WO2015007133A1 - Technologie d'excavation d'opérations parallèles de support provisoire et de support permanent pour support combiné hydraulique du type à chenilles et matériel l'utilisant - Google Patents
Technologie d'excavation d'opérations parallèles de support provisoire et de support permanent pour support combiné hydraulique du type à chenilles et matériel l'utilisant Download PDFInfo
- Publication number
- WO2015007133A1 WO2015007133A1 PCT/CN2014/080333 CN2014080333W WO2015007133A1 WO 2015007133 A1 WO2015007133 A1 WO 2015007133A1 CN 2014080333 W CN2014080333 W CN 2014080333W WO 2015007133 A1 WO2015007133 A1 WO 2015007133A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- support
- temporary
- temporary support
- hydraulic
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
Definitions
- Temporary support is to prevent the surrounding rock from falling and collapsing after the tunnel is excavated. In order to ensure the safety of the permanent support workers, the mining depth is shallow and the surrounding rock strength is high, and the self-supporting after excavation is stable and reliable. Simple construction and other suitable conditions, can be used for temporary support without temporary support. Under normal circumstances, after roadway excavation, temporary support should be carried out near the heading of the roadway, and the roadway should be implemented under the protection of temporary support. Permanent support.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2014292699A AU2014292699A1 (en) | 2013-07-15 | 2014-06-19 | Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310311586.9 | 2013-07-15 | ||
| CN201310311586.9A CN103382844B (zh) | 2013-07-15 | 2013-07-15 | 一种履带式液压组合支架临时支护与永久支护平行作业掘进工艺及设备 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2015007133A1 true WO2015007133A1 (fr) | 2015-01-22 |
Family
ID=49490748
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2014/080333 Ceased WO2015007133A1 (fr) | 2013-07-15 | 2014-06-19 | Technologie d'excavation d'opérations parallèles de support provisoire et de support permanent pour support combiné hydraulique du type à chenilles et matériel l'utilisant |
Country Status (3)
| Country | Link |
|---|---|
| CN (1) | CN103382844B (fr) |
| AU (1) | AU2014292699A1 (fr) |
| WO (1) | WO2015007133A1 (fr) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112943285A (zh) * | 2021-03-16 | 2021-06-11 | 中铁四院集团西南勘察设计有限公司 | 一种矩形顶管机盲区开挖用铲刀及矩形顶管机 |
| CN114837691A (zh) * | 2022-05-24 | 2022-08-02 | 赞比亚中色非洲矿业有限责任公司 | 一种软弱充填体内巷道掘进成套支护设备 |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103382844B (zh) * | 2013-07-15 | 2015-09-30 | 郑东风 | 一种履带式液压组合支架临时支护与永久支护平行作业掘进工艺及设备 |
| CN103670425B (zh) * | 2013-12-23 | 2015-12-02 | 郑东风 | 一种掘支一体化方法及掘进机托载式升降运移支架机械手 |
| CN103742176B (zh) * | 2014-01-21 | 2015-10-28 | 蒲长晏 | 一种掘支锚一体机组 |
| CN103758522B (zh) * | 2014-01-23 | 2015-12-30 | 郑东风 | 一种掘进工作面临时支护方法及其装备 |
| CN104179517B (zh) * | 2014-09-03 | 2017-03-15 | 兖矿集团有限公司 | 一种掘进支护系统及巷道支护方法 |
| CN104500116B (zh) * | 2014-12-15 | 2017-11-10 | 郑东风 | 一种机载式辅助支架升降搬运装置 |
| CN104675422B (zh) * | 2014-12-26 | 2016-08-24 | 安徽理工大学 | 煤矿巷道掘进工作面临时支护的液压装置 |
| CN108691545B (zh) * | 2018-03-30 | 2019-06-28 | 张卫东 | 一种适应复杂顶板形状的锚网支护连续掘进施工方法 |
| CN108894794B (zh) * | 2018-07-20 | 2024-02-27 | 陈成军 | 掘进流水线及其掘进作业方法 |
| CN112593961A (zh) * | 2020-12-04 | 2021-04-02 | 煤炭科学研究总院 | 巷道掘进方法 |
| CN114658432A (zh) * | 2022-03-24 | 2022-06-24 | 国家能源集团宁夏煤业有限责任公司 | 一种综采工作面回撤通道的施工方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3871707A (en) * | 1972-09-06 | 1975-03-18 | Consolidation Coal Co | Method for mining and supporting the mine roof |
| US4710064A (en) * | 1985-04-15 | 1987-12-01 | Stafford Frank K | Movable roof support and bolter system |
