[go: up one dir, main page]

WO2017099604A1 - A downhole tubular verification and centralizing device, and method - Google Patents

A downhole tubular verification and centralizing device, and method Download PDF

Info

Publication number
WO2017099604A1
WO2017099604A1 PCT/NO2016/050239 NO2016050239W WO2017099604A1 WO 2017099604 A1 WO2017099604 A1 WO 2017099604A1 NO 2016050239 W NO2016050239 W NO 2016050239W WO 2017099604 A1 WO2017099604 A1 WO 2017099604A1
Authority
WO
WIPO (PCT)
Prior art keywords
tubular
wall
bore
casing
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NO2016/050239
Other languages
French (fr)
Inventor
Sigurd GOA
Morten Lerbrekk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tyrfing Innovation As
Original Assignee
Tyrfing Innovation As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tyrfing Innovation As filed Critical Tyrfing Innovation As
Priority to GB1811127.8A priority Critical patent/GB2562649A/en
Priority to BR112018011565A priority patent/BR112018011565A2/en
Priority to AU2016366956A priority patent/AU2016366956A1/en
Priority to US16/061,163 priority patent/US20180355678A1/en
Publication of WO2017099604A1 publication Critical patent/WO2017099604A1/en
Anticipated expiration legal-status Critical
Priority to NO20180950A priority patent/NO20180950A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1014Flexible or expansible centering means, e.g. with pistons pressing against the wall of the well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/002Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe
    • E21B29/005Cutting, e.g. milling, a pipe with a cutter rotating along the circumference of the pipe with a radially-expansible cutter rotating inside the pipe, e.g. for cutting an annular window
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/134Bridging plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/09Locating or determining the position of objects in boreholes or wells, e.g. the position of an extending arm; Identifying the free or blocked portions of pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes

Definitions

  • the invention concerns a device and method for centralizing a tubular in a bore, as set out by the preambles of claims 1 , 8 and 11.
  • the invention is particularly useful in centralizing a casing, in connection with plugging-and-abandonment operations in subterranean hydrocarbon wells.
  • Hydrocarbons e.g. oil and/or gas
  • Hydrocarbons are extracted from subterranean formations, often referred to as a reservoirs, by drilling a wellbore into the formations containing hydrocarbons.
  • a completion normally involves the design, selection, and installation of equipment and materials in or around the wellbore for conveying, pumping, or controlling the production or injection of fluids.
  • production testing of the well can begin.
  • Hydrocarbon wells normally have an upper and outer conductor, which forms the base of the well, an upper casing arranged into and in extension of the conductor, and further down in the well more casings which are arranged into and overlaps the above casing.
  • a production tubing string is subsequently loca ted in the middle of the well for transporting petroleum from the bottom of the well to the earths surface or to a seabed facility. Annuli are thus formed between the different casings, as well as between the outer casing and the wellbore wall (i.e. the formation) .
  • cement plugs are normally used to provide a barrier in the well .
  • a common procedure during plug-and-abandonment operations is to place a cement plug inside an inner casing string and a further plug in the annulus between the inner casing string and the outer casing string, and in the annulus between the outer casing and the formation. The plug will then extend across the full section of the well, and extend a predetermined axial distance.
  • One commonly used method to install such plug is to make holes in the casing wall and force cement from within the central casing, through the casing wall holes and into the annulus. This procedure, and various variants, are well known in the art.
  • - wall-abutment means configured for generating a force between the tubular and the bore in order to at least partly shift the tubular inside the bore.
  • each penetration tool comprises sensing means configured for sensing the distance travelled by the penetration tool.
  • Each penetration tool may comprise sensing means configured for sensing the distance to a wall of the bore.
  • the penetration tools may be releasably connected to the motive means.
  • Three penetration tools may be arranged at 120° intervals around the body circumference.
  • Four penetration tools may be arranged at 90° intervals around the body circumference.
  • Five or more penetration tools may be arranged at regular intervals around the body circumference.
  • the penetration tool may comprise a milling tool.
  • the tool may which impinges on the wall may be extended further, whereby the casing is moved as a reaction.
  • the device body may be subsequently be disconnected from the tools and retrieved out of the bore upon completion of the steps.
  • Figure 1 is a cross-sectional drawing of an embodiment of the invented device, in an unactuated state, placed in a casing in a formation wellbore;
  • Figure 2 corresponds to figure 1 , and shows the invented device in an activated state, with four tools having been extended through the casing wall;
  • Figure 3 corresponds to figure 2, and shows how the tools have shifted the casing in the wellbore, to a more centralized position in the wellbore than previously;
  • Figure 4 corresponds to figure 4, and shows that the invented device has been removed from the casing, while the tools remain in the casing wall;
  • Figure 5 is a schematic illustration of a tool in an extended position
  • Figure 6 is a schematic illustration of an alternative embodiment of a tool
  • Figure 7 is a schematic illustration of an alternative embodiment of the invented device, during a first milling operation
  • Figure 8 illustrates the device of figure 7, during the installation of a first set of wedges in an annulus between a casing and a formation
  • Figure 9 illustrates the device of figure 7, during a second milling operation
  • Figure 10 illustrates the device of figure 7, during the installation of a second set of wedges in an annulus between a casing and a formation; and Figure 11 shows the first and second sets of wedges installed in an annulus between a casing and a formation, and a cement plug having been placed in a section of the annulus and casing.
  • Figure 1 shows a casing 1 placed in a wellbore 2 having a wall 2a against a subterranean formation 7.
  • the formation wall 2 a may be of an irregular shape and contain cracks, fissures and unconsolidated regions.
  • the casing 1 is not properly centralized in the wellbore 2, but is in contact with a portion of the wellbore wall 2a (in the upper, left-hand part, as shown in figure 1). There is thus no complete annulus between the casing and the wellbore wall 2a, or the annulus 3 is insufficiently wide, therefore rendering a cementing procedure impossible at this location.
