WO2010087209A1 - 中継協調通信システム及びその通信方法 - Google Patents
中継協調通信システム及びその通信方法 Download PDFInfo
- Publication number
- WO2010087209A1 WO2010087209A1 PCT/JP2010/000598 JP2010000598W WO2010087209A1 WO 2010087209 A1 WO2010087209 A1 WO 2010087209A1 JP 2010000598 W JP2010000598 W JP 2010000598W WO 2010087209 A1 WO2010087209 A1 WO 2010087209A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- base station
- relay
- uplink
- user apparatus
- reception quality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1825—Adaptation of specific ARQ protocol parameters according to transmission conditions
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/24—Radio transmission systems, i.e. using radiation field for communication between two or more posts
- H04B7/26—Radio transmission systems, i.e. using radiation field for communication between two or more posts at least one of which is mobile
- H04B7/2603—Arrangements for wireless physical layer control
- H04B7/2606—Arrangements for base station coverage control, e.g. by using relays in tunnels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/0001—Systems modifying transmission characteristics according to link quality, e.g. power backoff
- H04L1/0023—Systems modifying transmission characteristics according to link quality, e.g. power backoff characterised by the signalling
- H04L1/0026—Transmission of channel quality indication
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/27—Control channels or signalling for resource management between access points
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1812—Hybrid protocols; Hybrid automatic repeat request [HARQ]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L2001/0092—Error control systems characterised by the topology of the transmission link
- H04L2001/0097—Relays
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W40/00—Communication routing or communication path finding
- H04W40/02—Communication route or path selection, e.g. power-based or shortest path routing
- H04W40/12—Communication route or path selection, e.g. power-based or shortest path routing based on transmission quality or channel quality
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/54—Allocation or scheduling criteria for wireless resources based on quality criteria
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W84/00—Network topologies
- H04W84/02—Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
- H04W84/04—Large scale networks; Deep hierarchical networks
- H04W84/042—Public Land Mobile systems, e.g. cellular systems
- H04W84/047—Public Land Mobile systems, e.g. cellular systems using dedicated repeater stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Definitions
- the present invention relates to a cellular mobile communication system, and more specifically, to a scheduling method of a hybrid automatic repeat request (HARQ) applied to a mobile communication system using a relay technology.
- HARQ hybrid automatic repeat request
- the basic function of the radio relay technology is to re-process and transmit a signal from the base station using a relay node, thereby expanding a cell coverage and reducing a communication blind spot area.
- the wireless relay technology can balance the load and distribute the service in the hot spot area.
- the introduction of relay technology can reduce the transmission power of the terminal and extend the life of the battery of the terminal.
- relay stations will change the topology structure of conventional cellular communications.
- a base station and a user apparatus also referred to as a mobile station
- a method of assigning different time resources to the two links that is, that the relay station communicates with the base station and the user apparatus in a time division manner, is a simple and effective method. This method applies to both FDD (Frequency Division Duplex) systems and TDD (Time Division Duplex) systems.
- the relay station cannot simultaneously receive and transmit signals.
- the relay station when the relay station receives a downlink transmission signal from the base station through the background link, the relay station does not perform downlink transmission to the user apparatus. Similarly, when the base station receives an uplink transmission signal from the relay station, the relay station does not perform uplink reception from the user apparatus.
- the coverage of the cell can be expanded due to the presence of the relay station.
- this also causes a problem of a decrease in transmission efficiency.
- a decrease in transmission efficiency means an extension of the HARQ period necessary for data transmission between the terminal and the terminal (base station and user equipment).
- the user apparatus normally performs the HARQ process, a situation occurs in which the relay station must simultaneously receive and transmit signals.
- the present invention provides a solution for HARQ scheduling in a cellular system in which relay stations communicate in a coordinated manner.
- a set related to a root site of a physical downlink control channel is defined as a set of signaling transmission routes
- a set related to a route site of a data channel is defined as a set of data transmission routes.
- uplink data and downlink data have the same route scheme. That is, the set of data transmission routes is the same in the uplink and the downlink.
- the route scheme is the same as the route scheme in the data channel.
- the set of signaling transmission routes in the present invention is a set of sites that pass through the physical downlink control channel (PDCCH).
- a user apparatus that does not include a relay station in the route set (communication with the base station) is defined as a base station user apparatus, and no base station is included in the route set (communicates with the relay station).
- a user device as a relay user device. Note that the base station can also coordinate the communication of the relay user apparatus.
- the site of the present invention is a base station or a relay station
- the user apparatus of the present invention is a relay user apparatus or a base station user apparatus.
- a communication method is a communication method in a relay cooperative cellular communication system including a base station and at least one relay station, and the relay station or the relay station and the base station perform uplink transmission of a user apparatus.
- a step of measuring a reception quality of a link signal, a step of feeding back the reception quality measured by the relay station to the base station, and a reception quality measured by the relay station by the base station or the relay station And determining a transmission route between the user apparatus and the base station based on the reception quality measured by the base station.
- the communication method of the present invention is a communication method in a relay cooperative cellular communication system including a base station and at least one relay station, and the base station and the relay station, or the relay by the base station.
- link transmission, uplink retransmission, and downlink re-reception use the centralized scheduling of the base station, process the scheduling control information by the route site, and transfer the scheduling control information to the user equipment.
- the relay station or the relay station and the base station, Regardless successfully received the presence or absence of an uplink signal from the user equipment, characterized by comprising the step of feeding back a confirmation of correct reception to the user equipment.
- the relay cooperative cellular communication system of the present invention is a relay cooperative cellular communication system including a base station and at least one relay station, wherein the relay station receives a signal from a user apparatus, A first measurement device that measures reception quality of a signal from the user device; and a transfer device that feeds back the measured reception quality from the relay station to the base station. Based on the second receiving device that receives the signal, the second measuring device that measures the reception quality of the signal from the user device, the reception quality measured by the relay station, and the reception quality measured by the base station, A route determination device for determining a transmission route route between each of the user devices and the base station.
- the determination of the set of signaling transmission routes and the set of data transmission routes of the user equipment is not limited to the method proposed in the present invention.
- the transmission efficiency in the relay cooperative cellular communication system can be improved.
- FIG. 3 is a schematic diagram illustrating a schematic configuration of a communication system according to an embodiment of the present invention and a process in which a relay station acquires reception quality of an uplink signal from a user apparatus. It is a block diagram which shows the structure of the relay station in the communication system which concerns on embodiment of this invention. It is a block diagram which shows the structure of the base station in the communication system which concerns on embodiment of this invention. It is a schematic diagram which shows the process in which a base station selects the transmission route of a user apparatus based on the reception quality of the uplink signal fed back from the relay station. It is a figure which shows the 1st example which concerns on the radio
- FIG. 1A is a schematic diagram showing a configuration of a relay cooperative communication system (relay cooperative cellular communication system) 1 according to an embodiment of the present invention.
- the system 1 includes a user apparatus 10 (U 1 , U 2 , U 3 ), a base station (eNB) 30, and a relay station 20 (R 1) that plays a role of relay between the user apparatus 10 and the base station 30. , R 2 , R 3 ).
