WO2013060241A1 - 炉膛同轴分段燃烧炉及其加热方法 - Google Patents
炉膛同轴分段燃烧炉及其加热方法 Download PDFInfo
- Publication number
- WO2013060241A1 WO2013060241A1 PCT/CN2012/082931 CN2012082931W WO2013060241A1 WO 2013060241 A1 WO2013060241 A1 WO 2013060241A1 CN 2012082931 W CN2012082931 W CN 2012082931W WO 2013060241 A1 WO2013060241 A1 WO 2013060241A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- flue gas
- furnace
- burner
- chamber
- combustion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B17/00—Furnaces of a kind not covered by any of groups F27B1/00 - F27B15/00
- F27B17/0016—Chamber type furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/30—Arrangements for extraction or collection of waste gases; Hoods therefor
- F27D17/302—Constructional details of ancillary components, e.g. waste gas conduits or seals
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B19/00—Combinations of different kinds of furnaces that are not all covered by any single one of main groups F27B1/00 - F27B17/00
- F27B19/02—Combinations of different kinds of furnaces that are not all covered by any single one of main groups F27B1/00 - F27B17/00 combined in one structure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B9/00—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
- F27B9/02—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity of multiple-track type; of multiple-chamber type; Combinations of furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B9/00—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
- F27B9/30—Details, accessories or equipment specially adapted for furnaces of these types
- F27B9/38—Arrangements of devices for charging
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B9/00—Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
- F27B9/30—Details, accessories or equipment specially adapted for furnaces of these types
- F27B9/39—Arrangements of devices for discharging
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D15/00—Handling or treating discharged material; Supports or receiving chambers therefor
- F27D15/02—Cooling
- F27D15/0206—Cooling with means to convey the charge
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/10—Arrangements for using waste heat
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D99/00—Subject matter not provided for in other groups of this subclass
- F27D99/0001—Heating elements or systems
- F27D99/0033—Heating elements or systems using burners
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/10—Arrangements for using waste heat
- F27D17/12—Arrangements for using waste heat using heat storage
- F27D17/13—Arrangements for using waste heat using heat storage using regenerative heat exchangers
Definitions
- the invention relates to a gas and oil oil furnace, and mainly relates to a furnace back-fired multi-return heat storage energy-saving furnace and a heating method thereof, which can be used for metal reduction, heating hot water or steam generation. Background technique
- the traditional magnesium smelting process is the pidgeon method.
- This method uses a horizontal furnace, which adopts the civil construction method.
- the furnace body is made up of refractory bricks on the ground foundation, and there are several horizontal distributions in the furnace body.
- the reduction tank is filled with a reaction material pellet in the reduction tank, and the reduction tank is heated by the heat radiation of the furnace outside the reduction tank, and then the heat radiation is transmitted to the reaction material pellet by the reduction tank, and then the heat is transferred by the pellets. It is a kind of peripheral heating.
- the refractory brick is built into this large furnace heating mode.
- the furnace space is too large, the heat radiation transmission radius is large, and the high temperature flue gas convection has a dead angle, resulting in a small heat transfer rate in the reduction tank, a large temperature gradient, and a temperature.
- the uniformity is not good, the heat radiation transfer radius is large, so that the inner body of the tank reaches the process requirement reduction temperature of 1150-1200 degrees, the time is too long, it takes 10-12 hours, and the reduction tank is unevenly heated, resulting in thermal creep. It affects the service life of the reduction tank. It is usually used for about 2 months, which is scrapped and replaced.
- the volume of the charged tank is too small. Only one hundred kilograms of material can be loaded per tank per time, resulting in investment in multiple furnaces and multiple tanks. Meet capacity needs. Therefore, the reduction furnace of the civil construction method has the disadvantages of large land area, low production efficiency, high labor intensity, inability to mechanize or automate loading and unloading, high energy consumption, low magnesium reduction rate, serious environmental pollution, and short life of the reduction tank
- the object of the present invention is to provide a furnace coaxial sectional combustion energy-saving furnace and a heating method thereof, the furnace body adopts a metal furnace body, the metal furnace body is suspended on the gantry, and the furnace is a double combustion chamber alternate combustion heat storage preheating method By re-igniting multiple return strokes, the heat exchange area is increased, the hot smoke in the furnace is fully recovered and reused, and the traditional external heating mode is changed, achieving the purpose of fast heating, energy saving, high efficiency and small floor space. It better overcomes the shortcomings of existing gas furnaces.
- the method of implementing the present invention is: The following steps are included:
- a flue gas chamber is disposed in the middle and both ends of the two independent combustion chambers
- the flue gas chambers at both ends are respectively connected to the heating burners;
- the method also includes:
- a burner works to heat one combustion chamber, and the other burner does not work.
- the hot smoke generated by the heated combustion chamber enters the flue gas chamber for reversal, and passes through the multi-return flue gas heat radiant tube and the flue gas chamber to another a burner that does not work, and the hot smoke enters the heat storage device through the burner that does not work; the commutation valve is reversed, the burner burns stops, and the other burner starts to work.