  • Figure 1 also shows the invented device 4 in place inside the casing 1.
  • the device 4 may be connected to a drillpipe, coiled tubing (not shown), or other known downhole device conveyance means, and powered and controlled from an uphole location, in a manner generally known in the art.
  • the device 4 comprises a body 9 and four individually operated tools 5, which will be described below.
  • each individual tool 5 has been extended from the tool body 9 and advanced towards and through the casing wall.
  • Each individual tool 5 is extended by individual arms 6, which may be hydraulically operated telescopic cylinders, known per se in the art.
  • Each tool 5 comprises casing penetration means (not shown) for making a hole or other opening in the casing wall. Such casing penetration means may for example be jet blasting nozzles or a milling tool, all of which are generally known in the art.
  • Each tool 5 also comprises attachment means (not shown in figure 2) for attaching the tool to the casing wall, for example dogs, slips, or other anchoring means generally known in the art.
  • a first tool portion 5a of the tool 5 may be held in position in the hole made in the casing wall, while a second tool portion 5b is advancing (e.g. telescoping) towards and into abutment with the wellbore wall 2a.
  • Other tool advancing means such as a threaded, rotational configuration, are also envisaged.
  • Each tool 5 may comprise distance-sensing means (not shown), by which the distance travelled by the tool may be monitored. Alternatively, such sensing means may be integrated in the individual arm 6. It should be understood that the distance-sensing means may comprise generally known devices, including optical, acoustic and electromechanical means. The distance-sensing means will enable the device operator to determine the distance between the casing and the adjacent wellbore wall 2a, thus being able to evaluate whether or not a sufficient clearance between casing and wellbore wall exists.
  • the tools 5 have been advanced further through their respective casing penetrations, towards the wellbore wall 2a.
  • the casing is pushed away from the wellbore wall 2a when the tool is abutting the formation.
  • this is seen as the casing 1 has been pushed away from the wellbore wall by the tool 5' (towards the right in the figure).
  • the distance-sensing means are also in effect casing verification means, inasmuch as they will communicate the extended distance for each tool, and hence the minimum distance between the casing and the wellbore wall.
  • Figure 6 illustrates an alternative embodiment of the tool, being a deformable plug 5c, pressing against the formation wall.
  • Figure 4 shows the casing 1 centralized in the wellbore and thus forming an annulus 3 with the wellbore (formation) wall 2a.
  • the tools 5 have been disconnected from their individual arm, and the device has been retrieved to an uphole location.
  • the tools thus function as permanent casing centralizers, and cement (or other barrier element) 8 is placed into the annulus 3.
  • Each tool 5 is disconnectable from its individual arm by means that are known per se.
  • the device and tools may be integrated with an additional tool (not shown), whereby a well barrier placement operation may be performed following the verification and centralization procedure.
  • Figure 7 illustrates another embodiment of the invented device 41, having a tool section 41a and a milling section 41b.
  • the device is conveyed into the casing 1 and controlled via a drill string 10 (or coiled tubing, or similar).
  • the tool section 41a carries a first (upper) wedge set 52 and a second (lower) wedge set 53.
  • the milling section 41b which is rotatably connected to the tool section, carries a set of milling arms 51. It should be understood that each set comprises a plurality of wedges and milling arms, respectively.
  • the milling section 41b is rotated (as indicated by arrow R) with milling arms 51 in a deployed position, in a manner well known in the art, thus generating a first (upper) circumferential casing window 54 (see figure 8).
  • the device has been lowered further into the casing 1, and the second wedge set 53 has been entered (rammed or pushed) into the annulus 3, through the first casing window 54.
  • the connection between the first wedge set 53 and the tool section 41 is severed (e.g. sheared), and the device is being moved further into the casing, to a position shown in figure 9.
  • the milling section 41b is once again rotated (as indicated by arrow R) with milling arms 51 in a deployed position, to generate a second (lower) circumferential casing window 55 (see figure 10).
  • the device has been lowered further into the casing 1, and the first wedge set 52 has been entered (rammed or pushed) into the annulus 3, through the second casing window 55.
  • the connection between the first wedge set 53 and the tool section 41 is severed (e.g. sheared), and the device may be retrieved from the casing, e.g. to an uphole location.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)
  • Jigs For Machine Tools (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

