WO2008135608A1 - Structure de support pour coffrage de murs - Google Patents
Structure de support pour coffrage de murs Download PDFInfo
- Publication number
- WO2008135608A1 WO2008135608A1 PCT/ES2008/000134 ES2008000134W WO2008135608A1 WO 2008135608 A1 WO2008135608 A1 WO 2008135608A1 ES 2008000134 W ES2008000134 W ES 2008000134W WO 2008135608 A1 WO2008135608 A1 WO 2008135608A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wall
- support
- platform
- support structure
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
Definitions
- the present invention relates to a support structure for formwork of walls of suspended type, which allows achieving sensible advantages with respect to what is currently known.
- Suspended structures for wall formwork are intended to provide the means for the workers who make the formwork to carry out their work as the wall is being built, increasing its height.
- double-type structures are used to achieve high heights of formwork handling. Said structures have, apart from their work platform or upper "console”, an important prolongation in the lower part or second "console”, allowing work in sections of the wall located below the work platform.
- this type of structure suffers from a main problem due to its large dimensions that make it difficult to assemble the structure in the work by means of lifting cranes, especially in the initial phase of lifting the structure of the ground, where it will be mounted , until its placement for the start of the work of the same. Given the size of the structure with double console, the lifting operation is complicated by the lack of sufficient transverse stiffness of said structure, which is simply intended for its suspension coupling to the wall that will gradually be concreted.
- the present invention is also intended for cover important aspects of security of the double consoles currently known, since in these, when reaching sensitive heights, in the order of 6 meters, the part of the structure that lies below the work platform presents itself security problems for operators who must work on it and who eventually have to move from the work platform to the lower platform mentioned, since a height of the order of 6 meters can represent dangers in case of personnel falls.
- the present invention is based on constituting the part of the structure located below the work platform by several sections of lower height, for example, 2 meters, placing in each of them a platform of auxiliary work and constituting said sections in an articulated manner with each other, so that the rear part of each section, that is, the one adjacent to the wall under construction, which bears the auxiliary work platform, will be articulated by the two ends, upper and lower. lower, while the front part of each section will be in a first phase, disassembled by its lower part and articulated by its upper part, thus allowing the free movement and adaptation of the structure as a whole in the lifting phase from the horizontal position to move to the vertical or suspension position.
- each section of the structure is integrally fixed, giving rigidity to the assembly and allowing 'structure with double console normal working arrangement with a working platform main and several auxiliary platforms, preferably three, one for each of the lower sections with an approximate height of 2 meters.
- the upper part of the console which supports the shuttering panels, will be movable so that the set of the shuttering panels can move backwards, separating from the part of the wall already set, and forward, to occupy the work position.
- These shuttering panels will also be vertically displaceable, for the purpose of adjusting their working position.
- Figure 1 shows a schematic side elevation view of the set of elements of the support structure for formwork of walls object of the present invention, with a main platform and three sections, the two lower articulated.
- FIG. 2 shows a front view of the elements represented in figure 1.
- Figure 3 shows a perspective view of a structure corresponding to Figures 1 and 2, an auxiliary platform having been omitted for purposes of greater clarity.
- Figures 4 and 5 show respective side and perspective views of an element of the lower section coupled to the work platform of the structure, with a mast for supporting the protection handrails.
- Figure 6 shows a perspective view of part of an element such as those depicted in FIGS. Figures 5 and 6, with the mast carrying the protection handrails in folded arrangement.
- Figure 7 is a view similar to that of figure ⁇ but with the mast carrying the protection handrails raised.
- Figure 8 shows a detail of the interlocking means of the mast carrying the protection handrails with respect to the gusset.
- Figure 9 shows a detail of the arrangement of means for effecting the adjustment of the shuttering panel in a vertical direction and in a horizontal direction.
- the support structure for wall formwork comprises an upper module -1- carrier of the panels -2- for wall formwork and a work platform -3- as well as masts - 4- for protection handrails, said module being extended inferiorly in several articulated sections or modules arranged one after the other, such as those indicated with the numerals -5-, -6- and -7-, each of which will have an approximate height of 2 meters and will present an auxiliary work platform, indicated respectively with the numerals -8-, -9- and -10-.
