WO2011072438A1 - Procédé, dispositif et système de traitement de sortie de zone locale dans un scénario de serveur proxy d'interfonctionnement - Google Patents
Procédé, dispositif et système de traitement de sortie de zone locale dans un scénario de serveur proxy d'interfonctionnement Download PDFInfo
- Publication number
- WO2011072438A1 WO2011072438A1 PCT/CN2009/075561 CN2009075561W WO2011072438A1 WO 2011072438 A1 WO2011072438 A1 WO 2011072438A1 CN 2009075561 W CN2009075561 W CN 2009075561W WO 2011072438 A1 WO2011072438 A1 WO 2011072438A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pcc
- lbo
- response message
- iwp
- hpcrf
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W8/00—Network data management
- H04W8/02—Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks
- H04W8/08—Mobility data transfer
- H04W8/082—Mobility data transfer for traffic bypassing of mobility servers, e.g. location registers, home PLMNs or home agents
Definitions
- the present invention relates to the field of communications technologies, and in particular, to a LB0 processing method, apparatus, and system in an IWP scenario. Background of the invention
- the core network of the wireless evolution network mainly includes three logical functions: a mobility management entity (MME, Mobility Management Entity), a service gateway (S-GW, a Serving Gateway), and a packet data gateway (P_GW, Packet Data Network Gateway), among which
- MME mobility management entity
- S-GW service gateway
- P_GW packet data gateway
- the MME is responsible for encrypting NAS signaling and NAS signaling with the user equipment (UE, User Equipment), assigning temporary identity to the UE, and selecting core network elements such as S-GW and P-GW to provide roaming, tracking, and security. And so on, it corresponds to the control plane part of the SGSN inside the current UMTS system.
- the S-GW is a mobility anchor that switches between local E-UTRAN base stations (eNBs, E-UTRAN Nodes) and provides lawful interception related functions; the P-GW is responsible for user address allocation, policy control, and enforcement of charging rules. And legal listening related functions.
- the Home Subscriber Server (HSS) is used to store subscription information of users.
- the Policy Charging Rule Function (PCRF) provides policy and charging control rules.
- the S-GW and the P-GW are UEs via a core network and a packet data network (PDN, Packet Data).
- PDN Packet Data
- the S-GW and the P-GW belong to the same public land mobile communication network (PLMN), and they are connected by the S5 reference point;
- PLMN public land mobile communication network
- the S-GW is located in the visited Public Land Mobile Network (VPLMN)
- the P-GW is located in the home public land mobile network (HPLMN).
- the connection is made by the S8 reference point.
- GTP GPRS Tunneling Protocol
- ⁇ Proxy Mobile IP
- the PCRF passes the UE's Policy Control and Charging (PCC) policy and the Quality of Service (QoS) through the Gx interface.
- the P-GW delivers the QoS information to the S-GW/MME through the GTP message for the MME to allocate the radio resources.
- the S-GW obtains QoS information through the Gxc reference point with the PCRF, and the S-GW transmits the QoS information to the MME for the MME to allocate the radio resources.
- the P_GW and the S_GW are in the VPLMN, and the SPCR reference point is connected between the home hPCRF and the vPCRF of the visited place.
- the vPCRF obtains the QoS and PCC information of the hPCRF and generates the final QoS and PCC information.
- the gateway In the current 3GPP protocol, in order to solve the problem of GTP and PMIP network interworking, the gateway needs to support both GTP and PMIP.
- a protocol such as a gateway in a PMIP network, needs to support GTP at the same time to interwork with the GTP network.
- NTT proposes to use the interworking proxy (IWP) interworking gateway for GTP-PMIP protocol conversion.
- IWP interworking proxy
- An embodiment of the present invention provides a system architecture and a process solution solution for using an IWP as a protocol conversion point in an LBO scenario, where the method includes:
- the PCC request is directly sent to the home policy charging rule function hPCRF; the response message returned by the hPCRF is received, and the response message is forwarded.
- the embodiment of the present invention further provides a network entity, configured to locally route an LBO scenario, including:
- a determining unit configured to determine whether the roaming scene is an LBO
- a first sending unit configured to send a PCC request to the home policy charging rule function hPCRF directly according to the judgment result of the determining unit, if it is an LBO;
- a receiving unit configured to receive a PCC response message returned by the hPCRF
- a forwarding unit configured to forward the PCC response message.
- the embodiment of the present invention further provides a local routing LBO system in an inter-network proxy IWP scenario, including: a network entity, configured to determine whether a roaming scenario is an LBO, and if so, directly send a PCC request to the hPCRF, and receive and forward the hPCRF transmission. PCC response message;
- the hPCRF is configured to receive a PCC request and send a PCC response message to the network entity.
- FIG. 1 is a schematic flow chart 1 of a method provided by the prior art
- FIG. 2 is a schematic flowchart 2 of a method provided by the prior art
- FIG. 3 is a schematic flowchart of a method according to Embodiment 1 of the present invention
- 4 is a schematic flowchart of a method provided by Embodiment 2 of the present invention
- FIG. 5 is a schematic flowchart of a method according to Embodiment 3 of the present invention.
- FIG. 6 is a schematic flowchart of a method according to Embodiment 4 of the present invention.
- FIG. 7 is a schematic flowchart of a method according to Embodiment 5 of the present invention.
- FIG. 8 is a schematic structural diagram of a network entity according to an embodiment of the present disclosure.
- FIG. 9 is a schematic diagram of a communication system according to an embodiment of the present invention.
- the embodiments of the present invention will be described clearly and completely in conjunction with the drawings in the embodiments of the present invention. It is obvious that the described embodiments are only a part of the embodiments of the present invention, instead of All embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts are within the scope of the present invention.
- the P-GW is located in the HPLMN
- the S-GW is located in the VPLMN
- the S8 interface between the IWP and the S-GW adopts the PMIP protocol
- the S8 interface between the IWP and the P-GW adopts the GTP protocol.
- the UE sends a PDN connection request PDN Connectivity Request message to the MME;
- the MME sends a Create Session Request message to the S-GW, including the UE ID, the APN, the IWP address, and the default bearer QoS.
- the S-GW sends a gateway control session to establish a Gateway Control Session Establishment message to the vPCRF, requesting to obtain corresponding QoS information, where the message carries the APN and the UE ID;
- the vPCRF forwards the Gateway Control Session Establishment message to the IWP;
- the IWP sends the pre-configured temporary QoS information in the gateway control session establishment response Acknowledge Gateway Control Session Establishment message to the vPCRF, where the QoS rule is included;
- the vPCRF forwards the temporary QoS information in step S105 to the S-GW.
- the S-GW sends a proxy binding update Proxy Binding Update message to the IWP, where the UE ID is included.
- the IWP sends a Create Session Request message to the P-GW, including the UE ID, the address of the IWP, and the tunnel endpoint identifier, APN;
- the P-GW will send an IP-CAN session establishment request message to the hPCRF, which carries the UE ID, APN, IP-CAN type;
- hPCRF sends IP-CAN session establishment confirmation Acknowledge IP-CAN Session Establishment message to P-GW, including PCC rule information and real QoS information;
- the P-GW sends a Create Session Response message to the IWP, including the address of the P-GW and the tunnel endpoint identifier, the PDN address, the EPS bearer ID, and the real QoS.
- IWP sending proxy binding confirmation Proxy Binding Acknowledgemen message to the S-GW, including the identity and address information of the UE, and the Charging ID.
- the gateway control QoS rule is provided to provide a Gateway Control and QoS Rules Provision message, and the vPCRF forwards the real QoS information received from the IWP to the S-GW.
- the S-GW sends the Gateway Control and QoS Rules Provision Ack to the IJ1WP via the vPCRF; SI 15. The S-GW sends a Create Session Response message to the MME;
- the MME sends a PDN Connectivity Accept message to the UE.
- the S8 interface between the IWP and the S-GW adopts the GTP protocol
- the S8 interface between the IWP and the P-GW adopts the PMIP protocol
- the UE sends a PDN Connectivity Request message to the MME.
- the MME sends a Create Session Request message to the S-GW, where the UE ID, the APN, the IWP address, and the default bearer QoS are included.
- the S-GW sends a Create Session Request message to the IWP, where the UE ID, the address of the S-GW, and the TEID, APN are sent.
- the IWP sends a Gateway Control Session Establishment request message to the hPCRF, where the message carries the APN and the UE ID, and the default bearer QoS;
- the hPCRF sends a response message Acknowledge Gateway Control Session Establishment to the IWP, including the QoS rule;
- the IWP sending proxy binding updates the Proxy Binding Update request message to the PGW, including the UE ID, APN;
- the P-GW sends an IP-CAN session establishment request message to the hPCRF, where the UE ID, APN, and IP-CAN types are carried; 5208.
- the hPCRF sends an IP-CAN session establishment confirmation Acknowledge IP-CAN Session Establishment message to the P-GW, including PCC rule information, updated QoS information;
- the P-GW sending proxy binds the corresponding Proxy Binding Acknowledgement message to the IWP, including the identifier and address information of the UE, the Charging ID, and the like;
- the hPCRF will initialize the GW Control Session Modification process.
- the hPCRF sends a Gateway Control and QoS Rules Pro vision request to the IWP. Which includes QoS rules;
- the IWP sends a Gateway Control and QoS Rules Provision response to the hPCRF.
- the IWP creates a session response Create Session Response message to the S-GW, which includes the address and tunnel endpoint identifier of the IWP, and QoS information;
- the S-GW sends a Create Session Response message to the MME.
- Embodiment 1 of the present invention provides an LBO processing method in the case of an IWP as a protocol conversion point, as shown in FIG. 3, including:
- the IWP or vPCRF can determine whether the roaming scene is LBO by using the UE ID and the APN.
- the roaming scenario is a home route, which can be processed according to the method in the prior art.
- the PCC request is an IP-CAN Session Establishment request message
- PMIP is used between the S-GW and the P-GW
- the PCC request message between the S-GW and the IWP is The Gateway Control Session Establishment request message
- the message between the P-GW and the IWP is an IP-CAN Session Establishment request message.
- S303 Receive a PCC response message returned by the hPCRF, and forward the PCC response message.
- the forwarding of the PCC response message may be that the IWP sends the PCC response message to the vPCRF, or the vPCRF may directly send the PCC response message to the S-GW or the P-GW.
- the PCC response message is an IP-CAN Session Establishment response message
- a PMIP a PCC response message between the S-GW and the IWP is used between the S-GW and the P-GW It is a Gateway Control Session Establishment response message
- the PCC response message between the P-GW and the IWP is an IP-CAN Session Establishment response message.
- the method provided by the embodiment of the present invention effectively implements the LBO processing method in the scenario where the IWP is used as a protocol conversion point.
- the IWP distinguishes whether the current service scenario is an LBO and performs routing of the correct PCC message in the LBO scenario to ensure that the service process can be executed correctly.
- the forwarding response message may be different according to the protocol adopted by the S5 interface. For details, refer to the following embodiments.
- the IWP is used to determine whether it is an LBO scenario, and the S5 interface between the S-GW and the P-GW adopts the GTP protocol.
- the specific steps are as follows, see Figure 4:
- the UE initiates a request PDN connection process, and sends a PDN Connectivity Request message to the MME;
- the MME sends a Create Session Request to the S-GW, where the UE ID, the APN, the P-GW address, and the default bearer QoS are carried.
- the S-GW creates an entry in its EPS bearer table, and sends a Create Session Request to the P-GW, including the UE ID, the address of the S-GW, and the TEID, APN information.
- the P-GW will send an IP-CAN Session Establishment request message to the vPCRF, including the UE ID, APN, and IP-CAN types.
- the vPCRF forwards this message to the IWP;
- the IWP determines, according to the identifier of the UE and the APN, that the current LBO scenario is sent to the hPCRF directly.
- the user identification international mobile subscriber identity IMSI and APN are used to determine the roaming scenario, if the operator identifier of the APN is in the Operator Identifier part and the Mobility Country Code (MCC) and the Mobility Network Code (MNC) in the IMSI.
- MCC Mobility Country Code
- MNC Mobility Network Code
- the common PLMNs are the same, indicating that the current local network routing scenario; if not, the current LBO scenario.
- the hPCRF establishes an IP-CAN session record and returns an Acknowledge IP-CAN Session Establishment to the IWP, including PCC rule information;
- the IWP forwards the Acknowledge IP-CAN Session Establishment message to the P-GW via the vPCRF.
- the IWP sends a response message to the vPCRF, that is, an Acknowledge IP-CAN Session Establishment message, and the vPCRF forwards the response message to the P-GW.
- the P-GW returns a Create session response message to the S-GW, where the service flow information is included, where the service flow is from the PCC rule information in S407.
- the S-GW sends a Create Session Response message to the MME.
- the MME sends a PDN Connectivity Accept message to the UE.
- step S405 if the IWP determines that the routing mode of the system is the home route, the IP CAN session establishment request message is not sent to the hPCRF, that is, the above steps S406-S410 are not performed, but the existing steps are adopted. In the method of the technique, steps S204 to S214 in Fig. 2 are performed.
- the embodiment of the present invention can effectively solve the processing method of the GTP protocol on the S5 interface in the IWP scenario LB0.
- the IWP distinguishes whether the current service scenario is LB0 and routes the correct PCC message in the LB0 scenario to ensure that the service process can be executed correctly.
- the IWP is used to determine whether it is an LBO scenario, and the S5 interface between the S-GW and the P-GW adopts the PMIP protocol.
- the specific steps are as follows, see Figure 5:
- the UE initiates a request PDN connection process, and sends a PDN Connectivity Request message to the MME;
- the MME sends a Create Session Request to the S-GW, including the UE ID, the APN, the P-GW address, and the default bearer QoS;
- the S-GW sends a Gateway Control Session Establishment, which is forwarded to the IWP via the vPCRF, including the IP-CAN Type, the UE ID, so that the vPCRF can identify the IP-CAN session to be established in step 8, and also forward the received from the MME.
- Default bearer QoS
- the IWP After receiving the message, the IWP, according to the identifier of the UE and the APN, determines that the current LBO scenario is sent, and the Gateway Control Session Establishment message is directly sent to the hPCRF;
- the user identification of the International Mobile Subscriber Identity (IMSI) and the APN is used to determine the roaming scenario. If the Operator Identifier part of the APN is the same as the PLMN represented by the MCC and the MNC in the IMSI, the current local network routing scenario; if not, The description is currently an LBO scenario.
- IMSI International Mobile Subscriber Identity
- hPCRF sends a response message Acknowledge Gateway Control Session Establishment to IWP;
- the IWP is forwarded via the vPCRF to the Acknowledge Gateway Control Session Establishment.
- S-GW which includes QoS rules
- the IWP sends a response message to the vPCRF, that is, an Acknowledge IP-CAN Session Establishment message, and the vPCRF forwards the response message to the P-GW.
- the S-GW sends a Proxy Binding Update to the P-GW, where the UE identifier, the APN, is included; 5508.
- the P-GW sends an IP-CAN session establishment request to the IWP via the vPCRF, including the UE ID, APN, IP-CAN type;
- the IWP forwards the IP-CAN session establishment request to the hPCRF;
- the hPCRF sends an Acknowledge IP-CAN Session Establishment to the IWP, including PCC rule information;
- the IWP forwards the received acknowledgement to the PGW via the vPCRF;
- the P-GW sends a proxy binding acknowledgement to the S-GW, including the identifier and address information of the UE, a Charging ID, and the like;
- the hPCRF will initiate the GW Control Session Modification process, sending the Gateway Control and QoS Rules Provision to the IWP, including the QoS rules;
- the IWP forwards the Gateway Control and QoS Rules Provision to the S-GW via the vPCRF;
- the S-GW sends the Gateway Control and QoS Rules Provision Ack to the IJlWP via the vPCRF;
- the IWP forwards the confirmation message in step 15 to the hPCRF;
- the S-GW sends a Create Session Response message to the MME.
- the MME sends a PDN Connectivity Accept message to the UE.
- step S504 if the IWP determines that the routing mode of the system in which the system is located is the home route, steps S105-S116 in FIG. 1 are performed.
- the embodiment of the present invention can effectively solve the processing method of the PMIP protocol on the S5 interface of the IBO scenario.
- the IWP distinguishes whether the current service scenario is an LBO and routes the correct PCC message in the LBO scenario to ensure that the service process can be executed correctly.
- Embodiment 4
- the vPCRF is used to determine whether it is an LBO scenario, and the S5 interface between the S-GW and the P-GW adopts the GTP protocol.
- the specific steps are as follows, see Figure 6:
- the UE initiates a request PDN connection process, and sends a PDN Connectivity Request message to the MME.
- the MME sends a Create Session Bearer Request to the S-GW, including the UE ID, APN, P-GW address, and default bearer QoS;
- the S-GW creates an entry in its EPS bearer table, and sends a Create Session Request to the P-GW, including the UE ID, the address of the S-GW, and the TEID, APN; 5604.
- the P-GW will initialize the IP-CAN Session Establishment process, and send an IP-CAN session establishment request message to the vPCRF, including the UE identity, APN, IP-CAN type;
- the vPCRF After receiving the message, the vPCRF determines that the current LBO scenario is based on the APN and the UE identifier, and directly sends the message to the hPCRF.
- the hPCRF sends a response message Acknowledge IP-CAN Session Establishment to the vPCRF, including PCC rule information;
- the vPCRF forwards the Acknowledge IP-CAN Session Establishment to the PGW;
- the P-GW creates a new entry in its EPS bearer context table and sends a Create Session Response to the S-GW, including the address and TEID of the P-GW, the EPS bearer ID and the QoS and service flow information, the service Flowing PCC rule information from S606;
- the S-GW sends a Create Session Response message to the MME.
- the MME sends a PDN Connectivity Accept message to the UE.
- the vPCRF after determining that the current LBO scenario is present, the vPCRF directly sends a PCC request message to the hPCRF without the IWP.
- the vPCRF distinguishes whether the current service scenario is LBO. The correct PCC message is routed in the LBO scenario to ensure that the service process can be executed correctly.
- the vPCRF is used to determine whether it is an LBO scenario, and the S5 interface between the S-GW and the P-GW adopts the PMIP protocol.
- the specific steps are as follows, see Figure 7:
- the UE initiates a request PDN connection process, and sends a PDN Connectivity Request message to the MME.
- the MME sends a Create Session Request to the S-GW, including the UE ID, the APN, the P-GW address, and the default bearer QoS;
- the S-GW sends the Gateway Control Session Establishment to the vPCRF, including the IP-CAN Type, the UE ID, and also forwards the default bearer QoS received from the MME;
- the vPCRF After receiving the message, the vPCRF, according to the APN and the UE identifier, determines that the current LBO scenario is sent to the hPCRF directly.
- the hPCRF sends a response Acknowledge Gateway Control Session Establishment message to the vPCRF; 5706.
- the vPCRF forwards the acknowledgement message to the S-GW;
- the S-GW sends a Proxy Binding Update to the PGW, where the UE identifier, the APN, is included;
- the P-GW sends an IP-CAN session establishment request to the vPCRF via the vPCRF, including the identity of the UE, APN, and IP-CAN type;
- the VPCRF After receiving the message, the VPCRF, according to the APN and the UE identifier, determines that the current LBO scenario is sent to the hPCRF directly.
- the hPCRF establishes an IP CAN session record, and returns a response message carrying the PCC rule information to the vPCRF;
- the hPCRF sends an Acknowledge IP-CAN Session Establishment to the vPCRF, including PCC rule information;
- the vPCRF forwards the received acknowledgement to the PGW;
- the P-GW confirms to the S-GW, and sends a Binding Acknowledgement, which includes the identity and address information of the UE, Charging ID;
- the hPCRF will initialize the GW Control Session Modification process and send the Gateway Control and QoS Rules Provision to the vPCRF;
- the vPCRF forwards this message to the SGW;
- the S-GW sends the Gateway Control and QoS Rules Provision Ack to the IJvPCRF;
- the vPCRF forwards the acknowledgment message in step 15 to the hPCRF;
- the S-GW sends a Create Session Response message to the MME.
- the MME sends a PDN Connectivity Accept message to the UE.
- the vPCRF after determining that the current LBO scenario is present, the vPCRF directly sends a PCC request message to the hPCRF without the IWP.
- IWP Scenarios When the S5 interface uses the PMIP protocol, the vPCRF distinguishes the current service scenario from the LBO and performs the correct PCC message routing in the LBO scenario to ensure that the service process can be executed correctly.
- the embodiment of the present invention further provides a network entity, which is used in the LBO in the IWP scenario, as shown in FIG. 8, and includes:
- the determining unit 801 is configured to determine whether the roaming scene is an LBO
- the first sending unit 802 is configured to send, according to the determination result of the determining unit, a PCC request to the home policy charging rule function hPCRF, if it is an LBO;
- the receiving unit 803 is configured to receive a PCC response message returned by the hPCRF.
- the forwarding unit 804 is configured to forward the PCC response message.
- the network entity of the embodiment of the present invention may be an IWP.
- the receiving unit 803 is further configured to receive a PCC request from the vPCRF before the determining unit determines whether the roaming scenario is an LBO.
- the determining unit 801 is configured to determine, according to the UE identifier and the APN, whether the roaming scenario is an LBO;
- the forwarding unit 804 is configured to send the PCC response message to the vPCRF.
- the network entity of the embodiment of the present invention may be a vPCRF, and correspondingly, if the protocol between the S-GW and the P-GW is a GTP protocol, the forwarding unit 804 is configured to forward the response message to the P-GW;
- the forwarding unit is configured to send the PCC response message to the S-GW or the P-GW.
- the PCC request is an IP-CAN Session Establishment request message
- the PCC response message is an IP-CAN Session Establishment response message
- PMIP is used between the S-GW and the P-GW
- the PCC request message between the S-GW and the IWP is a Gateway Control Session Establishment request message
- the PCC response message between the S-GW and the IWP is a Gateway Control Session Establishment response message
- the PCC request message between the P-GW and the IWP It is an IP-CAN Session Establishment request message
- the PCC response message is an IP-CAN Session Establishment response message.
- the network entity provided by the embodiment of the present invention can distinguish whether the current service scenario is an LBO, and perform routing of the correct PCC message in the LBO scenario, so as to ensure that the service process can be correctly executed.
- the embodiment of the present invention further provides a local routing LBO communication system in an IWP scenario. As shown in FIG. 9, the network entity 901 is configured to determine whether the roaming scenario is LBO. If yes, the PCC request is directly sent to the hPCRF to receive and forward. a PCC response message sent by the hPCRF;
- the hPCRF 902 is configured to receive the PCC request, and send a PCC response message to the network entity.
- the network entity 901 in the communication system may be an IWP, and the IWP receives the PCC request message from the vPCRF, and sends the PCC request message to the PCRF directly after determining the LBO scenario, and determines whether the roaming scenario is determined according to the UE identifier and the APN. LBO.
- the network entity in the communication system may be a vPCRF. If the protocol between the S-GW and the P-GW is a GTP protocol, the vPCRF sends a response message to the P-GW, and the P-GW sends the response message to The S-GW.
- the vPCRF sends the response message directly to the Said S-GW or said P-GW.
- the communication system provided by the embodiment of the present invention can distinguish whether the current service scenario is an LBO, and perform routing of the correct PCC message in the LBO scenario, so as to ensure that the service process can be correctly executed.
Landscapes
- Engineering & Computer Science (AREA)
- Databases & Information Systems (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
La présente invention se rapporte, dans ses modes de réalisation, à un procédé de traitement de sortie de zone locale (LBO) dans un scénario de serveur proxy d'interfonctionnement (IWP). Le procédé consiste à : détermine si le scénario de routage est, ou non, une sortie LBO; si le scénario de routage est une sortie LBO, envoyer à une fonction de règle de chargement de politique de rattachement (hPCRF) une demande de commande et de chargement de politique (PCC); recevoir un message de réponse à la demande de PCC renvoyé par la fonction hPCRF et transmettre le message de réponse à la demande de PCC. Par conséquent, les modes de réalisation de la présente invention se rapportent également à une entité de réseau et à un système de communication.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/CN2009/075561 WO2011072438A1 (fr) | 2009-12-14 | 2009-12-14 | Procédé, dispositif et système de traitement de sortie de zone locale dans un scénario de serveur proxy d'interfonctionnement |
| CN200980118741.7A CN102763486B (zh) | 2009-12-14 | 2009-12-14 | 一种iwp场景下lbo处理方法、装置及系统 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/CN2009/075561 WO2011072438A1 (fr) | 2009-12-14 | 2009-12-14 | Procédé, dispositif et système de traitement de sortie de zone locale dans un scénario de serveur proxy d'interfonctionnement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2011072438A1 true WO2011072438A1 (fr) | 2011-06-23 |
Family
ID=44166720
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2009/075561 Ceased WO2011072438A1 (fr) | 2009-12-14 | 2009-12-14 | Procédé, dispositif et système de traitement de sortie de zone locale dans un scénario de serveur proxy d'interfonctionnement |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN102763486B (fr) |
| WO (1) | WO2011072438A1 (fr) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9596621B2 (en) | 2012-08-10 | 2017-03-14 | Ibasis, Inc. | Signaling traffic reduction in mobile communication systems |
| US9788188B2 (en) | 2012-12-14 | 2017-10-10 | Ibasis, Inc. | Method and system for hub breakout roaming |
| US10470031B2 (en) | 2016-05-20 | 2019-11-05 | Ibasis, Inc. | Voice over IMS roaming gateway |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3573360B1 (fr) | 2017-02-15 | 2022-11-30 | Huawei Technologies Co., Ltd. | Procédé de transmission de données de type "local breakout" |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101272534A (zh) * | 2008-05-08 | 2008-09-24 | 中兴通讯股份有限公司 | 一种隐藏拜访地网络拓扑结构的策略计费控制的方法 |
-
2009
- 2009-12-14 WO PCT/CN2009/075561 patent/WO2011072438A1/fr not_active Ceased
- 2009-12-14 CN CN200980118741.7A patent/CN102763486B/zh active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101272534A (zh) * | 2008-05-08 | 2008-09-24 | 中兴通讯股份有限公司 | 一种隐藏拜访地网络拓扑结构的策略计费控制的方法 |
Non-Patent Citations (2)
| Title |
|---|
| "3rd Generation Partnership Project. Architecture Enhancements for Non-3GPP Y Accesses", 3GPP TS 23.402 V8.7.0., 2 October 2009 (2009-10-02), pages 179 - 180 * |
| "3rd Generation Partnership Project. Interworking Proxy (IWP) between GTP based and PMIP based Interfaces", 3GPP TR 29.875 V1.0.0., 3 December 2009 (2009-12-03), pages 8 - 16 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9596621B2 (en) | 2012-08-10 | 2017-03-14 | Ibasis, Inc. | Signaling traffic reduction in mobile communication systems |
| US9788188B2 (en) | 2012-12-14 | 2017-10-10 | Ibasis, Inc. | Method and system for hub breakout roaming |
| US10911932B2 (en) | 2012-12-14 | 2021-02-02 | Ibasis, Inc. | Method and system for hub breakout roaming |
| US10470031B2 (en) | 2016-05-20 | 2019-11-05 | Ibasis, Inc. | Voice over IMS roaming gateway |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102763486B (zh) | 2015-08-19 |
| CN102763486A (zh) | 2012-10-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5499170B2 (ja) | 課金システム及び課金の方法 | |
| CN101646149B (zh) | 一种删除dra中会话信息的方法 | |
| CN101286915B (zh) | 分组数据网络的接入控制方法和系统、pcrf实体 | |
| CN102340866B (zh) | 一种上报固网接入信息的方法及系统 | |
| CN101730997B (zh) | 用于将互联网协议地址请求传送至受访服务网关的装置和方法 | |
| US9113436B2 (en) | Method and system for information transmission | |
| CN101969673A (zh) | 一种承载绑定和事件报告功能的重选方法 | |
| WO2011095100A1 (fr) | Procédé et système pour réguler l'établissement d'un accès ip local | |
| WO2013104234A1 (fr) | Procédé et système de contrôle de règles pour un réseau convergé | |
| WO2011006317A1 (fr) | Procédé et système permettant d'effacer des informations redondantes d'une fonction dimputation et de règles domestique | |
| WO2011029289A1 (fr) | Procédé et système de transmission d'un mode de commande de support dans des scénarios d'itinérance | |
| JP5972467B2 (ja) | アクセスネットワークの位置情報を通知する方法及びシステム | |
| CN102098653A (zh) | 一种实现服务质量控制的方法及系统 | |
| CN102761852B (zh) | 一种获取漫游信息的方法及系统 | |
| CN102763486B (zh) | 一种iwp场景下lbo处理方法、装置及系统 | |
| CN103369502B (zh) | 一种策略控制会话的处理方法及网元 | |
| JP2020205643A5 (ja) | Ue、pcrf及び通信制御方法 | |
| CN102238518B (zh) | 一种获取家用基站位置信息的方法和系统 | |
| CN102932915B (zh) | 一种建立会话的方法及系统 | |
| CN102378144B (zh) | 一种建立会话、策略下发的方法和系统 | |
| CN102740282B (zh) | 一种获取本地网关的ip地址的方法及系统 | |
| CN102547884B (zh) | 一种基站间切换资源控制的方法 | |
| WO2011097814A1 (fr) | Procédé de routage de message, passerelle de service et système de communication associés | |
| WO2013174188A1 (fr) | Procédé et système d'optimisation de routage, et élément de réseau sans fil | |
| CN104066114A (zh) | 融合网络中的策略控制方法、系统及装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 200980118741.7 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09852176 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 09852176 Country of ref document: EP Kind code of ref document: A1 |