WO2015142311A2 - New method for concrete crack repair - Google Patents
New method for concrete crack repair Download PDFInfo
- Publication number
- WO2015142311A2 WO2015142311A2 PCT/US2014/022884 US2014022884W WO2015142311A2 WO 2015142311 A2 WO2015142311 A2 WO 2015142311A2 US 2014022884 W US2014022884 W US 2014022884W WO 2015142311 A2 WO2015142311 A2 WO 2015142311A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- crack
- saw cut
- concrete
- expansive
- repair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B41/00—After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
- C04B41/53—After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone involving the removal of at least part of the materials of the treated article, e.g. etching, drying of hardened concrete
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C73/00—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D
- B29C73/24—Apparatus or accessories not otherwise provided for
- B29C73/26—Apparatus or accessories not otherwise provided for for mechanical pretreatment
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T428/00—Stock material or miscellaneous articles
- Y10T428/20—Patched hole or depression
Definitions
- U. S. Pat. No. 4,565,579 discloses an expansive mortar composition for breaking rock and concrete.
- the composition is commonly used for demolition purposes. Holes are drilled into the breakable material.
- the expansive mortar is poured into the holes where pressure builds and breaks the concrete or rock in an irregular way.
- U. S. Pat. No. 5,771 ,557 shows a metal stitching method of repairing concrete cracks. In this method the concrete surface is patched when the crack is filled. It would be very difficult to match the color of the patch with the color of the concrete being patched. This structural repair method is used in anticipation of a full resurfacing repair.
- U. S. Pat. No. 7,308,892 shows a method of making the concrete crack from below the slab. This method would leave a jagged somewhat straight crack. It would require a saw cut through the middle of each crack to make them have a more finished appearance.
- U. S. Pat. No. 8,146,309 shows a crack inducer with a drainage channel at the base of the slab. This will create an unfinished crack at the top of the slab.
- U. S. Pat. No. 7,572,852 shows a patching material for fixing exposed aggregate concrete. This will require a great deal of time to get a good color match. The repaired crack is likely to reoccur in the same location if a saw cut is not installed to relieve the pressures that caused the original crack.
- Spray applied concrete resurfacing materials, colorants, colored sealers or any combination can be used on a section or an entire area to conceal a damaged surface.
- a new method for concrete crack repair comprises a saw cut control joint near the crack and placing expansive mortar in the saw cut to apply pressure inside the saw cut whereby it opens the saw cut and closes the crack.
- the saw cut is then cleared of expansive mortar and fitted with an epoxy plug to hold the saw cut in the open position.
- Epoxy is placed inside the closed crack to bond both sides of the crack together.
- Fig 1 shows a top view example of an open shrinkage crack in a concrete slab.
- Fig 2 shows a top view of the open shrinkage crack, a dam and a saw cut that receives the expansive mortar application in a concrete slab.
- Fig 3 shows a top view of a completed repair including an expanded saw cut and a closed shrinkage crack in a concrete slab.
- Fig 4 shows a side view of a saw cut, an open shrinkage crack with the newly placed expansive mortar in a concrete slab.
- Fig 5 shows a side view of expansive mortar, expansive pressure inside the saw cut, the crack created at the bottom of the saw cut and the closed shrinkage crack in a concrete slab.
- Fig 6 shows a side view of a completed repair including a rigid spacer, caulk, expansive mortar, location of cosmetic repairs and the closed shrinkage crack in a concrete slab.
- a crack repair method is illustrated in Fig 1 , 2 and3 (top view) and Fig 4, 5 and 6 (side view).
- the repair begins with planning the location of a saw cut 10 that balances aesthetics and close proximity to the open shrinkage crack 8 located on concrete piece number one 19.
- the completed saw cut 10 should not appear askew.
- Restrict expansive mortar 13 from any area where the saw cut 10 runs inside the open shrinkage crack 8 in order to confine pressure and not spread concrete piece number one 19 and concrete piece number two 20 apart.
- Expansive mortar 13 is mixed to a fluid consistency and poured into the saw cut 10 being treated adjacent the crack.
- the expansive pressure generated by the expansive mortar 13 will create a crack 14 at the bottom of the saw cut 10 and progresses to move one side of the saw cut 10 and simultaneously close the shrinkage crack 12.
- the cracked edges 21 of concrete are held in place with the interlocking aggregate inside the closed shrinkage crack 12, a rigid spacer 15 in the saw cut 10 and adhesive 17 in the closed shrinkage crack 12.
- a cosmetic surface repair 7 is optionally made to the top of the closed shrinkage crack 12.
- expansive mortar is used to facilitate pressure inside the saw cut.
- the pressure can be developed from any other material that can be placed inside the saw cut that develops sufficient expandable pressure to open the saw cut, such as foam, plastic, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
- the rigid spacer used to hold the control joint is made of epoxy.
- the rigid spacer can be of made of any other material that can be placed inside the saw cut to hold the prescribed separation and the crack tightly in place, such as cement, mortar, foam, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
- gravity fed epoxy is used as adhesive to hold the cracked concrete pieces together.
- the adhesive can be of any other material installed in the crack designed to bond the pieces together.
- the adhesive can be installed before the crack closes, after closure or both.
- the adhesive can have long or short set times and consist of various materials such as film, fabrics, foam, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
- the saw cut is of sufficient depth to receive the expansive mortar.
- the saw cut can be of varying depths. Best results are achieved when the saw cuts down to the top of the steel reinforcement in the slab. The steel will remain in place and give support across the newly formed control joint. Sometimes reinforcement steel is too high in the slab and may inadvertently be cut when installing the saw cut control joint. Consequently, the concrete is supported by the compacted base material under it and the epoxy interlocking the crack at the bottom of the saw cut.
- the repair can be done by one person.
- the new method for concrete crack repair of various embodiments can be used to repair cracks easily and conveniently, can be used where a control joint should have been installed, can produce better quality repairs, is an exact color match and is economical.
- the active control joint created enhances the durability of the crack repair and so reduces jobsite call backs by increasing the repair performance.
- the new method for concrete crack repair has the additional advantages in that: • It permits increased speed in repair;
- the saw cut can have various sizes and shapes; the saw cut can have various depths; the shrinkage crack can be of various shapes, sizes and angles; the expansive mortar can be of various compositions of matter; the adhesive can be of various forms of matter; the closed shrinkage crack can be partially bonded; the adhesive can be omitted in the closed shrinkage crack; the epoxy bond inside the closed crack can individually hold the piece in place; the rigid spacer can be relied upon in combination with the interlocking aggregate to keep the pieces in place; the rigid spacer can be of any form of matter; the rigid spacer can be bonded to one side of the saw cut; the rigid spacer can be bonded to neither side of the saw cut; the rigid spacer can be bonded to both sides of the saw cut; the rigid spacer can be held in place by friction; the rigid spacer can have a finished the top surface to replace the caulk; the control joint
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Civil Engineering (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A method for repairing cracked concrete (8) using expansive mortar (13) comprising the steps of installing a saw cut (10) next to an open shrinkage crack (8) and opening the saw cut (10) with expansive mortar (13) to create a wider saw cut (11) and shift half the saw cut (10) toward the open shrinkage crack (8) to close the shrinkage crack (12) tightly. Install a rigid spacer (16) to maintain the width of the control joint. Install adhesive (18) from the top of finished concrete slab (9) into the closed shrinkage crack (12). The surface of the finished concrete slab (9) will receive cosmetic repair (7) to the closed shrinkage crack (12) and let dry before applying sealer. Other embodiments are described as shown.