- the whole of the structure is intended to be suspended in the wall as its setting permits.
- anchors will be fixed, for example -11- and -12- in the wall, allowing the suspension of the structure of said anchors.
- the sections of structure or modules -5-, -6- and -7- have a predetermined height to avoid risks in the bricks, for example, about 2 meters, to achieve greater security within each section, since the height of each of them does not represent any special danger for the staff in the event of a fall, as occurs with the current sections that reach 6 meters.
- the modules -6- and -7- are articulated with the corresponding front and rear platforms.
- the structure can be lifted simply by means of a crane, said modules articulating with each other.
- the fastening of the front elements of each module takes place after the vertical positioning of the structure, as will be explained in more detail below.
- Each of the modules -5-, -6- and -7- is constituted in the form of a kind of cage, which in the case of the module -5- is constituted by a minimum of two end elements such as that represented in FIG. figure 1, formed by a rear arm -13- that will be adjacent to the wall, a front arm -14- as opposed to the wall and the support -15- for the main or work platform and the lower support -8- for a platform assistant.
- the arm -14- will carry supports -16- and -17-, in variable number, for the incorporation of protection handrails.
- the upper module -1- has a support frame -18- of the board or formwork panels -2-, said frame -18- being tiltable with respect to a lower pivot point by the action of an adjustable brace -19- incorporated between the support -15- and said frame -18-.
- an adjustable brace -19- incorporated between the support -15- and said frame -18-.
- Figure 9 shows the threaded spindle horizontal displacement and tightening -30-, which is capable of horizontally moving and press the formwork board -2-, which presents the vertical plate -31-, for its frontal coupling to the part adjacent to the upper edge of the concrete wall -32-.
- the arrangement shown in the figure achieves a correct seal to prevent leaks in the pouring of concrete.
- the vertical displacement is achieved by the vertical spindle -33-, which allows the vertical movement of the formwork board -2- and front plate -31- to achieve the desired height position.
- Figures 4, 5, 6, 7 and 8 show construction details of one of the elements of the module -5-, that is, of the first module located below the support -15- of the platform.
- the specific embodiment of one of the elements of the module -5- comprises support crossings -8- and -15-, respectively for an auxiliary platform and for the main working platform as well as a vertical rear arm -13- and a front arm -14- carrier of the supports -16- and -17- for elements of guardrail.
- the elements -8-, -13-, -14- and -15- are rigidly joined to each other with a reinforcing rod-shaped bar -20-, forming a resistant frame that with the arrangement of the corresponding platforms and railing elements will form, together with another symmetrical element at the other end of the formwork support structure, the modular element with general cage structure -5-, which is the first below the work platform.
- the horizontal element -8- is extended on the side adjacent to the wall in a shoulder -21- of the wall, complementing with another projection -22- at the height of the fixation of the tie -20- and a third superior projection - 23- which is a prolongation of the support crossbar -15- and a lower reinforcing plate -24- carrying an angle-shaped groove -25- with the rounded apex directed upwards, carrying a pin -26- which in a The end of the slot prevents accidental disassembly of the support structure of the formwork, while at the other end allows free vertical movement of the structure to occupy another position at a higher height.
- the crosspiece -15- carries the strut -4- to support the railing elements, so that said strut -4- is mounted in an articulated manner on said crosspiece -15-, having two stable positions, one of which is represented in figures 4 and 5 to allow the operation of the struts -4- as supports for the railing elements and another folding position that will be explained based on figures 6, 7 and 8, which facilitates transport and storage.
- the strut -4- is articulated on a pin -27- and has a second hole near its end with a second pin -28- which is capable of being arranged as shown in figure 8, for the retraction position, or it can be arranged through the hole -29- located near the end of the crossbar -15-, vertically immobilizing said arm -A- as it is seen in figure 7.
- the lower modules -6- and -7- are articulated, being formed by rear arms -35- and -36- and front arms -38- and -39-, articulated at their ends, as shown and the auxiliary platforms -8-, -9- and -10-.
- the The support structure of the shuttering for walls will be suspended from the anchors fixed in the wall itself, for which the adjacent ends of the structure are carriers of plates with housings for the mentioned anchors.
- Figure 5 shows one of said plates -34- provided with an opening -35-, whose mouth is directed downwards and is intended to coincide in the anchors previously fixed in the wall, for the suspension of the support structure of formwork.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| MX2009011977A MX337744B (es) | 2007-05-08 | 2008-03-12 | Estructura de soporte para encofrado de muros. |
| BRPI0811439-0A2A BRPI0811439A2 (pt) | 2007-05-08 | 2008-03-12 | Estrutura de suporte para revestimento de paredes. |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200701232A ES2288438B1 (es) | 2007-05-08 | 2007-05-08 | "estructura de soporte para encofrado de muros". |
| ESP200701232 | 2007-05-08 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2008135608A1 true WO2008135608A1 (fr) | 2008-11-13 |
Family
ID=38858660
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/ES2008/000134 Ceased WO2008135608A1 (fr) | 2007-05-08 | 2008-03-12 | Structure de support pour coffrage de murs |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP1990482B1 (fr) |
| BR (1) | BRPI0811439A2 (fr) |
| ES (2) | ES2288438B1 (fr) |
| MX (1) | MX337744B (fr) |
| WO (1) | WO2008135608A1 (fr) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102018202097A1 (de) * | 2018-02-12 | 2019-08-14 | Peri Gmbh | Klettersystem und Verfahren zum Betrieb eines Klettersystems |
| DE102019204713A1 (de) * | 2019-04-03 | 2020-10-08 | Hünnebeck GmbH | Schalungssystem für die Herstellung von Betonwänden |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1301756A (fr) * | 1970-12-14 | 1973-01-04 | ||
| DE2445383A1 (de) * | 1974-09-23 | 1976-04-08 | Oesterr Doka Schalung | Kletterschalung |
| ES429713A1 (es) * | 1973-08-31 | 1976-08-16 | Samep S A | Dispositivo para el montaje de encofrados destinados al hormigonado de muros. |
| FR2393127A1 (fr) * | 1977-06-03 | 1978-12-29 | Dyckerhoff & Widmann Ag | Installation pour la realisation de constructions en beton arme courbees en plan et en elevation par un processus de grimpement |
| EP0512428A1 (fr) * | 1991-05-03 | 1992-11-11 | Peri Gmbh | Plate-forme de travail pour murs ou coffrages |
| GB2263497A (en) * | 1992-01-21 | 1993-07-28 | Sgb Holdings Ltd | Climbing formwork |
| WO2007000139A1 (fr) * | 2005-06-29 | 2007-01-04 | Peri Gmbh | Systeme grimpant guide sur des rails |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR1562186A (fr) * | 1968-02-19 | 1969-04-04 | ||
| DE2361110A1 (de) * | 1973-12-07 | 1975-06-26 | Oesterr Doka Schalung | Kletterschalung fuer betonwaende |
-
2007
- 2007-05-08 ES ES200701232A patent/ES2288438B1/es not_active Expired - Fee Related
-
2008
- 2008-03-12 MX MX2009011977A patent/MX337744B/es active IP Right Grant
- 2008-03-12 BR BRPI0811439-0A2A patent/BRPI0811439A2/pt not_active Application Discontinuation
- 2008-03-12 WO PCT/ES2008/000134 patent/WO2008135608A1/fr not_active Ceased
- 2008-03-13 EP EP08380087.0A patent/EP1990482B1/fr active Active
- 2008-03-13 ES ES08380087.0T patent/ES2543844T3/es active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1301756A (fr) * | 1970-12-14 | 1973-01-04 | ||
| ES429713A1 (es) * | 1973-08-31 | 1976-08-16 | Samep S A | Dispositivo para el montaje de encofrados destinados al hormigonado de muros. |
| DE2445383A1 (de) * | 1974-09-23 | 1976-04-08 | Oesterr Doka Schalung | Kletterschalung |
| FR2393127A1 (fr) * | 1977-06-03 | 1978-12-29 | Dyckerhoff & Widmann Ag | Installation pour la realisation de constructions en beton arme courbees en plan et en elevation par un processus de grimpement |
| EP0512428A1 (fr) * | 1991-05-03 | 1992-11-11 | Peri Gmbh | Plate-forme de travail pour murs ou coffrages |
| GB2263497A (en) * | 1992-01-21 | 1993-07-28 | Sgb Holdings Ltd | Climbing formwork |
| WO2007000139A1 (fr) * | 2005-06-29 | 2007-01-04 | Peri Gmbh | Systeme grimpant guide sur des rails |
Also Published As
| Publication number | Publication date |
|---|---|
| ES2543844T3 (es) | 2015-08-24 |
| EP1990482B1 (fr) | 2015-06-17 |
| MX337744B (es) | 2016-03-16 |
| EP1990482A3 (fr) | 2013-05-29 |
| ES2288438A1 (es) | 2008-01-01 |
| MX2009011977A (es) | 2009-11-19 |
| BRPI0811439A2 (pt) | 2014-11-18 |
| ES2288438B1 (es) | 2008-09-16 |
| EP1990482A2 (fr) | 2008-11-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| ES2644927T3 (es) | Elementos de andamio horizontales y verticales pivotantes, y método para montar una plataforma de andamio desplazable | |
| ES2961893T3 (es) | Sistema de andamio modular y larguero modificado con superficie continua de trabajo | |
| ES2326010A1 (es) | Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas. | |
| ES2904808T3 (es) | Disposición de unión | |
| ES2424631T3 (es) | Panel de forma ajustable para el encofrado de muros curvados | |
| WO2008135608A1 (fr) | Structure de support pour coffrage de murs | |
| ES2321132T3 (es) | Mensula de soporte de escalera. | |
| WO2015140357A1 (fr) | Système pour le montage/démontage de pales sur des aérogénérateurs | |
| ES2714831T3 (es) | Dispositivo de transporte aéreo con elemento de seguridad | |
| ES2657796T3 (es) | Torre de lavado para cubas de hormigón, que comprende unos patines de centrado de las caras inclinadas de estas cubas | |
| ES2209644B1 (es) | Andamio de fachada. | |
| ES2387199T3 (es) | Sistema de barandilla | |
| ES2355949T3 (es) | Plataforma elevadora y procedimiento para el montaje de una plataforma elevadora. | |
| ES2366847A1 (es) | Grúa con brazo elevable provisto de un sistema de enclavamiento mecánico. | |
| ES2539930T3 (es) | Torre de apuntalamiento modular para la ingeniería civil y la construcción | |
| ES2264334B1 (es) | "grua de torre con brazo y contrabrazo sin tirantes de sostenimiento". | |
| WO2024057161A1 (fr) | Échafaudage d'escalade préassemblé comprenant un système de translation avec chariot et panneau gang | |
| ES2260732T3 (es) | Dispositivo de proteccion, de barras cruzadas, para torres de andamios. | |
| ES3001357T3 (en) | Railing device, namely an intermediate railing for a scaffolding | |
| ES2561907B1 (es) | Accesorio nivelador para mantener el nivel de un panel horizontal de encofrado y sistema de encofrado que lo comprende | |
| ES2285959A1 (es) | "sistema de encofrado para zunchos perimetrales de estructuras de hormigon". | |
| ES1177734U (es) | Andamio de fachada. | |
| ES2981486T3 (es) | Un aparato contrapesado de protección contra caídas | |
| WO2012069663A1 (fr) | Système de support en hauteur de divers dispositifs | |
| ES2352389B1 (es) | Sistema de protección abatible para la construcción previo al encofrado. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08750377 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2009/011977 Country of ref document: MX |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 7185/DELNP/2009 Country of ref document: IN |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 08750377 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: PI0811439 Country of ref document: BR Kind code of ref document: A2 Effective date: 20091106 |