WO2013152321A1 - Method and apparatus for determining stiffness of a roadway - Google Patents

Method and apparatus for determining stiffness of a roadway Download PDF

Info

Publication number
WO2013152321A1
WO2013152321A1 PCT/US2013/035504 US2013035504W WO2013152321A1 WO 2013152321 A1 WO2013152321 A1 WO 2013152321A1 US 2013035504 W US2013035504 W US 2013035504W WO 2013152321 A1 WO2013152321 A1 WO 2013152321A1
Authority
WO
WIPO (PCT)
Prior art keywords
modulus
layer
estimated
roadway
compaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2013/035504
Other languages
French (fr)
Inventor
Sesh Commuri
Musharraf Zaman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Oklahoma
Original Assignee
University of Oklahoma
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Oklahoma filed Critical University of Oklahoma
Priority to EP13772090.0A priority Critical patent/EP2844798A4/en
Priority to US14/390,936 priority patent/US20150030392A1/en
Priority to CN201380029906.XA priority patent/CN104364445A/en
Publication of WO2013152321A1 publication Critical patent/WO2013152321A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • E01C19/28Vibrated rollers or rollers subjected to impacts, e.g. hammering blows
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • E01C19/28Vibrated rollers or rollers subjected to impacts, e.g. hammering blows
    • E01C19/288Vibrated rollers or rollers subjected to impacts, e.g. hammering blows adapted for monitoring characteristics of the material being compacted, e.g. indicating resonant frequency, measuring degree of compaction, by measuring values, detectable on the roller; using detected values to control operation of the roller, e.g. automatic adjustment of vibration responsive to such measurements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil

Definitions

  • the current disclosure is directed to methods and apparatus for the compaction of roadway materials, and more particularly, to methods and apparatus for calibrating a compaction analyzer, and determining stiffness during construction.
  • Asphalt is often used as pavement.
  • various grades of aggregate are used.
  • the aggregate is mixed with asphalt cement (tar) and sand, and heated to approximately 1 0 °C to 169 °C , and a paver lays down the hot asphalt mix and levels the asphalt mix with a series of augers and scrapers.
  • the material as laid is not dense enough due to air voids in the asphalt mix. Therefore, a roller makes a number of passes over the layer of asphalt material, referred to herein as the asphalt mat, driving back and forth, or otherwise creating sufficient compaction to form asphalt of the strength needed for the road surface, or an individual pavement layer.
  • One of the key process parameters that is monitored during the compaction process is the compacted density of the asphalt mat. While there are many specifications and procedures to ensure that the desired density is achieved, most of these specifications require only 3-5 density readings per lane mile. Typically, the density readings will be from extracted roadway cores.
  • the process of measuring density of the asphalt mat during the compaction process is cumbersome, time-consuming, and is not indicative of the overall compaction achieved unless measurements are taken at a large number of points distributed in a grid fashion, which is difficult to achieve in the field due to cost considerations alone. Failure to meet the target density is unacceptable and remedial measures may result in significant cost overruns. Because the density cannot be measured directly, researchers have attempted different methods for indirect measurements.
  • Stiffness is likewise a key design factor that directly impacts the load bearing capacity of roadway pavements. Early deterioration of pavements due to rutting, fatigue cracking, and other types of distresses may be attributed to inadequate stiffness achieved during the compaction process. The stiffness of a pavement is typically expressed in terms of modulus. While the dependence of pavement performance on stiffness is well known, stiffness is rarely measured or monitored in the field during pavement construction. Remedial measures to rectify inadequate compaction after pavement has cooled down are costly and time consuming.
  • the apparatus disclosed herein comprises a vibratory compactor, or roller, with sensors, and a compaction analyzer associated therewith.
  • the compaction analyzer has a feature extraction module, a neural network module and an analyzer module.
  • the sensors may comprise accelerometers for measuring vibratory response signals of the roller, and the compaction analyzer utilizes the characteristics of the vibratory response signals to generate, in real time, a modulus signal representative of the density of the material being compacted.
  • the compaction analyzer will generate signals representative of the dynamic modulus of the pavement.
  • a method of compacting a roadway section with a roller having a compaction analyzer operably associated therewith comprises entering initial input parameters into the compaction analyzer and making a plurality of passes with the roller over a layer of a portion of the roadway section.
  • the method may further comprise applying a vibratory energy to the portion of the roadway section with the roller as it moves over the layer of the portion of the roadway section and repeatedly gathering responsive vibration signals of the roller as it moves over the layer portion of the roadway section. Additional steps may comprise generating, with the compaction analyzer, estimated modulus signals representative of estimated dynamic moduli based upon the responsive vibration signals of the roller and the initial input parameters entered into the compaction analyzer and measuring the modulus of the layer of the roadway section at a pluralit of locations on the portion of the roadway section.
  • the measured moduli may be compared to the estimated moduli at the plurality of locations to determine the difference between the measured and the estimated moduli, Selected ones of the initial input parameters to the analyzer can then be adjusted based on the difference between the measured moduli and the estimated moduli.
  • the compaction analyzer will generate an adjusted modulus output signal which will more closely approximate an actual modulus of the roadway section than does the estimated modulus signal.
  • the remainder of the layer of the roadway section is rolled until the compaction analyzer with the adjusted input parameters generates a desired adjusted output modulus signal.
  • the method is performed on each layer of a multi-layer roadway section and an effective modulus for the multi-layer roadway section is determined using the modulus for each layer.
  • Another method may comprise entering initial input parameters into the compaction analyzer and making a plurality of passes over a layer of a portion of the roadway section.
  • Vibratory energy may be applied to a portion of layer the roadway section as the plurality of passes are made, responsive vibratory signals of the roller generated in response to the applied vibratory energy are gathered.
  • Selected responsive vibratory signals may be designated as corresponding to specified compaction levels, and the compaction levels of the portion of the roadway section representative of the responsive vibratory signals delivered in real time to an analyzer module in the compaction analyzer as the roller moves along the portion of the roadway section.
  • An estimated modulus is generated in real time with the compaction analyzer based on the delivered compaction level and the initial input parameters as the roller rolls along the portion of the roadway.
  • Modulus measurements of the portion of the roadway section may be taken at a plurality of locations on each layer of the portion of the roadway section to determine a measured modulus at each of the plurality of locations on each layer.
  • the estimated modulus generated by the compaction analyzer at the plurality of locations is compared with the measured modulus at the plurality of locations, and selected ones of the initial input parameters are adjusted based upon the differences between the estimated modulus and the measured modulus.
  • An adjusted modulus of the layer roadway section is generated in real time based upon the delivered compaction levels and the adjusted input parameters that more closely approximate the actual modulus than did the estimated modulus.
  • An effective modulus for the multi layer roadway section is determined based on the modulus of each layer.
  • FIG. 1 is a schematic representation of a roller with a compaction analyzer.
  • FIG. 2 is a schematic representation of the compaction analyzer components.
  • FIG. 3 is exemplary and shows spectral features at an instant in time.
  • FIG. 4 is a spectrogram, and shows a five-second data set for passes made by the roller
  • FIG. 5 shows the power content of the signals represented in FIG. 4.
  • FIG. 6 is a section showing multiple layers of the roadway.
  • the current disclosure is directed to methods and apparatus for compacting a roadway, and for using, and calibrating an Intelligent Asphalt Compaction Analyzer (I AC A).
  • the current disclosure is likewise directed to a method of determining the dynamic modulus of a roadway, which is a measure of the stiffness of the roadway,
  • FIG. 1 schematically shows the IACA 5, a device that can measure the density of an asphalt pavement continuously in real time, over the entire length of the pavement during its construction.
  • Quality control techniques currently used in the field involve the measurement of density at several locations on the completed pavement or the extraction of roadway cores. These methods are usually time-consuming and do not reveal the overall quality of the construction. Furthermore, any compaction issues that are identified cannot be easily remedied after the asphalt mat has cooled down.
  • IACA 5 is a measurement device that does not control any aspect of the machine behavior. Further, IACA 5 is a stand-alone device that can be retrofitted on any existing vibratory compactor. A primary utility of IACA 5 is in providing real-time measurements of the density of the asphalt mat at each location on the pavement under construction. This information can be utilized by the roller operator to ensure uniform compaction, address under-compaction, as well as prevent over-compaction of the pavement.
  • IACA 5 functions on the hypothesis that the vibratory roller, for example vibratory roller 10, and the underlying pavement material, which may be, for example, Hot Mix Asphalt (HMA) form a coupled system.
  • the response of vibratory roller 10 is determined by the frequency of its vibratory motors and the natural vibratory modes of the coupled system. Compaction of an asphalt mat increases its stiffness and as a consequence, the vibrations of the compactor are altered. The knowledge of the properties of the pavement material and the vibration spectrum of the compactor can therefore be used to estimate the stiffness of the asphalt mat.
  • Quality specifications for HMA are generally specified as a percentage of air voids so that, for example, 100% density means no air voids exist, and 90% density means 10% air voids exist. Since the quality specifications are usually specified as percentage air void content or as a percentage of the Maximum Theoretical Density (MTD) of the asphalt mat, IACA 5 can estimate the compacted density of the pavement.
  • MTD Maximum Theoretical Density
  • Vibratory compactor 10 which may be, for example, a DD- 138 HFA lngersoll Rand vibratory compactor, includes forward and rear drums 12 and 14, Forward drum 12 has an eccentric weight 16 mounted therein, and if desired, both forward and rear drums 12 and 14 may have eccentric weights 16 mounted therein. Eccentric weights 16 are rotated by motors (not shown), so that the rotation of the weights 16 within drums 12 and 14 cause an impact at the contact between drums 12 and 14 and a base 18, which may be comprised of HMA. Base 18 may be referred to as asphalt mat 18.
  • Sensor module 22 associated with 1ACA 5 consists of accelerometers 24 mounted to frame 30 for measuring the vibrations of the compactor 10 during operation and may include infrared temperature sensors 26 for measuring the surface temperature of the asphalt base. Accelerometer 24 and temperature sensors 26 may be mounted to a frame 30 of roller 10. Sensors 26 essentially comprise a real-time data acquisition system. IACA 5 may include a user interface 28 which may be an Intel Pentium based laptop for specifying the amplitude and frequency of the vibration motors, and to input mat properties such as the mix type and lift thickness.
  • Accelerometer 24 may be a CXL10HF3 tri-axial accelerometer manufactured by Crossbow, capable of measuring lOg acceleration up to a frequency of 10 kHz.
  • the surface temperature of asphalt mat 18 may be measured using an infrared temperature sensor 26 mounted on the frame 30.
  • a global positioning system (GPS) 32 may also be mounted to roller 10.
  • GPS will, as is known in the art provide locations of roller 10 and will be coordinated with IACA 5 so that the location of the densities generated by IACA 5 will be known.
  • GPS receiver 32 may be, for example, a Trimble Pro XT GPS receiver used to record the location of the roller 10 as it moves.
  • IACA 5 includes a feature extraction (FE) module 34 which computes the Fast Fourier Transform (FFT) of the input signal and extracts features corresponding to vibrations at different salient frequencies.
  • the input signals are the responsive vibratory signals of roller 10, which results from the impacts made by the eccentric weights 16.
  • the responsive vibratory signals are measured, or gathered by accelerometer 24.
  • IACA 5 also includes a Neural Network (NN) Classifier 36 which is a multi-layer Neural Network that is trained to classify the extracted features into different classes, where each class represents a vibration pattern specific to a pre-specified level of compaction.
  • Compaction analyzer module 38 in IACA 5 post-processes the output of the neural network and estimates the degree of compaction in real time. Each component of IACA 5 will be described in more detail hereinbelow.
  • Feature extractor module 34 implements a Fast Fourier Transform to efficiently extract the different frequency components of the responsive vibratory signals of roller 10.
  • the output of the FFT is a vector with 256 elements, where each element corresponds to the normalized signal power at the corresponding frequency.
  • the normalized signal power is the square of the amplitude at the frequency, so the extracted features are frequencies, and amplitudes at the frequencies.
  • FIG. 3 is an example of the spectral features of vibratory signals, and shows frequencies, and the normalized power (i.e., squares of amplitudes) of the frequencies.
  • the vibration signal of the roller 10 is sampled at a rate of 1 kHz (1000 Hz/sec), Because the responsive vibration signal of the roller 10 is sampled at 1 kHz, it is understood that the frequency spectrum is uniformly distributed from 0 to 500 Hz. Since the FFT output is a sector with 256 elements, the features are extracted in frequency bands of approximately 2 Hz. Features may be extracted eight times per second in an overlapping fashion, such that the input to the neural network 36 will include 128 elements from the previous instant at which features were extracted, and 128 elements from the current or immediate feature extraction.
  • Neural network classifier 36 is a three layer neural network with 200 inputs, 10 nodes in the input layer, 4 nodes in the hidden layer, and 1 node in the output layer.
  • the inputs of the neural network correspond to the outputs of the feature extraction module, i.e., in this case 200 features in the frequency spectrum.
  • 200 features in the frequency spectrum i.e., from 100-500 Hz
  • Those in the lower range represent the frequency of roller 10 and may be ignored.
  • Neural network 36 will classify the vibratory response signals of roller 10 into classes representing different levels of compaction.
  • the output of feature extraction module 34 is analyzed over several roller passes during the calibration process and the total power content in the responsive vibration signal of roller 10 is calculated at each instant in time.
  • the power calculation is set forth hereinbelow.
  • a minimum power level, a maximum power level, and equally spaced power levels are identified and the features of the vibratory response signal that correspond to the identified power levels are used to train the neural network 36.
  • the identified minimum, maximum and equally spaced power levels are designated as corresponding to specified levels of compaction.
  • the neural network 36 observes the features of the responsive vibration signals of the roller and classifies the features as corresponding to one of the levels of compaction.
  • the plurality of pre-specified compaction levels will be identified, or designated with a number.
  • a minimum compaction level can be identified, or designated as compaction level 0, and a maximum compaction level can be designated as compaction level 4.
  • the compaction levels therebetween can be designated as compaction levels 1, 2 and 3 which correspond to the equally spaced power levels between the minimum and maximum power levels.
  • FIG. 3 is exemplary, and shows features corresponding to five different compaction levels, with the lowest level corresponding to the case where the roller is operating with the vibration motors turned on and designated as level 0, level 4 designated as corresponding to the case where the maximum vibration is observed, and levels 1 through 3 corresponding to spaced levels therebetween.
  • compaction level 0 corresponds to a lay-down density of the asphalt mat and the compaction level 4 corresponds to the target density as specified in the mix design sheet (designed at 100 gyrations of the superpave gyratory compactor).
  • the lay-down density of asphalt is generally assumed to be, for example, 85% to 88%, and the target or maximum density will generally be 94-97%.
  • Compaction levels 1 , 2 and 3 are designated as corresponding to equally spaced densities therebetween.
  • Asphalt mat 18 may include a portion 40 of a roadway section 42 to be compacted.
  • the portion 40 will comprise a defined length, for example, thirty feet.
  • Locations will be identified on the portion of the roadway, marked as locations A, B, C, D and E on FIG. 1 . The locations will be used to obtain actual measured densities of the portion 40 of the roadway section 42.
  • roadway section 42 may extend for several miles and that once the calibration described herein has occurred, rolling of the remainder of the roadway section 42 can occur without further actual measurement of the density so long as the roadway section is comprised of the same roadway material as portion 42, based upon the output of the IACA 5 as indicated on an IACA display 44.
  • roller 10 makes a plurality of passes over the portion 40 of roadway section 42, eccentric weights 16 will generate impacts as described herein. Responsive vibratory signals of roller 10 are gathered by accelerometer 24 as roller 10 moves along portion 40 by accelerometer 24.
  • Roller 10 will cease making passes when the responsive vibratory signals become consistent, which indicates that no further change in compaction is occurring. Roller 10 should stop, for example, before rollover occurs,
  • the power content of the responsive vibratory signals of roller 10 are calculated using the extracted features by feature extractor 34.
  • the power content is calculated each time a feature extraction occurs, which as described herein, may be eight times per second.
  • the spectrogram of the vibration signal can be represented by a matrix of «, rows and n j columns, where each element of the spectrogram V represents the normalized power in a given feature at a particular instant in time (i.e., the square of the amplitude of the frequency). For example, the element in the i th row and f h column represents the normalized power contained in the i th feature at the j*T s instant in time, where T s is the sample time.
  • FIG. 4 An example showing the power contained in the vibration signal over successive roller passes over a stretch of pavement during its compaction is shown in FIG. 4.
  • the power index is set to three (3), that is the power content over three successive time instants is averaged to determine the average power content at a given instant.
  • the three successive time instants may be, for example, three consecutive intervals of .125 seconds since as explained earlier, features may be extracted every .125 seconds.
  • a spectrogram like the one shown in FIG. 5, can be used to identify the locations on portion 40 where the maximum and minimum power occurred, and the locations of equally spaced power levels, for example, three equally spaced power levels therebetween.
