[go: up one dir, main page]

WO2013170786A1 - Procédé de coordination du brouillage intercellulaire, station de base et système de communication - Google Patents

Procédé de coordination du brouillage intercellulaire, station de base et système de communication Download PDF

Info

Publication number
WO2013170786A1
WO2013170786A1 PCT/CN2013/075833 CN2013075833W WO2013170786A1 WO 2013170786 A1 WO2013170786 A1 WO 2013170786A1 CN 2013075833 W CN2013075833 W CN 2013075833W WO 2013170786 A1 WO2013170786 A1 WO 2013170786A1
Authority
WO
WIPO (PCT)
Prior art keywords
cell
base station
control base
occupancy rate
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2013/075833
Other languages
English (en)
Chinese (zh)
Inventor
汤斌淞
罗海燕
孙彦赞
邓天乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of WO2013170786A1 publication Critical patent/WO2013170786A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria

Definitions

  • a base station gives a user equipment on the downlink (User
  • Equipment UE transmits data and/or control information and receives data and/or control information of the user equipment on the uplink.
  • the Long Term Evolution (LTE) system is used as an example.
  • the base station sends control information to the UE on the Physical Downlink Control Channel (PDCCH).
  • the UE reads the control information carried on the PDCCH to learn the paging and system. Messages and information such as where to locate frequency domain resources.
  • the UE then reads data according to the above information to its scheduled Physical Downlink Share Channel (PDSCH).
  • PDSCH Physical Downlink Share Channel
  • the eNB indicates that the PDCCH actually occupies several Orthogonal Frequency Division Multiplexing (OFDM) symbols on the Physical Control Format Indictor Channel (PCnCH), which is generally 1 ⁇ 3; When the number of the downlink physical resource block (PRB, Physical Resource Block) is less than 10, the value is 2-4.
  • OFDM Orthogonal Frequency Division Multiplexing
  • the UE learns the time domain start position of the PDSCH time-frequency resource according to the PCFICH; The information is obtained, and the location of the frequency domain of the PDSCH time-frequency resource to which the UE is allocated is obtained. If the UE fails to read the PDCCH, the data carried on the subsequent PDSCH cannot be obtained, so The performance of the PDCCH is critical to the cell.
  • Heterogeneous Network a scenario in which a macro cell and a pico cell share a spectrum is taken as an example, because of the difference in transmit power between the Pico cell and the Macro cell. Larger, generally 30dBm and 46dBm respectively, the UE of the Pico cell receives severe interference from the Macro cell when receiving the PDCCH, resulting in poor PDCCH performance. If the Pico cell introduces a Cell Range Extension (CRE) technology, the performance of the PDCCH is further deteriorated. Therefore, the third generation partner, the Third Generation Partnership Project (3GPP), introduces the time domain enhanced inter-Cell Interference Coordination (elCIC) mechanism.
  • CRE Cell Range Extension
  • 3GPP Third Generation Partnership Project
  • ABS Almost Blank Subframe
  • the ABS subframe refers to a transmission with only common pilots in the subframe, or only a common pilot transmission and a control channel transmitted in a low power (or low activity mode).
  • the above two schemes are respectively called ABS.
  • Zero power scheme and ABS low power scheme are for PDCCH.
  • the aggregating cell configures its own individual downlink subframes as ABS subframes to reduce the downlink transmission to the victim cell, especially to the downlink control channel.
  • FIG. 1 it is a schematic structural diagram of a wireless heterogeneous network system in the prior art.
  • the Macro configures the downlink subframes 1, 2 as "zero power” ABS, and protects the Pico 1 and Pico 2 service transmission; Macro configures downlink subframes 6, 7 as "low power” ABS to protect Pico2 service transmission; thereby solving downlink inter-cell interference problem.
  • ABS mechanism still has the following problems: It is necessary to determine how many ABS subframes the Pico cell needs to protect its services from macro base station interference. For a Macro cell, multiple configuration of ABS subframes wastes resources. In addition, for the application scenario using the CRE technology, there is currently no mechanism for dynamically coordinating ABS after the CRE region changes. SUMMARY OF THE INVENTION Aspects of the present invention provide a method, a base station, and a communication system for inter-cell interference coordination, which are mechanisms for dynamically coordinating ABS after a CRE region change.
  • An aspect of the present invention provides a method for inter-cell interference coordination, including: a control base station of a first cell acquires a resource occupancy rate of a boundary user of the first cell; and a control base station of the first cell
  • the resource occupancy rate of the border user of a cell is sent to the control base station of the second cell; the second cell is the neighboring cell of the first cell, and the resource occupancy rate of the boundary user of the first cell is
  • the control base station of the second cell is configured to configure an almost null subframe for downlink transmission;
  • the control base station of the first cell receives almost blank subframe information configured by the control base station of the second cell, and the almost empty subframe information is used to indicate the The time domain location of the almost empty subframe transmitted by the downlink of the second cell;
  • the control base station of the first cell schedules the border user of the first cell to be sent in the downlink of the first cell according to the almost empty subframe information
  • the time domain position of the subframe is the same as the time domain location of the almost empty
  • a base station including: an obtaining unit, a sending unit, a receiving unit, and a scheduling unit.
  • the acquiring unit is configured to acquire a resource occupancy rate of a boundary user of the first cell.
  • the sending unit is configured to send a resource occupancy rate of a border user of the first cell to a control base station of the second cell; the second cell is a neighboring cell of the first cell, and a boundary of the first cell.
  • the resource occupancy rate of the user is used by the control base station of the second cell to configure an almost null subframe for downlink transmission.
  • the receiving unit is configured to receive almost blank subframe information configured by the control base station of the second cell, where the almost blank subframe information is used to indicate a time domain location of an almost null subframe of the downlink sending of the second cell.
  • the scheduling unit is configured to schedule, according to the almost empty subframe information, a boundary user of the first cell, in a downlink transmission subframe of the first cell, a time domain location of the subframe, and the second The time domain location of the almost empty subframe transmitted by the downlink of the cell is the same.
  • Another aspect of the present invention provides a method for inter-cell interference coordination, including: The control base station of the cell acquires the resource occupancy rate of the border user of the first cell; the control base station of the first cell sends the resource occupancy rate of the border user of the first cell to the control base station of the second cell;
  • the second cell is a neighboring cell of the first cell, where the control base station of the first cell and the control base station of the second cell are different base stations, and the first cell and the second cell have the same
  • the carrier occupancy rate of the border user of the first cell is used by the control base station of the second cell to configure an almost null subframe for downlink transmission; the control base station of the first cell receives the control base station of the second cell
  • the interference information includes: almost empty subframe information, where the almost empty subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell;
  • the interference information is used to control a switch of the first cell.
  • a base station including: an obtaining unit, a transmitting unit, a receiving unit, and a control unit.
  • the acquiring unit is configured to acquire a resource occupancy rate of a boundary user of the first cell.
  • the sending unit is configured to send the resource occupancy rate of the border user of the first cell to the control base station of the second cell; the second cell is a neighboring cell of the first cell, and the first cell is Controlling the base station and the control base station of the second cell are different base stations, and the first cell and the second cell have the same carrier; the resource occupancy rate of the border user of the first cell is used by the second cell
  • the control base station is configured to configure almost empty subframes for downlink transmission.
  • the receiving unit is configured to receive interference information of a control base station of the second cell, where the interference information includes almost null subframe information, and the almost blank subframe information is used to indicate an almost null subframe of downlink transmission of the second cell. Time domain location.
  • the control unit is configured to control a switch of the first cell according to the interference information.
  • Another aspect of the present invention provides a communication system, comprising: a control base station of a first cell and a control base station of a second cell; and the control base station of the first cell is any one of the base stations as described above;
  • the control base station of the second cell is configured to configure an almost null subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell, and send almost null subframe information to the control base station of the first cell.
  • Another aspect of the present invention provides a method for inter-cell interference coordination, including: a control base station of a third cell receives interference information sent by a control base station of a second cell; and the interference information includes control of the second cell
  • the base station configures the number of almost empty subframes to be transmitted in the downlink according to the resource occupancy rate of the boundary user of the first cell; the control base station of the third cell controls the switch of the third cell according to the interference information;
  • the first cell, the second cell, and the third cell are neighboring cells; the control base station of the first cell, the control base station of the second cell, and the control base station of the third cell are different.
  • a base station, and the first cell, the second cell, and the third cell have the same carrier.