| CN2189645Y (zh) * | 1993-12-02 | 1995-02-15 | 中国矿业大学 | 掘进头临时支护特种液压支架 |
| CN102678151A (zh) * | 2012-04-17 | 2012-09-19 | 太原理工大学 | 综掘自移式临时支护系统及其工艺方法 |
| CN103382844A (zh) * | 2013-07-15 | 2013-11-06 | 郑东风 | 一种“履带式”液压组合支架临时支护与永久支护平行作业掘进工艺及设备 |
| CN103643979A (zh) * | 2013-07-15 | 2014-03-19 | 郑东风 | 用于巷道临时支护的液压支架及其架设、使用方法 |
| CN203769795U (zh) * | 2013-07-15 | 2014-08-13 | 郑东风 | 一种“履带式”液压组合支架临时支护与永久支护平行作业掘进设备 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102410017B (zh) * | 2011-12-13 | 2014-06-25 | 单淑花 | 支护式综合掘锚机 |
| CN202645555U (zh) * | 2012-04-06 | 2013-01-02 | 中铁隧道装备制造有限公司 | 全密封煤巷掘锚同步机 |
| CN202768027U (zh) * | 2012-09-20 | 2013-03-06 | 石家庄煤矿机械有限责任公司 | 一种与掘进机配套使用的快速掘进临时支护系统 |
-
2013
- 2013-07-15 CN CN201310311586.9A patent/CN103382844B/zh not_active Expired - Fee Related
-
2014
- 2014-06-19 WO PCT/CN2014/080333 patent/WO2015007133A1/fr not_active Ceased
- 2014-06-19 AU AU2014292699A patent/AU2014292699A1/en not_active Abandoned
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3871707A (en) * | 1972-09-06 | 1975-03-18 | Consolidation Coal Co | Method for mining and supporting the mine roof |
| US4710064A (en) * | 1985-04-15 | 1987-12-01 | Stafford Frank K | Movable roof support and bolter system |
| CN2189645Y (zh) * | 1993-12-02 | 1995-02-15 | 中国矿业大学 | 掘进头临时支护特种液压支架 |
| CN102678151A (zh) * | 2012-04-17 | 2012-09-19 | 太原理工大学 | 综掘自移式临时支护系统及其工艺方法 |
| CN103382844A (zh) * | 2013-07-15 | 2013-11-06 | 郑东风 | 一种“履带式”液压组合支架临时支护与永久支护平行作业掘进工艺及设备 |
| CN103643979A (zh) * | 2013-07-15 | 2014-03-19 | 郑东风 | 用于巷道临时支护的液压支架及其架设、使用方法 |
| CN203769795U (zh) * | 2013-07-15 | 2014-08-13 | 郑东风 | 一种“履带式”液压组合支架临时支护与永久支护平行作业掘进设备 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112943285A (zh) * | 2021-03-16 | 2021-06-11 | 中铁四院集团西南勘察设计有限公司 | 一种矩形顶管机盲区开挖用铲刀及矩形顶管机 |
| CN114837691A (zh) * | 2022-05-24 | 2022-08-02 | 赞比亚中色非洲矿业有限责任公司 | 一种软弱充填体内巷道掘进成套支护设备 |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2014292699A1 (en) | 2016-01-28 |
| CN103382844A (zh) | 2013-11-06 |
| CN103382844B (zh) | 2015-09-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2015007133A1 (fr) | Technologie d'excavation d'opérations parallèles de support provisoire et de support permanent pour support combiné hydraulique du type à chenilles et matériel l'utilisant | |
| US11008860B2 (en) | Equipment system for no-roadway no-coal-pillar retained roadway mining method | |
| CN104564050B (zh) | 一种掘锚平行作业施工装备 | |
| CN104675422B (zh) | 煤矿巷道掘进工作面临时支护的液压装置 | |
| CN103643979B (zh) | 用于巷道临时支护的液压支架及其架设、使用方法 | |
| CN105971628A (zh) | 掘进巷道临时支护方法 | |
| CN107288648B (zh) | 开敞式全断面岩石掘进机用支护系统及支护方法 | |
| CN107060795B (zh) | 一种地下矿井tbm组装施工方法 | |
| CN109538224B (zh) | 一种新型煤巷快速掘进机 | |
| CN110985083B (zh) | 一种回采巷道垛式支架支护系统及方法 | |
| CN104234749A (zh) | 一种综采工作面大断面回撤通道围岩控制方法 | |
| CN104747201A (zh) | 不稳定围岩条件下的煤巷快速掘锚一体化设备 | |
| CN111911154B (zh) | 一种龙门式掘护锚机器人系统 | |
| CN204113319U (zh) | 一种折叠伸缩式巷道液压支架 | |
| CN104632236A (zh) | Tbm-epb双模式盾构在复合地层中的施工方法 | |
| US20200095747A1 (en) | Foundation Construction Device and Its Construction Method | |
| CN102536229A (zh) | 掘、护、锚平行作业系统与施工工艺 | |
| CN104373147B (zh) | 一种折叠伸缩式巷道液压支架 | |
| US4687375A (en) | Circular heading machine | |
| CN108691553B (zh) | 一种联络通道施工用类矩形顶管机 | |
| CN208441848U (zh) | 联络通道施工用类矩形顶管机 | |
| CN105065048A (zh) | 煤矿井下掘进工作面临时支架 | |
| CN204941586U (zh) | 煤矿井下掘进工作面临时支架 | |
| CN104500116B (zh) | 一种机载式辅助支架升降搬运装置 | |
| CN104863599A (zh) | 综采工作面同步扩帮安装方法及支护系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14826668 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2014292699 Country of ref document: AU Date of ref document: 20140619 Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14826668 Country of ref document: EP Kind code of ref document: A1 |