- the user apparatus (relay user apparatus) 10 receiving the relay receives control signals from all the relay stations 20 and the base station 30 in the cell.
- the strength of the signal received from each site (base station 30 or relay station 20) is determined by the distance from the relay user apparatus 10 to each site (base station 30 or relay station 20), shadowing, and the like.
- a set of signaling transmission routes (hereinafter referred to as signaling transmission routes) that are control signals of the user apparatus 10 is a set of all the relay stations 20 in the cell or the base station 30 and all the relay stations 20. It is.
- a set of user data transmission routes (hereinafter referred to as data transmission routes) is determined by the base station 30 based on the reception quality of the uplink signal received by each site. A collection of sites. For this reason, a set of data transmission route data is a set of some relay stations 20 approaching the relay user device 10 or a base station 30 and a user device (a user device connected to the relay user device 10 or the base station 30). (Base station user apparatus) 10) A set with some relay stations 20 approaching 10.
- the relay user apparatus 10 receives only signals from some relay stations 20 in the vicinity of the user apparatus 10.
- the set of signaling transmission routes is a set of data transmission routes, that is, a set of some relay stations 20 in the vicinity of the relay user apparatus 10.
- the set of data transmission routes and the set of signaling transmission routes include the same site.
- the set of data transmission routes is a set of sites determined by the base station 30 based on the reception quality of the uplink signal received by each site.
- the route method of the data channel may be macro diversity of sites in a set of data transmission routes, or radio resources of the same time and frequency at each site. Multiplex transmission may be possible.
- the downlink control signal and the data channel correspond to a set of signaling transmission routes and a set of data transmission routes, respectively.
- the set of signaling transmission routes may be the following set.
- All the sites in the set of signaling transmission routes of the user apparatus 10 share the same time / frequency radio resources and transmit the downlink control signal of the user apparatus 10.
- the control signal of each relay station 20 includes the same control information, and a reference signal (RS: Reference Signal) is overlapped on the user apparatus 10 side, and the control signal in this method uses a macro diversity technique. .
- the set of data transmission routes of the user apparatus 10 may be the following set. [1] Some relay stations 20 [2] Base station 30 and some relay stations 20
- the relay station 20 in the relay cooperative communication system 1 transmits / receives a signal to / from a transmission / reception unit (first reception device, transfer device) 102 (for example, a reception module and A transfer module), a measurement unit (first measurement device) 101 for measuring the reception quality of a signal received from the user device 10, a storage unit 104 for storing data and information, and a signal received by the transmission / reception unit
- a detection decoding unit 105 for performing detection and decoding processing (decoding check)
- a sequence generation unit 103 for reproducing a new symbol sequence based on a decoding result (decoding check result) by the detection decoding unit, etc. I have.
- the base station 30 in the relay cooperative communication system 1 transmits / receives a signal to / from a transmission / reception unit (second reception device) 202 (for example, a reception module and transmission). Module), a measurement unit (second measurement device) 201 for measuring the reception quality of a signal received from the user apparatus 10, reception quality fed back by the relay station 20, and reception quality measured by the measurement unit 201
- a transmission / reception unit for example, a reception module and transmission.
- a measurement unit (second measurement device) 201 for measuring the reception quality of a signal received from the user apparatus 10, reception quality fed back by the relay station 20, and reception quality measured by the measurement unit 201
- the path determination unit path determination apparatus
- Detection and decoding unit 205 for performing detection and decoding processing, data from different user devices 10 Performs synthesis for and a (e.g., maximum proportional method utilizes such as synthetic) synthesis for the unit 203 or the like.
- the downlink system bandwidth of the cell is denoted as W d
- the uplink system bandwidth is denoted as W u
- the relay station 20 in the cell is denoted as the relay station 20 (R i ).
- i 1, 2,..., R
- r is the number of relay stations 20 in the cell.
- the user apparatus 10 in a cell is described with the user apparatus 10 ( Uj ).
- j 1, 2,..., U
- u is the number of user apparatuses 10 in the cell.
- the set of data transmission routes is determined by the reception quality of each relay station 20 (R j ) in the cell that receives the uplink signal from the user apparatus 10 (U j ).
- the transmission / reception unit 102 receives an uplink signal from the user apparatus 10 (U j ), and the measurement unit 101 is connected to each user apparatus 10.
- An uplink signal is measured for (U j ) to obtain a parameter RSS i, j indicating the reception quality of the signal.
- the relay station 20 (R i ) feeds back the measurement result to the base station 30 through the background link between the base station 30 and the relay station 20 (R i ).
- a table such as [Equation 1] or [Equation 2] shown below is created on the basis of all reception quality measurement results, and is stored in the storage unit 204.
- the reception quality of the uplink signal of the corresponding user device 10 (U j) is the as shown in the following Formula 3 or [Equation 4] is there.
- the criterion for determining the route in the route determination unit 206 is the received power, the carrier-to-interference ratio, or the signal-to-noise ratio, and the corresponding threshold is set to RSS threshold .
- the RSS threshold is a preset value in the relay cooperative cellular communication system, a setting value obtained from simulation of the relay cooperative cellular communication system, system optimization, and a statistical measurement value in an actual operation environment of the relay cooperative cellular communication system. , A calculated value calculated by a system parameter, or a standard value defined by a specification of the corresponding relay cooperative cellular communication system.
- a set of data transmission routes of each user apparatus 10 (U j ) in the cell is determined.
- a set of signaling transmission routes of the user apparatus 10 (U j ) is determined by the arrangement of the relay system 1, and the arrangement of the relay system 1 includes the frame structure of the relay station R j and the like.
- a set of signaling transmission routes corresponding to the user apparatus 10 (U j ) is also determined.
- each site receives an uplink signal from the user apparatus 10 (U 1 , U 2 , U 3 ), and the reception quality RSS as shown in the following [Equation 5] of the measured uplink signal. Are fed back to the base station 30.
- the sets of data transmission routes determined by the route determination unit 206 of the base station 30 based on the set criteria are as follows.
- DU 1 (R 1 )
- DU 2 (R 2 , R 3 )
- DU 3 (R 3 )
- the uplink signal includes all uplink reference signals and random access signals.
- FIG. 3 4, and 5 are diagrams illustrating signal transmission schemes in the relay system 1 with different arrangements of the user apparatuses 10 (U j ).
- a physical downlink control channel (PDCCH) and a downlink data shared channel (also referred to as a physical downlink shared channel (PDSCH)) are time-division multiplexed. It is transmitted using the method.
- PDCH physical downlink control channel
- PDSCH physical downlink shared channel
- the downlink operation bandwidths of the relay stations 20 are W 1 d , W 2 d , W 3 d , respectively.
- the bandwidths do not overlap with each other, and the uplink operation bandwidths corresponding to the relay stations 20 (R 1 , R 2 , R 3 ) are W 1 u , W 2 u , W 3 u , respectively.
- the downlink operation bandwidths of the relay stations 20 are all W d
- each relay station 20 (R 1 , R 3 2 , R 3 ) all uplink operating bandwidths are W u .
- a set of signaling transmission routes of each user apparatus 10 (U j ) is as follows.
- the operation bandwidths of the physical downlink control channels (PDCCH) of the relay stations 20 (R 1 , R 2 , R 3 ) are all W d , and each relay The operation bandwidth of the shared channel for downlink data of the station 20 (R 1 , R 2 , R 3 ) is the same as the downlink operation bandwidth of the user apparatus 10 (U j ) that passes through the own station.
- the uplink operation bandwidths of the relay stations 20 (R 1 , R 2 , R 3 ) are all W u .
- SU 2 (R 1 , R 2 , R 3 )
- SU 3 (R 1 , R 2 , R 3 )
- FIG. 6 is a diagram showing a radio frame structure of the FDD LTE system.
- subframes 0 and 5 include a downlink synchronization signal (Synchronization Signal), and subframes 4 and 9 include a system paging signal. For this reason, the relay station 20 does not receive downlink data from the base station 30 in these four subframes.
- Synchronization Signal Synchronization Signal
- some subframes are selected for each frame via the upper layer of the system, and in these subframes, the base station 30 and the relay station 20 are connected in the downlink background. Realized by communication. That is, the relay station 20 receives data from the base station 30.
- the selected subframe can realize background communication in the downlink between the base station 30 and the relay station 20 by using the following two methods. One is that if all of the selected subframes are used for background communication, the relay station 20 does not perform any transmission in the corresponding frame, and thus the relay user apparatus 10 does not perform any reception. .
- a subframe by this method is defined as a blank frame (Blank Subframe).
- the other is that the relay station 20 switches between transmission and reception in the selected subframe by the time division method. That is, the control signal is downlink transmitted through the physical downlink control channel (PDCCH) using a part of the time of the subframe, and the base station 30 is used using the other part of the time. Receive data from.
- a subframe by this method corresponds to an MBSFN (Multimedia Broadcast Multicast Service Single Frequency Network) subframe of the LTE system.
- MBSFN Multimedia Broadcast Multicast Service Single Frequency Network
- base station ⁇ relay station indicates downlink transmission from the base station 30 to the relay station 20 on the background link
- relay station ⁇ base station indicates that on the background link.
- the uplink transmission from the relay station 20 to the base station 30 is shown.
- relay station ⁇ user apparatus indicates downlink transmission from the relay station 20 to the user apparatus 10 in the service providing area.
- Subframes 0, 4, 5, and 9 correspond to the system subframe of relay station 20 and include a broadcast channel (BCH: Broadcast Channel), a synchronization signal, and the like.
- BCH Broadcast Channel
- the “base station ⁇ relay station” since the transmission time from the base station 30 to the relay station 20 in the above arrangement and the time at which the relay station transmits the special subframe overlap, the “base station ⁇ relay station” has the downlink background link at that time. Indicates that transmission is canceled (from base station 30 to relay station 20). For example, as shown in the figure, since subframes 0, 9, and 4 compete with the system subframe of the relay station 20 in time, in these subframes, the relay station 20 performs only downlink transmission, No signal is received from the base station 30. The above situation occurs only when the blank subframe is arranged on the background link, and when the background link is arranged using the MBSFN subframe, the above time conflict does not occur.
- the relay station 20 performs cooperative communication based on the two types of arrangement methods in the downlink background link shown in FIGS. 7 and 8, the arrangement of the signaling transmission route set of the user apparatus 10 and the arrangement of the data transmission route set.
- An example of a physical process for realizing data transmission, retransmission, feedback, and the like on the uplink and downlink of the user apparatus 10 (U j ) in the cellular system performing the above will be described.
- the configurations of the base station 30, the user apparatus 10, the relay station 20, and the like are as shown in FIGS. 1A to 1C.
- the base station 30 transmits the uplink resources allocated for the user apparatus 10 to all sites in the set of signaling transmission routes through the background link between the relay station 20 and the base station 30. All sites in the set of signaling transmission routes downlink transmit a radio resource allocation control command to the user apparatus 10 at a certain scheduling time. After receiving the radio resource allocation control command, the user apparatus 10 uplinks a signal using the scheduled radio resource. All sites in the set of data transmission routes receive the uplink signal from the user apparatus 10, feed back ACK to the user apparatus 10, and feed back a demodulation result (ACK or NACK) to the base station 30. Then, the base station 30 receives feedback such as ACK or NACK transmitted from all sites in the set of data transmission routes of the user apparatus 10.
- ACK or NACK demodulation result
- the base station 30 transmits the retransmission control signal of the user apparatus 10 to all sites in the set of signaling transmission routes through the background link. All the sites in the set of signaling transmission routes receive the retransmission control signal, and transmit a retransmission command to the user apparatus 10 in a downlink at a certain scheduling time. In addition, after receiving the HARQ process retransmission instruction, the user apparatus 10 performs retransmission at a corresponding time.
- the uplink HARQ mechanism when the user apparatus 10 performs cooperative communication through a plurality of relay stations 20 or base stations 30, all feeds back to the base station 30 and performs centralized processing on these. Based on the following criteria.
- FIG. 11 is a diagram illustrating an example of a time sequence of initial transmission and self-adaptive retransmission in uplink HARQ using a blank subframe.
- FIG. 12 is a diagram illustrating an example of a time sequence of initial transmission and self-adaptive retransmission in uplink HARQ using MBSFN subframes.
- FIG. 13 is a diagram illustrating an example of a time sequence in which ACK is fed back in uplink HARQ using a blank subframe.
- FIG. 14 is a schematic diagram showing a time sequence in which ACK is fed back in uplink HARQ using MBSFN subframes.
- Step 1 The base station 30 transmits an uplink scheduling command related to the user apparatus 10 (U j ) to all sites in the set SR j of signaling transmission routes.
- Step 2 All sites in the set of signaling transmission routes SR j schedule subframes through the physical downlink control channel (PDCCH) and downlink uplink scheduling commands for the relay user equipment 10 (U j ).
- the uplink scheduling command includes control information such as radio resource allocation and modulation scheme in the uplink of the user apparatus 10 (U j ).
- Step 3 The user equipment 10 (U j ) transmits a signal in the uplink resource allocated by the base station 30, and all sites in the data transmission route set DR j receive and detect the uplink signal. And decrypt.
- all the uplink reference signals and random access signals of the corresponding user apparatus 10 (U j ) are measured by all the relay stations 20 (R j ) in the cell (or together with the base station 30). It is preferable to obtain the reception quality RSS j (or RSS j b ) of the uplink signal of the user apparatus 10 (U j ).
- Step 4 All sites in signaling transmission route set SR j regardless of whether or not the decoding process of sites in data transmission route set DR j is accurate for the data received from user equipment 10 (U j ) Transmits an ACK (accurate reception) confirmation command to the relay user apparatus 10 (U j ).
- Step 5 All sites in the set DR j of data transmission routes feed back to the base station 30 the results obtained by performing decoding processing and CRC (Cyclic Redundancy Check) on the data received from the user apparatus 10 (U j ). To do. For example, ACK is fed back when the CRC is correct, and NACK is fed back when the CRC is incorrect.
- CRC Cyclic Redundancy Check
- the reception quality RSS j (or RSS j b ) of the uplink signal of the user apparatus 10 (U j ) measured by all the relay stations 20 (R j ) (or together with the base station 30) in the cell. It is preferable to perform uplink transmission to the base station 30.
- Step 6 Whether the base station 30 is accurate in receiving the current uplink signal of the corresponding relay user apparatus 10 (U j ) based on the feedback results from all sites in the data transmission route set DR j Judge whether or not. If the feedback from all sites in the set DR j of data transmission routes is NACK, the base station 30 determines that the reception of the current uplink signal of the relay user apparatus 10 (U j ) is not accurate, and The retransmission of the relay user apparatus 10 (U j ) is scheduled. On the other hand, when the reception of at least one site in the set DR j of data transmission routes becomes accurate and ACK is fed back, step 10 is performed.
- the data of the corresponding user apparatus 10 (U j ) is updated.
- Step 7 The base station 30 sends a re-transmission command of the user equipment 10 (U j ) to all of the signaling transmission route set SR j through the background link between the relay station 20 (R j ) and the base station 30. Send downlink to site.
- Step 8 All sites in the set of signaling transmission routes SR j select an appropriate downlink transmission time and transmit a retransmission command to the relay user equipment 10 (U j ) in the downlink.
- the downlink transmission time needs to correspond to the same uplink HARQ process.
- Step 9 The relay user apparatus 10 (U j ) performs Step 3 after performing retransmission with the specified radio resource in response to the retransmission command.
- Step 10 The uplink transmission is completed successfully, and the base station 30 selects one site that has fed back the ACK, and uploads data of the user apparatus 10 (U j ) that has already been correctly received.
- the base station 30 transmits the uplink resources allocated for the user equipment 10 (U j ) to all sites in the set of signaling transmission routes through the background link between the relay station 20 (R j ) and the base station 30. Transmit to. All sites in the set of signaling transmission routes downlink transmit a radio resource allocation control command to the user equipment 10 (U j ) at a certain scheduling time. Then, after receiving the radio resource allocation control command, the user apparatus 10 (U j ) performs uplink transmission of the signal using the scheduled radio resource. Then, all the sites in the set of data transmission routes, and receives the uplink signal from the user device 10 (U j), feeds back an ACK to the user device 10 (U j).
- Each site in the set of data transmission routes newly modulates the acquired user equipment symbol and then transmits it to the base station 30 through the background link.
- the symbol sequence to be transmitted may be a sequence estimation obtained by detecting a signal received by each site, or when each site performs detection, decoding processing, etc. on the symbol, It may be a symbol sequence newly generated by modulation when detection is successful, or a symbol detection result for a signal received by each site that is directly adopted when detection fails.
- the base station 30 performs detection and decoding processing on the received multiplexed signal.
- the base station 30 determines that the current transmission of the HARQ process has succeeded, selects one relay station 20 (R j ) that has fed back the ACK, and has already received it correctly.
- the uploaded user device 10 (U j ) data is uploaded.
- the base station transmits the retransmission control signal of the user apparatus 10 (U j ) to all sites in the set of signaling transmission routes through the background link. Then, after receiving the retransmission control signal, all sites in the set of signaling transmission routes downlink transmit a retransmission command to the user apparatus 10 (U j ) at a certain scheduling time. Then, after receiving the HARQ process retransmission instruction, the user apparatus 10 (U j ) performs retransmission at the corresponding time.
- Step 1 The base station 30 transmits an uplink scheduling command for the user equipment 10 (U j ) to all sites in the set of signaling transmission routes SR j .
- Step 2 All sites in the set of signaling transmission routes SR j schedule subframes through the physical downlink control channel (PDCCH) and send uplink scheduling commands for the relay user equipment 10 (U j ).
- the uplink scheduling command includes control information such as radio resource allocation and modulation scheme in the uplink of the user apparatus 10 (U j ).
- Step 3 The user equipment 10 (U j ) transmits a signal on the uplink resource allocated by the base station, and all sites in the data transmission route set DR j receive and detect the uplink signal. Decrypt.
- the signal from the user apparatus 10 (U j ) is Using the bit information obtained by decoding, a new symbol sequence is generated in accordance with a prescribed encoding and modulation scheme, and the new symbol sequence is stored.
- the CRC result for the data received from the user apparatus 10 (U j ) obtained by detection at each site in the set DR j of data transmission routes is a reception failure
- the data is received from the user apparatus 10 (U j ).
- the current symbol inspection result for the processed data is stored.
- all the uplink reference signals and random access signals of the corresponding user apparatus 10 (U j ) are measured by all the relay stations 20 (R j ) in the cell (or together with the base station 30). It is preferable to acquire the reception quality RSS j (or RSS j b ) of the uplink signal of the user apparatus 10 (U j ).
- Step 4 Regardless of whether the decoding process of the site in the data transmission route set DR j is correct for the data received from the user equipment 10 (U j ), all sites in the signaling transmission route set SR j are An ACK (successful reception) confirmation command is transmitted to the relay user apparatus 10 (U j ).
- Step 5 All sites in the set DR j of data transmission routes newly modulate the stored symbol sequence for the user equipment 10 (U j ), and then transmit it to the base station 30.
- the uplink signal reception quality RSS j (or RSS j b ) of the user apparatus 10 (U j ) measured by all the relay stations 20 (R j ) (or together with the base station 30) in the cell is It is preferable to perform uplink transmission to the station 30.
- Step 6 The base station 30 performs processing such as symbol detection, decoding, and inspection on the symbol sequence of the user equipment 10 (U j ) processed and fed back by all sites in the data transmission route set DR j . .
- the base station 30 determines that the reception of the current uplink transmission of the relay user apparatus 10 (U j ) is successful, and performs Step 10.
- the base station 30 determines that the reception for the current uplink transmission of the relay user device 10 (U j) fails, the scheduling for the retransmission of the relay user device 10 (U j) Do.
- the data of the corresponding user apparatus 10 (U j ) is updated.
- Step 7 The base station 30 sends a re-transmission command of the user equipment 10 (U j ) to all of the signaling transmission route set SR j through the background link between the relay station 20 (R j ) and the base station 30. Send downlink to site.
- Step 8 All sites in the set of signaling transmission routes SR j select an appropriate downlink transmission time and transmit a retransmission command to the relay user equipment 10 (U j ) in the downlink.
- the downlink transmission time needs to correspond to the same uplink HARQ process.
- Step 9 The relay user apparatus 10 (U j ) performs Step 3 after performing retransmission using the specified radio resource in response to the retransmission instruction.
- Step 10 The process ends when the uplink transmission is successful.
- the base station 30 transmits a control signal for downlink service transmission to all the sites in the set of signaling transmission routes through the background link between the base station 30 and the relay station 20 (R j ). Also, the service data is transmitted to all sites in the set of data transmission routes through the background link between the relay station 20 (R j ) and the base station 30. Then, all sites in the set of signaling transmission routes downlink transmit signaling related to downlink service transmission to the user apparatus 10 (U j ) at a certain scheduling time, and downlink resources allocated by the base station 30 The information data is downlink transmitted to the user apparatus 10 (U j ).