  • a base station including: a receiving unit, configured to receive interference information sent by a control base station of the second cell; the interference information includes a control base station of the second cell according to the first And a control unit, configured to control, according to the interference information, a switch of the third cell, where the first cell, the first cell The second cell and the third cell are neighboring cells; the control base station of the first cell, the control base station of the second cell, and the control base station of the third cell are different base stations, and the first cell The second cell and the third cell have the same carrier.
  • the method for the inter-cell interference coordination provided by the embodiment of the present invention, the base station, and the communication system, configure the almost empty subframe of the second cell according to the resource occupancy rate of the boundary user of the first cell,
  • FIG. 1 is a schematic structural diagram of a wireless heterogeneous network system in the prior art
  • FIG. 2 is a schematic diagram of an almost empty subframe of inter-cell interference coordination in the prior art
  • FIG. 3 is a schematic flowchart of a method for inter-cell interference coordination by using an X2 interface or an S1 interface according to an embodiment of the present invention
  • FIG. 5 is a schematic flowchart of a method for inter-cell interference coordination for transmitting resource occupancy rate by OAM according to an embodiment of the present invention
  • FIG. 6 is a schematic flowchart of a method for inter-cell interference coordination for transmitting CRE configuration information through an X2 interface or an S1 interface according to an embodiment of the present invention
  • FIG. 7 is a schematic flowchart of a method for inter-cell interference coordination for transmitting CRE configuration information through OAM according to an embodiment of the present invention
  • FIG. 8 is a schematic flowchart of another method for inter-cell interference coordination according to an embodiment of the present invention
  • FIG. 9 is a schematic flowchart of another method for inter-cell interference coordination according to an embodiment of the present invention.
  • FIG. 11 is a schematic structural diagram of a transmitting unit of the base station shown in FIG. 10;
  • FIG. 12 is a schematic structural diagram of a communication system according to an embodiment of the present invention.
  • FIG. 13 is a schematic flowchart of another method for inter-cell interference coordination according to an embodiment of the present invention
  • FIG. 14 is a schematic structural diagram of another base station according to an embodiment of the present invention.
  • FIG. 15 is a schematic structural diagram of a control unit of the base station shown in FIG. 14;
  • 16 is a schematic structural diagram of another communication system according to an embodiment of the present invention.
  • FIG. 17 is a schematic flowchart of another method for inter-cell interference coordination according to an embodiment of the present invention.
  • FIG. 18 is a schematic structural diagram of another base station according to an embodiment of the present invention.
  • Figure 19 is a schematic diagram showing the structure of a control unit of the base station shown in Figure 18;
  • FIG. 20 is a schematic structural diagram of another communication system in the embodiment of the present invention.
  • the technical solutions in the embodiments of the present invention will be clearly described with reference to the accompanying drawings in the embodiments of the present invention. It is obvious that the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts are within the scope of the present invention.
  • the current standard is to determine the number of ABS subframes according to the current Pico cell traffic volume, and Pico.
  • the size of the traffic is described by the occupancy of Resource Blocks (RBs) on the ABS subframe.
  • RBs Resource Blocks
  • the RB occupancy rate on the ABS is exchanged between the Pico cell and the Macro cell.
  • the Macro cell allocates more ABS subframes to the Pico celL.
  • the service is divided into the central service and the edge. business.
  • the shaded area shown in Figure 1 is the CRE area of the Pico cell. The UE in the CRE area can only be scheduled on the ABS.
  • the signal to interference plus noise ratio can meet the scheduling requirements, so the UE in the Pico cell center can be scheduled on the ABS subframe or the Non-ABS subframe. on. Therefore, the RB occupancy rate on the ABS in the standard is used to describe the current Pico cell traffic volume is not accurate enough, or even erroneous, because the more UEs in the Pico cell center, the higher the probability of scheduling on the ABS. The degree of deviation of the required amount of ABS is also higher. Especially in the Pico cell power-on process, the Macro cell does not have an ABS subframe, which makes the resources protected by ABS unmeasurable.
  • the embodiment of the present invention provides a method, a base station, and a communication system for inter-cell interference coordination as follows, as a mechanism for dynamically coordinating ABS after a CRE region change.
  • a method for inter-cell interference coordination includes the following content.
  • the control base station of the first cell acquires a resource occupancy rate of a boundary user of the first cell.
  • the control base station of the first cell sends the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the second cell is a neighboring cell of the first cell; the resource occupancy rate of the border user of the first cell is used by the control base station of the second cell for configuration Almost empty sub-frames sent downstream.
  • the almost blank subframe information configured by the control base station of the second cell.
  • the almost blank subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the above almost null subframe information can indicate which of the downlink transmission subframes of the second cell are almost empty subframes and which are non-almost null subframes.
  • control base station of the first cell acquires the resource occupancy rate of the boundary user of the first cell, and includes the following content.
  • the control base station of the first cell receives the measurement report reported by the user equipment of the first cell, where the measurement report includes the reference signal received power RSRP P of the first cell and the reference signal received power of the second cell.
  • RSRP M The reference signal received power
  • RSRP M -Bias RSRP P ⁇ RSRpM the control base station of the first cell determines that the user equipment is a border user of the first cell; if RSRP P ⁇ RSRP M -Bias or RSRP P > RSRP M And the control base station of the first cell determines that the user equipment is not a boundary user of the first cell.
  • Bias is a pre-configured reference signal received power difference.
  • the control base station of the first cell collects the resource occupation of the border user of the first cell, where the user equipment in the first cell can be divided into a border user and a central user, and the border user refers to a cell range extension located in the first cell.
  • CRE Control base station
  • User equipment in the area, and the central user refers to the user equipment located in the central area of the first cell.
  • the boundary users of the first cell are scheduled in a low-power ABS subframe, and the central user is scheduled in a non-ABS subframe, which is advantageous for reducing interference, so that the UEs in the first cell are distinguished, and the radio resources can be allocated reasonably.
  • the method for the control base station of the first cell to collect the resource occupancy rate of the border user of the first cell includes: dividing the number of resource blocks of the boundary user of the first cell Obtaining a resource occupancy rate of the boundary user of the first cell by using the total number of resource blocks of the first cell; or dividing the number of resource blocks of the boundary user of the first cell by the first cell The number of resource blocks in the edge band obtains the resource occupancy rate of the boundary user of the first cell.
  • the cell edge band refers to a resource block that is scheduled to be preferentially scheduled for use by the border user. When there is no border user, it is scheduled to the center user.
  • the resource occupancy rate of the border user of the first cell is used by the control base station of the second cell to configure an almost null subframe for downlink transmission, that is, the control base station of the second cell according to the boundary of the first cell
  • the resource occupancy rate, the configuration of the almost empty subframe transmitted by the downlink specifically includes: the control base station of the second cell performs the resource occupancy rate of the boundary user of the first cell with the first threshold value and the second threshold value respectively. Comparing; the first threshold is less than the second threshold.
  • the resource occupancy rate of the border user of the first cell is less than the first threshold, the nearly null subframe of the downlink transmission of the second cell is reduced by 1 ⁇ >1; If the resource usage of the border user is greater than the second threshold, the almost empty subframe of the downlink transmission of the second cell is increased by N 2 , N 2 >1; if the resource of the border user of the first cell is occupied If the rate is greater than or equal to the first threshold, and the resource occupancy rate of the border user of the first cell is less than or equal to the second threshold, the downlink of the second cell is not changed. The number of frames.
  • the first threshold value, the second threshold value, and the value of N ⁇ N 2 may be set according to actual conditions.
  • the control base station of the first cell sends the resource occupancy rate of the border user of the first cell to the control base station of the second cell
  • the method includes: the control base station of the first cell is sent to the first
  • the control base station of the second cell is transmitted to the control base station of the second cell through the S1 interface, or to the control base station of the second cell through the Operation Administration and Maintenance (OAM) center, or through the base station and the base station coordinator.
  • the interface between (eCordinator) is transmitted to the control base station of the second cell.
  • the base station coordinator can be connected to multiple base stations to implement joint scheduling, synchronization, and control signals between the base stations. Let forwarding and other functions.
  • the method for coordinating inter-cell interference provided by this embodiment is configured to allocate resources according to the almost empty subframe information of the downlink of the second cell, and when the boundary user of the first cell schedules the downlink transmission subframe of the first cell, the scheduled The time domain position of the subframe is the same as the time domain location of the almost empty subframe transmitted by the downlink of the second cell, and the capability of inter-cell interference coordination can be improved.
  • the following describes the transmission of resource occupancy rate and the configuration procedure of almost empty subframes in conjunction with FIG. 4 and FIG.
  • the resource usage and ABS configuration flow are transmitted through the X2 interface or the S1 interface, including the following.
  • the user equipment and the control base station of the first cell perform service transmission.
  • the border user of the first cell After the control base station of the first cell obtains the resource occupancy rate of the border user, the border user of the first cell is connected through the X2 interface between the control base station of the first cell and the control base station of the second cell or through the S1 interface.
  • the resource occupancy rate is passed to the control base station of the second cell.
  • the control base station of the second cell After receiving the resource occupancy rate of the boundary user of the first cell, the control base station of the second cell configures the almost empty subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell; and controls by the first cell.
  • the X2 interface between the base station and the control base station of the second cell or through the S1 interface transmits almost blank subframe information to the control base station of the first cell.
  • the resource usage and ABS configuration process through OAM includes the following.
  • the user equipment and the control base station of the first cell perform service transmission.
  • the control base station of the first cell After obtaining the resource occupation rate of the boundary user of the first cell, the control base station of the first cell transmits the resource occupancy rate of the boundary user of the first cell to the OAM.
  • the OAM transmits the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the control base station of the second cell After the control base station of the second cell receives the resource occupancy rate of the boundary user of the first cell, Configuring a nearly null subframe that is sent in the downlink according to the resource occupancy rate of the boundary user of the first cell; and using an X2 interface between the control base station of the first cell and the control base station of the second cell or through the S1 interface, the almost empty subframe The information is passed to the control base station of the first cell.
  • the control base station of the first cell may further connect the boundary of the first cell by using an interface between the control base station of the first cell and the base station coordinator.
  • the resource occupancy rate of the user is transmitted to the base station coordinator, and the resource occupancy rate of the boundary user of the first cell is transmitted to the first by the base station coordinator through an interface between the base station coordinator and the control base station of the second cell.
  • the control base station of the second cell After receiving the resource occupancy rate of the border user of the first cell, the control base station of the second cell configures the almost empty subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell, and controls the second cell.
  • An interface between the base station and the base station coordinator transmits the almost blank subframe information to the base station coordinator, and the base station coordinator passes the almost empty subframe through an interface between the base station coordinator and the control base station of the first cell The information is passed to the control base station of the first cell.
  • the method for coordinating inter-cell interference provided in this embodiment, according to the resource occupancy rate of the boundary user of the first cell, reasonably configuring the downlink ABS subframe of the adjacent second cell; scheduling the first user of the boundary of the first cell
  • the time domain location of the scheduled subframe is the same as the time domain location of the almost empty subframe transmitted by the downlink of the second cell, and the first cell service can be protected from the second cell interference. And for the second cell, it will not cause waste of resources.
  • the method for coordinating inter-cell interference provided in this embodiment can configure the downlink transmission of the second cell according to the resource occupancy rate of the boundary user of the first cell when the control base station of the first cell is powered on.
  • the null subframe is specifically as follows: When the control base station of the first cell is powered on, the second cell does not set any ABS. Therefore, according to the current protocol, the load (traffic) in the ABS cannot be measured. After the CRE is configured in the first cell, the CRE area starts to be interfered.
  • the method for coordinating inter-cell interference provided by the foregoing embodiment is performed, and the boundary user in the first cell is determined, and the first cell is coordinated according to the resource occupancy rate of the boundary user in the first cell.
  • the number of ABS subframes protects the first cell service from the second cell interference. Moreover, the control base station of the second cell appropriately configures the number of ABS subframes to be sent in the downlink according to the resource occupancy rate of the boundary user of the first cell, and does not cause waste of resources for the second cell.
  • the method for coordinating inter-cell interference provided by the embodiment of the present invention, by monitoring the CRE configuration, dynamically coordinating the almost empty subframe transmitted by the downlink of the second cell after the CRE region is changed.
  • the method for inter-cell interference coordination further includes: when the first cell performs cell range extension, sending cell range extension configuration information to the control base station of the second cell. a cell range extension configuration value including a cell range extension offset value (CRE bias value), and a time when the cell range extension offset value is enabled; the cell range extension configuration information is used for Notifying the control base station of the second cell to change the cell range extension configuration; and receiving the cell range extension response information returned by the control base station of the second cell.
  • CRE bias value cell range extension offset value
  • the time to enable the CRE bias value can be absolute time, or relative time.
  • the absolute time includes: clock time; when the first cell and the second cell agree to reach the clock time point, the CRE configuration after the cell range extension is enabled.
  • the relative time includes: a certain subframe number; when the subframe transmitted by the downlink of the first cell and the second cell reaches the subframe number, the CRE bias value after the cell range extension is started to be used.
  • the relative time also includes: the Nth subframe number after receiving the CRE configuration information and before returning the CRE configuration response information. That is, after the first cell agrees that the second cell receives the CRE configuration information, the two parties in the Nth subframe start to jointly enable the CRE bias value after the cell range extension.
  • the relative time (such as the Nth subframe number) may be carried by the control base station of the first cell when transmitting the CRE configuration information, or may be carried by the control base station of the second cell when transmitting the CRE configuration response information.
  • control base station of the first cell does not receive the CRE configuration response information returned by the control base station of the second cell, the control base station in the first area will repeatedly send the CRE configuration. Set the information.
  • the first cell change cell range extension configuration may be a stepped CRE extension when the control base station of the first cell is powered on, as follows:
  • the CRE extension is started in a stepwise manner. For example, CRE starts with OdB and uses 0.5dB as the expansion step, with an extended interval of 0.5 hours, trying to extend the CRE area.
  • the CRE extension stops in the following situations:
  • the entire cell traffic of the first cell reaches a certain threshold; for example, the RB occupancy rate reaches 85%, which indicates that the network rule design for absorbing enough UE services is achieved, and the purpose of placing the first small area by the operator is achieved;
  • BLER is above a certain threshold, for example, higher than 0.1%, indicating that the CRE extended area is sufficiently disturbed and is no longer suitable for CRE expansion;
  • the CRE extension reaches the upper limit of the CRE value that can be set by the first cell.
  • each step of the CRE changes, and the control base station of the first cell passes the X2 interface, or through the S1 interface, or through the OAM, or through the interface between the base station and the base station coordinator.
  • the CRE configuration information is transmitted to the control base station of the second cell.
  • the user equipment and the control base station of the first cell perform service transmission.
  • the method for transmitting the CRE configuration information by the control base station of the first cell and the control base station of the second cell through the X2 interface or the S1 interface includes the following contents.
  • the control base station of the first cell transmits the CRE configuration information through the X2 interface between the control base station of the first cell and the control base station of the second cell or through the S1 interface. Go to the control base station of the second cell.
  • the control base station of the second cell After receiving the CRE configuration information, the control base station of the second cell changes the cell range extension configuration, and passes the X2 interface between the control base station of the first cell and the control base station of the second cell or The CRE configuration response information is returned to the control base station of the first cell through the SI interface.
  • the user equipment and the control base station of the first cell perform service transmission.
  • the control base station of the first cell and the control base station of the second cell transmit CRE configuration information through OAM, including the following.
  • the control base station of the first cell delivers the CRE configuration information to the OAM.
  • the OAM delivers the CRE configuration information to the control base station of the second cell.
  • the control base station of the second cell After receiving the CRE configuration information, the control base station of the second cell changes the cell range extension configuration, and returns the CRE configuration response information to the OAM.
  • the OAM returns CRE configuration response information to the control base station in the first area.
  • the CRE configuration information may be transmitted through the interface between the base station coordinator and the base station, and the delivery procedure is used to transmit the resource occupancy rate of the boundary user of the first cell to the foregoing interface between the base station coordinator and the base station.
  • the process is the same and will not be described in detail here.
  • the first cell change cell range extension configuration may be to reconfigure the CRE, for example: the operator needs to reconfigure the CRE of the first 'zone, including the CRE bias value increment due to network optimization or troubleshooting. Or decrement, or configure a new CRE bias value via OAM.
  • the first area service is too large (such as the RB occupancy rate exceeds 95% for a long time or the interference is obvious, or the PDCCH BLER is higher than the threshold value of 0.2%, etc.)
  • the first cell needs to be reduced.
  • CRE bias value The process of configuring the CRE is the same as the step of performing the stepped CRE expansion when the control base station of the first cell is powered on, and will not be described in detail herein.
  • performing step-based CRE expansion or reconfiguring the CRE when the control base station of the first cell is powered on may cause a change in the CRE area. If the CRE area becomes larger or smaller, the range of cell coverage changes, which will result in a change in the number of UEs actually accessing the cell, thereby causing a change in the edge traffic of the first cell. After the edge traffic changes, the edge service of the first cell can only be performed on the ABS.
  • the inter-cell provided by the foregoing embodiment is implemented.
  • the interference coordination method can coordinate the number of ABS subframes required by the first cell according to the resource occupancy rate of the boundary user in the first cell, and can meet the data transmission requirement of the boundary user of the first cell.
  • the ABS when the CRE size changes, the ABS can be dynamically coordinated through the X2 interface, the S1 interface, or the OAM. A detailed description will be given below with reference to Figs. 8 and 9.
  • this embodiment provides another method for inter-cell interference coordination.
  • the user equipment and the control base station of the first cell perform service transmission.
  • this embodiment passes
  • Dynamically coordinate ABS through the X2 interface or through the S1 interface including the following.
  • the control base station of the first cell transmits the CRE configuration information through the X2 interface between the control base station of the first cell and the control base station of the second cell or through the S1 interface. Go to the control base station of the second cell.
  • the first cell and the second cell are neighboring cells.
  • the control base station of the second cell After receiving the CRE configuration information, the control base station of the second cell changes the cell range extension configuration, and uses the X2 interface between the control base station of the first cell and the control base station of the second cell or through the S1 interface to the first cell.
  • the controlling base station returns CRE configuration response information.
  • the control base station of the first cell re-determines the boundary user of the first cell, and calculates the resource occupancy rate of the boundary user of the first cell, and passes the X2 interface between the control base station of the first cell and the control base station of the second cell or The S1 interface transmits the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the control base station of the second cell After receiving the resource occupancy rate of the border user of the first cell, the control base station of the second cell configures the almost empty subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell; and controls the first cell.
  • the X2 interface between the base station and the control base station of the second cell or through the S1 interface transmits almost blank subframe information to the control base station of the first cell.
  • the almost empty subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the above almost null subframe information can indicate which of the downlink transmission subframes of the second cell are almost empty subframes and which are non-almost null subframes.
  • the null subframe information is used to schedule the boundary user of the first cell in the downlink subframe of the first cell, and the time domain location of the subframe and the time domain location of the almost empty subframe transmitted by the downlink of the second cell the same.
  • this embodiment provides another method for inter-cell interference coordination.
  • the user equipment and the control base station of the first cell perform the service transmission.
  • the embodiment dynamically coordinates the ABS by using the OAM, and specifically includes the following content.
  • the OAM delivers the CRE configuration information to the control base station of the second cell.
  • the first cell and the second cell are neighboring cells.
  • the control base station of the second cell After receiving the CRE configuration information, the control base station of the second cell changes the cell range extension configuration, and returns the CRE configuration response information to the OAM.
  • the OAM returns a CRE configuration response message to the control base station in the first area.
  • the control base station of the first cell re-determines the boundary user of the first cell, and collects the resource occupancy rate of the boundary user of the first cell, and transmits the resource occupancy rate of the boundary user of the first cell to the OAM.
  • the OAM transmits the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the control base station of the second cell After receiving the resource occupancy rate of the border user of the first cell, the control base station of the second cell configures the almost empty subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell; and controls the first cell.
  • the X2 interface between the base station and the control base station of the second cell or through the S1 interface transmits almost blank subframe information to the control base station of the first cell.
  • the almost empty subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the above almost null subframe information can indicate which of the downlink transmission subframes of the second cell are almost empty subframes and which are non-almost null subframes.
  • the null subframe information is used to schedule the boundary user of the first cell in the downlink subframe of the first cell, and the time domain location of the subframe and the time domain location of the almost empty subframe transmitted by the downlink of the second cell the same.
  • the resource occupancy rate, the almost empty subframe information, and the CRE configuration information of the border user of the first cell may be transmitted through an interface between the base station coordinator and the base station.
  • the embodiment of the present invention further provides a base station according to FIG. 10 and a communication system as shown in FIG. 12, which can implement the foregoing method for coordinating inter-cell interference.
  • this embodiment provides a base station, including: an acquiring unit 100, a sending unit
  • the receiving unit 102 and the scheduling unit 103 The receiving unit 102 and the scheduling unit 103.
  • the acquiring unit 100 is configured to acquire a resource occupancy rate of a boundary user of the first cell.
  • the sending unit 101 is configured to send the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the second cell is a neighboring cell of the first cell; the resource occupancy rate of the border user of the first cell is used by the control base station of the second cell to configure an almost empty subframe transmitted by the downlink.
  • the receiving unit 102 is configured to receive almost blank subframe information configured by the control base station of the second cell, where the almost blank subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the scheduling unit 103 is configured to schedule, according to the almost empty subframe information, a boundary user of the first cell, in a downlink transmission subframe of the first cell, a time domain location of the subframe, and the foregoing
  • the time domain location of the almost empty subframe transmitted by the downlink of the two cells is the same.
  • the obtaining unit 100 specifically includes: a receiving subunit 1011, a determining subunit 1012, and a processing subunit 1013.
  • the receiving subunit 1011 is configured to receive a measurement report reported by the user equipment of the first cell, where the measurement report includes a reference signal received power RSRP P of the first cell and a reference signal received power RSRP of the second cell. M.
  • the determining subunit 1012 is configured to: if RSRP M -Bias RSRP P ⁇ RSRP M Determining that the user equipment is a border user of the first cell; if RSRP P ⁇ RSRP M -Bias or RSRP P > RSRP M , determining that the user equipment is not a boundary user of the first cell; wherein, Bias is The pre-configured reference signal receives the power difference.
  • the processing sub-unit 1013 is configured to collect the resource usage of the border user of the first cell.
  • the processing sub-unit 1013 may be further configured to: divide the number of resource blocks of the boundary user of the first cell by The number of all resource blocks of the first cell is obtained, and the resource occupancy rate of the boundary user of the first cell is obtained; or the number of resource blocks of the boundary user of the first cell is divided by the edge band of the first cell. The number of resource blocks is obtained, and the resource occupancy rate of the boundary user of the first cell is obtained.
  • the sending unit 101 is further configured to: when the first cell performs cell range extension, send cell range extension configuration information to a control base station of the second cell; the cell range extension configuration information includes a cell range extension offset a value, and a time when the cell range extension offset value is enabled; the cell range extension configuration information is used to notify the control base station of the second cell to change the cell range extension configuration;
  • the receiving subunit 1011 is further configured to: receive the cell range extension response information returned by the control base station of the second cell.
  • the base station provided in this embodiment allocates resources according to the almost empty subframe information of the downlink of the second cell, and when the boundary user of the first cell schedules the downlink transmission subframe of the first cell, the time domain of the scheduled subframe The location is the same as the time domain location of the almost empty subframe transmitted by the downlink of the second cell, and the capability of inter-cell interference coordination can be improved.
  • this embodiment provides a communication system including a control base station 121 of a first cell and a control base station 122 of a second cell.
  • the control base station 121 of the first cell is the base station described above in FIG. 10 and FIG. 11; the control base station 122 of the second cell is configured to use the resource occupancy rate of the boundary user of the first cell, The almost empty subframe transmitted in the downlink is configured, and the almost blank subframe information is sent to the control base station of the first cell.
  • the control base station 122 of the second cell specifically includes: a comparing unit 1221 and a configuration unit 1222.
  • the comparing unit 1221 is configured to compare the resource occupancy rate of the boundary user of the first cell with a first threshold value and a second threshold value, where the first threshold value is smaller than the second threshold. Limit.
  • the configuration unit 1222 is configured to: if the resource occupancy rate of the border user of the first cell is less than the first threshold, the nearly empty subframe of the downlink transmission of the second cell is reduced by >1; If the resource occupancy rate of the border user of the first cell is greater than the second threshold, the nearly null subframe of the downlink transmission of the second cell is increased by N 2 , N 2 >1; If the resource occupancy rate of the border user is greater than or equal to the first threshold, and the resource occupancy rate of the border user of the first cell is less than or equal to the second threshold, the second cell is not changed. The number of almost empty subframes sent downstream.
  • control base station of the first cell is further configured to use the X2 interface, or through an S1 interface, or through an operation management and maintenance center OAM, or through an interface between a base station and a base station coordinator.
  • the resource occupancy rate of the border user of the cell is transmitted to the control base station of the second cell.
  • the control base station of the second cell is further configured to transmit the almost blank subframe information to the first cell through an X2 interface, or through an S1 interface, or through OAM, or through an interface between a base station and a base station coordinator. Control base station.
  • the communication system provided in this embodiment can reasonably configure the almost empty subframe for downlink transmission of the neighboring second cell according to the resource occupancy rate of the boundary user of the first cell, and can not only protect the first cell service from the second cell interference. And for the second cell, it will not cause waste of resources.
  • the boundary user of the first cell schedules the downlink transmission subframe of the first cell according to the almost empty subframe information of the downlink transmission of the second cell
  • the time domain location of the scheduled subframe and the second cell are The time-domain locations of almost empty subframes transmitted by the downlink are the same, which can improve the ability of inter-cell interference coordination.
  • this embodiment provides another method for inter-cell interference coordination, including the following inner valley.
  • the control base station of the first cell acquires the resource occupation S131 of the border user of the first cell, and the control base station of the first cell sends the resource occupancy rate of the boundary user of the first cell to the second cell.
  • the second cell is a neighboring cell of the first cell, where the control base station of the first cell and the control base station of the second cell are different base stations, and the first cell and the second cell have the same
  • the carrier occupancy rate of the border user of the first cell is used by the control base station of the second cell to configure an almost null subframe for downlink transmission.
  • the control base station of the first cell receives interference information of a control base station of the second cell.
  • the interference information includes almost null subframe information; the almost blank subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the control base station of the first cell controls the switch of the first cell according to the interference information.
  • a method for determining a boundary user of a first 'zone, a method for counting resource occupancy of a boundary user of a first cell, a method for transmitting a resource occupancy rate, and a control base station for a second cell configuring an almost empty space for downlink transmission The method of the frame and the method of dynamically coordinating the ABS when the cell range is extended are the same as those of the embodiment described above with reference to FIG. 3 to FIG. 9, and are not described herein.
  • the control base station of the first cell controls the switch of the first cell according to the interference information, and includes: the control base station of the first cell performs the interference information with a preset threshold value. And comparing, according to the comparison result, determining whether the first cell needs to be closed; if the first cell needs to be shut down, switching the user equipment in the first cell to the third cell, and shutting down the first cell; If the first cell does not need to be shut down, the border user of the first cell is handed over to the third cell, and the first cell is not closed.
  • the control base station of the first cell and the control base station of the third cell are the same base station, and the first cell and the third cell have different carriers.
  • the first cell and the third cell are cells of two different carriers in the same control base station, that is, the base station uses a carrier aggregation (CA) cell of multiple carriers, and the base station can selectively turn on or off a certain cell.
  • CA carrier aggregation
  • the cell, or handover tunes the UE from the cell of one carrier to the cell of another carrier, in order to coordinate interference between cells.
  • the first cell and the second cell are the cells with the same carrier in the two different base stations.
  • the more the number of ABSs transmitted by the control base station of the second cell the higher the resource occupancy rate of the first cell scheduled on the CRE. That is, the greater the amount of traffic on the CRE, or the more UEs in the CRE area, the first, the more severe the interference experienced by the zone.
  • the base station may select a carrier according to the number of ABSs in the ABS information. For example, when the number of ABSs is 1, it indicates that the interference exists but is not serious, and the first cell may be used. When the number of ABSs exceeds a certain threshold (for example, the threshold is 2), the interference is severe, and the first cell needs to be shut down, other cells are used, or the UE of the first cell is switched to another cell.
  • a certain threshold for example, the threshold is 2
  • the control base station of the second cell transmits the interference information to the first cell through an X2 interface, or through an S1 interface, or through OAM, or through an interface between the base station and the base station coordinator.
  • the interference information may further include a High Interference Indicator ( ⁇ ), an Overload Indicator (01), a Relative Narrowband TX Power Indicator (RNTP), and a Block Error Rate (BLER).
  • High Interference Indicator
  • RNTP Relative Narrowband TX Power Indicator
  • BLER Block Error Rate
  • the method for determining whether the cell needs to be shut down is: comparing each item of the interference information with a corresponding threshold; if each item is greater than the corresponding threshold, it indicates that the first cell has serious interference and needs to be closed. First cell; otherwise there is no need to shut down the cell.
  • the method for co-inter-cell interference coordination provided in this embodiment allocates resources according to the almost empty subframe information of the downlink transmission of the second cell, and controls the switches of the neighboring cells, thereby improving the capability of inter-cell interference coordination.
  • the embodiment of the present invention further provides a base station as shown in FIG. 14 and a communication system as shown in FIG. A flow of a method capable of implementing the inter-cell interference coordination described in FIG. 13 above.
  • the base station provided in this embodiment includes: an obtaining unit 140, a sending unit 141, a receiving unit 142, and a control unit 143.
  • the acquiring unit 140 is configured to acquire a resource occupancy rate of a boundary user of the first cell.
  • the sending unit 141 is configured to send the resource occupancy rate of the border user of the first cell to the control base station of the second cell.
  • the second cell is a neighboring cell of the first cell, where the control base station of the first cell and the control base station of the second cell are different base stations, and the first cell and the second cell have the same
  • the carrier occupancy rate of the border user of the first cell is used by the control base station of the second cell to configure an almost null subframe for downlink transmission.
  • the receiving unit 142 is configured to receive interference information of a control base station of the second cell, where the interference information includes almost blank subframe information.
  • the almost blank subframe information is used to indicate a time domain location of an almost null subframe of the downlink transmission of the second cell.
  • the control unit 143 is configured to control the switch of the first cell according to the interference information.
  • the obtaining unit 140 and the transmitting unit 141 are the same as the structures and functions of the obtaining unit 100 and the transmitting unit 101 of FIG. 10 and FIG. 11 described above, and are not described herein.
  • control unit 143 specifically includes: a determining subunit 1431 and a coordinating subunit 1432.
  • the determining subunit 1431 is configured to compare the interference information with a preset threshold, and determine, according to the comparison result, whether the first cell needs to be closed.
  • the coordination subunit 1432 is configured to: if the first cell needs to be shut down, switch the user equipment in the first cell to the third cell, and close the first cell; if the first cell does not need to be closed The cell, the border user of the first cell is handed over to the third cell, and the first cell is not closed.
  • the control base station of the first cell and the control base station of the third cell are the same base station, and the first cell and the third cell have different carriers.
  • the interference information further includes at least one of ⁇ , 01, RNTP, BLER, and CQI.
  • the resource occupancy rate of the border user of the first cell is transmitted through the X2 interface.
  • the base station for inter-cell interference coordination allocates resources according to the almost empty subframe information of the downlink of the second cell, controls the switches of the neighboring cells, and can improve the capability of inter-cell interference coordination.
  • a communication system provided by this embodiment includes a control base station 161 of a first cell and a control base station 162 of a second cell.
  • the control base station 161 of the first cell is the base station described above with reference to Figs. 14 and 15 .
  • the control base station 162 of the second cell is configured to configure an almost null subframe transmitted by the downlink according to the resource occupancy rate of the boundary user of the first cell, and send almost blank subframe information to the control base station of the first cell.
  • the control base station 162 of the second cell specifically includes: a comparison unit 1621 and a configuration unit 1622.
  • the comparing unit 1621 is configured to: compare a resource occupancy rate of the boundary user of the first cell with a first threshold value and a second threshold value, where the first threshold value is smaller than the second threshold value; Threshold.
  • the configuration unit 1622 is configured to: if the resource occupancy rate of the border user of the first cell is less than the first threshold, the number of almost empty subframes sent by the second cell is reduced by >1; If the resource occupancy rate of the border user of the first cell is greater than the second threshold, the almost empty subframe of the downlink transmission of the second cell is increased by N 2 , N 2 >1; If the resource occupancy rate of the border user is greater than or equal to the first threshold, and the resource occupancy rate of the border user of the first cell is less than or equal to the second threshold, the second cell is not changed. The number of almost empty subframes sent downstream.
  • control base station of the first cell may use the X2 interface, or the S1 interface, or the OAM, or the interface between the base station and the base station coordinator to occupy the resource of the border user of the first cell.
  • Rate transmitted to the control base station of the second cell; the second The control base station of the cell may transmit the interference information to the control base station of the first cell through an X2 interface, or through an S1 interface, or through OAM, or through an interface between the base station and the base station coordinator.
  • the communication system provided in this embodiment can reasonably configure the almost empty subframe for downlink transmission of the neighboring second cell according to the resource occupancy rate of the boundary user of the first cell, and can not only protect the first cell service from the second cell interference. And for the second cell, it will not cause waste of resources.
  • the resources are allocated according to the almost empty subframe information of the downlink transmission of the second cell, and the switch of the adjacent cell is controlled, thereby improving the capability of inter-cell interference coordination.
  • this embodiment provides another method for inter-cell interference coordination, including the following intra-valley.
  • the control base station of the third cell receives the interference information sent by the control base station of the second cell, where the interference information includes the downlink transmission of the control base station of the second cell according to the resource occupancy rate of the boundary user of the first cell.
  • the control base station of the third cell controls, according to the interference information, a switch of the third cell.
  • the first cell, the second cell, and the third cell are neighboring cells; the control base station of the first cell, the control base station of the second cell, and the control base station of the third cell It is a different base station, and the first cell, the second cell, and the third cell have the same carrier.
  • how to determine a boundary user of a first cell, a method for collecting a resource occupancy rate of a boundary user of a first cell, a method for transmitting a resource occupancy rate, and a control base station of a second cell are configured to perform downlink transmission.
  • the method of the almost empty subframe and the method of dynamically coordinating the ABS when the cell range is extended are the same as those of the embodiment described above with reference to FIG. 3 to FIG. 9, and are not described herein.
  • the control base station of the third cell controls the switch of the third cell according to the interference information, and includes: the control base station of the third cell sets the interference information with a preset
  • the threshold values are compared, and it is determined according to the comparison result whether the third cell needs to be closed. If the third cell needs to be closed, the third cell is closed, and the fourth cell is turned on; if the third cell does not need to be shut down, the third cell is not closed, and the fourth cell is not enabled.
  • the control base station of the third cell and the control base station of the fourth cell are the same base station, and the third cell and the fourth cell have different carriers. The control base stations of the third cell and the fourth cell are used.
  • the base station may selectively turn on or off a certain cell, or switch the cell from one carrier to another in the cell to facilitate coordination of inter-cell interference.
  • the first cell, the second cell, and the third cell are cells having the same carrier among the three different base stations, and the more the number of ABSs transmitted by the control base station of the second cell is, the resource occupied by the first cell is scheduled to be scheduled on the CRE.
  • the neighboring base station turns off the third cell having the same carrier frequency as the first cell, and turns on the fourth cell of the other carrier.
  • the control base station of the second cell transmits the interference information to the third cell through an X2 interface, or through an S1 interface, or through OAM, or through an interface between the base station and the base station coordinator.
  • the interference information may further include at least one of ⁇ , 01, RNTP, BLER, CQI.
  • the method for determining whether to close the third cell is: comparing each item of the interference information with a corresponding threshold; if each item is greater than the corresponding threshold, it indicates that the first cell has serious interference. The third cell needs to be closed; otherwise the third cell does not need to be closed.
  • the fourth cell is first turned on, and the UE in the third cell is switched to the fourth cell, and then the third cell is closed. If there is no UE in the third cell (for example, when the control base station of the third cell is powered on, there is no UE in the third cell), then the third cell is directly turned off, and the fourth cell is turned on.
  • the method for coordinating the inter-cell interference provided by the embodiment, by receiving the interference information sent by the control base station of the neighboring cell, and controlling the switch of the neighboring cell according to the interference information, can High inter-cell interference coordination capability.
  • the embodiment of the present invention further provides a flow of a method for implementing inter-cell interference coordination according to the base station shown in FIG. 18 and the communication system shown in FIG.
  • the base station provided in this embodiment includes: a receiving unit 181 and a control unit 182.
  • the receiving unit 181 is configured to receive the interference information that is sent by the control base station of the second cell, where the interference information includes the downlink transmission of the control base station of the second cell according to the resource occupancy rate of the boundary user of the first cell. The number of almost empty sub-frames.
  • the control unit 182 is configured to control a switch of the third cell according to the interference information.
  • the first cell, the second cell, and the third cell are neighboring cells; the control base station of the first cell, the control base station of the second cell, and the control base station of the third cell It is a different base station, and the first cell, the second cell, and the third cell have the same carrier.
  • control unit 182 specifically includes: a determining subunit 1821 and a coordinating subunit 1822.
  • the determining subunit 1821 is configured to compare the interference information with a preset threshold, and determine, according to the comparison result, whether the third cell needs to be closed; the coordination subunit 1822 is configured to: if the third part needs to be closed And the third cell is closed, and the fourth cell is turned on; if the third cell is not required to be closed, the third cell is not closed, and the fourth cell is not enabled.
  • the control base station of the third cell and the control base station of the fourth cell are the same base station, and the third cell and the fourth cell have different carriers.
  • the interference information further includes at least one of ⁇ , 01, RNTP, BLER, and CQI.
  • a communication system includes a control base station 201 of a first cell, a control base station 202 of a second cell, and a control base station 203 of a third cell.
  • the control base station 203 of the third cell is the base station described in FIG. 18 and FIG. 19; the control base station 202 of the second cell is configured to configure the downlink transmission according to the resource occupancy rate of the boundary user of the first cell. Empty sub-frame.
  • control base station 201 of the first cell transmits the resource occupancy rate of the border user of the first cell to the control base station 202 of the second cell through the X2 interface, or through the S1 interface, or through the OAM;
  • the base station 202 transmits the interference information or almost null subframe information to the control base station 203 of the third cell through the X2 interface, or through the S1 interface, or through the OAM.
  • the base station receives the interference information sent by the control base station of the neighboring cell, and controls the switch of the neighboring cell according to the interference information, thereby improving the capability of inter-cell interference coordination.
  • the method for the inter-cell interference coordination provided by the embodiment of the present invention, the base station, and the communication system, according to the resource occupancy rate of the boundary user of the first cell, can reasonably configure the almost empty subframe of the downlink transmission of the adjacent second cell, which can not only protect the first A cell service is not interfered by the second cell, and for the second cell, no waste of resources is caused.
  • the present invention allocates resources according to the almost empty subframe information of the downlink transmission of the second cell, and when the boundary user of the first cell schedules the downlink transmission subframe of the first cell, the time domain location of the scheduled subframe and the second cell.
  • the time domain location of the almost empty subframe transmitted by the downlink is the same, or the switch of the adjacent cell is controlled, and the capability of inter-cell interference coordination can be improved.
  • the storage medium may be a magnetic disk, an optical disk, or a read-only storage memory. RAM) and so on.

Landscapes

  • Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

L'invention se rapporte à un procédé de coordination du brouillage intercellulaire, qui se déroule de la manière suivante : une station de base pilote d'une première cellule acquiert le taux d'occupation des ressources des utilisateurs en périphérie de ladite première cellule et envoie ce taux d'occupation des ressources à une station de base pilote d'une seconde cellule, cette seconde cellule étant une cellule voisine de la première, et le taux d'occupation des ressources des utilisateurs en périphérie de la première cellule étant utilisé par la station de base pilote de la seconde cellule pour configurer un secteur de trame presque vierge qui est envoyé par transmission dans le sens descendant ; et la station de base pilote de la première cellule reçoit des informations sur le secteur de trame presque vierge configuré par la station de base pilote de la seconde cellule, puis ordonnance les utilisateurs en périphérie de la première cellule sur un secteur de trame de la première cellule qui est envoyé par transmission dans le sens descendant, la localisation dans le domaine temporel dudit secteur de trame étant la même que celle du secteur de trame presque vierge de la seconde cellule qui est envoyé par transmission dans le sens descendant. L'invention concerne également une station de base et un système de communication. Ses modes de réalisation permettent de configurer correctement un secteur de trame presque vierge d'une cellule de brouillage, qui est envoyé par transmission dans le sens descendant, et d'améliorer la capacité de coordination du brouillage intercellulaire.
PCT/CN2013/075833 2012-05-17 2013-05-17 Procédé de coordination du brouillage intercellulaire, station de base et système de communication Ceased WO2013170786A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210153836.6 2012-05-17
CN201210153836.6A CN103428869B (zh) 2012-05-17 2012-05-17 小区间干扰协调的方法、基站及通信系统

Publications (1)

Publication Number Publication Date
WO2013170786A1 true WO2013170786A1 (fr) 2013-11-21

Family

ID=49583158

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/075833 Ceased WO2013170786A1 (fr) 2012-05-17 2013-05-17 Procédé de coordination du brouillage intercellulaire, station de base et système de communication

Country Status (2)

Country Link
CN (1) CN103428869B (fr)
WO (1) WO2013170786A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110391826A (zh) * 2018-04-20 2019-10-29 上海朗帛通信技术有限公司 一种被用于无线通信的用户设备、基站中的方法和装置

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104735789B (zh) * 2013-12-19 2018-06-26 中国移动通信集团公司 一种小区间干扰消除方法、装置及系统
EP3079424B1 (fr) 2014-01-03 2019-10-30 Huawei Technologies Co., Ltd. Appareil et procédé de planification de créneau temporel
CN104780546B (zh) * 2014-01-15 2018-06-05 普天信息技术研究院有限公司 一种动态干扰协调的方法
CN103796256B (zh) * 2014-02-21 2017-03-15 重庆邮电大学 基于移动状态信息和邻区邻近度的移动鲁棒性优化方法及装置
WO2015139275A1 (fr) * 2014-03-20 2015-09-24 富士通株式会社 Procédé, appareil et système d'équilibrage de charge
CN106170961B (zh) * 2014-04-21 2019-07-09 Lg 电子株式会社 无线通信系统中依照调制支持不同小区范围的方法和装置
CN103957563B (zh) * 2014-05-22 2017-07-18 西安电子科技大学 基于增强型小区间干扰协调的联合上下行负载分配方法
CN105792374A (zh) * 2014-12-25 2016-07-20 中兴通讯股份有限公司 小小区频率资源的分配方法及装置
CN108713332B (zh) * 2016-03-21 2020-10-27 华为技术有限公司 一种异构网络中小区测量方法及用户设备、基站
CN110831043B (zh) * 2018-08-10 2022-09-27 维沃移动通信有限公司 一种干扰处理方法、装置及系统
CN112996054B (zh) * 2019-12-16 2023-02-14 华为技术有限公司 信号干扰协调方法、通信装置及计算机可读存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102065490A (zh) * 2011-01-17 2011-05-18 大唐移动通信设备有限公司 基站间下行发射功率的协调方法和设备
CN102176781A (zh) * 2011-01-07 2011-09-07 电信科学技术研究院 一种信息获取方法及装置
CN102186247A (zh) * 2011-05-05 2011-09-14 新邮通信设备有限公司 一种小区间干扰协调的方法和系统
US20120113961A1 (en) * 2010-11-08 2012-05-10 Motorola Mobility, Inc. Interference Measurements in Enhanced Inter-Cell Interference Coordination Capable Wireless Terminals

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102075983A (zh) * 2010-12-29 2011-05-25 大唐移动通信设备有限公司 一种测量限制信息的处理方法和设备
CN102333378B (zh) * 2011-09-16 2015-02-18 新邮通信设备有限公司 一种长期演进lte系统中的干扰协调方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120113961A1 (en) * 2010-11-08 2012-05-10 Motorola Mobility, Inc. Interference Measurements in Enhanced Inter-Cell Interference Coordination Capable Wireless Terminals
CN102176781A (zh) * 2011-01-07 2011-09-07 电信科学技术研究院 一种信息获取方法及装置
CN102065490A (zh) * 2011-01-17 2011-05-18 大唐移动通信设备有限公司 基站间下行发射功率的协调方法和设备
CN102186247A (zh) * 2011-05-05 2011-09-14 新邮通信设备有限公司 一种小区间干扰协调的方法和系统

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110391826A (zh) * 2018-04-20 2019-10-29 上海朗帛通信技术有限公司 一种被用于无线通信的用户设备、基站中的方法和装置
CN110391826B (zh) * 2018-04-20 2021-04-27 上海朗帛通信技术有限公司 一种被用于无线通信的用户设备、基站中的方法和装置
US11012203B2 (en) 2018-04-20 2021-05-18 Shanghai Langbo Communication Technology Company Limited Method and device for wireless communication in UE and base station
CN112865848A (zh) * 2018-04-20 2021-05-28 上海朗帛通信技术有限公司 一种被用于无线通信的用户设备、基站中的方法和装置
CN112865848B (zh) * 2018-04-20 2022-06-21 上海朗帛通信技术有限公司 一种被用于无线通信的用户设备、基站中的方法和装置
US11626945B2 (en) 2018-04-20 2023-04-11 Shanghai Langbo Communication Technology Company Limiied Method and device for wireless communication in UE and base station
US12010047B2 (en) 2018-04-20 2024-06-11 Shanghai Langbo Communication Technology Company Limited Method and device for wireless communication in UE and base station

Also Published As

Publication number Publication date
CN103428869A (zh) 2013-12-04
CN103428869B (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN103428869B (zh) 小区间干扰协调的方法、基站及通信系统
CN105519167B (zh) 移动通信系统中用于支持多连接的控制方法和用于支持多连接的设备
KR101991160B1 (ko) 비허가 스펙트럼에서 캐리어 감지 적응적 송신 (csat) 조정
JP6453339B2 (ja) 免許不要周波数帯における日和見的補助ダウンリンク
CN102202400B (zh) 一种资源占用方式的指示及处理方法及装置
EP3050339B1 (fr) Amélioration de la performance d'un équipement utilisateur (ue) dans une bande de fréquence non soumise à licence
US20150163823A1 (en) Interference classification-based carrier sense adaptive transmission (csat) in unlicensed spectrum
US20150195774A1 (en) Method and apparatus for receiving system information in wireless communication system
KR101516168B1 (ko) Hetnet에서의 적응형 전력 구성 방법 및 대응하는 기지국들
KR20160052651A (ko) 비허가 스펙트럼에서의 측정 리포팅
TW201332382A (zh) 基地台中用於指示用戶終端進行干擾減輕的方法
WO2013067847A1 (fr) Procédé pour s'adapter à un brouillage de canal de commande de liaison descendante physique et station de base correspondante
JP2015537459A (ja) 干渉が緩和された実効的な測定に関係する方法及びデバイス
CN103733675A (zh) 在异构网络中改善无线设备性能
WO2012072038A1 (fr) Procédé, système et dispositif pour confirmer une configuration de liaison montante-descendante
CN105050124B (zh) 异构蜂窝网络基于业务感知的站间频谱资源聚合方法
WO2013139161A1 (fr) Procédé et appareil de planification de ressources dans un réseau sans fil
US9906974B2 (en) Channel quality measurement and reporting in a dual connectivity scenario
EP2772085B1 (fr) Appareil et procédé pour icic dans le domaine temporel avec modèle de coupure comprenant des parties fixes et optionnelles
CN104813719B (zh) 低功率载波类型以及相关方法和设备
CN103686879A (zh) 上下行配比切换的方法和基站
CN111988107B (zh) 用于干扰协调的方法和装置
WO2011134531A1 (fr) Gestion de porteuses dans des environnements de réseau hétérogène
CN104394555A (zh) 一种异构网络中基于负载感知的动态干扰管理方法
WO2014190506A1 (fr) Procédé et dispositif de régulation de brouillage pour mise en réseau de stations de base macro et micro à la même fréquence

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13791668

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13791668

Country of ref document: EP

Kind code of ref document: A1