[go: up one dir, main page]

WO2014045710A1 - 地金回収方法 - Google Patents

地金回収方法 Download PDF

Info

Publication number
WO2014045710A1
WO2014045710A1 PCT/JP2013/070163 JP2013070163W WO2014045710A1 WO 2014045710 A1 WO2014045710 A1 WO 2014045710A1 JP 2013070163 W JP2013070163 W JP 2013070163W WO 2014045710 A1 WO2014045710 A1 WO 2014045710A1
Authority
WO
WIPO (PCT)
Prior art keywords
ladle
molten iron
metal
bullion
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2013/070163
Other languages
English (en)
French (fr)
Inventor
貴博 吉野
杉浦 正之
将和 森
信太郎 多田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Nisshin Co Ltd
Original Assignee
Nisshin Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshin Steel Co Ltd filed Critical Nisshin Steel Co Ltd
Priority to IN703KON2015 priority Critical patent/IN2015KN00703A/en
Priority to KR1020157008515A priority patent/KR102096128B1/ko
Priority to US14/429,556 priority patent/US9663838B2/en
Priority to ES13838170.2T priority patent/ES2668862T3/es
Priority to CN201380049163.2A priority patent/CN104704132B/zh
Priority to MYPI2015700848A priority patent/MY197137A/en
Priority to EP13838170.2A priority patent/EP2899284B1/en
Publication of WO2014045710A1 publication Critical patent/WO2014045710A1/ja
Anticipated expiration legal-status Critical
Priority to ZA2015/02037A priority patent/ZA201502037B/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0075Treating in a ladle furnace, e.g. up-/reheating of molten steel within the ladle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/001Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like devices for cleaning ladles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D43/00Mechanical cleaning, e.g. skimming of molten metals
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/005Manufacture of stainless steel
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D25/00Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D25/00Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
    • F27D25/001Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag comprising breaking tools, e.g. hammers, drills, scrapers
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C1/00Refining of pig-iron; Cast iron
    • C21C1/06Constructional features of mixers for pig-iron
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C2200/00Recycling of waste material
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/5294General arrangement or layout of the electric melt shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the present invention relates to a bullion collection method for collecting bullion attached to a ladle as a material.
  • molten iron may be stirred and refined in a ladle.
  • this stirring refining the molten iron flows greatly, so more metal is attached to the ladle. That is, although the life of the refractory in the ladle is sufficient, an amount of bullion that interferes with the operation may adhere to the ladle.
  • the method of Patent Document 1 since the bullion is removed at the ladle maintenance factory in addition to the maintenance of the ladle, if the method of Patent Document 1 is applied as it is when stirring and refining, the unnecessary ladle transportation is carried out. Repeatedly, operation efficiency deteriorates.
  • the method of removing the bullion at the ladle maintenance factory cannot effectively use the heat of the ladle and the bullion for operation.
  • the present invention has been made in order to solve the above-mentioned problems, and its purpose is to avoid the deterioration of the operation efficiency when stirring and refining, and to further reduce the heat of the ladle and the metal. It is to provide a bullion collection method that can be used effectively.
  • the bullion recovery method pours molten iron from a melting furnace into a ladle, stirs and refines the molten iron in the ladle, and adheres the molten iron in the ladle to the ladle in a series of steps.
  • the bullion recovery method of the present invention after pouring molten iron from the ladle into the smelting furnace, the bullion attached to the ladle is dropped online into the ladle and dissolved in the ladle from which the bullion has been dropped.
  • the metal is melted and recovered as a material, so that it is possible to avoid the deterioration of the operation efficiency when performing the stirring and refining, and the heat of the ladle and the metal can be used more effectively.
  • FIG. 1 is an explanatory diagram showing a steel mill to which a metal collection method according to Embodiment 1 of the present invention is applied.
  • the steel mill is provided with an electric furnace tapping area 1, a KR desulfurization area 2, a converter pouring area 3, a metal dropping area 4 and a ladle maintenance area 5.
  • the ladle 6 that transports the molten iron 6a in the steelworks is usually transported in the order of the electric furnace tapping area 1, the KR desulfurization area 2, the converter pouring area 3, and the metal dropping area 4.
  • the ladle 6 conveyed to the bullion dropping area 4 is returned to the electric furnace tapping area 1.
  • a plurality of ladles 6 are circulated in order through the electric furnace tapping area 1, the KR desulfurization area 2, the converter pouring area 3, and the metal dropping area 4. Also good.
  • the ladle 6 is conveyed to the ladle maintenance area 5 (offline) when maintenance such as replacement of refractory is necessary.
  • the ladle 6 transported to the ladle maintenance area 5 is a standby pan (rest pan) until another ladle 6 is transported to the ladle maintenance area 5.
  • FIG. 2 is an explanatory view showing an electric furnace hot water discharge process performed in the electric furnace hot water discharge area 1 of FIG.
  • an electric furnace 10 is a melting furnace for melting molten material to produce molten iron 6a.
  • molten iron 6 a generated in the electric furnace 10 is poured into the ladle 6.
  • the molten iron 6a of the present embodiment is a molten stainless steel containing 9 to 30% by mass of Cr and 1 to 4% by mass of C.
  • the metal 6 b is dropped in the ladle 6.
  • the bullion 6b is dropped into the ladle 6 by the bullion dropping process performed in the bullion dropping area 4 (see FIG. 1) (see FIG. 5).
  • the metal 6b is melted and recovered as a material.
  • FIG. 3 is an explanatory view showing a KR desulfurization process performed in the KR desulfurization area 2 of FIG.
  • KR desulfurization is performed in the KR desulfurization area 2.
  • KR desulfurization is mechanical stirring in which a desulfurization agent such as quick lime, soda ash, carbide, caustic soda and slaked lime is supplied to a ladle 6 in which molten iron 6a is accommodated, and then stirred by an impeller 20 immersed in the molten iron 6a. It is refining (smelting in the ladle). By stirring with the impeller 20, the desulfurization reaction in the molten iron 6a is promoted, and the sulfur concentration in the molten iron 6a is reduced.
  • a desulfurization agent such as quick lime, soda ash, carbide, caustic soda and slaked lime
  • FIG. 4 is an explanatory view showing a converter pouring process performed in the converter pouring area 3 of FIG.
  • the converter 30 is a refining furnace for further refining the molten iron 6a.
  • the molten iron 6 a in the ladle 6 is poured into the converter 30 in the converter pouring area 3.
  • the metal 6b becomes a weir and hinders the pouring of the molten iron 6a from the ladle 6. It is done.
  • a large amount of metal 6b increases the overall weight of the ladle 6 and increases the load on the crane that lifts the ladle 6.
  • FIG. 5 is an explanatory diagram showing a bullion dropping process performed in the bullion dropping area 4 of FIG.
  • the bullion dropping area 4 is an area provided between the converter pouring area 3 and the electric furnace tapping area 1 in the transport path of the ladle 6 in the steel mill.
  • the bullion dropping area 4 is provided with a gate-type overdeck 40.
  • An articulated arm device 41 is provided on the gate-type overdeck 40.
  • a metal dropping machine 42 is attached to the tip of the movable arm 41 a of the articulated arm device 41.
  • As the bullion dropping machine 42 for example, a crusher that hits a sharp bit against an object is used.
  • the ladle 6 in which the molten iron 6 a is poured into the converter 30 in the converter pouring area 3 described above is placed on the carriage 43 and carried along the rail 44 in the vicinity of the gate-type overdeck 40.
  • the carriage 43 is fixed by the stopper 45, the movable arm 41a is rotated by the operation of the operator, and the bullion dropping machine 42 is driven to 6 b is dropped into the ladle 6.
  • the ladle 6 in which the metal 6b is dropped is returned to the electric furnace tapping area 1 without being a standby pan. That is, in this Embodiment, after pouring the molten iron 6a from the ladle 6 to the converter 30, the metal 6b adhering to the ladle 6 is dropped into the ladle 6 online (metal dropping area 4).
  • dropping the ingot 6b adhering to the ladle 6 online into the ladle 6 means that the ingot 6b is taken on the path to be transferred from the converter 30 (smelting furnace) to the electric furnace 10 (melting furnace). It means dropping into the pan 6 and using the ladle 6 continuously without making it a standby pan.
  • dropping the metal 6b adhering to the ladle 6 into the ladle 6 online it is possible to avoid transporting the ladle 6 that does not require maintenance to the ladle maintenance area 5 (offline). Can be avoided.
  • the ladle 6 and the metal bar 6b can return to the electric furnace tapping area 1 in the state where the temperature of the ladle 6 and the metal bar 6b is high, and the heat of the ladle 6 and the metal bar 6b can be utilized more effectively.
  • the ladle 6 is transported to the ladle maintenance area 5, the ladle 6 and the metal bar 6b are cooled to room temperature, but the ground is placed in the ladle 6 online as in this embodiment.
  • the temperature of the metal 6b when pouring the molten iron 6a from the electric furnace 10 to the ladle 6 is about 500 to 700 ° C.
  • the metal 6b adhering to the ladle 6 in the ladle stirring and refining has a feature that the ratio of valuable metals is higher than that of the metal adhering to the ladle 6 without being stirred and refined in the ladle. . For this reason, even if the metal 6b is melted and recovered as a material by the molten iron 6a from the electric furnace 10 as shown in FIG. 2, the disturbance of the components of the molten iron 6a is small.
  • the metal 6b adheres to the ladle 6 in the KR desulfurization process, but the molten iron 6a scattered in the electric furnace tapping process and the converter pouring process is used as the metal 6b. Adhere to. That is, when the molten iron 6a is poured from the electric furnace 10 into the ladle 6 and when the molten iron 6a in the ladle 6 is poured into the converter 30, the metal 6b dropped in the bullion dropping process adheres to the ladle 6. The bare metal 6b is also included.
  • FIG. 6 is a graph showing the liquidus temperature of molten stainless steel and molten iron.
  • the solid line indicates the liquid phase line of the molten stainless steel
  • the broken line indicates the liquid line of the normal steel molten iron.
  • the carbon concentration after desulfurization is set so that the temperature indicated by the liquidus becomes a lower temperature. That is, when stainless steel is produced, the carbon concentration after desulfurization is set to about 1.0 mass% to 4.0 mass%, and when normal steel is produced, the carbon concentration after desulfurization is 3.0 mass%. % To 5.5% by mass.
  • the carbon concentration after desulfurization is about 1.0 mass% to 4.0 mass%
  • the melting point of the molten stainless steel is about 1250 ° C.
  • the carbon concentration after desulfurization is about 3.0 mass% to It is higher than the melting point of ordinary steel molten iron (about 1150 ° C.) at about 5.5% by mass. That is, in the case of producing stainless steel, the molten iron 6a adheres to the ladle 6 as a bare metal 6b at a higher temperature compared to the case of producing ordinary steel. The amount increases. For this reason, when manufacturing stainless steel, it is necessary to remove the metal 6b more frequently than when manufacturing normal steel. Therefore, it is particularly advantageous when producing stainless steel to drop the metal 6b in the ladle 6 online to avoid the deterioration of the operation efficiency as in the method of the present embodiment.
  • the stirring refining is KR desulfurization (mechanical stirring refining) in which stirring is performed by the impeller 20 immersed in the molten iron 6a, a lot of molten iron 6a adheres to the ladle 6 as the metal 6b. For this reason, when performing KR desulfurization, it becomes very useful to be able to avoid that operating efficiency deteriorates by dropping the metal 6b into the ladle 6 online.
  • KR desulfurization mechanical stirring refining
  • the molten iron 6a poured into the ladle 6 from the electric furnace 10 is a molten stainless steel
  • a larger amount of molten iron 6a adheres to the ladle 6 as a bare metal 6b than in the case of producing ordinary steel.
  • the molten iron 6a is stainless steel molten iron, it is very useful to be able to avoid the deterioration of the operation efficiency by dropping the metal 6b into the ladle 6 online.
  • FIG. FIG. 7 is an explanatory view showing injection stirring refining in the metal recovery method according to Embodiment 2 of the present invention.
  • KR desulfurization mechanical stirring refining
  • the injection stirring refining shown in FIG. 7 can also be performed.
  • the molten iron 6a and the desulfurizing agent are stirred by blowing a gas into the molten iron 6a from the immersion nozzle 22 immersed in the molten iron 6a. Even in such injection stirring and refining, splashes 21 are generated, and the metal 6b adheres to the ladle 6.
  • Other configurations are the same as those in the first embodiment.
  • Embodiment 1 and 2 demonstrated that the molten iron 6a was produced
  • the molten iron 6a is described as stainless steel molten iron, but the molten iron may be obtained by, for example, dissolving ordinary steel or iron.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Treatment Of Steel In Its Molten State (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Processing Of Solid Wastes (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Description

地金回収方法
 本発明は、取鍋に付着した地金を材料として回収するための地金回収方法に関する。
 一般に、取鍋を複数チャージ使用すると取鍋に多くの地金が付着するため、取鍋の地金を除去することが必要となる。下記の特許文献1には、溶鉄が入っていない状態の取鍋を取鍋整備工場(オフライン)に搬送して、取鍋に付着した地金を重機によって落とすとともにその地金を取鍋外に除去することが提案されている。取鍋整備工場では、耐火物の張り替えや不定形耐火物の吹きつけ等の取鍋の整備も行われる。取鍋整備工場に搬送された取鍋は、他の取鍋が取鍋整備工場に搬送されるときまで待機鍋(休み鍋)とされる。取鍋から除去された地金は、溶解炉に投入されることで溶解されて材料として回収される。
特開平8-193210号公報
 ここで、製鉄所及び製鋼所では、取鍋内にて溶鉄の撹拌精錬を行うことがある。この撹拌精錬では、溶鉄が大きく流動されるため、より多くの地金が取鍋に付着する。すなわち、取鍋内の耐火物の寿命が十分に残っているにも拘わらず、操業に支障を来す量の地金が取鍋に付着することがある。特許文献1の方法では、取鍋の整備を兼ねて取鍋整備工場にて地金除去を行うので、撹拌精錬を行う場合に特許文献1の方法をそのまま適用すると不必要な取鍋の搬送を繰り返すことになり操業効率が悪化する。また、取鍋整備工場にて地金除去を行う方法では、取鍋及び地金の熱を操業に有効に利用できない。
 本発明は、上記のような課題を解決するためになされたものであり、その目的は、撹拌精錬を行う場合に操業効率が悪化することを回避できるとともに、取鍋及び地金の熱をより有効に利用できる地金回収方法を提供することである。
 本発明に係る地金回収方法は、溶解炉から取鍋に溶鉄を注ぎ、取鍋内にて溶鉄の撹拌精錬を行い、取鍋内の溶鉄を精錬炉に注ぐ一連の工程で取鍋に付着した地金を材料として回収するための地金回収方法であって、取鍋から精錬炉に溶鉄を注いだ後に取鍋に付着した地金をオンライン上で取鍋内に落とすとともに、地金が落とされた取鍋に溶解炉から溶鉄を注ぐことで地金を溶解して材料として回収することを特徴とする。
 本発明の地金回収方法によれば、取鍋から精錬炉に溶鉄を注いだ後に取鍋に付着した地金をオンライン上で取鍋内に落とすとともに、地金が落とされた取鍋に溶解炉から溶鉄を注ぐことで地金を溶解して材料として回収するので、撹拌精錬を行う場合に操業効率が悪化することを回避できるとともに、取鍋及び地金の熱をより有効に利用できる。
本発明の実施の形態1による地金回収方法が適用される製鋼所を示す説明図である。 図1の電気炉出湯エリアにて行われる電気炉出湯工程を示す説明図である。 図1のKR脱硫エリアにて行われるKR脱硫工程を示す説明図である。 図1の転炉注湯エリアにて行われる転炉注湯工程を示す説明図である。 図1の地金落としエリアにて行われる地金落とし工程を示す説明図である。 ステンレス鋼溶鉄及び普通鋼溶鉄の液相線温度を示すグラフである。 本発明の実施の形態2による地金回収方法におけるインジェクション撹拌精錬を示す説明図である。
 以下、本発明を実施するための形態について、図面を参照して説明する。
 実施の形態1.
 図1は、本発明の実施の形態1による地金回収方法が適用される製鋼所を示す説明図である。図において、製鋼所には、電気炉出湯エリア1、KR脱硫エリア2、転炉注湯エリア3、地金落としエリア4及び取鍋整備エリア5が設けられている。製鋼所内で溶鉄6aを移送する取鍋6は、通常、電気炉出湯エリア1、KR脱硫エリア2、転炉注湯エリア3及び地金落としエリア4の順で搬送される。地金落としエリア4まで搬送された取鍋6は、電気炉出湯エリア1に戻される。なお、図1では1つの取鍋6を示しているが、複数の取鍋6が電気炉出湯エリア1、KR脱硫エリア2、転炉注湯エリア3及び地金落としエリア4を順に循環されてもよい。
 取鍋6は、例えば耐火物の交換等の整備が必要なときに取鍋整備エリア5(オフライン)に搬送される。取鍋整備エリア5に搬送された取鍋6は、他の取鍋6が取鍋整備エリア5に搬送されるときまで待機鍋(休み鍋)とされる。
 次に、図2は、図1の電気炉出湯エリア1にて行われる電気炉出湯工程を示す説明図である。図において、電気炉10は、材料を溶解して溶鉄6aを生成する溶解炉である。電気炉出湯エリア1では、電気炉10にて生成された溶鉄6aが取鍋6に注がれる。なお、本実施の形態の溶鉄6aは、Crを9~30質量%及びCを1~4質量%含むステンレス鋼溶鉄である。
 電気炉10から取鍋6に溶鉄6aが注がれる際、取鍋6内には地金6bが落とされている。後に詳しく説明するように、地金6bは、地金落としエリア4(図1参照)にて行われる地金落とし工程により取鍋6内に落とされたものである(図5参照)。地金6bが落とされた取鍋6に電気炉10から溶鉄6aが注がれることで、地金6bが溶解されて材料として回収される。
 次に、図3は、図1のKR脱硫エリア2にて行われるKR脱硫工程を示す説明図である。図において、KR脱硫エリア2ではKR脱硫が行われる。KR脱硫とは、溶鉄6aが収容された取鍋6に例えば生石灰、ソーダ灰、カーバイド、苛性ソーダ及び消石灰等の脱硫剤が供給された後に、溶鉄6aに浸漬されたインペラ20により撹拌を行う機械撹拌精錬(取鍋内精錬)である。インペラ20による撹拌が行われることで、溶鉄6a内の脱硫反応が促進されて、溶鉄6aにおける硫黄濃度が低減される。
 インペラ20による撹拌が行われるときには、取鍋6の内壁側で溶鉄6aの液面が高くなる。このため、非撹拌時に溶鉄6aが触れず温度が低い取鍋6の上部内壁に溶鉄6aが接触し、上部内壁に接触した溶鉄6aが上部内壁で冷却されて地金6bとして上部内壁に付着する。また、インペラ20による撹拌が行われるときには、インペラ20の回転により飛沫21が発生する。この飛沫21も、上部内壁にて冷却されて地金6bとして上部内壁に付着する。
 次に、図4は、図1の転炉注湯エリア3にて行われる転炉注湯工程を示す説明図である。図において、転炉30は、溶鉄6aの精錬をさらに行うための精錬炉である。取鍋6内の溶鉄6aは、転炉注湯エリア3において転炉30に注がれる。取鍋6に多量の地金6bが付着している場合、取鍋6内の溶鉄6aを転炉30に注ぐ際に地金6bが堰となり、取鍋6からの溶鉄6aの注出が妨げられる。多量の地金6bは、取鍋6の全体重量を増加させ、取鍋6を吊り上げるクレーンの負荷を増大させる。
 次に、図5は、図1の地金落としエリア4にて行われる地金落とし工程を示す説明図である。地金落としエリア4は、製鋼所内の取鍋6の搬送経路における転炉注湯エリア3と電気炉出湯エリア1との間に設けられたエリアである。地金落としエリア4には、ゲート型オーバーデッキ40が設けられている。ゲート型オーバーデッキ40上には、多関節型アーム装置41が設けられている。多関節型アーム装置41の可動アーム41aの先端には、地金落とし機42が取付けられている。地金落とし機42としては、例えば鋭利なビットを対象物に打ち当てる破砕機等が用いられる。
 前述の転炉注湯エリア3において転炉30に溶鉄6aを注出した取鍋6は、台車43に載せられてレール44に沿ってゲート型オーバーデッキ40近傍運ばれる。台車43がゲート型オーバーデッキ40近傍に位置した際にストッパ45によって台車43が固定されるとともに、オペレータの操作により可動アーム41aが回動されるとともに地金落とし機42が駆動されて、地金6bが取鍋6内に落とされる。内部に地金6bが落とされた取鍋6は、待機鍋とされずに電気炉出湯エリア1に戻される。すなわち、本実施の形態では、取鍋6から転炉30に溶鉄6aを注いだ後に、取鍋6に付着した地金6bをオンライン上(地金落としエリア4)で取鍋6内に落とす。
 すなわち、取鍋6に付着した地金6bをオンライン上で取鍋6内に落とすとは、転炉30(精錬炉)から電気炉10(溶解炉)に搬送する経路上で地金6bを取鍋6内に落とし、その取鍋6を待機鍋とせずに連続的に使用することを意味する。取鍋6に付着した地金6bをオンライン上で取鍋6内に落とすことで、整備が不要な取鍋6を取鍋整備エリア5(オフライン)に搬送することを避けることができ、操業効率が悪化することを回避できる。また、取鍋6及び地金6bの温度が高い状態で電気炉出湯エリア1に戻すことができ、取鍋6及び地金6bの熱をより有効に利用できる。なお、取鍋6を取鍋整備エリア5に搬送した場合は取鍋6及び地金6bが常温まで冷却されることになるが、本実施の形態のようにオンライン上で取鍋6内に地金6bを落とした場合、電気炉10から取鍋6に溶鉄6aを注ぐ際の地金6bの温度は500~700℃程度となる。また、取鍋内撹拌精錬にて取鍋6に付着した地金6bは、取鍋内撹拌精錬が行われずに取鍋6に付着した地金と比べて有価金属の割合が高いという特徴を有する。このため、図2で示したように電気炉10からの溶鉄6aにより地金6bを溶解して材料として回収しても、溶鉄6aの成分の乱れは小さい。
 以上の説明では、地金6bはKR脱硫工程にて取鍋6に付着すると説明しているが、電気炉出湯工程及び転炉注湯工程においても飛び散った溶鉄6aが地金6bとして取鍋6に付着する。すなわち、地金落とし工程にて落とされる地金6bには、電気炉10から取鍋6に溶鉄6aを注ぐ際及び取鍋6内の溶鉄6aを転炉30に注ぐ際に取鍋6に付着した地金6bも含まれる。
 次に、図6は、ステンレス鋼溶鉄及び普通鋼溶鉄の液相線温度を示すグラフである。図において実線にて示すものはステンレス鋼溶鉄の液相線であり、破線にて示すものは普通鋼溶鉄の液相線である。
 一般に、脱硫後炭素濃度は、液相線にて示される温度がより低い温度となるように設定される。すなわち、ステンレス鋼が製造される場合には脱硫後炭素濃度が1.0質量%~4.0質量%程度に設定され、普通鋼が製造される場合には脱硫後炭素濃度が3.0質量%~5.5質量%程度に設定される。
 図6に示すように、脱硫後炭素濃度が1.0質量%~4.0質量%程度のときのステンレス鋼溶鉄の融点は1250℃程度であり、脱硫後炭素濃度が3.0質量%~5.5質量%程度のときの普通鋼溶鉄の融点(1150℃程度)よりも高い。すなわち、ステンレス鋼を製造する場合には、普通鋼を製造する場合と比較してより高い温度で溶鉄6aが地金6bとして取鍋6に付着するため、取鍋6に付着する地金6bの量が多くなる。このため、ステンレス鋼を製造する場合には、普通鋼を製造する場合よりも高い頻度で地金6bを除去する必要がある。従って、本実施の形態の方法のようにオンライン上で取鍋6内に地金6bを落として操業効率の悪化を回避することは、ステンレス鋼を製造する場合に特に有利である。
 このような地金回収方法では、取鍋6から転炉30(精錬炉)に溶鉄6aを注いだ後に、取鍋6に付着した地金6bをオンライン上で取鍋6内に落とすとともに、地金6bが落とされた取鍋6に電気炉10(溶解炉)から溶鉄6aを注ぐことで地金6bを溶解して材料として回収するので、撹拌精錬を行う場合に操業効率が悪化することを回避できるとともに、取鍋6及び地金6bの熱をより有効に利用できる。なお、従来方法では、取鍋6の外に地金6bを除去するために取鍋6を大きく傾ける作業が必要となっていたが、本実施の形態の方法ではこのような作業を不要とすることができ、操業効率を良くすることができる。
 また、撹拌精錬は、溶鉄6a内に浸漬されたインペラ20により撹拌を行うKR脱硫(機械撹拌精錬)であるので、多くの溶鉄6aが地金6bとして取鍋6に付着する。このため、KR脱硫を行う場合、オンライン上で地金6bを取鍋6内に落とすことで、操業効率が悪化することを回避できることが極めて有用となる。
 さらに、電気炉10から取鍋6に注がれる溶鉄6aはステンレス鋼溶鉄であるので、普通鋼を製造する場合と比べて多くの溶鉄6aが地金6bとして取鍋6に付着する。このため、溶鉄6aがステンレス鋼溶鉄である場合、オンライン上で地金6bを取鍋6内に落とすことで、操業効率が悪化することを回避できることが極めて有用となる。
 実施の形態2.
 図7は、本発明の実施の形態2による地金回収方法におけるインジェクション撹拌精錬を示す説明図である。実施の形態1では取鍋内撹拌精錬としてKR脱硫(機械撹拌精錬)を行うように説明したが、図7に示すインジェクション撹拌精錬を行うこともできる。インジェクション撹拌精錬では、溶鉄6a中に浸漬した浸漬ノズル22から溶鉄6a中にガスを吹き込むことで、溶鉄6a及び脱硫剤の撹拌が行われる。このようなインジェクション撹拌精錬でも飛沫21が発生し、取鍋6に地金6bが付着する。その他の構成は、実施の形態1と同様である。
 このように取鍋内撹拌精錬としてインジェクション撹拌精錬を行う場合も、多くの溶鉄6aが地金6bとして取鍋6に付着するため、操業効率が悪化することをオンライン上で地金6bを取鍋6内に落とすことで回避できることが極めて有用となる。
 なお、実施の形態1,2では、電気炉10で溶鉄6aを生成すると説明したが、例えば高炉等の他の溶解炉で溶鉄を生成してもよい。
 また、実施の形態1,2では、溶鉄6aはステンレス鋼溶鉄であると説明したが、溶鉄は例えば普通鋼や鉄等を溶解したものであってもよい。

Claims (3)

  1.  溶解炉から取鍋に溶鉄を注ぎ、前記取鍋内にて溶鉄の撹拌精錬を行い、前記取鍋内の溶鉄を精錬炉に注ぐ一連の工程で前記取鍋に付着した地金を材料として回収するための地金回収方法であって、前記取鍋から前記精錬炉に溶鉄を注いだ後に、前記取鍋に付着した地金をオンライン上で前記取鍋内に落とすとともに、前記地金が落とされた前記取鍋に前記溶解炉から溶鉄を注ぐことで前記地金を溶解して材料として回収する、地金回収方法。
  2.  前記撹拌精錬は、溶鉄内に浸漬されたインペラにより撹拌を行う機械撹拌精錬又は溶鉄中にガスを吹き込むインジェクション撹拌精錬である、請求項1記載の地金回収方法。
  3.  前記溶解炉から前記取鍋に注がれる溶鉄は、ステンレス鋼溶鉄である、請求項1又は請求項2に記載の地金回収方法。
PCT/JP2013/070163 2012-09-21 2013-07-25 地金回収方法 Ceased WO2014045710A1 (ja)

Priority Applications (8)

Application Number Priority Date Filing Date Title
IN703KON2015 IN2015KN00703A (ja) 2012-09-21 2013-07-25
KR1020157008515A KR102096128B1 (ko) 2012-09-21 2013-07-25 지금 회수 방법
US14/429,556 US9663838B2 (en) 2012-09-21 2013-07-25 Metal recovery method
ES13838170.2T ES2668862T3 (es) 2012-09-21 2013-07-25 Método de recuperación de metales
CN201380049163.2A CN104704132B (zh) 2012-09-21 2013-07-25 结壳回收方法
MYPI2015700848A MY197137A (en) 2012-09-21 2013-07-25 Metal recovery method
EP13838170.2A EP2899284B1 (en) 2012-09-21 2013-07-25 Metal recovery method
ZA2015/02037A ZA201502037B (en) 2012-09-21 2015-03-25 Metal recovery method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012207721A JP5723342B2 (ja) 2012-09-21 2012-09-21 地金回収方法
JP2012-207721 2012-09-21

Publications (1)

Publication Number Publication Date
WO2014045710A1 true WO2014045710A1 (ja) 2014-03-27

Family

ID=50341036

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/070163 Ceased WO2014045710A1 (ja) 2012-09-21 2013-07-25 地金回収方法

Country Status (11)

Country Link
US (1) US9663838B2 (ja)
EP (1) EP2899284B1 (ja)
JP (1) JP5723342B2 (ja)
KR (1) KR102096128B1 (ja)
CN (1) CN104704132B (ja)
ES (1) ES2668862T3 (ja)
IN (1) IN2015KN00703A (ja)
MY (1) MY197137A (ja)
TW (1) TWI593805B (ja)
WO (1) WO2014045710A1 (ja)
ZA (1) ZA201502037B (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108106448B (zh) * 2017-12-18 2019-07-26 巢湖云海镁业有限公司 一种用于真空冶炼还原装置的下顶渣机
CN118896806A (zh) * 2024-07-12 2024-11-05 上海图灵智造机器人股份有限公司 一种铁钢水试样取样系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08193210A (ja) 1995-01-18 1996-07-30 Nkk Corp 溶銑滓地金の使用方法
JPH09314316A (ja) * 1996-05-30 1997-12-09 Kawasaki Steel Corp 溶鋼鍋内の付着物除去方法
JP2001179437A (ja) * 1999-12-24 2001-07-03 Fujikoo:Kk 地金付着物の除去装置
JP2003001414A (ja) * 2001-06-22 2003-01-08 Fujikoo:Kk 溶銑保持容器の付着物の除去設備
JP2003166010A (ja) * 2001-11-29 2003-06-13 Nippon Steel Corp Krインペラー付着物除去装置及び方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2564037A (en) * 1947-10-28 1951-08-14 Air Reduction Method of removing skulls from metal receptacles
GB934163A (en) * 1961-07-11 1963-08-14 Foseco Int Treatment of vessels used for holding molten metal
JPS6164811A (ja) * 1984-09-03 1986-04-03 Nippon Kokan Kk <Nkk> 溶鋼の脱硫方法
KR20020032827A (ko) * 2000-10-27 2002-05-04 이구택 전기로 루프의 지금 재생장치
KR100829959B1 (ko) * 2001-12-22 2008-05-16 주식회사 포스코 레이들의 상부 누적 지금 제거장치
KR100778734B1 (ko) * 2001-12-24 2007-11-23 주식회사 포스코 레이들커버 및 랜스의 지금 제거장치
WO2006039744A2 (en) * 2004-10-11 2006-04-20 Technological Resources Pty. Limited Electric arc furnace steelmaking
JP4936787B2 (ja) * 2006-05-12 2012-05-23 日新製鋼株式会社 含Cr溶銑の脱硫精錬剤および脱硫方法
JP4714655B2 (ja) * 2006-09-05 2011-06-29 新日本製鐵株式会社 含クロム溶鉄の脱硫方法
JP4999483B2 (ja) * 2007-02-07 2012-08-15 日新製鋼株式会社 ステンレス溶銑の製造方法
JP5436302B2 (ja) * 2010-03-29 2014-03-05 日新製鋼株式会社 含クロム溶銑およびスラグの処理方法
JP5606152B2 (ja) * 2010-05-24 2014-10-15 株式会社神戸製鋼所 取鍋の地金除去方法
JP5309172B2 (ja) * 2011-03-08 2013-10-09 日新製鋼株式会社 インペラの回転数制御方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08193210A (ja) 1995-01-18 1996-07-30 Nkk Corp 溶銑滓地金の使用方法
JPH09314316A (ja) * 1996-05-30 1997-12-09 Kawasaki Steel Corp 溶鋼鍋内の付着物除去方法
JP2001179437A (ja) * 1999-12-24 2001-07-03 Fujikoo:Kk 地金付着物の除去装置
JP2003001414A (ja) * 2001-06-22 2003-01-08 Fujikoo:Kk 溶銑保持容器の付着物の除去設備
JP2003166010A (ja) * 2001-11-29 2003-06-13 Nippon Steel Corp Krインペラー付着物除去装置及び方法

Also Published As

Publication number Publication date
US20150247213A1 (en) 2015-09-03
JP5723342B2 (ja) 2015-05-27
JP2014062298A (ja) 2014-04-10
MY197137A (en) 2023-05-26
ZA201502037B (en) 2018-05-30
CN104704132A (zh) 2015-06-10
EP2899284B1 (en) 2018-02-28
KR20150054882A (ko) 2015-05-20
EP2899284A1 (en) 2015-07-29
CN104704132B (zh) 2016-09-28
TWI593805B (zh) 2017-08-01
ES2668862T3 (es) 2018-05-22
TW201413000A (zh) 2014-04-01
EP2899284A4 (en) 2016-05-25
IN2015KN00703A (ja) 2015-07-17
KR102096128B1 (ko) 2020-04-01
US9663838B2 (en) 2017-05-30

Similar Documents

Publication Publication Date Title
US10006100B2 (en) Plasma induced fuming
TWI874497B (zh) 改良式銅熔煉製程
CN102312103A (zh) 一种熔融液态含铅渣直接还原熔炼的方法
CN110273047A (zh) 一种热态铸余渣返铁水包的钢水回收方法
JP5723342B2 (ja) 地金回収方法
CN104152632A (zh) 一种中频炉冶炼炉外脱磷的方法
JP5326590B2 (ja) 溶銑からの銅及び硫黄の除去方法
JP5625654B2 (ja) 溶銑の製造方法
JP5726618B2 (ja) 錫含有銅の処理方法
JP2011174150A (ja) 銅製錬炉の操業方法及び銅製錬炉
JP4972974B2 (ja) 溶銑の脱硫方法
JP5749546B2 (ja) 鉄、錫含有銅処理炉の炉底堆積物の除去方法
JP6150972B2 (ja) 加熱装置を備えた貯銑炉内の溶銑を利用した冷鉄源の溶解方法
JP4946314B2 (ja) CaO系脱硫スラグからの地金の回収方法
Hogg et al. Furnace Slag Tapping System at Kazzinc
JP6350189B2 (ja) 傾動式スラグ供給装置のスラグ付着抑制方法
CN117512354A (zh) 一种冶炼再生铜降低渣含铜的方法
JP6658246B2 (ja) 耐火物を用いたスラグの希釈方法
FR3127848A1 (fr) Recyclage de résidus métallurgiques
JP5575026B2 (ja) 鉄・錫含有銅の処理装置および鉄・錫含有銅の処理方法
Cappel The link between refractories, slag, and steel in ferrous metallurgy
Hurley et al. Improved Corrosion Resistance of Alumina Refractories
JP2005294136A (ja) 鉛蓄電池用鉛合金の製造方法
JP2016075423A (ja) 傾動式スラグ供給装置のスラグ付着抑制方法
JP2011174149A (ja) 非鉄製錬炉の操業方法及び投入装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13838170

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14429556

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20157008515

Country of ref document: KR

Kind code of ref document: A