静材及びその鎮静方法
CN103540706B (zh) * 2012-07-11 2015-11-18 攀钢集团研究院有限公司 一种抑制炉渣泡沫化的方法
CN104878161A (zh) * 2014-02-28 2015-09-02 上海梅山钢铁股份有限公司 一种转炉渣罐用压渣剂及其制备方法
CN104561428B (zh) * 2014-12-11 2019-03-15 北京璞域环保科技有限公司 一种喷吹脱硫渣渣铁脱硫回收方法
CN105132605A (zh) * 2015-09-02 2015-12-09 新疆八一钢铁股份有限公司 高炉瓦斯灰用于转炉渣罐进行压渣消泡的工艺

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08325619A (ja) * 1995-05-29 1996-12-10 Nippon Steel Corp 製鋼スラグのフォーミング抑制方法
JP2016148061A (ja) * 2015-02-10 2016-08-18 Jfeスチール株式会社 溶融スラグのフォーミング鎮静方法及びスラグ製品の製造方法
JP2017031446A (ja) * 2015-07-29 2017-02-09 新日鐵住金株式会社 スラグのフォーミング抑制方法

Also Published As

Publication number Publication date
CN110139938A (zh) 2019-08-16
KR20190089018A (ko) 2019-07-29

Similar Documents

Publication Publication Date Title
JP4818567B2 (ja) 精錬剤および精錬方法
JP5888445B1 (ja) 溶融スラグのフォーミング鎮静方法及びスラグ製品の製造方法
JP4907411B2 (ja) スラグの鎮静方法
JP6477333B2 (ja) スラグのフォーミング抑制方法
JP5772339B2 (ja) 取鍋内スラグの再利用方法
TWI656219B (zh) 爐渣起泡鎮靜材及爐渣起泡鎮靜方法以及轉爐吹煉方法
JP6760248B2 (ja) スラグのフォーミング抑制方法及び溶鉄の精錬方法
TWI685577B (zh) 高錳鋼的冶煉方法
JP6816777B2 (ja) スラグのフォーミング抑制方法および転炉精錬方法
TWI699436B (zh) 鋼之製造方法
WO2018146754A1 (ja) スラグのフォーミング抑制方法
JP2017002363A (ja) 転炉排滓方法
JP5272378B2 (ja) 溶銑の脱燐処理方法
TWI665309B (zh) 爐渣的起泡抑制方法及轉爐精煉方法
JP6020414B2 (ja) アルミニウム含有ステンレス鋼の精錬方法
TWI638895B (zh) Method for suppressing slag foaming
JP2007270238A (ja) 溶銑の脱燐処理方法
JP7243185B2 (ja) ホットスラグリサイクル方法
JP7147550B2 (ja) スラグのフォーミング抑制方法および転炉精錬方法
RU2205231C1 (ru) Способ передела чугуна в конвертере
JP4403055B2 (ja) 製鋼スラグの処理方法
JP2004149876A (ja) 溶銑の脱珪、脱燐方法
JP5477704B2 (ja) 溶銑の脱珪脱りん方法
JP2022041397A (ja) スラグのフォーミング鎮静方法および転炉精錬方法
JP2002212618A (ja) 溶銑予備処理におけるスロッピング抑制方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17895986

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20197018163

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17895986

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP