WO2014119153A1 - エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ - Google Patents
エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ Download PDFInfo
- Publication number
- WO2014119153A1 WO2014119153A1 PCT/JP2013/083651 JP2013083651W WO2014119153A1 WO 2014119153 A1 WO2014119153 A1 WO 2014119153A1 JP 2013083651 W JP2013083651 W JP 2013083651W WO 2014119153 A1 WO2014119153 A1 WO 2014119153A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- discharge
- value
- unit
- power
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00004—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/008—Circuit arrangements for AC mains or AC distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/30—The power source being a fuel cell
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/40—Fuel cell technologies in production processes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/12—Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- Embodiments of the present invention relate to an energy management system, an energy management method, a program, and a server that manage an energy balance of a customer (customer) such as a household.
- HEMS Home Energy Management System
- a distributed power source such as a photovoltaic power generation (PV) system, a storage battery, or a fuel cell (FC) and a network of existing home appliances. It is a system that can connect and manage them comprehensively.
- PV photovoltaic power generation
- FC fuel cell
- PV units are becoming popular and are installed in many homes with the help of feed-in tariff (FIT) and subsidies.
- Household storage batteries have also been put into practical use and play a part in measures against power outages and load leveling. By combining these, it is possible to increase the amount of electricity sold derived from renewable energy by covering the power demand during PV power generation with the discharge of the storage battery. This is a merit due to the so-called push-up effect.
- a patent application has been filed for related technology (Japanese Patent Application No. 2012-255301).
- FC is expected to spread in the future.
- FC can generate power stably day and night regardless of the weather, and can supply heat energy using exhaust heat.
- a technology is known that combines a FC and a storage battery to avoid reverse power flow to the system and unnecessary power purchase from the system.
- a technique for calculating a driving schedule by modeling a household distributed power source including FC is already known.
- FC has the property of generating both electric power and heat simultaneously (cogeneration). Since the charging / discharging of the storage battery affects the power generation amount of the FC, the optimal charging / discharging timing of the storage battery cannot be determined without taking into account the power generation amount of the FC at that time. Due to such interaction, it is difficult to comprehensively manage the PV unit, the storage battery, and the FC, and to reduce the energy cost from both the electricity charge and the gas charge. There is a demand for a technology that eliminates unnecessary energy consumption and can reduce energy costs as much as possible.
- the purpose is to provide an energy management system, an energy management method, a program, and a server that can take advantage of the characteristics of a fuel cell and that can advantageously operate a new energy device.
- the energy management system includes a first power generation unit that generates electric power derived from renewable energy, a second power generation unit that generates electric power derived from non-renewable energy, and a power storage device. Manage your home energy.
- the energy management system includes a prediction unit, a calculation unit, a creation unit, and a control unit.
- the prediction unit predicts a demand for energy in the consumer to obtain a predicted value of the demand, predicts a power generation amount of the first power generation unit, and obtains a predicted value of the power generation amount.
- the calculation unit calculates an operation schedule of the second power generation unit based on the predicted value of demand and the predicted value of power generation amount.
- the creation unit uses a discharge strategy that can maximize the deduction amount obtained by subtracting the profit or loss of power purchase from the power sale profit by using the effect of boosting the power sale amount due to the discharge of the power storage device. Create based on the driving schedule.
- the control unit controls the discharge of the power storage device based on the actual value of demand, the actual value of power generation, the operation schedule, and the discharge strategy.
- FIG. 1 is a diagram illustrating an example of a system according to the embodiment.
- FIG. 2 is a diagram illustrating an example of an energy management system according to the embodiment.
- FIG. 3 is a functional block diagram illustrating a main part of the HEMS according to the first embodiment.
- FIG. 4 is a diagram for explaining the control target model 300g.
- FIG. 5 is a functional block diagram showing an example of the storage battery rule creation unit 122 shown in FIG.
- FIG. 6 is a diagram illustrating an example of a charge / discharge efficiency table of the storage battery 102.
- FIG. 7 is a flowchart showing a processing procedure in the first embodiment.
- FIG. 8 is a conceptual diagram showing an example of gene design of the genetic algorithm according to the embodiment.
- FIG. 9 is a flowchart illustrating an example of the flow of the optimization calculation according to the embodiment.
- FIG. 10 is a flowchart illustrating an example of a processing procedure related to creation of a discharge rule in the first embodiment.
- FIG. 11A is a graph illustrating an example of the PV power generation prediction value P PV (t).
- FIG. 11B is a graph showing an example of correction values ⁇ P D (t) of predicted power demand values.
- FIG. 11C is a graph showing an example of the discharge value V (t).
- FIG. 11D is a graph showing an example of the predicted value E (t) of the discharge value rate.
- FIG. 12 is a flowchart illustrating an example of a processing procedure of the battery controller 131.
- FIG. 11A is a graph illustrating an example of the PV power generation prediction value P PV (t).
- FIG. 11B is a graph showing an example of correction values ⁇ P D (t) of predicted power demand values.
- FIG. 11C is a graph showing
- FIG. 13 is a functional block diagram illustrating a main part of the HEMS according to the second embodiment.
- 14 is a functional block diagram showing an example of the storage battery rule creation unit 122 shown in FIG.
- FIG. 15 is a flowchart illustrating an example of a processing procedure related to creation of a discharge rule in the second embodiment.
- FIG. 16A is a diagram illustrating an example of daily fluctuations in the SOC of the storage battery 102.
- FIG. 16B is a diagram illustrating an example of daily fluctuations in the SOC of the storage battery 102.
- FIG. 17 is a diagram for explaining the effects obtained by the second embodiment.
- FIG. 1 is a diagram illustrating an example of a system according to the embodiment.
- FIG. 1 shows an example of a system known as a so-called smart grid.
- existing grid grid
- existing power plants such as nuclear power, thermal power, and hydropower are connected to a wide variety of consumers such as ordinary households, buildings, and factories through the power grid.
- distributed power sources such as photovoltaic (Powervoltaic Power Generation: PV) systems and wind power generators, power storage devices, new transportation systems and charging stations are connected to the power grid. Is done.
- PV photovoltaic Power Generation
- EMS Energy Management System
- HEMS Home Energy Management System
- BEMS Building Energy Management System
- MEMS Mansion Energy Management System
- CEMS Common Energy Management System
- FEMS Fractory Energy Management System
- FIG. 2 is a diagram illustrating an example of an energy management system according to the embodiment.
- the HEMS includes a client system and a cloud computing system (hereinafter abbreviated as “cloud”) 300.
- the cloud 300 can be understood as a server system that can communicate with a client system.
- the client system includes a home gateway (Home Gateway: HGW) 7.
- the home gateway 7 is a communication device installed in the home 100 and can receive provision of various services from the cloud 300.
- the cloud 300 includes a server computer SV and a database DB.
- the server computer SV may be single or plural.
- the database DB may be provided in one server computer SV or may be distributed and arranged in a plurality of server computers SV.
- power (AC voltage) supplied from the power grid 6 is distributed to each home via a transformer 61 and the like, and supplied to a distribution board 20 of the home 100 via a watt-hour meter (smart meter) 19.
- the watt-hour meter 19 has a function of measuring a power generation amount of an energy production device provided in the home 100, a power consumption amount of the home 100, a power amount flowing from the power grid 6, a power amount flowing back to the power grid 6, and the like.
- the electric power generated based on the renewable energy is allowed to flow backward to the power grid 6.
- Distribution board 20 supplies electric power to home appliances (lighting, air conditioner, etc.) 5 and power conditioning system (PCS) 104 connected to distribution board 20 via distribution line 21. Moreover, the distribution board 20 is provided with the measuring device which measures the electric energy for every feeder.
- home appliances lighting, air conditioner, etc.
- PCS power conditioning system
- the electric device is a device that can be connected to the distribution line 21 in the home 100.
- Devices that consume electric power (loads), devices that generate electric power, devices that consume and generate electric power, storage batteries, and the like correspond to electric devices. That is, the home appliance 5, the PV unit 101, the storage battery 102, and the fuel cell (hereinafter referred to as FC unit) 103 all correspond to electrical devices.
- the electric device is detachably connected to the distribution line 21 via an outlet (not shown), and is connected to the distribution board 20 via the distribution line 21.
- the PV unit 101 is installed on the roof and outer wall of the home 100.
- the PV unit 101 is an energy creation device that produces electric power energy from renewable energy. Wind power generation systems are also in the category of energy creation equipment. If surplus power derived from renewable energy is generated, this surplus power can be sold to the power grid 6.
- the FC unit 103 is a power generation unit that produces electric power from city gas or LP gas (liquefied propane gas) that is a non-renewable energy source. Since the power generated by the FC unit 103 is prohibited from flowing backward to the power grid 6, surplus power may be generated. Surplus power can be charged to the storage battery 102.
- city gas or LP gas liquefied propane gas
- PCS 104 includes a converter (not shown).
- the PCS 104 converts AC power from the distribution line 21 into DC power by a converter and supplies the DC power to the storage battery 102.
- the PCS 104 includes an inverter (not shown).
- the PCS 104 converts the DC power supplied from the PV unit 101, the storage battery 102, or the FC unit 103 into AC power using an inverter and supplies the AC power to the distribution line 21. Thereby, the electric device can receive power supply from the PV unit 101, the storage battery 102, and the FC unit 103 via the PCS 104.
- the PCS 104 has a function as a power converter for transferring energy between the PV unit 101, the storage battery 102, the FC unit 103, and the distribution line 21.
- the PCS 104 also has a function of controlling the storage battery 102 and the FC unit 103 to operate stably.
- FIG. 2 shows a form in which the PCS 104 is commonly connected to the PV unit 101, the storage battery 102, and the FC unit 103. Not only this form, but also the PV unit 101, the storage battery 102, and the FC unit 103 may each have a PCS function.
- a home network 25 such as a wireless local area network (LAN) is formed in the home 100.
- the home gateway 7 is detachably connected to both the home network 25 and the IP network 200 via a connector (not shown) or the like. Thereby, the home gateway 7 can communicate with the watt-hour meter 19, the distribution board 20, the PCS 104, and the home appliance 5 connected to the home network 25.
- the home network 25 may be either wireless or wired.
- the home gateway 7 includes a communication unit 7a as a processing function according to the embodiment.
- the communication unit 7 a is a network interface that transmits various data to the cloud 300 and receives various data from the cloud 300.
- the home gateway 7 is a computer having a Central Processing Unit (CPU) and a memory (not shown).
- the memory stores a program for controlling the computer.
- the program communicates with the cloud 300, requests the cloud 300 to calculate the operation schedule of the home appliance 5, the storage battery 102, and the FC unit 103, and gives instructions for reflecting the intention of the customer to control the system. Including.
- the functions of the home gateway 7 are realized by the CPU functioning based on various programs.
- the home gateway 7 transmits various data to the cloud 300 and receives various data from the cloud 300.
- the home gateway 7 is a client device that can communicate with the cloud 300 and the server computer SV.
- the various data transmitted from the home gateway 7 includes request signals for requesting the cloud 300 to perform various calculations.
- the home gateway 7 is connected to the terminal 105 via a wired line or a wireless line.
- the home gateway 7 and the terminal 105 can be combined to implement a function as a local server.
- the terminal 105 may be a so-called touch panel or the like, for example, a general-purpose portable information device, a personal computer, or a tablet terminal.
- the terminal 105 displays the operating status and power consumption of the home appliance 5, the PV unit 101, the storage battery 102, and the FC unit 103 on, for example, an LCD (Liquid Crystal Display), or notifies a consumer (user) by voice guidance or the like.
- the terminal 105 includes an operation panel, and accepts various operations and setting inputs by a consumer.
- the IP network 200 is the so-called Internet or a system vendor's VPN (Virtual Private Network).
- the home gateway 7 can communicate with the server computer SV via the IP network 200 and exchange data with the database DB.
- the IP network 200 may include a wireless or wired communication infrastructure for forming a bidirectional communication environment between the home gateway 7 and the cloud 300.
- the cloud 300 includes a collection unit 300a, a prediction unit 300b, a calculation unit 300c, and a control unit 300d.
- the control target model 300g of the storage battery 102 and the FC unit 103 and various data 300h are stored in the database DB of the cloud 300.
- the collection unit 300a, the prediction unit 300b, the calculation unit 300c, and the control unit 300d are functional objects distributed and arranged in a single server computer SV or the cloud 300. Those skilled in the art will readily understand how to implement these functional objects in the system.
- the collection unit 300a, the prediction unit 300b, the calculation unit 300c, and the control unit 300d are realized as programs executed by the server computer SV of the cloud 300.
- This program can be executed by a single computer or can be executed by a system including a plurality of computers.
- Various functions according to the embodiment are realized by executing the instructions described in the program.
- the collection unit 300a acquires various data related to the home appliance 5 of the home 100, the PV unit 101, the storage battery 102, the FC unit 103, and the like from the home gateway 7 of each home 100 regularly or irregularly. In addition, the collection unit 300 a acquires user operation history and the like on the terminal 105 from the terminal 105. Note that the collection unit 300a and the terminal 105 can directly communicate with each other via the communication line 40.
- the acquired data is stored as data 300h in the database DB.
- the data 300h includes the power demand of each home 100, the power consumption of each home appliance 5, the amount of hot water supply, the operating state, the remaining charge and charge / discharge power of the storage battery 102, the amount of power generated by the PV unit 101, and the like.
- weather data provided by the Japan Meteorological Agency can be included in the data 300h.
- the prediction unit 300b predicts an energy demand (electric power demand or hot water supply demand) and an energy production amount (power generation amount) in the home 100 based on the data 300h acquired by the collection unit 300a.
- the prediction unit 300b predicts, for example, a power demand of the home 100, a hot water supply demand, a PV power generation amount, and the like.
- the calculation unit 300c calculates the operation schedule of the storage battery 102 and the FC unit 103 based on the control target model 300g and the predicted energy demand and energy production amount. That is, the calculation unit 300c calculates, for example, a charge / discharge schedule of the storage battery 102 or a power generation schedule (FC power generation schedule) of the FC unit 103 based on, for example, a power demand, a hot water supply demand, and a PV power generation amount.
- the calculation unit 300 c determines the operation schedule of the storage battery 102 and the FC unit 103 in order to optimize the energy balance in the home 100. This process is called optimal scheduling.
- the energy balance is, for example, a utility bill, and is an amount that is evaluated based on a balance between the cost of power energy consumed by the home appliance 5 and the power sales fee of energy generated mainly by the PV unit 101.
- the calculated time series operation schedule of the storage battery 102 and the FC unit 103 is stored in the database DB.
- the control unit 300d generates control information for controlling the storage battery 102 and the FC unit 103 based on the calculated operation schedule. That is, the controller 300d generates a charge / discharge of the storage battery 102, an operation, an operation / stop instruction for power generation of the FC unit 103, an output target value, and the like from the result of the optimal scheduling. Such control information is transmitted to the terminal 105 and the home gateway 7 via the communication line 40.
- the terminal 105 of the home 100 includes an interface unit (user interface 105a in FIG. 3) for reflecting the intention of the consumer in the control of the home appliance 5 based on the control information transmitted from the control unit 300d.
- the user interface 105 a includes a display for displaying a charge / discharge schedule of the storage battery 102 and a power generation schedule of the FC unit 103.
- the consumer can check the schedule by looking at the contents displayed on the display, and can select whether to allow or reject the execution of the displayed schedule. Thereby, a consumer's intention can be reflected in execution of a schedule.
- the consumer can input an instruction (command) for requesting recalculation of the schedule to the cloud 300 or giving information necessary for the calculation to the system via the user interface 105a.
- FIG. 3 is a functional block diagram illustrating a main part of the HEMS according to the first embodiment.
- the home gateway 7 includes a power demand of the home 100, a hot water supply demand, a PV power generation amount, an SOC (State of Charge) of the storage battery 102, a hot water storage amount of the FC unit 103, a charge / discharge amount of the storage battery 102, Actual data such as the amount of hot water stored is transmitted to HEMS (cloud 300) regularly or irregularly. These data are accumulated in the database DB of HEMS. The operation history of the customer terminal 105 is also transmitted to the cloud 300. The actual data is a measured value indicating an actual value and is distinguished from the predicted value.
- the prediction unit 300b of the HEMS uses the collected power demand, hot water supply demand, PV power generation amount data, weather data (weather forecast), etc., and the power demand, hot water demand, PV for every predetermined time on the target day. Predict power generation. Meteorological data is distributed from other servers (such as the Japan Meteorological Agency) at several times a day. You may perform prediction calculation according to the timing which received this weather data.
- the calculation unit 300c executes optimal scheduling related to operation control of the storage battery 102 and the FC unit 103 based on the energy demand, energy supply amount, energy unit price, control target model 300g, and the like for each predetermined time calculated by the prediction calculation. To do.
- the optimal scheduling for example, the charge / discharge schedule of the storage battery 102 and the power generation schedule of the FC unit 103 are obtained.
- the prediction unit 300b, the calculation unit 300c, and the control unit 300d can be implemented as, for example, functional objects provided exclusively for each consumer. That is, the functions of the prediction unit 300b, the calculation unit 300c, and the control unit 300d can be provided for each consumer.
- a form is possible by creating a plurality of threads in the program execution process. According to such a form, there is an advantage such as easy security.
- the prediction unit 300b, the calculation unit 300c, and the control unit 300d can be implemented as functional objects provided for a plurality of consumers. That is, the calculation by the prediction unit 300b and the calculation unit 300c can be executed in units of a plurality of consumers. According to such a form, it is possible to obtain merits such as saving of calculation resources.
- the control unit 300d creates a discharge strategy that can maximize the deduction amount obtained by subtracting the power purchase profit / loss from the power sale profit by using the effect of increasing the amount of power sold by the discharge of the storage battery 102.
- the discharge strategy is created based on the predicted power demand value, the predicted PV power generation amount, the power generation schedule of the FC unit 103, and the like.
- the control unit 300d includes an FC rule creation unit 121 and a storage battery rule creation unit 122 as processing functions according to the embodiment.
- the FC rule creation unit 121 generates a start / stop command according to the power generation schedule created by the calculation unit 300c, and a power generation target value (control rule). This control rule is notified to the FC controller 132 via the communication line 40.
- the FC controller 132 controls the FC unit 103 based on the notified control rule, the power demand (measured value), the PV power generation amount (measured value), the power generation schedule of the FC unit 103, and the like.
- the power generation target value is fixed to some extent. Further, it is preferable that the activation / deactivation of the FC unit 103 is as little as possible.
- the storage battery rule creation unit 122 creates a control rule for controlling the storage battery 102.
- the control rule is notified to the battery controller 131 via the communication line 40.
- the battery controller 131 controls the charge / discharge amount and charge / discharge timing of the storage battery 102 based on the control rule, the power demand (measured value), the PV power generation amount (measured value), and the like.
- FIG. 4 is a diagram for explaining the control target model 300g.
- the control target model 300g includes each component of the power grid 6, the FC unit 103, the storage battery 102, the PV unit 101, and the load (home appliance) 205.
- the FC unit 103 includes components of an FC main body 220, an auxiliary boiler 221, a reverse power flow prevention heater 222, and a hot water tank 223.
- the variables shown in FIG. 4 are shown in Table 1.
- the control target model 300g shows an input / output relationship of each component and a relational expression between input variables or output variables between the components.
- the controlled object model 300g can be expressed by the equations (1) to (9).
- the gas supply amount F (t) is shown as the sum of the supply amount F FC (t) to the FC main body 220 and the supply amount F B (t) to the auxiliary boiler.
- the FC main body 220 generates power by P FC (t) with respect to the gas supply amount of F FC (t) and exhausts heat by Q FC (t).
- the input / output characteristics of the FC main body 220 are approximated as shown in equations (2) and (3).
- Expressions (2) and (3) indicate the relationship between the gas supply amount, the power generation amount, and the exhaust heat amount in the FC main body 220.
- the reverse power flow prevention heater 222 converts the surplus power P H (t) into heat of the heat quantity Q H (t) and consumes it. That reverse flow prevention heater 222, by discarding the heat of heat Q H (t), the surplus power is controlled so as not to reverse flow to the power grid 6.
- the auxiliary boiler 221 supplies hot water supply Q B (t) that cannot be covered by the hot water supply Q ST (t) from the hot water storage tank 223 in the hot water supply demand.
- the hot water storage amount H (t) of the hot water storage tank 223 includes the exhaust heat Q FC (t) of the FC main body 220, the heat generation amount Q H (t) of the reverse flow prevention heater 222, and hot water supply as shown in the equation (4). Increase or decrease by Q ST (t). The amount of heat lost due to heat dissipation or the like is expressed by hot water storage efficiency r. Equation (5) shows the capacity restriction of the hot water tank 223.
- the storage battery 102 can be modeled as a model in which the remaining charge S (t) increases or decreases depending on the charge / discharge power P SB (t).
- Equation (6) shows the power supply / demand balance.
- P D (t) indicates the power demand of the home 100
- P C (t) indicates purchased power or sold power
- P PV (t) indicates the amount of power generated by the PV 101.
- Expressions (7) and (8) indicate the constraint condition that the reverse power flow from the FC main body 220 and the storage battery 102 is prohibited.
- Equation (9) shows the constraint condition of the capacity of the storage battery 102.
- the calculation unit 300c (FIGS. 2 and 3) has the schedule of the power generation P FC (t) of the FC unit 103 so that the utility bill (energy cost) is minimized under the above conditions,
- the charging / discharging P SB (t) schedule of the storage battery 102 is obtained.
- electric power / hot water demand and PV power generation amount, electricity / gas unit price, power purchase price, and the like are also used.
- a genetic algorithm can be used as the optimization algorithm.
- FIG. 5 is a functional block diagram showing an example of the storage battery rule creation unit 122 shown in FIG.
- the storage battery rule creation unit 122 includes a correction unit 301, a discharge value rate calculation unit 302, and a rule determination unit 303.
- the storage battery rule creation unit 122 outputs a discharge value rate threshold value, which is a set value for charge / discharge control of the storage battery 102.
- the correction unit 301 acquires the FC power generation schedule from the calculation unit 300c, and acquires the power demand prediction value from the prediction unit 300b.
- the correction unit 301 corrects the acquired power demand predicted value with the power generation amount of the FC unit 103 based on the FC power generation schedule.
- the discharge value rate calculation unit 302 acquires the charge / discharge efficiency table (FIG. 6) from, for example, the database DB, acquires the electricity rate table from, for example, another server in the cloud 300, and acquires the predicted PV power generation amount from the prediction unit 300b. .
- the discharge value rate calculation unit 302 calculates the discharge value rate (predicted value) based on the charge / discharge efficiency table (FIG. 6), the electricity rate table, the power demand predicted value, and the PV power generation predicted value.
- the discharge value rate is passed to the rule determination unit 303.
- the discharge value rate is a value obtained by dividing the discharge value by the discharge amount of the storage battery 102.
- the discharge value rate has two values, a predicted value and an actual value.
- the predicted value of the discharge value rate is calculated by dividing the predicted value of the discharge value by the amount of discharge.
- the actual value of the discharge value rate is calculated by dividing the actual value of the discharge value by the amount of discharge.
- the predicted value of the discharge value is expressed as the sum of the amount of cancellation of the power purchase profit and loss when the correction value of the power demand predicted value is covered by the discharge of the storage battery 102 and the power sales profit based on the predicted value of the PV power generation amount. . Both the discharge value and the discharge value rate are calculated for each unit period (one hour or one minute in one day) in a reference period (for example, one day).
- FIG. 6 is a diagram showing an example of a charge / discharge efficiency table of the storage battery 102.
- the charge / discharge efficiency table is a table in which the value of the charging power of the storage battery 102 (or the value of the discharging power) is associated with the efficiency when charging (discharging) the power of that value.
- the charging efficiency and discharging efficiency of power of 500 watts [W] are 0.8. Values not shown in the table of FIG. 6 can be obtained by interpolation.
- the rule determination unit 303 acquires the SOC of the storage battery 102 from the database DB. And the rule determination part 303 determines the discharge rule of the storage battery 102 based on discharge value rate and storage battery SOC. That is, the rule determination part 303 adds the correction value of an electric power demand predicted value in an order from the unit period with a high predicted value of a discharge value rate. And the unit period when the total value becomes more than the total discharge amount of the storage battery 102 is specified. The predicted value of the discharge value rate in the specified unit period becomes a threshold value as a discharge rule.
- FIG. 7 is a flowchart showing a processing procedure in the first embodiment.
- the optimization calculation requires power demand prediction, hot water supply demand prediction, PV power generation amount prediction, and the like.
- the optimization calculation is executed at the timing of several times a day when these prediction calculations are executed.
- the prediction unit 300b acquires a power demand, a hot water supply demand, and a PV power generation amount every predetermined time from the database DB (step S11). In this step, not only current data but also past data such as data on the same day of the previous year may be acquired. Next, the prediction unit 300b predicts a power demand, a hot water supply demand, and a PV power generation amount every predetermined time (step S12).
- the calculation unit 300c calculates the power generation amount schedule of the FC unit 103 and the charge / discharge amount schedule of the storage battery 102 so as to minimize the utility bill (step S13).
- the calculated schedule is stored in the database DB.
- the system transmits a message signal indicating the charge / discharge amount schedule of the storage battery 102 or the schedule of the power generation amount of the FC unit 103 to the terminal 105 via the IP network 200.
- the terminal 105 decodes the message signal and displays various schedules on the interface (step S14). Routines related to message message transmission and display are executed periodically or in response to a request from the user.
- the cloud 300 waits for the arrival of a permission message signal indicating that the execution of the device operation schedule is permitted by the user (step S15). If permitted, the storage battery rule creation unit 122 creates a control rule for controlling the storage battery 102, and transmits this control rule to the home gateway 7 of the home 100 via the IP network 200 (step S16).
- the control rule includes, for example, an operation / stop instruction for charging / discharging the storage battery 102, an output target value, and the like.
- the FC rule creation unit 121 acquires the FC power generation schedule, and transmits the operation / stop time for power generation of the FC unit 103, the output target value, and the like to the home gateway 7 of the home 100 via the IP network 200 ( Step S17). The above procedure is repeated every time interval of the schedule.
- step S12 by combining the prediction procedure of step S12 and the optimal scheduling of step S13, according to power demand prediction, hot water supply demand prediction, and PV power generation prediction for a period of about one day.
- Demand and supply plans such as the power generation schedule of the FC unit 103 and the charge / discharge schedule of the storage battery 102 can be created in consideration of the overall balance. Therefore, it is possible to avoid a case where the storage battery 102 is fully charged and the surplus power of the FC unit 103 cannot be charged, or a case where the remaining charge is insufficient when the storage battery 102 should be discharged.
- FIG. 8 is a conceptual diagram showing an example of gene design of the genetic algorithm according to the embodiment.
- the power generation amount P FC (t) of the FC unit 103 and the charge / discharge power P SB (t) of the storage battery 102 are incorporated into the gene.
- the operation schedule of the storage battery 102 and the FC unit 103 for one day is an individual, and the generation includes a plurality of individuals.
- Equation (10) indicates the fitness Fit to be maximized. By optimizing this Fit as an objective function, the driving schedule can be calculated.
- Equation (11) represents the utility bill C.
- the fitness Fit shown in the equation (10) is a monotonically increasing function f (C) having a daily energy bill C as a variable and a cost g (P FC (t), P It is the reciprocal of the sum of SB (t))> 0. If the PV power generation amount greatly exceeds the power demand of the home 100, the utility bill C may become negative. Therefore, in order to correspond to the decrease in the utility bill C and the increase in fitness Fit, A form is adopted. In the first embodiment, a function satisfying f (C)> 0 is used.
- Power demand, hot water supply demand, PV power generation amount, electricity unit price, gas unit price, and PV purchase price are given to the above formula, and genetic operations such as mutation, crossing, dredging, etc. are repeated to maximize Fit. .
- genetic operations such as mutation, crossing, dredging, etc. are repeated to maximize Fit. .
- FIG. 9 is a flowchart illustrating an example of the flow of the optimization calculation according to the first embodiment.
- a genetic algorithm is taken as an example of an optimization algorithm. The processing procedure based on the genetic algorithm will be described below.
- Step S21 Generation of initial population
- the calculation unit 300c generates n initial individuals.
- the individual gene includes, for example, operation / stop of the FC unit 103 at time t, power generation amount of the FC unit 103, charge / discharge power of the storage battery 102, and the like. For example, one day (24 hours) can be provided as a gene string.
- Each individual is a set of gene sequences of the FC unit 103 and the storage battery 102. Solids that do not satisfy the constraint condition are bit-inverted to modify the gene to satisfy the constraint condition.
- Step S22 The loop of step S22 is a process of repeating the processes of steps S23 to S26. When this loop reaches the specified number of times, the algorithm operation is finished. In addition, the fitness of each individual and the average fitness of the generation are calculated. The average fitness in that generation is compared with the average fitness of the previous two generations. If the result of the comparison is less than or equal to the arbitrarily set value ⁇ , the algorithm operation is terminated.
- Step S23 ⁇ ⁇ ⁇ ⁇
- the calculation unit 300c excludes individuals that do not satisfy the constraint conditions. Therefore, individuals who do not satisfy the constraints are deceived. If there are more than a predetermined number of individuals, individuals with poor fitness (small fitness) are excluded, and the number of individuals is kept below the predetermined number.
- Step S24 Proliferation In this step, when the number of individuals is smaller than the predefined number of individuals, the calculation unit 300c proliferates individuals with the best fitness.
- Crossover Calculation unit 300c performs pairing at random. Pairing is performed as much as the ratio (crossover rate) to the total number of individuals, and gene loci are randomly selected for each pair and crossed at one point.
- Step S26 Mutation
- the calculation unit 300c randomly selects individuals by a ratio (mutation rate) to the total number of individuals, and selects a gene at an arbitrary (randomly determined) locus of each individual as a bit. Invert.
- Step S23 The procedure from (Step S23) to (Step S26) is repeated while incrementing the number of generations until the condition of the number of generations ⁇ the maximum number of generations is satisfied (loop of Step S22). If this condition is satisfied, the calculation unit 300c outputs the result (step S27) and ends the calculation procedure.
- the function indicating the fitness Fit to be maximized includes the gas charge required for the operation of the FC unit 103.
- a schedule for operating the reverse power flow prevention heater 222 wastefully is deceived in the process of optimization calculation under the condition that there is a possible solution.
- FIG. 10 is a flowchart illustrating an example of a processing procedure related to creation of a discharge rule for the storage battery 102.
- the control unit 300d corrects the time series of the predicted power demand value P D (t) based on the time series P FC (t) of the FC power generation amount indicated in the FC power generation schedule (step S31). That is, the corrected power demand predicted value ⁇ P D (t) is obtained by the equation (13). tilde ( ⁇ ) indicates a correction value.
- t is a variable indicating the time of the day. For example, if one day (reference period) is represented by a set of one minute (unit period), t takes a value from 0 to 1439. Note that, as shown in Expression (13), at the time when the FC power generation amount exceeds the predicted power demand value, the corrected power demand predicted value P D (t) is set to zero (0).
- control unit 300d creates a charging rule for the storage battery 102 (step S32).
- a charging rule in which charging is completed in the shortest possible time during a time when the power rate is cheap, the profit and loss of power purchase can be minimized.
- the control unit 300d Assuming that the end time of the time zone with the lowest power charge is Te, the control unit 300d generates a schedule in which the storage battery 102 is fully charged at time Te.
- the controller 300d calculates a time series of the predicted value V (t) of the discharge value based on the equations (11) to (14) (step S33).
- a time series from the time Te to the time Ts when the time when the electricity rate is lowest starts is calculated. That is, the value of V (t) per minute, which is a unit period, is calculated.
- D OV PV (t) in equation (14) is the difference between the predicted power demand value (correction value) exceeding the predicted PV power generation amount, and the predicted power demand value (correction value) is the PV power generation amount. It is a series that becomes 0 when it is below the predicted value.
- PV push (t) in equation (15) is the smaller value of P PV (t) and ⁇ P D (t). This PV push (t) is a series of power generation amounts that can boost the amount of PV power sold by covering the power demand with the discharge of the storage battery 102.
- V (t) in the equation (16) is a value obtained when discharging for ⁇ P D (t) at that time, that is, a discharge value.
- PRsell indicates a PV power purchase price
- PR (t) indicates a power charge.
- the first term on the right side is a power selling price corresponding to the pushed-up PV power generation amount, and indicates a predicted value of power sales profit based on the PV unit 101 power generation amount.
- the second term on the right side shows the amount of cancellation of the power purchase profit / loss when the predicted power demand (correction value) is covered by the discharge of the storage battery 102.
- the controller 300d calculates a time series of the predicted value E (t) of the discharge value rate based on the equation (17) (step S34). That is, E (t) is a value obtained by dividing the discharge value V (t) by the discharge amount.
- step S35 the controller 300d calculates a time tth as described below (step S35).
- the control unit 300d first rearranges the time index t in descending order of the value of E (t). If there is a time t having the same value of E (t), the rank of the time t having a larger value of ⁇ P D (t) is increased.
- control unit 300d accumulates ⁇ P D (t) in the order of the rearranged t. That is, ⁇ P D (t) is added in descending order of the discharge value rate E (t), and the total value gradually increases.
- the time t when the total value exceeds the charge amount (dischargeable amount) of the storage battery 102 for the first time is defined as time tth.
- the control unit 300d adds ⁇ P D (t) in order from the time t when the predicted value E (t) of the discharge value rate is high, the total of ⁇ P D (t) becomes the remaining power storage amount of the storage battery 102.
- the time tth is specified.
- the discharge value rate E (tth) at time tth is a threshold value for determining whether or not to discharge the storage battery 102. Then, the control unit 300d notifies the battery controller 131 of the threshold value E (tth) (step S36).
- FIG. 11A is a graph showing an example of the predicted PV power generation amount P PV (t).
- FIG. 11B is a graph showing an example of correction values ⁇ P D (t) of the predicted power demand value.
- FIG. 11C is a graph showing an example of the discharge value V (t).
- FIG. 11D is a graph showing an example of the predicted value E (t) of the discharge value rate.
- the horizontal axis represents time, and represents the cumulative value of “minute” that has been added since 0:00. The vertical axis shows the value for each minute.
- E (t) in the vicinity of 600 minutes (10:00) is higher than the value after 1000 minutes (16:40)
- the deduction between the power sales profit and the power purchase profit / loss can be further increased.
- the discharge rule for the day to be predicted is defined as “discharge the storage battery 102 when the actual value of the discharge value rate E (t) is 33.96 or more”. Further, the discharge amount is assumed to be power demand to P D (t) for each time.
- FIG. 12 is a flowchart showing an example of the processing procedure of the battery controller 131.
- the battery controller 131 turns on / off the discharge of the storage battery 102 based on the threshold value E (tth). Since charging may be performed according to the rule determined in step S32 in FIG. 10, the control of discharging will be described here.
- the battery controller 131 acquires a discharge value rate threshold value E (tth) as a discharge rule (step S41). Next, the battery controller 131 acquires a power demand measurement value (P D act), a PV power generation amount measurement value (P PV act), and a FC power generation amount measurement value P FC act (steps S42 to S44).
- P D act is measured by, for example, a sensor connected to the distribution board 20.
- P PV act is measured by a sensor built in the PV unit 101, for example.
- the P FC act is measured by a sensor provided in the FC unit 103, for example.
- the subscript act indicates that each quantity is a measured actual value.
- the battery controller 131 corrects the power demand (P D act) by the FC power generation amount (P FC act) based on the FC power generation schedule to obtain ⁇ P D act (step S45).
- ⁇ P D act is expressed as a value obtained by subtracting P FC act from P D act. However, if this value becomes negative, that is, if the FC power generation amount exceeds the power demand, ⁇ P D act is replaced with 0.
- the battery controller 131 obtains the discharge value at the current time, that is, the actual value Vact of the discharge value by using equations (19) to (21) (step S46).
- D OV PV in Equation (19) is the difference between the actual value of the corrected power demand that exceeds the actual value of the PV power generation amount, and the actual value of the corrected power demand is less than or equal to the actual value of the PV power generation amount.
- the series is 0.
- PV pushact in the equation (20) is the smaller value of P PV act and ⁇ P D act.
- This PV pushact is a series of power generation amount that can boost the amount of PV power sold by covering the correction value of the power demand with the discharge of the storage battery 102.
- Vact in equation (21) is a value obtained when discharging for Dact at the current time. That is, Vact is an actual value of discharge value.
- the battery controller 131 calculates an actual value Eact of the discharge value rate based on Expression (22) using Vact and Dact (step S47).
- Eact is a value obtained by dividing the sum of the cancellation amount of the power purchase profit / loss when the P D act is covered by the discharge of the storage battery 102 and the power sale profit based on the PPVact by the discharge amount considering the efficiency.
- Eact ⁇ E (tth) the battery controller 131 gives a discharge instruction to the storage battery 102 in order to discharge the power corresponding to ⁇ P D act. If Eact ⁇ E (tth), the battery controller 131 considers that the value of discharging at that time is low and does not discharge the storage battery 102.
- the discharge value is calculated as an index that can evaluate the net power purchase profit (or power sale profit / loss) considering the push-up effect. Then, a discharge value rate that is a discharge value per discharge amount is calculated, and based on this discharge value rate, a discharge strategy capable of maximizing power purchase profit (or minimizing power sales profit / loss) is created. Yes.
- the discharge rule is given by the threshold value E (tth) of the discharge value rate.
- whether or not the storage battery 102 can be discharged is determined based on whether or not the actual value of the discharge value rate is equal to or greater than the threshold value E (tth). This makes it possible to reduce the amount of rules and save resources required for control, compared to existing techniques that simply control discharge on / off based on time.
- a more appropriate discharge strategy can be obtained by executing a rule-based control of “determining discharge on / off based on the discharge value rate”.
- the discharge control is performed based on a completely new index called the discharge value, not the discharge time based on the prediction.
- whether discharge is possible is determined based on the comparison result between the actual value and the threshold value.
- a process of correcting the power demand in the home 100 in consideration of the power generation amount of the FC unit 103 is newly performed.
- the PV unit 101 and the storage battery 102 it is possible to control three types of new energy devices, namely the FC unit 103, in cooperation. Therefore, it is possible to reduce the cost in consideration of both the electricity charge and the gas charge.
- FIG. 13 is a functional block diagram illustrating a main part of the HEMS according to the second embodiment.
- the discharge rule of the storage battery 102 is determined in consideration of the FC power generation schedule.
- a discharge rule is determined in consideration of the charging / discharging schedule of the storage battery 102 produced by the calculation part 300c.
- FIG. 14 is a functional block diagram showing an example of the storage battery rule creation unit 122 shown in FIG.
- the rule determination unit 303 includes a charge rule determination unit 303a and a discharge rule determination unit 303b.
- the charging rule determination unit 303a acquires the value of the charging amount of the storage battery 102 from the charging / discharging schedule of the storage battery 102, and calculates the total charging amount by integrating the value. The calculated total charge amount is passed to the discharge rule determination unit 303b.
- the home gateway 7 is notified of the discharge time and charge amount target value in the charge / discharge schedule.
- the discharge rule determination unit 512 acquires the storage battery SOC, the discharge value rate, and the total charge amount, and calculates a threshold value of the discharge value rate. This threshold value is notified to the home gateway 7 as a discharge rule of the storage battery 102.
- FIG. 15 is a flowchart illustrating an example of a processing procedure related to creation of a discharge rule in the second embodiment.
- the control unit 300d calculates the discharge value rate E (t) by the same processing as Step S31 to Step S34 in FIG.
- control unit 300d calculates the total charge amount of the storage battery 102 by integrating the charge amount based on the charge schedule of the storage battery 102 (step S51).
- control unit 300d rearranges the time index t in descending order of the value of E (t). If there is a time t having the same value of E (t), the rank of the time t having a larger value of ⁇ P D (t) is increased. Next, the control unit 300d accumulates ⁇ P D (t) in the order of the rearranged t. And control part 300d makes time tth the time t when the total value exceeds the total charge amount of storage battery 102 for the first time (Step S52).
- E (tth) at time tth when the total of ⁇ P D (t) exceeds the dischargeable amount of the storage battery 102 (SOC at the start time of the control day) for the first time is used as the threshold value.
- E (tth) at time tth when the total of ⁇ P D (t) exceeds the total charge amount of the storage battery 102 for the first time is used as a threshold value.
- the total charge amount is synonymous with the total discharge amount.
- the total discharge amount includes the SOC at the start of discharge (for example, 7:00) and the charge amount to the storage battery 102 during the day.
- FIGS. 16A and 16B are diagrams showing an example of daily fluctuations in the SOC of the storage battery 102.
- FIG. FIG. 16A shows a case where charging is not performed after the start of discharging.
- FIG. 16B shows a case where charging is performed after the start of discharging.
- FIG. 16B it can be seen that the storage battery 102 is charged from 12:00 to 13:00 and from 17:00 to 18:00 due to an increase in the amount of PV power generation.
- the discharge rule threshold value
- FIG. 17 is a diagram for explaining the effect obtained by the second embodiment.
- FIG. 17 shows an example of an operation schedule for one day for the storage battery 102 and the FC unit 103. Each schedule is calculated based on the prediction result of the power demand and the prediction result of the hot water supply demand over one day of the home 100.
- the unit price of electricity charges is assumed for day and night. For example, the price from 7:00 to 23:00 is 28 yen / kWh, and from 23:00 to 7:00 the next day is 9 yen / kWh.
- the graph shown in FIG. 7 is calculated using the power demand, the hot water supply demand, the unit price of electricity, and the unit price of gas.
- the operation schedule of the storage battery 102 is charged in a time zone where the unit price of electricity is low (from 0:00 to 6:00), and a time zone where the unit price of electricity is high (from 7:00 to 10:00, from 13:00 to 22:00). ) To discharge. Thereby, since the purchased electric power in the time zone with a high electricity bill unit price decreases, an electricity bill can be reduced.
- the FC unit 103 is operated at the maximum output, and the surplus power generation amount is charged in the storage battery 102 during the time when the power generation amount exceeds the power demand (12:00 to 14:00). Therefore, it is possible to prevent the generated power from being consumed (discarded) wastefully by the reverse flow prevention heater 222, and it is possible to reduce gas costs. It can be seen that the reverse power flow prevention heater 222 has moved without operating for 24 hours.
- the storage battery can be discharged in consideration of the increase in SOC of the storage battery 102 as well as the time zone where the unit price of electricity is low. This makes it possible to obtain further cost merit.
- the present invention is not limited to the above embodiment.
- a genetic algorithm is not the only solution for calculating an operation schedule. It is possible to calculate an optimal driving schedule using various other algorithms.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Human Computer Interaction (AREA)
- Computer Networks & Wireless Communication (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
実施形態によれば、エネルギー管理システムは、予測部と、計算部と、作成部と、制御部とを具備する。予測部は、需要家におけるエネルギーのデマンドを予測してデマンドの予測値を得て、再生可能エネルギーに由来する電力を発電する第1発電ユニットの発電量を予測して発電量の予測値を得る。計算部は、デマンドの予測値と、発電量の予測値とに基づいて、非再生可能エネルギーに由来する電力を発電する第2発電ユニットの運転スケジュールを計算する。作成部は、売電利益から買電損益を減算した差し引き額を蓄電装置の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略を、デマンドの予測値、発電量の予測値および運転スケジュールに基づいて作成する。制御部は、デマンドの実現値、発電量の実現値、運転スケジュールおよび放電戦略に基づいて蓄電装置の放電を制御する。
Description
本発明の実施形態は、家庭などの需要家(カスタマー)のエネルギー収支を管理するエネルギー管理システム、エネルギー管理方法、プログラムおよびサーバに関する。
近年の環境保全意識の高まりと電力不足への不安を背景に、家庭エネルギー管理システム(Home Energy Management System:HEMS)に注目が集まっている。HEMSは、太陽光発電(Photovoltaic Power Generation:PV)システム、蓄電池、あるいは燃料電池(Fuel Cell:FC)などの分散型電源(以下、新エネルギー機器と総称する)と既存の家電機器とをネットワークに接続し、これらを総合的に管理可能とするシステムである。
PVユニットは再生可能エネルギーの固定価格買取制度(feed in tariff:FIT)や補助金などの後押しにより普及が進み、多くの家庭に設置されるようになってきている。家庭用の蓄電池も実用化され、停電対策や電力の負荷平準化の一翼を担っている。これらを組み合わせれば、PV発電時の電力デマンドを蓄電池の放電で賄うことで再生可能エネルギーに由来する売電量を増やすことができる。これは、いわゆる押し上げ効果によるメリットである。関連技術が特許出願されている(特願2012-255301号)。
新エネルギー機器のなかでも、FCは今後の普及が期待されている。FCは、昼夜、天候を問わず安定して発電でき、排熱を利用して熱エネルギーを供給することができる。例えば家庭の給湯デマンド予測に基づいてFCを制御する技術がある。また、FCと蓄電池とを組み合わせて、系統への逆潮流や系統からの無駄な買電を避ける技術が知られている。FCを含む家庭用分散電源をモデル化して運転スケジュールを計算する技術も、既に知られている。
FCは、電力と熱の双方を同時に発生する(熱電併給)という特性を有する。蓄電池の充放電はFCの発電量に影響を及ぼすので、蓄電池の最適な充放電タイミングはそのときのFCの発電量を抜きにして決めることができない。このような相互作用のため、PVユニット、蓄電池、およびFCを総合的に管理し、エネルギーコストを電気料金とガス料金との双方から削減することは難しい。エネルギーの無駄な消費をなくし、エネルギーコストをできる限り削減可能な技術が要望されている。
目的は、燃料電池の特性を活かし、新エネルギー機器を有利に運用することの可能なエネルギー管理システム、エネルギー管理方法、プログラムおよびサーバを提供することにある。
実施形態によれば、エネルギー管理システムは、再生可能エネルギーに由来する電力を発電する第1発電ユニットと、非再生可能エネルギーに由来する電力を発電する第2発電ユニットと、蓄電装置とを備える需要家のエネルギーを管理する。エネルギー管理システムは、予測部と、計算部と、作成部と、制御部とを具備する。予測部は、需要家におけるエネルギーのデマンドを予測してデマンドの予測値を得て、第1発電ユニットの発電量を予測して発電量の予測値を得る。計算部は、デマンドの予測値と、発電量の予測値とに基づいて、第2発電ユニットの運転スケジュールを計算する。作成部は、売電利益から買電損益を減算した差し引き額を蓄電装置の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略を、デマンドの予測値、発電量の予測値および運転スケジュールに基づいて作成する。制御部は、デマンドの実現値、発電量の実現値、運転スケジュールおよび放電戦略に基づいて蓄電装置の放電を制御する。
図1は、実施形態に係わるシステムの一例を示す図である。図1は、いわゆるスマートグリッドとして知られるシステムの一例を示す。既存の電力網(grid)では原子力、火力、水力などの既存発電所と、一般家庭や、ビル、工場といった多種多様な需要家とが電力網によって接続される。次世代の電力系統(Power grid)ではこれらに加えて太陽光発電(Photovoltaic Power Generation:PV)システムや風力発電装置などの分散型電源や蓄電装置、新交通システムや充電スタンドなどが電力系統に接続される。これら多種多様な要素は通信グリッドを介して通信することが可能である。
エネルギーを管理するシステムは、エネルギーマネジメントシステム(Energy Management System:EMS)と総称される。EMSはその規模などに応じて幾つかに分類される。例えば一般家庭向けのHEMS(Home Energy Management System)、ビルディング向けのBEMS(Building Energy Management System)などがある。このほか、集合住宅向けのMEMS(Mansion Energy Management System)、コミュニティ向けのCEMS(Community Energy Management System)、工場向けのFEMS(Factory Energy Management System)などがある。これらのシステムが連携することできめ細かなエネルギー最適化制御が実現される。
これらのシステムによれば既存の発電所、分散型電源、太陽光や風力などの再生可能エネルギー源、および需要家の相互間で高度な協調運用が可能になる。これにより自然エネルギーを主体とするエネルギー供給システムや、需要家と事業者との双方向連携による需要家参加型のエネルギー需給といった、新規かつスマートな形態の電力供給サービスが生み出される。
図2は、実施形態に係るエネルギー管理システムの一例を示す図である。HEMSは、クライアントシステムと、クラウドコンピューティングシステム(以下、クラウドと略称する)300とを備える。クラウド300は、クライアントシステムと通信可能なサーバシステムとして理解されることができる。
クライアントシステムは、ホームゲートウェイ(Home Gateway:HGW)7を備える。ホームゲートウェイ7は、ホーム100に設置される通信装置であり、クラウド300から各種のサービスの提供を受けることができる。
クラウド300は、サーバコンピュータSVとデータベースDBとを備える。サーバコンピュータSVは単体でも複数でも良い。データベースDBは一つのサーバコンピュータSVに備えられていても、複数のサーバコンピュータSVに分散して配置されていてもよい。
図2において、電力グリッド6から供給される電力(交流電圧)は、変圧器61などを経て各家庭に分配され、電力量計(スマートメータ)19を経てホーム100の分電盤20に供給される。電力量計19は、ホーム100に備わるエネルギー生産機器の発電量、ホーム100の消費電力量、電力グリッド6から流れ込む電力量、および、電力グリッド6に逆潮流する電力量などを計測する機能を備える。周知のように、再生可能エネルギーに基づいて発電された電力は、電力グリッド6に逆潮流することを許される。
分電盤20は、この分電盤20に接続される家電機器(照明、エアコンなど)5やパワーコンディショニングシステム(PCS)104に、配電線21を介して電力を供給する。また分電盤20は、フィーダごとの電力量を計測する計測装置を備える。
ホーム100は、電気機器を備える。電気機器はホーム100内の配電線21に接続可能な機器である。電力を消費する機器(負荷)、電力を生成する機器、電力を消費し生成する機器、および蓄電池などが電気機器に該当する。つまり家電機器5、PVユニット101、蓄電池102および燃料電池(以下、FCユニットと表記する)103などが、いずれも電気機器に相当する。電気機器はコンセント(図示せず)を介して配電線21に着脱可能に接続され、配電線21を介して分電盤20に接続される。
ホーム100の屋根や外壁にはPVユニット101が設置される。PVユニット101は、再生可能エネルギーから電力エネルギーを生産する創エネルギー機器である。風力発電システムなども創エネルギー機器の範疇に入る。再生可能エネルギーに由来する余剰電力が生じれば、この余剰電力は電力グリッド6に売電されることが可能である。
FCユニット103は、非再生可能エネルギー源である都市ガスやLPガス(液化プロパンガス)から電力を生産する発電ユニットである。FCユニット103により生成された電力は電力グリッド6に逆潮流することを禁止されているので、余剰電力を生じることがある。余剰電力は蓄電池102に充電されることが可能である。
PCS104はコンバータ(図示せず)を備える。PCS104は、配電線21からの交流電力をコンバータで直流電力に変換して蓄電池102に供給する。また、PCS104はインバータ(図示せず)を備える。PCS104は、PVユニット101、蓄電池102あるいはFCユニット103から供給される直流電力をインバータで交流電力に変換して、配電線21に供給する。これにより、電気機器はPCS104を介して、PVユニット101、蓄電池102およびFCユニット103から電力の供給を受けることができる。
要するにPCS104は、PVユニット101、蓄電池102およびFCユニット103と配電線21との間でエネルギーを授受するための、電力変換器としての機能を備える。PCS104は蓄電池102やFCユニット103を安定して稼働させるために制御する機能も備える。なお図2において、PCS104がPVユニット101、蓄電池102およびFCユニット103に共通に接続される形態が示される。この形態に限らず、PVユニット101、蓄電池102およびFCユニット103がそれぞれ個々にPCSの機能を備えてもよい。
ホーム100には無線LAN(Local Area Network)などのホームネットワーク25が形成される。ホームゲートウェイ7はホームネットワーク25とIPネットワーク200との双方に、コネクタ(図示せず)などを介して着脱可能に接続される。これによりホームゲートウェイ7は、ホームネットワーク25に接続される電力量計19、分電盤20、PCS104、および家電機器5と相互に通信可能である。なおホームネットワーク25は無線、あるいは有線のいずれでも良い。
ホームゲートウェイ7は、実施形態に係る処理機能として通信部7aを備える。通信部7aは、クラウド300に各種のデータを送信し、またクラウド300から各種のデータを受信する、ネットワークインタフェースである。
ホームゲートウェイ7はCentral Processing Unit(CPU)とメモリ(図示せず)を備えるコンピュータである。メモリは、このコンピュータを制御するプログラムを記憶する。プログラムは、クラウド300と通信したり、家電機器5や蓄電池102、FCユニット103の運転スケジュールの計算をクラウド300に要求したり、システムの制御に需要家の意思を反映させたりするための命令を含む。CPUが各種のプログラムに基づいて機能することで、ホームゲートウェイ7に係る諸機能が実現される。
すなわちホームゲートウェイ7は、クラウド300に各種のデータを送信し、またクラウド300から各種のデータを受信する。ホームゲートウェイ7は、クラウド300、サーバコンピュータSVと通信可能なクライアント装置である。ホームゲートウェイ7から送信される各種データには、クラウド300に各種の演算を要求するための要求信号が含まれる。
ホームゲートウェイ7は有線回線または無線回線を介して端末105に接続される。ホームゲートウェイ7と端末105とを合わせてローカルサーバとしての機能を実現することも可能である。端末105はいわゆるタッチパネルなどのほか、例えば汎用的な携帯情報機器、パーソナルコンピュータ、あるいはタブレット端末などでもよい。
端末105は家電機器5、PVユニット101、蓄電池102、FCユニット103の稼働状況や消費電力量を例えばLCD(Liquid Crystal Display)に表示したり、音声ガイダンスなどで需要家(ユーザ)に報知する。また端末105は操作パネルを備え、需要家による各種の操作や設定入力を受け付ける。
IPネットワーク200は、いわゆるインターネット、あるいはシステムベンダのVPN(Virtual Private Network)などである。ホームゲートウェイ7は、IPネットワーク200を経由してサーバコンピュータSVと通信したり、データベースDBとデータを授受したりできる。なおIPネットワーク200は、ホームゲートウェイ7とクラウド300との間に双方向の通信環境を形成するための、無線または有線の通信インフラストラクチャを含んで良い。
クラウド300は、収集部300a、予測部300b、計算部300c、および制御部300dを備える。また、蓄電池102およびFCユニット103の制御対象モデル300g、および各種のデータ300hがクラウド300のデータベースDBに記憶される。収集部300a、予測部300b、計算部300c、および制御部300dは、単体のサーバコンピュータSV、あるいは、クラウド300に分散配置される機能オブジェクトである。これらの機能オブジェクトを如何にしてシステムにインプリメントするかは、当業者によれば容易に理解されるであろう。
例えば収集部300a、予測部300b、計算部300c、および制御部300dは、クラウド300のサーバコンピュータSVにより実行されるプログラムとして実現される。このプログラムは単体のコンピュータにより実行されることもできるし、複数のコンピュータを備えるシステムにより実行されることも可能である。プログラムに記載される命令が実行されることで、実施形態に係わる諸機能が実現される。
収集部300aは、ホーム100の家電機器5、PVユニット101、蓄電池102およびFCユニット103などに係わる各種データを各ホーム100のホームゲートウェイ7から、定期的、あるいは不定期に取得する。また収集部300aは、端末105におけるユーザの操作履歴などを端末105から取得する。なお収集部300aと端末105とが通信回線40を介して直接通信することも可能である。
取得されたデータはデータベースDBにデータ300hとして記憶される。データ300hは、各ホーム100の電力デマンド、各家電機器5の消費電力量、給湯量、稼動状態、蓄電池102の充電残量や充放電電力、PVユニット101の発電量などを含む。加えて、気象庁などから提供される気象データなどもデータ300hに含めることが可能である。
予測部300bは、収集部300aにより取得されたデータ300hに基づいて、ホーム100におけるエネルギーデマンド(電力デマンドや給湯デマンド)およびエネルギー生産量(発電量)を予測する。予測部300bは、例えばホーム100の電力デマンド、給湯デマンド、PVの発電量などを予測する。
計算部300cは、制御対象モデル300gと、予測されたエネルギーデマンドおよびエネルギー生産量とに基づいて、蓄電池102、FCユニット103の運転スケジュールを計算する。つまり計算部300cは、例えば電力デマンド、給湯デマンド、およびPV発電量に基づいて、例えば蓄電池102の充放電スケジュール、またはFCユニット103の発電スケジュール(FC発電スケジュール)を計算する。
すなわち計算部300cは、ホーム100におけるエネルギー収支を最適化すべく、蓄電池102、FCユニット103の運転スケジュールを決定する。この処理を最適スケジューリングと称する。エネルギー収支とは例えば光熱費収支であり、家電機器5により消費される電力エネルギーのコストと、主にPVユニット101により生成されるエネルギーの売電料金とのバランスにより評価される量である。計算された蓄電池102、FCユニット103の時系列の運転スケジュールはデータベースDBに記憶される。
制御部300dは、計算された運転スケジュールに基づいて蓄電池102およびFCユニット103を制御するための制御情報を生成する。すなわち制御部300dは、最適スケジューリングの結果から蓄電池102の充放電、稼動、またはFCユニット103の発電のための運転・停止指示、出力目標値などを生成する。これらの制御情報は、通信回線40を介して端末105やホームゲートウェイ7に送信される。
ホーム100の端末105は、制御部300dから送信された制御情報に基づく家電機器5の制御に、需要家の意思を反映させるためのインタフェース部(図3のユーザインタフェース105a)を備える。ユーザインタフェース105aは、蓄電池102の充放電スケジュールやFCユニット103の発電スケジュールを表示するために表示器を備える。需要家は、表示器に表示された内容を見てスケジュールを確認したり、表示されたスケジュールの実行の許可または拒否を選択したりすることができる。これによりスケジュールの実行に需要家の意思を反映させることができる。
また、需要家は、クラウド300にスケジュールの再計算を要求したり、そのために必要になる情報をシステムに与えたりするための指示(コマンド)を、ユーザインタフェース105aを介して入力することができる。以上の構成を基礎として、以下に、複数の実施形態を説明する。
[第1の実施形態]
図3は、第1の実施形態に係るHEMSの要部を示す機能ブロック図である。図3において、ホームゲートウェイ7は、ホーム100の電力デマンド、給湯デマンド、PV発電量、蓄電池102のSOC(State of Charge)、FCユニット103の貯湯量、蓄電池102の充放電量、FCユニット103の貯湯量などの実績データを、HEMS(クラウド300)に定期的、あるいは不定期に送信する。これらのデータはHEMSのデータベースDBに蓄積される。また需要家の端末105の操作履歴なども、クラウド300に送信される。実績データは現実の値を示す計測値であり、予測値とは区別される。
図3は、第1の実施形態に係るHEMSの要部を示す機能ブロック図である。図3において、ホームゲートウェイ7は、ホーム100の電力デマンド、給湯デマンド、PV発電量、蓄電池102のSOC(State of Charge)、FCユニット103の貯湯量、蓄電池102の充放電量、FCユニット103の貯湯量などの実績データを、HEMS(クラウド300)に定期的、あるいは不定期に送信する。これらのデータはHEMSのデータベースDBに蓄積される。また需要家の端末105の操作履歴なども、クラウド300に送信される。実績データは現実の値を示す計測値であり、予測値とは区別される。
HEMSの予測部300bは、収集した電力デマンド、給湯デマンド、PV発電量などのデータ、および気象データ(天気予報)なども用いて、対象とする日の所定時間ごとの電力デマンド、給湯デマンド、PV発電量を予測する。気象データは1日数回のタイミングで他のサーバ(気象庁など)から配信される。この気象データを受信したタイミングに合わせて予測計算を実行してもよい。
計算部300cは、予測計算により算出された所定時間ごとのエネルギーデマンド、エネルギー供給量、エネルギー単価、および制御対象モデル300gなどに基づいて、蓄電池102、FCユニット103の動作制御に係わる最適スケジューリングを実行する。最適スケジューリングにより、例えば蓄電池102の充放電スケジュール、およびFCユニット103の発電スケジュールが得られる。
予測部300b、計算部300c、および制御部300dは、例えば需要家ごとに専用に設けられる機能オブジェクトとしてインプリメントされることが可能である。つまり予測部300b、計算部300c、および制御部300dの機能を需要家ごとに設けることが可能である。例えばプログラムの実行過程においてスレッドを複数立てることで、このような形態が可能である。このような形態によればセキュリティを確保し易いなどのメリットがある。
あるいは、予測部300b、計算部300c、および制御部300dを、複数の需要家を対象にして設けられる機能オブジェクトとしてインプリメントすることも可能である。つまり予測部300b、計算部300cによる演算を、複数の需要家をまとめた単位で実行することも可能である。このような形態によれば計算リソースの節約などのメリットを得ることが可能である。
制御部300dは、売電利益から買電損益を減算した差し引き額を蓄電池102の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略、を作成する。放電戦略は、電力デマンド予測値、PV発電量の予測値、およびFCユニット103の発電スケジュールなどに基づいて作成される。制御部300dは、実施形態に係る処理機能として、FCルール作成部121、および蓄電池ルール作成部122を備える。
FCルール作成部121は、計算部300cにより作成された発電スケジュールに従う起動/停止指令、および発電量目標値(制御ルール)を生成する。この制御ルールは、通信回線40を介してFCコントローラ132に通知される。FCコントローラ132は、通知された制御ルールと、電力デマンド(計測値)、PV発電量(計測値)、FCユニット103の発電スケジュールなどに基づいてFCユニット103を制御する。
FCユニット103の起動および停止には時間やコストがかかるし、発電量目標値の変更からその実現に至るまでにはやはり時間がかかる。このため発電量目標値はある程度固定化されるのが好ましい。また、FCユニット103の起動/停止もできるだけ少ないのが好ましい。
蓄電池ルール作成部122は、蓄電池102を制御するための制御ルールを作成する。制御ルールは通信回線40を介してバッテリーコントローラ131に通知される。バッテリーコントローラ131は、制御ルールと、電力デマンド(計測値)、PV発電量(計測値)などに基づいて、蓄電池102の充放電量や充放電タイミングを制御する。
図4は制御対象モデル300gについて説明するための図である。制御対象モデル300gは、電力グリッド6、FCユニット103、蓄電池102、PVユニット101、および負荷(家電)205の各構成要素を含む。FCユニット103は、FC本体220、補助ボイラ221、逆潮流防止ヒータ222、および貯湯槽223の各構成要素を含む。図4に示される変量は表1に示される。
式(1)において、ガス供給量F(t)は、FC本体220への供給量FFC(t)と補助ボイラへの供給量FB(t)との和として示される。FC本体220は、FFC(t)のガス供給量に対してPFC(t)だけ発電し、QFC(t)だけ排熱するとする。このFC本体220の入出力特性は、式(2)、(3)のように近似して示される。式(2)、(3)は、FC本体220におけるガス供給量、発電量、および排熱量の関係を示す。
逆潮流防止ヒータ222は、余剰電力PH(t)を熱量QH(t)の熱に変換にして消費させる。つまり逆潮流防止ヒータ222は、熱量QH(t)の熱を廃棄することで、余剰電力が電力グリッド6に逆潮流しないように制御する。補助ボイラ221は、給湯デマンドのうち貯湯槽223からの給湯QST(t)で賄いきれない分の給湯QB(t)を供給する。
貯湯槽223の貯湯量H(t)は、式(4)に示されるように、FC本体220の排熱QFC(t)、逆潮流防止ヒータ222の発熱量QH(t)、および給湯QST(t)により増減する。なお放熱などで失われる熱量は貯湯効率rにより表現される。式(5)は貯湯槽223の容量制約を示す。蓄電池102は、充放電電力PSB(t)により充電残量S(t)が増減するモデルとしてモデル化することが可能である。
式(6)は、電力の需給バランスを示す。PD(t)はホーム100の電力デマンドを示し、PC(t)は購入電力または売電電力を示し、PPV(t)はPV101の発電量を示す。式(7)、(8)はFC本体220と蓄電池102からの逆潮流を禁止するという制約条件を示す。式(9)は蓄電池102の容量の制約条件を示す。
計算部300c(図2、図3)は、以上のような条件のもとで、光熱費収支(エネルギーコスト)が最小となるように、FCユニット103の発電PFC(t)のスケジュールと、蓄電池102の充放電PSB(t)のスケジュールとを求める。最適化演算には、電力・給湯デマンドとPV発電量、電気・ガスの料金単価および電力買い取り価格なども用いられる。最適化アルゴリズムには例えば遺伝的アルゴリズムを用いることができる。
図5は、図3に示される蓄電池ルール作成部122の一例を示す機能ブロック図である。蓄電池ルール作成部122は、補正部301、放電価値率計算部302、およびルール決定部303を備える。蓄電池ルール作成部122は、蓄電池102の充放電制御のための設定値となる、放電価値率の閾値、を出力する。
補正部301は、FC発電スケジュールを計算部300cから取得し、電力デマンド予測値を予測部300bから取得する。補正部301は、取得した電力デマンド予測値を、FC発電スケジュールに基づくFCユニット103の発電量で補正する。
放電価値率計算部302は、充放電効率表(図6)を例えばデータベースDBから取得し、電気料金表を例えばクラウド300における他サーバから取得し、PV発電量予測値を予測部300bから取得する。
放電価値率計算部302は、充放電効率表(図6)、電気料金表と、電力デマンド予測値とPV発電予測値とに基づいて放電価値率(予測値)を算出する。放電価値率はルール決定部303に渡される。
放電価値率は、放電価値を蓄電池102の放電量で除算した値である。放電価値率には、予測値と実現値との2通りの値がある。放電価値率の予測値は、放電価値の予測値を放電量で割って算出される。放電価値率の実現値は、放電価値の実現値を放電量で割って算出される。
放電価値の予測値は、電力デマンド予測値の補正値を蓄電池102の放電で賄う場合の買電損益の打ち消し額と、PV発電量の予測値に基づく売電利益との和、として表される。放電価値、および放電価値率のいずれも基準期間(例えば1日)における単位期間(1日のうちの1時間、あるいは1分)ごとに算出される。
図6は、蓄電池102の充放電効率表の一例を示す図である。充放電効率表は、蓄電池102の充電電力の値(または放電電力の値)と、その値の電力を充電する(放電する)際の効率とを対応付けた表である。図6によれば、例えば500ワット[W]の電力の充電効率および放電効率は0.8であることが示される。図6の表に無い値は補間により求めることができる。
図5に戻り、ルール決定部303は、蓄電池102のSOCをデータベースDBから取得する。そしてルール決定部303は、放電価値率と蓄電池SOCとに基づいて、蓄電池102の放電ルールを決定する。
すなわちルール決定部303は、放電価値率の予測値の高い単位期間から順に、電力デマンド予測値の補正値を加算する。そして、その合計値が蓄電池102の総放電量以上となる単位期間を特定する。この特定された単位期間における放電価値率の予測値が、放電ルールとしての閾値となる。
すなわちルール決定部303は、放電価値率の予測値の高い単位期間から順に、電力デマンド予測値の補正値を加算する。そして、その合計値が蓄電池102の総放電量以上となる単位期間を特定する。この特定された単位期間における放電価値率の予測値が、放電ルールとしての閾値となる。
図7は、第1の実施形態における処理手順を示すフローチャートである。最適化演算は、電力デマンド予測、給湯デマンド予測、PV発電量予測などを必要とする。最適化演算は、これらの予測計算が実行される1日数回のタイミングに合わせて実行される。
図7において、予測部300bは所定時間ごとの電力デマンド、給湯デマンド、PV発電量をデータベースDBから取得する(ステップS11)。このステップでは現在のデータだけでなく、例えば前年同日のデータなど、過去のデータが取得されても良い。次に予測部300bは、所定時間ごとの電力デマンド、給湯デマンドおよびPV発電量を予測する(ステップS12)。
次に計算部300cは、FCユニット103の発電量のスケジュールと、蓄電池102の充放電量のスケジュールとを、光熱費収支を最小とすべく算出する(ステップS13)。算出されたスケジュールはデータベースDBに記憶される。
次にシステムは、蓄電池102の充放電量スケジュール、または、FCユニット103の発電量のスケジュール、を示すメッセージ信号を、IPネットワーク200を介して端末105に送信する。端末105はメッセージ信号を解読して各種スケジュールをインタフェースに表示する(ステップS14)。メッセージ信号の送信から表示に係わるルーチンは定期的に、あるいはユーザからの要求に応じて実行される。
次に、クラウド300は、機器運転スケジュールの実行がユーザにより許可されたことを示す許可メッセージ信号、の到来を待ち受ける(ステップS15)。許可されれば、蓄電池ルール作成部122は、蓄電池102を制御するための制御ルールを作成し、この制御ルールを、IPネットワーク200経由でホーム100のホームゲートウェイ7に送信する(ステップS16)。制御ルールは、例えば蓄電池102の充放電のための運転・停止指示、出力目標値などを含む。
また、FCルール作成部121は、FC発電スケジュールを取得し、FCユニット103の発電のための運転・停止時刻、出力目標値などを、IPネットワーク200経由でホーム100のホームゲートウェイ7に送信する(ステップS17)。以上の手順はスケジュールの時間間隔ごとに繰り返される。
図7に示されるフローチャートにおいて、ステップS12の予測手順と、ステップS13の最適スケジューリングとを組み合せることで、一日分程度のまとまった期間の電力デマンド予測、給湯デマンド予測、PV発電予測に応じて、FCユニット103の発電スケジュールや蓄電池102の充放電スケジュールといった需給プランを、全体のバランスを考慮したうえで作成できるようになる。従って、蓄電池102が満充電になり、FCユニット103の余剰電力を充電できないケースや、蓄電池102から放電すべきときに充電残量が足りないといったケースを回避することが可能になる。
図8は、実施形態に係る遺伝的アルゴリズムの遺伝子設計の一例を示す概念図である。実施形態では、FCユニット103の発電量PFC(t)と蓄電池102の充放電電力PSB(t)とが遺伝子に組み込まれる。1日分の蓄電池102およびFCユニット103の運転スケジュールを個体とし、世代は複数の個体を含む。
式(10)は、最大化すべき適合度Fitを示す。このFitを目的関数として最適化することにより、運転スケジュールを算出することができる。式(11)は光熱費収支Cを示す。式(12)は機器稼動の不連続性に掛かるコストg(PFC(t),PSB(t))を示す。光熱費収支Cにおけるt=0~t=23までの総和は、24時間にわたっての和を求めることに相当する。
式(10)に示される適合度Fitは、1日あたりの光熱費収支Cを変数とする単調増加関数f(C)と機器稼動の不連続性に掛かるコストg(PFC(t),PSB(t))>0との和の、逆数である。PV発電量がホーム100の電力デマンドを大きく上回ると光熱費収支Cが負になることがあるので、光熱費収支Cの減少と適合度Fitの増加とを対応させるために、式(10)のフォームが採用される。第1の実施形態ではf(C)>0となる関数が用いられる。
以上の式に、電力デマンド、給湯デマンド、PV発電量、太陽熱温水量、電気料金単価、ガス料金単価、およびPV買取価格を与え、突然変異、交差、淘汰など、遺伝的操作を繰り返してFitを最大化する。このような操作により、光熱費収支Cを最適化し得る、FCユニット103の発電量PFC(t)の系列と、蓄電池102の充放電PSB(t)の系列とを求めることが可能になる。
以上の式に、電力デマンド、給湯デマンド、PV発電量、電気料金単価、ガス料金単価、およびPV買取価格を与え、突然変異、交差、淘汰など、遺伝的操作を繰り返してFitが最大化される。このような操作により、光熱費収支Cを最適化し得る、FCユニット103の発電量PFC(t)の系列と、蓄電池102の充放電PSB(t)の系列とを求めることが可能になる。
図9は、第1の実施形態に係る最適化演算の流れの一例を示すフローチャートである。最適化アルゴリズムの一例として遺伝的アルゴリズムを採りあげる。以下、遺伝的アルゴリズムに基づく処理手順につき説明する。
(ステップS21) 初期個体群の生成
このステップにおいて、計算部300cは、n個の初期個体を発生させる。個体の遺伝子は、例えば時刻tでのFCユニット103の運転・停止、FCユニット103の発電量、蓄電池102の充放電電力などである。遺伝子列として例えば1日分(24時間分)を設けることができる。それぞれの個体は、FCユニット103、蓄電池102の各遺伝子列の集合である。制約条件を満足しない固体は遺伝子をビット反転させて、制約条件を満足させるように改変する。
(ステップS21) 初期個体群の生成
このステップにおいて、計算部300cは、n個の初期個体を発生させる。個体の遺伝子は、例えば時刻tでのFCユニット103の運転・停止、FCユニット103の発電量、蓄電池102の充放電電力などである。遺伝子列として例えば1日分(24時間分)を設けることができる。それぞれの個体は、FCユニット103、蓄電池102の各遺伝子列の集合である。制約条件を満足しない固体は遺伝子をビット反転させて、制約条件を満足させるように改変する。
(ステップS22)
ステップS22のループは、ステップS23~S26の処理を繰り返す処理である。このループが規定回数になれば、アルゴリズム演算が終了する。また、各個体の適合度およびその世代での平均適合度が計算される。その世代における平均適応度は前2世代の平均適応度と比較される。比較の結果が任意に設定された値ε以下であれば、アルゴリズム演算が終了する。
ステップS22のループは、ステップS23~S26の処理を繰り返す処理である。このループが規定回数になれば、アルゴリズム演算が終了する。また、各個体の適合度およびその世代での平均適合度が計算される。その世代における平均適応度は前2世代の平均適応度と比較される。比較の結果が任意に設定された値ε以下であれば、アルゴリズム演算が終了する。
(ステップS23) 淘汰
このステップにおいて、計算部300cは、制約条件を満足しない個体を排除する。よって、制約条件を満足しない個体は淘汰される。既定数以上の個体が存在する場合には適応度の悪い(適応度の小さい)個体を排除して、個体の数を既定数以下に保つようにする。
このステップにおいて、計算部300cは、制約条件を満足しない個体を排除する。よって、制約条件を満足しない個体は淘汰される。既定数以上の個体が存在する場合には適応度の悪い(適応度の小さい)個体を排除して、個体の数を既定数以下に保つようにする。
(ステップS24) 増殖
このステップにおいて、個体数が予め定義した個体数より少ない場合には、計算部300cは、適応度が最良の個体を増殖させる。
このステップにおいて、個体数が予め定義した個体数より少ない場合には、計算部300cは、適応度が最良の個体を増殖させる。
(ステップS25) 交叉
計算部300cは、ランダムにペアリングを行う。ペアリングは全個体数に対する割合(交叉率)分だけ行い、各ペアごとにランダムに遺伝子座を選び、一点交叉させる。
計算部300cは、ランダムにペアリングを行う。ペアリングは全個体数に対する割合(交叉率)分だけ行い、各ペアごとにランダムに遺伝子座を選び、一点交叉させる。
(ステップS26) 突然変異
このステップにおいて、計算部300cは、全個体数に対する割合(突然変異率)分だけランダムに個体を選び、各個体の任意(ランダムに決定する)の遺伝子座の遺伝子をビット反転させる。
このステップにおいて、計算部300cは、全個体数に対する割合(突然変異率)分だけランダムに個体を選び、各個体の任意(ランダムに決定する)の遺伝子座の遺伝子をビット反転させる。
(ステップS23)~(ステップS26)の手順は、世代数<最大世代数の条件が満たされるまで、世代数をインクリメントしつつ繰り返される(ステップS22のループ)。この条件が満たされれば、計算部300cは結果を出力し(ステップS27)、計算手順を終了する。
式(10)、(11)に示されるように、最大化すべき適合度Fitを示す関数が、FCユニット103の稼働に要するガス料金を含む。これにより、逆潮流防止ヒータ222を無駄に動作させるようなスケジュールは、可能解が存在するという条件下で、最適化計算の過程で淘汰される。
図10は、蓄電池102の放電ルールの作成に係わる処理手順の一例を示すフローチャートである。制御部300dは、電力デマンド予測値PD(t)の時系列を、FC発電スケジュールに示されるFC発電量の時系列PFC(t)に基づいて補正する(ステップS31)。すなわち式(13)により、補正された電力デマンド予測値~PD(t)が得られる。tilde(~)は、補正値であることを示す。
tは、1日における時刻を示す変数である。例えば1日(基準期間)を1分(単位期間)の集合で表すとすれば、tは0~1439の値をとる。なお、式(13)に示されるようにFC発電量が電力デマンド予測値を上回る時刻では、補正後された電力デマンド予測値~PD(t)をゼロ(0)とする。
次に制御部300dは、蓄電池102の充電ルールを作成する(ステップS32)。電力料金の安い時間帯にできるだけ短期間で充電が完了する充電ルールを作成することで、買電損益を最小にすることができる。電力料金が最低の時間帯の終了時刻をTeとすると、制御部300dは、時刻Teに蓄電池102が満充電となるスケジュールを生成する。
充電前の蓄電池102を空(SOC=0)とし、電池容量を6kWhとし、充電可能電力を2kWとする。また、電力料金が最低の時間帯を、例えば前日23:00から当日の7:00とする。このようなコンディションでは、3:00~6:00の間に2kWで蓄電池を充電する、というスケジュールを作成することができる。
次に、制御部300dは、式(11)~(14)に基づいて放電価値の予測値V(t)の時系列を算出する(ステップS33)。第1の実施形態では、時刻Teから、電気料金が最低の時間が開始する時刻Tsまでの時系列が算出される。つまり、単位期間である1分ごとのV(t)の値が算出される。
式(14)におけるDOVPV(t)は、電力デマンド予測値(補正値)がPV発電量の予測値を超えるときには両者の差になり、電力デマンド予測値(補正値)がPV発電量の予測値以下になるときには0になる系列である。
式(15)におけるPVpush(t)は、PPV(t)と~PD(t)とのうち小さいほうの値である。このPVpush(t)は、電力デマンドを蓄電池102の放電で賄うことでPV売電量を押し上げ可能な発電量、の系列である。
式(15)におけるPVpush(t)は、PPV(t)と~PD(t)とのうち小さいほうの値である。このPVpush(t)は、電力デマンドを蓄電池102の放電で賄うことでPV売電量を押し上げ可能な発電量、の系列である。
式(16)のV(t)が、その時刻に~PD(t)分放電したときに得られる価値、すなわち放電価値である。ここでPRsellはPV売電買い取り価格を示し、PR(t)は電力料金を示す。右辺第1項は、押し上げられたPV発電量の分の売電価格であり、PVユニット101の発電量に基づく売電利益の予測値を示す。右辺第2項は電力デマンド予測値(補正値)を蓄電池102の放電で賄う際の、買電損益の打ち消し額を示す。
式(17)におけるf(~PD(t))は、~PD(t)の放電量を得るために蓄電池102から放電される電力量を表す関数である。例えば1kWに対する放電効率を95%とすると、f(1kW)=1.052kWとなる。関数fによる変換後の値は充放電効率表(図6)により求められる。なお簡単のために、式(17)の右辺の分母を、補正された電力デマンド~PD(t)の予測値に置き換えても良い。
次に制御部300dは、以下に説明するようにして、時刻tthを算出する(ステップS35)。このステップにおいて制御部300dは、先ず、E(t)の値の大きい順に時刻インデックスtを並べ替える。仮にE(t)の値の等しい時刻tが有れば、~PD(t)の大きいほうの時刻tの順位を高くする。
そして制御部300dは、並べ替えたtの順に~PD(t)を積算(accumulate)する。つまり~PD(t)は放電価値率E(t)の高い順に加算されてゆき、その合計値が次第に大きくなる。そして、この合計値が蓄電池102の充電量(放電可能量)を初めて超える時刻tを、時刻tthとする。
つまり制御部300dは、放電価値率の予測値E(t)の高い時刻tから順に~PD(t)を加算したとき、~PD(t)の合計が蓄電池102の蓄電残量となる時刻tthを特定する。時刻tthにおける放電価値率E(tth)が、蓄電池102を放電させるか否かを判定するための閾値である。そして制御部300dは、閾値E(tth)をバッテリーコントローラ131に通知する(ステップS36)。
図11AはPV発電量予測値PPV(t)の一例を示すグラフである。図11Bは電力デマンド予測値の補正値~PD(t)の一例を示すグラフである。図11Cは放電価値V(t)の一例を示すグラフである。図11Dは放電価値率の予測値E(t)の一例を示すグラフである。図11A、11B、11Cおよび11Dの各グラフにおいて横軸は時間であり、0時から通算した“分”の累積値を示す。縦軸は各分ごとの値を示す。
図11DのグラフはTe(7:00)~Ts(23:00)間におけるE(t)を示す。例えば1000分(16:40)以降の値に比べて600分(10:00)近傍におけるE(t)の値のほうが高いので、600分の近傍で蓄電池102を放電させるほうが効率が高い。つまり売電利益と買電損益との差し引きをより高められることが分かる。
図11Dの例では、図10のステップS35で算出されるtthは、tth=667分目となり、このときE(667)=33.96(円/kWh)である。つまり閾値は33.96円/kWである。以上から第1の実施形態では、予測対象とする日の放電ルールを、『放電価値率E(t)の実現値が33.96以上になれば、蓄電池102を放電する』と定める。また、放電量を、時刻ごとの電力デマンド~PD(t)とする。
図12は、バッテリーコントローラ131の処理手順の一例を示すフローチャートである。バッテリーコントローラ131は閾値E(tth)に基づいて蓄電池102の放電をオン/オフする。なお充電については図10のステップS32で決定されたルールに従えば良いので、ここでは放電の制御について説明する。
バッテリーコントローラ131は、放電ルールとしての放電価値率閾値E(tth)を取得する(ステップS41)。次にバッテリーコントローラ131は、電力デマンドの計測値(PDact)と、PV発電量の計測値(PPVact)と、FC発電量の計測値PFCactとを取得する(ステップS42~S44)。PDactは例えば分電盤20に接続されるセンサにより計測される。PPVactは例えばPVユニット101に内蔵のセンサにより計測される。PFCactは例えばFCユニット103に備わるセンサにより計測される。添え字actは、各量が計測された実現値(actual value)であることを示す。
次にバッテリーコントローラ131は、FC発電スケジュールに基づくFC発電量(PFCact)により電力デマンド(PDact)を補正し、~PDactを得る(ステップS45)。式(18)に示されるように、~PDactはPDactからPFCactを減じた値としてあらわされる。ただし、この値が負になれば、つまりFC発電量が電力デマンドを上回る場合には、~PDactは0に置き換えられる。
式(19)におけるDOVPVは、補正された電力デマンドの実現値がPV発電量の実現値を超えるときには両者の差になり、補正された電力デマンドの実現値がPV発電量の実現値以下のときには0になる系列である。
式(20)のPVpushactは、PPVactと~PDactとのうち小さいほうの値である。このPVpushactは、電力デマンドの補正値を蓄電池102の放電で賄うことでPV売電量を押し上げ可能な発電量、の系列である。
式(21)のVactは、現在時刻にDact分放電したときに得られる価値である。すなわちVactは放電価値の実現値である。
式(20)のPVpushactは、PPVactと~PDactとのうち小さいほうの値である。このPVpushactは、電力デマンドの補正値を蓄電池102の放電で賄うことでPV売電量を押し上げ可能な発電量、の系列である。
式(21)のVactは、現在時刻にDact分放電したときに得られる価値である。すなわちVactは放電価値の実現値である。
つまりEactは、~PDactを蓄電池102の放電で賄うときの買電損益の打ち消し額とPPVactに基づく売電利益との和を、効率を加味した放電量で除算した値である。
バッテリーコントローラ131は、Eact≧E(tth)であれば、~PDact分の電力を放電すべく、蓄電池102に放電指示を与える。Eact<E(tth)であれば、バッテリーコントローラ131はその時点で放電する価値は低いと看做して、蓄電池102を放電させない。
以上説明したように第1の実施形態では、押し上げ効果を考慮した正味の買電利益(あるいは売電損益)を評価しうる指標として、放電価値を算出する。そして、放電量あたりの放電価値である放電価値率を算出し、この放電価値率に基づいて、買電利益を最大化(あるいは売電損益を最小化)し得る放電戦略を作成するようにしている。
つまり、限りある蓄電池102の電力を、放電価値の高い時間帯に放電させることの可能な放電ルールを作成することが可能になる。従って第1の実施形態によれば、売電による正味の利益を最大にすることが可能になる。
放電ルールは放電価値率の閾値E(tth)により与えられる。実施形態では、放電価値率の実現値が閾値E(tth)以上となるか否かに基づいて、蓄電池102の放電の可否が判定される。これにより、単純に時刻に基づいて放電オン/オフを制御する既存の技術に比べ、ルールの量を減らして、制御に要するリソースを節約することが可能になる。
PV発電予測や電力デマンド予測を100%正確に予測することは難しい。蓄電池102の放電を、時刻ベースの「スケジュール」という形で制御すると、放電価値率が低い時刻での放電や、放電価値が高い時刻での放電見送りが生じてしまう可能性がある。つまり予測値だけに頼って運転スケジュールを作成すると、予測値と実現値とのずれによって、期待された光熱費削減を実現できない可能性がある。
これに対し上記説明したように、「放電価値率に基づいて放電オン/オフを判定する」という、いわばルールベースでの制御を実行することで、より妥当な放電戦略を得ることができる。つまり第1の実施形態では予測に基づく放電時刻でなく、放電価値という、全く新たな指標に基づいて放電制御を行うようにしている。しかも、実現値と閾値との比較結果に基づいて放電の可否が決定される。これにより、予測値と実現値との乖離が生じてもなお、光熱費の削減を期待することの可能な制御を実現することができる。
さらに第1の実施形態では、FCユニット103の発電量を加味して、ホーム100における電力デマンドを補正するという処理を新たに実施するようにしている。これによりPVユニット101および蓄電池102に加えてFCユニット103という、3種の新エネルギー機器を連携して制御することが可能になる。従って電気料金とガス料金との双方を考慮したコスト削減が可能となる。
これらのことから、燃料電池の特性を活かし、新エネルギー機器を有利に運用することの可能なエネルギー管理システム、エネルギー管理方法、プログラムおよびサーバを提供することが可能になる。
[第2の実施形態]
図13は、第2の実施形態に係るHEMSの要部を示す機能ブロック図である。図13において図3と共通する部分には同じ符号を付して示し、ここでは異なる部分についてのみ説明する。第1の実施形態ではFC発電スケジュールを考慮して蓄電池102の放電ルールを決定した。第2の実施形態では、計算部300cにより作成された蓄電池102の充放電スケジュールを考慮して放電ルールが決定される。
図13は、第2の実施形態に係るHEMSの要部を示す機能ブロック図である。図13において図3と共通する部分には同じ符号を付して示し、ここでは異なる部分についてのみ説明する。第1の実施形態ではFC発電スケジュールを考慮して蓄電池102の放電ルールを決定した。第2の実施形態では、計算部300cにより作成された蓄電池102の充放電スケジュールを考慮して放電ルールが決定される。
図14は、図13に示される蓄電池ルール作成部122の一例を示す機能ブロック図である。図14においてルール決定部303は、充電ルール決定部303aおよび放電ルール決定部303bを備える。充電ルール決定部303aは、蓄電池102の充放電スケジュールから蓄電池102の充電量の値を取得し、その値を積算して総充電量を算出する。算出された総充電量は放電ルール決定部303bに渡される。なお充放電スケジュールにおける放電時間および充電量目標値は、ホームゲートウェイ7に通知される。
放電ルール決定部512は、蓄電池SOCと、放電価値率と、総充電量とを取得し、放電価値率の閾値を算出する。この閾値は蓄電池102の放電ルールとしてホームゲートウェイ7に通知される。
図15は、第2の実施形態における放電ルールの作成に係わる処理手順の一例を示すフローチャートである。第2の実施形態において、制御部300dは、図10のステップS31~ステップS34と同様の処理により放電価値率E(t)を算出する。
次に制御部300dは、蓄電池102の充電スケジュールに基づいて充電量を積算し、蓄電池102の総充電量を算出する(ステップS51)。
次に制御部300dは、E(t)の値の大きい順に時刻インデックスtを並べ替える。仮にE(t)の値の等しい時刻tが有れば、~PD(t)の大きいほうの時刻tの順位を高くする。次に制御部300dは、並べ替えたtの順に~PD(t)を積算(accumulate)する。そして制御部300dは、その合計値が蓄電池102の総充電量を初めて超える時刻tを、時刻tthとする(ステップS52)。
第1の実施形態では、~PD(t)の合計が蓄電池102の放電可能量(制御日の開始時点におけるSOC)を初めて超える時刻tthにおけるE(tth)を、閾値とした。これに代えて第2の実施形態では、~PD(t)の合計が蓄電池102の総充電量を初めて超える時刻tthにおけるE(tth)を閾値とする。
なお、スケジューリングの対象期間の前後で蓄電池102のSOCが同じであれば、総充電量は総放電量と同義である。総放電量は、放電開始時(例えば7:00)におけるSOCと、1日の中での蓄電池102への充電量とを含む。
図16Aおよび16Bは、蓄電池102のSOCの日内変動の一例を示す図である。図16Aは、放電開始以降において充電を行わないケースを示す。図16Bは、放電開始以降においても充電を行うケースを示す。図16Bにおいては、PV発電量の増加などにより12:00~13:00、17:00~18:00に蓄電池102が充電されていることがわかる。
このように第2の実施形態では、放電の開始後(7:00)にも蓄電池102が充電されるケースを想定して放電ルール(閾値)を決定することが可能になる。
図17は、第2の実施形態により得られる効果を説明するための図である。図17は、蓄電池102およびFCユニット103の1日分の運転スケジュールの一例を示す。各スケジュールは、ホーム100の1日にわたる、電力デマンドの予測結果と給湯デマンドの予測結果とに基づいて算出される。
図17においては、昼夜別の電気料金単価が想定され、例えば7:00から23:00までを28円/kWh、23:00から翌日7:00までを9円/kWhとする。また、売電による光熱費収支の改善については想定されない。つまり図7に示されるグラフは、電力デマンド、給湯デマンド、電気料金単価、およびガス料金単価を用いて計算される。
蓄電池102の運転スケジュールは、電気料金単価の安い時間帯(0:00~6:00)に充電し、電気料金単価の高い時間帯(7:00~10:00、13:00~22:00)に放電するようになっている。これにより、電気料金単価の高い時間帯の購入電力が減るので電気代を減らすことできる。
FCユニット103は最大出力で運転され、発電量が電力デマンドを上回る時間(12:00~14:00)は余剰発電量が蓄電池102に充電される。よって発電された電力が逆潮流防止ヒータ222で無駄に消費(廃棄)されることを防止でき、ガス代も削減することが可能になる。逆潮流防止ヒータ222は、24時間に渡って稼働することなく推移していることが分かる。
FCユニット103がシステムに加わると、余剰電力が発生するか否かにより、充電に適当な時間帯が電気料金単価から必ずしも一意に決まらない。第2の実施形態によれば、電気料金単価の安い時間帯だけでなく、蓄電池102のSOCの増加分を考慮して蓄電池の放電を行うことができる。これにより、さらなるコストメリットを得ることが可能になる。
なお、本発明は上記実施形態に限定されるものではない。例えば運転スケジュールを算出するための解法として遺伝的アルゴリズムは唯一のものではない。他の種々のアルゴリズムを用いて最適な運転スケジュールを算出することが可能である。
本発明のいくつかの実施形態を説明したが、これらの実施形態は例として提示するものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
Claims (14)
- 再生可能エネルギーに由来する電力を発電する第1発電ユニットと、非再生可能エネルギーに由来する電力を発電する第2発電ユニットと、蓄電装置とを備える需要家のエネルギーを管理するエネルギー管理システムであって、
前記需要家におけるエネルギーのデマンドを予測して前記デマンドの予測値を得て、前記第1発電ユニットの発電量を予測して前記発電量の予測値を得る予測部と、
前記デマンドの予測値と、前記発電量の予測値とに基づいて、前記第2発電ユニットの運転スケジュールを計算する計算部と、
売電利益から買電損益を減算した差し引き額を前記蓄電装置の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略を、デマンドの予測値、前記発電量の予測値および前記運転スケジュールに基づいて作成する作成部と、
前記デマンドの実現値、前記発電量の実現値、前記運転スケジュールおよび前記放電戦略に基づいて前記蓄電装置の放電を制御する制御部とを具備する、エネルギー管理システム。 - 前記作成部は、
前記デマンドの予測値を前記運転スケジュールに基づく前記第2発電ユニットの発電量で補正する補正部と、
放電価値率計算部と、
決定部とを備え、
前記放電価値率計算部は、
前記補正されたデマンドの予測値を前記蓄電装置の放電で賄う場合の前記買電損益の打ち消し額と前記発電量の予測値に基づく売電利益との和である放電価値の予測値を、基準期間内における単位期間ごとに算出し、
前記放電価値の予測値を前記蓄電装置の放電量で除算した値である放電価値率の予測値を前記単位期間ごとに算出し、
前記決定部は、
前記蓄電装置の放電量をそれぞれの単位期間に、前記放電価値率の予測値の高さの順に配分すべく前記放電戦略を決定する、請求項1に記載のエネルギー管理システム。 - 前記決定部は、
前記補正されたデマンドの予測値を前記放電価値率の予測値の高い単位期間から順に加算したとき、当該デマンドの合計が前記蓄電装置の総放電量以上となる単位期間を特定し、
前記特定された単位期間における放電価値率の予測値を閾値とし、
前記制御部は、
前記デマンドの実現値を前記運転スケジュールに基づく前記第2発電ユニットの発電量で補正した値を前記蓄電装置の放電で賄う場合の前記買電損益の打ち消し額と前記発電量の実現値に基づく売電利益との和を前記放電量で除算した値である放電価値率の実現値を算出し、
前記放電価値率の実現値が前記閾値以上のときに前記蓄電装置を放電させる、請求項2に記載のエネルギー管理システム。 - 前記総放電量は、放電開始時における前記蓄電装置の放電可能量と、前記基準期間内における前記蓄電装置への充電量とを含む、請求項3に記載のエネルギー管理システム。
- 前記需要家に設けられるローカルサーバと、このローカルサーバにネットワークを介して接続されるクラウドサーバとを具備し、
前記クラウドサーバは、前記予測部と、前記作成部と、前記計算部と、前記放電戦略を前記ネットワークを介して前記ローカルサーバに通知する通知部とを備え、
前記ローカルサーバは、前記制御部と、前記通知された放電戦略を受信するインタフェースとを備える、請求項1に記載のエネルギー管理システム。 - 再生可能エネルギーに由来する電力を発電する第1発電ユニットと、非再生可能エネルギーに由来する電力を発電する第2発電ユニットと、蓄電装置とを備える需要家のエネルギーを管理するエネルギー管理方法であって、
前記需要家におけるエネルギーのデマンドを予測して前記デマンドの予測値を得て、
前記第1発電ユニットの発電量を予測して前記発電量の予測値を得て、
前記デマンドの予測値と、前記発電量の予測値とに基づいて、前記第2発電ユニットの運転スケジュールを計算し、
売電利益から買電損益を減算した差し引き額を前記蓄電装置の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略を、デマンドの予測値、前記発電量の予測値および前記運転スケジュールに基づいて作成し、
前記デマンドの実現値、前記発電量の実現値、前記運転スケジュールおよび前記放電戦略に基づいて前記蓄電装置の放電を制御する、エネルギー管理方法。 - 前記デマンドの予測値を前記運転スケジュールに基づく前記第2発電ユニットの発電量で補正し、
前記補正されたデマンドの予測値を前記蓄電装置の放電で賄う場合の前記買電損益の打ち消し額と前記発電量の予測値に基づく売電利益との和である放電価値の予測値を、基準期間内における単位期間ごとに算出し、
前記放電価値の予測値を前記蓄電装置の放電量で除算した値である放電価値率の予測値を前記単位期間ごとに算出し、
前記蓄電装置の放電量をそれぞれの単位期間に、前記放電価値率の予測値の高さの順に配分すべく前記放電戦略を決定する、請求項6に記載のエネルギー管理方法。 - 前記補正されたデマンドの予測値を前記放電価値率の予測値の高い単位期間から順に加算したとき、当該デマンドの合計が前記蓄電装置の総放電量以上となる単位期間を特定し、
前記特定された単位期間における放電価値率の予測値を閾値とし、
前記デマンドの実現値を前記運転スケジュールに基づく前記第2発電ユニットの発電量で補正した値を前記蓄電装置の放電で賄う場合の前記買電損益の打ち消し額と前記発電量の実現値に基づく売電利益との和を前記放電量で除算した値である放電価値率の実現値を算出し、
前記放電価値率の実現値が前記閾値以上のときに前記蓄電装置を放電させる、請求項7に記載のエネルギー管理方法。 - 前記総放電量は、放電開始時における前記蓄電装置の放電可能量と、前記基準期間内における前記蓄電装置への充電量とを含む、請求項8に記載のエネルギー管理方法。
- 請求項6乃至9のいずれか1項に記載の方法をコンピュータに実行させるための命令を含む、プログラム。
- 再生可能エネルギーに由来する電力を発電する第1発電ユニットと、非再生可能エネルギーに由来する電力を発電する第2発電ユニットと、蓄電装置とを備える需要家のエネルギーを管理するサーバであって、
前記需要家におけるエネルギーのデマンドを予測して前記デマンドの予測値を得て、前記第1発電ユニットの発電量を予測して前記発電量の予測値を得る予測部と、
前記デマンドの予測値と、前記発電量の予測値とに基づいて、前記第2発電ユニットの運転スケジュールを計算する計算部と、
売電利益から買電損益を減算した差し引き額を前記蓄電装置の放電による売電量の押し上げ効果を利用して最大化可能な放電戦略を、デマンドの予測値、前記発電量の予測値および前記運転スケジュールに基づいて作成する作成部と、
前記放電戦略をネットワークを介して前記需要家に通知する通知部とを具備する、サーバ。 - 前記作成部は、
前記デマンドの予測値を前記運転スケジュールに基づく前記第2発電ユニットの発電量で補正する補正部と、
放電価値率計算部と、
決定部とを備え、
前記放電価値率計算部は、
前記補正されたデマンドの予測値を前記蓄電装置の放電で賄う場合の前記買電損益の打ち消し額と前記発電量の予測値に基づく売電利益との和である放電価値の予測値を、基準期間内における単位期間ごとに算出し、
前記放電価値の予測値を前記蓄電装置の放電量で除算した値である放電価値率の予測値を前記単位期間ごとに算出し、
前記決定部は、
前記蓄電装置の放電量をそれぞれの単位期間に、前記放電価値率の予測値の高さの順に配分すべく前記放電戦略を決定する、請求項11に記載のサーバ。 - 前記決定部は、
前記補正されたデマンドの予測値を前記放電価値率の予測値の高い単位期間から順に加算したとき、当該デマンドの合計が前記蓄電装置の総放電量以上となる単位期間を特定し、
前記特定された単位期間における放電価値率の予測値を閾値とし、
前記通知部は、前記閾値を前記需要家に通知する、請求項12に記載のサーバ。 - 前記総放電量は、放電開始時における前記蓄電装置の放電可能量と、前記基準期間内における前記蓄電装置への充電量とを含む、請求項13に記載のサーバ。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP13824087.4A EP2953230A4 (en) | 2013-01-31 | 2013-12-16 | ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT PROCESS, PROGRAM AND SERVER |
| US14/169,568 US20140214219A1 (en) | 2013-01-31 | 2014-01-31 | Energy management system, energy management method, medium, and server |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2013-017607 | 2013-01-31 | ||
| JP2013017607A JP2014150641A (ja) | 2013-01-31 | 2013-01-31 | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/169,568 Continuation US20140214219A1 (en) | 2013-01-31 | 2014-01-31 | Energy management system, energy management method, medium, and server |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014119153A1 true WO2014119153A1 (ja) | 2014-08-07 |
Family
ID=51261879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2013/083651 Ceased WO2014119153A1 (ja) | 2013-01-31 | 2013-12-16 | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP2953230A4 (ja) |
| JP (1) | JP2014150641A (ja) |
| WO (1) | WO2014119153A1 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7048797B1 (ja) | 2021-06-04 | 2022-04-05 | 株式会社東芝 | 管理装置、管理方法、および管理プログラム |
| JP7630111B1 (ja) * | 2023-09-29 | 2025-02-17 | パナソニックIpマネジメント株式会社 | 計画方法、計画装置及び電力システム |
| WO2025069923A1 (ja) * | 2023-09-29 | 2025-04-03 | パナソニックIpマネジメント株式会社 | 計画方法、計画装置及び電力システム |
Families Citing this family (29)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2016059250A (ja) * | 2014-09-12 | 2016-04-21 | 株式会社東芝 | 機器運転計画作成装置、機器運転計画作成方法、及び機器運転計画作成プログラム |
| JP6630038B2 (ja) * | 2014-11-10 | 2020-01-15 | 株式会社東光高岳 | 需給制御装置、電力供給システム及び需給制御方法 |
| US9837818B2 (en) | 2014-12-31 | 2017-12-05 | Yung Yeung | System and method of storing and capitalizing off-peak electricity |
| CN104779633A (zh) * | 2015-04-08 | 2015-07-15 | 中国西电电气股份有限公司 | 一种燃气发电系统功率补偿与能量回收装置 |
| JP6366836B2 (ja) * | 2015-06-08 | 2018-08-01 | 京セラ株式会社 | 電力変換装置、電力管理装置及び電力管理方法 |
| JP6135953B2 (ja) * | 2015-09-30 | 2017-05-31 | 日本テクノ株式会社 | 給与計算システム、給与計算方法、給与計算プログラム |
| US11519612B2 (en) * | 2015-12-25 | 2022-12-06 | Mitsubishi Electric Corporation | Control device, control method for water heater, and program |
| ES2773478T3 (es) * | 2016-03-01 | 2020-07-13 | Siemens Ag | Procedimiento y sistema para operar una red de suministro de energía autónoma |
| JP6653472B2 (ja) * | 2016-03-07 | 2020-02-26 | パナソニックIpマネジメント株式会社 | 蓄電システム、制御装置、制御方法、及び制御プログラム |
| US10705496B2 (en) | 2016-08-05 | 2020-07-07 | Lg Electronics Inc. | Control device of home energy management system |
| WO2018043639A1 (ja) | 2016-08-31 | 2018-03-08 | 京セラ株式会社 | 電力管理方法、電力管理サーバ、ローカル制御装置及び電力管理システム |
| JP6637402B2 (ja) * | 2016-10-31 | 2020-01-29 | 京セラ株式会社 | エネルギー管理装置、その制御方法及び熱電供給システム |
| WO2018146717A1 (ja) * | 2017-02-07 | 2018-08-16 | 株式会社 東芝 | 電力供給システム、電力供給システム用制御装置、電力供給システム用プログラムおよび電力供給システムの制御方法 |
| JP7221006B2 (ja) * | 2018-07-30 | 2023-02-13 | 株式会社日立製作所 | 蓄電システムおよび制御方法 |
| GB2592218B (en) * | 2020-02-19 | 2022-06-22 | Conductify Ltd | A method for managing an energy system |
| KR102636457B1 (ko) * | 2019-04-09 | 2024-02-15 | 엘에스일렉트릭(주) | Ess 및 그 ess의 제어 방법 |
| JP2020043762A (ja) * | 2019-12-20 | 2020-03-19 | 京セラ株式会社 | エネルギー管理装置、その制御方法及び熱電供給システム |
| KR102384981B1 (ko) * | 2020-05-15 | 2022-04-08 | 한국지역난방공사 | 열변환장치를 활용한 가상발전소 시스템 및 이를 이용한 가상발전소 운영 방법 |
| KR102384980B1 (ko) * | 2020-05-15 | 2022-04-08 | 한국지역난방공사 | 신재생 열병합발전소를 활용한 가상발전소 시스템 및 이를 이용한 가상발전소 운영 방법 |
| US20220043414A1 (en) * | 2020-08-05 | 2022-02-10 | Korea Advanced Institute Of Science And Technology | Apparatus and method for operating energy storage system |
| GB2602337B (en) * | 2020-12-23 | 2025-03-12 | Larkfleet Smart Homes Ltd | Electrical system for a residential site |
| JP7694048B2 (ja) * | 2021-02-05 | 2025-06-18 | オムロン株式会社 | 電力供給システム、管理装置、管理方法及びプログラム |
| CN117878999A (zh) | 2021-05-14 | 2024-04-12 | 华为数字能源技术有限公司 | 一种储能系统及相关方法 |
| CN115579889A (zh) * | 2021-06-21 | 2023-01-06 | 青岛海尔智能技术研发有限公司 | 热电联供系统及其孤岛运行控制方法、装置 |
| CN113553701B (zh) * | 2021-07-05 | 2022-04-26 | 福建时代星云科技有限公司 | 一种储充站仿真建模方法及终端 |
| CN117081116A (zh) * | 2023-07-25 | 2023-11-17 | 阳光电源(上海)有限公司 | 储能调度方法及相关设备 |
| JP7620859B1 (ja) * | 2023-09-29 | 2025-01-24 | パナソニックIpマネジメント株式会社 | 制御方法、制御装置及び電力システム |
| WO2025069902A1 (ja) * | 2023-09-29 | 2025-04-03 | パナソニックIpマネジメント株式会社 | 制御方法、制御装置及び電力システム |
| CN117833391A (zh) * | 2023-11-27 | 2024-04-05 | 华为数字能源技术有限公司 | 一种储能装置及储能系统 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005143218A (ja) * | 2003-11-06 | 2005-06-02 | Nippon Telegr & Teleph Corp <Ntt> | エネルギーシステムの制御装置および制御方法 |
| JP2005333701A (ja) * | 2004-05-18 | 2005-12-02 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギーコミュニティシステムの運転計画作成方法、装置、およびプログラム |
| WO2009107373A1 (ja) * | 2008-02-29 | 2009-09-03 | 株式会社 東芝 | エネルギー貯蔵装置の運転計画作成方法および運転計画作成装置 |
| JP2009240080A (ja) | 2008-03-27 | 2009-10-15 | Nippon Telegr & Teleph Corp <Ntt> | エネルギーシステム運転計画作成装置および方法 |
| JP2010067512A (ja) | 2008-09-11 | 2010-03-25 | Toshiba Fuel Cell Power Systems Corp | 燃料電池システムとその運転方法 |
| JP2010273407A (ja) | 2009-05-19 | 2010-12-02 | Osaka Gas Co Ltd | エネルギー供給システム |
| JP2011124287A (ja) * | 2009-12-08 | 2011-06-23 | Sony Corp | 発電量予測装置、発電量予測システム、発電量予測方法及びコンピュータプログラム |
| JP2012152093A (ja) * | 2010-12-28 | 2012-08-09 | Panasonic Corp | 電力制御装置 |
| JP2012255301A (ja) | 2011-06-09 | 2012-12-27 | Sumitomo Mitsui Construction Co Ltd | 上路式吊床版橋の構築方法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2008086114A2 (en) * | 2007-01-03 | 2008-07-17 | Gridpoint, Inc. | Utility console for controlling energy resources |
| EP2509180A4 (en) * | 2009-11-30 | 2017-07-26 | Kyocera Corporation | Control apparatus and control method |
| JP5695464B2 (ja) * | 2011-03-28 | 2015-04-08 | 株式会社東芝 | 充放電判定装置及び充放電判定プログラム |
-
2013
- 2013-01-31 JP JP2013017607A patent/JP2014150641A/ja active Pending
- 2013-12-16 EP EP13824087.4A patent/EP2953230A4/en not_active Withdrawn
- 2013-12-16 WO PCT/JP2013/083651 patent/WO2014119153A1/ja not_active Ceased
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005143218A (ja) * | 2003-11-06 | 2005-06-02 | Nippon Telegr & Teleph Corp <Ntt> | エネルギーシステムの制御装置および制御方法 |
| JP2005333701A (ja) * | 2004-05-18 | 2005-12-02 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギーコミュニティシステムの運転計画作成方法、装置、およびプログラム |
| WO2009107373A1 (ja) * | 2008-02-29 | 2009-09-03 | 株式会社 東芝 | エネルギー貯蔵装置の運転計画作成方法および運転計画作成装置 |
| JP2009240080A (ja) | 2008-03-27 | 2009-10-15 | Nippon Telegr & Teleph Corp <Ntt> | エネルギーシステム運転計画作成装置および方法 |
| JP2010067512A (ja) | 2008-09-11 | 2010-03-25 | Toshiba Fuel Cell Power Systems Corp | 燃料電池システムとその運転方法 |
| JP2010273407A (ja) | 2009-05-19 | 2010-12-02 | Osaka Gas Co Ltd | エネルギー供給システム |
| JP2011124287A (ja) * | 2009-12-08 | 2011-06-23 | Sony Corp | 発電量予測装置、発電量予測システム、発電量予測方法及びコンピュータプログラム |
| JP2012152093A (ja) * | 2010-12-28 | 2012-08-09 | Panasonic Corp | 電力制御装置 |
| JP2012255301A (ja) | 2011-06-09 | 2012-12-27 | Sumitomo Mitsui Construction Co Ltd | 上路式吊床版橋の構築方法 |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP2953230A4 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7048797B1 (ja) | 2021-06-04 | 2022-04-05 | 株式会社東芝 | 管理装置、管理方法、および管理プログラム |
| JP2022186394A (ja) * | 2021-06-04 | 2022-12-15 | 株式会社東芝 | 管理装置、管理方法、および管理プログラム |
| JP7630111B1 (ja) * | 2023-09-29 | 2025-02-17 | パナソニックIpマネジメント株式会社 | 計画方法、計画装置及び電力システム |
| WO2025069923A1 (ja) * | 2023-09-29 | 2025-04-03 | パナソニックIpマネジメント株式会社 | 計画方法、計画装置及び電力システム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2014150641A (ja) | 2014-08-21 |
| EP2953230A4 (en) | 2016-10-05 |
| EP2953230A1 (en) | 2015-12-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2014119153A1 (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ | |
| JP5921390B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 | |
| WO2014034391A1 (ja) | エネルギー管理システム、サーバ、エネルギー管理方法および記憶媒体 | |
| JP6009976B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ | |
| JP6178045B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 | |
| US10727784B2 (en) | Aggregation system, control method thereof, and control apparatus | |
| Arun et al. | Intelligent residential energy management system for dynamic demand response in smart buildings | |
| Nguyen et al. | Dynamic pricing design for demand response integration in power distribution networks | |
| JP2017229233A (ja) | エネルギー管理システム、エネルギー管理方法、プログラム、サーバおよびクライアント装置 | |
| US9772643B2 (en) | Methods, apparatus and systems for managing energy assets | |
| JP5996460B2 (ja) | エネルギー管理装置、エネルギー管理システム、エネルギー管理方法およびプログラム | |
| US20140214219A1 (en) | Energy management system, energy management method, medium, and server | |
| Falvo et al. | Electric vehicles integration in demand response programs | |
| US20140257584A1 (en) | Energy management system, energy management method, medium, and server | |
| JP6429200B2 (ja) | 電力系統を運転するための方法およびシステム | |
| Zhu et al. | The case for efficient renewable energy management in smart homes | |
| JP2014096866A (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 | |
| JP6042184B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラム、サーバ装置およびローカルサーバ | |
| WO2012145563A1 (en) | Methods, apparatus and systems for managing energy assets | |
| JP6045945B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置 | |
| JP5847650B2 (ja) | エネルギー管理システム、サーバ装置、エネルギー管理方法およびプログラム | |
| JP2016059249A (ja) | 契約電力選択装置、契約電力選択方法、及び、契約電力選択プログラム | |
| JP2017118785A (ja) | 蓄電池制御装置及び蓄電池制御方法 | |
| OLUWALEKE et al. | DEVELOPMENT OF AN ITERATIVE METHOD FOR OPTIMIZATION AND ENERGY MANAGEMENT PROBLEM AVOIDANCE IN A SMART BUILDING: CONSIDERING INTEGRATION OF GRID SUPPLY, PV AND BESS | |
| Zhao | Multi-Value Demand Side Response for Low Carbon Networks |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| REEP | Request for entry into the european phase |
Ref document number: 2013824087 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2013824087 Country of ref document: EP |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13824087 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |