WO2012054139A3 - Procédés d'établissement de réseau de fractures souterrain - Google Patents
Procédés d'établissement de réseau de fractures souterrain Download PDFInfo
- Publication number
- WO2012054139A3 WO2012054139A3 PCT/US2011/049579 US2011049579W WO2012054139A3 WO 2012054139 A3 WO2012054139 A3 WO 2012054139A3 US 2011049579 W US2011049579 W US 2011049579W WO 2012054139 A3 WO2012054139 A3 WO 2012054139A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- reservoir
- fractures
- fracture network
- network
- create
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/006—Measuring wall stresses in the borehole
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Abstract
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2011318546A AU2011318546A1 (en) | 2010-10-20 | 2011-08-29 | Methods for establishing a subsurface fracture network |
| DE112011103548T DE112011103548T5 (de) | 2010-10-20 | 2011-08-29 | Verfahren zum Erzeugen eines Untergrund-Rissnetzwerks |
| US13/825,796 US20130220604A1 (en) | 2010-10-20 | 2011-08-29 | Methods For Establishing A Subsurface Fracture Network |
| CA2814750A CA2814750A1 (fr) | 2010-10-20 | 2011-08-29 | Procedes d'etablissement de reseau de fractures souterrain |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US40506910P | 2010-10-20 | 2010-10-20 | |
| US61/405,069 | 2010-10-20 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2012054139A2 WO2012054139A2 (fr) | 2012-04-26 |
| WO2012054139A3 true WO2012054139A3 (fr) | 2014-03-20 |
Family
ID=45975799
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2011/049579 Ceased WO2012054139A2 (fr) | 2010-10-20 | 2011-08-29 | Procédés d'établissement de réseau de fractures souterrain |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20130220604A1 (fr) |
| AU (1) | AU2011318546A1 (fr) |
| CA (1) | CA2814750A1 (fr) |
| DE (1) | DE112011103548T5 (fr) |
| WO (1) | WO2012054139A2 (fr) |
Families Citing this family (37)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2014028432A1 (fr) * | 2012-08-13 | 2014-02-20 | Schlumberger Canada Limited | Compétition entre des fractures hydrauliques transversales et axiales dans un puits horizontal |
| CA2884071A1 (fr) * | 2012-09-10 | 2014-03-13 | Schlumberger Canada Limited | Procede de fracturation transversale d'une formation souterraine |
| MX2015004345A (es) * | 2012-10-04 | 2015-06-10 | Nexen Energy Ulc | Proceso mejorado de fracturacion hidraulica para pozos desviados. |
| WO2014163853A2 (fr) * | 2013-03-13 | 2014-10-09 | Exxonmobil Upstream Research Company | Production d'hydrocarbures à partir d'une formation |
| GB2512122B (en) * | 2013-03-21 | 2015-12-30 | Statoil Petroleum As | Increasing hydrocarbon recovery from reservoirs |
| CA2820742A1 (fr) * | 2013-07-04 | 2013-09-20 | IOR Canada Ltd. | Procede ameliore de recuperation des hydrocarbures exploitant plusieurs fractures induites |
| US9719338B2 (en) * | 2013-09-05 | 2017-08-01 | Halliburton Energy Services, Inc. | Determining fracturing rheological behavior of fracturing fluids |
| CA2863764A1 (fr) * | 2013-09-19 | 2015-03-19 | Shell Internationale Research Maatschappij B.V. | Procede de stimulation progressive |
| WO2015089458A1 (fr) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Création de fentes radiales dans un puits de forage |
| US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
| US9617839B2 (en) | 2014-05-28 | 2017-04-11 | Exxonmobil Upstream Research Company | Method of forming directionally controlled wormholes in a subterranean formation |
| US10738577B2 (en) | 2014-07-22 | 2020-08-11 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
| US10001613B2 (en) * | 2014-07-22 | 2018-06-19 | Schlumberger Technology Corporation | Methods and cables for use in fracturing zones in a well |
| WO2016069977A1 (fr) | 2014-10-30 | 2016-05-06 | Schlumberger Canada Limited | Création de fentes radiales dans une formation souterraine |
| CA2887292A1 (fr) * | 2015-04-02 | 2016-10-02 | Nexen Energy Ulc | Procedes de fracturation hydraulique |
| US10012064B2 (en) * | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
| US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
| US20160326853A1 (en) * | 2015-05-08 | 2016-11-10 | Schlumberger Technology Corporation | Multiple wellbore perforation and stimulation |
| WO2016198894A2 (fr) | 2015-06-10 | 2016-12-15 | Ikon Science Innovation Limited | Procédé et appareil pour l'analyse de réservoirs et conception de fracture dans une couche de roche |
| US10364672B2 (en) * | 2016-03-28 | 2019-07-30 | Baker Hughes, A Ge Company, Llc | Completion optimization process based on acoustic logging data in the lateral section in a horizontal well |
| US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
| US12104828B2 (en) * | 2017-03-24 | 2024-10-01 | The Johns Hopkins University | Coiled tubing for radiator enhanced geothermal system |
| CN107228656B (zh) * | 2017-07-19 | 2023-05-09 | 中国电建集团中南勘测设计研究院有限公司 | 用于监测裂缝三向变形的组件及监测方法 |
| US20190249527A1 (en) * | 2018-02-09 | 2019-08-15 | Crestone Peak Resources | Simultaneous Fracturing Process |
| CN112012709B (zh) * | 2019-05-30 | 2022-11-04 | 新奥科技发展有限公司 | 一种地热生产井及地热层多级压裂方法 |
| US10934825B2 (en) * | 2019-06-28 | 2021-03-02 | Halliburton Energy Services, Inc. | Pressurizing and protecting a parent well during fracturing of a child well |
| CN113027404B (zh) * | 2019-12-09 | 2022-10-04 | 中国石油天然气股份有限公司 | 一种径向多分支井诱导裂缝定向压裂方法 |
| WO2021151120A1 (fr) * | 2020-01-24 | 2021-07-29 | Fu Xuebing | Procédés de production de pétrole de réservoir étanche par récupération secondaire |
| CN113586020A (zh) * | 2020-04-30 | 2021-11-02 | 中国石油化工股份有限公司 | 径向井结合二氧化碳压裂的直井体积压裂方法及系统 |
| CN113622889B (zh) * | 2020-05-07 | 2024-04-05 | 新疆宝成信能源技术有限公司 | 径向井体积压裂方法 |
| CN114086935B (zh) * | 2020-08-05 | 2024-05-07 | 中国石油化工股份有限公司 | 地热系统热储压裂缝网设计方法、装置以及存储介质 |
| CN115142828B (zh) * | 2021-03-31 | 2025-02-14 | 中国石油化工股份有限公司 | 水平井分段压裂模拟井筒、其实验装置及实验方法 |
| CN113982571B (zh) * | 2021-08-27 | 2023-09-22 | 中国石油大学(北京) | 一种致密储层压裂受效区评价方法 |
| CN114278257B (zh) * | 2021-12-24 | 2023-12-15 | 中海石油(中国)有限公司 | 海上油田开采与超临界二氧化碳封存的同步装置与方法 |
| US12247470B1 (en) | 2024-06-20 | 2025-03-11 | Mazama Energy, Inc. | Enhancing connectivity between injector and producer wells using sequenced stimulation |
| US12305893B1 (en) | 2024-06-20 | 2025-05-20 | Mazama Energy, Inc. | Systems and processes for stimulating subterranean geologic formations |
| CN120440497B (zh) * | 2025-07-09 | 2025-10-17 | 中国煤炭地质总局勘查研究总院 | 一种co2-高盐水协同封存装置及封存方法 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3965993A (en) * | 1974-09-20 | 1976-06-29 | Schlumberger Technology Corporation | Well bore perforating apparatus |
| US5884715A (en) * | 1997-08-01 | 1999-03-23 | Reddoch; Jeffrey | Method and apparatus for injecting drilling waste into a well while drilling |
| US6318469B1 (en) * | 1999-02-09 | 2001-11-20 | Schlumberger Technology Corp. | Completion equipment having a plurality of fluid paths for use in a well |
| US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
| US20080083531A1 (en) * | 2006-10-10 | 2008-04-10 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
| US20080087420A1 (en) * | 2006-10-13 | 2008-04-17 | Kaminsky Robert D | Optimized well spacing for in situ shale oil development |
| US20090260828A1 (en) * | 2008-04-16 | 2009-10-22 | Gregory Kubala | Use of Carbon-Dioxide-Based Fracturing Fluids |
| US7784545B2 (en) * | 2004-05-14 | 2010-08-31 | Maguire James Q | In-situ method of fracturing gas shale and geothermal areas |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4724905A (en) | 1986-09-15 | 1988-02-16 | Mobil Oil Corporation | Sequential hydraulic fracturing |
| US4830106A (en) | 1987-12-29 | 1989-05-16 | Mobil Oil Corporation | Simultaneous hydraulic fracturing |
| US5111881A (en) | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
| US7946340B2 (en) | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
| US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
| US20100132946A1 (en) * | 2008-12-01 | 2010-06-03 | Matthew Robert George Bell | Method for the Enhancement of Injection Activities and Stimulation of Oil and Gas Production |
| US8631872B2 (en) * | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
-
2011
- 2011-08-29 CA CA2814750A patent/CA2814750A1/fr not_active Abandoned
- 2011-08-29 US US13/825,796 patent/US20130220604A1/en not_active Abandoned
- 2011-08-29 AU AU2011318546A patent/AU2011318546A1/en not_active Abandoned
- 2011-08-29 WO PCT/US2011/049579 patent/WO2012054139A2/fr not_active Ceased
- 2011-08-29 DE DE112011103548T patent/DE112011103548T5/de not_active Withdrawn
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3965993A (en) * | 1974-09-20 | 1976-06-29 | Schlumberger Technology Corporation | Well bore perforating apparatus |
| US5884715A (en) * | 1997-08-01 | 1999-03-23 | Reddoch; Jeffrey | Method and apparatus for injecting drilling waste into a well while drilling |
| US6318469B1 (en) * | 1999-02-09 | 2001-11-20 | Schlumberger Technology Corp. | Completion equipment having a plurality of fluid paths for use in a well |
| US7784545B2 (en) * | 2004-05-14 | 2010-08-31 | Maguire James Q | In-situ method of fracturing gas shale and geothermal areas |
| US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
| US20080083531A1 (en) * | 2006-10-10 | 2008-04-10 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
| US20080087420A1 (en) * | 2006-10-13 | 2008-04-17 | Kaminsky Robert D | Optimized well spacing for in situ shale oil development |
| US20090260828A1 (en) * | 2008-04-16 | 2009-10-22 | Gregory Kubala | Use of Carbon-Dioxide-Based Fracturing Fluids |
Also Published As
| Publication number | Publication date |
|---|---|
| DE112011103548T5 (de) | 2013-08-08 |
| WO2012054139A2 (fr) | 2012-04-26 |
| CA2814750A1 (fr) | 2012-04-26 |
| AU2011318546A1 (en) | 2013-05-30 |
| US20130220604A1 (en) | 2013-08-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2012054139A3 (fr) | Procédés d'établissement de réseau de fractures souterrain | |
| GB2506793A (en) | System and method for performing wellbore fracture operations | |
| WO2008048455A3 (fr) | Production renforcée de l'huile de schiste par chauffage in situ par des puits en production hydrauliquement fracturés | |
| MX2017015001A (es) | Fracturacion de caudal bajo inducida termicamente. | |
| WO2009032924A3 (fr) | Procédé et système d'augmentation de la production d'un réservoir à l'aide de puits latéraux | |
| WO2009077715A3 (fr) | Stimulation par fracturation durant le forage | |
| WO2014163853A3 (fr) | Production d'hydrocarbures à partir d'une formation | |
| WO2012058027A3 (fr) | Procédé et système de fracturation d'une formation | |
| WO2008112837A3 (fr) | Contrôle de l'initiation et de la propagation d'une fracture hydraulique dans des sédiments faiblement consolidés et non consolidés | |
| WO2007100956A3 (fr) | Controle de l'amorçage et de la propagation de fractures hydrauliques verticales dans des sediments non consolides et faiblement cimentes | |
| WO2013164478A3 (fr) | Méthode de forage d'un puits de forage souterrain | |
| MX2010003218A (es) | Metodo para completar depositos de petroleo y gas hermeticos. | |
| WO2010020747A3 (fr) | Procédé de stimulation à débit élevé destiné à la réalisation de grands trous profonds | |
| MX2012001983A (es) | Metodo de perforacion de un pozo subterraneo. | |
| GB2450829A (en) | Perforating and fracturing | |
| WO2009134669A3 (fr) | Procédé d’analyse de récupération d'hydrocarbures | |
| EA201592153A1 (ru) | Система для гидравлического разрыва подземного пласта | |
| WO2011010113A3 (fr) | Procédé pour induire une complexité de fracture dans des réalisations de puits horizontal fracturé hydrauliquement | |
| WO2008048454A3 (fr) | Mise en valeur combinée de schistes bitumineux par chauffage in situ avec une ressource d'hydrocarbures plus profonde | |
| WO2010092352A3 (fr) | Procédé et appareil pour la stimulation dans une pluralité de zones | |
| MX2014001022A (es) | Aparato y metodos para recuperacion de hidrocarburos. | |
| GB2464003B (en) | System and method for performing oilfield simulation operations | |
| WO2007112175A3 (fr) | Amorçage d'une fracture hydraulique et controle de sa propagation dans des sediments non consolides et faiblement cimentes | |
| MX370614B (es) | Produccion de hidrocarburos. | |
| WO2013043663A3 (fr) | Puits d'observation et de production à double usage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11834792 Country of ref document: EP Kind code of ref document: A2 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13825796 Country of ref document: US |
|
| ENP | Entry into the national phase |
Ref document number: 2814750 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1120111035489 Country of ref document: DE Ref document number: 112011103548 Country of ref document: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2011318546 Country of ref document: AU Date of ref document: 20110829 Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11834792 Country of ref document: EP Kind code of ref document: A2 |