- the user apparatus 10 (U j ) performs CRC on the received data, and performs uplink feedback of ACK or NACK that is a check result. All sites in the set of data transmission routes receive uplink feedback for the current downlink transmission from the user equipment 10 (U j ) and then pass it between the base station 30 and the relay station 20 (R j ). Uplink transmission to the base station 30 through the background link. Then, the base station 30 processes the received multiplexed signal. For example, when the detected feedback is ACK, the base station 30 determines that the transmission of the process is successful, and when the detected feedback is NACK, It is determined that the transmission of the process has failed, and downlink retransmission scheduling is performed.
- FIG. 16 is a diagram illustrating another example of a time sequence of NACK feedback and retransmission in downlink HARQ using blank subframes.
- FIG. 17 is a diagram illustrating another example of a time sequence of NACK feedback and retransmission in downlink HARQ using MBSFN subframes.
- FIG. 18 is a diagram illustrating another example of an ACK feedback and retransmission time sequence in downlink HARQ using blank subframes.
- FIG. 19 is a diagram illustrating another example of an ACK feedback and retransmission time sequence in downlink HARQ using MBSFN subframes.
- Step 1 The base station 30 transmits downlink control signals including radio resource allocation, modulation scheme, and the like within the scheduling time to all sites in the set SR j of signaling transmission routes of the user apparatus 10 (U j ). while, transmits downlink to all sites in the set DR j of a data transmission route of the user device 10 the user equipment service data (U j) 10 (U j ).
- Step 2 All sites in signaling transmission route set SR j receive a control signal including radio resource allocation, modulation scheme, etc., and transmit it in a downlink through a physical downlink control channel (PDCCH). At the same time, all the sites in the data transmission route set DR j transmit the service data of the user equipment 10 (U j ) through the physical shared channel in the downlink. And applicable user apparatus 10 ( Uj ) receives the information data and control signal which were downlink-transmitted from the some site.
- PDCCH physical downlink control channel
- Step 3 The user apparatus 10 (U j ) performs processing such as symbol detection, decoding, and CRC on the received downlink service data based on the received control signal. For example, when the CRC is accurate, it means that the downlink transmission has been correctly received, and when a CRC error occurs, it means that there is an error in the reception of the downlink transmission.
- Step 4 User equipment 10 (U j ) performs uplink feedback of ACK or NACK, and all relay stations 20 (R j ) or all relay stations 20 (R j ) and base station 30 in the cell Receives uplink feedback from the user equipment 10 (U j ).
- all the uplink reference signals and random access signals of the user apparatus 10 (U j ) are measured by all the relay stations 20 (R j ) (or together with the base station 30) in the cell, It is preferable to acquire the reception quality RSS j (or RSS j b ) of the uplink signal of the corresponding user apparatus 10 (U j ).
- Step 5 All the sites in the set DR j of data transmission routes transmit uplink feedback from the user equipment 10 (U j ) to the base station 30 after newly modulating.
- the uplink signal reception quality RSS j (or RSS j b ) of the user apparatus 10 (U j ) that has already been measured by all the relay stations 20 (R j ) (or together with the base station 30) in the cell. ) Is preferably uplink transmitted to the base station 30.
- Step 6 If the feedback result received from each site is a reception failure of the user apparatus 10 (U j ), the base station 30 performs downlink retransmission scheduling and generates a corresponding control signal. Step 1 is then performed. Otherwise, step 7 is performed.
- the data of the corresponding user apparatus 10 (U j ) is updated.
- Step 7 End due to the current downlink transmission success.
- the determination of the set of signaling transmission routes and the set of data transmission routes of the user apparatus 10 (U j ) is not limited to the above-described embodiment. .
- the present invention can be applied to a cellular system in which relay stations communicate cooperatively.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
- Radio Relay Systems (AREA)
Abstract
Description
セル内の各中継局20が、同じ周波数帯域を共用する場合、中継を受けるユーザ装置(中継ユーザ装置)10は、セル内のすべての中継局20及び基地局30からの制御信号を受信することができ、各サイト(基地局30又は中継局20)から受信する信号の強度は、中継ユーザ装置10から各サイト(基地局30又は中継局20)までの距離及びシャドウィング等により決定される。この場合、ユーザ装置10の制御信号であるシグナリングの伝送ルート(以降、シグナリング伝送ルートと称する)の集合は、セル内のすべての中継局20、あるいは基地局30とすべての中継局20との集合である。なお、ユーザ装置10のデータチャネルにおいて、ユーザデータの伝送ルート(以降、データ伝送ルートと称する)の集合は、各サイトが受信した上りリンク信号の受信品質に基づいて、基地局30により確定されたサイトの集合である。このため、データ伝送ルートデータの集合は、中継ユーザ装置10に近づいている一部の中継局20の集合、あるいは、基地局30とユーザ装置(中継ユーザ装置10あるいは基地局30と接続するユーザ装置(基地局ユーザ装置)10)10に近づいている一部の中継局20との集合である。
[1]セル内すべての中継局20
[2]すべての中継局20と基地局30
[1]一部の中継局20
[2]基地局30と一部の中継局20
DU1=(R1)
DU2=(R2,R3)
DU3=(R3)
SU1=(R1)
SU2=(R2,R3)
SU3=(R3)
SU1=(R1,R2,R3)
SU2=(R1,R2,R3)
SU3=(R1,R2,R3)
あるいは、
SU1=(R1,R2,R3,eNb)
SU2=(R1,R2,R3,eNb)
SU3=(R1,R2,R3,eNb)
SU1=(R1,R2,R3)
SU2=(R1,R2,R3)
SU3=(R1,R2,R3)
基地局30は、ユーザ装置10のために割り当てられた上りリンクリソースを、中継局20と基地局30とのバックグランドリンクを通してシグナリング伝送ルートの集合におけるすべてのサイトに伝送する。シグナリング伝送ルートの集合におけるすべてのサイトは、あるスケジューリング時間において、無線リソース割り当ての制御指令をユーザ装置10に下りリンク送信する。ユーザ装置10は、上記無線リソースの割り当て制御指令を受信した後、スケジューリングされた無線リソースを用いて信号を上りリンク送信する。そして、データ伝送ルートの集合におけるすべてのサイトは、ユーザ装置10からの上りリンク信号を受信し、ACKをユーザ装置10にフィードバックするとともに、復調結果(ACKあるいはNACK)を基地局30にフィードバックする。そして、基地局30は、ユーザ装置10のデータ伝送ルートの集合におけるすべてのサイトから送信された、ACKあるいはNACK等のフィードバックを受信する。ここで、上りリンクHARQに関するフィードバックにACKが含まれる場合は、該HARQプロセスの現在の伝送が成功したことを意味する。一方、上りリンクHARQに関するフィードバックにNACKのみが含まれる場合は、該HARQプロセスの現在の伝送が失敗したことを意味する。この場合、基地局30は、ユーザ装置10の再送信制御信号を、バックグランドリンクを通して、シグナリング伝送ルートの集合内のすべてのサイトに伝送する。そして、シグナリング伝送ルートの集合内のすべてのサイトは、再送信制御信号を受信して、あるスケジューリング時間において、再送信指令をユーザ装置10に下りリンク送信する。また、ユーザ装置10は、該HARQプロセスの再送信指令を受信した後、対応する時刻において再送信を行う。
基地局30は、ユーザ装置10(Uj)のために割り当てられた上りリンクリソースを、中継局20(Rj)と基地局30とのバックグランドリンクを通して、シグナリング伝送ルートの集合におけるすべてのサイトに伝送する。シグナリング伝送ルートの集合におけるすべてのサイトは、あるスケジューリングの時間において、無線リソース割り当ての制御指令をユーザ装置10(Uj)に下りリンク送信する。そして、ユーザ装置10(Uj)は、無線リソース割り当ての制御指令を受信した後、スケジューリングされた無線リソースを利用して信号を上りリンク送信する。そして、データ伝送ルートの集合におけるすべてのサイトは、ユーザ装置10(Uj)からの上りリンク信号を受信し、ACKをユーザ装置10(Uj)にフィードバックする。データ伝送ルートの集合内の各サイトは、それぞれ取得したユーザ装置シンボルを、新たに変調した後、バックグランドリンクを通して基地局30に送信する。ここで、送信される上記シンボルシーケンスは、各サイトが受信した信号を検出して得たシーケンス推定であってもよいし、各サイトがシンボルに対して検出、復号処理等を行った場合に、検出成功したときに新たに変調して生成されたシンボルシーケンス、あるいは、検出失敗したときに直接採用する、各サイトが受信した信号に対するシンボル検出結果であってもよい。基地局30は、受信した多重信号に対して検出及び復号処理を行う。また、基地局30は、ACKの検出に成功した場合、該HARQプロセスの現在の伝送に成功したと判断し、ACKをフィードバックした1つの中継局20(Rj)を選択して、すでに正しく受信したユーザ装置10(Uj)データをアップロードする。CRCでNACKのみを検出した場合、基地局は、ユーザ装置10(Uj)の再送信制御信号を、バックグランドリンクを通してシグナリング伝送ルートの集合内のすべてのサイトに送信する。そして、シグナリング伝送ルートの集合におけるすべてのサイトは、再送信制御信号を受信した後、あるスケジューリングの時間において、再送信指令をユーザ装置10(Uj)に下りリンク送信する。そして、ユーザ装置10(Uj)は、該HARQプロセスの再送信指令を受信した後、対応する時刻において再送信を行う。
基地局30は、下りリンクサービス伝送の制御信号を、基地局30と中継局20(Rj)との間のバックグランドリンクを通して、シグナリング伝送ルートの集合におけるすべてのサイトに伝送する。また、サービスデータを、中継局20(Rj)と基地局30との間のバックグランドリンクを通して、データ伝送ルートの集合内のすべてのサイトに伝送する。そして、シグナリング伝送ルートの集合におけるすべてのサイトは、あるスケジューリングの時間に、下りリンクサービス伝送に関するシグナリングをユーザ装置10(Uj)に下りリンク送信するとともに、基地局30により割り当てられた下りリンクリソースにおいて、情報データをユーザ装置10(Uj)に下りリンク送信する。そして、ユーザ装置10(Uj)は、受信したデータに対してCRCを行い、検査結果となるACK或いはNACKを上りリンクフィードバックする。データ伝送ルートの集合におけるすべてのサイトは、ユーザ装置10(Uj)からの現在の下りリンク伝送に対する上りリンクフィードバックを受信した後、それを基地局30と中継局20(Rj)との間のバックグランドリンクを通して基地局30に上りリンク伝送する。そして、基地局30は、受信した多重信号を処理し、例えば、検出したフィードバックがACKである場合には、該プロセスの伝送が成功したと判断し、検出したフィードバックがNACKである場合には、該プロセスの伝送が失敗したと判断し、且つ下りリンク再送信スケジューリングを行う。
Claims (18)
- 基地局と少なくとも一つの中継局とを備えた中継協調セルラー通信システムの通信方法であって、
上記中継局あるいは上記中継局と上記基地局とにより、各ユーザ装置の上りリンク信号の受信品質を測定するステップと、
上記中継局により、測定した上記受信品質を上記基地局にフィードバックするステップと、
上記基地局により、上記中継局が測定した受信品質あるいは上記中継局と上記基地局とが測定した上記受信品質に基づいて、上記各ユーザ装置と上記基地局との間の伝送ルートを確定するステップとを含むことを特徴とする通信方法。 - 上記中継局あるいは上記中継局と上記基地局とによりユーザ装置の上りリンク信号の受信品質を測定するステップにおいて、
上記中継局あるいは上記中継局と上記基地局とは、上記ユーザ装置からの上りリンク参照信号あるいはランダムアクセス信号に対し、信号対雑音比と、搬送波対干渉波比と、受信電力とのうち、少なくとも一つを測定して、測定した結果を上記各ユーザ装置の上りリンク信号の受信品質とすることを特徴とする請求項1に記載の通信方法。 - 上記基地局により、上記中継局が測定した受信品質あるいは上記中継局と上記基地局とが測定した受信品質に基づいて、上記各ユーザ装置と上記基地局との間の伝送ルートを確定するステップにおいて、
上記基地局は、各ユーザ装置に対し、その受信品質が規定の閾値より大きいか否かを判断して、上記各ユーザ装置と上記基地局と間の伝送ルートを確定することを特徴とする請求項1又は2に記載の通信方法。 - 上記基地局により、上記中継局が測定した受信品質あるいは上記中継局と上記基地局とが測定した受信品質に基づいて、上記各ユーザ装置と上記基地局との間の伝送ルートを確定するステップにおいて、
上記基地局は、上記各ユーザ装置に対し、上記受信品質が最大となる個数の上記中継局を選択して、選択した中継局を、当該ユーザ装置のルートサイトとすることを特徴とする請求項1又は2に記載の通信方法。 - 基地局と少なくとも一つの中継局とを備えた中継協調セルラー通信システムの通信方法であって、
上記基地局により、上記基地局と上記中継局、あるいは上記中継局が測定した受信品質に基づいて、ユーザ装置のルートサイトを確定するステップと、
上記ユーザ装置により、割り当てられた上りリンクリソース上において信号を送信するステップと、
上記ユーザ装置の下りリンク受信、上りリンク送信、上りリンク再送信及び下りリンク再送信は、基地局の集中式スケジューリングを利用し、上記ルートサイトにより、スケジューリング制御情報を処理して上記ユーザ装置に転送するステップと、
上りリンクHARQ(Hybrid Automatic Repeat Request)メカニズムにおいて、上記中継局あるいは上記中継局と上記基地局とにより、それぞれ自局での上記ユーザ装置からの上りリンク信号の受信成功の取得の有無にかかわらず、正確受信の確認を上記ユーザ装置にフィードバックするステップとを含むことを特徴とする通信方法。 - 上記中継局あるいは上記中継局と上記基地局とにより、上記ユーザ装置からの上りリンク参照信号あるいはランダムアクセス信号に対し、信号対雑音比と、搬送波対干渉波比と、受信電力とのうち、少なくとも一つを測定して、測定した結果を上記ユーザ装置の上りリンク信号の受信品質とすることを特徴とする請求項5に記載の通信方法。
- 上記基地局により、上記中継局と上記基地局とが測定した受信品質あるいは上記中継局が測定した受信品質に基づいて、上記各ユーザ装置のルートサイトを確定するステップにおいて、
上記基地局は、上記各ユーザ装置に対し、上記受信品質が規定の閾値より大きいか否かを判断して、上記各ユーザ装置と上記基地局との間の伝送ルートを確定することを特徴とする請求項5に記載の通信方法。 - 上記基地局により、上記中継局と上記基地局とが測定した受信品質あるいは上記中継局が測定した受信品質に基づいて、上記各ユーザ装置の伝送ルートを確定するステップにおいて、
上記基地局は、上記各ユーザ装置に対し、上記受信品質が最大となる個数の上記中継局を選択して、選択した中継局を当該ユーザ装置のルートサイトとして確定することを特徴とする請求項5に記載の通信方法。 - 上記上りリンクHARQメカニズムにおいて、上記中継局は、上記ユーザ装置の上りリンク信号に対する復号検査結果を上記基地局にフィードバックすることを特徴とする請求項5に記載の通信方法。
- 上記上りリンクHARQメカニズムにおいて、上記中継局は、上記ユーザ装置から受信した上りリンク信号を処理し、新しいシンボルシーケンスを生成して、再変調してから、上記基地局に転送することを特徴とする請求項5に記載の通信方法。
- 上記上りリンクHARQメカニズムにおいて、上記基地局は、
受信したすべてのフィードバックが受信失敗という情報である場合、該当するユーザ装置の上りリンク再送信をスケジューリングし、
それ以外の場合、上記ユーザ装置の上りリンク信号の受信に成功したと判断することを特徴とする請求項5に記載の通信方法。 - 上記上りリンクHARQメカニズムにおいて、上記中継局は、上記ユーザ装置の上りリンク信号に対して復号検査を行い、
検査結果が正確受信である場合、復号後のビットを新たに符号化して変調し、新しく生成されたシンボルシーケンスを上記基地局への転送対象とし、
検査結果が受信失敗である場合、上記ユーザ装置の上りリンク信号に対してシンボル検出を行い、得られたシンボルシーケンスを上記基地局への転送対象とすることを特徴とする請求項5に記載の通信方法。 - 上記上りリンクHARQメカニズムにおいて、上記基地局は、複数のサイトから生成されたユーザ装置の上りリンク信号の新しいシンボルシーケンスを受信して復号検査を行い、
検査結果が成功の場合、上記ユーザ装置の上りリンク信号を正確に受信し、
検査結果が失敗の場合、上記ユーザ装置の再送信をスケジューリングすることを特徴とする請求項5に記載の通信方法。 - 上記上りリンクHARQメカニズムにおいて、上記基地局は、ACK(Acknowledgment)をフィードバックする中継局を選択してスケジューリングし、選択された中継局は、正確に受信した上記ユーザ装置の上りリンク信号を上記基地局に転送することを特徴とする請求項5に記載の通信方法。
- 基地局と少なくとも一つの中継局とを備えた中継協調セルラー通信システムであって、
上記中継局は、
ユーザ装置からの信号を受信する第1受信装置と、
上記第1受信装置が受信した上記ユーザ装置からの信号の受信品質を測定する第1測定装置と、
上記第1測定装置が測定した受信品質を上記中継局から上記基地局にフィードバックする転送装置とを備え、
上記基地局は、
上記ユーザ装置からの信号を受信する第2受信装置と、
上記第2受信装置が受信した上記ユーザ装置からの信号の受信品質を測定する第2測定装置と、
上記転送装置から受信した受信品質と上記第2測定装置が測定した受信品質とに基づいて、上記各ユーザ装置と上記基地局間との間の伝送ルートを確定する経路確定装置とを備えることを特徴とする中継協調セルラー通信システム。 - 上記第1測定装置及び第2測定装置は、上記ユーザ装置からの上りリンク参照信号あるいはランダムアクセス信号に対し、信号対雑音比と、搬送波対干渉波比と、受信電力とのうち、少なくとも一つを測定して、測定した結果を上記ユーザ装置の上りリンク信号の受信品質とすることを特徴とする請求項15に記載の中継協調セルラー通信システム。
- 上記経路確定装置は、上記各ユーザ装置に対し、上記受信品質が規定の閾値より大きいか否かを判断して、上記各ユーザ装置と上記基地局との間の伝送ルートを確定することを特徴とする請求項15又は16に記載の中継協調セルラー通信システム。
- 上記経路確定装置は、上記ユーザ装置に対し、上記受信品質が最大となる個数の中継局を選択して、選択した中継局を当該ユーザ装置のルートサイトとすることを特徴とする請求項15又は16に記載の中継協調セルラー通信システム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010548447A JP5490730B2 (ja) | 2009-02-02 | 2010-02-02 | 中継装置、ユーザ装置、中継協調通信システム、及び通信方法 |
| US13/146,956 US20120015662A1 (en) | 2009-02-02 | 2010-02-02 | Relay collaborative communication system and communication method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN200910009652A CN101795169A (zh) | 2009-02-02 | 2009-02-02 | 中继协助通信系统及其方法 |
| CN200910009652.0 | 2009-02-02 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2010087209A1 true WO2010087209A1 (ja) | 2010-08-05 |
Family
ID=42395471
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2010/000598 Ceased WO2010087209A1 (ja) | 2009-02-02 | 2010-02-02 | 中継協調通信システム及びその通信方法 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20120015662A1 (ja) |
| JP (1) | JP5490730B2 (ja) |
| CN (1) | CN101795169A (ja) |
| WO (1) | WO2010087209A1 (ja) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015533466A (ja) * | 2012-11-02 | 2015-11-24 | クゥアルコム・インコーポレイテッドQualcomm Incorporated | ダウンリンク動作とアップリンク動作とを分離するための技法 |
| US9276660B2 (en) | 2013-11-18 | 2016-03-01 | Fujitsu Limited | Control apparatus, control method, and wireless communication system |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101170797B (zh) * | 2006-10-25 | 2012-03-14 | 诺基亚西门子网络两合公司 | 利用中继站协助处理用户终端的请求的方法及装置 |
| WO2011097817A1 (zh) * | 2010-02-11 | 2011-08-18 | 上海贝尔股份有限公司 | 中继无线通信系统中通信方法和相关装置 |
| US9281889B2 (en) * | 2010-02-16 | 2016-03-08 | Lg Electronics Inc. | Relay node apparatus for transmitting and receiving signal according to link operation mode in wireless communication system and method thereof |
| KR101875611B1 (ko) | 2010-11-22 | 2018-07-06 | 엘지전자 주식회사 | 무선 통신 시스템에서 하향링크 전송에 대한 확인응답의 전송 방법 및 장치 |
| CN103597893B (zh) * | 2011-06-13 | 2017-08-08 | 瑞典爱立信有限公司 | 使用中继的无线通信系统中的子载波分配 |
| CN102457366A (zh) * | 2012-01-06 | 2012-05-16 | 中兴通讯股份有限公司 | 透明中继网络中的数据重传方法及装置 |
| WO2013109171A1 (en) * | 2012-01-16 | 2013-07-25 | Telefonaktiebolaget L M Ericsson (Publ) | Method and arrangement for relaying |
| US9265047B2 (en) * | 2012-04-04 | 2016-02-16 | Qualcomm Incorporated | Procedures to activate opportunistic relays |
| CN103580828A (zh) * | 2012-08-06 | 2014-02-12 | 夏普株式会社 | 发送/接收harq消息的方法,基站和用户设备 |
| JP5920111B2 (ja) * | 2012-08-24 | 2016-05-18 | 富士通株式会社 | 通信制御装置、通信システム及び通信方法 |
| CN104113400B (zh) * | 2013-04-18 | 2017-07-28 | 上海交通大学 | 双路径d2d系统中的混合自动重传方法和频率调度方法 |
| CN105379385B (zh) * | 2013-10-22 | 2019-03-05 | 华为技术有限公司 | 一种数据传输方法和设备 |
| WO2015180181A1 (zh) | 2014-05-30 | 2015-12-03 | 华为技术有限公司 | 数据传输方法及基站 |
| CN105323044B (zh) * | 2014-07-15 | 2018-09-25 | 中国移动通信集团公司 | 一种数据调度方法、装置和带内中继 |
| TWI577205B (zh) * | 2015-05-08 | 2017-04-01 | 宏碁股份有限公司 | 行動通訊裝置及服務持續方法 |
| CN106470484A (zh) * | 2015-08-14 | 2017-03-01 | 中兴通讯股份有限公司 | 一种用户设备模拟基站通信的方法、用户设备和基站 |
| GB201520008D0 (en) * | 2015-11-12 | 2015-12-30 | Telensa Ltd | Methods and apparatus for transmitting data in a network |
| JPWO2017126518A1 (ja) * | 2016-01-22 | 2018-11-08 | 株式会社Nttドコモ | 無線基地局及び通信制御方法 |
| CN105682173A (zh) * | 2016-03-16 | 2016-06-15 | 青岛海信移动通信技术股份有限公司 | 一种接入网络的方法和设备 |
| CN107306417B (zh) * | 2016-04-17 | 2019-09-06 | 上海朗帛通信技术有限公司 | 一种窄带移动通信的ue和基站中的方法和装置 |
| US10250340B1 (en) | 2017-02-27 | 2019-04-02 | Sprint Communications Company L.P. | Wireless relay directional testing |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007504750A (ja) * | 2003-09-03 | 2007-03-01 | モトローラ・インコーポレイテッド | 通信の中継を容易にする方法及び装置 |
| WO2008035600A1 (en) * | 2006-09-20 | 2008-03-27 | Panasonic Corporation | Relay transmission device and relay transmission method |
| JP2008167141A (ja) * | 2006-12-28 | 2008-07-17 | Nec Corp | データ伝送方法および装置、それを用いた通信システム |
| JP2008172759A (ja) * | 2007-01-08 | 2008-07-24 | Mitsubishi Electric Research Laboratories Inc | 中継ネットワークにおいてパケットを通信する方法 |
| WO2008129677A1 (ja) * | 2007-04-18 | 2008-10-30 | Fujitsu Limited | 無線中継システムにおける再送制御方法並びに無線中継局及び無線基地局 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101170351B (zh) * | 2006-10-23 | 2012-07-04 | 株式会社Ntt都科摩 | 一种数据传输方法 |
-
2009
- 2009-02-02 CN CN200910009652A patent/CN101795169A/zh active Pending
-
2010
- 2010-02-02 WO PCT/JP2010/000598 patent/WO2010087209A1/ja not_active Ceased
- 2010-02-02 JP JP2010548447A patent/JP5490730B2/ja not_active Expired - Fee Related
- 2010-02-02 US US13/146,956 patent/US20120015662A1/en not_active Abandoned
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007504750A (ja) * | 2003-09-03 | 2007-03-01 | モトローラ・インコーポレイテッド | 通信の中継を容易にする方法及び装置 |
| WO2008035600A1 (en) * | 2006-09-20 | 2008-03-27 | Panasonic Corporation | Relay transmission device and relay transmission method |
| JP2008167141A (ja) * | 2006-12-28 | 2008-07-17 | Nec Corp | データ伝送方法および装置、それを用いた通信システム |
| JP2008172759A (ja) * | 2007-01-08 | 2008-07-24 | Mitsubishi Electric Research Laboratories Inc | 中継ネットワークにおいてパケットを通信する方法 |
| WO2008129677A1 (ja) * | 2007-04-18 | 2008-10-30 | Fujitsu Limited | 無線中継システムにおける再送制御方法並びに無線中継局及び無線基地局 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015533466A (ja) * | 2012-11-02 | 2015-11-24 | クゥアルコム・インコーポレイテッドQualcomm Incorporated | ダウンリンク動作とアップリンク動作とを分離するための技法 |
| US9276660B2 (en) | 2013-11-18 | 2016-03-01 | Fujitsu Limited | Control apparatus, control method, and wireless communication system |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2010087209A1 (ja) | 2012-08-02 |
| CN101795169A (zh) | 2010-08-04 |
| US20120015662A1 (en) | 2012-01-19 |
| JP5490730B2 (ja) | 2014-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5490730B2 (ja) | 中継装置、ユーザ装置、中継協調通信システム、及び通信方法 | |
| US9445380B2 (en) | Method and apparatus for power control and interference coordination | |
| JP6510121B2 (ja) | 通信装置、再送制御方法、及び集積回路 | |
| US8693413B2 (en) | Wireless communication base station device, wireless communication relay device, wireless communication terminal device, packet retransmission method, and wireless communication system | |
| EP1976175B1 (en) | Apparatus and method for asynchronous control message transmission for data retransmission in wireless relay communication system | |
| WO2018059282A1 (en) | System and method for d2d communication | |
| US20180092023A1 (en) | Data throughput for cell-edge users in a lte network using down-link repeaters and up-link harq relays | |
| US9461800B2 (en) | Retransmitting communications in a mobile network using small cell clusters | |
| JP5598535B2 (ja) | 移動通信システム、無線中継装置、移動通信装置および無線通信方法 | |
| US10708896B2 (en) | Wireless communication system, wireless base station, wireless terminal, and wireless communication method | |
| US20080248793A1 (en) | Apparatus and method for data retransmission in multihop relay wireless communication system | |
| KR101335971B1 (ko) | 무선 중계 방법 및 디바이스 | |
| US9118479B2 (en) | Mobile communication system | |
| JP2013138441A (ja) | 多重ホップ中継方式を使用する無線通信システムにおけるデータ再送信装置及び方法 | |
| JP2020072318A (ja) | 無線通信装置、無線通信システム、無線通信方法及びプログラム | |
| EP4352899B1 (en) | Hybrid automatic repeat request transfer | |
| CN101888701B (zh) | 一种避免上行链路干扰的方法 | |
| KR20190049443A (ko) | Tdd 방식 이동 통신 시스템에서의 저지연 통신 방법 및 장치 | |
| JP2020072319A (ja) | 無線通信装置及び無線通信システム | |
| WO2012020917A1 (ko) | 중계기 지원 무선 통신 시스템에서 데이터 송수신 방법 및 장치 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10735679 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2010548447 Country of ref document: JP Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13146956 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 10735679 Country of ref document: EP Kind code of ref document: A1 |