A device (4; 41) for centralizing a tubular (1) in a bore (2), comprises a body (9; 41) configured for being positioned at a predetermined location inside the tubular. A plurality of penetration tools (5; 51) are movably connected to the body via respective motive means (6; 41b) and configured for extension from the body and through the tubular wall. Wall-abutment means (5b; 5c; 52, 53) are configured for generating a force between the tubular in order rat least partly shift the tubular inside the bore. The tool which impinges on the wall may be extended further, whereby the casing is moved as a reaction.

Description

A downhole tubular verification and centralizing device, and method
Field of the invention
The invention concerns a device and method for centralizing a tubular in a bore, as set out by the preambles of claims 1 , 8 and 11. The invention is particularly useful in centralizing a casing, in connection with plugging-and-abandonment operations in subterranean hydrocarbon wells.
Background of the invention
Hydrocarbons (e.g. oil and/or gas) are extracted from subterranean formations, often referred to as a reservoirs, by drilling a wellbore into the formations containing hydrocarbons. When a wellbore has been drilled, the well must be completed before hydrocarbons can be produced from the reservoir. A completion normally involves the design, selection, and installation of equipment and materials in or around the wellbore for conveying, pumping, or controlling the production or injection of fluids. After the well has been completed, production testing of the well can begin. Hydrocarbon wells normally have an upper and outer conductor, which forms the base of the well, an upper casing arranged into and in extension of the conductor, and further down in the well more casings which are arranged into and overlaps the above casing. A production tubing string is subsequently loca ted in the middle of the well for transporting petroleum from the bottom of the well to the earths surface or to a seabed facility. Annuli are thus formed between the different casings, as well as between the outer casing and the wellbore wall (i.e. the formation) .
Before the well is permanently abandoned, it must be securely plugged, in a manner that is in compliance with regulatory requirements. Cement plugs are normally used to provide a barrier in the well . A common procedure during plug-and-abandonment operations is to place a cement plug inside an inner casing string and a further plug in the annulus between the inner casing string and the outer casing string, and in the annulus between the outer casing and the formation. The plug will then extend across the full section of the well, and extend a predetermined axial distance. One commonly used method to install such plug, is to make holes in the casing wall and force cement from within the central casing, through the casing wall holes and into the annulus. This procedure, and various variants, are well known in the art.
In order to ensure that the dimensions and integrity of a plug are within acceptable tolerances, there must be a minimum distance between the casing and the wellbore wall (i.e. the formation), allowing the cement (or other barrier element) to form a barrier of a predetermined minimum thickness and density. This is because the structural integrity of the wellbore wall is not always known. Devices and methods for determining the distance between the casing and the formation exist. For example, an acoustic logging tool may be lowered to the desired location and activated to determine the distribution of material outside the casing. Sometimes, the casing-to-formation clearance is found to be too small or non-existing, due to casing movement during several years of production or formation instabilities. The casing is thus too close to the wellbore wall. Such regions of casing are normally unsuitable for plugging, because it is impossible to establish a complete annular barrier in the annulus between the casing and wellbore wall. It is therefore a need for a device and method whereby the above problems may be mitigated.
Summary of the invention
The invention is set forth and characterized in the main claim, while the dependent claims describe other characteristics of the invention.
It is thus provided a device for centralizing a tubular in a bore, characterized by
- a body configured for being positioned at a predetermined location inside the tubular;
- a plurality of penetration tools movably connected to the body via respective motive means and configured for extension from the body and through the tubular wall; and
- wall-abutment means configured for generating a force between the tubular and the bore in order to at least partly shift the tubular inside the bore.
In one embodiment, each penetration tool comprises sensing means configured for sensing the distance travelled by the penetration tool. Each penetration tool may comprise sensing means configured for sensing the distance to a wall of the bore. The penetration tools may be releasably connected to the motive means. Three penetration tools may be arranged at 120° intervals around the body circumference. Four penetration tools may be arranged at 90° intervals around the body circumference. Five or more penetration tools may be arranged at regular intervals around the body circumference. The penetration tool may comprise a milling tool.
It is also provided a method of centralizing a tubular in a bore, characterized by a) arranging the invented device a predetermined location inside the tubular;
b) extending a plurality of penetration tools radially from the device body and make an opening in respective portions of the tubular while securing at least a portion of the tool to the tubular; and
c) extending at least a portion of the tool a predetermined distance towards a wall of the bore, or until at least one of the tools impinges on the wall.
Following step c), the tool may which impinges on the wall may be extended further, whereby the casing is moved as a reaction.
