[go: up one dir, main page]

WO2011110802A8 - Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ - Google Patents

Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ Download PDF

Info

Publication number
WO2011110802A8
WO2011110802A8 PCT/GB2011/000302 GB2011000302W WO2011110802A8 WO 2011110802 A8 WO2011110802 A8 WO 2011110802A8 GB 2011000302 W GB2011000302 W GB 2011000302W WO 2011110802 A8 WO2011110802 A8 WO 2011110802A8
Authority
WO
WIPO (PCT)
Prior art keywords
flow patterns
methods relating
modifying flow
situ
barriers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/GB2011/000302
Other languages
English (en)
Other versions
WO2011110802A1 (fr
Inventor
Mohamed Y. Soliman
Robert F. Shelley
Loyd E. East
Alvin S. Cullick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to CA2790891A priority Critical patent/CA2790891C/fr
Priority to EP11710535A priority patent/EP2545139A1/fr
Priority to AU2011225933A priority patent/AU2011225933B2/en
Priority to MX2012010431A priority patent/MX2012010431A/es
Publication of WO2011110802A1 publication Critical patent/WO2011110802A1/fr
Anticipated expiration legal-status Critical
Publication of WO2011110802A8 publication Critical patent/WO2011110802A8/fr
Ceased legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/58Compositions for enhanced recovery methods for obtaining hydrocarbons, i.e. for improving the mobility of the oil, e.g. displacing fluids
    • C09K8/588Compositions for enhanced recovery methods for obtaining hydrocarbons, i.e. for improving the mobility of the oil, e.g. displacing fluids characterised by the use of specific polymers
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • C09K8/84Compositions based on water or polar solvents
    • C09K8/86Compositions based on water or polar solvents containing organic compounds
    • C09K8/88Compositions based on water or polar solvents containing organic compounds macromolecular compounds

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Sealing Material Composition (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

L'invention concerne l'utilisation d'une source de fluide dans une formation souterraine; l'utilisation d'un puits de forage dans la formation souterraine; et l'utilisation d'une barrière in situ. Selon l'invention, la barrière in situ est disposée dans l'environnement souterrain et modifie la configuration d'écoulement d'au moins un fluide dans la formation souterraine qui est fourni par la source de fluide et s'écoule vers le puits de forage.
PCT/GB2011/000302 2010-03-10 2011-03-04 Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ Ceased WO2011110802A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CA2790891A CA2790891C (fr) 2010-03-10 2011-03-04 Procedes relatifs a la modification de configurations d'ecoulement utilisant des barrieres in situ
EP11710535A EP2545139A1 (fr) 2010-03-10 2011-03-04 Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ
AU2011225933A AU2011225933B2 (en) 2010-03-10 2011-03-04 Methods relating to modifying flow patterns using in-situ barriers
MX2012010431A MX2012010431A (es) 2010-03-10 2011-03-04 Metodos relacionados con la modificacion de patrones de flujo utilizando barreras in-situ.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/720,736 US20110220359A1 (en) 2010-03-10 2010-03-10 Methods Relating to Modifying Flow Patterns Using In-Situ Barriers
US12/720,736 2010-03-10

Publications (2)

Publication Number Publication Date
WO2011110802A1 WO2011110802A1 (fr) 2011-09-15
WO2011110802A8 true WO2011110802A8 (fr) 2012-10-18

Family

ID=43919914

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2011/000302 Ceased WO2011110802A1 (fr) 2010-03-10 2011-03-04 Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ

Country Status (7)

Country Link
US (1) US20110220359A1 (fr)
EP (1) EP2545139A1 (fr)
AR (1) AR080474A1 (fr)
AU (1) AU2011225933B2 (fr)
CA (1) CA2790891C (fr)
MX (1) MX2012010431A (fr)
WO (1) WO2011110802A1 (fr)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8967276B2 (en) 2012-01-18 2015-03-03 Baker Hughes Incorporated Non-ballistic tubular perforating system and method
US20140054050A1 (en) * 2012-08-24 2014-02-27 Halliburton Energy Services, Inc. Gas Fracture Injection to Overcome Retrograde Condensation in Gas Wells
CA2881111C (fr) 2012-08-27 2018-07-03 Halliburton Energy Services, Inc. Garniture assemblee d'element de vanne de securite annulaire
US10093770B2 (en) 2012-09-21 2018-10-09 Schlumberger Technology Corporation Supramolecular initiator for latent cationic epoxy polymerization
EP2738349B1 (fr) * 2012-11-30 2015-09-02 Maersk Olie Og Gas A/S Dispositif d'étanchéité et procédé d'obturation de fractures ou de fuites dans un mur entourant un canal en forme de tube
US20150308221A1 (en) * 2012-11-30 2015-10-29 Maersk Olie Og Gas A/S Method of providing a barrier in a fracture-containing system
CN103113871B (zh) * 2013-01-15 2016-12-28 中国石油天然气股份有限公司 中高温油田注水井调剖用选堵球及其制备方法与应用
CN104059307A (zh) * 2013-03-19 2014-09-24 河北科信特种橡塑有限公司 遇海水膨胀橡胶止水条的材料质量配方比及其生产工艺
US9605519B2 (en) 2013-07-24 2017-03-28 Baker Hughes Incorporated Non-ballistic tubular perforating system and method
US9441455B2 (en) 2013-09-27 2016-09-13 Baker Hughes Incorporated Cement masking system and method thereof
US9410398B2 (en) 2013-09-27 2016-08-09 Baker Hughes Incorporated Downhole system having compressable and expandable member to cover port and method of displacing cement using member
US9739129B2 (en) * 2014-01-21 2017-08-22 Montana Emergent Technologies, Inc. Methods for increased hydrocarbon recovery through mineralization sealing of hydraulically fractured rock followed by refracturing
US9617839B2 (en) * 2014-05-28 2017-04-11 Exxonmobil Upstream Research Company Method of forming directionally controlled wormholes in a subterranean formation
MX2017008756A (es) * 2015-03-26 2017-11-17 Halliburton Energy Services Inc Metodos y composiciones para reducir la produccion de agua en vacios o fracturas en las formaciones subterraneas.
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) * 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10309207B2 (en) * 2015-10-02 2019-06-04 Halliburton Energy Services, Inc. Methods of controlling well bashing
US10519757B2 (en) * 2016-02-09 2019-12-31 Frank Thomas Graff, JR. Multi-directional enhanced oil recovery (MEOR) method
US10066469B2 (en) * 2016-02-09 2018-09-04 Frank Thomas Graff Multi-directional enhanced oil recovery (MEOR) method
US10035946B2 (en) * 2016-02-23 2018-07-31 Ecolab Usa Inc. Hydrazide crosslinked polymer emulsions for use in crude oil recovery
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
CN110240836B (zh) * 2018-03-09 2022-02-01 浙江省化工研究院有限公司 一种氟碳防腐涂料
US10844274B2 (en) * 2018-04-17 2020-11-24 University Of Wyoming Organic acid-based enhanced waterflooding
CN109897554B (zh) * 2018-06-27 2021-01-12 湖北工业大学 纤维素纳米晶改性装配式外墙板拼接缝粘结密封材料
CN111101936B (zh) * 2019-12-30 2023-06-30 中国地质大学(武汉) 一种模拟垮塌堆积储集体底水驱动采油的实验装置
US12286584B2 (en) 2021-11-30 2025-04-29 Saudi Arabian Oil Company High-performance primary emulsifier for invert-emulsion oil based mud
US20250101289A1 (en) * 2023-09-25 2025-03-27 Saudi Arabian Oil Company Water shut-off materials and methods thereof
US12428913B1 (en) * 2024-03-26 2025-09-30 Saudi Arabian Oil Company Systems and methods for conformance control of a wellbore

Family Cites Families (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3342261A (en) * 1965-04-30 1967-09-19 Union Oil Co Method for recovering oil from subterranean formations
US3385367A (en) * 1966-12-07 1968-05-28 Kollsman Paul Sealing device for perforated well casing
US3902556A (en) * 1973-12-26 1975-09-02 Texaco Inc Secondary oil recovery method
US6328106B1 (en) * 1999-02-04 2001-12-11 Halliburton Energy Services, Inc. Sealing subterranean zones
FR2809743B1 (fr) * 2000-06-06 2006-08-18 Inst Francais Du Petrole Fluide de puits a base d'huile comprenant un systeme emulsifiant stable en temperature et non polluant
NO312478B1 (no) * 2000-09-08 2002-05-13 Freyer Rune Fremgangsmåte for å tette ringrom ved oljeproduksjon
US6476169B1 (en) * 2000-09-28 2002-11-05 Halliburton Energy Services, Inc. Methods of reducing subterranean formation water permeability
MY135121A (en) * 2001-07-18 2008-02-29 Shell Int Research Wellbore system with annular seal member
US6832651B2 (en) * 2002-08-29 2004-12-21 Halliburton Energy Services, Inc. Cement composition exhibiting improved resilience/toughness and method for using same
US7647970B2 (en) * 2002-11-08 2010-01-19 Bj Services Company Self-sealing well cement composition
US7759292B2 (en) * 2003-05-16 2010-07-20 Halliburton Energy Services, Inc. Methods and compositions for reducing the production of water and stimulating hydrocarbon production from a subterranean formation
US7032663B2 (en) * 2003-06-27 2006-04-25 Halliburton Energy Services, Inc. Permeable cement and sand control methods utilizing permeable cement in subterranean well bores
AU2004260885B2 (en) * 2003-07-29 2007-11-08 Swellfix Uk Limited System for sealing a space in a wellbore
US7607482B2 (en) * 2005-09-09 2009-10-27 Halliburton Energy Services, Inc. Settable compositions comprising cement kiln dust and swellable particles
US7114568B2 (en) * 2004-04-15 2006-10-03 Halliburton Energy Services, Inc. Hydrophobically modified polymers for a well completion spacer fluid
NO325434B1 (no) 2004-05-25 2008-05-05 Easy Well Solutions As Fremgangsmate og anordning for a ekspandere et legeme under overtrykk
US7690429B2 (en) * 2004-10-21 2010-04-06 Halliburton Energy Services, Inc. Methods of using a swelling agent in a wellbore
MY143661A (en) * 2004-11-18 2011-06-30 Shell Int Research Method of sealing an annular space in a wellbore
US7708081B2 (en) * 2004-12-15 2010-05-04 Shell Oil Company Wellbore system extending through a salt layer
US7870903B2 (en) * 2005-07-13 2011-01-18 Halliburton Energy Services Inc. Inverse emulsion polymers as lost circulation material
US8453746B2 (en) * 2006-04-20 2013-06-04 Halliburton Energy Services, Inc. Well tools with actuators utilizing swellable materials
US7717180B2 (en) * 2006-06-29 2010-05-18 Halliburton Energy Services, Inc. Swellable elastomers and associated methods
US7520327B2 (en) * 2006-07-20 2009-04-21 Halliburton Energy Services, Inc. Methods and materials for subterranean fluid forming barriers in materials surrounding wells
US7640982B2 (en) * 2007-08-01 2010-01-05 Halliburton Energy Services, Inc. Method of injection plane initiation in a well
EP2071003A1 (fr) * 2007-12-12 2009-06-17 Services Pétroliers Schlumberger Composition de compression pour la restauration d'isolation

Also Published As

Publication number Publication date
CA2790891A1 (fr) 2011-09-15
WO2011110802A1 (fr) 2011-09-15
AR080474A1 (es) 2012-04-11
AU2011225933B2 (en) 2014-02-06
US20110220359A1 (en) 2011-09-15
CA2790891C (fr) 2015-11-24
AU2011225933A1 (en) 2012-09-06
MX2012010431A (es) 2012-10-01
EP2545139A1 (fr) 2013-01-16

Similar Documents

Publication Publication Date Title
WO2011110802A8 (fr) Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ
BR112012013850A2 (pt) método de realizar manutenção em um furo de poço, ferramenta de controle de fluxo de fluido e método de recuperação de hidrocarbonetos a partir de uma formação subterrânea
MX2013010316A (es) Reticuladores para fluido de fracturacion hidraulica.
IN2014DN00219A (fr)
MX2016005898A (es) Modelado de interaccion de fracturas hidraulicas en redes de fracturas complejas.
BR112014005479A2 (pt) método para perfilagem de uma formação, e, método para perfilagem de poço de formações de subsuperfície penetradas por um furo de poço
AU2012294881A1 (en) Methods for monitoring fluids within or produced from a subterranean formation during fracturing operations using opticoanalytical devices
BRPI1011890A8 (pt) métodos para operar um furo de poço, para produzir fluidos a partir de um furo de poço, para produzir fluidos a partir de um poço, para formar um poço em uma formação subterrânea, e para instalar equipamento de furo abaixo em um furo de poço
GB2499172A (en) Method for combined cleaning and plugging in a well, a washing tool for directional washing in a well, and uses thereof
WO2011150048A3 (fr) Système de complétion intelligente pour puits de forage à portée étendue
BRPI1011091A2 (pt) método para bloquear fluxo de fluido através de uma via em formação subterrânea penetrada por um furo de poço, e método para tratar circulação perdida em um poço, em uma formação subterrânea penetrada por um furo de poço.
WO2013154420A3 (fr) Appareil et procédé permettant de réguler à distance un écoulement de fluide dans des tiges tubulaires et un espace annulaire de trou de forage
EA201490168A1 (ru) Способ разработки газоносных и низкопроницаемых угольных пластов
MY184972A (en) Wellbore servicing compositions and methods of making and using same
BRPI1010526A2 (pt) método para estimar propriedades de fluidos em formações rochosas, em locais geodésicos selecionados dentro de uma bacia geológica
MX2015009123A (es) Composiciones para el mantenimiento de pozos y metodos para fabricarlas y utilizarlas.
WO2012125933A3 (fr) Appareil déflecteur de fracture hydraulique et procédé associé
WO2011143639A3 (fr) Matériaux et méthodes d'obstruction temporaire de parties de puits de forage
WO2009006526A3 (fr) Système et procédé pour réaliser des opérations de simulation de champ pétrolifère
WO2013040427A3 (fr) Procédés d'utilisation de fluides oléagineux pour des opérations de complétion
BR112015011635A2 (pt) método para deslocar um fluido de perfuração e para avaliar um fluido espaçador, e, fluido espaçador consolidante
EA201391118A1 (ru) Системы и способы усовершенствованного доступа скважины к подземным пластам
WO2012012098A8 (fr) Procédé d'estimation et d'optimisation in situ du fluide lors d'opérations de déplacement dans un puits de forage
WO2012106623A3 (fr) Procédé d'atténuation de corrosion à l'aide d'additifs à base de nanoparticules
MX356781B (es) Proceso para fracturar un pozo.

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11710535

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011225933

Country of ref document: AU

ENP Entry into the national phase

Ref document number: 2790891

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2011710535

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2011225933

Country of ref document: AU

Date of ref document: 20110304

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: MX/A/2012/010431

Country of ref document: MX