  • five identified power levels are designated as corresponding to minimum compaction level 0, equally spaced compaction levels 1 , 2 and 3, and maximum compaction level 4.
  • neural network 36 will classify the features and identify the features as corresponding to one of the compaction levels 0, 1 , 2, 3 or 4.
  • 200 features representative of the responsive vibration signal of the roller at that time namely, the 200 frequencies and the normalized power (squares of the amplitudes) of those frequencies are provided as inputs to the neural network. Only 200 features are utilized and those features in the lower range (i.e., 0-100 Hz) are ignored.
  • the network will be trained so that the output of the neural network is one of compaction levels 0, 1, 2, 3, 4.
  • the neural network will be trained to recognize the extracted features as being the same, or most similar to the features that correspond to one of the identified power levels, and will be classified accordingly. Thus, if the extracted features are most similar to the features that correspond to the minimum power level, the output of the neural network will be the indicator 0, for the minimum compaction level. If the extracted features are most similar to those contained in the maximum power signal, the output of the neural network will be the number 4, which indicates that the maximum compaction has been reached. The same process will occur when the extracted features are features that are most similar to those at one of the equally spaced power levels, in which case the output of the neural network will be one of the numbers 1 , 2 or 3. During the training process, the interconnection weights of the neural network are modified to minimize the error between the output of the neural network and the level of compaction corresponding to each data set.
  • IACA 5 can be calibrated to estimate the dynamic modulus E, or M of the constructed road 40.
  • the modulus M of each layer of the road 40 as it is constructed can be determined using the IACA, and thereafter the overall effective modulus E eff oi the road can be determined.
  • the manner and method of calibration is like that disclosed with respect to density applied to dynamic modulus.
  • the initial calibration of IACA 5 thus assumes that compaction level 0 corresponds to the modulus of the asphalt mat at the lay-down density and the compaction level 4 corresponds to the target dynamic modulus M T at the density specified in the mix design sheet (designed at 100 gyrations of the superpave gyratory compactor).
  • the IACA is trained to classify the vibrations into estimated levels of compactors, it is thus calibrated to reflect the modulus M of pavement layers, so that the overall E eff for the constructed multi-layer pavement can be determined.
  • dynamic modulus tests are conducted in a lab for the mix used in the construction of each layer.
  • w is assumed to correspond to the dynamic modulus at the lay-down density of the layer, and thus corresponds to the lowest compaction level.
  • the modulus value M r at the target density of the compacted mix is assumed to be the highest modulus that can be achieved and corresponds to the highest compaction level.
  • MM and M T are determined by performing dynamic modulus tests for the asphalt mix being used in accordance with the AASHTO TP 62-03 test method. Master curves for the mix used are developed using the test to correlate the modulus with density. Curves are developed for the mix at different densities, for example 6%, 8%, 10% and 12% air voids.
  • M !d will be the modulus at 12% voids, and Mr will be the modulus at 6% voids - or 94% density.
  • the construction of the master curves is explained in more detail below.
  • the lay-down density of asphalt is generally assumed to be, for example, 85% to 88%, and the target or maximum density will generally be 94-97%.
  • Compaction levels 1 , 2 and 3 are designated as corresponding to equally spaced densities therebetween.
  • the curves are generated at 88%, 90%, 92% and 94% density.
  • the asphalt mixtures are thermorheologically simple materials and the time- temperature superposition principle is applicable in the linear viscoelastic state.
  • Dynamic modulus and phase angle of asphalt mixtures can be shifted along the frequency axis to form single characteristic master curves at a desired reference temperature or frequency.
  • the master curve for a mix is generated at a reference temperature of 21°C using the procedure outlined in Practical Procedure for Developing Dynamic Modulus Master Curves to Pavement Structural Design, Transportation Research Record (2005) No. 1929, by R, Bonaquit and D. W.
  • the shift factor used here was of the following form:
  • Max is the maximum ]E*
  • f r is the reduced frequency at reference temperature
  • f is the frequency at a particular temperature
  • ⁇ ⁇ is the viscosity of binder at reference temperature
  • A is the regression intercept of viscosity-temperature curve
  • VTS is the regression slope of viscosity-temperature susceptibility
  • a (T) is the shift factor as a function of temperature and age
  • ⁇ , ⁇ , ⁇ , c are fitting parameters.
  • Asphalt mat 18 may include portion 40 of the roadway section 42, which is a multi layer roadway, to be compacted.
  • roadway section 42 is a three layer roadway section.
  • the portion 40 will comprise a defined length, for example, thirty feet. Locations will be identified on the portion of the roadway, marked as locations A, B, C, D and E on FIG. 1. As shown in FIG. 6 the locations may be identified with a subscript to correspond to the individual layers.
  • Locations for layer LI may be identified as Ai , Bj, C
  • Locations for layer L2 may be identified as A 2 , B 2 , C 2 , D 2 , and E 2 .
  • Locations for layer L I may be identified as A3, B3, C3, D3, and E3.
  • the pattern will follow if more layers are used so that the locations will be Aj-Ej, where i is the layer number.
  • the locations A-E are exemplary and more or less locations my be used in the methods described herein.
  • the modulus of each layer, LI , L2 and L3 will be used to obtain actual measured, or independently determined modulus of the layers of portion 40 of the roadway section 42.
  • roadway section 42 may extend for several miles and that once the calibration described herein has occurred, rolling of the remainder of the roadway section 42 can occur without further actual measurement of the modulus so long as the roadway section is comprised of the same roadway material as portion 42, based upon the output of the IACA 5 as indicated on an IACA display 44.
  • a plurality of initial inputs are entered into the compaction analyzer module 38.
  • the initial inputs include the mix parameters of the roadway materials which may include, for example, type of construction (full depth, overlay, etc.), mix type, pavement lift, and lift thickness.
  • Other initial inputs include the estimated target modulus Mr at the maximum density, and a minimum estimated modulus / y which may be the modulus at the lay-down density. Mr will be the target density as described herein. Mr and MM from the master curves will be at 21°C. The modulus value at other temperatures can be calculated by applying the correction factors developed in the master curves.
  • Additional initial inputs to be entered into analyzer module 38 include an initial offset (offin) which is an estimated, or assumed offset, or difference between the assumed modulus Mi d at the lay-down density and the actual modulus at the lay-down density, and an initial slope k in .
  • the slope constant is simply the slope of a line running through Mr and w and the compaction levels.
  • kt n is ( ⁇ - tf)/(ncL-l) , where ncL is the number of compaction layers.
  • the GPS sensor 32 will trigger accelerometer 24 to begin collecting vibration data when location A is reached.
  • the coordinates at the beginning A and end E of the portion 40 may be, for example, at the center of the width of the roadway portion 40. The coordinates will be utilized to start and stop the collection of responsive vibration signals of roller 10 as roller 10 passes over portion 40.
  • the additional locations B, C and D may be, for example, at five, fifteen and twenty-five feet and are marked as well, at the center of the width of the portion 40 of the roadway section.
  • the compaction level will be an input to the analyzer module 38, which will utilize the initially entered input parameters and will generate a display of an estimated modulus in MegaPascals (MPa).
  • Analyzer module 38 will convert the compaction level into an estimated modulus in MPa.
  • an actual measured, or independently determined modulus is determined.
  • One method for measuring is by using a Falling Weight Deflectometer (FWD) to determine the modulus. Measurements are taken using an FWD, for example, at locations Ai, ⁇ , C ⁇ , ⁇ ⁇ and Ei which were previously marked on the center of layer 1 portion 40 of roadway section 42. The measured modulus of each location is compared to the estimated modulus (i.e., M est ) at each of the identified locations.
  • FWD Falling Weight Deflectometer
  • the locations and estimated level of compaction at each of the locations is determined through GPS measurements and the output of the neural network 36 as described.
  • the location of the estimated modulus is available from the display, since the GPS unit 32 will provide the location at which the estimated modulus occur.
  • the slope and offset are then adjusted, or modified to minimize the square of the error between the estimated and measured modulus.
  • the adjusted or modified slope and offset are represented by k ad j and offadj.
  • the adjusted offset is calculated as the mean error between the estimated and the measured densities so that
  • Offadj - ⁇
  • n the number of locations at which a modulus is measured in this case at five locations.
  • off adj the average error.
  • Mi d - modulus at lay-down density [00049] Ci or / tillrind - output of the neural network (compaction level) [00050] M est - estimated density of the neural network, and [00051] mefl i - measured modulus.
  • the calibration scheme using the measured modulus is as follows.
  • the new offset, of adj is calculated as set forth above.
  • the initial input parameters are adjusted to utilize off adj and k aclj in the density calculation in the analyzer module.
  • the adjusted modulus M adj is a more reliable indicator of actual stiffness of roadway portion 40 than is the estimated modulus.
  • the roller 10 can make passes on roadway section 42 until the IACA display indicates a predetermined desired final stiffness, at which point roller 10 can be moved to another roadway section. If the additional roadway section has the same mix parameters as roadway section 42, there is no need for recalibration.
  • the adjusted modulus is determined using the initial input parameters, except for the selected adjusted input parameters, namely, k adj and offad j, along with the compaction level delivered to the analyzer module from the neural network.
  • ELj, EL 2 and EL 3 are the dynamic modulus for layers LI, L2 and L3, respectively, and hi, h 2 and h 3 are the thickness of the respective layers.
  • Ci and C 2 are correction factors utilized to obtain better agreement with the exact theory of elasticity as explained I P. Ullidtz, Modeling Flexible Pavement Response and Performance, Narayana Press, Odden, denmark, pp. 38-43 (1998). The value depends on layer thicknesses, modulus ratios, Poisson ratios and the number of layers. It is understood that the process can be extended using the Odemark method for transformation of a layered system.
  • master curves are developed based on the mix used in the construction of the road.
  • the dynamic modulus master curves for the asphalt mix must be determined before the IACA calibration can occur.
  • the master curves can be developed as described above by compacting the asphalt mix in a laboratory to obtain compacted specimens of 6%, 8%, 10% and 12% air voids. To obtain the desired results, a plurality of samples may be compacted for each target void. As described earlier, the mix may be preheated and compacted using a superpave gyratory compactor.
  • Dynamic modulus tests may be conducted on the specimens using a MTS servo-hydraulic system in accordance with the test protocol set forth in AASHTO (2002) TP62-03. Testing is preferably performed at a plurality of temperatures, for example, 4°C, 21 °C, 40°C and 55°C. For each temperature level, tests may be conducted at a plurality of frequencies. As described above, master curves are generated for the different air void levels (6%, 8%, 10% and 12%) at a reference temperature of 21 °C using the procedure outlined in Practical Procedure
  • ELi, EL 2 and EL 3 are preferably determined using an FWD, there are occasions in which testing can not be conducted. There are at least two other methods that can be used to determine EL] , EL 2 and EL 3 . If it is not possible to conduct FWD tests, cores can be cut at locations Aj-E and the densities of the cores determined using known methods. The master curves can then be utilized to find the corresponding modulus, which will be used as the M meas in the calculations expressed herein. If it is not possible to construct Dynamic Modulus Master Curves for estimating modulus from density, there are known empirical models developed for known mixes, which can be used to supply M meas .
  • the 2 nd and 3 rd layer mixes contained approximately 22 percent 1 " rock, 50 percent manufactured sand, 13 percent sand, and 15 percent recycled asphalt pavement (RAP), and 4.1 percent PG 76-28 OK binder.
  • the gradations and other volumetric properties of all HMA mixes are given in Table 1 and Table 2.
  • the loose HMA mixes were preheated in an oven, and samples were compacted using a Superpave Gyratory Compactor (SGC). Three replicates of samples were compacted at 6, 8, 10, and 12 % ⁇ 1 % target air voids levels. Initially, samples having 150 mm in diameter x 167.5 mm in height were prepared.
  • test specimens of 100 mm in diameter were cored from the center of the gyratory compacted specimens, and sawed from each end of the specimen to get final sample of size 100 mm in diameter x 150 mm in height.
  • the volumetric analysis was conducted to obtain effective binder content (V b eir), the voids in mineral aggregates (VMA), the voids filled with asphalt (VFA), and the air voids (V a ) for all the mixes (Table 3).
  • VMA Voids in Mineral Aggregates
  • V, Air Voids Table 3 Specimens Volumetric Properties for all HMA Mixes .1
  • Dynamic modulus was measured for all collected mixes at four different air voids: 6 %, 8 %, 10 %, and 12 %, All dynamic modulus tests were performed using a MTS servo- hydraulic testing system.
  • the test specimen was placed in an environmental chamber and allowed to equilibrium to the specified testing temperature ⁇ 0.5° C.
  • the specimen temperature was monitored using a dummy specimen with a thermocouple mounted at the center.
  • Two linear variable differential transducer (LVDTs) were mounted on the specimen. Friction reducing end treatment, two teflon papers were placed between the specimen ands and loading plates. To begin testing, a minimal contact load was applied to the specimen. A sinusoidal axial compressive load was applied to the specimen without impact in a cyclic manner.
  • test was run on each test specimen at four different temperatures, including 4, 21 , 40, and 55° C, and the test started from the lowest temperature to the highest temperature. For each temperature level, the test was run at different frequencies from the highest to the lowest, including 25 , 10, 5, 1 , 0.5, 0.1 Hz. Prior to testing, the sample was conditioned by appiying 200 cycles of load at a frequency of 25 Hz. The load magnitude was adjusted based on the material stiffness, air void content, temperature, and frequency to keep the strain response within 50-150 micro-strains. The data was recorded for the last 5 cycles of each sequence. The dynamic modulus tests were performed according to the AASHTO TP62-03.
  • Air Voids (%) Ma s E* (MPa) ⁇ P ⁇ Fit
  • the use of the IACA in estimating the stiffness of a multi layer HMA pavement was investigated during the construction of interstate 1-35 in Norman, OK. A test section of 450 feet was selected and seven test locations, approximately 20 meters apart, were marked on the center line of the lane for verification analysis. The test procedure and results are now discussed. [00072] The 1ACA data was collected during the compaction of the all three layers (base, 2 nd layer, and 3 rd layer). First, the test points were marked on base layer, and the IACA data was collected. The GPS location of these points was recorded to locate these test locations on each pavement layer. Similar points were marked on 2 nd and 3 rd layers and the IACA data was collected during the compaction of each of these layers.
  • Odemark method is used to transform a system consisting of layers with different moduli into an equivalent system where the thicknesses of the layers are altered but all layers have the same modulus.
  • Ei , E 2 and E 3 are dynamic modulus of top, 2 nd , and base layer, and hi, h 2 , and h 3 are the thickness of respective layers.
  • Ci, and C 2 are the correction factors to obtain better agreement with exact theory of elasticity, (21 , 26). The value of correction factors depend on the layer thicknesses, modular ratios, Poisson ratios and the number of layers in pavement structure. In the present study correction factors were taken as C
  • the verification of the TACA measured modulus was done by conducting FWD testing on seven test locations that were marked before for estimating density using the IACA.
  • the FWD is a nondestructive test device used to characterize the in-situ pavement moduli (15, 27). It drops a transient load from a specified height on a 300 mm diameter circular plate with a thin rubber pad mounted underneath. The load and deflection is measured using load cell and sensors set on the ground. Seven sensors were placed at 0, 200, 300, 450, 600, 900, and 1 00 mm away from the center of the loading plate.
  • the FWD test was conducted on 3 rd layer of pavement using a Dynatest FWD test system.
  • Numerical back-calculation software MODULUS 6.0 was used to process the FWD raw data so as to determine the modulus value (28).
  • the back-calculated modulus is often called the effective modulus because the value represents the effect of the layer within the whole pavement structure.
  • the effective modulus was calculated at 21° C to compare this modulus with laboratory measured effective dynamic modulus. Since, the FWD loading induces a pulse of duration of 0.03 s (29), which is equivalent to a test frequency of 5.3 Hz (1/0.03/2 ⁇ ), hence, the comparisons in this paper are performed using modulus values calculated at 21 °C and 5 Hz frequency.
  • Table 6 shows the results of the FWD test.
  • FIG 3. below shows that the modulus estimated by the proposed method is in good agreement with the FWD measurements.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

An apparatus for the compaction of roadway materials includes a compaction analyzer for calculating stiffness during construction of the roadway. The apparatus generates a dynamic modulus for each layer of a roadway which can be used to calculate the overall effective modulus. A method for determining stiffness includes generating a dynamic modulus for each layer and calculating the overall effective modulus using the modulus of each layer.

Description

METHOD AND APPARATUS FOR DETERMINING STIFFNESS OF A ROADWAY
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] Priority is claimed from United States Provisional Application Serial No. 61/621,259, entitled "Method of Determining Stiffness" filed April 6, 2012.
BACKGROUND OF THE INVENTION
[0002] The current disclosure is directed to methods and apparatus for the compaction of roadway materials, and more particularly, to methods and apparatus for calibrating a compaction analyzer, and determining stiffness during construction.
[0003] Asphalt is often used as pavement. In the asphalt paving process, various grades of aggregate are used. The aggregate is mixed with asphalt cement (tar) and sand, and heated to approximately 1 0 °C to 169 °C , and a paver lays down the hot asphalt mix and levels the asphalt mix with a series of augers and scrapers. The material as laid is not dense enough due to air voids in the asphalt mix. Therefore, a roller makes a number of passes over the layer of asphalt material, referred to herein as the asphalt mat, driving back and forth, or otherwise creating sufficient compaction to form asphalt of the strength needed for the road surface, or an individual pavement layer.
[0004] One of the key process parameters that is monitored during the compaction process is the compacted density of the asphalt mat. While there are many specifications and procedures to ensure that the desired density is achieved, most of these specifications require only 3-5 density readings per lane mile. Typically, the density readings will be from extracted roadway cores. The process of measuring density of the asphalt mat during the compaction process is cumbersome, time-consuming, and is not indicative of the overall compaction achieved unless measurements are taken at a large number of points distributed in a grid fashion, which is difficult to achieve in the field due to cost considerations alone. Failure to meet the target density is unacceptable and remedial measures may result in significant cost overruns. Because the density cannot be measured directly, researchers have attempted different methods for indirect measurements. Some of these are identified and described in United States Patent 8, 190,338 entitled Method and Apparatus for Compaction of Roadway Materials. [0005] Stiffness is likewise a key design factor that directly impacts the load bearing capacity of roadway pavements. Early deterioration of pavements due to rutting, fatigue cracking, and other types of distresses may be attributed to inadequate stiffness achieved during the compaction process. The stiffness of a pavement is typically expressed in terms of modulus. While the dependence of pavement performance on stiffness is well known, stiffness is rarely measured or monitored in the field during pavement construction. Remedial measures to rectify inadequate compaction after pavement has cooled down are costly and time consuming. Since pavement is designed to have adequate strength and stiffness to withstand traffic load, it is desirable to know the stiffness of finished pavement layers. While density of an asphalt mix is a measure of its quality it does not directly provide information of the performance of the pavement under loading conditions. Stiffness on the other hand directly impacts the performance of a pavement under traffic loads. There is thus a need for apparatus and methods that provide for measurement and . monitoring of stiffness during the compaction process.
SUMMARY OF THE INVENTION
[0006] The apparatus disclosed herein comprises a vibratory compactor, or roller, with sensors, and a compaction analyzer associated therewith. The compaction analyzer has a feature extraction module, a neural network module and an analyzer module. The sensors may comprise accelerometers for measuring vibratory response signals of the roller, and the compaction analyzer utilizes the characteristics of the vibratory response signals to generate, in real time, a modulus signal representative of the density of the material being compacted. In addition, the compaction analyzer will generate signals representative of the dynamic modulus of the pavement. A method of compacting a roadway section with a roller having a compaction analyzer operably associated therewith comprises entering initial input parameters into the compaction analyzer and making a plurality of passes with the roller over a layer of a portion of the roadway section. The method may further comprise applying a vibratory energy to the portion of the roadway section with the roller as it moves over the layer of the portion of the roadway section and repeatedly gathering responsive vibration signals of the roller as it moves over the layer portion of the roadway section. Additional steps may comprise generating, with the compaction analyzer, estimated modulus signals representative of estimated dynamic moduli based upon the responsive vibration signals of the roller and the initial input parameters entered into the compaction analyzer and measuring the modulus of the layer of the roadway section at a pluralit of locations on the portion of the roadway section. The measured moduli may be compared to the estimated moduli at the plurality of locations to determine the difference between the measured and the estimated moduli, Selected ones of the initial input parameters to the analyzer can then be adjusted based on the difference between the measured moduli and the estimated moduli. The compaction analyzer will generate an adjusted modulus output signal which will more closely approximate an actual modulus of the roadway section than does the estimated modulus signal. The remainder of the layer of the roadway section is rolled until the compaction analyzer with the adjusted input parameters generates a desired adjusted output modulus signal. The method is performed on each layer of a multi-layer roadway section and an effective modulus for the multi-layer roadway section is determined using the modulus for each layer.
[0007] Another method may comprise entering initial input parameters into the compaction analyzer and making a plurality of passes over a layer of a portion of the roadway section. Vibratory energy may be applied to a portion of layer the roadway section as the plurality of passes are made, responsive vibratory signals of the roller generated in response to the applied vibratory energy are gathered. Selected responsive vibratory signals may be designated as corresponding to specified compaction levels, and the compaction levels of the portion of the roadway section representative of the responsive vibratory signals delivered in real time to an analyzer module in the compaction analyzer as the roller moves along the portion of the roadway section. An estimated modulus is generated in real time with the compaction analyzer based on the delivered compaction level and the initial input parameters as the roller rolls along the portion of the roadway. Modulus measurements of the portion of the roadway section may be taken at a plurality of locations on each layer of the portion of the roadway section to determine a measured modulus at each of the plurality of locations on each layer. The estimated modulus generated by the compaction analyzer at the plurality of locations is compared with the measured modulus at the plurality of locations, and selected ones of the initial input parameters are adjusted based upon the differences between the estimated modulus and the measured modulus. An adjusted modulus of the layer roadway section is generated in real time based upon the delivered compaction levels and the adjusted input parameters that more closely approximate the actual modulus than did the estimated modulus. An effective modulus for the multi layer roadway section is determined based on the modulus of each layer.
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] FIG. 1 is a schematic representation of a roller with a compaction analyzer.
[0009] FIG. 2 is a schematic representation of the compaction analyzer components.
[00010] FIG. 3 is exemplary and shows spectral features at an instant in time.
[00011] FIG. 4 is a spectrogram, and shows a five-second data set for passes made by the roller,
[0ΘΘ12] FIG. 5 shows the power content of the signals represented in FIG. 4.
[00013] FIG. 6 is a section showing multiple layers of the roadway.
DESCRIPTION OF A PREFERRED EMBODIMENT
[00014] The current disclosure is directed to methods and apparatus for compacting a roadway, and for using, and calibrating an Intelligent Asphalt Compaction Analyzer (I AC A). The current disclosure is likewise directed to a method of determining the dynamic modulus of a roadway, which is a measure of the stiffness of the roadway,
[00015] FIG. 1 schematically shows the IACA 5, a device that can measure the density of an asphalt pavement continuously in real time, over the entire length of the pavement during its construction. Quality control techniques currently used in the field involve the measurement of density at several locations on the completed pavement or the extraction of roadway cores. These methods are usually time-consuming and do not reveal the overall quality of the construction. Furthermore, any compaction issues that are identified cannot be easily remedied after the asphalt mat has cooled down.
[00016] In recent years, several intelligent Compaction (IC) technologies have been introduced by manufacturers of vibratory compactors. Uniform compaction of both soil and aggregate bases is achieved through the variation of the machine parameters (amplitude and frequency of vibrations, vectoring of the thrust, etc.). Dynamic control of the machine parameters allows for the application of the vibratory energy only to under-compacted areas and thereby preventing over-compaction and ensuring uniform compaction of the soil/aggregate base. While these IC techniques hold promise for the future, their performance is yet to be fully evaluated. Further, these IC products require the purchase of a new vibratory compactor that is equipped with the technology.
[00017] In contrast to the IC technologies being offered in the market place today, IACA 5 is a measurement device that does not control any aspect of the machine behavior. Further, IACA 5 is a stand-alone device that can be retrofitted on any existing vibratory compactor. A primary utility of IACA 5 is in providing real-time measurements of the density of the asphalt mat at each location on the pavement under construction. This information can be utilized by the roller operator to ensure uniform compaction, address under-compaction, as well as prevent over-compaction of the pavement.
[00018] IACA 5, as shown in FIG. 1, functions on the hypothesis that the vibratory roller, for example vibratory roller 10, and the underlying pavement material, which may be, for example, Hot Mix Asphalt (HMA) form a coupled system. The response of vibratory roller 10 is determined by the frequency of its vibratory motors and the natural vibratory modes of the coupled system. Compaction of an asphalt mat increases its stiffness and as a consequence, the vibrations of the compactor are altered. The knowledge of the properties of the pavement material and the vibration spectrum of the compactor can therefore be used to estimate the stiffness of the asphalt mat. Quality specifications for HMA are generally specified as a percentage of air voids so that, for example, 100% density means no air voids exist, and 90% density means 10% air voids exist. Since the quality specifications are usually specified as percentage air void content or as a percentage of the Maximum Theoretical Density (MTD) of the asphalt mat, IACA 5 can estimate the compacted density of the pavement.
[00019] Referring now to the drawings, vibratory compactor, or roller 10 is shown in Figure 1. Vibratory compactor 10 which may be, for example, a DD- 138 HFA lngersoll Rand vibratory compactor, includes forward and rear drums 12 and 14, Forward drum 12 has an eccentric weight 16 mounted therein, and if desired, both forward and rear drums 12 and 14 may have eccentric weights 16 mounted therein. Eccentric weights 16 are rotated by motors (not shown), so that the rotation of the weights 16 within drums 12 and 14 cause an impact at the contact between drums 12 and 14 and a base 18, which may be comprised of HMA. Base 18 may be referred to as asphalt mat 18. The spacing between impacts is a function of the speed of the roller 10, and the speed of the eccentric weights 16, and may be, for example, 10-12 impulses per linear foot. Sensor module 22 associated with 1ACA 5 consists of accelerometers 24 mounted to frame 30 for measuring the vibrations of the compactor 10 during operation and may include infrared temperature sensors 26 for measuring the surface temperature of the asphalt base. Accelerometer 24 and temperature sensors 26 may be mounted to a frame 30 of roller 10. Sensors 26 essentially comprise a real-time data acquisition system. IACA 5 may include a user interface 28 which may be an Intel Pentium based laptop for specifying the amplitude and frequency of the vibration motors, and to input mat properties such as the mix type and lift thickness. User interface 28 will also be utilized to enter other initial input parameters as will be explained in more detail hereinbelow. Accelerometer 24 may be a CXL10HF3 tri-axial accelerometer manufactured by Crossbow, capable of measuring lOg acceleration up to a frequency of 10 kHz. The surface temperature of asphalt mat 18 may be measured using an infrared temperature sensor 26 mounted on the frame 30. A global positioning system (GPS) 32 may also be mounted to roller 10. The GPS will, as is known in the art provide locations of roller 10 and will be coordinated with IACA 5 so that the location of the densities generated by IACA 5 will be known. GPS receiver 32 may be, for example, a Trimble Pro XT GPS receiver used to record the location of the roller 10 as it moves.
[00020] IACA 5 includes a feature extraction (FE) module 34 which computes the Fast Fourier Transform (FFT) of the input signal and extracts features corresponding to vibrations at different salient frequencies. The input signals are the responsive vibratory signals of roller 10, which results from the impacts made by the eccentric weights 16. The responsive vibratory signals are measured, or gathered by accelerometer 24. IACA 5 also includes a Neural Network (NN) Classifier 36 which is a multi-layer Neural Network that is trained to classify the extracted features into different classes, where each class represents a vibration pattern specific to a pre-specified level of compaction. Compaction analyzer module 38 in IACA 5 post-processes the output of the neural network and estimates the degree of compaction in real time. Each component of IACA 5 will be described in more detail hereinbelow.
[00021 ] Feature extractor module 34 implements a Fast Fourier Transform to efficiently extract the different frequency components of the responsive vibratory signals of roller 10. The output of the FFT is a vector with 256 elements, where each element corresponds to the normalized signal power at the corresponding frequency. The normalized signal power, as is understood, is the square of the amplitude at the frequency, so the extracted features are frequencies, and amplitudes at the frequencies. FIG. 3 is an example of the spectral features of vibratory signals, and shows frequencies, and the normalized power (i.e., squares of amplitudes) of the frequencies. The vibration signal of the roller 10 is sampled at a rate of 1 kHz (1000 Hz/sec), Because the responsive vibration signal of the roller 10 is sampled at 1 kHz, it is understood that the frequency spectrum is uniformly distributed from 0 to 500 Hz. Since the FFT output is a sector with 256 elements, the features are extracted in frequency bands of approximately 2 Hz. Features may be extracted eight times per second in an overlapping fashion, such that the input to the neural network 36 will include 128 elements from the previous instant at which features were extracted, and 128 elements from the current or immediate feature extraction.
[00022] Neural network classifier 36 is a three layer neural network with 200 inputs, 10 nodes in the input layer, 4 nodes in the hidden layer, and 1 node in the output layer. The inputs of the neural network correspond to the outputs of the feature extraction module, i.e., in this case 200 features in the frequency spectrum. In the preferred embodiment, only the upper 200 features in the frequency spectrum (i.e., from 100-500 Hz) are considered. Those in the lower range represent the frequency of roller 10 and may be ignored. Neural network 36 will classify the vibratory response signals of roller 10 into classes representing different levels of compaction.
[00023] The output of feature extraction module 34 is analyzed over several roller passes during the calibration process and the total power content in the responsive vibration signal of roller 10 is calculated at each instant in time. The power calculation is set forth hereinbelow. A minimum power level, a maximum power level, and equally spaced power levels are identified and the features of the vibratory response signal that correspond to the identified power levels are used to train the neural network 36. The identified minimum, maximum and equally spaced power levels are designated as corresponding to specified levels of compaction. During the compaction process, the neural network 36 observes the features of the responsive vibration signals of the roller and classifies the features as corresponding to one of the levels of compaction. [00024] The plurality of pre-specified compaction levels will be identified, or designated with a number. In the case where five compaction levels are specified, a minimum compaction level can be identified, or designated as compaction level 0, and a maximum compaction level can be designated as compaction level 4. The compaction levels therebetween can be designated as compaction levels 1, 2 and 3 which correspond to the equally spaced power levels between the minimum and maximum power levels. FIG. 3 is exemplary, and shows features corresponding to five different compaction levels, with the lowest level corresponding to the case where the roller is operating with the vibration motors turned on and designated as level 0, level 4 designated as corresponding to the case where the maximum vibration is observed, and levels 1 through 3 corresponding to spaced levels therebetween.
[00025] The initial calibration of IACA 5 assumes that compaction level 0 corresponds to a lay-down density of the asphalt mat and the compaction level 4 corresponds to the target density as specified in the mix design sheet (designed at 100 gyrations of the superpave gyratory compactor). The lay-down density of asphalt is generally assumed to be, for example, 85% to 88%, and the target or maximum density will generally be 94-97%. Compaction levels 1 , 2 and 3 are designated as corresponding to equally spaced densities therebetween.
[00026] During the calibration operation, roller 10 will make several passes on asphalt mat 18. Asphalt mat 18 may include a portion 40 of a roadway section 42 to be compacted. The portion 40 will comprise a defined length, for example, thirty feet. Locations will be identified on the portion of the roadway, marked as locations A, B, C, D and E on FIG. 1 . The locations will be used to obtain actual measured densities of the portion 40 of the roadway section 42. It is understood that roadway section 42 may extend for several miles and that once the calibration described herein has occurred, rolling of the remainder of the roadway section 42 can occur without further actual measurement of the density so long as the roadway section is comprised of the same roadway material as portion 42, based upon the output of the IACA 5 as indicated on an IACA display 44.
[00027] As roller 10 makes a plurality of passes over the portion 40 of roadway section 42, eccentric weights 16 will generate impacts as described herein. Responsive vibratory signals of roller 10 are gathered by accelerometer 24 as roller 10 moves along portion 40 by accelerometer 24.
[00028] Roller 10 will cease making passes when the responsive vibratory signals become consistent, which indicates that no further change in compaction is occurring. Roller 10 should stop, for example, before rollover occurs,
[00029] The power content of the responsive vibratory signals of roller 10 are calculated using the extracted features by feature extractor 34. The power content is calculated each time a feature extraction occurs, which as described herein, may be eight times per second.
[00030] The power level, or power content of the responsive vibratory signals of roller 10 can be calculated as follows. Using as the index in the frequency domain, such that i = 1 , .., and '/ as the index in the time domain such that j = 1, .. ., ¾ n, represents the maximum number of features extracted from the vibration signal and nj represents the maximum number of samples of the vibration signal. The spectrogram of the vibration signal can be represented by a matrix of «, rows and nj columns, where each element of the spectrogram V represents the normalized power in a given feature at a particular instant in time (i.e., the square of the amplitude of the frequency). For example, the element in the ith row and fh column represents the normalized power contained in the ith feature at the j*Ts instant in time, where Ts is the sample time.
[00031] If fj is the frequency of the i'h feature, then the total power contained in the vibration signal at time index y is calculated as,
( f. Y
[00032] />, = £ ] J = 1,
[00033] For a set of 'm' consecutive time indices, the power feature of that set is calculated by
1
Ρ,· = — vt-t P , r is the index of power feature of set of m consecutive time m i=r
indices,
[00034] r = 1 , nr ; nr = « - m + 1. An example showing the power contained in the vibration signal over successive roller passes over a stretch of pavement during its compaction is shown in FIG. 4. In the figure, the power index is set to three (3), that is the power content over three successive time instants is averaged to determine the average power content at a given instant. The three successive time instants may be, for example, three consecutive intervals of .125 seconds since as explained earlier, features may be extracted every .125 seconds.
[00035] Once the power content of the responsive vibratory signals of roller 10 are calculated, a spectrogram, like the one shown in FIG. 5, can be used to identify the locations on portion 40 where the maximum and minimum power occurred, and the locations of equally spaced power levels, for example, three equally spaced power levels therebetween. Generally, five identified power levels are designated as corresponding to minimum compaction level 0, equally spaced compaction levels 1 , 2 and 3, and maximum compaction level 4.
[00036] The features extracted by feature extractor 34, namely the frequencies and the amplitudes of the frequencies are used as inputs to neural network 36. Neural network 36 will classify the features and identify the features as corresponding to one of the compaction levels 0, 1 , 2, 3 or 4. As explained previously, each time a feature extraction occurs, 200 features representative of the responsive vibration signal of the roller at that time, namely, the 200 frequencies and the normalized power (squares of the amplitudes) of those frequencies are provided as inputs to the neural network. Only 200 features are utilized and those features in the lower range (i.e., 0-100 Hz) are ignored. The network will be trained so that the output of the neural network is one of compaction levels 0, 1, 2, 3, 4. The neural network will be trained to recognize the extracted features as being the same, or most similar to the features that correspond to one of the identified power levels, and will be classified accordingly. Thus, if the extracted features are most similar to the features that correspond to the minimum power level, the output of the neural network will be the indicator 0, for the minimum compaction level. If the extracted features are most similar to those contained in the maximum power signal, the output of the neural network will be the number 4, which indicates that the maximum compaction has been reached. The same process will occur when the extracted features are features that are most similar to those at one of the equally spaced power levels, in which case the output of the neural network will be one of the numbers 1 , 2 or 3. During the training process, the interconnection weights of the neural network are modified to minimize the error between the output of the neural network and the level of compaction corresponding to each data set.
[00037] While density is a widely accepted method for acceptance testing finished pavement, density measurements are only an indirect measurement of the desired pavement property, which is stiffness. In addition to providing real time density readouts for a roadway during construction, the IACA 5 can likewise be utilized to provide real time indications of the stiffness of the road being constructed.
[00038] IACA 5 can be calibrated to estimate the dynamic modulus E, or M of the constructed road 40. The modulus M of each layer of the road 40 as it is constructed can be determined using the IACA, and thereafter the overall effective modulus E eff oi the road can be determined. The manner and method of calibration is like that disclosed with respect to density applied to dynamic modulus.
[00039] The initial calibration of IACA 5 thus assumes that compaction level 0 corresponds to the modulus of the asphalt mat at the lay-down density and the compaction level 4 corresponds to the target dynamic modulus MT at the density specified in the mix design sheet (designed at 100 gyrations of the superpave gyratory compactor). After the IACA is trained to classify the vibrations into estimated levels of compactors, it is thus calibrated to reflect the modulus M of pavement layers, so that the overall Eeff for the constructed multi-layer pavement can be determined. To calibrate the IACA 5 for dynamic modulus, dynamic modulus tests are conducted in a lab for the mix used in the construction of each layer. w is assumed to correspond to the dynamic modulus at the lay-down density of the layer, and thus corresponds to the lowest compaction level. The modulus value Mr at the target density of the compacted mix is assumed to be the highest modulus that can be achieved and corresponds to the highest compaction level. MM and MT are determined by performing dynamic modulus tests for the asphalt mix being used in accordance with the AASHTO TP 62-03 test method. Master curves for the mix used are developed using the test to correlate the modulus with density. Curves are developed for the mix at different densities, for example 6%, 8%, 10% and 12% air voids. M!d will be the modulus at 12% voids, and Mr will be the modulus at 6% voids - or 94% density. The construction of the master curves is explained in more detail below. The lay-down density of asphalt is generally assumed to be, for example, 85% to 88%, and the target or maximum density will generally be 94-97%. Compaction levels 1 , 2 and 3 are designated as corresponding to equally spaced densities therebetween. Here, the curves are generated at 88%, 90%, 92% and 94% density.
[00040] The asphalt mixtures are thermorheologically simple materials and the time- temperature superposition principle is applicable in the linear viscoelastic state. Dynamic modulus and phase angle of asphalt mixtures can be shifted along the frequency axis to form single characteristic master curves at a desired reference temperature or frequency. The master curve for a mix is generated at a reference temperature of 21°C using the procedure outlined in Practical Procedure for Developing Dynamic Modulus Master Curves to Pavement Structural Design, Transportation Research Record (2005) No. 1929, by R, Bonaquit and D. W. Christensen, (Practical Procedure) The following equations, which show the stgmoidal function and shift factor used for fitting the master curves, are used to develop the master curves as described in the Mechanistic-Empirical Pavement Design Guide and in accordance with AASHTO TP 62-03 , A nonlinear optimization program, such as Solver in Microsoft Excel may be used for simultaneously solving these unknown parameters.
Figure imgf000013_0001
The shift factor used here was of the following form:
Figure imgf000013_0002
where, Max is the maximum ]E*| for a particular mix, fr is the reduced frequency at reference temperature, f is the frequency at a particular temperature, η^Γ is the viscosity of binder at reference temperature, A is the regression intercept of viscosity-temperature curve, VTS is the regression slope of viscosity-temperature susceptibility, a (T) is the shift factor as a function of temperature and age, and δ, β, γ, c are fitting parameters.
[00041] As with the density calibration, during the dynamic modulus calibration operation, roller 10 will make several passes on asphalt mat 18. Asphalt mat 18 may include portion 40 of the roadway section 42, which is a multi layer roadway, to be compacted. In the embodiment described, roadway section 42 is a three layer roadway section. The portion 40 will comprise a defined length, for example, thirty feet. Locations will be identified on the portion of the roadway, marked as locations A, B, C, D and E on FIG. 1. As shown in FIG. 6 the locations may be identified with a subscript to correspond to the individual layers. Locations for layer LI may be identified as Ai , Bj, C| , Di , and E] , Locations for layer L2 may be identified as A2, B2, C2, D2, and E2. Locations for layer L I may be identified as A3, B3, C3, D3, and E3. The pattern will follow if more layers are used so that the locations will be Aj-Ej, where i is the layer number. The locations A-E are exemplary and more or less locations my be used in the methods described herein. The modulus of each layer, LI , L2 and L3 will be used to obtain actual measured, or independently determined modulus of the layers of portion 40 of the roadway section 42. It is understood that roadway section 42 may extend for several miles and that once the calibration described herein has occurred, rolling of the remainder of the roadway section 42 can occur without further actual measurement of the modulus so long as the roadway section is comprised of the same roadway material as portion 42, based upon the output of the IACA 5 as indicated on an IACA display 44.
100042] Prior to rolling portion 40, a plurality of initial inputs are entered into the compaction analyzer module 38. The initial inputs include the mix parameters of the roadway materials which may include, for example, type of construction (full depth, overlay, etc.), mix type, pavement lift, and lift thickness. Other initial inputs include the estimated target modulus Mr at the maximum density, and a minimum estimated modulus /y which may be the modulus at the lay-down density. Mr will be the target density as described herein. Mr and MM from the master curves will be at 21°C. The modulus value at other temperatures can be calculated by applying the correction factors developed in the master curves. Additional initial inputs to be entered into analyzer module 38 include an initial offset (offin) which is an estimated, or assumed offset, or difference between the assumed modulus Mid at the lay-down density and the actual modulus at the lay-down density, and an initial slope kin. The slope constant is simply the slope of a line running through Mr and w and the compaction levels. In the described embodiment, ktn is (Μψ - tf)/(ncL-l), where ncL is the number of compaction layers.
[00043] When roller 10 moves along layer LI of portion 40 of roadway section 42, the GPS sensor 32 will trigger accelerometer 24 to begin collecting vibration data when location A is reached. The coordinates at the beginning A and end E of the portion 40 may be, for example, at the center of the width of the roadway portion 40. The coordinates will be utilized to start and stop the collection of responsive vibration signals of roller 10 as roller 10 passes over portion 40. The additional locations B, C and D may be, for example, at five, fifteen and twenty-five feet and are marked as well, at the center of the width of the portion 40 of the roadway section. When the features extracted by feature extractor 34 are classified by neural network 36, the compaction level will be an input to the analyzer module 38, which will utilize the initially entered input parameters and will generate a display of an estimated modulus in MegaPascals (MPa). The estimated modulus Mest will be calculated with the equation M = Λ½ + kin * Q + off,„ where Q is the level of compaction, offin is assumed to be 0. For example, assuming a lay-down density of 88% and a corresponding modulus M!d of 2500 MPa, and a maximum estimated density of 96% and corresponding modulus MT of 3500 MPa, with three equally spaced levels therebetween, an output of the neural network of 2 and the offset assumed to be 0, Mest = 2500 + (1000/4)(2) = 3000 MPa. Analyzer module 38 will convert the compaction level into an estimated modulus in MPa.
[00044] It will be understood that because of the speed of the roller 10, and the rapidity of the pace at which samples are taken, the display, in the absence of any filtering, would likely rapidly alternate between estimated densities so that the display may be unreadable. Low pass filters can be used to smooth out the signal and provide a stable display without flicker to the user. Once no change in compaction in the layer being rolled is occurring, roller 10 ceases making passes, or moving along the portion 40. The modulus of layer LI estimated by the IACA 5 after the initial calibration is based on the assumption that the target stiffness MT for the specified mix for layer LI is indeed achieved during compaction in the field. However, several features such as the compaction equipment, rolling pattern, lay-down temperature of the mix, lift thickness and other parameters may influence the actual modulus at any given location. In order to account for such deviations, an actual measured, or independently determined modulus is determined. One method for measuring is by using a Falling Weight Deflectometer (FWD) to determine the modulus. Measurements are taken using an FWD, for example, at locations Ai, \, C\, Ό\ and Ei which were previously marked on the center of layer 1 portion 40 of roadway section 42. The measured modulus of each location is compared to the estimated modulus (i.e., Mest) at each of the identified locations. The locations and estimated level of compaction at each of the locations is determined through GPS measurements and the output of the neural network 36 as described. The location of the estimated modulus is available from the display, since the GPS unit 32 will provide the location at which the estimated modulus occur. The slope and offset are then adjusted, or modified to minimize the square of the error between the estimated and measured modulus. The adjusted or modified slope and offset are represented by kadj and offadj.
[00045] Once both the measured and estimated moduli are known, the adjusted offset, is calculated as the mean error between the estimated and the measured densities so that
Offadj = - ∑
Figure imgf000016_0001
where n is the number of locations at which a modulus is measured in this case at five locations. Thus, offadj is the average error. The notations used in the derivation and steps used in calculating the adjusted slope and offset are as follows.
[00046] k - slope
[00047] off- offset
[00048] Mid - modulus at lay-down density [00049] Ci or /„„ - output of the neural network (compaction level) [00050] Mest - estimated density of the neural network, and [00051] mefli - measured modulus.
[00052] The calibration scheme using the measured modulus is as follows. The new offset, of adj, is calculated as set forth above.
[Θ0053] Assume n modulus measurements, Mi meas, /=1 , the corresponding estimated moduli are given by esl = 1, n, where Mest = My + km *C + offin, as described above.
[00054] The error between the raw estimates and the measured moduli are calculated as follows.
Mmeas = Mld + ki!t x C + offn meas
∑ (M,d + k X C, ' + 0ffin - MmeJ
Figure imgf000016_0002
∑ [(Mld + offln -Mmsas) + k *Q i =∑ (MM + offin - UmeJ + [{Mu + qffl„ - Mmeos) * (k * C, ')] +∑ (k *
Figure imgf000017_0001
[00055] Minimizing the mean square error (MSE), one obtains the desired adjusted stop slope kad
ft
=∑<f - 0
dk '='
[(MM + offin-Mmas) * V]+ 2k (C, 2 = 0
n
' ' = ∑ [≠meas - Mw - o^„) * C, ')]
∑[( ΜΙ - Μ, - 0/:Η))^; ]
∑(c;)2
[00Θ56] Once the adjusted offset and slope are determined, the initial input parameters are adjusted to utilize offadj and kaclj in the density calculation in the analyzer module. Analyzer module 38 will use the equation M adj = M\d + kadj * C( + oJfaijj to arrive at the adjusted modulus readout, The adjusted modulus Madj is a more reliable indicator of actual stiffness of roadway portion 40 than is the estimated modulus. Once the selected initial input parameters have been adjusted, the roller 10 can roll the remainder of roadway section 42, and IACA display 44 will generate an adjusted density that can be viewed and relied upon by the operator. The roller 10 can make passes on roadway section 42 until the IACA display indicates a predetermined desired final stiffness, at which point roller 10 can be moved to another roadway section. If the additional roadway section has the same mix parameters as roadway section 42, there is no need for recalibration. The adjusted modulus is determined using the initial input parameters, except for the selected adjusted input parameters, namely, kadj and offadj, along with the compaction level delivered to the analyzer module from the neural network.
[00057] The procedure described is used for each layer L(i) of the roadway being constructed. Once ΜΑ has been determined for each layer of the roadway, the effective modulus can be determined for the entire roadway. After the Madj is determined for each layer, the overall modulus Eeff at any location on the roadway can be determined. Assuming a three-layer asphalt roadway 40 having layers LI , L2 and L3 the following equation yields
Eeff. effective
Figure imgf000018_0001
[00058] ELj, EL2 and EL3 are the dynamic modulus for layers LI, L2 and L3, respectively, and hi, h2 and h3 are the thickness of the respective layers. Ci and C2 are correction factors utilized to obtain better agreement with the exact theory of elasticity as explained I P. Ullidtz, Modeling Flexible Pavement Response and Performance, Narayana Press, Odden, denmark, pp. 38-43 (1998). The value depends on layer thicknesses, modulus ratios, Poisson ratios and the number of layers. It is understood that the process can be extended using the Odemark method for transformation of a layered system.
[00059] In order to determine the initial « and MT to be used to determine Mest, and to use as the initial inputs, master curves are developed based on the mix used in the construction of the road. The dynamic modulus master curves for the asphalt mix must be determined before the IACA calibration can occur. The master curves can be developed as described above by compacting the asphalt mix in a laboratory to obtain compacted specimens of 6%, 8%, 10% and 12% air voids. To obtain the desired results, a plurality of samples may be compacted for each target void. As described earlier, the mix may be preheated and compacted using a superpave gyratory compactor. Dynamic modulus tests may be conducted on the specimens using a MTS servo-hydraulic system in accordance with the test protocol set forth in AASHTO (2002) TP62-03. Testing is preferably performed at a plurality of temperatures, for example, 4°C, 21 °C, 40°C and 55°C. For each temperature level, tests may be conducted at a plurality of frequencies. As described above, master curves are generated for the different air void levels (6%, 8%, 10% and 12%) at a reference temperature of 21 °C using the procedure outlined in Practical Procedure
[00060] Once the master curves are developed, modulus for the curves at 12% density and 6% density is used to calibrate the IACA. [00061] While ELi, EL2 and EL3 are preferably determined using an FWD, there are occasions in which testing can not be conducted. There are at least two other methods that can be used to determine EL] , EL2 and EL3 . If it is not possible to conduct FWD tests, cores can be cut at locations Aj-E and the densities of the cores determined using known methods. The master curves can then be utilized to find the corresponding modulus, which will be used as the Mmeas in the calculations expressed herein. If it is not possible to construct Dynamic Modulus Master Curves for estimating modulus from density, there are known empirical models developed for known mixes, which can be used to supply Mmeas.
[00062] The following is an example of the use of the method for determining stiffness.
[00063] The use of the IACA in estimating the stiffness of a multi layer HMA pavement was investigated during the construction of Interstate 1-35 in Norman, OK. This project involved the expansion of the existing highway, stabilizing the subgrade to a depth of 200 mm using 10% cement kiln dust (CKD), followed by 200 mm thick aggregate base. The base layer was consisted of 100 mm thick asphalt layers of 1 mm Nominal Maximum Aggregate Size (NMAS) S3 (64-22 OK), while 2nd and 3rd layer were constructed with 19 mm NMAS S3 (76-28 OK) consisted of 100 mm and 75 mm thickness, respectively.
[00064] Material and Sample Preparation. The loose HMA mixes of type S3 (PG 64-22 OK) and S3 (PG76-28) were collected from the construction site during the time of pavement construction. The S3 (PG 64-22) type of mix was used in base layer, while, S3 (PG 76-28) mix was used in 2nd and 3rd layers of pavement. The nominal maximum aggregate (primarily limestone) size for all mixes was 19 mm. The base mix contained approximately 20 percent 1" rock, 44 percent manufactured sand, 1 1 percent sand, and 25 percent recycled asphalt pavement (RAP), and 4.1 percent PG 64-22 OK binder. The 2nd and 3rd layer mixes contained approximately 22 percent 1 " rock, 50 percent manufactured sand, 13 percent sand, and 15 percent recycled asphalt pavement (RAP), and 4.1 percent PG 76-28 OK binder. The gradations and other volumetric properties of all HMA mixes are given in Table 1 and Table 2. The loose HMA mixes were preheated in an oven, and samples were compacted using a Superpave Gyratory Compactor (SGC). Three replicates of samples were compacted at 6, 8, 10, and 12 % ± 1 % target air voids levels. Initially, samples having 150 mm in diameter x 167.5 mm in height were prepared. Then, the test specimens of 100 mm in diameter were cored from the center of the gyratory compacted specimens, and sawed from each end of the specimen to get final sample of size 100 mm in diameter x 150 mm in height. The volumetric analysis was conducted to obtain effective binder content (Vbeir), the voids in mineral aggregates (VMA), the voids filled with asphalt (VFA), and the air voids (Va) for all the mixes (Table 3).
Table 1 Gradation of All HMA Mixes
Material (%) Base Layer and Layer
Rook
Manufactured Sand
Sand
RAP
Sieve Size Gradation ( % Passing)
RAP = Reclaimed Asphalt Pavement
Table 2 Materials Volumetric Properties
Base Layei and Layer
Volumetrics Properties a
Binder Type PG PG
Pi, (%)
VMA {%) Min.
Max.
VFA (¼) Min.
Max.
Va (%)
Aggregate Type Limestone Limestone
Mix Type Recycled Recycled
Gmra = Maximum Theoretical Specific Gravity Mixture
Gsi, = Bulk Specific Gravity of Aggregate
Gsc = Effective Specific Gravity of Aggregate
Gt = Specific Gravity of Binder
Pb ■■- Asphalt Content
VMA = Voids in Mineral Aggregates
VFA - Voids Filled with Asphalt
V, = Air Voids Table 3 Specimens Volumetric Properties for all HMA Mixes
Figure imgf000021_0001
.1
.9
9 9
.9
1 1
1
.9 41
[00065] Dynamic Modulus Testing
[00066] Dynamic modulus was measured for all collected mixes at four different air voids: 6 %, 8 %, 10 %, and 12 %, All dynamic modulus tests were performed using a MTS servo- hydraulic testing system. The test specimen was placed in an environmental chamber and allowed to equilibrium to the specified testing temperature ±0.5° C. The specimen temperature was monitored using a dummy specimen with a thermocouple mounted at the center. Two linear variable differential transducer (LVDTs) were mounted on the specimen. Friction reducing end treatment, two teflon papers were placed between the specimen ands and loading plates. To begin testing, a minimal contact load was applied to the specimen. A sinusoidal axial compressive load was applied to the specimen without impact in a cyclic manner. The test was run on each test specimen at four different temperatures, including 4, 21 , 40, and 55° C, and the test started from the lowest temperature to the highest temperature. For each temperature level, the test was run at different frequencies from the highest to the lowest, including 25 , 10, 5, 1 , 0.5, 0.1 Hz. Prior to testing, the sample was conditioned by appiying 200 cycles of load at a frequency of 25 Hz. The load magnitude was adjusted based on the material stiffness, air void content, temperature, and frequency to keep the strain response within 50-150 micro-strains. The data was recorded for the last 5 cycles of each sequence. The dynamic modulus tests were performed according to the AASHTO TP62-03.
[00067] Construction of the Master Curves [00068] The master curves are generated at a reference temperature of 21°C using the procedure outlined above, and the equations set forth above and reproduced below:
(Max
Iog|E*| = δ +
JJ+T [log(f)+c(i0(A+VTS 1^¾-Io^t=v¾
1 + e (5)
a<T) = k
f (6)
[00069] The A and VTS parameters for PG 64-22 (10.98, -3,680), and PG 76-28 (9.2, - 3,024) were taken from the MEPDG guide. The constructed master curves for base, 2nd and 3rd layers are shown in Figure 3 and Figure 4. It can be seen from Figure 3, and Figure 4 that dynamic modulus value decreases as air voids increases. The developed master curves were used to estimate dynamic modulus of each layers at any air voids levels, and temperature. The 'goodness-of-fit' statistic, Se/Sy (standard error of the estimated/standard deviation), and correlation coefficient, (R2), were used to assess the validity of the correlation between laboratory measured and master curve fit equation. Based on these criteria, the developed m ster curve equations in this study were found to be in excellent correlation with laboratory measured data. The coefficients and the fitting statistics of the
master curves are summarized in Table 4.
Figure imgf000022_0001
10 1oD 102 103 10" 10s 106 107
Reduced Frequency (Hz) Figure 1 Master Curves for Base Layer Mixture (S3
64-22
Figure imgf000023_0001
10'T it« 10-6 io* lei-3 io-? io-1 io° io ioJ io3 io5 ioB 107
Figure 2 Master Curves for 2nd and 3rd Layers Mixtures {S3
76-28)
Table 4 Master Curves Parameters
Base Layer (Mix- S3 64-22)
Air Voids (%) Ma s E* (MPa) δ P Ϊ Fit
6 23084 1.81 - 1 ,02 -0,43 1,20 0.99 0,07 Excellent
8 22256 1.54 -0.98 -0.39 1.20 0.99 0.05 Excellent
10 21232 1.23 -0.86 -0.37 1,04 0.99 0 06 Excellent
12 19942 1.72 -0.41 -0.40 1.05 0.99 0,08 Excellent
2"" and 3ri Layer (Mix- S3 76-28)
6 22826 2, 10 -0,25 -0.45 1.24 0.99 0.04 Excellent
8 22027 1.99 -0.24 -0.42 1.18 0.99 0.05 Excellent
10 21 157 1.98 -0, 17 -0,42 1.12 0.99 0.04 Excellent
12 20182 1.71 -0. 12 -0.37 1.13 0.99 0.05 Excellent
Shift Factors log(aT)
Base Layer (Mix -S3 64-22) 2nd and 3rd Layer (Mix- S3 76-28)
Air Voids (%)
4° C 21° C 40° C 55° C 4" C 21" C 40° C 55° C
6 2.66 0.00 -2.23 -3.60 2.24 0.00 - 1.96 -3,20
8 2.65 0.00 -2.22 -3.58 2, 13 0.00 - 1,86 -3.04
10 2.30 0.00 - 1.93 -3. I I 2.02 0.00 - 1.77 -2.89
12 2.32 0,00 - 1.95 -3, 14 2.04 0,00 - 1 ,78 -2.91
[00070] Measurement of Density using IACA
[00071] The use of the IACA in estimating the stiffness of a multi layer HMA pavement was investigated during the construction of interstate 1-35 in Norman, OK. A test section of 450 feet was selected and seven test locations, approximately 20 meters apart, were marked on the center line of the lane for verification analysis. The test procedure and results are now discussed. [00072] The 1ACA data was collected during the compaction of the all three layers (base, 2nd layer, and 3rd layer). First, the test points were marked on base layer, and the IACA data was collected. The GPS location of these points was recorded to locate these test locations on each pavement layer. Similar points were marked on 2nd and 3rd layers and the IACA data was collected during the compaction of each of these layers. The IACA data was analyzed to get the density estimate of each layers. It is known that the IACA measurements are typically within 1% of the density measured from pavement cores (10- 1 1). The measured density of each layer is given in Table 5, The density for base layer varies from 89.4 % to 93.3 %, similiarly the density of 2nd and 3rd layers vary from 89.5 % to 88.9 %, and 91.8 5 % to 93.3 %, respectively. It can be seen that the density at each location changes with the layer types, with most consisent density was observed on top layer. Such variation in the density in three layer might affect stiffness of combined layer. These density were converetd into the air voids ( % air voids = 100- % density) to estimate dynamic modulus of of each location.
Table 5 IACA Measured Density of Each Layer
Test IACA Estimated Density
Point Base Layer 2nd Layer 3^ Layer
T8 92.5 88.9 91.8
TIN 91.9 90,6 92.9
T2N 91.6 92,3 93.2
T3N 93.3 90,9 92,3
T4N 91.7 92.1 92, 1
T5N 90,9 92.3 92,2
M6 89.4 89.5 93.3
[00073] Estimating the Effective Modulus of Pavement Layers
[00074] The FWD measured modulus is compared with the actual effective modulus of the layers using the Odemark method of equivalent thickness. Odemark method is used to transform a system consisting of layers with different moduli into an equivalent system where the thicknesses of the layers are altered but all layers have the same modulus. The transformation assumes that the stiffness of the layer remains the same, i.e. I x E / (1 - μ2) remains constant where I = moment of inertia; E = layer modulus; and ί~= Poisson ratio (19- 22).
[00075] This approach is used in the present paper to calculate the effective modulus of the three layers that constitute the pavement on 1-35. The IACA data collected during the compaction of each of the pavement layers is first used to determine the dynamic modulus at each of the each test locations. The effective modulus (Eef ective or Eeff) of three layers of pavement was calculated using Equation 7. The effective moduli were calculated at 21 °C and 5 Hz frequency (Table 6).The similar approach was used by several other researchers to find the effective modulus for layered system of pavement (23-25).
E, effective
Figure imgf000025_0001
Ei , E2 and E3 are dynamic modulus of top, 2nd, and base layer, and hi, h2, and h3 are the thickness of respective layers. Ci, and C2 are the correction factors to obtain better agreement with exact theory of elasticity, (21 , 26). The value of correction factors depend on the layer thicknesses, modular ratios, Poisson ratios and the number of layers in pavement structure. In the present study correction factors were taken as C| =1 while C2 =0.8.
Table 6 Effective Modulus and FWD Modulus of Three
Layers of Pavement
Measured Dynamic Modulus (MPa) Effective FWD
Point Base Layer 2nd Layer 3'd Layer Modulus (MP a) Modulus (MPa)
T8 5406 2190 3049 2365 3062
TIN 5070 2659 3456 2502 2482
T2N 4910 3227 3576 2637 2353
T3N 5889 2751 3227 2667 2696
T4N 4963 3155 3155 2554 2878
T5N 45S6 3227 3191 2482 2657
M6 3880 2345 3617 2161 2760
[00076] Verification of the IACA measured Pavement Modulus. The verification of the TACA measured modulus was done by conducting FWD testing on seven test locations that were marked before for estimating density using the IACA. The FWD is a nondestructive test device used to characterize the in-situ pavement moduli (15, 27). It drops a transient load from a specified height on a 300 mm diameter circular plate with a thin rubber pad mounted underneath. The load and deflection is measured using load cell and sensors set on the ground. Seven sensors were placed at 0, 200, 300, 450, 600, 900, and 1 00 mm away from the center of the loading plate. In the present study the FWD test was conducted on 3rd layer of pavement using a Dynatest FWD test system. Numerical back-calculation software, MODULUS 6.0, was used to process the FWD raw data so as to determine the modulus value (28). The back-calculated modulus is often called the effective modulus because the value represents the effect of the layer within the whole pavement structure. The effective modulus was calculated at 21° C to compare this modulus with laboratory measured effective dynamic modulus. Since, the FWD loading induces a pulse of duration of 0.03 s (29), which is equivalent to a test frequency of 5.3 Hz (1/0.03/2π), hence, the comparisons in this paper are performed using modulus values calculated at 21 °C and 5 Hz frequency. Table 6 shows the results of the FWD test. FIG 3. below shows that the modulus estimated by the proposed method is in good agreement with the FWD measurements.
Figure imgf000026_0001
T8 T1N T2N T3 T4N T5N M6
Points
[00077] Thus, it is seen that the apparatus and methods of the present invention readily achieve the ends and advantages mentioned as well as those inherent therein. While certain preferred embodiments of the invention have been illustrated and described for purposes of the present disclosure, numerous changes in the arrangement and construction of parts and steps may be made by those skilled in the art, which changes are encompassed within the scope and spirit of the present invention as defined by the appended claims.

Claims

What is claimed is:
1. A method of compacting a multi-layer roadway section with a roller having a compaction analyzer operably associated therewith comprising:
entering initial input parameters of the first layer of the roadway section into the compaction analyzer;
making a plurality of passes with the roller over the first layer of a portion of the roadway section;
applying a vibratory energy to the first layer of the portion of the roadway section with the roller as it moves thereover;
repeatedly gathering responsive vibration signals of the roller as it moves over the first layer portion of the roadway section;
generating, with the compaction analyzer, estimated dynamic modulus signals representative of estimated moduli based upon the responsive vibration signals of the roller and the initial input parameters entered into the compaction analyzer;
measuring the dynamic modulus of the first layer of the roadway section at a plurality of locations on the portion of the roadway section;
comparing the measured modulus with the estimated modulus at the plurality of locations to determine the difference between the measured and the estimated moduli;
adjusting selected ones of the initial input parameters to the analyzer based on the difference between the determined modulus and the estimated modulus so that an adjusted modulus output signal generated by the compaction analyzer will more closely approximate an actual modulus of the roadway section than does the estimated modulus signal; and
rolling the remainder of the roadway section until the compaction analyzer with the adjusted input parameters generates a desired adjusted output modulus signal.
2. The method of claim 1, wherein the initial input parameters include mix characteristics of roadway material, an estimated minimum modulus ( ¾) and an estimated maximum modulus (Mj) for the first layer.
3. The method of claim 1 , wherein (Mid) is the modulus at a specified lay-down density and Mr is the modulus a target density achieved in a mix specification for the roadway material used in the first layer.
4. The method of claim 3, further comprising:
identifying the responsive vibration signals with the highest power, the lowest power, and equally spaced power levels therebetween; and
designating specified minimum, maximum and equally spaced compaction levels as corresponding to the responsive vibration signals with the highest, lowest, and equally spaced powers;
delivering the compaction levels to an analyzer module of the compaction analyzer; and
generating the estimated modulus (Mest) of the first layer portion of the roadway section in real time with the formula
Mest = Mld + ki„ * (Ci) + off m, where km is an initial slope parameter that is an initial input parameter, offm is an estimated offset from the minimum estimated modulus and is also an initial offset parameter, and is the compaction level delivered to the analyzer module.
5. The method of claim 4, wherein the adjusting step comprises adjusting the initial slope and offset parameters, so that the compaction analyzer will generate an adjusted density (Madj) with the formula
Madj = Mia + ka j (Q) + offsetadj, where kadj and ¾ ¾· are the adjusted slope and offset parameters respectively.
6. The method of claim 4 wherein the power of a given responsive vibration signal is calculated using the equation
where f, represents a plurality of frequencies contained in the given responsive vibration signal and Si is the square of the amplitude of the frequencies,
7. The method of claim 6 wherein the initial slope parameter kin is represented by the equation kin = Mr - M/ nc l where nci is the total number of compaction levels, and wherein the estimated initial offset is zero.
8. The method of claim 7, wherein the adjusting step comprises adjusting the initial slope and offset parameters, and generating an adjusted density (Maaj) with the formula
Madj = M + kadj (C\) + offset, where kadj and offad are the adjusted slope and offset parameters respectively.
9. The method of claim 8, wherein the adjusted offset is calculated using the equation (M'meas - M )
n
where n is the number of the plurality of locations at which density is measured, Mest is the estimated modulus at the plurality of locations, Mmeas is the measured modulus at the plurality of locations and the adjusted slope is calculated using the equation
[ , - Mld ~ offadj )xC, ]
Figure imgf000029_0001
10. A method of compacting, comprising performing the steps of claims 1 through 5 on each additional layer of the portion of the roadway section to determine adj for each layer of the roadway section.
1 1 . The method of claim 10 further comprising determining an overall effective modulus Eeff based on the M^- for each layer of the roadway section.
12. The method of claim 1 1, where the roadway is a three layer roadway section, and Eeff is determined using the equation
Figure imgf000029_0002
where ELi, EL2 and EL3 are the dynamic modulus for layers LI , L2 and L3, respectively, and hi, h2 and h3 are the thickness of the respective layers and are correction factors.
13. A method of determining the stiffness of a multi layer roadway comprising: (a) making a plurality of passes with a roller over the first layer of the roadway section;
(b) applying a vibratory energy to the first layer of the portion of the roadway section with the roller;
(c) generating, with a compaction analyzer operably associated with the roller, estimated modulus signals based upon the responsive vibration signals of the roller;
(d) independently determining the dynamic modulus at a plurality of locations on the first layer;
(e) adjusting selected ones of input parameters for the compaction analyzer based on the differences between the estimated modulus and the independently determined modulus at the plurality of locations to arrive at an adjusted modulus that more closely approximates the actual modulus than the estimated modulus;
(f) performing steps (a) - (e) for each layer of the roadway section; and
(g) calculating an overall modulus Eeff using the adjusted modulus Μαψ ΐοτ each layer of the roadway.
14. The method of claim 13 wherein the independently determining step comprises:
determining the modulus at the plurality of locations with a failing weight deflectometer.
15. The method of claim 14 wherein the roadway is a three layer roadway, and Eeg is calculated with the following equation
E ',effective
Figure imgf000030_0001
where ELi, EL2 and EL3 are the dynamic modulus for layers LI , L2 and L3, respectively, and hi , h2 and 1¾ are the thickness of the respective layers and Ci and C2 are correction factors.
16. The method of claim 15, wherein the initial input parameters include mix characteristics of roadway material, an estimated minimum modulus (M14) and an estimated maximum modulus (Mr) for the first layer.
17. The method of claim 16, wherein (M^ is the modulus specified lay-down density and Mr is the modulus a target density achieved in a mix specification for the roadway material.
18. The method of claim 17 , further comprising:
identifying the responsive vibration signals with the highest power, the lowest power, and equally spaced power levels therebetween; and
designating specified minimum, maximum and equally spaced compaction levels as corresponding to the responsive vibration signals with the highest, lowest, and equally spaced powers;
delivering the compaction levels to an analyzer module of the compaction analyzer; and
generating the estimated modulus (Mest) of the first layer portion of the roadway section in real time with the formula
MESL = MM + hn * (Ci) + offi„, where kin is an initial slope parameter that is an initial input parameter, offin is an estimated offset from the minimum estimated modulus and is also an initial offset parameter, and C\ is the compaction level delivered to the analyzer module.
19. The method of claim 18, wherein the adjusting step comprises adjusting the initial slope and offset parameters, so that the compaction analyzer will generate an adjusted density (Madj) with the formula
Madj = Mid + kadj * (Ci) + offsetadj, where kadj and offa(jj are the adjusted slope and offset parameters respectively.
20. The method of claim 13, wherein the independently determining step comprises:
cutting cores from the plurality of locations, measuring the density of the cores; and
finding the modulus that corresponds to the measured density based on master curves for the mix used for each layer respectively.
21 . The method of claim 13, wherein the independently determining step comprises using known empirical models for the mixes to determine the modulus.
22. A method of determining the stiffness of a roadway comprising:
compacting the asphalt mix to be used for each layer of the roadway to obtain a plurality of laboratory specimens of a plurality of densities for each layer;
determining a laydown modulus Mu and a target modulus r that correspond to the laydown and target densities of the specimens for each layer;
using the laydown modulus and the target modulus of each layer to calculate a modulus of each roadway layer; and
calculating an overall effective modulus for the roadway using the modulus of each layer.
23. The method of claim 20 wherein the using step comprises:
making a plurality of passes with a roller having a compaction analyzer operably associate therewith over each layer of a portion of the roadway section beginning with the first layer;
applying a vibratory energy to each layer of the portion of the roadway section with the roller as it moves thereover;
repeatedly gathering responsive vibration signals of the roller as it moves over each layer portion of the roadway section;
calculating an estimated modulus Mesl of each layer of the roadway section with the formula Mest = Mld + kjn (Ci) + off;n at a plurality of locations on each layer, where an initial slope parameter kj„ is (Μχ - Mid)/(ncL-l) and an initial input parameter, offin is an estimated offset from the minimum estimated modulus and is also an initial offset parameter, C] is the compaction level delivered to the analyzer module and nci is the number of compaction levels;
measuring the dynamic modulus of each layer of the roadway section at the plurality of locations on the portion of the roadway section;
comparing the measured modulus with the estimated modulus at the plurality of locations to determine the difference between the measured and the estimated moduli; and adjusting selected ones of the initial input parameters to the analyzer based on the difference between the determined modulus and the estimated modulus so that an adjusted modulus output signal generated by the compaction analyzer will more closely approximate an actual modulus of the roadway section than does the estimated modulus signal, the adjusting step comprising adjusting the initial slope and offset parameters, so that the compaction analyzer will generate an adjusted density (Μα(ι with the formula
Madj = Mia + kadj (Ci) + offsetadj, where kadj and offa j are the adjusted slope and offset parameters respectively.
24, The method of claim 23, wherein the road is a three-layer road, and wherein the overall modulus for the road is calculated using the equation:
E ',effective
Figure imgf000033_0001
where EL] , EL2 and EL3 are the dynamic modulus for layers LI , L2 and L3, respectively, and h], h2 and h3 are the thickness of the respective layers and Ci and C2 are correction factors.
25. The method of claim 23, the determining step comprising:
creating master curves to represent the relationship between the density of the specimens and the modulus of the specimens for each layer; and
locating Mi and the Μτ on the master curves,
26. The method of claim 23, wherein the measuring step comprises using an F WD to find the modulus at the plurality of locations.
27. A method of compacting a multi-layer road comprising:
determining a modulus at a plurality of locations on each layer; and calculating an overall effective modulus for the roadway using the modulus for each of the layers.
28. The method of claim 27, wherein the roadway is a three-layer roadway and the modulus is calculated using the equation:
Figure imgf000033_0002
where ELj, EL2 and EL3 are the dynamic modulus for layers L I , L2 and L3, respectively, and hi, h2 and h3 are the thickness of the respective layers and Ci and C2 are correction factors.
29. The method of claim 26, the determining step comprising:
making a plurality of passes with a roller having a compaction analyzer over each layer of a portion of the roadway section;
applying a vibratory energy to each layer of the portion of the roadway section with the roller as it moves thereover;
repeatedly gathering responsive vibration signals of the roller as it moves over the first layer portion of the roadway section;
generating, with the compaction analyzer, estimated dynamic modulus signals representative of estimated moduli based upon the responsive vibration signals of the roller and the initial input parameters entered into the compaction analyzer;
measuring the dynamic modulus of the first layer of the roadway section at a plurality of locations on the portion of the roadway section;
comparing the measured modulus with the estimated modulus at the plurality of locations to determine the difference between the measured and the estimated moduli;
adjusting selected ones of the initial input parameters to the analyzer based on the difference between the determined modulus and the estimated modulus so that an adjusted modulus output signal generated by the compaction analyzer will more closely approximate an actual modulus of the roadway section than does the estimated modulus signal.
30. The method of claim 27, further comprising rolling the remainder of each layer of the roadway section until the compaction analyzer with the adjusted input parameters generates a desired adjusted output modulus signal.
PCT/US2013/035504 2012-04-06 2013-04-05 Method and apparatus for determining stiffness of a roadway Ceased WO2013152321A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13772090.0A EP2844798A4 (en) 2012-04-06 2013-04-05 METHOD AND APPARATUS FOR DETERMINING THE RIGIDITY OF A PAVEMENT
US14/390,936 US20150030392A1 (en) 2012-04-06 2013-04-05 Method and apparatus for determining stiffness of a roadway
CN201380029906.XA CN104364445A (en) 2012-04-06 2013-04-05 Method and device for determining road hardness

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201261621259P 2012-04-06 2012-04-06
US61/621,259 2012-04-06

Publications (1)

Publication Number Publication Date
WO2013152321A1 true WO2013152321A1 (en) 2013-10-10

Family

ID=49301099

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2013/035504 Ceased WO2013152321A1 (en) 2012-04-06 2013-04-05 Method and apparatus for determining stiffness of a roadway

Country Status (4)

Country Link
US (1) US20150030392A1 (en)
EP (1) EP2844798A4 (en)
CN (1) CN104364445A (en)
WO (1) WO2013152321A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114166664A (en) * 2021-12-13 2022-03-11 中电建路桥集团有限公司 Road strength real-time detection equipment used in urban road construction
CN114197275A (en) * 2022-01-21 2022-03-18 山推工程机械股份有限公司 Control system and method of road roller

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016009085A1 (en) * 2016-07-26 2018-02-01 Bomag Gmbh Soil compaction roller with sensor device on the rolling drum and method for determining the soil stiffness
CN107219300B (en) * 2017-05-23 2019-09-03 徐工集团工程机械股份有限公司 A kind of compactness detection on locomotive system based on the degree of correlation
CN108254068B (en) * 2018-01-12 2019-07-12 清华大学 An online vibration energy detection system for compaction quality of filling engineering
WO2019182575A1 (en) 2018-03-21 2019-09-26 Volvo Construction Equipment Ab Asphalt density estimation system, and related method of reducing signal noise
CN109993223B (en) * 2019-03-26 2023-05-16 南京道润交通科技有限公司 Pavement use performance prediction method, storage medium and electronic equipment
CN110362930B (en) * 2019-07-17 2023-04-18 上海市城市建设设计研究总院(集团)有限公司 Asphalt pavement base damage judging method based on deflection basin parameters
CA3161259A1 (en) * 2019-12-23 2021-07-01 Sesh Commuri Retrofit intelligent compaction analyzer
EP3929356A1 (en) * 2020-06-22 2021-12-29 MOBA Mobile Automation AG Method and apparatus for detecting a data set
JP6884260B1 (en) * 2020-10-30 2021-06-09 前田道路株式会社 Rolling machine and density estimation system for asphalt mixture
CN112686510B (en) * 2020-12-22 2024-01-23 江苏中路工程技术研究院有限公司 Asphalt pavement structural performance evaluation method
JP6978577B1 (en) * 2020-12-24 2021-12-08 日本国土開発株式会社 Compaction method and compaction management device
CN112862200B (en) * 2021-02-20 2022-08-02 河北工业大学 Intelligent feedback optimization method for whole process of highway construction quality
CN115081061B (en) * 2022-05-25 2025-04-01 华南理工大学 Method, device and medium for constructing master curve of dynamic viscoelastic behavior of asphalt-based materials
WO2024151535A1 (en) * 2023-01-09 2024-07-18 University Of Pittsburgh - Of The Commonwealth System Of Higher Education Scalable adaptive sampling methods for surrogate modeling using machine learning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5735634A (en) * 1995-06-21 1998-04-07 Joseph Vogele Ag Road finisher and a method of applying surface layers
US7455476B2 (en) * 2003-12-18 2008-11-25 Kmc Enterprises, Inc. Method of reconstructing a bituminous-surfaced pavement
US7923992B2 (en) * 2004-03-25 2011-04-12 Targosz Thomas C Inspection of asphalt during manufacturing
US20110293369A9 (en) * 2008-09-02 2011-12-01 The Board Of Regents Of The University Of Oklahoma Method and apparatus for compaction of roadway materials

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073767A (en) * 1991-12-25 1993-06-30 湖南省交通科学研究所 Dynamic nuclear soil foundation compactness and water content measuring instrument
US6803771B2 (en) * 2000-05-04 2004-10-12 Transtech Systems, Inc. Paving material analyzer system and method
EP1516961B1 (en) * 2003-09-19 2013-12-25 Ammann Aufbereitung AG Method for determining soil rigidity and soil compaction device
DE102006008266B4 (en) * 2006-02-22 2009-11-12 Wacker Neuson Se Method and device for measuring soil parameters by means of compaction machines
CA2609763C (en) * 2006-11-06 2016-04-26 Thomas C. Targosz Inspection of asphalt during manufacturing
DE102007019419A1 (en) * 2007-04-23 2008-10-30 Hamm Ag Method for determining a degree of compaction of asphalts and system for determining a degree of compaction
US8116950B2 (en) * 2008-10-07 2012-02-14 Caterpillar Inc. Machine system and operating method for compacting a work area
US8635903B2 (en) * 2009-12-22 2014-01-28 Caterpillar Paving Products Inc. Method and system for compaction measurement
DE102010052713A1 (en) * 2010-11-26 2012-05-31 Bomag Gmbh A traveling soil compacting device and method for detecting a layer E modulus of a topmost layer of said bottom layer structure
US20150211199A1 (en) * 2014-01-24 2015-07-30 Caterpillar Inc. Device and process to measure ground stiffness from compactors
US20160076205A1 (en) * 2014-09-16 2016-03-17 Caterpillar Paving Products Inc. Device and Process for Controlling Compaction Based on Previously Mapped Data
US9423332B2 (en) * 2014-10-14 2016-08-23 Caterpillar Inc. System and method for validating compaction of a work site

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5735634A (en) * 1995-06-21 1998-04-07 Joseph Vogele Ag Road finisher and a method of applying surface layers
US7455476B2 (en) * 2003-12-18 2008-11-25 Kmc Enterprises, Inc. Method of reconstructing a bituminous-surfaced pavement
US7923992B2 (en) * 2004-03-25 2011-04-12 Targosz Thomas C Inspection of asphalt during manufacturing
US20110293369A9 (en) * 2008-09-02 2011-12-01 The Board Of Regents Of The University Of Oklahoma Method and apparatus for compaction of roadway materials

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
See also references of EP2844798A4 *
VAKILI, J.: "A Simplified Method for Evaluation of Pavement Layers Moduli Using Surface Deflection Data", INTERNATIONAL ASSOCIATION FOR COMPUTER METHODS AND ADVANCES IN GEOMECHANICS (IACMAG); 12TH INTERNATIONAL CONFERENCE, October 2008 (2008-10-01), GOA INDIA, XP008174872 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114166664A (en) * 2021-12-13 2022-03-11 中电建路桥集团有限公司 Road strength real-time detection equipment used in urban road construction
CN114166664B (en) * 2021-12-13 2024-01-16 中电建路桥集团有限公司 Real-time road intensity detection equipment used for urban road construction
CN114197275A (en) * 2022-01-21 2022-03-18 山推工程机械股份有限公司 Control system and method of road roller
CN114197275B (en) * 2022-01-21 2023-04-25 山推工程机械股份有限公司 Control system and method of road roller

Also Published As

Publication number Publication date
CN104364445A (en) 2015-02-18
EP2844798A1 (en) 2015-03-11
EP2844798A4 (en) 2016-08-24
US20150030392A1 (en) 2015-01-29

Similar Documents

Publication Publication Date Title
WO2013152321A1 (en) Method and apparatus for determining stiffness of a roadway
US8190338B2 (en) Method and apparatus for compaction of roadway materials
Inam et al. Effect of principal stress axis rotation on cyclic plastic deformation characteristics of unsaturated base course material
Ahmed et al. Combined effect of asphalt concrete cross-anisotropy and temperature variation on pavement stress–strain under dynamic loading
Commuri et al. A novel neural network-based asphalt compaction analyzer
US12404638B2 (en) Retrofit intelligent compaction analyzer
EP2324336B1 (en) Method for compaction of roadway materials
Camargo et al. Intelligent compaction: A Minnesota case history
Commuri et al. Calibration procedures for the intelligent asphalt compaction analyzer
Mahmoud et al. Development of a field torque test to evaluate in-situ tack coat performance
Ebrahimi et al. Light-weight deflectometer for mechanistic quality control of base course materials
Singh et al. Application of intelligent compaction technology for estimation of effective modulus for a multilayered asphalt pavement
Beainy et al. Asphalt compaction quality control using artificial neural network
Maupin Preliminary field investigation of intelligent compaction of hot-mix asphalt.
Khosla et al. Evaluation of the effects of mixture properties and compaction methods on the predicted performance of superpave mixtures
Hu Evaluation of intelligent compaction technology in asphalt pavement construction and laboratory compaction
Von Quintus Evaluation of intelligent compaction technology for densification of roadway subgrades and structural layers
Awadalla Field and laboratory investigation of asphalt pavement permeability
Walubita et al. Texas flexible pavements and overlays: data analysis plans and reporting format.
Commuri et al. Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes
Bhattacharjee et al. Use of MMLS3 Scaled Accelerated Loading for Fatigue Characterization of Hot Mix Asphalt HMA in the laboratory
Singh et al. In-situ assessment of stiffness during the construction of HMA pavements
Bhattacharjee et al. Effect of loading and temperature on dynamic modulus of hot mix asphalt tested under MMLS3
Myers et al. Evaluation of performance data from repeated load test
Scullion et al. Field evaluation of new technologies for measuring pavement quality

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13772090

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2013772090

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2013772090

Country of ref document: EP