The device body may be subsequently be disconnected from the tools and retrieved out of the bore upon completion of the steps.
It is also provided a method of centralizing at least a portion of a tubular in a bore, characterized by
a) arranging a device according to the invention at a predetermined first location inside the tubular;
b) extending penetration tools from the device body to make a first circumferential window in the tubular;
c) installing at least one force member, through the first window, between the tubular outer wall and the bore;
d) relocating said device to a predetermined second location inside the tubular;
e) extending penetration tools from the device body to make a second circumferential window in the tubular; and
f) installing at least one force member, through the second window, between the tubular outer wall and the bore. With the invention, it is possible to verify sufficient distance between a tubular (e.g. a casing) and an adjacent wall (e.g. wellbore wall), and, if necessary, move the casing laterally in order to establish sufficient distance between the tubular and the wall. With the invented device and method, these operations may be conducted in one downhole trip.
Brief description of the drawings
These and other characteristics of the invention will become clear from the following description of preferential embodiments, given as non-restrictive examples, with reference to the attached schematic drawings, wherein:
Figure 1 is a cross-sectional drawing of an embodiment of the invented device, in an unactuated state, placed in a casing in a formation wellbore;
Figure 2 corresponds to figure 1 , and shows the invented device in an activated state, with four tools having been extended through the casing wall;
Figure 3 corresponds to figure 2, and shows how the tools have shifted the casing in the wellbore, to a more centralized position in the wellbore than previously;
Figure 4 corresponds to figure 4, and shows that the invented device has been removed from the casing, while the tools remain in the casing wall;
Figure 5 is a schematic illustration of a tool in an extended position;
Figure 6 is a schematic illustration of an alternative embodiment of a tool;
Figure 7 is a schematic illustration of an alternative embodiment of the invented device, during a first milling operation;
Figure 8 illustrates the device of figure 7, during the installation of a first set of wedges in an annulus between a casing and a formation;
Figure 9 illustrates the device of figure 7, during a second milling operation;
Figure 10 illustrates the device of figure 7, during the installation of a second set of wedges in an annulus between a casing and a formation; and Figure 11 shows the first and second sets of wedges installed in an annulus between a casing and a formation, and a cement plug having been placed in a section of the annulus and casing.
Detailed description of preferential embodiments
The following description may use terms such as "horizontal", "vertical", "lateral", "back and forth", "up and down", "upper", "lower", etc. These terms generally refer to the views and orientations as shown in the drawings and that are associated with the illustrated use of the invention. The terms are used for the reader's convenience only and shall not be limiting.
Figure 1 shows a casing 1 placed in a wellbore 2 having a wall 2a against a subterranean formation 7. As the jagged lines indicate, the formation wall 2 a may be of an irregular shape and contain cracks, fissures and unconsolidated regions. The casing 1 is not properly centralized in the wellbore 2, but is in contact with a portion of the wellbore wall 2a (in the upper, left-hand part, as shown in figure 1). There is thus no complete annulus between the casing and the wellbore wall 2a, or the annulus 3 is insufficiently wide, therefore rendering a cementing procedure impossible at this location.
Figure 1 also shows the invented device 4 in place inside the casing 1. The device 4 may be connected to a drillpipe, coiled tubing (not shown), or other known downhole device conveyance means, and powered and controlled from an uphole location, in a manner generally known in the art. In the illustrated embodiment, the device 4 comprises a body 9 and four individually operated tools 5, which will be described below.
In figure 2, the tools 5 have been extended from the tool body 9 and advanced towards and through the casing wall. Each individual tool 5 is extended by individual arms 6, which may be hydraulically operated telescopic cylinders, known per se in the art. Each tool 5 comprises casing penetration means (not shown) for making a hole or other opening in the casing wall. Such casing penetration means may for example be jet blasting nozzles or a milling tool, all of which are generally known in the art. Each tool 5 also comprises attachment means (not shown in figure 2) for attaching the tool to the casing wall, for example dogs, slips, or other anchoring means generally known in the art. With these means (referring to figure 5) a first tool portion 5a of the tool 5 may be held in position in the hole made in the casing wall, while a second tool portion 5b is advancing (e.g. telescoping) towards and into abutment with the wellbore wall 2a. Other tool advancing means, such as a threaded, rotational configuration, are also envisaged.
Each tool 5 may comprise distance-sensing means (not shown), by which the distance travelled by the tool may be monitored. Alternatively, such sensing means may be integrated in the individual arm 6. It should be understood that the distance-sensing means may comprise generally known devices, including optical, acoustic and electromechanical means. The distance-sensing means will enable the device operator to determine the distance between the casing and the adjacent wellbore wall 2a, thus being able to evaluate whether or not a sufficient clearance between casing and wellbore wall exists.
In figure 3, the tools 5 have been advanced further through their respective casing penetrations, towards the wellbore wall 2a. By virtue of the individual tools' attachment to the casing wall, the casing is pushed away from the wellbore wall 2a when the tool is abutting the formation. In figure 3, this is seen as the casing 1 has been pushed away from the wellbore wall by the tool 5' (towards the right in the figure). Thereby, a complete annulus 3, with a satisfactory casing -to- wall gap, has been established. The distance-sensing means are also in effect casing verification means, inasmuch as they will communicate the extended distance for each tool, and hence the minimum distance between the casing and the wellbore wall.
Figure 6 illustrates an alternative embodiment of the tool, being a deformable plug 5c, pressing against the formation wall.
Figure 4 shows the casing 1 centralized in the wellbore and thus forming an annulus 3 with the wellbore (formation) wall 2a. The tools 5 have been disconnected from their individual arm, and the device has been retrieved to an uphole location. The tools thus function as permanent casing centralizers, and cement (or other barrier element) 8 is placed into the annulus 3. Each tool 5 is disconnectable from its individual arm by means that are known per se. With the invention, it is possible to verify the distance between the casing and the adjacent wellbore wall, and, if necessary, move the casing laterally in order to centralize the casing and establish sufficient distance between the casing and the wall. These operations may be conducted in one downhole trip. The device and tools may be integrated with an additional tool (not shown), whereby a well barrier placement operation may be performed following the verification and centralization procedure.
Although the invention has been described with reference to a casing and an adjacent wellbore (formation) wall, it should be understood that the invention is equally applicable for verifying and centralizing an inner casing in an outer casing.
Figure 7 illustrates another embodiment of the invented device 41, having a tool section 41a and a milling section 41b. The device is conveyed into the casing 1 and controlled via a drill string 10 (or coiled tubing, or similar). The tool section 41a carries a first (upper) wedge set 52 and a second (lower) wedge set 53. The milling section 41b, which is rotatably connected to the tool section, carries a set of milling arms 51. It should be understood that each set comprises a plurality of wedges and milling arms, respectively. In figure 7, the milling section 41b is rotated (as indicated by arrow R) with milling arms 51 in a deployed position, in a manner well known in the art, thus generating a first (upper) circumferential casing window 54 (see figure 8).
In figure 8, the device has been lowered further into the casing 1, and the second wedge set 53 has been entered (rammed or pushed) into the annulus 3, through the first casing window 54. At this stage, the connection between the first wedge set 53 and the tool section 41 is severed (e.g. sheared), and the device is being moved further into the casing, to a position shown in figure 9. In the position shown in figure 9, the milling section 41b is once again rotated (as indicated by arrow R) with milling arms 51 in a deployed position, to generate a second (lower) circumferential casing window 55 (see figure 10).
In figure 10, the device has been lowered further into the casing 1, and the first wedge set 52 has been entered (rammed or pushed) into the annulus 3, through the second casing window 55. Upon completion of this step, the connection between the first wedge set 53 and the tool section 41 is severed (e.g. sheared), and the device may be retrieved from the casing, e.g. to an uphole location.
The action of forcing the sets of wedges 52, 53 into the annulus 3 between the casing 1 and wellbore 7 wall, serves to move (se M in figure 11) and centralize the casing portion between the first and second casing window 54, 55, and thus create an annulus 3 where the wall-to-wall distance d is above a predetermined value considered safe for placing a well barrier element. This is illustrated in figure 11 , also showing how a plug of well barrier element (e.g. cement) 8 (or other barrier fluid) is placed in the region between the casing windows.
Although the description above with reference to figures 7 to 10 describe a procedure in which the upper (first) casing window 54 is milled before the lower (second) casing window 55, and the sets of wedges are installed in a corresponding sequence, it should be understood that the tool is equally applicable for a reversed method. In such method, the lower casing window 55 is milled first. Then, a lower wedge set 53 is installed through the lower casing window, whereupon the device is pulled to a location above the lower casing window. Here, the upper casing window 54 is milled and the corresponding upper wedge set 52 is installed.
Although the invention has been described with reference to casings, it should be understood that the invention is equally applicable to other tubulars. Although the invention has been described with reference to a plug-and-abandon operation, it should be understood that the invention is applicable to any centralization of tubulars.
Although the invention has been described with reference to figures showing a vertically oriented wellbore and casing, the invention shall not be limited to such orientations, but are equally applicable wellbores having to horizontal or inclined orientations.
Although the invention has been described with reference to a device having four tools, the invention shall not be limited to this number. A device having fewer or more tools shall be considered to be within the scope of this invention. For practical purposes, however, three tools, evenly spaced around the tool perimeter, is considered a minimum number. Five tools have been found to be a suitable number.

Claims

Claims
1. A device (4; 41) for centralizing a tubular (1) in a bore (2), Characterized by
- a body (9; 41) configured for being positioned at a predetermined location inside the tubular;
- a plurality of penetration tools (5; 51) movably connected to the body via respective motive means (6; 41b) and configured for extension from the body and through the tubular wall; and
- wall-abutment means (5b; 5c; 52, 53) configured for generating a force between the tubular and the bore in order to at least partly shift the tubular inside the bore.
2. The device of claim 1, wherein each penetration tool comprises sensing means configured for sensing the distance travelled by the penetration tool.
3. The device of claim 1 or claim 2, wherein each penetration tool comprises sensing means configured for sensing the distance to a wall (2a) of the bore.
4. The device of any one of claims 1 -3, wherein the penetration tools are releasably connected to the motive means (6).
5. The device of any one of claims 1 -4, wherein three penetration tools are arranged at 120° intervals around the body circumference, as seen in a tubular cross - sectional plane.
6. The device of any one of claims 1 -4, wherein four penetration tools are arranged at 90° intervals around the body circumference, as seen in a tubular cross-sectional plane.
7. The device of any one of the preceding claims, wherein the penetration tool comprises a milling tool.
8. A method of centralizing a tubular (1) in a bore (2), characterized by a) arranging a device according to any of claims 1 -7 at a predetermined location inside the tubular;
b) extending a plurality of penetration tools (5) radially from the device body (9) and make an opening in respective portions of the tubular (1) while securing at least a portion of the tool to the tubular; and c) extending at least a portion of the tool a predetermined distance towards a wall (2a) of the bore (2), or until at least one of the tools (5') impi nges on the wall (2a).
9. The method of claim 8, wherein, following step c), extend the tool (5') which impinges on the wall further, whereby the casing is moved as a reaction.
10. The method of claim 8 or claim 9, whereby the device body (9) is disconnected from the tools and retrieved out of the bore upon completion of either step c) or the step described in claim 9.
11. A method of centralizing at least a portion of a tubular (1) in a bore (2), characterized by
a) arranging a device according to any of claims 1 -7 at a predetermined first location inside the tubular;
b) extending penetration tools (51) from the device body (41b) to make a first circumferential window (54) in the tubular;
c) installing at least one force member (53), through the first window (54), between the tubular outer wall and the bore;
d) relocating said device to a predetermined second location inside the tubular;
e) extending penetration tools (51) from the device body (41b) to make a second circumferential window (55) in the tubular; and
f) installing at least one force member (52), through the second window (55), between the tubular outer wall and the bore.
PCT/NO2016/050239 2015-12-09 2016-11-24 A downhole tubular verification and centralizing device, and method Ceased WO2017099604A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
GB1811127.8A GB2562649A (en) 2015-12-09 2016-11-24 A downhole tubular verification and centralizing device, and method
BR112018011565A BR112018011565A2 (en) 2015-12-09 2016-11-24 device and method for centering a tubular element in a hole, and method for centering at least a portion of a tubular element in a hole.
AU2016366956A AU2016366956A1 (en) 2015-12-09 2016-11-24 A downhole tubular verification and centralizing device, and method
US16/061,163 US20180355678A1 (en) 2015-12-09 2016-11-24 A downhole tubular verification and centralizing device, and method
NO20180950A NO20180950A1 (en) 2015-12-09 2018-07-06 A downhole tubular verification and centralizing device, and method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20151694 2015-12-09
NO20151694 2015-12-09

Publications (1)

Publication Number Publication Date
WO2017099604A1 true WO2017099604A1 (en) 2017-06-15

Family

ID=59012850

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2016/050239 Ceased WO2017099604A1 (en) 2015-12-09 2016-11-24 A downhole tubular verification and centralizing device, and method

Country Status (6)

Country Link
US (1) US20180355678A1 (en)
AU (1) AU2016366956A1 (en)
BR (1) BR112018011565A2 (en)
GB (1) GB2562649A (en)
NO (1) NO20180950A1 (en)
WO (1) WO2017099604A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2277337A (en) * 1993-04-20 1994-10-26 Conoco Inc Apparatus and method for centralizing pipe in a wellbore
WO1995009967A1 (en) * 1993-10-07 1995-04-13 Conoco Inc. Downhole activated process and apparatus for completing a wellbore
US20040079535A1 (en) * 2002-10-25 2004-04-29 Richard Bennett M. Telescoping centralizers for expandable tubulars
WO2015175025A1 (en) * 2014-05-16 2015-11-19 Aarbakke Innovation A.S. Multifunction wellbore tubular penetration tool

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7431107B2 (en) * 2003-01-22 2008-10-07 Schlumberger Technology Corporation Coring bit with uncoupled sleeve
AU2005220766B2 (en) * 2004-03-04 2010-06-24 Halliburton Energy Services, Inc. Downhole formation sampling
US7530407B2 (en) * 2005-08-30 2009-05-12 Baker Hughes Incorporated Rotary coring device and method for acquiring a sidewall core from an earth formation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2277337A (en) * 1993-04-20 1994-10-26 Conoco Inc Apparatus and method for centralizing pipe in a wellbore
WO1995009967A1 (en) * 1993-10-07 1995-04-13 Conoco Inc. Downhole activated process and apparatus for completing a wellbore
US20040079535A1 (en) * 2002-10-25 2004-04-29 Richard Bennett M. Telescoping centralizers for expandable tubulars
WO2015175025A1 (en) * 2014-05-16 2015-11-19 Aarbakke Innovation A.S. Multifunction wellbore tubular penetration tool

Also Published As

Publication number Publication date
BR112018011565A2 (en) 2018-11-27
GB2562649A (en) 2018-11-21
GB201811127D0 (en) 2018-08-22
AU2016366956A1 (en) 2018-06-07
NO20180950A1 (en) 2018-07-06
US20180355678A1 (en) 2018-12-13
GB2562649A8 (en) 2018-12-05

Similar Documents

Publication Publication Date Title
US10612342B2 (en) Plugging tool, and method of plugging a well
RU2601641C2 (en) Multi-zone completion with formation hydraulic fracturing
EP3036395B1 (en) One trip perforating and washing tool for plugging and abandoning wells
US20200325746A1 (en) A downhole apparatus and a method at a downhole location
NO348085B1 (en) Method and system for hydraulic communication with target well from relief well
US10794121B2 (en) Connecting assembly and receptacle adapted to receive said connecting assembly for connecting two tubing sections, and method for installing and connecting two tubing sections in a wellbore
US9845650B2 (en) Running tool lock open device
EP3538739B1 (en) Production tubing conversion device and methods of use
US10900332B2 (en) Extendable perforation in cased hole completion
US10392885B2 (en) Method and apparatus for plugging a well
US20180355678A1 (en) A downhole tubular verification and centralizing device, and method
US9145744B2 (en) Plug and perforate using casing profiles
CA3137490C (en) Seating assembly including a convertible landing seat
Carpenter Wellhead Design Enables Offline Cementing and a Shift in Operational Efficiency
NO20180239A1 (en) A plugging tool, and method of plugging a well
CN106795742A (en) Breech locked is with drill sleeve system and method
CN101772617A (en) Method for altering the stress state of a formation and/or a tubular

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16873430

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016366956

Country of ref document: AU

Date of ref document: 20161124

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112018011565

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 201811127

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20161124

WWE Wipo information: entry into national phase

Ref document number: 1811127.8

Country of ref document: GB

ENP Entry into the national phase

Ref document number: 112018011565

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20180607

122 Ep: pct application non-entry in european phase

Ref document number: 16873430

Country of ref document: EP

Kind code of ref document: A1