Description
Patent Application of
Thomas Taverne
For
NEW METHOD FOR CONCRETE CRACK REPAIR
Background- Prior Art
The following is a tabulation of some prior art that presently appears relevant:
U.S. Patents
Patent Number Kind Code Publ. Date Patentee
4,565,579 Jan 21 , 1986 Fujioka 5,771 ,557 Jun 30, 1998 Contrasto 7,308,892 B2 Jan 18, 2007 Cockerell 8,146,309 B1 Apr 03, 2012 Logemann 7,572,852 B1 Aug 1 1 , 2009 Ware
Nonpatent Literature Documents
"Mechanical cracking of saw cut joints in concrete slabs on ground to eliminate the need for steel reinforcement", Allen Cockerell, Concrete Slab Technology Pty Ltd
"Methods of concrete crack repair" www.theconstructor.org
"Bustar Expanding Grout Technical Page" www.demolotiontechnologiies.com
"Crusting Cracks" www.indecorativeconcrete.com
"Concrete cracking. It happens. Here's how to fix it." Kim Basham PhD, PE www.Imcc.com
There are many methods for repairing concrete where the crack goes all the way through the concrete and has a gap. This type of crack can be called an open shrinkage crack. These gaps are often left unrepaired. The crack is often less noticeable than a repair. Adding a saw cut on top of a crack will conceal a crack by making it appear to be a saw cut control joint. Longer, wider or crooked cracks that have a gap can be filled with various products to protect against water intrusion, weed control, improve load transfer and improve general appearance. Structural repairs can include epoxy to bond pieces together, steel bars installed at intervals across a crack or a combination of both. A cracked concrete section can be cut out, demolished and replaced. Full slab removal and replacement may be an option when concrete is severely degraded or an exact color match is required.
U. S. Pat. No. 4,565,579 discloses an expansive mortar composition for breaking rock and concrete. The composition is commonly used for demolition purposes. Holes are drilled into the breakable material. The expansive mortar is poured into the holes where pressure builds and breaks the concrete or rock in an irregular way.
U. S. Pat. No. 5,771 ,557 shows a metal stitching method of repairing concrete cracks. In this method the concrete surface is patched when the crack is filled. It would be very difficult to match the color of the patch with the color of the concrete being patched. This structural repair method is used in anticipation of a full resurfacing repair.
U. S. Pat. No. 7,308,892 shows a method of making the concrete crack from below the slab. This method would leave a jagged somewhat straight crack. It would require a saw cut through the middle of each crack to make them have a more finished appearance.
U. S. Pat. No. 8,146,309 shows a crack inducer with a drainage channel at the base of the slab. This will create an unfinished crack at the top of the slab.
U. S. Pat. No. 7,572,852 shows a patching material for fixing exposed aggregate concrete. This will require a great deal of time to get a good color match. The repaired crack is likely to reoccur in the same location if a saw cut is not installed to relieve the pressures that caused the original crack.
All the crack repair methods heretofore known suffer from a number of disadvantages:
(a) Crack fill repairs make a crack extremely noticeable by highlighting the crack.
(b) Coloring the crack filler material to make an exact color match with the concrete is nearly impossible.
(c) An exact color match between batches of concrete is nearly impossible.
(d) Concrete is installed in uncontrolled environmental conditions that cause some of the color matching problems.
(e) The difficulty of color matching concrete increases as the concrete ages.
(f) Aesthetic repairs are often required to cover a visible crack repair.
(g) Installing some inches of new concrete over an entire area can be done to cover the top of unsightly concrete.
(h) Concrete resurfacing with 1 /4 to 3/8 inch of polymer modified type cement can be as expensive as four inches of new concrete.
(i) Spray applied concrete resurfacing materials, colorants, colored sealers or any combination can be used on a section or an entire area to conceal a damaged surface.
(j) Carpet or tile can be required to cover cracked concrete,
(k) Rework of mismatched colors to improve aesthetics is time consuming and
costly.
(I) Concrete demolition is very labor intensive,
(m) Installation of concrete is very labor intensive.
(n) Installing a straight line saw cut on a crooked or bowed crack will only partially conceal the crack,
(o) Saw cut repairs are limited to concealing straight cracks.
(p) Saw cut repairs are limited to cracks that fall in line with the standard control joint layout.
(q) Repairs may require removing a concrete section between a saw cut and a path of a jagged crack that results in the major challenges of unsightly patching and mismatching color as obstacles to a successful repair.
Summary
In accordance with one embodiment a new method for concrete crack repair comprises a saw cut control joint near the crack and placing expansive mortar in the saw cut to apply pressure inside the saw cut whereby it opens the saw cut and closes the crack. The saw cut is then cleared of expansive mortar and fitted with an epoxy plug to hold the saw cut in the open position. Epoxy is placed inside the closed crack to bond both sides of the crack together. A cosmetic treatment is now possible to the top of the closed crack and caulk to the opened saw cut.
Advantages
Accordingly several advantages of one or more aspects are as follows: to provide a very tight crack, that is easy to cosmetically touch up, that increases load transfer across the crack, that develops interlocking action of aggregate particles on the face of the crack, that creates a control joint that isolates future movement, that spreads an active control joint, that transfers the width of the crack to the control joint, that is aesthetically pleasing, that is less noticeable, that will be bonded together with low viscosity epoxy, that produces the control joint that distracts the eye away from the closed crack, that eliminates the need to remove a concrete section, that eliminates the need to resurface or cover unsightly patching, that lowers the skill level required of craftsmen performing a crack repair, that can be cosmetically treated in similar ways as crusting cracks in decorative concrete, that eliminates the need to fill a crack, that eliminates caulking cracks, that reduces patching to pop outs that may have occurred along the top edge of a jagged crack, that reduces the labor required to make the repair, that can be held in place with the control joint spacer, that does not require coloring, that is aesthetically superior, that is easier to repair, that can be applied again to close the larger crack, that is economical, that increases job site profitability, that increases jobsite safety, that reduces the number of tools required to fix the job, etc.
Drawings-Figures
Fig 1 shows a top view example of an open shrinkage crack in a concrete slab.
Fig 2 shows a top view of the open shrinkage crack, a dam and a saw cut that receives the expansive mortar application in a concrete slab.
Fig 3 shows a top view of a completed repair including an expanded saw cut and a closed shrinkage crack in a concrete slab.
Fig 4 shows a side view of a saw cut, an open shrinkage crack with the newly placed expansive mortar in a concrete slab.
Fig 5 shows a side view of expansive mortar, expansive pressure inside the saw cut, the crack created at the bottom of the saw cut and the closed shrinkage crack in a concrete slab.
Fig 6 shows a side view of a completed repair including a rigid spacer, caulk, expansive mortar, location of cosmetic repairs and the closed shrinkage crack in a concrete slab.
Drawings-Reference Numerals
7 cosmetic surface repair 15 rigid spacer
8 open shrinkage crack 16 caulk
9 finished concrete slab 17 adhesive
10 saw cut 18 dam
1 1 wider saw cut 19 concrete piece number one
12 closed shrinkage crack 20 concrete piece number two
13 expansive mortar 21 cracked edges
14 created crack
DETAILED DESCRIPTION OF THE INVENTION
One embodiment of a crack repair method is illustrated in Fig 1 , 2 and3 (top view) and Fig 4, 5 and 6 (side view). The repair begins with planning the location of a saw cut 10 that balances aesthetics and close proximity to the open shrinkage crack 8 located on concrete piece number one 19. The completed saw cut 10 should not appear askew. Create a dam 18 inside the saw cut 10. Restrict expansive mortar 13 from any area where the saw cut 10 runs inside the open shrinkage crack 8 in order to confine pressure and not spread concrete piece number one 19 and concrete piece number two 20 apart. Expansive mortar 13 is mixed to a fluid consistency and poured into the saw cut 10 being treated adjacent the crack. The expansive pressure generated by the expansive mortar 13 will create a crack 14 at the bottom of the saw cut 10 and progresses to move one side of the saw cut 10 and simultaneously close the shrinkage crack 12. The cracked edges 21 of concrete are held in place with the interlocking aggregate inside the closed shrinkage crack 12, a rigid spacer 15 in the saw cut 10 and adhesive 17 in the closed shrinkage crack 12. A cosmetic surface repair 7 is optionally made to the top of the closed shrinkage crack 12.
Alternative Embodiments
In one embodiment, expansive mortar is used to facilitate pressure inside the saw cut. However, the pressure can be developed from any other material that can be placed inside the saw cut that develops sufficient expandable pressure to open the saw cut, such as foam, plastic, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
In one embodiment, the rigid spacer used to hold the control joint is made of epoxy. The rigid spacer can be of made of any other material that can be placed inside the saw cut to hold the prescribed separation and the crack tightly in place, such as cement, mortar, foam, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various
impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
In one embodiment, gravity fed epoxy is used as adhesive to hold the cracked concrete pieces together. The adhesive can be of any other material installed in the crack designed to bond the pieces together. The adhesive can be installed before the crack closes, after closure or both. The adhesive can have long or short set times and consist of various materials such as film, fabrics, foam, polyethylene, polypropylene, vinyl, nylon, rubber, leather, various impregnated or laminated fibrous materials, various plasticized materials, cardboard, paper, etc.
In one embodiment, the saw cut is of sufficient depth to receive the expansive mortar. The saw cut can be of varying depths. Best results are achieved when the saw cuts down to the top of the steel reinforcement in the slab. The steel will remain in place and give support across the newly formed control joint. Sometimes reinforcement steel is too high in the slab and may inadvertently be cut when installing the saw cut control joint. Consequently, the concrete is supported by the compacted base material under it and the epoxy interlocking the crack at the bottom of the saw cut.
Advantages
From the description above, a number of advantages of some embodiments of my new method for concrete crack repair become evident:
(a) The tightly closed shrinkage crack can be treated with cosmetic repairs that produce aesthetically pleasing results.
(b) The tightly closed shrinkage crack can be left untouched and produce
aesthetically pleasing results.
(c) The expansive action of the mortar in the saw cut creates an active control joint.
(d) Expansion and contraction movement of the repaired concrete slab are directed toward the new control joint.
(e) Expansion and contraction movement of the repaired concrete slab are directed away from the repaired crack.
(f) A saw cut control joint omitted from the original concrete installation can be
added after a crack has occurred.
(g) The expansive mortar does not stain the concrete surface like other materials.
(h) This method does not require full resurfacing.
(i) This method does not require new concrete.
(j) The cracked concrete becomes the repair material,
(k) The cracked concrete is an exact color match.
(I) The demolition becomes unnecessary.
(m)The new control joint will distract the eye and render a tight crack less noticeable, (n) The damage from striking or prying is avoided by activating the control joint with expansive mortar.
(o) The pressure generated with expansive mortar is uniform inside the saw cut. (p) The pressure generated is internal and does not chip the top surface,
(q) The entire crack shifts simultaneously without pinch points,
(r) The repair can be done by one person.
Accordingly, the reader will see that the new method for concrete crack repair of various embodiments can be used to repair cracks easily and conveniently, can be used where a control joint should have been installed, can produce better quality repairs, is an exact color match and is economical. In addition, when cracks are repaired, the active control joint created enhances the durability of the crack repair and so reduces jobsite call backs by increasing the repair performance. Furthermore, the new method for concrete crack repair has the additional advantages in that:
• It permits increased speed in repair;
• It permits increased quality of repair;
• It permits reduction in man power to make the repair;
• It permits using the existing concrete in the repair;
• It permits a new option for the repair man;
• It permits trial and error when selecting control joint placement;
• It permits increases work place safety; and
• It permits increases work efficiency.
Although the description above contains much specificity, these should not be construed as limiting the scope of the embodiments but merely providing illustrations of some of the several embodiments. For example, the saw cut can have various sizes and shapes; the saw cut can have various depths; the shrinkage crack can be of various shapes, sizes and angles; the expansive mortar can be of various compositions of matter; the adhesive can be of various forms of matter; the closed shrinkage crack can be partially bonded; the adhesive can be omitted in the closed shrinkage crack; the epoxy bond inside the closed crack can individually hold the piece in place; the rigid spacer can be relied upon in combination with the interlocking aggregate to keep the pieces in place; the rigid spacer can be of any form of matter; the rigid spacer can be bonded to one side of the saw cut; the rigid spacer can be bonded to neither side of the saw cut; the rigid spacer can be bonded to both sides of the saw cut; the rigid spacer can be held in place by friction; the rigid spacer can have a finished the top surface to replace the caulk; the control joint can be held open with any form of matter, etc.
Thus the scope of the embodiments should be determined by the appended claims and their legal equivalents, rather than by the examples given.
Claims
1. Concrete, comprising:
(a) an open crack;
(b) a saw cut positioned adjacent said open crack;
(c) an expansive composition positioned in said saw cut; and
(d) wherein the expansive agent pushes said open crack closed.
2. A dynamic crack closing system comprising:
(a) a slab;
(b) a crack in said slab;
(c) a saw cut adjacent to said crack;
(d) an expansive composition positioned in the saw cut; and
(e) wherein the expansive composition closes said crack by opening said saw cut.
3. A dynamic crack closing system of claim 2 including the step of applying a coating of adhesive inside the crack.
4. A dynamic crack closing system of claim 2 including the step of installing a rigid spacer in the augmented saw cut.
5. A crack repair kit, comprising:
(a) an expansive mortar;
(b) a saw cut modus operandi;
(c) a container wherein said expansive mortar can be mixed.
6. A method of repairing a concrete crack comprising:
(a) said crack;
(b) a saw cut adjacent said crack;
(c) an expansive mortar positioned in said saw cut; and
(d) wherein said saw cut splits, and further the portion of said saw cut
nearest said crack moves until the sides of the crack are conjoined.
7. A method for joining two pieces of concrete together at their cracked edges, comprising:
(a) providing said two pieces of concrete and the natural alignment of said cracked edges,
(b) passing a saw cut into one of the said two pieces of concrete,
(c ) placing expansive mortar into said saw cut,
(d) widening said saw cut with said expansive mortar,
(e) whereby said two pieces of concrete will be conjoined at their said cracked edges.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/783,356 | 2013-03-03 | ||
| US13/783,356 US9090515B2 (en) | 2013-03-03 | 2013-03-03 | Method for concrete crack repair |
Publications (4)
| Publication Number | Publication Date |
|---|---|
| WO2015142311A2 true WO2015142311A2 (en) | 2015-09-24 |
| WO2015142311A3 WO2015142311A3 (en) | 2015-11-12 |
| WO2015142311A4 WO2015142311A4 (en) | 2015-12-10 |
| WO2015142311A8 WO2015142311A8 (en) | 2016-03-10 |
Family
ID=51421070
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2014/022884 Ceased WO2015142311A2 (en) | 2013-03-03 | 2014-03-11 | New method for concrete crack repair |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US9090515B2 (en) |
| WO (1) | WO2015142311A2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4282978A2 (en) | 2016-09-28 | 2023-11-29 | Gavish-Galilee Bio Applications Ltd. | A universal platform for car therapy targeting a novel antigenic signature of cancer |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9090515B2 (en) * | 2013-03-03 | 2015-07-28 | Thomas Taverne | Method for concrete crack repair |
| CH712927A1 (en) * | 2016-09-07 | 2018-03-15 | Timber Structures 3 0 Ag | Method for elevating a wooden element. |
| US10487473B2 (en) * | 2017-06-20 | 2019-11-26 | Charles L. Asplin | Wall lifting methods |
| CA2983543C (en) | 2017-10-24 | 2019-07-23 | Jason May | Apparatus and method for stabilizing cracks and joints |
| US10571383B2 (en) * | 2017-12-11 | 2020-02-25 | James Joseph Spiegel | Concrete crack seal tester |
| US10890518B2 (en) | 2017-12-11 | 2021-01-12 | James Joseph Spiegel | Substrate seal test method and apparatus |
| US10494826B1 (en) * | 2018-09-20 | 2019-12-03 | Donald E. Wheatley | Method of repairing cracked concrete |
| CN117661417B (en) * | 2024-01-04 | 2025-10-10 | 长沙康旭电子科技有限公司 | An efficient concrete filling device with void detection function |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2539875A (en) * | 1943-12-11 | 1951-01-30 | William J Van London | Expansion joint filler for existing concrete pavements |
| US4565579A (en) | 1982-10-28 | 1986-01-21 | Central Glass Company, Limited | Nonexplosive chemical composition for gently breaking rock or concrete mass |
| US5771557A (en) | 1996-11-21 | 1998-06-30 | Contrasto; Sam | Concrete internal metal stitching |
| US7572852B1 (en) | 2002-02-19 | 2009-08-11 | Ware Don H | Concrete crack filler composition and method |
| WO2006002486A1 (en) | 2004-07-05 | 2006-01-12 | Concrete Slab Technology Pty Ltd | Method and apparatus for forming cracks in concrete |
| US8146309B1 (en) | 2007-10-11 | 2012-04-03 | Concrete Joint Ventures, LLC | Concrete crack inducer with drainage channel |
| US9090515B2 (en) * | 2013-03-03 | 2015-07-28 | Thomas Taverne | Method for concrete crack repair |
-
2013
- 2013-03-03 US US13/783,356 patent/US9090515B2/en not_active Expired - Fee Related
-
2014
- 2014-03-11 WO PCT/US2014/022884 patent/WO2015142311A2/en not_active Ceased
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4282978A2 (en) | 2016-09-28 | 2023-11-29 | Gavish-Galilee Bio Applications Ltd. | A universal platform for car therapy targeting a novel antigenic signature of cancer |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2015142311A3 (en) | 2015-11-12 |
| US20140248460A1 (en) | 2014-09-04 |
| WO2015142311A4 (en) | 2015-12-10 |
| US9090515B2 (en) | 2015-07-28 |
| WO2015142311A8 (en) | 2016-03-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9090515B2 (en) | Method for concrete crack repair | |
| US3969851A (en) | Architectural paving system with individual control joint paving | |
| KR101522505B1 (en) | Overall repairing method for concrete and asphalt road after repairing cracks by using the overall pavement products | |
| Jamieson et al. | Defining Australian rigid aircraft pavement design and detailing practice | |
| CN109278181A (en) | Stone material back-hand craft | |
| US6682260B2 (en) | Roller compacted concrete paving sealing method | |
| KR20170077067A (en) | Maintenance method of leaking area from roof top of concrete structure | |
| CN114960978A (en) | Waterproof method for concrete abutted seam without reserved embedded structure in reconstruction and extension structure | |
| KR100967952B1 (en) | Road paving method | |
| Plunkett | Construction and Detailing for Interior Design Second Edition | |
| CN108385612A (en) | A kind of construction method of the good concrete protecting face plate of stability | |
| JP6057325B2 (en) | Repair structure and repair method for existing waterways | |
| KR101664272B1 (en) | sealant mixi dissolution equipment | |
| KR101959104B1 (en) | composition for tile joint of tile gap, and method of constraction for the same | |
| CN107795097A (en) | A kind of construction method of heavy construction earth construction | |
| WO2004072395A8 (en) | Expansion joint for concrete work | |
| KR101115082B1 (en) | Hybrid waterproof panel and waterproofing method using the same | |
| WO2002000795A3 (en) | Method for preparing cold bituminous mixes and road pavements from bituminous emulsions, said bituminous emulsions | |
| KR102421703B1 (en) | Decoration concrete paving method | |
| KR20170081154A (en) | Paving Stone | |
| JP5068013B2 (en) | Repair method | |
| JP3715250B2 (en) | Drainable pavement structure near road bridge joints | |
| CN210828435U (en) | Leveling layer crack filling structure | |
| TW201942455A (en) | Micro-repair method for hollow decorative tiles | |
| KR20170069451A (en) | Paving Stone |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14886529 Country of ref document: EP Kind code of ref document: A2 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14886529 Country of ref document: EP Kind code of ref document: A2 |