- another The hot smoke generated by a heated combustion chamber enters the flue gas chamber for commutation, and passes through the multi-return flue gas heat radiant tube and the flue gas chamber to another non-working burner, and the hot smoke is also entered through the stopped burner.
- the heat storage heat exchanger is circulated in this way.
- the structure for realizing the present invention is as follows:
- the furnace comprises a metal furnace body, and a furnace is arranged in the metal furnace body, and the middle of the furnace is divided into two sections by a heat-resistant material, and becomes two independent combustion chambers on the left and right sides.
- Two independent combustion chambers are respectively connected to one end of the flue gas chamber, and the other end of the flue gas chamber is also respectively connected with a burner, and two independent combustion chambers are respectively provided with a flue gas heat radiant tube, in the middle position of the furnace There is also an intermediate flue gas chamber, and two ends of the heat radiant tube are respectively connected with the flue gas chamber and the intermediate flue gas chamber, and the two independent combustion chambers respectively pass through the flue gas chamber, the flue gas heat radiant tube and the intermediate flue gas chamber In turn, two independent combustion chambers are alternately combusted. When one combustion chamber burns, the other combustion chamber stops burning.
- the hot smoke generated by the combustion of the combustion chamber passes through the flue gas chamber, the flue gas heat radiant tube, and the intermediate flue gas chamber.
- the heat radiant tube, the flue gas chamber, the non-combustion burner are sucked to the heat storage body heat exchange device, and the feed hole and the crystal collector are further arranged on the metal furnace body, and the unloading material is further arranged under the metal furnace body Port, there are also hanging points on the surface of the metal furnace body;
- Suspension device for horizontal or inclined suspension of metal furnace body including gantry frame, metal furnace body is suspended on the gantry frame by suspension point, and a traveling mechanism and a feeding mechanism are also arranged on the gantry frame;
- the burner includes a nozzle, and the nozzle is provided with an igniter, a fuel inlet, a hot flue gas inlet, and a hot flue gas outlet, wherein the hot flue gas inlet and the hot flue gas outlet are respectively connected to the regenerator heat exchange device.
- the structure also includes:
- the metal furnace body is respectively connected with a sealing head at both ends thereof, and the metal furnace body and the sealing head are fastened together by a quick locker and a tightener, and the flue gas chamber is fixed in the sealing head through the bushing, in the flue gas
- a sealing sleeve is further disposed between the chamber and the head bushing, and a connecting flange is respectively arranged at two ends of the metal furnace body, the connecting flange is provided with a wedge surface; and the head flange is provided with a head flange, the head method
- the flange is provided with a wedge surface; a cooling channel is arranged on the connecting surface of the connecting flange and the head flange, and a cooling water inlet and cooling water which are connected to the cooling water channel are respectively arranged on the connecting flange and the head flange.
- the quick locker is provided with a quick locking block, and the quick locking block is provided with a V-shaped groove and a locking hole, and the V-shaped groove is caught on the wedge surface of the connecting flange and the flange of the sealing head.
- the wire rope of the tensioner passes through the locking hole of the quick locking block to fasten the metal furnace body and the head together.
- the crystallization collector is connected to the crystallization trap vacuum tube through a V-shaped quick joint, and the lower end of the crystallization collector vacuum tube is connected to the metal furnace body, wherein
- the crystallization collector comprises a cooling sleeve, and a conical crystal sleeve is arranged in the cooling sleeve, and a cooling water inlet, a cooling water outlet and a vacuuming port are respectively arranged on the cooling jacket, wherein the cooling water inlet is connected to the water pump, and the cooling water is discharged.
- the nozzle is connected to the water tank, and the vacuum pump is connected to the vacuum pump.
- the end of the cooling sleeve is also covered with a cooling cover flange, and the cooling sleeve flange is provided with a wedge surface and a V-shaped connecting head;
- the upper end of the crystallization collector vacuum tube is provided with a vacuum collecting tube flange, the vacuum collecting tube flange is provided with a wedge surface and a V-shaped connecting seat, and the V-shaped connecting head is connected with the V-shaped connecting seat, and the V-shaped connecting head and the V-shaped
- a sealing rubber ring is arranged on the connecting surface between the connecting seats, and is fastened by a V-shaped quick joint on the wedge surface of the cooling sleeve flange and the vacuum collecting tube flange.
- the suspension device comprises a double-span gantry structure composed of two gantry frames, and a suspension lifting lug is arranged on the gantry frame, and two suspension points are respectively arranged at two ends of the metal furnace body, wherein one suspension point is suspended by the wire rope at the gantry On one of the suspension lugs of the frame, the other suspension point is connected to the other suspension lug by a wire rope and an electric hoist.
- the heat storage body heat exchange device includes a heat storage body A, a reversing valve and a regenerator B, and the burners at both ends of the combustion chamber are alternately operated by the regenerator A, the reversing valve and the regenerator B, respectively.
- the combustor of the combustion chamber is provided with a hot flue gas inlet and a hot flue gas outlet
- the regenerator body A and the regenerator body B are respectively provided with a hot flue gas inlet and a hot flue gas outlet, and a hot flue gas inlet on the burner and
- the hot flue gas outlet is connected to the hot flue gas inlet and the hot flue gas outlet of the regenerator A and the regenerator B, respectively.
- a traveling mechanism is suspended on the gantry, the walking mechanism includes an I-beam, the I-beam is provided with a channel steel, and the traveling steel is provided with a walking wheel, and the traveling wheel is bridged to the lower beam of the I-beam Above, a lifting lug connected to the electric hoist is arranged on the bottom surface of the channel steel, and the hook of the electric hoist is connected to the charging mechanism via the hopper wire rope;
- the loading mechanism is provided with a loading hopper, and the lower end of the loading hopper is a discharging opening, and the discharging opening is provided with a split discharge door, and the two ends of the split discharge door are hinged on the discharge opening, and the unloading type is unloaded
- the opposite ends of the doors are connected by a discharge door wire rope which is connected to the electric hoist via a hopper wire rope.
- the feeding port is provided with a cooling ring, a cooling water channel is arranged on the cooling ring, and a feeding door is arranged on the feeding port, and the feeding door is controlled by the electric actuator to realize opening and closing;
- the discharge port is provided with a cooling ring, a cooling water channel is arranged on the cooling ring, and a discharge door is arranged on the discharge port, and the discharge door is controlled by the electric actuator to realize opening and closing.
- the metal furnace body is provided with an oscillator, which drives the furnace body to vibrate.
- the metal furnace body is provided with a heat resistant material layer.
- the furnace can use a gas burner or an oil burner.
- the invention has the beneficial effects: the invention has mechanized intelligence, controls various working conditions through PLC programming, CRT display, monitoring and monitoring.
- the stainless steel consumables up to 35T using this patent technology can save 90% stainless steel reduction tank material in the case of equal or excess capacity, reduce 2/3 labor, save (oil , coal, gas) energy consumption of 60%, three times more than the traditional 12-hour furnace reduction cycle (about 4 hours a reduction cycle), completely changed the traditional thermal refining metal magnesium furnace and reduction tank split-type external heating, to solve
- the thermal efficiency is low, the production efficiency is low, no automation, mechanization, labor intensity, harsh environment and other backward conditions, and the mechanization, automation, energy saving, high efficiency, high production and convenient maintenance of the hot metal refining process are achieved.
- the furnace adopts a metal furnace body to realize industrial mass production and assembly, completely changing the traditional brickwork construction furnace production mode, and has a wider application range, and can be used as a metal reduction furnace, a hot water boiler and a steam boiler.
- Figure 1 is a schematic view showing the overall structure of the present invention.
- Figure 2-3 is a schematic diagram of the trend of hot smoke in the combustion chamber of Figure 1.
- Figure 4 is a schematic view of the metal furnace body of Figure 1.
- Figure 5 is a side view of Figure 4.
- Figure 6 is a cross-sectional view taken along line A-A of Figure 5;
- Figure 7 is a cross-sectional view taken along line B-B of Figure 6;
- Figure 8 is a perspective view of Figure 4.
- Figure 9 is a schematic view of the burner of Figure 1.
- Figure 10 is a schematic illustration of the crystal collector of Figure 1.
- Figure 11 is a schematic view of the cooling jacket of Figure 10.
- Figure 12 is a schematic illustration of the crystal sleeve of Figure 10.
- Figure 13 is a schematic view of the closure of Figure 10.
- Figure 14 is a schematic view of the quick locker of Figure 10.
- Figure 15 is a schematic view of the quick lock block of Figure 14.
- Figure 16 is a schematic view of the upper locking flange of Figure 14.
- Figure 17 is a schematic view of the lower locking flange of Figure 14.
- Figure 18 is a schematic view of the running mechanism of Figure 1.
- Figure 19 is a schematic view of the loading mechanism of Figure 1.
- Figure 20 is a schematic view of the loading door mechanism of Figure 1.
- Figure 21 is a schematic view of the discharge door mechanism of Figure 1.
- Figure 22 is an enlarged view of the direction A in Figure 1 .
- Figure 23 is a schematic view of a heat storage device of the heat storage body of the present invention.
- Figure 24 is a graph showing the relationship between the heat storage preheating combustion air and the fuel economy ratio of the present invention.
- the furnace consists of a suspension device, a metal furnace body 40, a left and right head 5, a burner 3, a magnesium crystallization collector 8, a loading mechanism 9, a traveling mechanism 20, a loading door mechanism 30, and unloading.
- the door mechanism 70, the heat storage body heat exchange device, the quick locker 6, the oscillator 80, and the like, and the metal furnace body 40 are horizontally suspended on the suspension device.
- the suspension device is mainly used for suspending the metal furnace body 40, and is further provided with a loading traveling mechanism 20 and a loading mechanism 9, which is composed of two gantry frames 50 as a double-span gantry structure, and the gantry frame 50 is fixed on the foundation 1,
- the suspension point 41 at both ends of the entire metal furnace body 40 is suspended by the wire rope 7 on the lifting lug of the gantry 50, wherein a suspension point 41 is suspended from the lifting lug of the gantry 50 by the wire rope 7 and the electric hoist 10, and the end passes
- the electric hoist 10 can be moved up and down, the loading mechanism 9 supplies the raw materials, and the lower loading vehicle 17 carries the removed waste residue.
- the metal furnace body 40 is connected with a head 5 at both ends thereof, wherein the reduction furnace body 40 has a connecting flange 49 at both ends thereof, the connecting flange 49 has a wedge surface 48, and the sealing head 5 is sealed.
- the head flange 52, the head flange 52 has a wedge surface 48, and there are cooling water passages 13 on the joint surface of the joint flange 49 and the head flange 52, and the joint flange 49 and the head flange 52 respectively have The cooling water inlet 47 and the cooling water outlet 51 communicating with the cooling water channel 13 are fixed to the wedge surface 48 by the quick locker 6 after the metal furnace body 40 is butted against the joint.
- the furnace is divided into two independent furnaces from the middle, that is, two independent combustion chambers, respectively a left combustion chamber 18 and a right combustion chamber 19, and a left and right combustion chamber 18, 19 is respectively connected with a burner 3, and the left and right combustion chambers 18, 19 are also respectively connected to the flue gas chambers 2, 60, and the flue gas chambers 2, 60 are fixed in the head 5 through the bushings, in the flue gas chambers 2, 60 and the head There is also a sealing sleeve 4 between the bushings, a burner 3 is arranged at the end of the flue gas chambers 2, 60, and a smoke hole is arranged in the flue gas chambers 2, 60 (Fig.
- the flue gas heat radiant tube 14 has one end connected to the intermediate flue gas chamber 100, and the other end of the flue gas heat radiant tube 14 is connected to the flue gas chambers 2, 60, respectively, and two independent combustion chambers 18, 19
- the flue gas chambers 2, 60, the flue gas heat radiant tubes 14 and the intermediate flue gas chambers 100 are respectively connected, and the combustion chamber 18 and the combustion chamber 19 are alternately combusted.
- the metal furnace body 40 has a charging port 11 and a magnesium crystal collector 8 thereon.
- the metal furnace body 40 has a discharge port 15 underneath.
- the space between the metal furnace body 40 and the combustion chambers 18, 19 is a charging chamber, a metal furnace body.
- the surface 40 also has a suspension point 41.
- the metal furnace body 40 has a heat resistant material layer and a heat insulating layer (not shown).
- the metal furnace body 40 has an oscillator 80 for vibrating the metal furnace body 40 to charge more in the furnace body and to heat more uniformly and fully.
- the flue gas chamber 2 and the flue gas chamber 60 are flue gas reversing, abutting the combustion chamber 18 and the combustion chamber 19, and the end faces thereof have a plurality of holes 28 for welding the flue gas heat radiating tubes 14.
- the intermediate flue gas chamber 100 is formed by butt welding two flat head tube sheets, and is fixed at an intermediate position of the outer circle of the furnace, and has a plurality of ends for connecting the flue gas heat radiant tubes 14 . Hole 28.
- the burner 3 is composed of an igniter 31, a fuel inlet 32, a hot flue gas inlet 33, a hot flue gas outlet 34, a burner flange 35, and a flame spout 36; a hot flue gas inlet 43 of the combustor 3
- the hot flue gas outlets 44 are connected to the regenerators 102 of the regenerator heat exchanger and the hot flue gas inlets and the hot flue gas outlets of the heat accumulators 107, respectively.
- the heat storage body heat exchange device is composed of a solenoid valve 101, a heat storage body A (102), a blower 103, a switching valve 104, an induced draft fan 105, a smoke exhaust pipe 106, and a heat storage body B (107).
- the hot flue gas generated in the combustion chamber of the metal furnace 40 enters the regenerator through the hot flue gas outlet 34 of the burner 3, respectively.
- a and the regenerator B under the action of the reversing valve 84, enter the other combustion chamber of the metal furnace body 40 through the hot flue gas inlet 33 of the burner 3, alternately, and function as preheating, combustion assisting, and energy saving.
- the lower end of the crystallization collector 8 is connected to the crystallization collector vacuum tube 85 through a V-shaped quick joint, and the lower end of the crystallization collector vacuum tube 85 is connected to the metal furnace body 40.
- the crystallization collector 8 includes a cooling jacket 81. In the cooling jacket 81, there is a cone crystal sleeve 82. On the cooling jacket 81, there are a cooling water inlet 72, a cooling water outlet 73, a vacuum port 71, and a cooling water inlet 72.
- the water pump is connected, the cooling water outlet 73 is connected to the water tank, the vacuum port 71 is connected to the vacuum pump, the end of the cooling sleeve 81 is also covered with an end cover 84, and the lower end of the cooling sleeve 81 is provided with a cooling sleeve flange 87, a cooling sleeve
- the flange 87 has a wedge face 48 and a truncated cone plug 26.
- the upper end of the crystallization collecting pipe 85 is provided with a collecting pipe flange 88.
- the collecting pipe flange 88 has a wedge face 48 and a truncated cone hole 27, and the V-shaped connecting head 26 and the V-shaped connecting seat 27 is plugged together, and a sealing rubber ring 89 is arranged on the plugging surface between the V-shaped connecting head 26 and the V-shaped connecting seat 27, and after the lower end of the cooling jacket 81 is butted against the upper end of the crystal collector vacuum tube 85, on the wedge surface 48 Fastened together by a V-shaped quick connector.
- the quick locker 6 has a quick lock block 61 having a V-shaped groove 63 and a lock hole 62 on the quick lock block 61, and the V-shaped groove 63 is caught on the wedge face 48, through The wire rope of the manual retractor 38 passes through the locking holes 62 of the quick-locking block to fasten the wedge faces 48 together.
- the traveling mechanism is composed of an I-beam 21, a traveling wheel 22, a channel 23, a lower beam 24, a lifting lug 25 and an electric hoist 10, and the channel 23 is placed on the I-beam 21, on the channel 23
- the electric hoist 10 is connected to the loading mechanism 9 by a wire rope.
- the loading mechanism 9 is composed of a loading hopper 91, a hopper discharge opening 92, a split discharge door 93, a discharge door wire rope 94, and a lifting ring 95.
- the lower end of the loading hopper 91 is a hopper discharge opening 92.
- the discharge port 92 has a split type writing door 93, and both ends of the split discharge door 93 are hinged on the discharge opening 92, and the opposite end of the split discharge door 93 is connected via the discharge door wire rope 94.
- the discharge door wire rope 94 is connected to the electric hoist 10 via a wire rope.
- the discharge door 93 When the wire rope is pulled up, the discharge door 93 is closed.
- the discharge door 93 is automatically opened under the weight of the material, and the material flows into the reduction furnace body 40.
- the loading port 11 has a loading door mechanism 30, and the loading door mechanism 30 is composed of a loading door 59, a loading door fixing frame 58, and an electric actuator 55, and the loading door fixing frame 58 is fixed in the loading.
- the loading door 59 passes The hinge shaft 56 is hinged to the loading door holder 58 and the electric actuator 55 is connected to the rear end of the loading door 59. Under the driving of the electric actuator 55, the loading door 59 is pivoted with the hinge shaft 56 as a center to open and close.
- the feed port 11 has a sealing rubber ring 57 between the loading door 59 and the loading door holder 58.
- a discharge door mechanism 70 at the discharge port 15 there is a discharge door mechanism 70 at the discharge port 15, and the structure and working principle of the discharge door mechanism 70 are the same as those of the feed door mechanism 30.
- Figure 24 is a table showing the relationship between the heat storage preheating combustion air and the fuel economy ratio, wherein the numbers 10 - 70 indicate the combustion energy saving rate %, and the numbers 200 - 1400 indicate the heat storage preheating combustion air temperature.
- C the curve in the figure shows the temperature curve of the flue gas discharged without heat storage.
- the invention is applicable to the heating constant temperature requirement in the heating temperature range of 120CTC and below, the heating, drying, thermal release and thermal decomposition of the hot magnesium smelting and other metal mineral materials, and the atmospheric pressure or vacuum adsorption type according to the process requirements. 0.013/kpa, refining and thermal decomposition of metal magnesium and other negative pressure adsorption reduction processes below 120CTC.
- the furnace adopts coaxial segmented regenerative preheating combustion method, and the furnace is partitioned from one furnace body. Divided into two separate furnaces (two combustion chambers), the two ends are respectively heated by a burner.
- the heating method is the heat absorption and exothermic heating mode of the burner and the regenerator, and the burners are alternately burned, so that the materials in the furnace are heated and heated rapidly to heat up, and the materials in the furnace are utilized with maximum efficiency and high efficiency. Perform uniform heating and heating.
- the invention provides a burner for burning the inside of the furnace (combustion chamber), the combustion chamber radiates, conducts, convects and heats from the inside to the outside, and is provided with external heating to assist combustion, heat storage, recovery of preheating combustion air, and control to achieve high temperature. Low excess air coefficient combustion for optimum combustion heating.
- the combustible gas or fuel is pre-mixed into the combustion chamber through the burner, and is radiated to the surrounding high temperature.
- the high-temperature flue gas generated after the combustion passes through the regenerator and then enters the burner for recycling, and the combustion combustion air and the combustible gas are combusted.
- Preheating heating heating the combustible gas and combustion air from normal temperature to 800-1000 °C, after the exhausted gas is heated by the heat storage body, it becomes i50 °c, and the flue gas is discharged to the outside (traditional old-style grate burning temperature) Up to 1000 — liocrc ) See Figure 24 for a table of the relationship between preheated air temperature and fuel economy.
- the furnace is horizontally mounted and can be discharged obliquely.
- the body part is a split structure, which is composed of a furnace body and a head. Two independent combustion chambers (furnace) are arranged horizontally in the furnace body, and the working mode is alternate.
- the furnace body is also provided with a flue gas chamber communicating with the combustion chamber for exchanging heat, and there are a plurality of flue gas heat radiant tubes communicating with the flue gas chamber around the flue gas chamber, and the two combustion chambers are separated
- the two combustion chambers are connected by a flue gas chamber, a flue gas heat radiant tube and a burner.
- This structure facilitates the installation and removal of internal heating components, lowers the furnace body, loosens the flange fasteners, and replaces new parts or repairs, so that the furnace parts can be used without being scrapped.
- Another feature of the furnace is that it has a cooling and cooling structure in many places to extend the service life of the equipment.
- the working principle of the regenerative burner (shown in Figure 9):
- the normal temperature air from the blower is switched from the reversing valve into the regenerative burner B, after passing through the regenerative burner B (ceramic ball or honeycomb)
- the air is heated to near the furnace temperature in a very short time (generally lower than the furnace temperature by 5 (T100 °C). After the heated high temperature air enters the furnace, the smoke in the surrounding furnace is formed.
- the oxygen content of the strand is much lower than 21% of the lean oxygen-poor high-temperature gas stream, and at the same time, fuel (fuel or gas) is injected near the thin high-temperature air, and the fuel is burned in an oxygen-poor (2-20%) state; at the same time, the furnace
- the hot flue gas after combustion is discharged into the atmosphere through another regenerative burner A.
- the sensible heat is stored in the regenerative burner A, and then The low-temperature flue gas below 150 °C is discharged through the reversing valve.
- the reversing valve with low working temperature is switched at a certain frequency, so that the two regenerative burners are in the state of alternating heat storage and heat release, thereby achieving Energy saving and lowering
- the usual switching period is 30 to 200 seconds.
- the first burner works to heat one combustion chamber
- the other burner does not work
- the hot smoke generated by the heated combustion chamber enters the flue gas chamber for reversal
- the hot smoke also enters the regenerator heat exchange device through the inoperative burner; the reversing valve is reversing, the burning burner When the work stops, the other burner starts to work.
- the hot smoke generated by the other heated combustion chamber enters the flue gas chamber for reversal, and passes through the multi-return flue gas heat radiant tube and the flue gas chamber to give another A non-working burner, while the hot smoke is also passed through the burner that has stopped working into the heat storage heat exchanger, and thus circulates.
- the vacuum jacket is evacuated while the cooling jacket is being cooled during the heating and reduction process. When the reduction is over, remove the end cap on the cooling jacket, take out the crystal sleeve, take out the crystal body (such as magnesium crystal), open the slag door, release the waste residue and transport it away, then install the crystal sleeve, charge, heat, so cycle.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Furnace Details (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/124,251 US9360256B2 (en) | 2011-10-28 | 2012-10-14 | Energy efficient furnace with coaxial segmented center hearth and multiple combustion stages with regenerative heat return |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110335470XA CN102359744A (zh) | 2011-10-28 | 2011-10-28 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
| CN201110335470.X | 2011-10-28 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013060241A1 true WO2013060241A1 (zh) | 2013-05-02 |
Family
ID=45585108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2012/082931 Ceased WO2013060241A1 (zh) | 2011-10-28 | 2012-10-14 | 炉膛同轴分段燃烧炉及其加热方法 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US9360256B2 (zh) |
| CN (1) | CN102359744A (zh) |
| WO (1) | WO2013060241A1 (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105983683A (zh) * | 2015-01-29 | 2016-10-05 | 边仁杰 | 蓄热炉底管 |
| CN107883777A (zh) * | 2017-11-03 | 2018-04-06 | 广东工业大学 | 熔铝炉烟气回收利用系统 |
| CN109443022A (zh) * | 2018-12-14 | 2019-03-08 | 大峘集团有限公司 | 一种用于钢铁厂含铁尘泥处理的推式多层炉装置 |
| CN111928277A (zh) * | 2020-07-12 | 2020-11-13 | 厦门大学嘉庚学院 | 一种陶瓷设计用便于瓷坯取放的环保型烧制炉 |
| CN112756835A (zh) * | 2021-01-29 | 2021-05-07 | 东方电气集团东方锅炉股份有限公司 | 管板对接焊缝堆焊层加工方法 |
| CN115218665A (zh) * | 2022-07-22 | 2022-10-21 | 安徽顺达环保科技股份有限公司 | 一种水泥窑防塌料的分级燃烧脱硝装置及方法 |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102359744A (zh) * | 2011-10-28 | 2012-02-22 | 李恒杰 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
| CN104075745A (zh) * | 2013-03-27 | 2014-10-01 | 上海赫特能源科技有限公司 | 锅炉燃烧试验炉 |
| CN103574591B (zh) * | 2013-11-27 | 2016-03-30 | 陈洁 | 一种双炉体式旋转烧炉 |
| WO2017113162A1 (en) * | 2015-12-30 | 2017-07-06 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Method for injecting fluid-propelled particulate solid fuel and oxidant and injector for same |
| CN105588094B (zh) * | 2016-02-22 | 2018-07-03 | 大震锅炉工业(昆山)有限公司 | 一种带内置蓄热器的烟管废气余热锅炉系统 |
| JP6423102B2 (ja) * | 2016-03-24 | 2018-11-14 | 日本碍子株式会社 | 工業炉及びその熱利用方法 |
| CN113943853B (zh) * | 2021-12-10 | 2022-12-16 | 江西耐乐铜业有限公司 | 一种铜管智能在线退火设备 |
| CN114955907B (zh) * | 2022-05-23 | 2024-11-26 | 中国化学工程第三建设有限公司 | 将合成设备二段炉中的混合器拉出装置和使用方法 |
| CN116659239B (zh) * | 2023-07-31 | 2023-10-13 | 康硕(德阳)智能制造有限公司 | 一种陶瓷件烧结炉 |
| CN118640705B (zh) * | 2024-08-14 | 2024-11-05 | 南通理工学院 | 一种低阶煤热解回转窑用烟气循环载热装置 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB409333A (en) * | 1932-09-27 | 1934-04-27 | Robert Henry Russell | Method and apparatus for creating high temperatures by the combustion of liquid fuels composed of oil and water |
| GB937081A (en) * | 1960-09-22 | 1963-09-18 | Gustavsbergs Fabriker Ab | Improvements in or relating to furnaces for intermittent combustion |
| CN87202383U (zh) * | 1987-02-28 | 1987-10-14 | 高书兰 | 可逆式连续使用型煤炉灶 |
| CN2031503U (zh) * | 1988-03-31 | 1989-01-25 | 沈阳中捷友谊厂 | 双室预热-加热交替循环锻造加热炉 |
| CN101210283A (zh) * | 2006-12-31 | 2008-07-02 | 贵州世纪天元矿业有限公司 | 一种真空金属冶炼蓄热还原炉系统 |
| CN101463995A (zh) * | 2007-12-19 | 2009-06-24 | 北京神雾热能技术有限公司 | 燃用液态燃料的单蓄热式注汽锅炉及其燃烧方法 |
| CN101832708A (zh) * | 2010-04-23 | 2010-09-15 | 浙江大学 | 蓄热浸没式等温熔炼炉 |
| CN102359744A (zh) * | 2011-10-28 | 2012-02-22 | 李恒杰 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
| CN202304386U (zh) * | 2011-10-28 | 2012-07-04 | 李恒杰 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2504379A (en) * | 1947-05-23 | 1950-04-18 | Bloom Frederick Stuart | Regenerative ingot-heating furnace with oil burners |
| US2494415A (en) * | 1947-06-06 | 1950-01-10 | Us Steel Corp Of Delaware | Open-hearth furnace and method of operating the same |
| US3783309A (en) * | 1972-08-07 | 1974-01-01 | Columbia Res Labor Inc | Signal generating device for use with a structure which is subjected to a range of vibrations |
| JPS6042843B2 (ja) * | 1979-07-30 | 1985-09-25 | 東洋エンジニアリング株式会社 | 廃熱ボイラ− |
| JP3719616B2 (ja) * | 1995-12-28 | 2005-11-24 | 日本ファーネス工業株式会社 | 気流炉 |
| DE10233818B4 (de) * | 2002-07-25 | 2007-05-24 | Uhde Gmbh | Abhitzekessel für eine Claus-Anlage |
| JP4348165B2 (ja) * | 2003-11-04 | 2009-10-21 | 大阪瓦斯株式会社 | 回転式坩堝炉 |
| JP2009216359A (ja) * | 2008-03-12 | 2009-09-24 | Toho Gas Co Ltd | 加熱炉 |
| CN101457305B (zh) * | 2008-12-31 | 2011-01-12 | 邓小宝 | 双燃双热蓄热式炉罐一体化还原炉系统 |
-
2011
- 2011-10-28 CN CN201110335470XA patent/CN102359744A/zh active Pending
-
2012
- 2012-10-14 US US14/124,251 patent/US9360256B2/en not_active Expired - Fee Related
- 2012-10-14 WO PCT/CN2012/082931 patent/WO2013060241A1/zh not_active Ceased
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB409333A (en) * | 1932-09-27 | 1934-04-27 | Robert Henry Russell | Method and apparatus for creating high temperatures by the combustion of liquid fuels composed of oil and water |
| GB937081A (en) * | 1960-09-22 | 1963-09-18 | Gustavsbergs Fabriker Ab | Improvements in or relating to furnaces for intermittent combustion |
| CN87202383U (zh) * | 1987-02-28 | 1987-10-14 | 高书兰 | 可逆式连续使用型煤炉灶 |
| CN2031503U (zh) * | 1988-03-31 | 1989-01-25 | 沈阳中捷友谊厂 | 双室预热-加热交替循环锻造加热炉 |
| CN101210283A (zh) * | 2006-12-31 | 2008-07-02 | 贵州世纪天元矿业有限公司 | 一种真空金属冶炼蓄热还原炉系统 |
| CN101463995A (zh) * | 2007-12-19 | 2009-06-24 | 北京神雾热能技术有限公司 | 燃用液态燃料的单蓄热式注汽锅炉及其燃烧方法 |
| CN101832708A (zh) * | 2010-04-23 | 2010-09-15 | 浙江大学 | 蓄热浸没式等温熔炼炉 |
| CN102359744A (zh) * | 2011-10-28 | 2012-02-22 | 李恒杰 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
| CN202304386U (zh) * | 2011-10-28 | 2012-07-04 | 李恒杰 | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105983683A (zh) * | 2015-01-29 | 2016-10-05 | 边仁杰 | 蓄热炉底管 |
| CN107883777A (zh) * | 2017-11-03 | 2018-04-06 | 广东工业大学 | 熔铝炉烟气回收利用系统 |
| CN107883777B (zh) * | 2017-11-03 | 2024-04-02 | 广东工业大学 | 熔铝炉烟气回收利用系统 |
| CN109443022A (zh) * | 2018-12-14 | 2019-03-08 | 大峘集团有限公司 | 一种用于钢铁厂含铁尘泥处理的推式多层炉装置 |
| CN109443022B (zh) * | 2018-12-14 | 2024-01-05 | 大峘集团有限公司 | 一种用于钢铁厂含铁尘泥处理的推式多层炉装置 |
| CN111928277A (zh) * | 2020-07-12 | 2020-11-13 | 厦门大学嘉庚学院 | 一种陶瓷设计用便于瓷坯取放的环保型烧制炉 |
| CN111928277B (zh) * | 2020-07-12 | 2022-07-12 | 厦门大学嘉庚学院 | 一种陶瓷设计用便于瓷坯取放的环保型烧制炉 |
| CN112756835A (zh) * | 2021-01-29 | 2021-05-07 | 东方电气集团东方锅炉股份有限公司 | 管板对接焊缝堆焊层加工方法 |
| CN112756835B (zh) * | 2021-01-29 | 2022-10-28 | 东方电气集团东方锅炉股份有限公司 | 管板对接焊缝堆焊层加工方法 |
| CN115218665A (zh) * | 2022-07-22 | 2022-10-21 | 安徽顺达环保科技股份有限公司 | 一种水泥窑防塌料的分级燃烧脱硝装置及方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| US9360256B2 (en) | 2016-06-07 |
| US20140127636A1 (en) | 2014-05-08 |
| CN102359744A (zh) | 2012-02-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2013060241A1 (zh) | 炉膛同轴分段燃烧炉及其加热方法 | |
| WO2013060242A1 (zh) | 悬挂式立卧两用还原炉及其加热方法 | |
| CN102963890B (zh) | 一种炭化活化一体炉 | |
| CN102251094B (zh) | 燃烧低热值煤气的蓄热式均热炉 | |
| CN202419651U (zh) | 多流股二级燃烧、高温低氧、低NOx组合式蓄热烧嘴 | |
| CN106967448B (zh) | 一种干熄焦系统耐材大面积更换后的烘炉方法 | |
| CN201364022Y (zh) | 中心回燃内热蓄热式节能高效炉罐一体化还原炉系统 | |
| CN104566339B (zh) | 一种生物质气化燃烧机 | |
| CN204806401U (zh) | 蓄热式燃烧装置 | |
| CN102275927A (zh) | 燃气电弧双热式蓄热余热废气回燃环保节能高效炼硅炉 | |
| CN202008289U (zh) | 辊道式环保脱硝催化剂脱脂煅烧炉 | |
| CN104261484B (zh) | 一种铁鳞氧化处理设备 | |
| CN208472142U (zh) | 一种炼钢设备 | |
| CN108624739B (zh) | 一种用废钢炼钢的炼钢设备和冶炼方法 | |
| CN104848220B (zh) | 蓄热式燃烧装置 | |
| CN105948048B (zh) | 节能环保型二硫化碳气化反应炉 | |
| CN202304386U (zh) | 炉膛同轴分段燃烧中心回燃多回程蓄热节能炉 | |
| CN202175560U (zh) | 燃气电弧双热式蓄热余热废气回燃环保节能高效炼硅炉 | |
| CN102965523A (zh) | 中心加热还原炉 | |
| CN201116834Y (zh) | 一种高温空气低氧燃烧的立式镁还原炉 | |
| CN202885517U (zh) | 一种双面加热熔铝炉系统 | |
| CN202116623U (zh) | 燃烧低热值煤气的蓄热式均热炉 | |
| RU2657948C1 (ru) | Отражательная печь для переплава алюминиевого лома | |
| CN201522185U (zh) | 燃气冲天炉 | |
| CN202350504U (zh) | 悬挂式自下料立卧两用蓄热节能还原炉 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12843044 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14124251 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 14/08/2014) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 12843044 Country of ref document: EP Kind code of ref document: A1 |